Page 1: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

Hall D Design StatusGlueX Collaboration Meeting

JLab, December 11-13, 2003 Ravi Anumagalla

Page 2: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

Hall D Subsystems

• Solenoid – Iron yokes – Cryostats– Filler plates

• Veto – Scintillators– Iron plates

• Cerenkov detector • Cylindrical Drift Chamber• Forward Drift chamber • Replacement of thermal shields in the cryostat• Barrel Calorimeter

} Require

Support Structures &

Maintenance Platforms

Work is being done to support the BC to the iron yokes

Page 3: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

CDC

FDC Barrel Calorimeter

Iron Yokes

VETO

Cryo Stat

Target

Vertex Detector

Page 4: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla
Page 5: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

More data needed for Cerenkov detector

How is the veto fixed to the upstream end ?

Page 6: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

• The components are extracted by “4 ft” from each o other to facilitate future maintenance

• The detector requires a “platform” to support the ex t extracted components

Page 7: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

• Structures are designed to accommodate the solenoid and the Cerenkov detector

• Rails are provided to move the components backwards for having access to the FDC’s for maintenance

Support Structures

Page 8: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

Top View of the HALL

• The Platform is 8 ft from the base

• Supports the extracted

components

• Assists in assembling the parts

Detector Platform

Page 9: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

A hole is necessary in the platform to gain access to the upstream veto

Rails are provided to extract the veto in the forward direction

Service Platform

Page 10: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

The CDC enclosed in the Fiber Glass Cylinder is inserted into the Barrel Calorimeter supported by the rails

CDC

Barrel Calorimeter

CDC OD : 120cm

BC OD : 130cm

Page 11: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

CDC Fiber Glass Cylinders with the rails Barrel Calorimeter

Rails Attached to the Fiber glass

Page 12: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

A removable access platform is used for maintenance of CDC, target and vertex detector

Page 13: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

The temporary platform is supported on the rollers

Alignment features can be included to maintain the precision while extraction/installation

Page 14: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla
Page 15: Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

CONCLUSION

• Support structures for the hall D components have been built and drawing are created for fabrication

• Concept extraction mechanisms have been proposed for review

• Need a discussion with the individual subsystem collaborators to verify the geometry of the models in CAD ( Barrel Calorimeter, Forward VETO,CDC, FDC, Target and Vertex Detector)

• Comments and suggestions for improving the Design