Page 1 of 101 PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2 J3 PROJECT JAMNAGAR GASIFICATION PROGRAM Status as : 2nd Shipmen PT.HANJUNG INDONESIA Date : Mar. 11 201 Rev : D PACK NO. DRAWING NO. MARKING NO. PACKAGE TYPE DESCRIPTION QTY WEIGHT (ton) DIMENSION (mm) CBM (m3) BARGE/ CONTAINER REMARK No. NETT. GROSS HEIGHT WIDTH LENGTH 3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82 7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53 11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53 12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34 16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07 23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57 32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31 36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41 41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43 46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66 50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28 53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49 59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53 65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88 67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49 73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33 74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61 79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01 84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68 91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60 95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17 97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77 101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 7.23 1192 1450 8437 14.58 H220-550-FPGC16 H220-550-FPGC16 RIL/PTH-J3-0102 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66 H220-550-FPGC28 H220-550-FPGC28 RIL/PTH-J3-0103 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66 H361-013-VB5 H361-013-VB5 BUNDLE SUB PIPE RACK ACR 001 4 1.10 1.28 649 505 2130 2.79 H361-013-VB6 H361-013-VB6 SUB PIPE RACK ACR 001 4 1.18 1.36 649 506 2397 3.15 H361-013-VB7 H361-013-VB7 SUB PIPE RACK ACR 001 4 1.18 1.36 653 508 2456 3.26 285 H361-013-B50 H361-013-B50 BUNDLE SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673 289 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

Upload: duong-truong

Post on 21-Dec-2015

24 views

Category:

Documents


9 download

DESCRIPTION

Packing list of steel structures

TRANSCRIPT

Page 1: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:02

Page 1 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82

7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53

11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53

12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34

16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07

23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57

32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31

36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41

41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43

46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66

50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28

53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49

59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53

65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88

67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49

73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33

74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61

79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01

84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68

91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60

95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17

97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77

101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 7.23 1192 1450 8437 14.58

H220-550-FPGC16 H220-550-FPGC16 RIL/PTH-J3-0102 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66

H220-550-FPGC28 H220-550-FPGC28 RIL/PTH-J3-0103 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66

H361-013-VB5 H361-013-VB5

BUNDLE

SUB PIPE RACK ACR 001 4 1.10 1.28 649 505 2130 2.79

H361-013-VB6 H361-013-VB6 SUB PIPE RACK ACR 001 4 1.18 1.36 649 506 2397 3.15

H361-013-VB7 H361-013-VB7 SUB PIPE RACK ACR 001 4 1.18 1.36 653 508 2456 3.26

285 H361-013-B50 H361-013-B50BUNDLE

SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673

289 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

Page 2: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:02

Page 2 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

8 2.71 3.30 670 1050 5720 32.19

A. H210-550 ROOD MILL STRUCTURE

1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99

2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51

4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34

5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59

6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54

8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28

9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79

10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73

13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54

15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40

17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45

18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87

21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16

22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47

24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13

26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58

27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22

28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70

29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74

30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50

31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20

33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47

34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76

37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70

38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31

39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15

40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99

42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22

43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12

44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29

45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28

47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22

48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28

49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83

51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48

52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49

Page 3: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 3 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11

55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89

56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47

57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34

58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02

60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99

62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96

63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93

64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12

66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09

68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42

69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25

70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18

71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31

72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82

75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31

77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51

78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41

80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65

81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41

82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73

83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24

85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91

86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39

87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01

88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33

89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42

90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15

92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44

93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83

94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01

96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42

98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59

99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 76 634.55 647.59 905.65

B. H220-550 ROOD MILL STRUCTURE

100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73

102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.75 1440 1495 5000 10.76

103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.20 1400 1540 12000 25.87

104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.77 1540 1250 10500 20.21

105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.41 1547 1608 8437 20.99

106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.59 1540 1180 5000 9.09

107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.27 2259 1271 12000 34.45

Page 4: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 4 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.35 1524 961 10500 15.38

109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.57 1125 1540 6036 10.46

110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.31 1550 885 8437 11.57

111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 2 11.33 11.60 1540 995 5000 15.32

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 12 92.96 7.23 184.84

C. H360-013 SUB PIPE RACK ACR 001

112 H360-013-VB19 H360-013-VB19

RIL/PTH-J3-0112 BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526 0.27

113 H360-013-VB20 H360-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151 0.21

114 H360-013-VB21 H360-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862 0.31

115 H360-013-VB22 H360-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898 0.08

116 H360-013-VB23 H360-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760 0.07

10 0.16 0.52 361 375 1526 2.07

117 H360-013-HB1 H360-013-HB1

RIL/PTH-J3-0113 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334 0.11

118 H360-013-HB2 H360-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450 0.12

119 H360-013-HB3 H360-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484 0.12

120 H360-013-HB4 H360-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536 0.13

121 H360-013-HB5 H360-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987 2.67

122 H360-013-HB6 H360-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698 0.14

123 H360-013-VB16 H360-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870 0.07

124 H360-013-VB17 H360-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652 0.28

125 H360-013-VB18 H360-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455 0.12

25 0.49 1.63 461 545 1987 12.48

126 H360-013-CT6 H360-013-CT6

RIL/PTH-J3-0114 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150 0.09

127 H360-013-CT7 H360-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150 0.18

128 H360-013-CT8 H360-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150 0.19

129 H360-013-CT9 H360-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150 0.88

130 H360-013-CT10 H360-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150 0.18

131 H360-013-CT11 H360-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150 0.45

132 H360-013-CT12 H360-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935 0.14

133 H360-013-CT13 H360-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045 0.08

13 0.19 1.42 1270 871 1150 16.54

134 H360-013-B67 H360-013-B67

RIL/PTH-J3-0115 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

135 H360-013-B68 H360-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

136 H360-013-B69 H360-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

137 H360-013-B70 H360-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

138 H360-013-B71 H360-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461 0.84

139 H360-013-B72 H360-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461 0.28

140 H360-013-B73 H360-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

141 H360-013-B74 H360-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

142 H360-013-B75 H360-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

143 H360-013-B76 H360-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

Page 5: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 5 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

144 H360-013-B77 H360-013-B77

RIL/PTH-J3-0115 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

145 H360-013-B78 H360-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334 0.67

146 H360-013-B79 H360-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962 0.29

147 H360-013-B88 H360-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211 0.15

20 0.58 2.72 461 1020 2962 27.86

148 H360-013-B82 H360-013-B82 RIL/PTH-J3-0116 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461 0.64

4 0.14 0.26 400 275 1461 0.64

149 H360-013-CT1 H360-013-CT1RIL/PTH-J3-0117 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388 0.36

150 H360-013-CT2 H360-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388 0.66

8 0.11 0.53 1110 658 388 2.27

151 H360-013-B19 H360-013-B19

RIL/PTH-J3-0118 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461 0.20

152 H360-013-B80 H360-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461 0.39

153 H360-013-B81 H360-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657 0.77

4 0.23 0.38 436 378 4657 3.07

154 H360-013-B7 H360-013-B7

RIL/PTH-J3-0119 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673 0.99

155 H360-013-B8 H360-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142 0.18

156 H360-013-B9 H360-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942 0.94

157 H360-013-B10 H360-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102 0.34

158 H360-013-B11 H360-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102 0.30

5 0.59 0.78 874 399 5942 10.36

159 H360-013-B4 H360-013-B4 RIL/PTH-J3-0120 BUNDLE SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827 1.45

1 0.16 0.20 856 352 4827 1.45

160 H360-013-B5 H360-013-B5 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944 5.92

1 0.58 0.63 1722 578 5944 5.92

161 H360-013-B6 H360-013-B6 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944 5.90

1 0.58 0.63 1718 578 5944 5.90

162 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0123 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684 0.66

1 0.12 0.19 380 1031 1684 0.66

163 H360-013-B1 H360-013-B1 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904 0.39

1 0.11 0.15 399 336 2904 0.39

164 H360-013-B2 H360-013-B2 RIL/PTH-J3-0125 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673 10.68

11 1.91 2.58 971 833 5673 50.47

165 H360-013-B3 H360-013-B3 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827 3.64

Page 6: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 6 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

6 0.87 1.13 397 503 4827 5.78

166 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0127 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389 0.70

4 0.17 0.32 397 413 1389 0.91

167 H360-013-B55 H360-013-B55 RIL/PTH-J3-0128 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673 1.78

1 0.21 0.27 358 876 5673 1.78

168 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0129 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442 1.48

3 0.20 0.35 900 649 1442 2.53

169 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0130 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684 0.91

1 0.13 0.23 380 1420 1684 0.91

170 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684 0.53

1 0.12 0.16 826 380 1684 0.53

171 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790 4.62

1 0.38 0.46 777 1242 4790 4.62

172 H360-013-B12 H360-013-B12

RIL/PTH-J3-0133 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236 0.63

173 H360-013-B13 H360-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236 0.30

174 H360-013-B17 H360-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086 0.27

175 H360-013-B20 H360-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673 0.94

176 H360-013-B21 H360-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

177 H360-013-B23 H360-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142 0.25

178 H360-013-B25 H360-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142 0.29

179 H360-013-B27 H360-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181 0.20

180 H360-013-B37 H360-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731 0.12

10 1.31 1.79 750 587 5673 24.98

181 H360-013-B29 H360-013-B29

RIL/PTH-J3-0134 BUNDLE

SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617 1.31

182 H360-013-B33 H360-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594 1.30

183 H360-013-B38 H360-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912 0.97

184 H360-013-B41 H360-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201 0.41

185 H360-013-B50 H360-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673 6.61

186 H360-013-B51 H360-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

187 H360-013-B52 H360-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

188 H360-013-B53 H360-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

189 H360-013-B56 H360-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

190 H360-013-B84 H360-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593 1.30

191 H360-013-SC1 H360-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530 0.98

20 5.55 6.91 1142 966 5673 125.17

Page 7: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 7 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

192 H360-013-B14 H360-013-B14 RIL/PTH-J3-0135 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942 5.63

1 0.85 0.89 1821 520 5942 5.63

193 H360-013-B15 H360-013-B15 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942 3.81

1 0.63 0.67 1233 520 5942 3.81

194 H360-013-B16 H360-013-B16 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944 4.98

1 0.78 0.83 1615 519 5944 4.98

195 H360-013-B18 H360-013-B18 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673 1.49

1 0.37 0.42 410 642 5673 1.49

196 H360-013-B22 H360-013-B22 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594 1.86

1 0.36 0.41 609 666 4594 1.86

197 H360-013-B24 H360-013-B24 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61

1 0.73 0.77 1584 406 5607 3.61

198 H360-013-B26 H360-013-B26 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181 0.49

1 0.09 0.15 633 662 1181 0.49

199 H360-013-B28 H360-013-B28 RIL/PTH-J3-0142 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617 6.33

2 0.69 0.82 793 864 4617 6.33

200 H360-013-B30 H360-013-B30 RIL/PTH-J3-0143 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594 3.72

1 0.36 0.43 846 958 4594 3.72

201 H360-013-B31 H360-013-B31 RIL/PTH-J3-0144 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617 4.89

2 0.70 0.82 610 868 4617 4.89

202 H360-013-B32 H360-013-B32 RIL/PTH-J3-0145 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10

1 0.37 0.42 610 745 4617 2.10

203 H360-013-B34 H360-013-B34 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607 2.25

1 0.73 0.76 1165 344 5607 2.25

204 H360-013-B35 H360-013-B35 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942 3.06

1 0.87 0.91 1284 401 5942 3.06

205 H360-013-B36 H360-013-B36 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731 0.20

1 0.06 0.10 659 406 731 0.20

206 H360-013-B39 H360-013-B39 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951 1.60

1 0.37 0.42 410 657 5951 1.60

Page 8: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 8 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

207 H360-013-B40 H360-013-B40 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951 1.61

1 0.37 0.43 410 660 5951 1.61

208 H360-013-B42 H360-013-B42 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961 1.76

1 0.32 0.38 410 867 4961 1.76

209 H360-013-B43 H360-013-B43 RIL/PTH-J3-0152 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961 3.38

3 0.95 1.11 344 660 4961 3.38

210 H360-013-B44 H360-013-B44 RIL/PTH-J3-0153 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961 1.77

1 0.32 0.39 410 868 4961 1.77

211 H360-013-B45 H360-013-B45 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961 1.77

1 0.33 0.40 410 868 4961 1.77

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 35.77 363.58

D. H361-013 SUB PIPE RACK ACR 001

212 H361-013-VB19 H361-013-VB19

RIL/PTH-J3-0155BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526 0.27

213 H361-013-VB20 H361-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151 0.21

214 H361-013-VB21 H361-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862 0.31

215 H361-013-VB22 H361-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898 0.08

216 H361-013-VB23 H361-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760 0.07

10 0.16 0.52 361 375 1526 2.07

217 H361-013-HB1 H361-013-HB1

RIL/PTH-J3-0156 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334 0.11

218 H361-013-HB2 H361-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450 0.12

219 H361-013-HB3 H361-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484 0.12

220 H361-013-HB4 H361-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536 0.13

221 H361-013-HB5 H361-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987 2.67

222 H361-013-HB6 H361-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698 0.14

223 H361-013-VB16 H361-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870 0.07

224 H361-013-VB17 H361-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652 0.28

225 H361-013-VB18 H361-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455 0.12

25 0.49 1.63 461 545 1987 12.48

226 H361-013-CT6 H361-013-CT6

RIL/PTH-J3-0157 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150 0.09

227 H361-013-CT7 H361-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150 0.18

228 H361-013-CT8 H361-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150 0.19

229 H361-013-CT9 H361-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150 0.88

230 H361-013-CT10 H361-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150 0.18

231 H361-013-CT11 H361-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150 0.45

232 H361-013-CT12 H361-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935 0.14

233 H361-013-CT13 H361-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045 0.08

Page 9: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 9 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

13 0.19 1.42 1270 871 1150 16.54

234 H361-013-B67 H361-013-B67

RIL/PTH-J3-0158 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

235 H361-013-B68 H361-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

236 H361-013-B69 H361-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

237 H361-013-B70 H361-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

238 H361-013-B71 H361-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461 0.84

239 H361-013-B72 H361-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461 0.28

240 H361-013-B73 H361-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

241 H361-013-B74 H361-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

242 H361-013-B75 H361-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

243 H361-013-B76 H361-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

244 H361-013-B77 H361-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

245 H361-013-B78 H361-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334 0.67

246 H361-013-B79 H361-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962 0.29

247 H361-013-B88 H361-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211 0.15

20 0.58 2.72 461 1020 2962 27.86

248 H361-013-B82 H361-013-B82 RIL/PTH-J3-0159 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461 0.64

4 0.14 0.26 400 275 1461 0.64

249 H361-013-CT1 H361-013-CT1RIL/PTH-J3-0160 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388 0.36

250 H361-013-CT2 H361-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388 0.66

8 0.11 0.53 1110 658 388 2.27

251 H361-013-B19 H361-013-B19

RIL/PTH-J3-0161 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461 0.20

252 H361-013-B80 H361-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461 0.39

253 H361-013-B81 H361-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657 0.77

4 0.23 0.38 436 378 4657 3.07

254 H361-013-B7 H361-013-B7

RIL/PTH-J3-0162 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673 0.99

255 H361-013-B8 H361-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142 0.18

256 H361-013-B9 H361-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942 0.94

257 H361-013-B10 H361-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102 0.34

258 H361-013-B11 H361-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102 0.30

5 0.59 0.78 874 399 5942 10.36

259 H361-013-B4 H361-013-B4 RIL/PTH-J3-0163 SKID SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827 1.45

1 0.16 0.20 856 352 4827 1.45

260 H361-013-B5 H361-013-B5 RIL/PTH-J3-0164 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944 5.92

1 0.58 0.63 1722 578 5944 5.92

261 H361-013-B6 H361-013-B6 RIL/PTH-J3-0165 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944 5.90

Page 10: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 10 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.58 0.63 1718 578 5944 5.90

262 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0166 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684 0.66

1 0.12 0.19 380 1031 1684 0.66

263 H361-013-B1 H361-013-B1 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904 0.39

1 0.11 0.15 399 336 2904 0.39

264 H361-013-B2 H361-013-B2 RIL/PTH-J3-0168 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673 10.68

11 1.91 2.58 971 833 5673 50.47

265 H361-013-B3 H361-013-B3 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827 3.64

6 0.87 1.13 397 503 4827 5.78

266 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389 0.70

4 0.17 0.32 397 413 1389 0.91

267 H361-013-B55 H361-013-B55 RIL/PTH-J3-0171 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673 1.78

1 0.21 0.27 358 876 5673 1.78

268 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0172 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442 1.48

3 0.20 0.35 900 649 1442 2.53

269 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0173 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684 0.91

1 0.13 0.23 380 1420 1684 0.91

270 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684 0.53

1 0.12 0.16 826 380 1684 0.53

271 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790 4.62

1 0.38 0.46 777 1242 4790 4.62

272 H361-013-B12 H361-013-B12

RIL/PTH-J3-0176 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236 0.63

273 H361-013-B13 H361-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236 0.30

274 H361-013-B17 H361-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086 0.27

275 H361-013-B20 H361-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673 0.94

276 H361-013-B21 H361-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

277 H361-013-B23 H361-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142 0.25

278 H361-013-B25 H361-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142 0.29

279 H361-013-B27 H361-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181 0.20

280 H361-013-B37 H361-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731 0.12

10 1.31 1.79 750 587 5673 24.98

281 H361-013-B29 H361-013-B29 RIL/PTH-J3-0177 BUNDLE SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617 1.31

Page 11: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 11 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

282 H361-013-B33 H361-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594 1.30

283 H361-013-B38 H361-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912 0.97

284 H361-013-B41 H361-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201 0.41

286 H361-013-B51 H361-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

287 H361-013-B52 H361-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

288 H361-013-B53 H361-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

290 H361-013-B84 H361-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593 1.30

291 H361-013-SC1 H361-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530 0.98

12 2.83 3.65 1142 966 5640 74.66

292 H361-013-B14 H361-013-B14 RIL/PTH-J3-0178 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942 5.63

1 0.85 0.89 1821 520 5942 5.63

293 H361-013-B15 H361-013-B15 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942 3.81

1 0.63 0.67 1233 520 5942 3.81

294 H361-013-B16 H361-013-B16 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944 4.98

1 0.78 0.83 1615 519 5944 4.98

295 H361-013-B18 H361-013-B18 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673 1.49

1 0.37 0.42 410 642 5673 1.49

296 H361-013-B22 H361-013-B22 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594 1.86

1 0.36 0.41 609 666 4594 1.86

297 H361-013-B24 H361-013-B24 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61

1 0.73 0.77 1584 406 5607 3.61

298 H361-013-B26 H361-013-B26 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181 0.49

1 0.09 0.15 633 662 1181 0.49

299 H361-013-B28 H361-013-B28 RIL/PTH-J3-0185 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617 6.33

2 0.69 0.82 793 864 4617 6.33

300 H361-013-B30 H361-013-B30 RIL/PTH-J3-0186 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594 3.72

1 0.36 0.43 846 958 4594 3.72

301 H361-013-B31 H361-013-B31 RIL/PTH-J3-0187 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617 4.89

2 0.70 0.82 610 868 4617 4.89

302 H361-013-B32 H361-013-B32 RIL/PTH-J3-0188 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10

1 0.37 0.42 610 745 4617 2.10

303 H361-013-B34 H361-013-B34 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607 2.25

Page 12: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 12 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.73 0.76 1165 344 5607 2.25

304 H361-013-B35 H361-013-B35 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942 3.06

1 0.87 0.91 1284 401 5942 3.06

305 H361-013-B36 H361-013-B36 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731 0.20

1 0.06 0.10 659 406 731 0.20

306 H361-013-B39 H361-013-B39 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951 1.60

1 0.37 0.42 410 657 5951 1.60

307 H361-013-B40 H361-013-B40 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951 1.61

1 0.37 0.43 410 660 5951 1.61

308 H361-013-B42 H361-013-B42 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961 1.76

1 0.32 0.38 410 867 4961 1.76

309 H361-013-B43 H361-013-B43 RIL/PTH-J3-0195 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961 3.38

3 0.95 1.11 344 660 4961 3.38

310 H361-013-B44 H361-013-B44 RIL/PTH-J3-0196 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961 1.77

1 0.32 0.39 410 868 4961 1.77

311 H361-013-B45 H361-013-B45 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961 1.77

1 0.33 0.40 410 868 4961 1.77

SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001 168 22.44 32.51 313.08

D. H360-009 SULPHUR RECOVERY UNIT APR 002

312 H360-009-1HB1 H360-009-1HB1

RIL/PTH-J3-0198 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897 1.91

313 H360-009-1HB2 H360-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039 0.40

314 H360-009-1HB3 H360-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797 0.18

315 H360-009-1HB4 H360-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258 0.43

316 H360-009-1HB6 H360-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866 0.57

317 H360-009-1HB7 H360-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671 0.48

318 H360-009-1HB8 H360-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889 0.76

319 H360-009-1HB10 H360-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863 0.25

320 H360-009-1HB11 H360-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891 0.19

321 H360-009-1HB12 H360-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828 0.25

322 H360-009-1HB13 H360-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053 0.20

323 H360-009-1HB14 H360-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977 0.20

324 H360-009-1HB15 H360-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203 0.63

325 H360-009-1VB1 H360-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201 0.16

326 H360-009-1VB2 H360-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777 0.05

327 H360-009-1VB3 H360-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899 0.13

328 H360-009-1VB4 H360-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594 0.11

Page 13: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 13 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

329 H360-009-1VB5 H360-009-1VB5

RIL/PTH-J3-0198 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348 0.22

330 H360-009-1VB6 H360-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625 0.21

331 H360-009-1VB7 H360-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940 0.52

332 H360-009-1VB8 H360-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498 0.20

333 H360-009-1VB9 H360-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392 0.09

334 H360-009-1VB10 H360-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481 0.10

335 H360-009-1VB11 H360-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389 0.09

336 H360-009-1VB26 H360-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388 0.09

48 3.00 5.36 698 610 3940 80.52

337 H360-009-1HB16 H360-009-1HB16

RIL/PTH-J3-0199 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396 0.38

338 H360-009-1HB17 H360-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230 0.07

339 H360-009-1VB12 H360-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366 0.08

340 H360-009-1VB25 H360-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409 0.26

9 0.13 0.43 326 319 2409 2.25

341 H360-009-1HB5 H360-009-1HB5

RIL/PTH-J3-0200 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934 0.11

342 H360-009-1HB18 H360-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589 0.18

343 H360-009-1HB19 H360-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616 0.09

344 H360-009-1HB20 H360-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753 0.09

345 H360-009-1HB21 H360-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383 0.14

346 H360-009-1HB22 H360-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017 0.12

347 H360-009-1HB23 H360-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804 0.10

348 H360-009-1HB24 H360-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513 0.15

349 H360-009-1HB25 H360-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967 0.23

350 H360-009-1HB26 H360-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603 0.19

351 H360-009-1HB27 H360-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893 0.22

352 H360-009-1HB28 H360-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914 0.56

353 H360-009-1HB29 H360-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916 0.22

354 H360-009-1HB30 H360-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819 0.11

355 H360-009-1HB31 H360-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959 0.23

356 H360-009-1HB32 H360-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560 0.09

357 H360-009-1HB33 H360-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895 0.11

358 H360-009-1HB34 H360-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582 0.09

359 H360-009-1HB35 H360-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622 0.09

360 H360-009-1HB36 H360-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578 0.09

361 H360-009-1HB37 H360-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542 0.18

362 H360-009-1HB38 H360-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735 0.10

363 H360-009-1HB39 H360-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690 0.10

364 H360-009-1HB40 H360-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758 0.10

365 H360-009-1HB41 H360-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455 0.08

366 H360-009-1HB42 H360-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208 0.13

367 H360-009-1HB43 H360-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865 0.11

368 H360-009-1HB44 H360-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960 0.11

Page 14: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 14 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

369 H360-009-1HB45 H360-009-1HB45

RIL/PTH-J3-0200 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756 0.10

370 H360-009-1HB46 H360-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576 0.09

371 H360-009-1HB47 H360-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503 0.09

372 H360-009-1HB48 H360-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872 0.11

373 H360-009-1HB49 H360-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591 0.09

374 H360-009-1HB50 H360-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439 0.08

375 H360-009-1HB51 H360-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816 0.21

376 H360-009-1HB52 H360-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626 0.09

377 H360-009-1HB53 H360-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864 0.33

378 H360-009-1HB54 H360-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787 0.10

379 H360-009-1HB55 H360-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235 0.07

380 H360-009-1HB56 H360-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260 0.07

381 H360-009-1HB57 H360-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953 0.11

382 H360-009-1HB58 H360-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476 0.09

383 H360-009-1HB59 H360-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783 0.10

384 H360-009-1HB60 H360-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416 0.08

385 H360-009-1HB61 H360-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387 0.08

386 H360-009-1HB62 H360-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938 0.11

387 H360-009-1HB63 H360-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803 0.10

388 H360-009-1HB64 H360-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749 0.10

389 H360-009-1HB65 H360-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227 0.14

390 H360-009-1HB66 H360-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979 0.23

391 H360-009-1HB67 H360-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763 0.10

392 H360-009-1HB68 H360-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351 0.08

393 H360-009-1HB69 H360-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921 0.11

394 H360-009-1HB70 H360-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445 0.20

395 H360-009-1HB71 H360-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378 0.08

396 H360-009-1HB72 H360-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005 0.12

397 H360-009-1HB73 H360-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954 0.11

398 H360-009-1HB74 H360-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638 0.10

399 H360-009-1HB75 H360-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946 0.11

400 H360-009-1HB76 H360-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463 0.08

401 H360-009-1HB77 H360-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809 0.10

402 H360-009-1HB78 H360-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517 0.09

403 H360-009-1HB79 H360-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366 0.08

404 H360-009-1HB80 H360-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437 0.08

405 H360-009-1HB81 H360-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085 0.06

406 H360-009-1VB23 H360-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480 0.20

407 H360-009-1VB24 H360-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580 0.03

83 1.58 7.79 585 624 3480 105.44

408 H360-009-1B123 H360-009-1B123RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084 0.16

409 H360-009-1B124 H360-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099 0.16

4 0.04 0.16 330 229 1099 0.33

Page 15: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 15 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

410 H360-009-1B254 H360-009-1B254RIL/PTH-J3-0202 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876 0.08

411 H360-009-1B255 H360-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969 0.09

2 0.03 0.09 386 254 969 0.19

412 H360-009-1B166 H360-009-1B166

RIL/PTH-J3-0203 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464 0.16

413 H360-009-1B168 H360-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563 0.17

414 H360-009-1B171 H360-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

415 H360-009-1B172 H360-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

416 H360-009-1B173 H360-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

417 H360-009-1B175 H360-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

418 H360-009-1B179 H360-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164 0.13

419 H360-009-1B180 H360-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

420 H360-009-1B181 H360-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

421 H360-009-1B182 H360-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

422 H360-009-1B187 H360-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461 0.16

423 H360-009-1B189 H360-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

424 H360-009-1B191 H360-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

425 H360-009-1B192 H360-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411 0.16

426 H360-009-1B196 H360-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

427 H360-009-1B197 H360-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

428 H360-009-1B199 H360-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960 0.33

429 H360-009-1B200 H360-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860 0.31

430 H360-009-1B204 H360-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

431 H360-009-1B206 H360-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363 0.15

432 H360-009-1B208 H360-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

433 H360-009-1B209 H360-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

36 2.39 4.76 950 920 2961 93.16

434 H360-009-1B167 H360-009-1B167

RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563 0.34

435 H360-009-1B169 H360-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464 1.61

436 H360-009-1B170 H360-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463 0.80

437 H360-009-1B174 H360-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

438 H360-009-1B176 H360-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

439 H360-009-1B177 H360-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964 0.33

440 H360-009-1B178 H360-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

441 H360-009-1B183 H360-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874 0.10

442 H360-009-1B184 H360-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240 0.14

443 H360-009-1B185 H360-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

444 H360-009-1B186 H360-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

445 H360-009-1B188 H360-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961 1.30

446 H360-009-1B190 H360-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961 1.63

447 H360-009-1B193 H360-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

448 H360-009-1B194 H360-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

Page 16: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 16 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

449 H360-009-1B195 H360-009-1B195RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836 0.09

450 H360-009-1B198 H360-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960 0.65

451 H360-009-1B201 H360-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857 0.09

452 H360-009-1B202 H360-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459 0.16

453 H360-009-1B203 H360-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

454 H360-009-1B205 H360-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363 0.15

455 H360-009-1B207 H360-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

456 H360-009-1B210 H360-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178 0.13

457 H360-009-1B211 H360-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

458 H360-009-1B212 H360-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

459 H360-009-1B213 H360-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860 0.09

460 H360-009-1B214 H360-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260 0.14

461 H360-009-1B215 H360-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964 0.32

462 H360-009-1B216 H360-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

463 H360-009-1B217 H360-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494 0.16

464 H360-009-1B218 H360-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

465 H360-009-1B219 H360-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954 0.32

68 2.67 11.36 1087 1278 2964 279.99

466 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0205 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312 0.13

4 0.05 0.18 352 289 312 0.13

467 H360-009-1B115 H360-009-1B115

RIL/PTH-J3-0206 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

468 H360-009-1B116 H360-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

469 H360-009-1B118 H360-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585 0.82

470 H360-009-1B119 H360-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547 0.32

471 H360-009-1B120 H360-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547 0.32

472 H360-009-1B121 H360-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596 0.43

473 H360-009-1B128 H360-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959 0.40

474 H360-009-1B133 H360-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413 0.19

475 H360-009-1B134 H360-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463 0.20

476 H360-009-1B135 H360-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462 0.73

477 H360-009-1B136 H360-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712 0.10

478 H360-009-1B138 H360-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

479 H360-009-1B139 H360-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

480 H360-009-1B140 H360-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461 0.20

481 H360-009-1B141 H360-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

482 H360-009-1B142 H360-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

483 H360-009-1B143 H360-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

484 H360-009-1B145 H360-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

485 H360-009-1B146 H360-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961 0.40

486 H360-009-1B147 H360-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176 0.16

487 H360-009-1B151 H360-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960 0.40

488 H360-009-1B154 H360-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

Page 17: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 17 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

489 H360-009-1B157 H360-009-1B157

RIL/PTH-J3-0206 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

490 H360-009-1B158 H360-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

491 H360-009-1B161 H360-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764 0.24

492 H360-009-1B163 H360-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514 0.20

493 H360-009-1B164 H360-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463 0.39

494 H360-009-1B165 H360-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763 0.10

495 H360-009-1FR10 H360-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355 0.18

496 H360-009-1SC2 H360-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

497 H360-009-1SC3 H360-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

33 2.09 6.41 1372 1314 5964 354.81

498 H360-009-1CT28 H360-009-1CT28

RIL/PTH-J3-0207 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988 0.27

499 H360-009-1CT29 H360-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778 0.21

500 H360-009-1CT30 H360-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548 0.22

501 H360-009-1CT31 H360-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548 0.15

502 H360-009-1CT32 H360-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188 0.16

9 0.32 1.60 1180 1457 1988 30.76

503 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0208 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463 0.37

1 0.05 0.09 680 375 1463 0.37

504 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093 1.25

1 0.11 0.16 682 591 3093 1.25

505 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463 0.20

1 0.05 0.08 403 333 1463 0.20

506 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899 0.39

1 0.08 0.12 403 333 2899 0.39

507 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963 0.40

1 0.08 0.12 403 333 2963 0.40

508 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

509 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964 0.40

1 0.10 0.13 403 333 2964 0.40

510 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.13 403 333 2964 0.40

511 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

Page 18: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 18 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

512 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

513 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

514 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411 0.19

1 0.04 0.08 403 333 1411 0.19

515 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860 0.38

1 0.10 0.13 403 333 2860 0.38

516 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860 0.38

1 0.09 0.13 403 333 2860 0.38

517 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0222 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461 0.39

2 0.10 0.17 403 333 1461 0.39

518 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0223 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348 0.18

1 0.06 0.09 403 333 1348 0.18

519 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093 0.42

1 0.12 0.15 403 333 3093 0.42

520 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

1 0.15 0.19 403 333 5464 0.73

521 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964 0.80

1 0.17 0.20 403 333 5964 0.80

522 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364 0.32

1 0.07 0.11 403 333 2364 0.32

523 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364 0.32

1 0.08 0.11 403 333 2364 0.32

524 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882 1.06

1 0.23 0.27 403 333 7882 1.06

525 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062 0.41

1 0.09 0.13 403 333 3062 0.41

526 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744 0.23

Page 19: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 19 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.35 0.39 403 333 1744 0.23

527 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647 0.09

1 0.19 0.22 403 333 647 0.09

528 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647 0.09

1 0.18 0.21 403 333 647 0.09

529 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850 0.25

1 0.16 0.19 403 333 1850 0.25

530 H360-009-1B40 H360-009-1B40

RIL/PTH-J3-0235 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834 0.45

531 H360-009-1B42 H360-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963 3.13

532 H360-009-1B43 H360-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963 2.50

533 H360-009-1B44 H360-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963 0.63

534 H360-009-1B45 H360-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963 0.97

535 H360-009-1B49 H360-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963 0.47

536 H360-009-1B50 H360-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963 0.63

537 H360-009-1B52 H360-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962 0.63

538 H360-009-1B56 H360-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585 4.42

539 H360-009-1B57 H360-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463 0.18

21 3.37 6.03 1218 1262 5963 192.48

540 H360-009-1B41 H360-009-1B41

RIL/PTH-J3-0236 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834 0.71

541 H360-009-1B58 H360-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463 0.57

542 H360-009-1B59 H360-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

543 H360-009-1B60 H360-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

544 H360-009-1B72 H360-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160 0.43

545 H360-009-1B78 H360-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460 0.57

546 H360-009-1B81 H360-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461 1.21

547 H360-009-1B85 H360-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659 0.61

548 H360-009-1B90 H360-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394 0.48

549 H360-009-1B69 H360-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949 0.50

550 H360-009-1B74 H360-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963 0.47

551 H360-009-1B73 H360-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963 2.34

552 H360-009-1B75 H360-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963 0.50

553 H360-009-1B76 H360-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

554 H360-009-1B77 H360-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

555 H360-009-1B82 H360-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461 0.89

556 H360-009-1B84 H360-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659 0.52

557 H360-009-1SC4 H360-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332 0.42

24 2.56 7.11 1121 2042 5461 300.02

558 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0237 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464 0.76

Page 20: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 20 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

2 0.14 0.24 456 566 1464 0.76

559 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0238 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460 1.96

1 0.22 0.28 456 787 5460 1.96

560 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460 2.20

1 0.23 0.29 455 885 5460 2.20

561 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462 2.10

1 0.25 0.31 455 845 5462 2.10

562 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962 1.25

1 0.18 0.23 455 696 3962 1.25

563 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963 1.26

1 0.18 0.23 456 699 3963 1.26

564 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0243 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585 8.07

5 1.19 1.39 634 456 5585 8.07

565 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0244 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462 4.69

1 0.28 0.35 851 1010 5462 4.69

566 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462 3.82

1 0.23 0.29 850 822 5462 3.82

567 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462 2.84

1 0.23 0.28 850 612 5462 2.84

568 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0247 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462 6.06

5 1.07 1.25 641 346 5462 6.06

569 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0248 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462 2.03

1 0.22 0.28 456 817 5462 2.03

570 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462 2.02

1 0.23 0.29 455 814 5462 2.02

571 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462 1.43

1 0.22 0.27 456 574 5462 1.43

572 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462 2.11

1 0.23 0.29 456 847 5462 2.11

Page 21: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 21 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

573 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0252 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462 6.34

3 0.67 0.86 456 849 5462 6.34

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88

E. H361-009 SULPHUR RECOVERY UNIT APR 002

574 H361-009-1HB1 H361-009-1HB1

RIL/PTH-J3-0253 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897 1.91

575 H361-009-1HB2 H361-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039 0.40

576 H361-009-1HB3 H361-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797 0.18

577 H361-009-1HB4 H361-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258 0.43

578 H361-009-1HB6 H361-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866 0.57

579 H361-009-1HB7 H361-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671 0.48

580 H361-009-1HB8 H361-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889 0.76

581 H361-009-1HB10 H361-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863 0.25

582 H361-009-1HB11 H361-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891 0.19

583 H361-009-1HB12 H361-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828 0.25

584 H361-009-1HB13 H361-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053 0.20

585 H361-009-1HB14 H361-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977 0.20

586 H361-009-1HB15 H361-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203 0.63

587 H361-009-1VB1 H361-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201 0.16

588 H361-009-1VB2 H361-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777 0.05

589 H361-009-1VB3 H361-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899 0.13

590 H361-009-1VB4 H361-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594 0.11

591 H361-009-1VB5 H361-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348 0.22

592 H361-009-1VB6 H361-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625 0.21

593 H361-009-1VB7 H361-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940 0.52

594 H361-009-1VB8 H361-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498 0.20

595 H361-009-1VB9 H361-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392 0.09

596 H361-009-1VB10 H361-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481 0.10

597 H361-009-1VB11 H361-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389 0.09

598 H361-009-1VB26 H361-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388 0.09

48 3.00 5.36 698 610 3940 80.52

599 H361-009-1HB16 H361-009-1HB16

RIL/PTH-J3-0254 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396 0.38

600 H361-009-1HB17 H361-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230 0.07

601 H361-009-1VB12 H361-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366 0.08

602 H361-009-1VB25 H361-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409 0.26

9 0.13 0.43 326 319 2409 2.25

603 H361-009-1HB5 H361-009-1HB5

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934 0.11

604 H361-009-1HB18 H361-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589 0.18

605 H361-009-1HB19 H361-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616 0.09

606 H361-009-1HB20 H361-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753 0.09

607 H361-009-1HB21 H361-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383 0.14

608 H361-009-1HB22 H361-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017 0.12

Page 22: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 22 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

609 H361-009-1HB23 H361-009-1HB23

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804 0.10

610 H361-009-1HB24 H361-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513 0.15

611 H361-009-1HB25 H361-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967 0.23

612 H361-009-1HB26 H361-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603 0.19

613 H361-009-1HB27 H361-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893 0.22

614 H361-009-1HB28 H361-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914 0.56

615 H361-009-1HB29 H361-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916 0.22

616 H361-009-1HB30 H361-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819 0.11

617 H361-009-1HB31 H361-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959 0.23

618 H361-009-1HB32 H361-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560 0.09

619 H361-009-1HB33 H361-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895 0.11

620 H361-009-1HB34 H361-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582 0.09

621 H361-009-1HB35 H361-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622 0.09

622 H361-009-1HB36 H361-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578 0.09

623 H361-009-1HB37 H361-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542 0.18

624 H361-009-1HB38 H361-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735 0.10

625 H361-009-1HB39 H361-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690 0.10

626 H361-009-1HB40 H361-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758 0.10

627 H361-009-1HB41 H361-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455 0.08

628 H361-009-1HB42 H361-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208 0.13

629 H361-009-1HB43 H361-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865 0.11

630 H361-009-1HB44 H361-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960 0.11

631 H361-009-1HB45 H361-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756 0.10

632 H361-009-1HB46 H361-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576 0.09

633 H361-009-1HB47 H361-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503 0.09

634 H361-009-1HB48 H361-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872 0.11

635 H361-009-1HB49 H361-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591 0.09

636 H361-009-1HB50 H361-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439 0.08

637 H361-009-1HB51 H361-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816 0.21

638 H361-009-1HB52 H361-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626 0.09

639 H361-009-1HB53 H361-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864 0.33

640 H361-009-1HB54 H361-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787 0.10

641 H361-009-1HB55 H361-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235 0.07

642 H361-009-1HB56 H361-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260 0.07

643 H361-009-1HB57 H361-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953 0.11

644 H361-009-1HB58 H361-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476 0.09

645 H361-009-1HB59 H361-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783 0.10

646 H361-009-1HB60 H361-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416 0.08

647 H361-009-1HB61 H361-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387 0.08

648 H361-009-1HB62 H361-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938 0.11

649 H361-009-1HB63 H361-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803 0.10

650 H361-009-1HB64 H361-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749 0.10

651 H361-009-1HB65 H361-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227 0.14

652 H361-009-1HB66 H361-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979 0.23

Page 23: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 23 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

653 H361-009-1HB67 H361-009-1HB67

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763 0.10

654 H361-009-1HB68 H361-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351 0.08

655 H361-009-1HB69 H361-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921 0.11

656 H361-009-1HB70 H361-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445 0.20

657 H361-009-1HB71 H361-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378 0.08

658 H361-009-1HB72 H361-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005 0.12

659 H361-009-1HB73 H361-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954 0.11

660 H361-009-1HB74 H361-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638 0.10

661 H361-009-1HB75 H361-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946 0.11

662 H361-009-1HB76 H361-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463 0.08

663 H361-009-1HB77 H361-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809 0.10

664 H361-009-1HB78 H361-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517 0.09

665 H361-009-1HB79 H361-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366 0.08

666 H361-009-1HB80 H361-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437 0.08

667 H361-009-1HB81 H361-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085 0.06

668 H361-009-1VB23 H361-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480 0.20

669 H361-009-1VB24 H361-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580 0.03

83 1.58 7.79 585 624 3480 105.44

670 H361-009-1B123 H361-009-1B123RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084 0.16

671 H361-009-1B124 H361-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099 0.16

4 0.04 0.16 330 229 1099 0.33

672 H361-009-1B254 H361-009-1B254RIL/PTH-J3-0257 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876 0.08

673 H361-009-1B255 H361-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969 0.09

2 0.03 0.09 386 254 969 0.19

674 H361-009-1B166 H361-009-1B166

RIL/PTH-J3-0258 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464 0.16

675 H361-009-1B168 H361-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563 0.17

676 H361-009-1B171 H361-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

677 H361-009-1B172 H361-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

678 H361-009-1B173 H361-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

679 H361-009-1B175 H361-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

680 H361-009-1B179 H361-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164 0.13

681 H361-009-1B180 H361-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

682 H361-009-1B181 H361-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

683 H361-009-1B182 H361-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

684 H361-009-1B187 H361-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461 0.16

685 H361-009-1B189 H361-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

686 H361-009-1B191 H361-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

687 H361-009-1B192 H361-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411 0.16

688 H361-009-1B196 H361-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

689 H361-009-1B197 H361-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

690 H361-009-1B199 H361-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960 0.33

Page 24: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 24 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

691 H361-009-1B200 H361-009-1B200

RIL/PTH-J3-0258 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860 0.31

692 H361-009-1B204 H361-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

693 H361-009-1B206 H361-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363 0.15

694 H361-009-1B208 H361-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

695 H361-009-1B209 H361-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

36 2.39 4.76 950 920 2961 93.16

696 H361-009-1B167 H361-009-1B167

RIL/PTH-J3-0259 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563 0.34

697 H361-009-1B169 H361-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464 1.61

698 H361-009-1B170 H361-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463 0.80

699 H361-009-1B174 H361-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

700 H361-009-1B176 H361-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

701 H361-009-1B177 H361-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964 0.33

702 H361-009-1B178 H361-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

703 H361-009-1B183 H361-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874 0.10

704 H361-009-1B184 H361-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240 0.14

705 H361-009-1B185 H361-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

706 H361-009-1B186 H361-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

707 H361-009-1B188 H361-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961 1.30

708 H361-009-1B190 H361-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961 1.63

709 H361-009-1B193 H361-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

710 H361-009-1B194 H361-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

711 H361-009-1B195 H361-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836 0.09

712 H361-009-1B198 H361-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960 0.65

713 H361-009-1B201 H361-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857 0.09

714 H361-009-1B202 H361-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459 0.16

715 H361-009-1B203 H361-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

716 H361-009-1B205 H361-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363 0.15

717 H361-009-1B207 H361-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

718 H361-009-1B210 H361-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178 0.13

719 H361-009-1B211 H361-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

720 H361-009-1B212 H361-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

721 H361-009-1B213 H361-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860 0.09

722 H361-009-1B214 H361-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260 0.14

723 H361-009-1B215 H361-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964 0.32

724 H361-009-1B216 H361-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

725 H361-009-1B217 H361-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494 0.16

726 H361-009-1B218 H361-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

727 H361-009-1B219 H361-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954 0.32

68 2.67 11.36 1087 1278 2964 279.99

728 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0260 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312 0.13

4 0.05 0.18 352 289 312 0.13

Page 25: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 25 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

729 H361-009-1B115 H361-009-1B115

RIL/PTH-J3-0261 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

730 H361-009-1B116 H361-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

731 H361-009-1B118 H361-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585 0.82

732 H361-009-1B119 H361-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547 0.32

733 H361-009-1B120 H361-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547 0.32

734 H361-009-1B121 H361-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596 0.43

735 H361-009-1B128 H361-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959 0.40

736 H361-009-1B133 H361-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413 0.19

737 H361-009-1B134 H361-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463 0.20

738 H361-009-1B135 H361-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462 0.73

739 H361-009-1B136 H361-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712 0.10

740 H361-009-1B138 H361-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

741 H361-009-1B139 H361-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

742 H361-009-1B140 H361-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461 0.20

743 H361-009-1B141 H361-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

744 H361-009-1B142 H361-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

745 H361-009-1B143 H361-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

746 H361-009-1B145 H361-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

747 H361-009-1B146 H361-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961 0.40

748 H361-009-1B147 H361-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176 0.16

749 H361-009-1B151 H361-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960 0.40

750 H361-009-1B154 H361-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

751 H361-009-1B157 H361-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

752 H361-009-1B158 H361-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

753 H361-009-1B161 H361-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764 0.24

754 H361-009-1B163 H361-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514 0.20

755 H361-009-1B164 H361-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463 0.39

756 H361-009-1B165 H361-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763 0.10

757 H361-009-1FR10 H361-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355 0.18

758 H361-009-1SC2 H361-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

759 H361-009-1SC3 H361-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

33 2.09 6.41 1372 1314 5964 354.81

760 H361-009-1CT28 H361-009-1CT28

RIL/PTH-J3-0262 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988 0.27

761 H361-009-1CT29 H361-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778 0.21

762 H361-009-1CT30 H361-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548 0.22

763 H361-009-1CT31 H361-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548 0.15

764 H361-009-1CT32 H361-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188 0.16

9 0.32 1.60 1180 1457 1988 30.76

765 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0263 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463 0.37

1 0.05 0.09 680 375 1463 0.37

766 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093 1.25

Page 26: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 26 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.11 0.16 682 591 3093 1.25

767 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463 0.20

1 0.05 0.08 403 333 1463 0.20

768 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899 0.39

1 0.08 0.12 403 333 2899 0.39

769 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963 0.40

1 0.08 0.12 403 333 2963 0.40

770 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

771 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964 0.40

1 0.10 0.13 403 333 2964 0.40

772 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.13 403 333 2964 0.40

773 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

774 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

775 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

776 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411 0.19

1 0.04 0.08 403 333 1411 0.19

777 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860 0.38

1 0.10 0.13 403 333 2860 0.38

778 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860 0.38

1 0.09 0.13 403 333 2860 0.38

779 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0277 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461 0.39

2 0.10 0.17 403 333 1461 0.39

780 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0278 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348 0.18

1 0.06 0.09 403 333 1348 0.18

Page 27: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 27 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

781 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093 0.42

1 0.12 0.15 403 333 3093 0.42

782 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

1 0.15 0.19 403 333 5464 0.73

783 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964 0.80

1 0.17 0.20 403 333 5964 0.80

784 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364 0.32

1 0.07 0.11 403 333 2364 0.32

785 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364 0.32

1 0.08 0.11 403 333 2364 0.32

786 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882 1.06

1 0.23 0.27 403 333 7882 1.06

787 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062 0.41

1 0.09 0.13 403 333 3062 0.41

788 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744 0.23

1 0.35 0.39 403 333 1744 0.23

789 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647 0.09

1 0.19 0.22 403 333 647 0.09

790 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647 0.09

1 0.18 0.21 403 333 647 0.09

791 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850 0.25

1 0.16 0.19 403 333 1850 0.25

792 H361-009-1B40 H361-009-1B40

RIL/PTH-J3-0290 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834 0.45

793 H361-009-1B42 H361-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963 3.13

794 H361-009-1B43 H361-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963 2.50

795 H361-009-1B44 H361-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963 0.63

796 H361-009-1B45 H361-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963 0.97

797 H361-009-1B49 H361-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963 0.47

798 H361-009-1B50 H361-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963 0.63

799 H361-009-1B52 H361-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962 0.63

800 H361-009-1B56 H361-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585 4.42

801 H361-009-1B57 H361-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463 0.18

21 3.37 6.03 1218 1262 5963 192.48

Page 28: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 28 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

802 H361-009-1B41 H361-009-1B41

RIL/PTH-J3-0291 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834 0.71

803 H361-009-1B58 H361-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463 0.57

804 H361-009-1B59 H361-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

805 H361-009-1B60 H361-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

806 H361-009-1B72 H361-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160 0.43

807 H361-009-1B78 H361-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460 0.57

808 H361-009-1B81 H361-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461 1.21

809 H361-009-1B85 H361-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659 0.61

810 H361-009-1B90 H361-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394 0.48

811 H361-009-1B69 H361-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949 0.50

812 H361-009-1B74 H361-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963 0.47

813 H361-009-1B73 H361-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963 2.34

814 H361-009-1B75 H361-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963 0.50

815 H361-009-1B76 H361-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

816 H361-009-1B77 H361-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

817 H361-009-1B82 H361-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461 0.89

818 H361-009-1B84 H361-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659 0.52

819 H361-009-1SC4 H361-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332 0.42

24 2.56 7.11 1121 2042 5461 300.02

820 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0292 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464 0.76

2 0.14 0.24 456 566 1464 0.76

821 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0293 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460 1.96

1 0.22 0.28 456 787 5460 1.96

822 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460 2.20

1 0.23 0.29 455 885 5460 2.20

823 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462 2.10

1 0.25 0.31 455 845 5462 2.10

824 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962 1.25

1 0.18 0.23 455 696 3962 1.25

825 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963 1.26

1 0.18 0.23 456 699 3963 1.26

826 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0298 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585 8.07

5 1.19 1.39 634 456 5585 8.07

827 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0299 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462 4.69

1 0.28 0.35 851 1010 5462 4.69

Page 29: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 29 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

828 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462 3.82

1 0.23 0.29 850 822 5462 3.82

829 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462 2.84

1 0.23 0.28 850 612 5462 2.84

830 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0302 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462 6.06

5 1.07 1.25 641 346 5462 6.06

831 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0303 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462 2.03

1 0.22 0.28 456 817 5462 2.03

832 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462 2.02

1 0.23 0.29 455 814 5462 2.02

833 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462 1.43

1 0.22 0.27 456 574 5462 1.43

834 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462 2.11

1 0.23 0.29 456 847 5462 2.11

835 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0307 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462 6.34

3 0.67 0.86 456 849 5462 6.34

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88

GRAND TOTAL 1224 829.15 847.90 4766.90

I2466
Design Engineer: Summary Edit
Page 30: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 30 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

A. H210-550 ROOD MILL STRUCTURE

1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99 ###

2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51 ###

3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82 ###

4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34 ###

5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59 ###

6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54 ###

7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53 ###

8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28 ###

9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79 ###

10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73 ###

11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53 ###

12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34 ###

13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###

14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54 ###

15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40 ###

Page 31: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 31 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07 ###

17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45 ###

18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78 ###

19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78 ###

20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87 ###

21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16 ###

22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47 ###

23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57 ###

24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###

25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13 ###

26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58 ###

27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22 ###

28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70 ###

29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74 ###

30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50 ###

31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20 ###

32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31 ###

33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47 ###

34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###

35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76 ###

36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41 ###

37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70 ###

38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31 ###

39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15 ###

40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99 ###

41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43 ###

42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22 ###

43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12 ###

44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29 ###

45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28 ###

46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66 ###

47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22 ###

48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28 ###

49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83 ###

50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28 ###

Page 32: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 32 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48 ###

52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49 ###

53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49 ###

54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11 ###

55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89 ###

56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47 ###

57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34 ###

58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02 ###

59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 ###

60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99 ###

61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53 ###

62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96 ###

63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93 ###

64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12 ###

65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88 ###

66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09 ###

67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49 ###

68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42 ###

69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25 ###

70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18 ###

71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31 ###

72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82 ###

73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33 ###

74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61 ###

75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 ###

76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31 ###

77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51 ###

78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41 ###

79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01 ###

80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65 ###

81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41 ###

82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73 ###

83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24 ###

84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68 ###

85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91 ###

Page 33: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 33 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39 ###

87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01 ###

88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33 ###

89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42 ###

90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15 ###

91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60 ###

92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44 ###

93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83 ###

94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01 ###

95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17 ###

96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42 ###

97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77 ###

98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59 ###

99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02 ###

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 99 807.81 824.20 1149.16 ###

B. H220-550 ROOD MILL STRUCTURE

100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73 ###

101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 6.99 1192 1450 8437 14.58 ###

102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.75 1440 1495 5000 10.76 ###

103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.20 1400 1540 12000 25.87 ###

104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.78 1540 1250 10500 20.21 ###

105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.42 1547 1608 8437 20.99 ###

106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.59 1540 1180 5000 9.09 ###

107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.27 2259 1271 12000 34.45 ###

108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.35 1524 961 10500 15.38 ###

109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.57 1125 1540 6036 10.46 ###

110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.32 1550 885 8437 11.57 ###

111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66 ###

112 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0112 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 13 99.95 102.56 199.42 ###

C. H360-013 SUB PIPE RACK ACR 001

113 H360-013-VB19 H360-013-VB19

RIL/PTH-J3-0113 BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526

114 H360-013-VB20 H360-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151

115 H360-013-VB21 H360-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862

116 H360-013-VB22 H360-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898

Page 34: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 34 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

117 H360-013-VB23 H360-013-VB23

RIL/PTH-J3-0113 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760

10 0.16 0.19 361 375 1526 0.21 ###

118 H360-013-HB1 H360-013-HB1

RIL/PTH-J3-0114 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334

119 H360-013-HB2 H360-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450

120 H360-013-HB3 H360-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484

121 H360-013-HB4 H360-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536

122 H360-013-HB5 H360-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987

123 H360-013-HB6 H360-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698

124 H360-013-VB16 H360-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870

125 H360-013-VB17 H360-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652

126 H360-013-VB18 H360-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455

25 0.49 0.53 461 545 1987 0.50 ###

127 H360-013-CT6 H360-013-CT6

RIL/PTH-J3-0115 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150

128 H360-013-CT7 H360-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150

129 H360-013-CT8 H360-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150

130 H360-013-CT9 H360-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150

131 H360-013-CT10 H360-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150

132 H360-013-CT11 H360-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150

133 H360-013-CT12 H360-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935

134 H360-013-CT13 H360-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045

13 0.19 0.28 1270 871 1150 1.27 ###

135 H360-013-B67 H360-013-B67

RIL/PTH-J3-0116 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

136 H360-013-B68 H360-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

137 H360-013-B69 H360-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

138 H360-013-B70 H360-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

139 H360-013-B71 H360-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461

140 H360-013-B72 H360-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461

141 H360-013-B73 H360-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

142 H360-013-B74 H360-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

143 H360-013-B75 H360-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

144 H360-013-B76 H360-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

145 H360-013-B77 H360-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

Page 35: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 35 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

146 H360-013-B78 H360-013-B78

RIL/PTH-J3-0116 BUNDLE

SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334

147 H360-013-B79 H360-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962

148 H360-013-B88 H360-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211

20 0.58 0.69 461 1020 2962 1.39 ###

149 H360-013-B82 H360-013-B82 RIL/PTH-J3-0117 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461

4 0.14 0.17 400 275 1461 0.16 ###

150 H360-013-CT1 H360-013-CT1RIL/PTH-J3-0118 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388

151 H360-013-CT2 H360-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388

8 0.11 0.17 1110 658 388 0.28 ###

152 H360-013-B19 H360-013-B19

RIL/PTH-J3-0119 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461

153 H360-013-B80 H360-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461

154 H360-013-B81 H360-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657

4 0.23 0.27 436 378 4657 0.77 ###

155 H360-013-B7 H360-013-B7

RIL/PTH-J3-0120 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673

156 H360-013-B8 H360-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142

157 H360-013-B9 H360-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942

158 H360-013-B10 H360-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102

159 H360-013-B11 H360-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102

5 0.59 0.63 874 399 5942 2.07 ###

160 H360-013-B4 H360-013-B4 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827

1 0.16 0.20 856 352 4827 1.45 ###

161 H360-013-B5 H360-013-B5 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944

1 0.58 0.63 1722 578 5944 5.92 ###

162 H360-013-B6 H360-013-B6 RIL/PTH-J3-0123 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944

1 0.58 0.63 1718 578 5944 5.90 ###

163 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684

1 0.12 0.19 380 1031 1684 0.66 ###

Page 36: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 36 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

164 H360-013-B1 H360-013-B1 RIL/PTH-J3-0125 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904

1 0.11 0.15 399 336 2904 0.39 ###

165 H360-013-B2 H360-013-B2 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673

11 1.91 1.97 971 833 5673 4.59 ###

166 H360-013-B3 H360-013-B3 RIL/PTH-J3-0127 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827

6 0.87 0.91 397 503 4827 0.96 ###

167 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389

4 0.17 0.21 397 413 1389 0.23 ###

168 H360-013-B55 H360-013-B55 RIL/PTH-J3-0129 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673

1 0.21 0.27 358 876 5673 1.78 ###

169 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0130 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442

3 0.20 0.25 900 649 1442 0.84 ###

170 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684

1 0.13 0.23 380 1420 1684 0.91 ###

171 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684

1 0.12 0.16 826 380 1684 0.53 ###

172 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0133 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790

1 0.38 0.46 777 1242 4790 4.62 ###

173 H360-013-B12 H360-013-B12

RIL/PTH-J3-0134 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236

174 H360-013-B13 H360-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236

175 H360-013-B17 H360-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086

176 H360-013-B20 H360-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673

177 H360-013-B21 H360-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

178 H360-013-B23 H360-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142

179 H360-013-B25 H360-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142

Page 37: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 37 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

180 H360-013-B27 H360-013-B27

RIL/PTH-J3-0134 BUNDLE

SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181

181 H360-013-B37 H360-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731

10 1.31 1.36 750 587 5673 2.50 ###

182 H360-013-B29 H360-013-B29

RIL/PTH-J3-0135 BUNDLE

SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617

183 H360-013-B33 H360-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594

184 H360-013-B38 H360-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912

185 H360-013-B41 H360-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201

186 H360-013-B50 H360-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673

187 H360-013-B51 H360-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

188 H360-013-B52 H360-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

189 H360-013-B53 H360-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

190 H360-013-B56 H360-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

191 H360-013-B84 H360-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593

192 H360-013-SC1 H360-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530

20 5.55 5.61 1142 966 5673 6.26 ###

193 H360-013-B14 H360-013-B14 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942

1 0.85 0.89 1821 520 5942 5.63 ###

194 H360-013-B15 H360-013-B15 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942

1 0.63 0.67 1233 520 5942 3.81 ###

195 H360-013-B16 H360-013-B16 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944

1 0.78 0.83 1615 519 5944 4.98 ###

196 H360-013-B18 H360-013-B18 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673

1 0.37 0.42 410 642 5673 1.49 ###

197 H360-013-B22 H360-013-B22 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594

1 0.36 0.41 609 666 4594 1.86 ###

198 H360-013-B24 H360-013-B24 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607

1 0.73 0.77 1584 406 5607 3.61 ###

Page 38: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 38 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

199 H360-013-B26 H360-013-B26 RIL/PTH-J3-0142 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181

1 0.09 0.15 633 662 1181 0.49 ###

200 H360-013-B28 H360-013-B28 RIL/PTH-J3-0143 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617

2 0.69 0.76 793 864 4617 3.16 ###

201 H360-013-B30 H360-013-B30 RIL/PTH-J3-0144 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594

1 0.36 0.43 846 958 4594 3.72 ###

202 H360-013-B31 H360-013-B31 RIL/PTH-J3-0145 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617

2 0.70 0.76 610 868 4617 2.44 ###

203 H360-013-B32 H360-013-B32 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617

1 0.37 0.42 610 745 4617 2.10 ###

204 H360-013-B34 H360-013-B34 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607

1 0.73 0.76 1165 344 5607 2.25 ###

205 H360-013-B35 H360-013-B35 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942

1 0.87 0.91 1284 401 5942 3.06 ###

206 H360-013-B36 H360-013-B36 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731

1 0.06 0.10 659 406 731 0.20 ###

207 H360-013-B39 H360-013-B39 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951

1 0.37 0.42 410 657 5951 1.60 ###

208 H360-013-B40 H360-013-B40 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951

1 0.37 0.43 410 660 5951 1.61 ###

209 H360-013-B42 H360-013-B42 RIL/PTH-J3-0152 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961

1 0.32 0.38 410 867 4961 1.76 ###

210 H360-013-B43 H360-013-B43 RIL/PTH-J3-0153 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961

3 0.95 1.00 344 660 4961 1.13 ###

Page 39: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 39 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

211 H360-013-B44 H360-013-B44 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961

1 0.32 0.39 410 868 4961 1.77 ###

212 H360-013-B45 H360-013-B45 RIL/PTH-J3-0155 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961

1 0.33 0.40 410 868 4961 1.77 ###

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 27.45 92.64 ###

D. H361-013 SUB PIPE RACK ACR 001

213 H361-013-VB19 H361-013-VB19

RIL/PTH-J3-0156BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526

214 H361-013-VB20 H361-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151

215 H361-013-VB21 H361-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862

216 H361-013-VB22 H361-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898

217 H361-013-VB23 H361-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760

10 0.16 0.19 361 375 1526 0.21 ###

218 H361-013-HB1 H361-013-HB1

RIL/PTH-J3-0157 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334

219 H361-013-HB2 H361-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450

220 H361-013-HB3 H361-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484

221 H361-013-HB4 H361-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536

222 H361-013-HB5 H361-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987

223 H361-013-HB6 H361-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698

224 H361-013-VB16 H361-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870

225 H361-013-VB17 H361-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652

226 H361-013-VB18 H361-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455

25 0.49 0.53 461 545 1987 0.50 ###

227 H361-013-CT6 H361-013-CT6

RIL/PTH-J3-0158 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150

228 H361-013-CT7 H361-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150

229 H361-013-CT8 H361-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150

230 H361-013-CT9 H361-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150

231 H361-013-CT10 H361-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150

232 H361-013-CT11 H361-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150

233 H361-013-CT12 H361-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935

234 H361-013-CT13 H361-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045

L472
Design Engineer: Summary Edit
Page 40: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 40 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

13 0.19 0.28 1270 871 1150 1.27 ###

235 H361-013-B67 H361-013-B67

RIL/PTH-J3-0159 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

236 H361-013-B68 H361-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

237 H361-013-B69 H361-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

238 H361-013-B70 H361-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

239 H361-013-B71 H361-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461

240 H361-013-B72 H361-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461

241 H361-013-B73 H361-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

242 H361-013-B74 H361-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

243 H361-013-B75 H361-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

244 H361-013-B76 H361-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

245 H361-013-B77 H361-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

246 H361-013-B78 H361-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334

247 H361-013-B79 H361-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962

248 H361-013-B88 H361-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211

20 0.58 0.69 461 1020 2962 1.39 ###

249 H361-013-B82 H361-013-B82 RIL/PTH-J3-0160 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461

4 0.14 0.17 400 275 1461 0.16 ###

250 H361-013-CT1 H361-013-CT1RIL/PTH-J3-0161 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388

251 H361-013-CT2 H361-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388

8 0.11 0.17 1110 658 388 0.28 ###

252 H361-013-B19 H361-013-B19

RIL/PTH-J3-0162 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461

253 H361-013-B80 H361-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461

254 H361-013-B81 H361-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657

4 0.23 0.27 436 378 4657 0.77 ###

255 H361-013-B7 H361-013-B7

RIL/PTH-J3-0163 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673

256 H361-013-B8 H361-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142

257 H361-013-B9 H361-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942

258 H361-013-B10 H361-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102

259 H361-013-B11 H361-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102

Page 41: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 41 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

5 0.59 0.63 874 399 5942 2.07 ###

260 H361-013-B4 H361-013-B4 RIL/PTH-J3-0164 SKID SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827

1 0.16 0.20 856 352 4827 1.45 ###

261 H361-013-B5 H361-013-B5 RIL/PTH-J3-0165 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944

1 0.58 0.63 1722 578 5944 5.92 ###

262 H361-013-B6 H361-013-B6 RIL/PTH-J3-0166 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944

1 0.58 0.63 1718 578 5944 5.90 ###

263 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684

1 0.12 0.19 380 1031 1684 0.66 ###

264 H361-013-B1 H361-013-B1 RIL/PTH-J3-0168 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904

1 0.11 0.15 399 336 2904 0.39 ###

265 H361-013-B2 H361-013-B2 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673

11 1.91 1.97 971 833 5673 4.59 ###

266 H361-013-B3 H361-013-B3 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827

6 0.87 0.91 397 503 4827 0.96 ###

267 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0171 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389

4 0.17 0.21 397 413 1389 0.23 ###

268 H361-013-B55 H361-013-B55 RIL/PTH-J3-0172 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673

1 0.21 0.27 358 876 5673 1.78 ###

269 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0173 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442

3 0.20 0.25 900 649 1442 0.84 ###

270 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684

1 0.13 0.23 380 1420 1684 0.91 ###

Page 42: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 42 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

271 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684

1 0.12 0.16 826 380 1684 0.53 ###

272 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0176 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790

1 0.38 0.46 777 1242 4790 4.62 ###

273 H361-013-B12 H361-013-B12

RIL/PTH-J3-0177 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236

274 H361-013-B13 H361-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236

275 H361-013-B17 H361-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086

276 H361-013-B20 H361-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673

277 H361-013-B21 H361-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

278 H361-013-B23 H361-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142

279 H361-013-B25 H361-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142

280 H361-013-B27 H361-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181

281 H361-013-B37 H361-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731

10 1.31 1.36 750 587 5673 2.50 ###

282 H361-013-B29 H361-013-B29

RIL/PTH-J3-0178 BUNDLE

SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617

283 H361-013-B33 H361-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594

284 H361-013-B38 H361-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912

285 H361-013-B41 H361-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201

286 H361-013-B50 H361-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673

287 H361-013-B51 H361-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

288 H361-013-B52 H361-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

289 H361-013-B53 H361-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

290 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

291 H361-013-B84 H361-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593

292 H361-013-SC1 H361-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530

20 5.55 5.61 1142 966 5673 6.26 ###

293 H361-013-B14 H361-013-B14 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942

1 0.85 0.89 1821 520 5942 5.63 ###

294 H361-013-B15 H361-013-B15 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942

1 0.63 0.67 1233 520 5942 3.81 ###

Page 43: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 43 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

295 H361-013-B16 H361-013-B16 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944

1 0.78 0.83 1615 519 5944 4.98 ###

296 H361-013-B18 H361-013-B18 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673

1 0.37 0.42 410 642 5673 1.49 ###

297 H361-013-B22 H361-013-B22 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594

1 0.36 0.41 609 666 4594 1.86 ###

298 H361-013-B24 H361-013-B24 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61

1 0.73 0.77 1584 406 5607 3.61 ###

299 H361-013-B26 H361-013-B26 RIL/PTH-J3-0185 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181

1 0.09 0.15 633 662 1181 0.49 ###

300 H361-013-B28 H361-013-B28 RIL/PTH-J3-0186 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617

2 0.69 0.76 793 864 4617 3.16 ###

301 H361-013-B30 H361-013-B30 RIL/PTH-J3-0187 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594

1 0.36 0.43 846 958 4594 3.72 ###

302 H361-013-B31 H361-013-B31 RIL/PTH-J3-0188 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617

2 0.70 0.76 610 868 4617 2.44 ###

303 H361-013-B32 H361-013-B32 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10

1 0.37 0.42 610 745 4617 2.10 ###

304 H361-013-B34 H361-013-B34 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607

1 0.73 0.76 1165 344 5607 2.25 ###

305 H361-013-B35 H361-013-B35 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942

1 0.87 0.91 1284 401 5942 3.06 ###

306 H361-013-B36 H361-013-B36 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731

Page 44: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 44 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.06 0.10 659 406 731 0.20 ###

307 H361-013-B39 H361-013-B39 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951

1 0.37 0.42 410 657 5951 1.60 ###

308 H361-013-B40 H361-013-B40 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951

1 0.37 0.43 410 660 5951 1.61 ###

309 H361-013-B42 H361-013-B42 RIL/PTH-J3-0195 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961

1 0.32 0.38 410 867 4961 1.76 ###

310 H361-013-B43 H361-013-B43 RIL/PTH-J3-0196 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961

3 0.95 1.00 344 660 4961 1.13 ###

311 H361-013-B44 H361-013-B44 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961

1 0.32 0.39 410 868 4961 1.77 ###

312 H361-013-B45 H361-013-B45 RIL/PTH-J3-0198 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961

1 0.33 0.40 410 868 4961 1.77 ###

SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001 176 25.15 27.45 92.64

D. H360-009 SULPHUR RECOVERY UNIT APR 002

313 H360-009-1HB1 H360-009-1HB1

RIL/PTH-J3-0199 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897

314 H360-009-1HB2 H360-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039

315 H360-009-1HB3 H360-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797

316 H360-009-1HB4 H360-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258

317 H360-009-1HB6 H360-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866

318 H360-009-1HB7 H360-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671

319 H360-009-1HB8 H360-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889

320 H360-009-1HB10 H360-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863

321 H360-009-1HB11 H360-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891

322 H360-009-1HB12 H360-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828

323 H360-009-1HB13 H360-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053

324 H360-009-1HB14 H360-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977

325 H360-009-1HB15 H360-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203

326 H360-009-1VB1 H360-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201

L811
Design Engineer: Summary Edit
Page 45: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 45 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

327 H360-009-1VB2 H360-009-1VB2

RIL/PTH-J3-0199 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777

328 H360-009-1VB3 H360-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899

329 H360-009-1VB4 H360-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594

330 H360-009-1VB5 H360-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348

331 H360-009-1VB6 H360-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625

332 H360-009-1VB7 H360-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940

333 H360-009-1VB8 H360-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498

334 H360-009-1VB9 H360-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392

335 H360-009-1VB10 H360-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481

336 H360-009-1VB11 H360-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389

337 H360-009-1VB26 H360-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388

48 3.00 3.05 698 610 3940 1.68 ###

338 H360-009-1HB16 H360-009-1HB16

RIL/PTH-J3-0200 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396

339 H360-009-1HB17 H360-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230

340 H360-009-1VB12 H360-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366

341 H360-009-1VB25 H360-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409

9 0.13 0.16 326 319 2409 0.25 ###

342 H360-009-1HB5 H360-009-1HB5

RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934

343 H360-009-1HB18 H360-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589

344 H360-009-1HB19 H360-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616

345 H360-009-1HB20 H360-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753

346 H360-009-1HB21 H360-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383

347 H360-009-1HB22 H360-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017

348 H360-009-1HB23 H360-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804

349 H360-009-1HB24 H360-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513

350 H360-009-1HB25 H360-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967

351 H360-009-1HB26 H360-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603

352 H360-009-1HB27 H360-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893

353 H360-009-1HB28 H360-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914

354 H360-009-1HB29 H360-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916

355 H360-009-1HB30 H360-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819

356 H360-009-1HB31 H360-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959

357 H360-009-1HB32 H360-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560

Page 46: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 46 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

358 H360-009-1HB33 H360-009-1HB33

RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895

359 H360-009-1HB34 H360-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582

360 H360-009-1HB35 H360-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622

361 H360-009-1HB36 H360-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578

362 H360-009-1HB37 H360-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542

363 H360-009-1HB38 H360-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735

364 H360-009-1HB39 H360-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690

365 H360-009-1HB40 H360-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758

366 H360-009-1HB41 H360-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455

367 H360-009-1HB42 H360-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208

368 H360-009-1HB43 H360-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865

369 H360-009-1HB44 H360-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960

370 H360-009-1HB45 H360-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756

371 H360-009-1HB46 H360-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576

372 H360-009-1HB47 H360-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503

373 H360-009-1HB48 H360-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872

374 H360-009-1HB49 H360-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591

375 H360-009-1HB50 H360-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439

376 H360-009-1HB51 H360-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816

377 H360-009-1HB52 H360-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626

378 H360-009-1HB53 H360-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864

379 H360-009-1HB54 H360-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787

380 H360-009-1HB55 H360-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235

381 H360-009-1HB56 H360-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260

382 H360-009-1HB57 H360-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953

383 H360-009-1HB58 H360-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476

384 H360-009-1HB59 H360-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783

385 H360-009-1HB60 H360-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416

386 H360-009-1HB61 H360-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387

387 H360-009-1HB62 H360-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938

388 H360-009-1HB63 H360-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803

389 H360-009-1HB64 H360-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749

390 H360-009-1HB65 H360-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227

391 H360-009-1HB66 H360-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979

392 H360-009-1HB67 H360-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763

Page 47: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 47 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

393 H360-009-1HB68 H360-009-1HB68

RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351

394 H360-009-1HB69 H360-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921

395 H360-009-1HB70 H360-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445

396 H360-009-1HB71 H360-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378

397 H360-009-1HB72 H360-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005

398 H360-009-1HB73 H360-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954

399 H360-009-1HB74 H360-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638

400 H360-009-1HB75 H360-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946

401 H360-009-1HB76 H360-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463

402 H360-009-1HB77 H360-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809

403 H360-009-1HB78 H360-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517

404 H360-009-1HB79 H360-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366

405 H360-009-1HB80 H360-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437

406 H360-009-1HB81 H360-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085

407 H360-009-1VB23 H360-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480

408 H360-009-1VB24 H360-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580

83 1.58 1.66 585 624 3480 1.27 ###

409 H360-009-1B123 H360-009-1B123RIL/PTH-J3-0202 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084

410 H360-009-1B124 H360-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099

4 0.04 0.07 330 229 1099 0.08 ###

411 H360-009-1B254 H360-009-1B254RIL/PTH-J3-0203 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876

412 H360-009-1B255 H360-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969

2 0.03 0.06 386 254 969 0.10 ###

413 H360-009-1B166 H360-009-1B166

RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464

414 H360-009-1B168 H360-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563

415 H360-009-1B171 H360-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

416 H360-009-1B172 H360-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

417 H360-009-1B173 H360-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

418 H360-009-1B175 H360-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

419 H360-009-1B179 H360-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164

420 H360-009-1B180 H360-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

421 H360-009-1B181 H360-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

Page 48: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 48 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

422 H360-009-1B182 H360-009-1B182

RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

423 H360-009-1B187 H360-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461

424 H360-009-1B189 H360-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

425 H360-009-1B191 H360-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

426 H360-009-1B192 H360-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411

427 H360-009-1B196 H360-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

428 H360-009-1B197 H360-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

429 H360-009-1B199 H360-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960

430 H360-009-1B200 H360-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860

431 H360-009-1B204 H360-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

432 H360-009-1B206 H360-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363

433 H360-009-1B208 H360-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

434 H360-009-1B209 H360-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

36 2.39 2.45 950 920 2961 2.59 ###

435 H360-009-1B167 H360-009-1B167

RIL/PTH-J3-0205 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563

436 H360-009-1B169 H360-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464

437 H360-009-1B170 H360-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463

438 H360-009-1B174 H360-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

439 H360-009-1B176 H360-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

440 H360-009-1B177 H360-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964

441 H360-009-1B178 H360-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

442 H360-009-1B183 H360-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874

443 H360-009-1B184 H360-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240

444 H360-009-1B185 H360-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

445 H360-009-1B186 H360-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

446 H360-009-1B188 H360-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961

447 H360-009-1B190 H360-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961

448 H360-009-1B193 H360-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

449 H360-009-1B194 H360-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

450 H360-009-1B195 H360-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836

451 H360-009-1B198 H360-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960

452 H360-009-1B201 H360-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857

453 H360-009-1B202 H360-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459

454 H360-009-1B203 H360-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

Page 49: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 49 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

455 H360-009-1B205 H360-009-1B205

RIL/PTH-J3-0205 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363

456 H360-009-1B207 H360-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

457 H360-009-1B210 H360-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178

458 H360-009-1B211 H360-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

459 H360-009-1B212 H360-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

460 H360-009-1B213 H360-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860

461 H360-009-1B214 H360-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260

462 H360-009-1B215 H360-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964

463 H360-009-1B216 H360-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

464 H360-009-1B217 H360-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494

465 H360-009-1B218 H360-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

466 H360-009-1B219 H360-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954

68 2.67 2.79 1087 1278 2964 4.12 ###

467 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0206 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312

4 0.05 0.08 352 289 312 0.03 ###

468 H360-009-1B115 H360-009-1B115

RIL/PTH-J3-0207 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

469 H360-009-1B116 H360-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

470 H360-009-1B118 H360-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585

471 H360-009-1B119 H360-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547

472 H360-009-1B120 H360-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547

473 H360-009-1B121 H360-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596

474 H360-009-1B128 H360-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959

475 H360-009-1B133 H360-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413

476 H360-009-1B134 H360-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463

477 H360-009-1B135 H360-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462

478 H360-009-1B136 H360-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712

479 H360-009-1B138 H360-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

480 H360-009-1B139 H360-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

481 H360-009-1B140 H360-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461

482 H360-009-1B141 H360-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

483 H360-009-1B142 H360-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

484 H360-009-1B143 H360-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

485 H360-009-1B145 H360-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

Page 50: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 50 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

486 H360-009-1B146 H360-009-1B146

RIL/PTH-J3-0207 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961

487 H360-009-1B147 H360-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176

488 H360-009-1B151 H360-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960

489 H360-009-1B154 H360-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

490 H360-009-1B157 H360-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

491 H360-009-1B158 H360-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

492 H360-009-1B161 H360-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764

493 H360-009-1B163 H360-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514

494 H360-009-1B164 H360-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463

495 H360-009-1B165 H360-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763

496 H360-009-1FR10 H360-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355

497 H360-009-1SC2 H360-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

498 H360-009-1SC3 H360-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

33 2.09 2.22 1372 1314 5964 10.75 ###

499 H360-009-1CT28 H360-009-1CT28

RIL/PTH-J3-0208 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988

500 H360-009-1CT29 H360-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778

501 H360-009-1CT30 H360-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548

502 H360-009-1CT31 H360-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548

503 H360-009-1CT32 H360-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188

9 0.32 0.46 1180 1457 1988 3.42 ###

504 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463

1 0.05 0.09 680 375 1463 0.37 ###

505 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093

1 0.11 0.16 682 591 3093 1.25 ###

506 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463

1 0.05 0.08 403 333 1463 0.20 ###

507 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899

1 0.08 0.12 403 333 2899 0.39 ###

508 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963

Page 51: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 51 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.08 0.12 403 333 2963 0.40 ###

509 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

510 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964

1 0.10 0.13 403 333 2964 0.40 ###

511 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.13 403 333 2964 0.40 ###

512 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

513 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

514 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

515 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411

1 0.04 0.08 403 333 1411 0.19 ###

516 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860

1 0.10 0.13 403 333 2860 0.38 ###

517 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0222 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860

1 0.09 0.13 403 333 2860 0.38 ###

518 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0223 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461

2 0.10 0.13 403 333 1461 0.20 ###

519 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348

1 0.06 0.09 403 333 1348 0.18 ###

Page 52: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 52 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

520 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093

1 0.12 0.15 403 333 3093 0.42 ###

521 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

1 0.15 0.19 403 333 5464 0.73 ###

522 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964

1 0.17 0.20 403 333 5964 0.80 ###

523 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364

1 0.07 0.11 403 333 2364 0.32 ###

524 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364

1 0.08 0.11 403 333 2364 0.32 ###

525 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882

1 0.23 0.27 403 333 7882 1.06 ###

526 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062

1 0.09 0.13 403 333 3062 0.41 ###

527 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744

1 0.35 0.39 403 333 1744 0.23 ###

528 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647

1 0.19 0.22 403 333 647 0.09 ###

529 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647

1 0.18 0.21 403 333 647 0.09 ###

530 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0235 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850

1 0.16 0.19 403 333 1850 0.25 ###

531 H360-009-1B40 H360-009-1B40

RIL/PTH-J3-0236 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834

532 H360-009-1B42 H360-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963

Page 53: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 53 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

533 H360-009-1B43 H360-009-1B43

RIL/PTH-J3-0236 BUNDLE

SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963

534 H360-009-1B44 H360-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963

535 H360-009-1B45 H360-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963

536 H360-009-1B49 H360-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963

537 H360-009-1B50 H360-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963

538 H360-009-1B52 H360-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962

539 H360-009-1B56 H360-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585

540 H360-009-1B57 H360-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463

21 3.37 3.50 1218 1262 5963 9.17 ###

541 H360-009-1B41 H360-009-1B41

RIL/PTH-J3-0237 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834

542 H360-009-1B58 H360-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463

543 H360-009-1B59 H360-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

544 H360-009-1B60 H360-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

545 H360-009-1B72 H360-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160

546 H360-009-1B78 H360-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460

547 H360-009-1B81 H360-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461

548 H360-009-1B85 H360-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659

549 H360-009-1B90 H360-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394

550 H360-009-1B69 H360-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949

551 H360-009-1B74 H360-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963

552 H360-009-1B73 H360-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963

553 H360-009-1B75 H360-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963

554 H360-009-1B76 H360-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

555 H360-009-1B77 H360-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

556 H360-009-1B82 H360-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461

557 H360-009-1B84 H360-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659

558 H360-009-1SC4 H360-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332

24 2.56 2.75 1121 2042 5461 12.50 ###

559 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0238 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464

2 0.14 0.19 456 566 1464 0.38 ###

560 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460

1 0.22 0.28 456 787 5460 1.96 ###

Page 54: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 54 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

561 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460

1 0.23 0.29 455 885 5460 2.20 ###

562 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462

1 0.25 0.31 455 845 5462 2.10 ###

563 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962

1 0.18 0.23 455 696 3962 1.25 ###

564 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0243 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963

1 0.18 0.23 456 699 3963 1.26 ###

565 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0244 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585

5 1.19 1.23 634 456 5585 1.61 ###

566 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462

1 0.28 0.35 851 1010 5462 4.69 ###

567 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462

1 0.23 0.29 850 822 5462 3.82 ###

568 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0247 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462

1 0.23 0.28 850 612 5462 2.84 ###

569 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0248 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462

5 1.07 1.11 641 346 5462 1.21 ###

570 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462

1 0.22 0.28 456 817 5462 2.03 ###

571 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462

1 0.23 0.29 455 814 5462 2.02 ###

572 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462

Page 55: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 55 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.22 0.27 456 574 5462 1.43 ###

573 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0252 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462

1 0.23 0.29 456 847 5462 2.11 ###

574 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0253 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462

3 0.67 0.74 456 849 5462 2.11 ###

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 29.88 89.62

E. H361-009 SULPHUR RECOVERY UNIT APR 002

575 H361-009-1HB1 H361-009-1HB1

RIL/PTH-J3-0254 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897

576 H361-009-1HB2 H361-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039

577 H361-009-1HB3 H361-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797

578 H361-009-1HB4 H361-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258

579 H361-009-1HB6 H361-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866

580 H361-009-1HB7 H361-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671

581 H361-009-1HB8 H361-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889

582 H361-009-1HB10 H361-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863

583 H361-009-1HB11 H361-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891

584 H361-009-1HB12 H361-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828

585 H361-009-1HB13 H361-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053

586 H361-009-1HB14 H361-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977

587 H361-009-1HB15 H361-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203

588 H361-009-1VB1 H361-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201

589 H361-009-1VB2 H361-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777

590 H361-009-1VB3 H361-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899

591 H361-009-1VB4 H361-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594

592 H361-009-1VB5 H361-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348

593 H361-009-1VB6 H361-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625

594 H361-009-1VB7 H361-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940

595 H361-009-1VB8 H361-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498

596 H361-009-1VB9 H361-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392

597 H361-009-1VB10 H361-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481

598 H361-009-1VB11 H361-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389

599 H361-009-1VB26 H361-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388

Page 56: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 56 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

48 3.00 3.05 698 610 3940 1.68 ###

600 H361-009-1HB16 H361-009-1HB16

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396

601 H361-009-1HB17 H361-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230

602 H361-009-1VB12 H361-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366

603 H361-009-1VB25 H361-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409

9 0.13 0.16 326 319 2409 0.25 ###

604 H361-009-1HB5 H361-009-1HB5

RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934

605 H361-009-1HB18 H361-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589

606 H361-009-1HB19 H361-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616

607 H361-009-1HB20 H361-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753

608 H361-009-1HB21 H361-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383

609 H361-009-1HB22 H361-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017

610 H361-009-1HB23 H361-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804

611 H361-009-1HB24 H361-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513

612 H361-009-1HB25 H361-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967

613 H361-009-1HB26 H361-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603

614 H361-009-1HB27 H361-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893

615 H361-009-1HB28 H361-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914

616 H361-009-1HB29 H361-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916

617 H361-009-1HB30 H361-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819

618 H361-009-1HB31 H361-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959

619 H361-009-1HB32 H361-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560

620 H361-009-1HB33 H361-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895

621 H361-009-1HB34 H361-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582

622 H361-009-1HB35 H361-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622

623 H361-009-1HB36 H361-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578

624 H361-009-1HB37 H361-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542

625 H361-009-1HB38 H361-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735

626 H361-009-1HB39 H361-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690

627 H361-009-1HB40 H361-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758

628 H361-009-1HB41 H361-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455

629 H361-009-1HB42 H361-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208

630 H361-009-1HB43 H361-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865

Page 57: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 57 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

631 H361-009-1HB44 H361-009-1HB44

RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960

632 H361-009-1HB45 H361-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756

633 H361-009-1HB46 H361-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576

634 H361-009-1HB47 H361-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503

635 H361-009-1HB48 H361-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872

636 H361-009-1HB49 H361-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591

637 H361-009-1HB50 H361-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439

638 H361-009-1HB51 H361-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816

639 H361-009-1HB52 H361-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626

640 H361-009-1HB53 H361-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864

641 H361-009-1HB54 H361-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787

642 H361-009-1HB55 H361-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235

643 H361-009-1HB56 H361-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260

644 H361-009-1HB57 H361-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953

645 H361-009-1HB58 H361-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476

646 H361-009-1HB59 H361-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783

647 H361-009-1HB60 H361-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416

648 H361-009-1HB61 H361-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387

649 H361-009-1HB62 H361-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938

650 H361-009-1HB63 H361-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803

651 H361-009-1HB64 H361-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749

652 H361-009-1HB65 H361-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227

653 H361-009-1HB66 H361-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979

654 H361-009-1HB67 H361-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763

655 H361-009-1HB68 H361-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351

656 H361-009-1HB69 H361-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921

657 H361-009-1HB70 H361-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445

658 H361-009-1HB71 H361-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378

659 H361-009-1HB72 H361-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005

660 H361-009-1HB73 H361-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954

661 H361-009-1HB74 H361-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638

662 H361-009-1HB75 H361-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946

663 H361-009-1HB76 H361-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463

664 H361-009-1HB77 H361-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809

665 H361-009-1HB78 H361-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517

Page 58: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 58 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

666 H361-009-1HB79 H361-009-1HB79

RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366

667 H361-009-1HB80 H361-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437

668 H361-009-1HB81 H361-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085

669 H361-009-1VB23 H361-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480

670 H361-009-1VB24 H361-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580

83 1.58 1.66 585 624 3480 1.27 ###

671 H361-009-1B123 H361-009-1B123RIL/PTH-J3-0257 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084

672 H361-009-1B124 H361-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099

4 0.04 0.07 330 229 1099 0.08 ###

673 H361-009-1B254 H361-009-1B254RIL/PTH-J3-0258 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876

674 H361-009-1B255 H361-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969

2 0.03 0.06 386 254 969 0.10 ###

675 H361-009-1B166 H361-009-1B166

RIL/PTH-J3-0259 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464

676 H361-009-1B168 H361-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563

677 H361-009-1B171 H361-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

678 H361-009-1B172 H361-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

679 H361-009-1B173 H361-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

680 H361-009-1B175 H361-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

681 H361-009-1B179 H361-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164

682 H361-009-1B180 H361-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

683 H361-009-1B181 H361-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

684 H361-009-1B182 H361-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

685 H361-009-1B187 H361-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461

686 H361-009-1B189 H361-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

687 H361-009-1B191 H361-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

688 H361-009-1B192 H361-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411

689 H361-009-1B196 H361-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

690 H361-009-1B197 H361-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

691 H361-009-1B199 H361-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960

692 H361-009-1B200 H361-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860

693 H361-009-1B204 H361-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

694 H361-009-1B206 H361-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363

Page 59: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 59 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

695 H361-009-1B208 H361-009-1B208

RIL/PTH-J3-0259 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

696 H361-009-1B209 H361-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

36 2.39 2.45 950 920 2961 2.59 ###

697 H361-009-1B167 H361-009-1B167

RIL/PTH-J3-0260 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563

698 H361-009-1B169 H361-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464

699 H361-009-1B170 H361-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463

700 H361-009-1B174 H361-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

701 H361-009-1B176 H361-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

702 H361-009-1B177 H361-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964

703 H361-009-1B178 H361-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

704 H361-009-1B183 H361-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874

705 H361-009-1B184 H361-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240

706 H361-009-1B185 H361-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

707 H361-009-1B186 H361-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

708 H361-009-1B188 H361-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961

709 H361-009-1B190 H361-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961

710 H361-009-1B193 H361-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

711 H361-009-1B194 H361-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

712 H361-009-1B195 H361-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836

713 H361-009-1B198 H361-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960

714 H361-009-1B201 H361-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857

715 H361-009-1B202 H361-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459

716 H361-009-1B203 H361-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

717 H361-009-1B205 H361-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363

718 H361-009-1B207 H361-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

719 H361-009-1B210 H361-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178

720 H361-009-1B211 H361-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

721 H361-009-1B212 H361-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

722 H361-009-1B213 H361-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860

723 H361-009-1B214 H361-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260

724 H361-009-1B215 H361-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964

725 H361-009-1B216 H361-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

726 H361-009-1B217 H361-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494

727 H361-009-1B218 H361-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

Page 60: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 60 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

728 H361-009-1B219 H361-009-1B219

RIL/PTH-J3-0260 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954

68 2.67 2.79 1087 1278 2964 4.12 ###

729 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0261 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312

4 0.05 0.08 352 289 312 0.03 ###

730 H361-009-1B115 H361-009-1B115

RIL/PTH-J3-0262 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

731 H361-009-1B116 H361-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

732 H361-009-1B118 H361-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585

733 H361-009-1B119 H361-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547

734 H361-009-1B120 H361-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547

735 H361-009-1B121 H361-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596

736 H361-009-1B128 H361-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959

737 H361-009-1B133 H361-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413

738 H361-009-1B134 H361-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463

739 H361-009-1B135 H361-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462

740 H361-009-1B136 H361-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712

741 H361-009-1B138 H361-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

742 H361-009-1B139 H361-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

743 H361-009-1B140 H361-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461

744 H361-009-1B141 H361-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

745 H361-009-1B142 H361-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

746 H361-009-1B143 H361-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

747 H361-009-1B145 H361-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

748 H361-009-1B146 H361-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961

749 H361-009-1B147 H361-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176

750 H361-009-1B151 H361-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960

751 H361-009-1B154 H361-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

752 H361-009-1B157 H361-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

753 H361-009-1B158 H361-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

754 H361-009-1B161 H361-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764

755 H361-009-1B163 H361-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514

756 H361-009-1B164 H361-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463

757 H361-009-1B165 H361-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763

758 H361-009-1FR10 H361-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355

Page 61: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 61 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

759 H361-009-1SC2 H361-009-1SC2

RIL/PTH-J3-0262 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

760 H361-009-1SC3 H361-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

33 2.09 2.22 1372 1314 5964 10.75 ###

761 H361-009-1CT28 H361-009-1CT28

RIL/PTH-J3-0263 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988

762 H361-009-1CT29 H361-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778

763 H361-009-1CT30 H361-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548

764 H361-009-1CT31 H361-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548

765 H361-009-1CT32 H361-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188

9 0.32 0.46 1180 1457 1988 3.42 ###

766 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463

1 0.05 0.09 680 375 1463 0.37 ###

767 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093

1 0.11 0.16 682 591 3093 1.25 ###

768 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463

1 0.05 0.08 403 333 1463 0.20 ###

769 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899

1 0.08 0.12 403 333 2899 0.39 ###

770 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963

1 0.08 0.12 403 333 2963 0.40 ###

771 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

772 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964

1 0.10 0.13 403 333 2964 0.40 ###

773 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.13 403 333 2964 0.40 ###

Page 62: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 62 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

774 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

775 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

776 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

777 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411

1 0.04 0.08 403 333 1411 0.19 ###

778 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860

1 0.10 0.13 403 333 2860 0.38 ###

779 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0277 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860

1 0.09 0.13 403 333 2860 0.38 ###

780 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0278 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461

2 0.10 0.13 403 333 1461 0.20 ###

781 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348

1 0.06 0.09 403 333 1348 0.18 ###

782 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093

1 0.12 0.15 403 333 3093 0.42 ###

783 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

1 0.15 0.19 403 333 5464 0.73 ###

784 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964

1 0.17 0.20 403 333 5964 0.80 ###

785 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364

1 0.07 0.11 403 333 2364 0.32 ###

Page 63: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 63 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

786 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364

1 0.08 0.11 403 333 2364 0.32 ###

787 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882

1 0.23 0.27 403 333 7882 1.06 ###

788 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062

1 0.09 0.13 403 333 3062 0.41 ###

789 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744

1 0.35 0.39 403 333 1744 0.23 ###

790 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647

1 0.19 0.22 403 333 647 0.09 ###

791 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647

1 0.18 0.21 403 333 647 0.09 ###

792 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0290 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850

1 0.16 0.19 403 333 1850 0.25 ###

793 H361-009-1B40 H361-009-1B40

RIL/PTH-J3-0291 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834

794 H361-009-1B42 H361-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963

795 H361-009-1B43 H361-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963

796 H361-009-1B44 H361-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963

797 H361-009-1B45 H361-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963

798 H361-009-1B49 H361-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963

799 H361-009-1B50 H361-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963

800 H361-009-1B52 H361-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962

801 H361-009-1B56 H361-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585

802 H361-009-1B57 H361-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463

21 3.37 3.50 1218 1262 5963 9.17 ###

803 H361-009-1B41 H361-009-1B41

RIL/PTH-J3-0292 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834

Page 64: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 64 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

804 H361-009-1B58 H361-009-1B58

RIL/PTH-J3-0292 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463

805 H361-009-1B59 H361-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

806 H361-009-1B60 H361-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

807 H361-009-1B72 H361-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160

808 H361-009-1B78 H361-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460

809 H361-009-1B81 H361-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461

810 H361-009-1B85 H361-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659

811 H361-009-1B90 H361-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394

812 H361-009-1B69 H361-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949

813 H361-009-1B74 H361-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963

814 H361-009-1B73 H361-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963

815 H361-009-1B75 H361-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963

816 H361-009-1B76 H361-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

817 H361-009-1B77 H361-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

818 H361-009-1B82 H361-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461

819 H361-009-1B84 H361-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659

820 H361-009-1SC4 H361-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332

24 2.56 2.75 1121 2042 5461 12.50 ###

821 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0293 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464

2 0.14 0.19 456 566 1464 0.38 ###

822 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460

1 0.22 0.28 456 787 5460 1.96 ###

823 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460

1 0.23 0.29 455 885 5460 2.20 ###

824 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462

1 0.25 0.31 455 845 5462 2.10 ###

825 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962

1 0.18 0.23 455 696 3962 1.25 ###

826 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0298 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963

Page 65: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 65 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.18 0.23 456 699 3963 1.26 ###

827 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0299 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585

5 1.19 1.23 634 456 5585 1.61 ###

828 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462

1 0.28 0.35 851 1010 5462 4.69 ###

829 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462

1 0.23 0.29 850 822 5462 3.82 ###

830 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0302 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462

1 0.23 0.28 850 612 5462 2.84 ###

831 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0303 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462

5 1.07 1.11 641 346 5462 1.21 ###

832 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462

1 0.22 0.28 456 817 5462 2.03 ###

833 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462

1 0.23 0.29 455 814 5462 2.02 ###

834 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462

1 0.22 0.27 456 574 5462 1.43 ###

835 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0307 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462

1 0.23 0.29 456 847 5462 2.11 ###

836 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0308 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462

3 0.67 0.74 456 849 5462 2.11 ###

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 29.88 89.62

GRAND TOTAL 1256 1012.12 1041.43 1713.09

L2463
Design Engineer: Summary Edit
Page 66: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 66 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

A. H210-550 ROOD MILL STRUCTURE

1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99

2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51

3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82

4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34

5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59

6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54

7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53

8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28

9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79

10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73

11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53

12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34

13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54

15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40

Page 67: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 67 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07

17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45

18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87

21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16

22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47

23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57

24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13

26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58

27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22

28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70

29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74

30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50

31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20

32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31

33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47

34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76

36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41

37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70

38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31

39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15

40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99

41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43

42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22

43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12

44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29

45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28

46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66

47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22

48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28

49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83

50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28

Page 68: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 68 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48

52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49

53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49

54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11

55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89

56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47

57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34

58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02

59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99

61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53

62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96

63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93

64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12

65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88

66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09

67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49

68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42

69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25

70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18

71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31

72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82

73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33

74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61

75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31

77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51

78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41

79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01

80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65

81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41

82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73

83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24

84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68

85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91

Page 69: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 69 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39

87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01

88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33

89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42

90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15

91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60

92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44

93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83

94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01

95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17

96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42

97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77

98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59

99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 99 807.81 824.20 1149.16

B. H220-550 ROOD MILL STRUCTURE

100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73

101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 6.99 1192 1450 8437 14.58

102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.74 1440 1495 5000 10.76

103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.17 1400 1540 12000 25.87

104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.75 1540 1250 10500 20.21

105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.40 1547 1608 8437 20.99

106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.57 1540 1180 5000 9.09

107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.24 2259 1271 12000 34.45

108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.33 1524 961 10500 15.38

109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.55 1125 1540 6036 10.46

110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.30 1550 885 8437 11.57

111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 1 5.67 5.79 1540 995 5000 7.66

112 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0112 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 13 99.95 102.33 199.42 99951

C. H360-013 SUB PIPE RACK ACR 001

113 H360-013-VB19 ~ 23 H360-013-VB19 ~ 23 RIL/PTH-J3-0113 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23 10 0.16 0.52 361 375 1526 2.07

114 RIL/PTH-J3-0114 BUNDLE 25 0.49 1.63 461 545 1987 12.48H360-013-HB2 ~ HB6, VB16 ~ VB18

H360-013-HB2 ~ HB6, VB16 ~ VB18

SUB PIPE RACK ACR 001 H360-013-HB2 ~ HB6, VB16 ~ VB18

Page 70: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 70 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

115 H360-013-CT7 ~ CT13 H360-013-CT7 ~ CT13 RIL/PTH-J3-0115 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT7 ~ CT13 13 0.19 1.42 1270 871 1150 16.54

116 H360-013-B67 ~ B79, B88 H360-013-B67 ~ B79, B88 RIL/PTH-J3-0116 BUNDLE SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88 20 0.58 2.72 461 1020 2962 27.86

117 H360-013-B82 H360-013-B82 RIL/PTH-J3-0117 BUNDLE SUB PIPE RACK ACR 001 H360-013-B82 4 0.14 0.26 400 275 1461 0.64

118 H360-013-CT1 ~ CT2 H360-013-CT1 ~ CT2 RIL/PTH-J3-0118 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT1 ~ CT2 8 0.11 0.53 1110 658 388 2.27

119 H360-013-B19, B80 ~ B81 H360-013-B19, B80 ~ B81 RIL/PTH-J3-0119 BUNDLE SUB PIPE RACK ACR 001 H360-013-B19, B80 ~ B81 4 0.23 0.38 436 378 4657 3.07

120 H360-013-B7 ~ B11 H360-013-B7 ~ B11 RIL/PTH-J3-0120 BUNDLE SUB PIPE RACK ACR 001 H360-013-B7 ~ B11 5 0.59 0.78 874 399 5942 10.36

121 H360-013-B4 H360-013-B4 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 H360-013-B4 1 0.16 0.20 856 352 4827 1.45

122 H360-013-B5 H360-013-B5 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 H360-013-B5 1 0.58 0.63 1722 578 5944 5.92

123 H360-013-B6 H360-013-B6 RIL/PTH-J3-0123 BUNDLE SUB PIPE RACK ACR 001 H360-013-B6 1 0.58 0.63 1718 578 5944 5.90

124 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 H360-013-CT5 1 0.12 0.19 380 1031 1684 0.66

125 H360-013-B1 H360-013-B1 RIL/PTH-J3-0125 SKID SUB PIPE RACK ACR 001 H30-013-B1 1 0.11 0.15 399 336 2904 0.39

126 H360-013-B2 H360-013-B2 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 H360-013-B2 11 1.91 2.58 971 833 5673 50.47

127 H360-013-B3 H360-013-B3 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 H360-013-B3 6 0.87 1.13 397 503 4827 5.78

128 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB1 4 0.17 0.32 397 413 1389 0.91

129 H360-013-B55 H360-013-B55 RIL/PTH-J3-0129 SKID SUB PIPE RACK ACR 001 H360-013-B55 1 0.21 0.27 358 876 5673 1.78

130 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0130 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT3 3 0.20 0.35 900 649 1442 2.53

Page 71: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 71 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

131 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 H360-013-CT5 1 0.13 0.23 380 1420 1684 0.91

132 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 H360-013-CT14 1 0.12 0.16 826 380 1684 0.53

133 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0133 SKID SUB PIPE RACK ACR 001 H360-013-FR1 1 0.38 0.46 777 1242 4790 4.62

134 RIL/PTH-J3-0134 BUNDLE 10 1.31 1.79 750 587 5673 24.98

135 RIL/PTH-J3-0135 BUNDLE 20 5.55 6.91 1142 966 5673 125.17

136 H360-013-B14 H360-013-B14 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 H360-013-B14 1 0.85 0.89 1821 520 5942 5.63

137 H360-013-B15 H360-013-B15 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 H360-013-B15 1 0.63 0.67 1233 520 5942 3.81

138 H360-013-B16 H360-013-B16 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 H360-013-B16 1 0.78 0.83 1615 519 5944 4.98

139 H360-013-B18 H360-013-B18 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 H360-013-B18 1 0.37 0.42 410 642 5673 1.49

140 H360-013-B22 H360-013-B22 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 H360-013-B22 1 0.36 0.41 609 666 4594 1.86

141 H360-013-B24 H360-013-B24 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 H360-013-B24 1 0.73 0.77 1584 406 5607 3.61

142 H360-013-B26 H360-013-B26 RIL/PTH-J3-0142 SKID SUB PIPE RACK ACR 001 H360-013-B26 1 0.09 0.15 633 662 1181 0.49

143 H360-013-B28 H360-013-B28 RIL/PTH-J3-0143 BUNDLE SUB PIPE RACK ACR 001 H360-013-B28 2 0.69 0.82 793 864 4617 6.33

144 H360-013-B30 H360-013-B30 RIL/PTH-J3-0144 SKID SUB PIPE RACK ACR 001 H360-013-B30 1 0.36 0.43 846 958 4594 3.72

145 H360-013-B31 H360-013-B31 RIL/PTH-J3-0145 BUNDLE SUB PIPE RACK ACR 001 H360-013-B31 2 0.70 0.82 610 868 4617 4.89

146 H360-013-B32 H360-013-B32 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 H360-013-B32 1 0.37 0.42 610 745 4617 2.10

H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B36

H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

SUB PIPE RACK ACR 001 H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

SUB PIPE RACK ACR 001 H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

Page 72: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 72 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

147 H360-013-B34 H360-013-B34 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 H360-013-B34 1 0.73 0.76 1165 344 5607 2.25

148 H360-013-B35 H360-013-B35 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 H360-013-B35 1 0.87 0.91 1284 401 5942 3.06

149 H360-013-B36 H360-013-B36 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 H360-013-B36 1 0.06 0.10 659 406 731 0.20

150 H360-013-B39 H360-013-B39 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 H360-013-B39 1 0.37 0.42 410 657 5951 1.60

151 H360-013-B40 H360-013-B40 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 H360-013-B40 1 0.37 0.43 410 660 5951 1.61

152 H360-013-B42 H360-013-B42 RIL/PTH-J3-0152 SKID SUB PIPE RACK ACR 001 H360-013-B42 1 0.32 0.38 410 867 4961 1.76

153 H360-013-B43 H360-013-B43 RIL/PTH-J3-0153 BUNDLE SUB PIPE RACK ACR 001 H360-013-B43 3 0.95 1.11 344 660 4961 3.38

154 H360-013-B44 H360-013-B44 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 H360-013-B44 1 0.32 0.39 410 868 4961 1.77

155 H360-013-B45 H360-013-B45 RIL/PTH-J3-0155 SKID SUB PIPE RACK ACR 001 H360-013-B45 1 0.33 0.40 410 868 4961 1.77

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 35.77 363.58

D. H361-013 SUB PIPE RACK ACR 001

156 H360-013-VB19 ~ 23 H360-013-VB19 ~ 23 RIL/PTH-J3-0113 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23 10 0.16 0.52 361 375 1526 2.07

157 RIL/PTH-J3-0157 BUNDLE 25 0.49 1.63 461 545 1987 12.48

158 H361-013-CT7 ~ CT13 H361-013-CT7 ~ CT13 RIL/PTH-J3-0158 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT7 ~ CT13 13 0.19 1.42 1270 871 1150 16.54

159 H361-013-B67 ~ B79, B88 H361-013-B67 ~ B79, B88 RIL/PTH-J3-0159 BUNDLE SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88 20 0.58 2.72 461 1020 2962 27.86

160 H361-013-B82 H361-013-B82 RIL/PTH-J3-0160 BUNDLE SUB PIPE RACK ACR 001 H361-013-B82 4 0.14 0.26 400 275 1461 0.64

161 H361-013-CT1 ~ CT2 H361-013-CT1 ~ CT2 RIL/PTH-J3-0161 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT1 ~ CT2 8 0.11 0.53 1110 658 388 2.27

162 H361-013-B19, B80 ~ B81 H361-013-B19, B80 ~ B81 RIL/PTH-J3-0162 BUNDLE SUB PIPE RACK ACR 001 H361-013-B19, B80 ~ B81 4 0.23 0.38 436 378 4657 3.07

H361-013-HB2 ~ HB6, VB16 ~ VB18

H361-013-HB2 ~ HB6, VB16 ~ VB18

SUB PIPE RACK ACR 001 H361-013-HB2 ~ HB6, VB16 ~ VB18

L472
Design Engineer: Summary Edit
Page 73: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 73 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

163 H361-013-B7 ~ B11 H361-013-B7 ~ B11 RIL/PTH-J3-0163 BUNDLE SUB PIPE RACK ACR 001 H361-013-B7 ~ B11 5 0.59 0.78 874 399 5942 10.36

164 H361-013-B4 H361-013-B4 RIL/PTH-J3-0164 BUNDLE SUB PIPE RACK ACR 001 H361-013-B4 1 0.16 0.20 856 352 4827 1.45

165 H361-013-B5 H361-013-B5 RIL/PTH-J3-0165 BUNDLE SUB PIPE RACK ACR 001 H361-013-B5 1 0.58 0.63 1722 578 5944 5.92

166 H361-013-B6 H361-013-B6 RIL/PTH-J3-0166 BUNDLE SUB PIPE RACK ACR 001 H361-013-B6 1 0.58 0.63 1718 578 5944 5.90

167 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 H361-013-CT5 1 0.12 0.19 380 1031 1684 0.66

168 H361-013-B1 H361-013-B1 RIL/PTH-J3-0168 SKID SUB PIPE RACK ACR 001 H31-013-B1 1 0.11 0.15 399 336 2904 0.39

169 H361-013-B2 H361-013-B2 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 H361-013-B2 11 1.91 2.58 971 833 5673 50.47

170 H361-013-B3 H361-013-B3 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 H361-013-B3 6 0.87 1.13 397 503 4827 5.78

171 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0171 BUNDLE SUB PIPE RACK ACR 001 H361-013-VB1 4 0.17 0.32 397 413 1389 0.91

172 H361-013-B55 H361-013-B55 RIL/PTH-J3-0172 SKID SUB PIPE RACK ACR 001 H361-013-B55 1 0.21 0.27 358 876 5673 1.78

173 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0173 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT3 3 0.20 0.35 900 649 1442 2.53

174 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 H361-013-CT5 1 0.13 0.23 380 1420 1684 0.91

175 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 H361-013-CT14 1 0.12 0.16 826 380 1684 0.53

176 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0176 SKID SUB PIPE RACK ACR 001 H361-013-FR1 1 0.38 0.46 777 1242 4790 4.62

177 RIL/PTH-J3-0177 BUNDLE 10 1.31 1.79 750 587 5673 24.98

178 RIL/PTH-J3-0178 BUNDLE 20 5.55 6.91 1142 966 5673 125.17

H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B36

H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

SUB PIPE RACK ACR 001 H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

SUB PIPE RACK ACR 001 H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

Page 74: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 74 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

179 H361-013-B14 H361-013-B14 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 H361-013-B14 1 0.85 0.89 1821 520 5942 5.63

180 H361-013-B15 H361-013-B15 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 H361-013-B15 1 0.63 0.67 1233 520 5942 3.81

181 H361-013-B16 H361-013-B16 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 H361-013-B16 1 0.78 0.83 1615 519 5944 4.98

182 H361-013-B18 H361-013-B18 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 H361-013-B18 1 0.37 0.42 410 642 5673 1.49

183 H361-013-B22 H361-013-B22 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 H361-013-B22 1 0.36 0.41 609 666 4594 1.86

184 H361-013-B24 H361-013-B24 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 H361-013-B24 1 0.73 0.77 1584 406 5607 3.61

185 H361-013-B26 H361-013-B26 RIL/PTH-J3-0185 SKID SUB PIPE RACK ACR 001 H361-013-B26 1 0.09 0.15 633 662 1181 0.49

186 H361-013-B28 H361-013-B28 RIL/PTH-J3-0186 BUNDLE SUB PIPE RACK ACR 001 H361-013-B28 2 0.69 0.82 793 864 4617 6.33

187 H361-013-B30 H361-013-B30 RIL/PTH-J3-0187 SKID SUB PIPE RACK ACR 001 H361-013-B30 1 0.36 0.43 846 958 4594 3.72

188 H361-013-B31 H361-013-B31 RIL/PTH-J3-0188 BUNDLE SUB PIPE RACK ACR 001 H361-013-B31 2 0.70 0.82 610 868 4617 4.89

189 H361-013-B32 H361-013-B32 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 H361-013-B32 1 0.37 0.42 610 745 4617 2.10

190 H361-013-B34 H361-013-B34 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 H361-013-B34 1 0.73 0.76 1165 344 5607 2.25

191 H361-013-B35 H361-013-B35 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 H361-013-B35 1 0.87 0.91 1284 401 5942 3.06

192 H361-013-B36 H361-013-B36 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 H361-013-B36 1 0.06 0.10 659 406 731 0.20

193 H361-013-B39 H361-013-B39 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 H361-013-B39 1 0.37 0.42 410 657 5951 1.60

194 H361-013-B40 H361-013-B40 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 H361-013-B40 1 0.37 0.43 410 660 5951 1.61

195 H361-013-B42 H361-013-B42 RIL/PTH-J3-0195 SKID SUB PIPE RACK ACR 001 H361-013-B42 1 0.32 0.38 410 867 4961 1.76

Page 75: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 75 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

196 H361-013-B43 H361-013-B43 RIL/PTH-J3-0196 BUNDLE SUB PIPE RACK ACR 001 H361-013-B43 3 0.95 1.11 344 660 4961 3.38

197 H361-013-B44 H361-013-B44 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 H361-013-B44 1 0.32 0.39 410 868 4961 1.77

198 H361-013-B45 H361-013-B45 RIL/PTH-J3-0198 SKID SUB PIPE RACK ACR 001 H361-013-B45 1 0.33 0.40 410 868 4961 1.77

#REF! 176 25.15 35.77 363.58 25155

D. H360-009 SULPHUR RECOVERY UNIT APR 002

199 RIL/PTH-J3-0199 BUNDLE 48 3.00 5.36 698 610 3940 80.52

200 RIL/PTH-J3-0200 BUNDLE 9 0.13 0.43 326 319 2409 2.25

201 RIL/PTH-J3-0201 BUNDLE 83 1.58 7.79 585 624 3480 105.44

202 H360-009-1B123 ~ 1B124 H360-009-1B123 ~ 1B124 RIL/PTH-J3-0202 BUNDLE 4 0.04 0.16 330 229 1099 0.33

203 H360-009-1B254 ~ 1B255 H360-009-1B254 ~ 1B255 RIL/PTH-J3-0203 BUNDLE 2 0.03 0.09 386 254 969 0.19

204 RIL/PTH-J3-0204 BUNDLE 36 2.39 4.76 950 920 2961 93.16

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H360-009-1B123 ~ 1B124

SULPHUR RECOVERY UNIT APR 002 H360-009-1B254 ~ 1B255

H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

SULPHUR RECOVERY UNIT APR 002 H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

Page 76: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 76 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

205 RIL/PTH-J3-0205 BUNDLE 68 2.67 11.36 1087 1278 2964 279.99

206 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0206 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1CT27 4 0.05 0.18 352 289 312 0.13

207 33 2.09 6.41 1372 1314 5964 354.81

208 H360-009-1CT28 ~ 1CT32 H360-009-1CT28 ~ 1CT32 RIL/PTH-J3-0208 BUNDLE 9 0.32 1.60 1180 1457 1988 30.76

209 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B114 1 0.05 0.09 680 375 1463 0.37

210 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B117 1 0.11 0.16 682 591 3093 1.25

211 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B122 1 0.05 0.08 403 333 1463 0.20

212 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B125 1 0.08 0.12 403 333 2899 0.39

213 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B126 1 0.08 0.12 403 333 2963 0.40

214 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B127 1 0.05 0.09 403 333 1459 0.20

215 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B129 1 0.10 0.13 403 333 2964 0.40

216 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B130 1 0.09 0.13 403 333 2964 0.40

217 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B131 1 0.09 0.12 403 333 2964 0.40

H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

SULPHUR RECOVERY UNIT APR 002 H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32

Page 77: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 77 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

218 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B132 1 0.09 0.12 403 333 2964 0.40

219 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B137 1 0.05 0.09 403 333 1459 0.20

220 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B144 1 0.04 0.08 403 333 1411 0.19

221 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B148 1 0.10 0.13 403 333 2860 0.38

222 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0222 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B149 1 0.09 0.13 403 333 2860 0.38

223 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0223 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B150 2 0.10 0.17 403 333 1461 0.39

224 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B152 1 0.06 0.09 403 333 1348 0.18

225 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B153 1 0.12 0.15 403 333 3093 0.42

226 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B155 1 0.15 0.19 403 333 5464 0.73

227 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B156 1 0.17 0.20 403 333 5964 0.80

228 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B159 1 0.07 0.11 403 333 2364 0.32

229 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B160 1 0.08 0.11 403 333 2364 0.32

230 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B162 1 0.23 0.27 403 333 7882 1.06

231 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B259 1 0.09 0.13 403 333 3062 0.41

232 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR6 1 0.35 0.39 403 333 1744 0.23

233 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR7 1 0.19 0.22 403 333 647 0.09

234 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR8 1 0.18 0.21 403 333 647 0.09

Page 78: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 78 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

235 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0235 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR9 1 0.16 0.19 403 333 1850 0.25

236 RIL/PTH-J3-0236 BUNDLE 21 3.37 6.03 1218 1262 5963 192.48

237 RIL/PTH-J3-0237 BUNDLE 24 2.56 7.11 1121 2042 5461 300.02

238 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0238 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B46 2 0.14 0.24 456 566 1464 0.76

239 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B47 1 0.22 0.28 456 787 5460 1.96

240 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B48 1 0.23 0.29 455 885 5460 2.20

241 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B51 1 0.25 0.31 455 845 5462 2.10

242 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B53 1 0.18 0.23 455 696 3962 1.25

243 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0243 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B54 1 0.18 0.23 456 699 3963 1.26

244 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0244 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B55 5 1.19 1.39 634 456 5585 8.07

245 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B61 1 0.28 0.35 851 1010 5462 4.69

246 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B62 1 0.23 0.29 850 822 5462 3.82

247 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0247 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B63 1 0.23 0.28 850 612 5462 2.84

248 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0248 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B64 5 1.07 1.25 641 346 5462 6.06

249 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B65 1 0.22 0.28 456 817 5462 2.03

250 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B66 1 0.23 0.29 455 814 5462 2.02

H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

SULPHUR RECOVERY UNIT APR 002 H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

SULPHUR RECOVERY UNIT APR 002 H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

Page 79: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 79 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

251 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B67 1 0.22 0.27 456 574 5462 1.43

252 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0252 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B68 1 0.23 0.29 456 847 5462 2.11

253 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0253 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B70 3 0.67 0.86 456 849 5462 6.34

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88 62400

E. H361-009 SULPHUR RECOVERY UNIT APR 002

254 RIL/PTH-J3-0254 BUNDLE 48 3.00 5.36 698 610 3940 80.52

255 RIL/PTH-J3-0255 BUNDLE 9 0.13 0.43 326 319 2409 2.25

256 RIL/PTH-J3-0256 BUNDLE 83 1.58 7.79 585 624 3480 105.44

257 H361-009-1B123 ~ 1B124 H360-009-1B123 ~ 1B124 RIL/PTH-J3-0257 BUNDLE 4 0.04 0.16 330 229 1099 0.33

258 H361-009-1B254 ~ 1B255 H360-009-1B254 ~ 1B255 RIL/PTH-J3-0258 BUNDLE 2 0.03 0.09 386 254 969 0.19

259 RIL/PTH-J3-0259 BUNDLE 36 2.39 4.76 950 920 2961 93.16

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25

SULPHUR RECOVERY UNIT APR 002 H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H361-009-1B123 ~ 1B124

SULPHUR RECOVERY UNIT APR 002 H361-009-1B254 ~ 1B255

H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

SULPHUR RECOVERY UNIT APR 002 H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

Page 80: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 80 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

260 RIL/PTH-J3-0260 BUNDLE 68 2.67 11.36 1087 1278 2964 279.99

261 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0261 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1CT27 4 0.05 0.18 352 289 312 0.13

262 RIL/PTH-J3-0262 33 2.09 6.41 1372 1314 5964 354.81

263 H361-009-1CT28 ~ 1CT32 H361-009-1CT28 ~ 1CT32 RIL/PTH-J3-0263 BUNDLE 9 0.32 1.60 1180 1457 1988 30.76

264 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B114 1 0.05 0.09 680 375 1463 0.37

265 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B117 1 0.11 0.16 682 591 3093 1.25

266 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B122 1 0.05 0.08 403 333 1463 0.20

267 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B125 1 0.08 0.12 403 333 2899 0.39

268 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B126 1 0.08 0.12 403 333 2963 0.40

269 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B127 1 0.05 0.09 403 333 1459 0.20

270 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B129 1 0.10 0.13 403 333 2964 0.40

271 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B130 1 0.09 0.13 403 333 2964 0.40

272 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B131 1 0.09 0.12 403 333 2964 0.40

H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

SULPHUR RECOVERY UNIT APR 002 H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32

Page 81: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 81 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

273 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B132 1 0.09 0.12 403 333 2964 0.40

274 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B137 1 0.05 0.09 403 333 1459 0.20

275 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B144 1 0.04 0.08 403 333 1411 0.19

276 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B148 1 0.10 0.13 403 333 2860 0.38

277 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0277 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B149 1 0.09 0.13 403 333 2860 0.38

278 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0278 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B150 2 0.10 0.17 403 333 1461 0.39

279 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B152 1 0.06 0.09 403 333 1348 0.18

280 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B153 1 0.12 0.15 403 333 3093 0.42

281 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B155 1 0.15 0.19 403 333 5464 0.73

282 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B156 1 0.17 0.20 403 333 5964 0.80

283 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B159 1 0.07 0.11 403 333 2364 0.32

284 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B160 1 0.08 0.11 403 333 2364 0.32

285 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B162 1 0.23 0.27 403 333 7882 1.06

286 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B259 1 0.09 0.13 403 333 3062 0.41

287 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR6 1 0.35 0.39 403 333 1744 0.23

288 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR7 1 0.19 0.22 403 333 647 0.09

289 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR8 1 0.18 0.21 403 333 647 0.09

Page 82: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 82 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

290 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0290 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR9 1 0.16 0.19 403 333 1850 0.25

291 RIL/PTH-J3-0291 BUNDLE 21 3.37 6.03 1218 1262 5963 192.48

292 RIL/PTH-J3-0292 BUNDLE 24 2.56 7.11 1121 2042 5461 300.02

293 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0293 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B46 2 0.14 0.24 456 566 1464 0.76

294 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B47 1 0.22 0.28 456 787 5460 1.96

295 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B48 1 0.23 0.29 455 885 5460 2.20

296 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B51 1 0.25 0.31 455 845 5462 2.10

297 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B53 1 0.18 0.23 455 696 3962 1.25

298 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0298 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B54 1 0.18 0.23 456 699 3963 1.26

299 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0299 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B55 5 1.19 1.39 634 456 5585 8.07

300 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B61 1 0.28 0.35 851 1010 5462 4.69

301 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B62 1 0.23 0.29 850 822 5462 3.82

302 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0302 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B63 1 0.23 0.28 850 612 5462 2.84

303 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0303 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B64 5 1.07 1.25 641 346 5462 6.06

304 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B65 1 0.22 0.28 456 817 5462 2.03

H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

SULPHUR RECOVERY UNIT APR 002 H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

SULPHUR RECOVERY UNIT APR 002 H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

Page 83: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 83 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

305 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B66 1 0.23 0.29 455 814 5462 2.02

306 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B67 1 0.22 0.27 456 574 5462 1.43

307 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0307 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B68 1 0.23 0.29 456 847 5462 2.11

308 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0308 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B70 3 0.67 0.86 456 849 5462 6.34

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88

GRAND TOTAL 1256 1012.12 1122.86 5075.49