hampton bays@ crossroads

26
HAMPTON BAYS@ CROSSROADS Hampton Bays Corridor Strategic Plan Draft Generic Environmental Impact Statement (DGEIS) Eve Houlihan HBCA Board Member& HBGEIS Ad Hoc Committee

Upload: skip

Post on 14-Jan-2016

37 views

Category:

Documents


1 download

DESCRIPTION

HAMPTON BAYS@ CROSSROADS. Hampton Bays Corridor Strategic Plan Draft Generic Environmental Impact Statement (DGEIS) Eve Houlihan HBCA Board Member& HBGEIS Ad Hoc Committee. STATUTORY AUTHORITY. Intent of State Regulations Study Diversity of Resources & Conditions - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HAMPTON BAYS@ CROSSROADS

HAMPTON BAYS@ CROSSROADS

Hampton Bays Corridor Strategic PlanDraft Generic Environmental Impact Statement

(DGEIS)Eve Houlihan

HBCA Board Member& HBGEIS Ad Hoc Committee

Page 2: HAMPTON BAYS@ CROSSROADS

STATUTORY AUTHORITY

• Intent of State Regulations• Study Diversity of Resources & Conditions• Development of Comprehensive Plan• Once Adopted– All Town Land Use Regulations Must Be In

Accordance With Plan

Page 3: HAMPTON BAYS@ CROSSROADS

MORATORIA

• Community MUST Be Actively Engaged:– Development– Revision– New Regulations

• Comprehensive Plan Becomes A Living Document

Page 4: HAMPTON BAYS@ CROSSROADS

PURPOSE

• Impetus For Moratorium & GEIS– Escalating Development– Rapid & Dense Growth– Increasing Infrastructure Stress/Taxes– Environmental Concerns

Page 5: HAMPTON BAYS@ CROSSROADS

COMMITTEE STRUCTURE

• 13 Community Representatives• Southampton Land Management

Representative(s)• Committee Interaction With:– Hutton Associates (January 2009)– Cashin & Associates (January 2010)

• Town Board Liaison (Supervisor)

Page 6: HAMPTON BAYS@ CROSSROADS

CHRONOLOGY

• 2008– June 10: Hampton Bays Corridor Moratorium– June 20: Scoping Session• Topics to be Studied Selected

– August 12: Moratorium Boundaries Expanded– August 26: Final Scope of GEIS Adopted– November 4: Ad-Hoc Committee Introductory

Meeting

Page 7: HAMPTON BAYS@ CROSSROADS

CHRONOLOGY

• 2009– Eleven Meetings of Ad-Hoc Committee

• 2010– Three Meetings of Ad-Hoc Committee

Page 8: HAMPTON BAYS@ CROSSROADS

POPULATION STATISTICS

• Census Hampton Bays Balance of SH Town• 1990 8,134 37,775• 2000 12,236 42,980• 2010 14,500 (Projected)

• Density 1,016 339* Factor Per Sq. Mile (*Not Including HB)

Page 9: HAMPTON BAYS@ CROSSROADS

NOTE!

• 50% Increase Between 1990 and 2000• 78% Increase Between 1990 and 2010!

• 1970 Master Plan for Hampton Bays Indicated:– Maximum Population for Hampton Bays Should

NOT EXCEED 9,274 Due to:• Available Fresh Water Supply• Problems of Sanitary Waste Disposal

Page 10: HAMPTON BAYS@ CROSSROADS

BUILD-OUT NUMBERS

• 82% of all parcels are One Acre or Less• DGEIS Estimated Build-Out numbers are

reported as totaling 1,015 New Units:– 550 New Single Family Residences– 200 Potential Accessory Apartments

– 15 Potential L.I. Workforce Housing Act bonus

density units– 250 Condominium Units potentially resulting

from motel/condo conversion

Page 11: HAMPTON BAYS@ CROSSROADS

BUILD-OUT NUMBERS

• Based on these “estimates” the DGEIS projects a total new population of Plus 2,018 “New Baymen” (Represented as “Conservative” )

• Estimated Hampton Bays Population Could Grow to 16,500

• 103% Increase from 1990!

Page 12: HAMPTON BAYS@ CROSSROADS

HAMPTON BAYS SCHOOLS

• Capacity 2,080

• Current Enrollment (2009–2010) 1,998

• 96% of Capacity

• 12.06% Spike Between 2008 and 2009

• Third Highest School Taxes

• Serving the largest population– 22% of Town-wide total (2000)

Page 13: HAMPTON BAYS@ CROSSROADS

HOUSING VALUES & TAXES

• Housing Values have Lagged Behind Town-Wide Median Prices

• Sharp Growth in that Discrepancy in Recent Years

• Prevailing Tax Disparity between Single Family Residences (SFR) & Condos– Condos Assessed at Approx. 50% of Market Value

– Disproportionately Shifting Tax Burdens to SFRs.

Page 14: HAMPTON BAYS@ CROSSROADS

WATER SUPPLY

• Increased Water Consumption due to Population Growth and Household Use

• Stress on Water District Infrastructure

• Future Transmission of Adequate Water Supply throughout the District has been linked to Needed Installation of 16” or Larger Water Mains

Page 15: HAMPTON BAYS@ CROSSROADS

EMS

• Pressures on the Hampton Bays Ambulance Corps have Risen in Tandem with Population Increases

• As full time Residents have Increased, so have calls for Pediatric and Aging Adult Aid

Page 16: HAMPTON BAYS@ CROSSROADS

PROPOSED ACTIONS

Hampton Bays Corridor Strategic Plan recommendations

Page 17: HAMPTON BAYS@ CROSSROADS

LAND USE PLANNING AND ZONING

• Amend the Zoning Map to apply Hamlet Office (HO) and Hamlet Commercial (HC) Districts (in Highway Business and/or Other Districts)

• Enact Location-Specific Design Standards• Refine the use of PDD Rezoning to make the

process more transparent and accountable• Acquire Vacant Properties on Montauk Highway

near Bittersweet South Extension to preserve for Open Space on Montauk Highway and facilitate proposed road improvements

Page 18: HAMPTON BAYS@ CROSSROADS

Transportation RoadwayInfrastructure Improvements

Construction of a North Main Street to provide access to Good Ground Park from Squiretown Road

Controlled access lane east of Bittersweet South Extension, with sidewalk

Good Ground Road Extension Realignment of Old Riverhead Road to

increase sight distance to the east for motorists attempting to enter Montauk Highway

Page 19: HAMPTON BAYS@ CROSSROADS

Transportation RoadwayInfrastructure Improvements

Reconfigure Montauk Highway west of RT 24 to consist of two 12’ wide lanes, a 12’ center median/turning lane, 4’ shoulders, and 8’ sidewalk areas --- all of which can be accommodated within the existing ROW

Roundabout at intersection of Montauk Highway and Old North Highway.

Cross-Access Agreements

Page 20: HAMPTON BAYS@ CROSSROADS

Recommendations & Mitigations

• Land Use and Zoning– Review and Update Policies and procedures for processing

PDD applications to achieve: “Density Neutrality for new PDDs in Hampton Bays utilizing CPB credit redemption or TDRs.” and equity in calculation of community benefits.

– For PDDs exceeding density standards for groundwater, require a modified subsurface sewage disposal (MSSD) system that treats for nitrates. Site at least 200 feet from the SCWA property near “Tiana Commons.”

– Develop a tree protection ordinance to preserve large, mature, or otherwise notable trees, and prevent clear cutting.

Page 21: HAMPTON BAYS@ CROSSROADS

Recommendations & Mitigations

• Land Use and Zoning– Investigate feasibility of burying electrical utilities

and eliminating telephone poles in the Hamlet to improve aesthetic qualities. New utilities should be underground.

– Promote the use of façade easements as a tool for historic preservation.

– To the extent feasible, Town discretionary powers should be used to encourage rehabilitation and reuse of the existing Canoe Place Inn structure.

Page 22: HAMPTON BAYS@ CROSSROADS

Recommendations & Mitigations

• Environment– Prohibit the application of pesticides or fertilizers

within 100 feet of surface through restrictive covenants, easements and conditions of wetlands permits.

– Complete the Town’s Local Waterfront Revitalization Plan (LWRP).

– Increase the priority of land acquisition in the sensitive CEA areas.

– Augment the CPF priority list with preservation targets identified by the Hampton Bays community.

Page 23: HAMPTON BAYS@ CROSSROADS

Recommendations & Mitigations

• Environment– Promote stormwater management best practices on

developed property

– Promote the cause of water conservation

– Link development regulations to Groundwater Management Zone limitations, with potential amendments to the Accessory Apartment code, and the anticipated motel conversion code.

Page 24: HAMPTON BAYS@ CROSSROADS

Recommendations & Mitigations

• Community Facilities:

Schools, Economic & Fiscal Considerations– Offset density bonuses granted through PDD

rezonings with preservation of residentially-zoned land elsewhere

– Offset bonuses for residential density with open space preservation

Page 25: HAMPTON BAYS@ CROSSROADS

QUESTIONS!

Page 26: HAMPTON BAYS@ CROSSROADS

CREDITS

Written & Presented by Eve HoulihanPower Point by Dr. Bruce A. King, President

Presented at the January 24th 2011 Membership Meeting