PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82
7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53
11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53
12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34
16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07
23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57
32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31
36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41
41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43
46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66
50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28
53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49
59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99
61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53
65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88
67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49
73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33
74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61
79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01
84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68
91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60
95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17
97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77
101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 7.23 1192 1450 8437 14.58
H220-550-FPGC16 H220-550-FPGC16 RIL/PTH-J3-0102 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66
H220-550-FPGC28 H220-550-FPGC28 RIL/PTH-J3-0103 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66
H361-013-VB5 H361-013-VB5
BUNDLE
SUB PIPE RACK ACR 001 4 1.10 1.28 649 505 2130 2.79
H361-013-VB6 H361-013-VB6 SUB PIPE RACK ACR 001 4 1.18 1.36 649 506 2397 3.15
H361-013-VB7 H361-013-VB7 SUB PIPE RACK ACR 001 4 1.18 1.36 653 508 2456 3.26
285 H361-013-B50 H361-013-B50BUNDLE
SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673
289 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
04/18/2023 23:19:02
Page 2 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
8 2.71 3.30 670 1050 5720 32.19
A. H210-550 ROOD MILL STRUCTURE
1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99
2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51
4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34
5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59
6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54
8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28
9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79
10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73
13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35
14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54
15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40
17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45
18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78
19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78
20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87
21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16
22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47
24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35
25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13
26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58
27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22
28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70
29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74
30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50
31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20
33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47
34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35
35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76
37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70
38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31
39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15
40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99
42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22
43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12
44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29
45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28
47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22
48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28
49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83
51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48
52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49
04/18/2023 23:19:03
Page 3 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11
55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89
56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47
57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34
58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02
60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99
62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96
63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93
64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12
66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09
68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42
69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25
70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18
71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31
72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82
75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99
76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31
77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51
78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41
80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65
81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41
82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73
83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24
85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91
86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39
87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01
88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33
89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42
90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15
92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44
93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83
94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01
96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42
98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59
99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02
SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 76 634.55 647.59 905.65
B. H220-550 ROOD MILL STRUCTURE
100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73
102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.75 1440 1495 5000 10.76
103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.20 1400 1540 12000 25.87
104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.77 1540 1250 10500 20.21
105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.41 1547 1608 8437 20.99
106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.59 1540 1180 5000 9.09
107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.27 2259 1271 12000 34.45
04/18/2023 23:19:03
Page 4 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.35 1524 961 10500 15.38
109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.57 1125 1540 6036 10.46
110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.31 1550 885 8437 11.57
111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 2 11.33 11.60 1540 995 5000 15.32
SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 12 92.96 7.23 184.84
C. H360-013 SUB PIPE RACK ACR 001
112 H360-013-VB19 H360-013-VB19
RIL/PTH-J3-0112 BUNDLE
SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526 0.27
113 H360-013-VB20 H360-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151 0.21
114 H360-013-VB21 H360-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862 0.31
115 H360-013-VB22 H360-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898 0.08
116 H360-013-VB23 H360-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760 0.07
10 0.16 0.52 361 375 1526 2.07
117 H360-013-HB1 H360-013-HB1
RIL/PTH-J3-0113 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334 0.11
118 H360-013-HB2 H360-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450 0.12
119 H360-013-HB3 H360-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484 0.12
120 H360-013-HB4 H360-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536 0.13
121 H360-013-HB5 H360-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987 2.67
122 H360-013-HB6 H360-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698 0.14
123 H360-013-VB16 H360-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870 0.07
124 H360-013-VB17 H360-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652 0.28
125 H360-013-VB18 H360-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455 0.12
25 0.49 1.63 461 545 1987 12.48
126 H360-013-CT6 H360-013-CT6
RIL/PTH-J3-0114 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150 0.09
127 H360-013-CT7 H360-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150 0.18
128 H360-013-CT8 H360-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150 0.19
129 H360-013-CT9 H360-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150 0.88
130 H360-013-CT10 H360-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150 0.18
131 H360-013-CT11 H360-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150 0.45
132 H360-013-CT12 H360-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935 0.14
133 H360-013-CT13 H360-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045 0.08
13 0.19 1.42 1270 871 1150 16.54
134 H360-013-B67 H360-013-B67
RIL/PTH-J3-0115 BUNDLE
SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
135 H360-013-B68 H360-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
136 H360-013-B69 H360-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
137 H360-013-B70 H360-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
138 H360-013-B71 H360-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461 0.84
139 H360-013-B72 H360-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461 0.28
140 H360-013-B73 H360-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
141 H360-013-B74 H360-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
142 H360-013-B75 H360-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
143 H360-013-B76 H360-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
04/18/2023 23:19:03
Page 5 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
144 H360-013-B77 H360-013-B77
RIL/PTH-J3-0115 BUNDLE
SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
145 H360-013-B78 H360-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334 0.67
146 H360-013-B79 H360-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962 0.29
147 H360-013-B88 H360-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211 0.15
20 0.58 2.72 461 1020 2962 27.86
148 H360-013-B82 H360-013-B82 RIL/PTH-J3-0116 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461 0.64
4 0.14 0.26 400 275 1461 0.64
149 H360-013-CT1 H360-013-CT1RIL/PTH-J3-0117 BUNDLE
SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388 0.36
150 H360-013-CT2 H360-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388 0.66
8 0.11 0.53 1110 658 388 2.27
151 H360-013-B19 H360-013-B19
RIL/PTH-J3-0118 BUNDLE
SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461 0.20
152 H360-013-B80 H360-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461 0.39
153 H360-013-B81 H360-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657 0.77
4 0.23 0.38 436 378 4657 3.07
154 H360-013-B7 H360-013-B7
RIL/PTH-J3-0119 BUNDLE
SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673 0.99
155 H360-013-B8 H360-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142 0.18
156 H360-013-B9 H360-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942 0.94
157 H360-013-B10 H360-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102 0.34
158 H360-013-B11 H360-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102 0.30
5 0.59 0.78 874 399 5942 10.36
159 H360-013-B4 H360-013-B4 RIL/PTH-J3-0120 BUNDLE SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827 1.45
1 0.16 0.20 856 352 4827 1.45
160 H360-013-B5 H360-013-B5 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944 5.92
1 0.58 0.63 1722 578 5944 5.92
161 H360-013-B6 H360-013-B6 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944 5.90
1 0.58 0.63 1718 578 5944 5.90
162 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0123 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684 0.66
1 0.12 0.19 380 1031 1684 0.66
163 H360-013-B1 H360-013-B1 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904 0.39
1 0.11 0.15 399 336 2904 0.39
164 H360-013-B2 H360-013-B2 RIL/PTH-J3-0125 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673 10.68
11 1.91 2.58 971 833 5673 50.47
165 H360-013-B3 H360-013-B3 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827 3.64
04/18/2023 23:19:03
Page 6 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
6 0.87 1.13 397 503 4827 5.78
166 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0127 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389 0.70
4 0.17 0.32 397 413 1389 0.91
167 H360-013-B55 H360-013-B55 RIL/PTH-J3-0128 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673 1.78
1 0.21 0.27 358 876 5673 1.78
168 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0129 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442 1.48
3 0.20 0.35 900 649 1442 2.53
169 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0130 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684 0.91
1 0.13 0.23 380 1420 1684 0.91
170 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684 0.53
1 0.12 0.16 826 380 1684 0.53
171 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790 4.62
1 0.38 0.46 777 1242 4790 4.62
172 H360-013-B12 H360-013-B12
RIL/PTH-J3-0133 BUNDLE
SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236 0.63
173 H360-013-B13 H360-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236 0.30
174 H360-013-B17 H360-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086 0.27
175 H360-013-B20 H360-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673 0.94
176 H360-013-B21 H360-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94
177 H360-013-B23 H360-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142 0.25
178 H360-013-B25 H360-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142 0.29
179 H360-013-B27 H360-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181 0.20
180 H360-013-B37 H360-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731 0.12
10 1.31 1.79 750 587 5673 24.98
181 H360-013-B29 H360-013-B29
RIL/PTH-J3-0134 BUNDLE
SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617 1.31
182 H360-013-B33 H360-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594 1.30
183 H360-013-B38 H360-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912 0.97
184 H360-013-B41 H360-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201 0.41
185 H360-013-B50 H360-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673 6.61
186 H360-013-B51 H360-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94
187 H360-013-B52 H360-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93
188 H360-013-B53 H360-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93
189 H360-013-B56 H360-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93
190 H360-013-B84 H360-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593 1.30
191 H360-013-SC1 H360-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530 0.98
20 5.55 6.91 1142 966 5673 125.17
04/18/2023 23:19:03
Page 7 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
192 H360-013-B14 H360-013-B14 RIL/PTH-J3-0135 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942 5.63
1 0.85 0.89 1821 520 5942 5.63
193 H360-013-B15 H360-013-B15 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942 3.81
1 0.63 0.67 1233 520 5942 3.81
194 H360-013-B16 H360-013-B16 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944 4.98
1 0.78 0.83 1615 519 5944 4.98
195 H360-013-B18 H360-013-B18 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673 1.49
1 0.37 0.42 410 642 5673 1.49
196 H360-013-B22 H360-013-B22 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594 1.86
1 0.36 0.41 609 666 4594 1.86
197 H360-013-B24 H360-013-B24 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61
1 0.73 0.77 1584 406 5607 3.61
198 H360-013-B26 H360-013-B26 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181 0.49
1 0.09 0.15 633 662 1181 0.49
199 H360-013-B28 H360-013-B28 RIL/PTH-J3-0142 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617 6.33
2 0.69 0.82 793 864 4617 6.33
200 H360-013-B30 H360-013-B30 RIL/PTH-J3-0143 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594 3.72
1 0.36 0.43 846 958 4594 3.72
201 H360-013-B31 H360-013-B31 RIL/PTH-J3-0144 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617 4.89
2 0.70 0.82 610 868 4617 4.89
202 H360-013-B32 H360-013-B32 RIL/PTH-J3-0145 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10
1 0.37 0.42 610 745 4617 2.10
203 H360-013-B34 H360-013-B34 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607 2.25
1 0.73 0.76 1165 344 5607 2.25
204 H360-013-B35 H360-013-B35 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942 3.06
1 0.87 0.91 1284 401 5942 3.06
205 H360-013-B36 H360-013-B36 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731 0.20
1 0.06 0.10 659 406 731 0.20
206 H360-013-B39 H360-013-B39 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951 1.60
1 0.37 0.42 410 657 5951 1.60
04/18/2023 23:19:03
Page 8 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
207 H360-013-B40 H360-013-B40 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951 1.61
1 0.37 0.43 410 660 5951 1.61
208 H360-013-B42 H360-013-B42 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961 1.76
1 0.32 0.38 410 867 4961 1.76
209 H360-013-B43 H360-013-B43 RIL/PTH-J3-0152 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961 3.38
3 0.95 1.11 344 660 4961 3.38
210 H360-013-B44 H360-013-B44 RIL/PTH-J3-0153 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961 1.77
1 0.32 0.39 410 868 4961 1.77
211 H360-013-B45 H360-013-B45 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961 1.77
1 0.33 0.40 410 868 4961 1.77
SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 35.77 363.58
D. H361-013 SUB PIPE RACK ACR 001
212 H361-013-VB19 H361-013-VB19
RIL/PTH-J3-0155BUNDLE
SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526 0.27
213 H361-013-VB20 H361-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151 0.21
214 H361-013-VB21 H361-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862 0.31
215 H361-013-VB22 H361-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898 0.08
216 H361-013-VB23 H361-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760 0.07
10 0.16 0.52 361 375 1526 2.07
217 H361-013-HB1 H361-013-HB1
RIL/PTH-J3-0156 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334 0.11
218 H361-013-HB2 H361-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450 0.12
219 H361-013-HB3 H361-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484 0.12
220 H361-013-HB4 H361-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536 0.13
221 H361-013-HB5 H361-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987 2.67
222 H361-013-HB6 H361-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698 0.14
223 H361-013-VB16 H361-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870 0.07
224 H361-013-VB17 H361-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652 0.28
225 H361-013-VB18 H361-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455 0.12
25 0.49 1.63 461 545 1987 12.48
226 H361-013-CT6 H361-013-CT6
RIL/PTH-J3-0157 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150 0.09
227 H361-013-CT7 H361-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150 0.18
228 H361-013-CT8 H361-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150 0.19
229 H361-013-CT9 H361-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150 0.88
230 H361-013-CT10 H361-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150 0.18
231 H361-013-CT11 H361-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150 0.45
232 H361-013-CT12 H361-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935 0.14
233 H361-013-CT13 H361-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045 0.08
04/18/2023 23:19:03
Page 9 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
13 0.19 1.42 1270 871 1150 16.54
234 H361-013-B67 H361-013-B67
RIL/PTH-J3-0158 BUNDLE
SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
235 H361-013-B68 H361-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
236 H361-013-B69 H361-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
237 H361-013-B70 H361-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
238 H361-013-B71 H361-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461 0.84
239 H361-013-B72 H361-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461 0.28
240 H361-013-B73 H361-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
241 H361-013-B74 H361-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
242 H361-013-B75 H361-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
243 H361-013-B76 H361-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
244 H361-013-B77 H361-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14
245 H361-013-B78 H361-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334 0.67
246 H361-013-B79 H361-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962 0.29
247 H361-013-B88 H361-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211 0.15
20 0.58 2.72 461 1020 2962 27.86
248 H361-013-B82 H361-013-B82 RIL/PTH-J3-0159 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461 0.64
4 0.14 0.26 400 275 1461 0.64
249 H361-013-CT1 H361-013-CT1RIL/PTH-J3-0160 BUNDLE
SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388 0.36
250 H361-013-CT2 H361-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388 0.66
8 0.11 0.53 1110 658 388 2.27
251 H361-013-B19 H361-013-B19
RIL/PTH-J3-0161 BUNDLE
SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461 0.20
252 H361-013-B80 H361-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461 0.39
253 H361-013-B81 H361-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657 0.77
4 0.23 0.38 436 378 4657 3.07
254 H361-013-B7 H361-013-B7
RIL/PTH-J3-0162 BUNDLE
SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673 0.99
255 H361-013-B8 H361-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142 0.18
256 H361-013-B9 H361-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942 0.94
257 H361-013-B10 H361-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102 0.34
258 H361-013-B11 H361-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102 0.30
5 0.59 0.78 874 399 5942 10.36
259 H361-013-B4 H361-013-B4 RIL/PTH-J3-0163 SKID SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827 1.45
1 0.16 0.20 856 352 4827 1.45
260 H361-013-B5 H361-013-B5 RIL/PTH-J3-0164 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944 5.92
1 0.58 0.63 1722 578 5944 5.92
261 H361-013-B6 H361-013-B6 RIL/PTH-J3-0165 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944 5.90
04/18/2023 23:19:03
Page 10 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.58 0.63 1718 578 5944 5.90
262 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0166 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684 0.66
1 0.12 0.19 380 1031 1684 0.66
263 H361-013-B1 H361-013-B1 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904 0.39
1 0.11 0.15 399 336 2904 0.39
264 H361-013-B2 H361-013-B2 RIL/PTH-J3-0168 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673 10.68
11 1.91 2.58 971 833 5673 50.47
265 H361-013-B3 H361-013-B3 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827 3.64
6 0.87 1.13 397 503 4827 5.78
266 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389 0.70
4 0.17 0.32 397 413 1389 0.91
267 H361-013-B55 H361-013-B55 RIL/PTH-J3-0171 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673 1.78
1 0.21 0.27 358 876 5673 1.78
268 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0172 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442 1.48
3 0.20 0.35 900 649 1442 2.53
269 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0173 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684 0.91
1 0.13 0.23 380 1420 1684 0.91
270 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684 0.53
1 0.12 0.16 826 380 1684 0.53
271 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790 4.62
1 0.38 0.46 777 1242 4790 4.62
272 H361-013-B12 H361-013-B12
RIL/PTH-J3-0176 BUNDLE
SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236 0.63
273 H361-013-B13 H361-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236 0.30
274 H361-013-B17 H361-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086 0.27
275 H361-013-B20 H361-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673 0.94
276 H361-013-B21 H361-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94
277 H361-013-B23 H361-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142 0.25
278 H361-013-B25 H361-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142 0.29
279 H361-013-B27 H361-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181 0.20
280 H361-013-B37 H361-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731 0.12
10 1.31 1.79 750 587 5673 24.98
281 H361-013-B29 H361-013-B29 RIL/PTH-J3-0177 BUNDLE SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617 1.31
04/18/2023 23:19:03
Page 11 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
282 H361-013-B33 H361-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594 1.30
283 H361-013-B38 H361-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912 0.97
284 H361-013-B41 H361-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201 0.41
286 H361-013-B51 H361-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94
287 H361-013-B52 H361-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93
288 H361-013-B53 H361-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93
290 H361-013-B84 H361-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593 1.30
291 H361-013-SC1 H361-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530 0.98
12 2.83 3.65 1142 966 5640 74.66
292 H361-013-B14 H361-013-B14 RIL/PTH-J3-0178 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942 5.63
1 0.85 0.89 1821 520 5942 5.63
293 H361-013-B15 H361-013-B15 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942 3.81
1 0.63 0.67 1233 520 5942 3.81
294 H361-013-B16 H361-013-B16 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944 4.98
1 0.78 0.83 1615 519 5944 4.98
295 H361-013-B18 H361-013-B18 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673 1.49
1 0.37 0.42 410 642 5673 1.49
296 H361-013-B22 H361-013-B22 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594 1.86
1 0.36 0.41 609 666 4594 1.86
297 H361-013-B24 H361-013-B24 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61
1 0.73 0.77 1584 406 5607 3.61
298 H361-013-B26 H361-013-B26 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181 0.49
1 0.09 0.15 633 662 1181 0.49
299 H361-013-B28 H361-013-B28 RIL/PTH-J3-0185 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617 6.33
2 0.69 0.82 793 864 4617 6.33
300 H361-013-B30 H361-013-B30 RIL/PTH-J3-0186 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594 3.72
1 0.36 0.43 846 958 4594 3.72
301 H361-013-B31 H361-013-B31 RIL/PTH-J3-0187 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617 4.89
2 0.70 0.82 610 868 4617 4.89
302 H361-013-B32 H361-013-B32 RIL/PTH-J3-0188 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10
1 0.37 0.42 610 745 4617 2.10
303 H361-013-B34 H361-013-B34 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607 2.25
04/18/2023 23:19:03
Page 12 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.73 0.76 1165 344 5607 2.25
304 H361-013-B35 H361-013-B35 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942 3.06
1 0.87 0.91 1284 401 5942 3.06
305 H361-013-B36 H361-013-B36 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731 0.20
1 0.06 0.10 659 406 731 0.20
306 H361-013-B39 H361-013-B39 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951 1.60
1 0.37 0.42 410 657 5951 1.60
307 H361-013-B40 H361-013-B40 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951 1.61
1 0.37 0.43 410 660 5951 1.61
308 H361-013-B42 H361-013-B42 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961 1.76
1 0.32 0.38 410 867 4961 1.76
309 H361-013-B43 H361-013-B43 RIL/PTH-J3-0195 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961 3.38
3 0.95 1.11 344 660 4961 3.38
310 H361-013-B44 H361-013-B44 RIL/PTH-J3-0196 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961 1.77
1 0.32 0.39 410 868 4961 1.77
311 H361-013-B45 H361-013-B45 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961 1.77
1 0.33 0.40 410 868 4961 1.77
SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001 168 22.44 32.51 313.08
D. H360-009 SULPHUR RECOVERY UNIT APR 002
312 H360-009-1HB1 H360-009-1HB1
RIL/PTH-J3-0198 BUNDLE
SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897 1.91
313 H360-009-1HB2 H360-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039 0.40
314 H360-009-1HB3 H360-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797 0.18
315 H360-009-1HB4 H360-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258 0.43
316 H360-009-1HB6 H360-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866 0.57
317 H360-009-1HB7 H360-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671 0.48
318 H360-009-1HB8 H360-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889 0.76
319 H360-009-1HB10 H360-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863 0.25
320 H360-009-1HB11 H360-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891 0.19
321 H360-009-1HB12 H360-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828 0.25
322 H360-009-1HB13 H360-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053 0.20
323 H360-009-1HB14 H360-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977 0.20
324 H360-009-1HB15 H360-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203 0.63
325 H360-009-1VB1 H360-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201 0.16
326 H360-009-1VB2 H360-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777 0.05
327 H360-009-1VB3 H360-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899 0.13
328 H360-009-1VB4 H360-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594 0.11
04/18/2023 23:19:03
Page 13 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
329 H360-009-1VB5 H360-009-1VB5
RIL/PTH-J3-0198 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348 0.22
330 H360-009-1VB6 H360-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625 0.21
331 H360-009-1VB7 H360-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940 0.52
332 H360-009-1VB8 H360-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498 0.20
333 H360-009-1VB9 H360-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392 0.09
334 H360-009-1VB10 H360-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481 0.10
335 H360-009-1VB11 H360-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389 0.09
336 H360-009-1VB26 H360-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388 0.09
48 3.00 5.36 698 610 3940 80.52
337 H360-009-1HB16 H360-009-1HB16
RIL/PTH-J3-0199 BUNDLE
SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396 0.38
338 H360-009-1HB17 H360-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230 0.07
339 H360-009-1VB12 H360-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366 0.08
340 H360-009-1VB25 H360-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409 0.26
9 0.13 0.43 326 319 2409 2.25
341 H360-009-1HB5 H360-009-1HB5
RIL/PTH-J3-0200 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934 0.11
342 H360-009-1HB18 H360-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589 0.18
343 H360-009-1HB19 H360-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616 0.09
344 H360-009-1HB20 H360-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753 0.09
345 H360-009-1HB21 H360-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383 0.14
346 H360-009-1HB22 H360-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017 0.12
347 H360-009-1HB23 H360-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804 0.10
348 H360-009-1HB24 H360-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513 0.15
349 H360-009-1HB25 H360-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967 0.23
350 H360-009-1HB26 H360-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603 0.19
351 H360-009-1HB27 H360-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893 0.22
352 H360-009-1HB28 H360-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914 0.56
353 H360-009-1HB29 H360-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916 0.22
354 H360-009-1HB30 H360-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819 0.11
355 H360-009-1HB31 H360-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959 0.23
356 H360-009-1HB32 H360-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560 0.09
357 H360-009-1HB33 H360-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895 0.11
358 H360-009-1HB34 H360-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582 0.09
359 H360-009-1HB35 H360-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622 0.09
360 H360-009-1HB36 H360-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578 0.09
361 H360-009-1HB37 H360-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542 0.18
362 H360-009-1HB38 H360-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735 0.10
363 H360-009-1HB39 H360-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690 0.10
364 H360-009-1HB40 H360-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758 0.10
365 H360-009-1HB41 H360-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455 0.08
366 H360-009-1HB42 H360-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208 0.13
367 H360-009-1HB43 H360-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865 0.11
368 H360-009-1HB44 H360-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960 0.11
04/18/2023 23:19:03
Page 14 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
369 H360-009-1HB45 H360-009-1HB45
RIL/PTH-J3-0200 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756 0.10
370 H360-009-1HB46 H360-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576 0.09
371 H360-009-1HB47 H360-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503 0.09
372 H360-009-1HB48 H360-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872 0.11
373 H360-009-1HB49 H360-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591 0.09
374 H360-009-1HB50 H360-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439 0.08
375 H360-009-1HB51 H360-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816 0.21
376 H360-009-1HB52 H360-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626 0.09
377 H360-009-1HB53 H360-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864 0.33
378 H360-009-1HB54 H360-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787 0.10
379 H360-009-1HB55 H360-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235 0.07
380 H360-009-1HB56 H360-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260 0.07
381 H360-009-1HB57 H360-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953 0.11
382 H360-009-1HB58 H360-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476 0.09
383 H360-009-1HB59 H360-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783 0.10
384 H360-009-1HB60 H360-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416 0.08
385 H360-009-1HB61 H360-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387 0.08
386 H360-009-1HB62 H360-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938 0.11
387 H360-009-1HB63 H360-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803 0.10
388 H360-009-1HB64 H360-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749 0.10
389 H360-009-1HB65 H360-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227 0.14
390 H360-009-1HB66 H360-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979 0.23
391 H360-009-1HB67 H360-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763 0.10
392 H360-009-1HB68 H360-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351 0.08
393 H360-009-1HB69 H360-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921 0.11
394 H360-009-1HB70 H360-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445 0.20
395 H360-009-1HB71 H360-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378 0.08
396 H360-009-1HB72 H360-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005 0.12
397 H360-009-1HB73 H360-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954 0.11
398 H360-009-1HB74 H360-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638 0.10
399 H360-009-1HB75 H360-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946 0.11
400 H360-009-1HB76 H360-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463 0.08
401 H360-009-1HB77 H360-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809 0.10
402 H360-009-1HB78 H360-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517 0.09
403 H360-009-1HB79 H360-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366 0.08
404 H360-009-1HB80 H360-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437 0.08
405 H360-009-1HB81 H360-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085 0.06
406 H360-009-1VB23 H360-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480 0.20
407 H360-009-1VB24 H360-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580 0.03
83 1.58 7.79 585 624 3480 105.44
408 H360-009-1B123 H360-009-1B123RIL/PTH-J3-0201 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084 0.16
409 H360-009-1B124 H360-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099 0.16
4 0.04 0.16 330 229 1099 0.33
04/18/2023 23:19:03
Page 15 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
410 H360-009-1B254 H360-009-1B254RIL/PTH-J3-0202 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876 0.08
411 H360-009-1B255 H360-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969 0.09
2 0.03 0.09 386 254 969 0.19
412 H360-009-1B166 H360-009-1B166
RIL/PTH-J3-0203 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464 0.16
413 H360-009-1B168 H360-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563 0.17
414 H360-009-1B171 H360-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
415 H360-009-1B172 H360-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
416 H360-009-1B173 H360-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
417 H360-009-1B175 H360-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
418 H360-009-1B179 H360-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164 0.13
419 H360-009-1B180 H360-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16
420 H360-009-1B181 H360-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16
421 H360-009-1B182 H360-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16
422 H360-009-1B187 H360-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461 0.16
423 H360-009-1B189 H360-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61
424 H360-009-1B191 H360-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61
425 H360-009-1B192 H360-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411 0.16
426 H360-009-1B196 H360-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31
427 H360-009-1B197 H360-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31
428 H360-009-1B199 H360-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960 0.33
429 H360-009-1B200 H360-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860 0.31
430 H360-009-1B204 H360-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
431 H360-009-1B206 H360-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363 0.15
432 H360-009-1B208 H360-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
433 H360-009-1B209 H360-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
36 2.39 4.76 950 920 2961 93.16
434 H360-009-1B167 H360-009-1B167
RIL/PTH-J3-0204 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563 0.34
435 H360-009-1B169 H360-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464 1.61
436 H360-009-1B170 H360-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463 0.80
437 H360-009-1B174 H360-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
438 H360-009-1B176 H360-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32
439 H360-009-1B177 H360-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964 0.33
440 H360-009-1B178 H360-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13
441 H360-009-1B183 H360-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874 0.10
442 H360-009-1B184 H360-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240 0.14
443 H360-009-1B185 H360-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96
444 H360-009-1B186 H360-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96
445 H360-009-1B188 H360-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961 1.30
446 H360-009-1B190 H360-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961 1.63
447 H360-009-1B193 H360-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16
448 H360-009-1B194 H360-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16
04/18/2023 23:19:03
Page 16 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
449 H360-009-1B195 H360-009-1B195RIL/PTH-J3-0204 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836 0.09
450 H360-009-1B198 H360-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960 0.65
451 H360-009-1B201 H360-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857 0.09
452 H360-009-1B202 H360-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459 0.16
453 H360-009-1B203 H360-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
454 H360-009-1B205 H360-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363 0.15
455 H360-009-1B207 H360-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32
456 H360-009-1B210 H360-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178 0.13
457 H360-009-1B211 H360-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
458 H360-009-1B212 H360-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
459 H360-009-1B213 H360-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860 0.09
460 H360-009-1B214 H360-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260 0.14
461 H360-009-1B215 H360-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964 0.32
462 H360-009-1B216 H360-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13
463 H360-009-1B217 H360-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494 0.16
464 H360-009-1B218 H360-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13
465 H360-009-1B219 H360-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954 0.32
68 2.67 11.36 1087 1278 2964 279.99
466 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0205 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312 0.13
4 0.05 0.18 352 289 312 0.13
467 H360-009-1B115 H360-009-1B115
RIL/PTH-J3-0206 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30
468 H360-009-1B116 H360-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30
469 H360-009-1B118 H360-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585 0.82
470 H360-009-1B119 H360-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547 0.32
471 H360-009-1B120 H360-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547 0.32
472 H360-009-1B121 H360-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596 0.43
473 H360-009-1B128 H360-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959 0.40
474 H360-009-1B133 H360-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413 0.19
475 H360-009-1B134 H360-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463 0.20
476 H360-009-1B135 H360-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462 0.73
477 H360-009-1B136 H360-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712 0.10
478 H360-009-1B138 H360-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23
479 H360-009-1B139 H360-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23
480 H360-009-1B140 H360-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461 0.20
481 H360-009-1B141 H360-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40
482 H360-009-1B142 H360-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40
483 H360-009-1B143 H360-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40
484 H360-009-1B145 H360-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40
485 H360-009-1B146 H360-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961 0.40
486 H360-009-1B147 H360-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176 0.16
487 H360-009-1B151 H360-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960 0.40
488 H360-009-1B154 H360-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73
04/18/2023 23:19:03
Page 17 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
489 H360-009-1B157 H360-009-1B157
RIL/PTH-J3-0206 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80
490 H360-009-1B158 H360-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80
491 H360-009-1B161 H360-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764 0.24
492 H360-009-1B163 H360-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514 0.20
493 H360-009-1B164 H360-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463 0.39
494 H360-009-1B165 H360-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763 0.10
495 H360-009-1FR10 H360-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355 0.18
496 H360-009-1SC2 H360-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07
497 H360-009-1SC3 H360-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07
33 2.09 6.41 1372 1314 5964 354.81
498 H360-009-1CT28 H360-009-1CT28
RIL/PTH-J3-0207 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988 0.27
499 H360-009-1CT29 H360-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778 0.21
500 H360-009-1CT30 H360-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548 0.22
501 H360-009-1CT31 H360-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548 0.15
502 H360-009-1CT32 H360-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188 0.16
9 0.32 1.60 1180 1457 1988 30.76
503 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0208 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463 0.37
1 0.05 0.09 680 375 1463 0.37
504 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093 1.25
1 0.11 0.16 682 591 3093 1.25
505 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463 0.20
1 0.05 0.08 403 333 1463 0.20
506 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899 0.39
1 0.08 0.12 403 333 2899 0.39
507 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963 0.40
1 0.08 0.12 403 333 2963 0.40
508 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20
1 0.05 0.09 403 333 1459 0.20
509 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964 0.40
1 0.10 0.13 403 333 2964 0.40
510 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40
1 0.09 0.13 403 333 2964 0.40
511 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40
1 0.09 0.12 403 333 2964 0.40
04/18/2023 23:19:03
Page 18 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
512 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40
1 0.09 0.12 403 333 2964 0.40
513 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20
1 0.05 0.09 403 333 1459 0.20
514 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411 0.19
1 0.04 0.08 403 333 1411 0.19
515 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860 0.38
1 0.10 0.13 403 333 2860 0.38
516 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860 0.38
1 0.09 0.13 403 333 2860 0.38
517 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0222 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461 0.39
2 0.10 0.17 403 333 1461 0.39
518 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0223 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348 0.18
1 0.06 0.09 403 333 1348 0.18
519 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093 0.42
1 0.12 0.15 403 333 3093 0.42
520 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73
1 0.15 0.19 403 333 5464 0.73
521 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964 0.80
1 0.17 0.20 403 333 5964 0.80
522 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364 0.32
1 0.07 0.11 403 333 2364 0.32
523 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364 0.32
1 0.08 0.11 403 333 2364 0.32
524 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882 1.06
1 0.23 0.27 403 333 7882 1.06
525 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062 0.41
1 0.09 0.13 403 333 3062 0.41
526 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744 0.23
04/18/2023 23:19:03
Page 19 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.35 0.39 403 333 1744 0.23
527 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647 0.09
1 0.19 0.22 403 333 647 0.09
528 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647 0.09
1 0.18 0.21 403 333 647 0.09
529 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850 0.25
1 0.16 0.19 403 333 1850 0.25
530 H360-009-1B40 H360-009-1B40
RIL/PTH-J3-0235 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834 0.45
531 H360-009-1B42 H360-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963 3.13
532 H360-009-1B43 H360-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963 2.50
533 H360-009-1B44 H360-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963 0.63
534 H360-009-1B45 H360-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963 0.97
535 H360-009-1B49 H360-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963 0.47
536 H360-009-1B50 H360-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963 0.63
537 H360-009-1B52 H360-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962 0.63
538 H360-009-1B56 H360-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585 4.42
539 H360-009-1B57 H360-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463 0.18
21 3.37 6.03 1218 1262 5963 192.48
540 H360-009-1B41 H360-009-1B41
RIL/PTH-J3-0236 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834 0.71
541 H360-009-1B58 H360-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463 0.57
542 H360-009-1B59 H360-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38
543 H360-009-1B60 H360-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38
544 H360-009-1B72 H360-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160 0.43
545 H360-009-1B78 H360-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460 0.57
546 H360-009-1B81 H360-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461 1.21
547 H360-009-1B85 H360-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659 0.61
548 H360-009-1B90 H360-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394 0.48
549 H360-009-1B69 H360-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949 0.50
550 H360-009-1B74 H360-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963 0.47
551 H360-009-1B73 H360-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963 2.34
552 H360-009-1B75 H360-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963 0.50
553 H360-009-1B76 H360-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63
554 H360-009-1B77 H360-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63
555 H360-009-1B82 H360-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461 0.89
556 H360-009-1B84 H360-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659 0.52
557 H360-009-1SC4 H360-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332 0.42
24 2.56 7.11 1121 2042 5461 300.02
558 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0237 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464 0.76
04/18/2023 23:19:03
Page 20 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
2 0.14 0.24 456 566 1464 0.76
559 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0238 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460 1.96
1 0.22 0.28 456 787 5460 1.96
560 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460 2.20
1 0.23 0.29 455 885 5460 2.20
561 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462 2.10
1 0.25 0.31 455 845 5462 2.10
562 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962 1.25
1 0.18 0.23 455 696 3962 1.25
563 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963 1.26
1 0.18 0.23 456 699 3963 1.26
564 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0243 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585 8.07
5 1.19 1.39 634 456 5585 8.07
565 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0244 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462 4.69
1 0.28 0.35 851 1010 5462 4.69
566 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462 3.82
1 0.23 0.29 850 822 5462 3.82
567 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462 2.84
1 0.23 0.28 850 612 5462 2.84
568 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0247 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462 6.06
5 1.07 1.25 641 346 5462 6.06
569 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0248 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462 2.03
1 0.22 0.28 456 817 5462 2.03
570 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462 2.02
1 0.23 0.29 455 814 5462 2.02
571 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462 1.43
1 0.22 0.27 456 574 5462 1.43
572 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462 2.11
1 0.23 0.29 456 847 5462 2.11
04/18/2023 23:19:03
Page 21 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
573 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0252 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462 6.34
3 0.67 0.86 456 849 5462 6.34
SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88
E. H361-009 SULPHUR RECOVERY UNIT APR 002
574 H361-009-1HB1 H361-009-1HB1
RIL/PTH-J3-0253 BUNDLE
SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897 1.91
575 H361-009-1HB2 H361-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039 0.40
576 H361-009-1HB3 H361-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797 0.18
577 H361-009-1HB4 H361-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258 0.43
578 H361-009-1HB6 H361-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866 0.57
579 H361-009-1HB7 H361-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671 0.48
580 H361-009-1HB8 H361-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889 0.76
581 H361-009-1HB10 H361-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863 0.25
582 H361-009-1HB11 H361-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891 0.19
583 H361-009-1HB12 H361-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828 0.25
584 H361-009-1HB13 H361-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053 0.20
585 H361-009-1HB14 H361-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977 0.20
586 H361-009-1HB15 H361-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203 0.63
587 H361-009-1VB1 H361-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201 0.16
588 H361-009-1VB2 H361-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777 0.05
589 H361-009-1VB3 H361-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899 0.13
590 H361-009-1VB4 H361-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594 0.11
591 H361-009-1VB5 H361-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348 0.22
592 H361-009-1VB6 H361-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625 0.21
593 H361-009-1VB7 H361-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940 0.52
594 H361-009-1VB8 H361-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498 0.20
595 H361-009-1VB9 H361-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392 0.09
596 H361-009-1VB10 H361-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481 0.10
597 H361-009-1VB11 H361-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389 0.09
598 H361-009-1VB26 H361-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388 0.09
48 3.00 5.36 698 610 3940 80.52
599 H361-009-1HB16 H361-009-1HB16
RIL/PTH-J3-0254 BUNDLE
SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396 0.38
600 H361-009-1HB17 H361-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230 0.07
601 H361-009-1VB12 H361-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366 0.08
602 H361-009-1VB25 H361-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409 0.26
9 0.13 0.43 326 319 2409 2.25
603 H361-009-1HB5 H361-009-1HB5
RIL/PTH-J3-0255 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934 0.11
604 H361-009-1HB18 H361-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589 0.18
605 H361-009-1HB19 H361-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616 0.09
606 H361-009-1HB20 H361-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753 0.09
607 H361-009-1HB21 H361-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383 0.14
608 H361-009-1HB22 H361-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017 0.12
04/18/2023 23:19:03
Page 22 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
609 H361-009-1HB23 H361-009-1HB23
RIL/PTH-J3-0255 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804 0.10
610 H361-009-1HB24 H361-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513 0.15
611 H361-009-1HB25 H361-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967 0.23
612 H361-009-1HB26 H361-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603 0.19
613 H361-009-1HB27 H361-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893 0.22
614 H361-009-1HB28 H361-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914 0.56
615 H361-009-1HB29 H361-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916 0.22
616 H361-009-1HB30 H361-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819 0.11
617 H361-009-1HB31 H361-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959 0.23
618 H361-009-1HB32 H361-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560 0.09
619 H361-009-1HB33 H361-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895 0.11
620 H361-009-1HB34 H361-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582 0.09
621 H361-009-1HB35 H361-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622 0.09
622 H361-009-1HB36 H361-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578 0.09
623 H361-009-1HB37 H361-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542 0.18
624 H361-009-1HB38 H361-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735 0.10
625 H361-009-1HB39 H361-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690 0.10
626 H361-009-1HB40 H361-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758 0.10
627 H361-009-1HB41 H361-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455 0.08
628 H361-009-1HB42 H361-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208 0.13
629 H361-009-1HB43 H361-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865 0.11
630 H361-009-1HB44 H361-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960 0.11
631 H361-009-1HB45 H361-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756 0.10
632 H361-009-1HB46 H361-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576 0.09
633 H361-009-1HB47 H361-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503 0.09
634 H361-009-1HB48 H361-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872 0.11
635 H361-009-1HB49 H361-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591 0.09
636 H361-009-1HB50 H361-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439 0.08
637 H361-009-1HB51 H361-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816 0.21
638 H361-009-1HB52 H361-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626 0.09
639 H361-009-1HB53 H361-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864 0.33
640 H361-009-1HB54 H361-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787 0.10
641 H361-009-1HB55 H361-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235 0.07
642 H361-009-1HB56 H361-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260 0.07
643 H361-009-1HB57 H361-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953 0.11
644 H361-009-1HB58 H361-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476 0.09
645 H361-009-1HB59 H361-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783 0.10
646 H361-009-1HB60 H361-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416 0.08
647 H361-009-1HB61 H361-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387 0.08
648 H361-009-1HB62 H361-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938 0.11
649 H361-009-1HB63 H361-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803 0.10
650 H361-009-1HB64 H361-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749 0.10
651 H361-009-1HB65 H361-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227 0.14
652 H361-009-1HB66 H361-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979 0.23
04/18/2023 23:19:03
Page 23 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
653 H361-009-1HB67 H361-009-1HB67
RIL/PTH-J3-0255 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763 0.10
654 H361-009-1HB68 H361-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351 0.08
655 H361-009-1HB69 H361-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921 0.11
656 H361-009-1HB70 H361-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445 0.20
657 H361-009-1HB71 H361-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378 0.08
658 H361-009-1HB72 H361-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005 0.12
659 H361-009-1HB73 H361-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954 0.11
660 H361-009-1HB74 H361-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638 0.10
661 H361-009-1HB75 H361-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946 0.11
662 H361-009-1HB76 H361-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463 0.08
663 H361-009-1HB77 H361-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809 0.10
664 H361-009-1HB78 H361-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517 0.09
665 H361-009-1HB79 H361-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366 0.08
666 H361-009-1HB80 H361-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437 0.08
667 H361-009-1HB81 H361-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085 0.06
668 H361-009-1VB23 H361-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480 0.20
669 H361-009-1VB24 H361-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580 0.03
83 1.58 7.79 585 624 3480 105.44
670 H361-009-1B123 H361-009-1B123RIL/PTH-J3-0256 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084 0.16
671 H361-009-1B124 H361-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099 0.16
4 0.04 0.16 330 229 1099 0.33
672 H361-009-1B254 H361-009-1B254RIL/PTH-J3-0257 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876 0.08
673 H361-009-1B255 H361-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969 0.09
2 0.03 0.09 386 254 969 0.19
674 H361-009-1B166 H361-009-1B166
RIL/PTH-J3-0258 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464 0.16
675 H361-009-1B168 H361-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563 0.17
676 H361-009-1B171 H361-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
677 H361-009-1B172 H361-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
678 H361-009-1B173 H361-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
679 H361-009-1B175 H361-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
680 H361-009-1B179 H361-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164 0.13
681 H361-009-1B180 H361-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16
682 H361-009-1B181 H361-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16
683 H361-009-1B182 H361-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16
684 H361-009-1B187 H361-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461 0.16
685 H361-009-1B189 H361-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61
686 H361-009-1B191 H361-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61
687 H361-009-1B192 H361-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411 0.16
688 H361-009-1B196 H361-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31
689 H361-009-1B197 H361-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31
690 H361-009-1B199 H361-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960 0.33
04/18/2023 23:19:03
Page 24 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
691 H361-009-1B200 H361-009-1B200
RIL/PTH-J3-0258 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860 0.31
692 H361-009-1B204 H361-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
693 H361-009-1B206 H361-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363 0.15
694 H361-009-1B208 H361-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
695 H361-009-1B209 H361-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16
36 2.39 4.76 950 920 2961 93.16
696 H361-009-1B167 H361-009-1B167
RIL/PTH-J3-0259 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563 0.34
697 H361-009-1B169 H361-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464 1.61
698 H361-009-1B170 H361-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463 0.80
699 H361-009-1B174 H361-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
700 H361-009-1B176 H361-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32
701 H361-009-1B177 H361-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964 0.33
702 H361-009-1B178 H361-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13
703 H361-009-1B183 H361-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874 0.10
704 H361-009-1B184 H361-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240 0.14
705 H361-009-1B185 H361-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96
706 H361-009-1B186 H361-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96
707 H361-009-1B188 H361-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961 1.30
708 H361-009-1B190 H361-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961 1.63
709 H361-009-1B193 H361-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16
710 H361-009-1B194 H361-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16
711 H361-009-1B195 H361-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836 0.09
712 H361-009-1B198 H361-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960 0.65
713 H361-009-1B201 H361-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857 0.09
714 H361-009-1B202 H361-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459 0.16
715 H361-009-1B203 H361-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
716 H361-009-1B205 H361-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363 0.15
717 H361-009-1B207 H361-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32
718 H361-009-1B210 H361-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178 0.13
719 H361-009-1B211 H361-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
720 H361-009-1B212 H361-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16
721 H361-009-1B213 H361-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860 0.09
722 H361-009-1B214 H361-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260 0.14
723 H361-009-1B215 H361-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964 0.32
724 H361-009-1B216 H361-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13
725 H361-009-1B217 H361-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494 0.16
726 H361-009-1B218 H361-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13
727 H361-009-1B219 H361-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954 0.32
68 2.67 11.36 1087 1278 2964 279.99
728 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0260 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312 0.13
4 0.05 0.18 352 289 312 0.13
04/18/2023 23:19:03
Page 25 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
729 H361-009-1B115 H361-009-1B115
RIL/PTH-J3-0261 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30
730 H361-009-1B116 H361-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30
731 H361-009-1B118 H361-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585 0.82
732 H361-009-1B119 H361-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547 0.32
733 H361-009-1B120 H361-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547 0.32
734 H361-009-1B121 H361-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596 0.43
735 H361-009-1B128 H361-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959 0.40
736 H361-009-1B133 H361-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413 0.19
737 H361-009-1B134 H361-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463 0.20
738 H361-009-1B135 H361-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462 0.73
739 H361-009-1B136 H361-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712 0.10
740 H361-009-1B138 H361-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23
741 H361-009-1B139 H361-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23
742 H361-009-1B140 H361-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461 0.20
743 H361-009-1B141 H361-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40
744 H361-009-1B142 H361-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40
745 H361-009-1B143 H361-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40
746 H361-009-1B145 H361-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40
747 H361-009-1B146 H361-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961 0.40
748 H361-009-1B147 H361-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176 0.16
749 H361-009-1B151 H361-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960 0.40
750 H361-009-1B154 H361-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73
751 H361-009-1B157 H361-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80
752 H361-009-1B158 H361-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80
753 H361-009-1B161 H361-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764 0.24
754 H361-009-1B163 H361-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514 0.20
755 H361-009-1B164 H361-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463 0.39
756 H361-009-1B165 H361-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763 0.10
757 H361-009-1FR10 H361-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355 0.18
758 H361-009-1SC2 H361-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07
759 H361-009-1SC3 H361-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07
33 2.09 6.41 1372 1314 5964 354.81
760 H361-009-1CT28 H361-009-1CT28
RIL/PTH-J3-0262 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988 0.27
761 H361-009-1CT29 H361-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778 0.21
762 H361-009-1CT30 H361-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548 0.22
763 H361-009-1CT31 H361-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548 0.15
764 H361-009-1CT32 H361-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188 0.16
9 0.32 1.60 1180 1457 1988 30.76
765 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0263 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463 0.37
1 0.05 0.09 680 375 1463 0.37
766 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093 1.25
04/18/2023 23:19:03
Page 26 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.11 0.16 682 591 3093 1.25
767 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463 0.20
1 0.05 0.08 403 333 1463 0.20
768 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899 0.39
1 0.08 0.12 403 333 2899 0.39
769 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963 0.40
1 0.08 0.12 403 333 2963 0.40
770 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20
1 0.05 0.09 403 333 1459 0.20
771 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964 0.40
1 0.10 0.13 403 333 2964 0.40
772 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40
1 0.09 0.13 403 333 2964 0.40
773 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40
1 0.09 0.12 403 333 2964 0.40
774 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40
1 0.09 0.12 403 333 2964 0.40
775 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20
1 0.05 0.09 403 333 1459 0.20
776 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411 0.19
1 0.04 0.08 403 333 1411 0.19
777 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860 0.38
1 0.10 0.13 403 333 2860 0.38
778 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860 0.38
1 0.09 0.13 403 333 2860 0.38
779 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0277 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461 0.39
2 0.10 0.17 403 333 1461 0.39
780 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0278 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348 0.18
1 0.06 0.09 403 333 1348 0.18
04/18/2023 23:19:03
Page 27 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
781 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093 0.42
1 0.12 0.15 403 333 3093 0.42
782 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73
1 0.15 0.19 403 333 5464 0.73
783 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964 0.80
1 0.17 0.20 403 333 5964 0.80
784 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364 0.32
1 0.07 0.11 403 333 2364 0.32
785 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364 0.32
1 0.08 0.11 403 333 2364 0.32
786 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882 1.06
1 0.23 0.27 403 333 7882 1.06
787 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062 0.41
1 0.09 0.13 403 333 3062 0.41
788 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744 0.23
1 0.35 0.39 403 333 1744 0.23
789 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647 0.09
1 0.19 0.22 403 333 647 0.09
790 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647 0.09
1 0.18 0.21 403 333 647 0.09
791 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850 0.25
1 0.16 0.19 403 333 1850 0.25
792 H361-009-1B40 H361-009-1B40
RIL/PTH-J3-0290 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834 0.45
793 H361-009-1B42 H361-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963 3.13
794 H361-009-1B43 H361-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963 2.50
795 H361-009-1B44 H361-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963 0.63
796 H361-009-1B45 H361-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963 0.97
797 H361-009-1B49 H361-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963 0.47
798 H361-009-1B50 H361-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963 0.63
799 H361-009-1B52 H361-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962 0.63
800 H361-009-1B56 H361-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585 4.42
801 H361-009-1B57 H361-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463 0.18
21 3.37 6.03 1218 1262 5963 192.48
04/18/2023 23:19:03
Page 28 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
802 H361-009-1B41 H361-009-1B41
RIL/PTH-J3-0291 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834 0.71
803 H361-009-1B58 H361-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463 0.57
804 H361-009-1B59 H361-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38
805 H361-009-1B60 H361-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38
806 H361-009-1B72 H361-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160 0.43
807 H361-009-1B78 H361-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460 0.57
808 H361-009-1B81 H361-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461 1.21
809 H361-009-1B85 H361-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659 0.61
810 H361-009-1B90 H361-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394 0.48
811 H361-009-1B69 H361-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949 0.50
812 H361-009-1B74 H361-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963 0.47
813 H361-009-1B73 H361-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963 2.34
814 H361-009-1B75 H361-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963 0.50
815 H361-009-1B76 H361-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63
816 H361-009-1B77 H361-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63
817 H361-009-1B82 H361-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461 0.89
818 H361-009-1B84 H361-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659 0.52
819 H361-009-1SC4 H361-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332 0.42
24 2.56 7.11 1121 2042 5461 300.02
820 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0292 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464 0.76
2 0.14 0.24 456 566 1464 0.76
821 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0293 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460 1.96
1 0.22 0.28 456 787 5460 1.96
822 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460 2.20
1 0.23 0.29 455 885 5460 2.20
823 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462 2.10
1 0.25 0.31 455 845 5462 2.10
824 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962 1.25
1 0.18 0.23 455 696 3962 1.25
825 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963 1.26
1 0.18 0.23 456 699 3963 1.26
826 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0298 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585 8.07
5 1.19 1.39 634 456 5585 8.07
827 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0299 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462 4.69
1 0.28 0.35 851 1010 5462 4.69
04/18/2023 23:19:03
Page 29 of 83
PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT
JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015
Rev : D
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
828 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462 3.82
1 0.23 0.29 850 822 5462 3.82
829 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462 2.84
1 0.23 0.28 850 612 5462 2.84
830 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0302 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462 6.06
5 1.07 1.25 641 346 5462 6.06
831 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0303 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462 2.03
1 0.22 0.28 456 817 5462 2.03
832 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462 2.02
1 0.23 0.29 455 814 5462 2.02
833 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462 1.43
1 0.22 0.27 456 574 5462 1.43
834 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462 2.11
1 0.23 0.29 456 847 5462 2.11
835 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0307 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462 6.34
3 0.67 0.86 456 849 5462 6.34
SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88
GRAND TOTAL 1224 829.15 847.90 4766.90
04/18/2023 23:19:03
Page 30 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
A. H210-550 ROOD MILL STRUCTURE
1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99 ###
2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51 ###
3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82 ###
4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34 ###
5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59 ###
6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54 ###
7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53 ###
8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28 ###
9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79 ###
10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73 ###
11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53 ###
12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34 ###
13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###
14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54 ###
15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40 ###
04/18/2023 23:19:03
Page 31 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07 ###
17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45 ###
18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78 ###
19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78 ###
20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87 ###
21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16 ###
22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47 ###
23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57 ###
24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###
25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13 ###
26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58 ###
27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22 ###
28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70 ###
29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74 ###
30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50 ###
31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20 ###
32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31 ###
33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47 ###
34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###
35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76 ###
36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41 ###
37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70 ###
38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31 ###
39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15 ###
40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99 ###
41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43 ###
42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22 ###
43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12 ###
44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29 ###
45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28 ###
46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66 ###
47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22 ###
48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28 ###
49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83 ###
50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28 ###
04/18/2023 23:19:03
Page 32 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48 ###
52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49 ###
53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49 ###
54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11 ###
55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89 ###
56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47 ###
57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34 ###
58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02 ###
59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 ###
60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99 ###
61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53 ###
62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96 ###
63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93 ###
64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12 ###
65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88 ###
66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09 ###
67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49 ###
68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42 ###
69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25 ###
70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18 ###
71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31 ###
72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82 ###
73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33 ###
74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61 ###
75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 ###
76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31 ###
77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51 ###
78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41 ###
79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01 ###
80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65 ###
81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41 ###
82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73 ###
83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24 ###
84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68 ###
85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91 ###
04/18/2023 23:19:03
Page 33 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39 ###
87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01 ###
88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33 ###
89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42 ###
90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15 ###
91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60 ###
92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44 ###
93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83 ###
94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01 ###
95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17 ###
96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42 ###
97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77 ###
98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59 ###
99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02 ###
SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 99 807.81 824.20 1149.16 ###
B. H220-550 ROOD MILL STRUCTURE
100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73 ###
101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 6.99 1192 1450 8437 14.58 ###
102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.75 1440 1495 5000 10.76 ###
103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.20 1400 1540 12000 25.87 ###
104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.78 1540 1250 10500 20.21 ###
105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.42 1547 1608 8437 20.99 ###
106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.59 1540 1180 5000 9.09 ###
107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.27 2259 1271 12000 34.45 ###
108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.35 1524 961 10500 15.38 ###
109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.57 1125 1540 6036 10.46 ###
110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.32 1550 885 8437 11.57 ###
111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66 ###
112 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0112 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66
SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 13 99.95 102.56 199.42 ###
C. H360-013 SUB PIPE RACK ACR 001
113 H360-013-VB19 H360-013-VB19
RIL/PTH-J3-0113 BUNDLE
SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526
114 H360-013-VB20 H360-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151
115 H360-013-VB21 H360-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862
116 H360-013-VB22 H360-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898
04/18/2023 23:19:03
Page 34 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
117 H360-013-VB23 H360-013-VB23
RIL/PTH-J3-0113 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760
10 0.16 0.19 361 375 1526 0.21 ###
118 H360-013-HB1 H360-013-HB1
RIL/PTH-J3-0114 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334
119 H360-013-HB2 H360-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450
120 H360-013-HB3 H360-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484
121 H360-013-HB4 H360-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536
122 H360-013-HB5 H360-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987
123 H360-013-HB6 H360-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698
124 H360-013-VB16 H360-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870
125 H360-013-VB17 H360-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652
126 H360-013-VB18 H360-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455
25 0.49 0.53 461 545 1987 0.50 ###
127 H360-013-CT6 H360-013-CT6
RIL/PTH-J3-0115 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150
128 H360-013-CT7 H360-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150
129 H360-013-CT8 H360-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150
130 H360-013-CT9 H360-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150
131 H360-013-CT10 H360-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150
132 H360-013-CT11 H360-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150
133 H360-013-CT12 H360-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935
134 H360-013-CT13 H360-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045
13 0.19 0.28 1270 871 1150 1.27 ###
135 H360-013-B67 H360-013-B67
RIL/PTH-J3-0116 BUNDLE
SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
136 H360-013-B68 H360-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
137 H360-013-B69 H360-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
138 H360-013-B70 H360-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
139 H360-013-B71 H360-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461
140 H360-013-B72 H360-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461
141 H360-013-B73 H360-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
142 H360-013-B74 H360-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
143 H360-013-B75 H360-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
144 H360-013-B76 H360-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
145 H360-013-B77 H360-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
04/18/2023 23:19:03
Page 35 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
146 H360-013-B78 H360-013-B78
RIL/PTH-J3-0116 BUNDLE
SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334
147 H360-013-B79 H360-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962
148 H360-013-B88 H360-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211
20 0.58 0.69 461 1020 2962 1.39 ###
149 H360-013-B82 H360-013-B82 RIL/PTH-J3-0117 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461
4 0.14 0.17 400 275 1461 0.16 ###
150 H360-013-CT1 H360-013-CT1RIL/PTH-J3-0118 BUNDLE
SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388
151 H360-013-CT2 H360-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388
8 0.11 0.17 1110 658 388 0.28 ###
152 H360-013-B19 H360-013-B19
RIL/PTH-J3-0119 BUNDLE
SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461
153 H360-013-B80 H360-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461
154 H360-013-B81 H360-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657
4 0.23 0.27 436 378 4657 0.77 ###
155 H360-013-B7 H360-013-B7
RIL/PTH-J3-0120 BUNDLE
SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673
156 H360-013-B8 H360-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142
157 H360-013-B9 H360-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942
158 H360-013-B10 H360-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102
159 H360-013-B11 H360-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102
5 0.59 0.63 874 399 5942 2.07 ###
160 H360-013-B4 H360-013-B4 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827
1 0.16 0.20 856 352 4827 1.45 ###
161 H360-013-B5 H360-013-B5 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944
1 0.58 0.63 1722 578 5944 5.92 ###
162 H360-013-B6 H360-013-B6 RIL/PTH-J3-0123 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944
1 0.58 0.63 1718 578 5944 5.90 ###
163 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684
1 0.12 0.19 380 1031 1684 0.66 ###
04/18/2023 23:19:03
Page 36 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
164 H360-013-B1 H360-013-B1 RIL/PTH-J3-0125 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904
1 0.11 0.15 399 336 2904 0.39 ###
165 H360-013-B2 H360-013-B2 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673
11 1.91 1.97 971 833 5673 4.59 ###
166 H360-013-B3 H360-013-B3 RIL/PTH-J3-0127 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827
6 0.87 0.91 397 503 4827 0.96 ###
167 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389
4 0.17 0.21 397 413 1389 0.23 ###
168 H360-013-B55 H360-013-B55 RIL/PTH-J3-0129 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673
1 0.21 0.27 358 876 5673 1.78 ###
169 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0130 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442
3 0.20 0.25 900 649 1442 0.84 ###
170 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684
1 0.13 0.23 380 1420 1684 0.91 ###
171 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684
1 0.12 0.16 826 380 1684 0.53 ###
172 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0133 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790
1 0.38 0.46 777 1242 4790 4.62 ###
173 H360-013-B12 H360-013-B12
RIL/PTH-J3-0134 BUNDLE
SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236
174 H360-013-B13 H360-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236
175 H360-013-B17 H360-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086
176 H360-013-B20 H360-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673
177 H360-013-B21 H360-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640
178 H360-013-B23 H360-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142
179 H360-013-B25 H360-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142
04/18/2023 23:19:03
Page 37 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
180 H360-013-B27 H360-013-B27
RIL/PTH-J3-0134 BUNDLE
SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181
181 H360-013-B37 H360-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731
10 1.31 1.36 750 587 5673 2.50 ###
182 H360-013-B29 H360-013-B29
RIL/PTH-J3-0135 BUNDLE
SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617
183 H360-013-B33 H360-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594
184 H360-013-B38 H360-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912
185 H360-013-B41 H360-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201
186 H360-013-B50 H360-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673
187 H360-013-B51 H360-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640
188 H360-013-B52 H360-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
189 H360-013-B53 H360-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
190 H360-013-B56 H360-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
191 H360-013-B84 H360-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593
192 H360-013-SC1 H360-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530
20 5.55 5.61 1142 966 5673 6.26 ###
193 H360-013-B14 H360-013-B14 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942
1 0.85 0.89 1821 520 5942 5.63 ###
194 H360-013-B15 H360-013-B15 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942
1 0.63 0.67 1233 520 5942 3.81 ###
195 H360-013-B16 H360-013-B16 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944
1 0.78 0.83 1615 519 5944 4.98 ###
196 H360-013-B18 H360-013-B18 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673
1 0.37 0.42 410 642 5673 1.49 ###
197 H360-013-B22 H360-013-B22 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594
1 0.36 0.41 609 666 4594 1.86 ###
198 H360-013-B24 H360-013-B24 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607
1 0.73 0.77 1584 406 5607 3.61 ###
04/18/2023 23:19:03
Page 38 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
199 H360-013-B26 H360-013-B26 RIL/PTH-J3-0142 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181
1 0.09 0.15 633 662 1181 0.49 ###
200 H360-013-B28 H360-013-B28 RIL/PTH-J3-0143 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617
2 0.69 0.76 793 864 4617 3.16 ###
201 H360-013-B30 H360-013-B30 RIL/PTH-J3-0144 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594
1 0.36 0.43 846 958 4594 3.72 ###
202 H360-013-B31 H360-013-B31 RIL/PTH-J3-0145 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617
2 0.70 0.76 610 868 4617 2.44 ###
203 H360-013-B32 H360-013-B32 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617
1 0.37 0.42 610 745 4617 2.10 ###
204 H360-013-B34 H360-013-B34 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607
1 0.73 0.76 1165 344 5607 2.25 ###
205 H360-013-B35 H360-013-B35 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942
1 0.87 0.91 1284 401 5942 3.06 ###
206 H360-013-B36 H360-013-B36 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731
1 0.06 0.10 659 406 731 0.20 ###
207 H360-013-B39 H360-013-B39 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951
1 0.37 0.42 410 657 5951 1.60 ###
208 H360-013-B40 H360-013-B40 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951
1 0.37 0.43 410 660 5951 1.61 ###
209 H360-013-B42 H360-013-B42 RIL/PTH-J3-0152 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961
1 0.32 0.38 410 867 4961 1.76 ###
210 H360-013-B43 H360-013-B43 RIL/PTH-J3-0153 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961
3 0.95 1.00 344 660 4961 1.13 ###
04/18/2023 23:19:04
Page 39 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
211 H360-013-B44 H360-013-B44 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961
1 0.32 0.39 410 868 4961 1.77 ###
212 H360-013-B45 H360-013-B45 RIL/PTH-J3-0155 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961
1 0.33 0.40 410 868 4961 1.77 ###
SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 27.45 92.64 ###
D. H361-013 SUB PIPE RACK ACR 001
213 H361-013-VB19 H361-013-VB19
RIL/PTH-J3-0156BUNDLE
SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526
214 H361-013-VB20 H361-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151
215 H361-013-VB21 H361-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862
216 H361-013-VB22 H361-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898
217 H361-013-VB23 H361-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760
10 0.16 0.19 361 375 1526 0.21 ###
218 H361-013-HB1 H361-013-HB1
RIL/PTH-J3-0157 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334
219 H361-013-HB2 H361-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450
220 H361-013-HB3 H361-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484
221 H361-013-HB4 H361-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536
222 H361-013-HB5 H361-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987
223 H361-013-HB6 H361-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698
224 H361-013-VB16 H361-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870
225 H361-013-VB17 H361-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652
226 H361-013-VB18 H361-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455
25 0.49 0.53 461 545 1987 0.50 ###
227 H361-013-CT6 H361-013-CT6
RIL/PTH-J3-0158 BUNDLE
SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150
228 H361-013-CT7 H361-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150
229 H361-013-CT8 H361-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150
230 H361-013-CT9 H361-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150
231 H361-013-CT10 H361-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150
232 H361-013-CT11 H361-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150
233 H361-013-CT12 H361-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935
234 H361-013-CT13 H361-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045
04/18/2023 23:19:04
Page 40 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
13 0.19 0.28 1270 871 1150 1.27 ###
235 H361-013-B67 H361-013-B67
RIL/PTH-J3-0159 BUNDLE
SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
236 H361-013-B68 H361-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
237 H361-013-B69 H361-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
238 H361-013-B70 H361-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
239 H361-013-B71 H361-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461
240 H361-013-B72 H361-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461
241 H361-013-B73 H361-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
242 H361-013-B74 H361-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
243 H361-013-B75 H361-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
244 H361-013-B76 H361-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
245 H361-013-B77 H361-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461
246 H361-013-B78 H361-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334
247 H361-013-B79 H361-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962
248 H361-013-B88 H361-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211
20 0.58 0.69 461 1020 2962 1.39 ###
249 H361-013-B82 H361-013-B82 RIL/PTH-J3-0160 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461
4 0.14 0.17 400 275 1461 0.16 ###
250 H361-013-CT1 H361-013-CT1RIL/PTH-J3-0161 BUNDLE
SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388
251 H361-013-CT2 H361-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388
8 0.11 0.17 1110 658 388 0.28 ###
252 H361-013-B19 H361-013-B19
RIL/PTH-J3-0162 BUNDLE
SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461
253 H361-013-B80 H361-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461
254 H361-013-B81 H361-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657
4 0.23 0.27 436 378 4657 0.77 ###
255 H361-013-B7 H361-013-B7
RIL/PTH-J3-0163 BUNDLE
SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673
256 H361-013-B8 H361-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142
257 H361-013-B9 H361-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942
258 H361-013-B10 H361-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102
259 H361-013-B11 H361-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102
04/18/2023 23:19:04
Page 41 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
5 0.59 0.63 874 399 5942 2.07 ###
260 H361-013-B4 H361-013-B4 RIL/PTH-J3-0164 SKID SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827
1 0.16 0.20 856 352 4827 1.45 ###
261 H361-013-B5 H361-013-B5 RIL/PTH-J3-0165 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944
1 0.58 0.63 1722 578 5944 5.92 ###
262 H361-013-B6 H361-013-B6 RIL/PTH-J3-0166 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944
1 0.58 0.63 1718 578 5944 5.90 ###
263 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684
1 0.12 0.19 380 1031 1684 0.66 ###
264 H361-013-B1 H361-013-B1 RIL/PTH-J3-0168 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904
1 0.11 0.15 399 336 2904 0.39 ###
265 H361-013-B2 H361-013-B2 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673
11 1.91 1.97 971 833 5673 4.59 ###
266 H361-013-B3 H361-013-B3 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827
6 0.87 0.91 397 503 4827 0.96 ###
267 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0171 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389
4 0.17 0.21 397 413 1389 0.23 ###
268 H361-013-B55 H361-013-B55 RIL/PTH-J3-0172 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673
1 0.21 0.27 358 876 5673 1.78 ###
269 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0173 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442
3 0.20 0.25 900 649 1442 0.84 ###
270 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684
1 0.13 0.23 380 1420 1684 0.91 ###
04/18/2023 23:19:04
Page 42 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
271 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684
1 0.12 0.16 826 380 1684 0.53 ###
272 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0176 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790
1 0.38 0.46 777 1242 4790 4.62 ###
273 H361-013-B12 H361-013-B12
RIL/PTH-J3-0177 BUNDLE
SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236
274 H361-013-B13 H361-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236
275 H361-013-B17 H361-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086
276 H361-013-B20 H361-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673
277 H361-013-B21 H361-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640
278 H361-013-B23 H361-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142
279 H361-013-B25 H361-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142
280 H361-013-B27 H361-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181
281 H361-013-B37 H361-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731
10 1.31 1.36 750 587 5673 2.50 ###
282 H361-013-B29 H361-013-B29
RIL/PTH-J3-0178 BUNDLE
SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617
283 H361-013-B33 H361-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594
284 H361-013-B38 H361-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912
285 H361-013-B41 H361-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201
286 H361-013-B50 H361-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673
287 H361-013-B51 H361-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640
288 H361-013-B52 H361-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
289 H361-013-B53 H361-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
290 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
291 H361-013-B84 H361-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593
292 H361-013-SC1 H361-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530
20 5.55 5.61 1142 966 5673 6.26 ###
293 H361-013-B14 H361-013-B14 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942
1 0.85 0.89 1821 520 5942 5.63 ###
294 H361-013-B15 H361-013-B15 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942
1 0.63 0.67 1233 520 5942 3.81 ###
04/18/2023 23:19:04
Page 43 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
295 H361-013-B16 H361-013-B16 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944
1 0.78 0.83 1615 519 5944 4.98 ###
296 H361-013-B18 H361-013-B18 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673
1 0.37 0.42 410 642 5673 1.49 ###
297 H361-013-B22 H361-013-B22 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594
1 0.36 0.41 609 666 4594 1.86 ###
298 H361-013-B24 H361-013-B24 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61
1 0.73 0.77 1584 406 5607 3.61 ###
299 H361-013-B26 H361-013-B26 RIL/PTH-J3-0185 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181
1 0.09 0.15 633 662 1181 0.49 ###
300 H361-013-B28 H361-013-B28 RIL/PTH-J3-0186 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617
2 0.69 0.76 793 864 4617 3.16 ###
301 H361-013-B30 H361-013-B30 RIL/PTH-J3-0187 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594
1 0.36 0.43 846 958 4594 3.72 ###
302 H361-013-B31 H361-013-B31 RIL/PTH-J3-0188 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617
2 0.70 0.76 610 868 4617 2.44 ###
303 H361-013-B32 H361-013-B32 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10
1 0.37 0.42 610 745 4617 2.10 ###
304 H361-013-B34 H361-013-B34 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607
1 0.73 0.76 1165 344 5607 2.25 ###
305 H361-013-B35 H361-013-B35 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942
1 0.87 0.91 1284 401 5942 3.06 ###
306 H361-013-B36 H361-013-B36 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731
04/18/2023 23:19:04
Page 44 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.06 0.10 659 406 731 0.20 ###
307 H361-013-B39 H361-013-B39 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951
1 0.37 0.42 410 657 5951 1.60 ###
308 H361-013-B40 H361-013-B40 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951
1 0.37 0.43 410 660 5951 1.61 ###
309 H361-013-B42 H361-013-B42 RIL/PTH-J3-0195 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961
1 0.32 0.38 410 867 4961 1.76 ###
310 H361-013-B43 H361-013-B43 RIL/PTH-J3-0196 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961
3 0.95 1.00 344 660 4961 1.13 ###
311 H361-013-B44 H361-013-B44 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961
1 0.32 0.39 410 868 4961 1.77 ###
312 H361-013-B45 H361-013-B45 RIL/PTH-J3-0198 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961
1 0.33 0.40 410 868 4961 1.77 ###
SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001 176 25.15 27.45 92.64
D. H360-009 SULPHUR RECOVERY UNIT APR 002
313 H360-009-1HB1 H360-009-1HB1
RIL/PTH-J3-0199 BUNDLE
SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897
314 H360-009-1HB2 H360-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039
315 H360-009-1HB3 H360-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797
316 H360-009-1HB4 H360-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258
317 H360-009-1HB6 H360-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866
318 H360-009-1HB7 H360-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671
319 H360-009-1HB8 H360-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889
320 H360-009-1HB10 H360-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863
321 H360-009-1HB11 H360-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891
322 H360-009-1HB12 H360-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828
323 H360-009-1HB13 H360-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053
324 H360-009-1HB14 H360-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977
325 H360-009-1HB15 H360-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203
326 H360-009-1VB1 H360-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201
04/18/2023 23:19:04
Page 45 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
327 H360-009-1VB2 H360-009-1VB2
RIL/PTH-J3-0199 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777
328 H360-009-1VB3 H360-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899
329 H360-009-1VB4 H360-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594
330 H360-009-1VB5 H360-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348
331 H360-009-1VB6 H360-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625
332 H360-009-1VB7 H360-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940
333 H360-009-1VB8 H360-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498
334 H360-009-1VB9 H360-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392
335 H360-009-1VB10 H360-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481
336 H360-009-1VB11 H360-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389
337 H360-009-1VB26 H360-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388
48 3.00 3.05 698 610 3940 1.68 ###
338 H360-009-1HB16 H360-009-1HB16
RIL/PTH-J3-0200 BUNDLE
SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396
339 H360-009-1HB17 H360-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230
340 H360-009-1VB12 H360-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366
341 H360-009-1VB25 H360-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409
9 0.13 0.16 326 319 2409 0.25 ###
342 H360-009-1HB5 H360-009-1HB5
RIL/PTH-J3-0201 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934
343 H360-009-1HB18 H360-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589
344 H360-009-1HB19 H360-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616
345 H360-009-1HB20 H360-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753
346 H360-009-1HB21 H360-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383
347 H360-009-1HB22 H360-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017
348 H360-009-1HB23 H360-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804
349 H360-009-1HB24 H360-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513
350 H360-009-1HB25 H360-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967
351 H360-009-1HB26 H360-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603
352 H360-009-1HB27 H360-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893
353 H360-009-1HB28 H360-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914
354 H360-009-1HB29 H360-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916
355 H360-009-1HB30 H360-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819
356 H360-009-1HB31 H360-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959
357 H360-009-1HB32 H360-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560
04/18/2023 23:19:04
Page 46 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
358 H360-009-1HB33 H360-009-1HB33
RIL/PTH-J3-0201 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895
359 H360-009-1HB34 H360-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582
360 H360-009-1HB35 H360-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622
361 H360-009-1HB36 H360-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578
362 H360-009-1HB37 H360-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542
363 H360-009-1HB38 H360-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735
364 H360-009-1HB39 H360-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690
365 H360-009-1HB40 H360-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758
366 H360-009-1HB41 H360-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455
367 H360-009-1HB42 H360-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208
368 H360-009-1HB43 H360-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865
369 H360-009-1HB44 H360-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960
370 H360-009-1HB45 H360-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756
371 H360-009-1HB46 H360-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576
372 H360-009-1HB47 H360-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503
373 H360-009-1HB48 H360-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872
374 H360-009-1HB49 H360-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591
375 H360-009-1HB50 H360-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439
376 H360-009-1HB51 H360-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816
377 H360-009-1HB52 H360-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626
378 H360-009-1HB53 H360-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864
379 H360-009-1HB54 H360-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787
380 H360-009-1HB55 H360-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235
381 H360-009-1HB56 H360-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260
382 H360-009-1HB57 H360-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953
383 H360-009-1HB58 H360-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476
384 H360-009-1HB59 H360-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783
385 H360-009-1HB60 H360-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416
386 H360-009-1HB61 H360-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387
387 H360-009-1HB62 H360-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938
388 H360-009-1HB63 H360-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803
389 H360-009-1HB64 H360-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749
390 H360-009-1HB65 H360-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227
391 H360-009-1HB66 H360-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979
392 H360-009-1HB67 H360-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763
04/18/2023 23:19:04
Page 47 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
393 H360-009-1HB68 H360-009-1HB68
RIL/PTH-J3-0201 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351
394 H360-009-1HB69 H360-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921
395 H360-009-1HB70 H360-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445
396 H360-009-1HB71 H360-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378
397 H360-009-1HB72 H360-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005
398 H360-009-1HB73 H360-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954
399 H360-009-1HB74 H360-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638
400 H360-009-1HB75 H360-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946
401 H360-009-1HB76 H360-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463
402 H360-009-1HB77 H360-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809
403 H360-009-1HB78 H360-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517
404 H360-009-1HB79 H360-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366
405 H360-009-1HB80 H360-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437
406 H360-009-1HB81 H360-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085
407 H360-009-1VB23 H360-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480
408 H360-009-1VB24 H360-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580
83 1.58 1.66 585 624 3480 1.27 ###
409 H360-009-1B123 H360-009-1B123RIL/PTH-J3-0202 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084
410 H360-009-1B124 H360-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099
4 0.04 0.07 330 229 1099 0.08 ###
411 H360-009-1B254 H360-009-1B254RIL/PTH-J3-0203 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876
412 H360-009-1B255 H360-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969
2 0.03 0.06 386 254 969 0.10 ###
413 H360-009-1B166 H360-009-1B166
RIL/PTH-J3-0204 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464
414 H360-009-1B168 H360-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563
415 H360-009-1B171 H360-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
416 H360-009-1B172 H360-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
417 H360-009-1B173 H360-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
418 H360-009-1B175 H360-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
419 H360-009-1B179 H360-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164
420 H360-009-1B180 H360-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464
421 H360-009-1B181 H360-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464
04/18/2023 23:19:04
Page 48 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
422 H360-009-1B182 H360-009-1B182
RIL/PTH-J3-0204 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464
423 H360-009-1B187 H360-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461
424 H360-009-1B189 H360-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961
425 H360-009-1B191 H360-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961
426 H360-009-1B192 H360-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411
427 H360-009-1B196 H360-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860
428 H360-009-1B197 H360-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860
429 H360-009-1B199 H360-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960
430 H360-009-1B200 H360-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860
431 H360-009-1B204 H360-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
432 H360-009-1B206 H360-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363
433 H360-009-1B208 H360-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
434 H360-009-1B209 H360-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
36 2.39 2.45 950 920 2961 2.59 ###
435 H360-009-1B167 H360-009-1B167
RIL/PTH-J3-0205 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563
436 H360-009-1B169 H360-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464
437 H360-009-1B170 H360-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463
438 H360-009-1B174 H360-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
439 H360-009-1B176 H360-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463
440 H360-009-1B177 H360-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964
441 H360-009-1B178 H360-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164
442 H360-009-1B183 H360-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874
443 H360-009-1B184 H360-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240
444 H360-009-1B185 H360-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461
445 H360-009-1B186 H360-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461
446 H360-009-1B188 H360-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961
447 H360-009-1B190 H360-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961
448 H360-009-1B193 H360-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476
449 H360-009-1B194 H360-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476
450 H360-009-1B195 H360-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836
451 H360-009-1B198 H360-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960
452 H360-009-1B201 H360-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857
453 H360-009-1B202 H360-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459
454 H360-009-1B203 H360-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
04/18/2023 23:19:04
Page 49 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
455 H360-009-1B205 H360-009-1B205
RIL/PTH-J3-0205 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363
456 H360-009-1B207 H360-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463
457 H360-009-1B210 H360-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178
458 H360-009-1B211 H360-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
459 H360-009-1B212 H360-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
460 H360-009-1B213 H360-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860
461 H360-009-1B214 H360-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260
462 H360-009-1B215 H360-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964
463 H360-009-1B216 H360-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164
464 H360-009-1B217 H360-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494
465 H360-009-1B218 H360-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164
466 H360-009-1B219 H360-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954
68 2.67 2.79 1087 1278 2964 4.12 ###
467 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0206 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312
4 0.05 0.08 352 289 312 0.03 ###
468 H360-009-1B115 H360-009-1B115
RIL/PTH-J3-0207 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163
469 H360-009-1B116 H360-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163
470 H360-009-1B118 H360-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585
471 H360-009-1B119 H360-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547
472 H360-009-1B120 H360-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547
473 H360-009-1B121 H360-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596
474 H360-009-1B128 H360-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959
475 H360-009-1B133 H360-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413
476 H360-009-1B134 H360-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463
477 H360-009-1B135 H360-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462
478 H360-009-1B136 H360-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712
479 H360-009-1B138 H360-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746
480 H360-009-1B139 H360-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746
481 H360-009-1B140 H360-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461
482 H360-009-1B141 H360-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961
483 H360-009-1B142 H360-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961
484 H360-009-1B143 H360-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961
485 H360-009-1B145 H360-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961
04/18/2023 23:19:04
Page 50 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
486 H360-009-1B146 H360-009-1B146
RIL/PTH-J3-0207 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961
487 H360-009-1B147 H360-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176
488 H360-009-1B151 H360-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960
489 H360-009-1B154 H360-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464
490 H360-009-1B157 H360-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964
491 H360-009-1B158 H360-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964
492 H360-009-1B161 H360-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764
493 H360-009-1B163 H360-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514
494 H360-009-1B164 H360-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463
495 H360-009-1B165 H360-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763
496 H360-009-1FR10 H360-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355
497 H360-009-1SC2 H360-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508
498 H360-009-1SC3 H360-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508
33 2.09 2.22 1372 1314 5964 10.75 ###
499 H360-009-1CT28 H360-009-1CT28
RIL/PTH-J3-0208 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988
500 H360-009-1CT29 H360-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778
501 H360-009-1CT30 H360-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548
502 H360-009-1CT31 H360-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548
503 H360-009-1CT32 H360-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188
9 0.32 0.46 1180 1457 1988 3.42 ###
504 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463
1 0.05 0.09 680 375 1463 0.37 ###
505 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093
1 0.11 0.16 682 591 3093 1.25 ###
506 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463
1 0.05 0.08 403 333 1463 0.20 ###
507 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899
1 0.08 0.12 403 333 2899 0.39 ###
508 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963
04/18/2023 23:19:04
Page 51 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.08 0.12 403 333 2963 0.40 ###
509 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459
1 0.05 0.09 403 333 1459 0.20 ###
510 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964
1 0.10 0.13 403 333 2964 0.40 ###
511 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964
1 0.09 0.13 403 333 2964 0.40 ###
512 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964
1 0.09 0.12 403 333 2964 0.40 ###
513 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964
1 0.09 0.12 403 333 2964 0.40 ###
514 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459
1 0.05 0.09 403 333 1459 0.20 ###
515 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411
1 0.04 0.08 403 333 1411 0.19 ###
516 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860
1 0.10 0.13 403 333 2860 0.38 ###
517 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0222 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860
1 0.09 0.13 403 333 2860 0.38 ###
518 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0223 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461
2 0.10 0.13 403 333 1461 0.20 ###
519 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348
1 0.06 0.09 403 333 1348 0.18 ###
04/18/2023 23:19:04
Page 52 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
520 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093
1 0.12 0.15 403 333 3093 0.42 ###
521 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464
1 0.15 0.19 403 333 5464 0.73 ###
522 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964
1 0.17 0.20 403 333 5964 0.80 ###
523 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364
1 0.07 0.11 403 333 2364 0.32 ###
524 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364
1 0.08 0.11 403 333 2364 0.32 ###
525 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882
1 0.23 0.27 403 333 7882 1.06 ###
526 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062
1 0.09 0.13 403 333 3062 0.41 ###
527 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744
1 0.35 0.39 403 333 1744 0.23 ###
528 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647
1 0.19 0.22 403 333 647 0.09 ###
529 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647
1 0.18 0.21 403 333 647 0.09 ###
530 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0235 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850
1 0.16 0.19 403 333 1850 0.25 ###
531 H360-009-1B40 H360-009-1B40
RIL/PTH-J3-0236 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834
532 H360-009-1B42 H360-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963
04/18/2023 23:19:04
Page 53 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
533 H360-009-1B43 H360-009-1B43
RIL/PTH-J3-0236 BUNDLE
SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963
534 H360-009-1B44 H360-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963
535 H360-009-1B45 H360-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963
536 H360-009-1B49 H360-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963
537 H360-009-1B50 H360-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963
538 H360-009-1B52 H360-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962
539 H360-009-1B56 H360-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585
540 H360-009-1B57 H360-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463
21 3.37 3.50 1218 1262 5963 9.17 ###
541 H360-009-1B41 H360-009-1B41
RIL/PTH-J3-0237 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834
542 H360-009-1B58 H360-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463
543 H360-009-1B59 H360-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463
544 H360-009-1B60 H360-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463
545 H360-009-1B72 H360-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160
546 H360-009-1B78 H360-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460
547 H360-009-1B81 H360-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461
548 H360-009-1B85 H360-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659
549 H360-009-1B90 H360-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394
550 H360-009-1B69 H360-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949
551 H360-009-1B74 H360-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963
552 H360-009-1B73 H360-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963
553 H360-009-1B75 H360-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963
554 H360-009-1B76 H360-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962
555 H360-009-1B77 H360-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962
556 H360-009-1B82 H360-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461
557 H360-009-1B84 H360-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659
558 H360-009-1SC4 H360-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332
24 2.56 2.75 1121 2042 5461 12.50 ###
559 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0238 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464
2 0.14 0.19 456 566 1464 0.38 ###
560 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460
1 0.22 0.28 456 787 5460 1.96 ###
04/18/2023 23:19:04
Page 54 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
561 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460
1 0.23 0.29 455 885 5460 2.20 ###
562 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462
1 0.25 0.31 455 845 5462 2.10 ###
563 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962
1 0.18 0.23 455 696 3962 1.25 ###
564 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0243 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963
1 0.18 0.23 456 699 3963 1.26 ###
565 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0244 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585
5 1.19 1.23 634 456 5585 1.61 ###
566 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462
1 0.28 0.35 851 1010 5462 4.69 ###
567 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462
1 0.23 0.29 850 822 5462 3.82 ###
568 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0247 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462
1 0.23 0.28 850 612 5462 2.84 ###
569 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0248 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462
5 1.07 1.11 641 346 5462 1.21 ###
570 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462
1 0.22 0.28 456 817 5462 2.03 ###
571 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462
1 0.23 0.29 455 814 5462 2.02 ###
572 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462
04/18/2023 23:19:04
Page 55 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.22 0.27 456 574 5462 1.43 ###
573 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0252 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462
1 0.23 0.29 456 847 5462 2.11 ###
574 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0253 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462
3 0.67 0.74 456 849 5462 2.11 ###
SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 29.88 89.62
E. H361-009 SULPHUR RECOVERY UNIT APR 002
575 H361-009-1HB1 H361-009-1HB1
RIL/PTH-J3-0254 BUNDLE
SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897
576 H361-009-1HB2 H361-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039
577 H361-009-1HB3 H361-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797
578 H361-009-1HB4 H361-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258
579 H361-009-1HB6 H361-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866
580 H361-009-1HB7 H361-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671
581 H361-009-1HB8 H361-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889
582 H361-009-1HB10 H361-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863
583 H361-009-1HB11 H361-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891
584 H361-009-1HB12 H361-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828
585 H361-009-1HB13 H361-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053
586 H361-009-1HB14 H361-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977
587 H361-009-1HB15 H361-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203
588 H361-009-1VB1 H361-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201
589 H361-009-1VB2 H361-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777
590 H361-009-1VB3 H361-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899
591 H361-009-1VB4 H361-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594
592 H361-009-1VB5 H361-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348
593 H361-009-1VB6 H361-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625
594 H361-009-1VB7 H361-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940
595 H361-009-1VB8 H361-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498
596 H361-009-1VB9 H361-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392
597 H361-009-1VB10 H361-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481
598 H361-009-1VB11 H361-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389
599 H361-009-1VB26 H361-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388
04/18/2023 23:19:04
Page 56 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
48 3.00 3.05 698 610 3940 1.68 ###
600 H361-009-1HB16 H361-009-1HB16
RIL/PTH-J3-0255 BUNDLE
SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396
601 H361-009-1HB17 H361-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230
602 H361-009-1VB12 H361-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366
603 H361-009-1VB25 H361-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409
9 0.13 0.16 326 319 2409 0.25 ###
604 H361-009-1HB5 H361-009-1HB5
RIL/PTH-J3-0256 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934
605 H361-009-1HB18 H361-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589
606 H361-009-1HB19 H361-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616
607 H361-009-1HB20 H361-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753
608 H361-009-1HB21 H361-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383
609 H361-009-1HB22 H361-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017
610 H361-009-1HB23 H361-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804
611 H361-009-1HB24 H361-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513
612 H361-009-1HB25 H361-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967
613 H361-009-1HB26 H361-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603
614 H361-009-1HB27 H361-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893
615 H361-009-1HB28 H361-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914
616 H361-009-1HB29 H361-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916
617 H361-009-1HB30 H361-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819
618 H361-009-1HB31 H361-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959
619 H361-009-1HB32 H361-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560
620 H361-009-1HB33 H361-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895
621 H361-009-1HB34 H361-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582
622 H361-009-1HB35 H361-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622
623 H361-009-1HB36 H361-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578
624 H361-009-1HB37 H361-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542
625 H361-009-1HB38 H361-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735
626 H361-009-1HB39 H361-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690
627 H361-009-1HB40 H361-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758
628 H361-009-1HB41 H361-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455
629 H361-009-1HB42 H361-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208
630 H361-009-1HB43 H361-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865
04/18/2023 23:19:04
Page 57 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
631 H361-009-1HB44 H361-009-1HB44
RIL/PTH-J3-0256 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960
632 H361-009-1HB45 H361-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756
633 H361-009-1HB46 H361-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576
634 H361-009-1HB47 H361-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503
635 H361-009-1HB48 H361-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872
636 H361-009-1HB49 H361-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591
637 H361-009-1HB50 H361-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439
638 H361-009-1HB51 H361-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816
639 H361-009-1HB52 H361-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626
640 H361-009-1HB53 H361-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864
641 H361-009-1HB54 H361-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787
642 H361-009-1HB55 H361-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235
643 H361-009-1HB56 H361-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260
644 H361-009-1HB57 H361-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953
645 H361-009-1HB58 H361-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476
646 H361-009-1HB59 H361-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783
647 H361-009-1HB60 H361-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416
648 H361-009-1HB61 H361-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387
649 H361-009-1HB62 H361-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938
650 H361-009-1HB63 H361-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803
651 H361-009-1HB64 H361-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749
652 H361-009-1HB65 H361-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227
653 H361-009-1HB66 H361-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979
654 H361-009-1HB67 H361-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763
655 H361-009-1HB68 H361-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351
656 H361-009-1HB69 H361-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921
657 H361-009-1HB70 H361-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445
658 H361-009-1HB71 H361-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378
659 H361-009-1HB72 H361-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005
660 H361-009-1HB73 H361-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954
661 H361-009-1HB74 H361-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638
662 H361-009-1HB75 H361-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946
663 H361-009-1HB76 H361-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463
664 H361-009-1HB77 H361-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809
665 H361-009-1HB78 H361-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517
04/18/2023 23:19:04
Page 58 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
666 H361-009-1HB79 H361-009-1HB79
RIL/PTH-J3-0256 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366
667 H361-009-1HB80 H361-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437
668 H361-009-1HB81 H361-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085
669 H361-009-1VB23 H361-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480
670 H361-009-1VB24 H361-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580
83 1.58 1.66 585 624 3480 1.27 ###
671 H361-009-1B123 H361-009-1B123RIL/PTH-J3-0257 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084
672 H361-009-1B124 H361-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099
4 0.04 0.07 330 229 1099 0.08 ###
673 H361-009-1B254 H361-009-1B254RIL/PTH-J3-0258 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876
674 H361-009-1B255 H361-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969
2 0.03 0.06 386 254 969 0.10 ###
675 H361-009-1B166 H361-009-1B166
RIL/PTH-J3-0259 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464
676 H361-009-1B168 H361-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563
677 H361-009-1B171 H361-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
678 H361-009-1B172 H361-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
679 H361-009-1B173 H361-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
680 H361-009-1B175 H361-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
681 H361-009-1B179 H361-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164
682 H361-009-1B180 H361-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464
683 H361-009-1B181 H361-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464
684 H361-009-1B182 H361-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464
685 H361-009-1B187 H361-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461
686 H361-009-1B189 H361-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961
687 H361-009-1B191 H361-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961
688 H361-009-1B192 H361-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411
689 H361-009-1B196 H361-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860
690 H361-009-1B197 H361-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860
691 H361-009-1B199 H361-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960
692 H361-009-1B200 H361-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860
693 H361-009-1B204 H361-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
694 H361-009-1B206 H361-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363
04/18/2023 23:19:04
Page 59 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
695 H361-009-1B208 H361-009-1B208
RIL/PTH-J3-0259 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
696 H361-009-1B209 H361-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463
36 2.39 2.45 950 920 2961 2.59 ###
697 H361-009-1B167 H361-009-1B167
RIL/PTH-J3-0260 BUNDLE
SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563
698 H361-009-1B169 H361-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464
699 H361-009-1B170 H361-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463
700 H361-009-1B174 H361-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
701 H361-009-1B176 H361-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463
702 H361-009-1B177 H361-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964
703 H361-009-1B178 H361-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164
704 H361-009-1B183 H361-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874
705 H361-009-1B184 H361-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240
706 H361-009-1B185 H361-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461
707 H361-009-1B186 H361-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461
708 H361-009-1B188 H361-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961
709 H361-009-1B190 H361-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961
710 H361-009-1B193 H361-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476
711 H361-009-1B194 H361-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476
712 H361-009-1B195 H361-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836
713 H361-009-1B198 H361-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960
714 H361-009-1B201 H361-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857
715 H361-009-1B202 H361-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459
716 H361-009-1B203 H361-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
717 H361-009-1B205 H361-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363
718 H361-009-1B207 H361-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463
719 H361-009-1B210 H361-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178
720 H361-009-1B211 H361-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
721 H361-009-1B212 H361-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463
722 H361-009-1B213 H361-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860
723 H361-009-1B214 H361-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260
724 H361-009-1B215 H361-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964
725 H361-009-1B216 H361-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164
726 H361-009-1B217 H361-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494
727 H361-009-1B218 H361-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164
04/18/2023 23:19:04
Page 60 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
728 H361-009-1B219 H361-009-1B219
RIL/PTH-J3-0260 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954
68 2.67 2.79 1087 1278 2964 4.12 ###
729 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0261 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312
4 0.05 0.08 352 289 312 0.03 ###
730 H361-009-1B115 H361-009-1B115
RIL/PTH-J3-0262 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163
731 H361-009-1B116 H361-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163
732 H361-009-1B118 H361-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585
733 H361-009-1B119 H361-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547
734 H361-009-1B120 H361-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547
735 H361-009-1B121 H361-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596
736 H361-009-1B128 H361-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959
737 H361-009-1B133 H361-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413
738 H361-009-1B134 H361-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463
739 H361-009-1B135 H361-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462
740 H361-009-1B136 H361-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712
741 H361-009-1B138 H361-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746
742 H361-009-1B139 H361-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746
743 H361-009-1B140 H361-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461
744 H361-009-1B141 H361-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961
745 H361-009-1B142 H361-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961
746 H361-009-1B143 H361-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961
747 H361-009-1B145 H361-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961
748 H361-009-1B146 H361-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961
749 H361-009-1B147 H361-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176
750 H361-009-1B151 H361-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960
751 H361-009-1B154 H361-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464
752 H361-009-1B157 H361-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964
753 H361-009-1B158 H361-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964
754 H361-009-1B161 H361-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764
755 H361-009-1B163 H361-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514
756 H361-009-1B164 H361-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463
757 H361-009-1B165 H361-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763
758 H361-009-1FR10 H361-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355
04/18/2023 23:19:04
Page 61 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
759 H361-009-1SC2 H361-009-1SC2
RIL/PTH-J3-0262 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508
760 H361-009-1SC3 H361-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508
33 2.09 2.22 1372 1314 5964 10.75 ###
761 H361-009-1CT28 H361-009-1CT28
RIL/PTH-J3-0263 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988
762 H361-009-1CT29 H361-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778
763 H361-009-1CT30 H361-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548
764 H361-009-1CT31 H361-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548
765 H361-009-1CT32 H361-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188
9 0.32 0.46 1180 1457 1988 3.42 ###
766 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463
1 0.05 0.09 680 375 1463 0.37 ###
767 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093
1 0.11 0.16 682 591 3093 1.25 ###
768 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463
1 0.05 0.08 403 333 1463 0.20 ###
769 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899
1 0.08 0.12 403 333 2899 0.39 ###
770 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963
1 0.08 0.12 403 333 2963 0.40 ###
771 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459
1 0.05 0.09 403 333 1459 0.20 ###
772 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964
1 0.10 0.13 403 333 2964 0.40 ###
773 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964
1 0.09 0.13 403 333 2964 0.40 ###
04/18/2023 23:19:04
Page 62 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
774 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964
1 0.09 0.12 403 333 2964 0.40 ###
775 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964
1 0.09 0.12 403 333 2964 0.40 ###
776 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459
1 0.05 0.09 403 333 1459 0.20 ###
777 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411
1 0.04 0.08 403 333 1411 0.19 ###
778 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860
1 0.10 0.13 403 333 2860 0.38 ###
779 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0277 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860
1 0.09 0.13 403 333 2860 0.38 ###
780 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0278 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461
2 0.10 0.13 403 333 1461 0.20 ###
781 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348
1 0.06 0.09 403 333 1348 0.18 ###
782 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093
1 0.12 0.15 403 333 3093 0.42 ###
783 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464
1 0.15 0.19 403 333 5464 0.73 ###
784 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964
1 0.17 0.20 403 333 5964 0.80 ###
785 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364
1 0.07 0.11 403 333 2364 0.32 ###
04/18/2023 23:19:04
Page 63 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
786 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364
1 0.08 0.11 403 333 2364 0.32 ###
787 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882
1 0.23 0.27 403 333 7882 1.06 ###
788 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062
1 0.09 0.13 403 333 3062 0.41 ###
789 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744
1 0.35 0.39 403 333 1744 0.23 ###
790 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647
1 0.19 0.22 403 333 647 0.09 ###
791 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647
1 0.18 0.21 403 333 647 0.09 ###
792 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0290 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850
1 0.16 0.19 403 333 1850 0.25 ###
793 H361-009-1B40 H361-009-1B40
RIL/PTH-J3-0291 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834
794 H361-009-1B42 H361-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963
795 H361-009-1B43 H361-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963
796 H361-009-1B44 H361-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963
797 H361-009-1B45 H361-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963
798 H361-009-1B49 H361-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963
799 H361-009-1B50 H361-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963
800 H361-009-1B52 H361-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962
801 H361-009-1B56 H361-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585
802 H361-009-1B57 H361-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463
21 3.37 3.50 1218 1262 5963 9.17 ###
803 H361-009-1B41 H361-009-1B41
RIL/PTH-J3-0292 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834
04/18/2023 23:19:04
Page 64 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
804 H361-009-1B58 H361-009-1B58
RIL/PTH-J3-0292 BUNDLE
SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463
805 H361-009-1B59 H361-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463
806 H361-009-1B60 H361-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463
807 H361-009-1B72 H361-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160
808 H361-009-1B78 H361-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460
809 H361-009-1B81 H361-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461
810 H361-009-1B85 H361-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659
811 H361-009-1B90 H361-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394
812 H361-009-1B69 H361-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949
813 H361-009-1B74 H361-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963
814 H361-009-1B73 H361-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963
815 H361-009-1B75 H361-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963
816 H361-009-1B76 H361-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962
817 H361-009-1B77 H361-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962
818 H361-009-1B82 H361-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461
819 H361-009-1B84 H361-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659
820 H361-009-1SC4 H361-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332
24 2.56 2.75 1121 2042 5461 12.50 ###
821 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0293 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464
2 0.14 0.19 456 566 1464 0.38 ###
822 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460
1 0.22 0.28 456 787 5460 1.96 ###
823 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460
1 0.23 0.29 455 885 5460 2.20 ###
824 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462
1 0.25 0.31 455 845 5462 2.10 ###
825 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962
1 0.18 0.23 455 696 3962 1.25 ###
826 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0298 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963
04/18/2023 23:19:04
Page 65 of 83
DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1,012.12 TONS
Quantity of Cubic Meters : 1,713.09 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 17-Mar-15
Rev. 3
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
1 0.18 0.23 456 699 3963 1.26 ###
827 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0299 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585
5 1.19 1.23 634 456 5585 1.61 ###
828 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462
1 0.28 0.35 851 1010 5462 4.69 ###
829 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462
1 0.23 0.29 850 822 5462 3.82 ###
830 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0302 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462
1 0.23 0.28 850 612 5462 2.84 ###
831 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0303 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462
5 1.07 1.11 641 346 5462 1.21 ###
832 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462
1 0.22 0.28 456 817 5462 2.03 ###
833 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462
1 0.23 0.29 455 814 5462 2.02 ###
834 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462
1 0.22 0.27 456 574 5462 1.43 ###
835 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0307 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462
1 0.23 0.29 456 847 5462 2.11 ###
836 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0308 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462
3 0.67 0.74 456 849 5462 2.11 ###
SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 29.88 89.62
GRAND TOTAL 1256 1012.12 1041.43 1713.09
04/18/2023 23:19:04
Page 66 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
A. H210-550 ROOD MILL STRUCTURE
1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99
2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51
3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82
4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34
5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59
6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54
7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53
8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28
9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79
10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73
11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53
12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34
13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35
14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54
15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40
04/18/2023 23:19:04
Page 67 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07
17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45
18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78
19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78
20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87
21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16
22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47
23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57
24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35
25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13
26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58
27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22
28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70
29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74
30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50
31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20
32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31
33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47
34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35
35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76
36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41
37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70
38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31
39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15
40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99
41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43
42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22
43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12
44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29
45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28
46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66
47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22
48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28
49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83
50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28
04/18/2023 23:19:04
Page 68 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48
52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49
53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49
54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11
55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89
56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47
57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34
58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02
59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99
60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99
61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53
62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96
63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93
64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12
65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88
66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09
67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49
68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42
69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25
70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18
71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31
72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82
73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33
74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61
75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99
76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31
77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51
78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41
79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01
80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65
81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41
82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73
83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24
84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68
85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91
04/18/2023 23:19:04
Page 69 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39
87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01
88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33
89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42
90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15
91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60
92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44
93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83
94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01
95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17
96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42
97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77
98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59
99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02
SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 99 807.81 824.20 1149.16
B. H220-550 ROOD MILL STRUCTURE
100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73
101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 6.99 1192 1450 8437 14.58
102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.74 1440 1495 5000 10.76
103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.17 1400 1540 12000 25.87
104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.75 1540 1250 10500 20.21
105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.40 1547 1608 8437 20.99
106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.57 1540 1180 5000 9.09
107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.24 2259 1271 12000 34.45
108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.33 1524 961 10500 15.38
109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.55 1125 1540 6036 10.46
110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.30 1550 885 8437 11.57
111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 1 5.67 5.79 1540 995 5000 7.66
112 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0112 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66
SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 13 99.95 102.33 199.42 99951
C. H360-013 SUB PIPE RACK ACR 001
113 H360-013-VB19 ~ 23 H360-013-VB19 ~ 23 RIL/PTH-J3-0113 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23 10 0.16 0.52 361 375 1526 2.07
114 RIL/PTH-J3-0114 BUNDLE 25 0.49 1.63 461 545 1987 12.48H360-013-HB2 ~ HB6, VB16 ~ VB18
H360-013-HB2 ~ HB6, VB16 ~ VB18
SUB PIPE RACK ACR 001 H360-013-HB2 ~ HB6, VB16 ~ VB18
04/18/2023 23:19:04
Page 70 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
115 H360-013-CT7 ~ CT13 H360-013-CT7 ~ CT13 RIL/PTH-J3-0115 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT7 ~ CT13 13 0.19 1.42 1270 871 1150 16.54
116 H360-013-B67 ~ B79, B88 H360-013-B67 ~ B79, B88 RIL/PTH-J3-0116 BUNDLE SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88 20 0.58 2.72 461 1020 2962 27.86
117 H360-013-B82 H360-013-B82 RIL/PTH-J3-0117 BUNDLE SUB PIPE RACK ACR 001 H360-013-B82 4 0.14 0.26 400 275 1461 0.64
118 H360-013-CT1 ~ CT2 H360-013-CT1 ~ CT2 RIL/PTH-J3-0118 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT1 ~ CT2 8 0.11 0.53 1110 658 388 2.27
119 H360-013-B19, B80 ~ B81 H360-013-B19, B80 ~ B81 RIL/PTH-J3-0119 BUNDLE SUB PIPE RACK ACR 001 H360-013-B19, B80 ~ B81 4 0.23 0.38 436 378 4657 3.07
120 H360-013-B7 ~ B11 H360-013-B7 ~ B11 RIL/PTH-J3-0120 BUNDLE SUB PIPE RACK ACR 001 H360-013-B7 ~ B11 5 0.59 0.78 874 399 5942 10.36
121 H360-013-B4 H360-013-B4 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 H360-013-B4 1 0.16 0.20 856 352 4827 1.45
122 H360-013-B5 H360-013-B5 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 H360-013-B5 1 0.58 0.63 1722 578 5944 5.92
123 H360-013-B6 H360-013-B6 RIL/PTH-J3-0123 BUNDLE SUB PIPE RACK ACR 001 H360-013-B6 1 0.58 0.63 1718 578 5944 5.90
124 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 H360-013-CT5 1 0.12 0.19 380 1031 1684 0.66
125 H360-013-B1 H360-013-B1 RIL/PTH-J3-0125 SKID SUB PIPE RACK ACR 001 H30-013-B1 1 0.11 0.15 399 336 2904 0.39
126 H360-013-B2 H360-013-B2 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 H360-013-B2 11 1.91 2.58 971 833 5673 50.47
127 H360-013-B3 H360-013-B3 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 H360-013-B3 6 0.87 1.13 397 503 4827 5.78
128 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB1 4 0.17 0.32 397 413 1389 0.91
129 H360-013-B55 H360-013-B55 RIL/PTH-J3-0129 SKID SUB PIPE RACK ACR 001 H360-013-B55 1 0.21 0.27 358 876 5673 1.78
130 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0130 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT3 3 0.20 0.35 900 649 1442 2.53
04/18/2023 23:19:04
Page 71 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
131 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 H360-013-CT5 1 0.13 0.23 380 1420 1684 0.91
132 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 H360-013-CT14 1 0.12 0.16 826 380 1684 0.53
133 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0133 SKID SUB PIPE RACK ACR 001 H360-013-FR1 1 0.38 0.46 777 1242 4790 4.62
134 RIL/PTH-J3-0134 BUNDLE 10 1.31 1.79 750 587 5673 24.98
135 RIL/PTH-J3-0135 BUNDLE 20 5.55 6.91 1142 966 5673 125.17
136 H360-013-B14 H360-013-B14 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 H360-013-B14 1 0.85 0.89 1821 520 5942 5.63
137 H360-013-B15 H360-013-B15 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 H360-013-B15 1 0.63 0.67 1233 520 5942 3.81
138 H360-013-B16 H360-013-B16 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 H360-013-B16 1 0.78 0.83 1615 519 5944 4.98
139 H360-013-B18 H360-013-B18 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 H360-013-B18 1 0.37 0.42 410 642 5673 1.49
140 H360-013-B22 H360-013-B22 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 H360-013-B22 1 0.36 0.41 609 666 4594 1.86
141 H360-013-B24 H360-013-B24 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 H360-013-B24 1 0.73 0.77 1584 406 5607 3.61
142 H360-013-B26 H360-013-B26 RIL/PTH-J3-0142 SKID SUB PIPE RACK ACR 001 H360-013-B26 1 0.09 0.15 633 662 1181 0.49
143 H360-013-B28 H360-013-B28 RIL/PTH-J3-0143 BUNDLE SUB PIPE RACK ACR 001 H360-013-B28 2 0.69 0.82 793 864 4617 6.33
144 H360-013-B30 H360-013-B30 RIL/PTH-J3-0144 SKID SUB PIPE RACK ACR 001 H360-013-B30 1 0.36 0.43 846 958 4594 3.72
145 H360-013-B31 H360-013-B31 RIL/PTH-J3-0145 BUNDLE SUB PIPE RACK ACR 001 H360-013-B31 2 0.70 0.82 610 868 4617 4.89
146 H360-013-B32 H360-013-B32 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 H360-013-B32 1 0.37 0.42 610 745 4617 2.10
H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B36
H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37
SUB PIPE RACK ACR 001 H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37
H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1
H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1
SUB PIPE RACK ACR 001 H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1
04/18/2023 23:19:04
Page 72 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
147 H360-013-B34 H360-013-B34 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 H360-013-B34 1 0.73 0.76 1165 344 5607 2.25
148 H360-013-B35 H360-013-B35 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 H360-013-B35 1 0.87 0.91 1284 401 5942 3.06
149 H360-013-B36 H360-013-B36 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 H360-013-B36 1 0.06 0.10 659 406 731 0.20
150 H360-013-B39 H360-013-B39 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 H360-013-B39 1 0.37 0.42 410 657 5951 1.60
151 H360-013-B40 H360-013-B40 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 H360-013-B40 1 0.37 0.43 410 660 5951 1.61
152 H360-013-B42 H360-013-B42 RIL/PTH-J3-0152 SKID SUB PIPE RACK ACR 001 H360-013-B42 1 0.32 0.38 410 867 4961 1.76
153 H360-013-B43 H360-013-B43 RIL/PTH-J3-0153 BUNDLE SUB PIPE RACK ACR 001 H360-013-B43 3 0.95 1.11 344 660 4961 3.38
154 H360-013-B44 H360-013-B44 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 H360-013-B44 1 0.32 0.39 410 868 4961 1.77
155 H360-013-B45 H360-013-B45 RIL/PTH-J3-0155 SKID SUB PIPE RACK ACR 001 H360-013-B45 1 0.33 0.40 410 868 4961 1.77
SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 35.77 363.58
D. H361-013 SUB PIPE RACK ACR 001
156 H360-013-VB19 ~ 23 H360-013-VB19 ~ 23 RIL/PTH-J3-0113 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23 10 0.16 0.52 361 375 1526 2.07
157 RIL/PTH-J3-0157 BUNDLE 25 0.49 1.63 461 545 1987 12.48
158 H361-013-CT7 ~ CT13 H361-013-CT7 ~ CT13 RIL/PTH-J3-0158 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT7 ~ CT13 13 0.19 1.42 1270 871 1150 16.54
159 H361-013-B67 ~ B79, B88 H361-013-B67 ~ B79, B88 RIL/PTH-J3-0159 BUNDLE SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88 20 0.58 2.72 461 1020 2962 27.86
160 H361-013-B82 H361-013-B82 RIL/PTH-J3-0160 BUNDLE SUB PIPE RACK ACR 001 H361-013-B82 4 0.14 0.26 400 275 1461 0.64
161 H361-013-CT1 ~ CT2 H361-013-CT1 ~ CT2 RIL/PTH-J3-0161 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT1 ~ CT2 8 0.11 0.53 1110 658 388 2.27
162 H361-013-B19, B80 ~ B81 H361-013-B19, B80 ~ B81 RIL/PTH-J3-0162 BUNDLE SUB PIPE RACK ACR 001 H361-013-B19, B80 ~ B81 4 0.23 0.38 436 378 4657 3.07
H361-013-HB2 ~ HB6, VB16 ~ VB18
H361-013-HB2 ~ HB6, VB16 ~ VB18
SUB PIPE RACK ACR 001 H361-013-HB2 ~ HB6, VB16 ~ VB18
04/18/2023 23:19:04
Page 73 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
163 H361-013-B7 ~ B11 H361-013-B7 ~ B11 RIL/PTH-J3-0163 BUNDLE SUB PIPE RACK ACR 001 H361-013-B7 ~ B11 5 0.59 0.78 874 399 5942 10.36
164 H361-013-B4 H361-013-B4 RIL/PTH-J3-0164 BUNDLE SUB PIPE RACK ACR 001 H361-013-B4 1 0.16 0.20 856 352 4827 1.45
165 H361-013-B5 H361-013-B5 RIL/PTH-J3-0165 BUNDLE SUB PIPE RACK ACR 001 H361-013-B5 1 0.58 0.63 1722 578 5944 5.92
166 H361-013-B6 H361-013-B6 RIL/PTH-J3-0166 BUNDLE SUB PIPE RACK ACR 001 H361-013-B6 1 0.58 0.63 1718 578 5944 5.90
167 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 H361-013-CT5 1 0.12 0.19 380 1031 1684 0.66
168 H361-013-B1 H361-013-B1 RIL/PTH-J3-0168 SKID SUB PIPE RACK ACR 001 H31-013-B1 1 0.11 0.15 399 336 2904 0.39
169 H361-013-B2 H361-013-B2 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 H361-013-B2 11 1.91 2.58 971 833 5673 50.47
170 H361-013-B3 H361-013-B3 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 H361-013-B3 6 0.87 1.13 397 503 4827 5.78
171 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0171 BUNDLE SUB PIPE RACK ACR 001 H361-013-VB1 4 0.17 0.32 397 413 1389 0.91
172 H361-013-B55 H361-013-B55 RIL/PTH-J3-0172 SKID SUB PIPE RACK ACR 001 H361-013-B55 1 0.21 0.27 358 876 5673 1.78
173 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0173 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT3 3 0.20 0.35 900 649 1442 2.53
174 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 H361-013-CT5 1 0.13 0.23 380 1420 1684 0.91
175 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 H361-013-CT14 1 0.12 0.16 826 380 1684 0.53
176 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0176 SKID SUB PIPE RACK ACR 001 H361-013-FR1 1 0.38 0.46 777 1242 4790 4.62
177 RIL/PTH-J3-0177 BUNDLE 10 1.31 1.79 750 587 5673 24.98
178 RIL/PTH-J3-0178 BUNDLE 20 5.55 6.91 1142 966 5673 125.17
H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B36
H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37
SUB PIPE RACK ACR 001 H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37
H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1
H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1
SUB PIPE RACK ACR 001 H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1
04/18/2023 23:19:04
Page 74 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
179 H361-013-B14 H361-013-B14 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 H361-013-B14 1 0.85 0.89 1821 520 5942 5.63
180 H361-013-B15 H361-013-B15 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 H361-013-B15 1 0.63 0.67 1233 520 5942 3.81
181 H361-013-B16 H361-013-B16 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 H361-013-B16 1 0.78 0.83 1615 519 5944 4.98
182 H361-013-B18 H361-013-B18 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 H361-013-B18 1 0.37 0.42 410 642 5673 1.49
183 H361-013-B22 H361-013-B22 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 H361-013-B22 1 0.36 0.41 609 666 4594 1.86
184 H361-013-B24 H361-013-B24 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 H361-013-B24 1 0.73 0.77 1584 406 5607 3.61
185 H361-013-B26 H361-013-B26 RIL/PTH-J3-0185 SKID SUB PIPE RACK ACR 001 H361-013-B26 1 0.09 0.15 633 662 1181 0.49
186 H361-013-B28 H361-013-B28 RIL/PTH-J3-0186 BUNDLE SUB PIPE RACK ACR 001 H361-013-B28 2 0.69 0.82 793 864 4617 6.33
187 H361-013-B30 H361-013-B30 RIL/PTH-J3-0187 SKID SUB PIPE RACK ACR 001 H361-013-B30 1 0.36 0.43 846 958 4594 3.72
188 H361-013-B31 H361-013-B31 RIL/PTH-J3-0188 BUNDLE SUB PIPE RACK ACR 001 H361-013-B31 2 0.70 0.82 610 868 4617 4.89
189 H361-013-B32 H361-013-B32 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 H361-013-B32 1 0.37 0.42 610 745 4617 2.10
190 H361-013-B34 H361-013-B34 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 H361-013-B34 1 0.73 0.76 1165 344 5607 2.25
191 H361-013-B35 H361-013-B35 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 H361-013-B35 1 0.87 0.91 1284 401 5942 3.06
192 H361-013-B36 H361-013-B36 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 H361-013-B36 1 0.06 0.10 659 406 731 0.20
193 H361-013-B39 H361-013-B39 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 H361-013-B39 1 0.37 0.42 410 657 5951 1.60
194 H361-013-B40 H361-013-B40 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 H361-013-B40 1 0.37 0.43 410 660 5951 1.61
195 H361-013-B42 H361-013-B42 RIL/PTH-J3-0195 SKID SUB PIPE RACK ACR 001 H361-013-B42 1 0.32 0.38 410 867 4961 1.76
04/18/2023 23:19:04
Page 75 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
196 H361-013-B43 H361-013-B43 RIL/PTH-J3-0196 BUNDLE SUB PIPE RACK ACR 001 H361-013-B43 3 0.95 1.11 344 660 4961 3.38
197 H361-013-B44 H361-013-B44 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 H361-013-B44 1 0.32 0.39 410 868 4961 1.77
198 H361-013-B45 H361-013-B45 RIL/PTH-J3-0198 SKID SUB PIPE RACK ACR 001 H361-013-B45 1 0.33 0.40 410 868 4961 1.77
#REF! 176 25.15 35.77 363.58 25155
D. H360-009 SULPHUR RECOVERY UNIT APR 002
199 RIL/PTH-J3-0199 BUNDLE 48 3.00 5.36 698 610 3940 80.52
200 RIL/PTH-J3-0200 BUNDLE 9 0.13 0.43 326 319 2409 2.25
201 RIL/PTH-J3-0201 BUNDLE 83 1.58 7.79 585 624 3480 105.44
202 H360-009-1B123 ~ 1B124 H360-009-1B123 ~ 1B124 RIL/PTH-J3-0202 BUNDLE 4 0.04 0.16 330 229 1099 0.33
203 H360-009-1B254 ~ 1B255 H360-009-1B254 ~ 1B255 RIL/PTH-J3-0203 BUNDLE 2 0.03 0.09 386 254 969 0.19
204 RIL/PTH-J3-0204 BUNDLE 36 2.39 4.76 950 920 2961 93.16
H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26
H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26
SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26
H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25
H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25
SULPHUR RECOVERY UNIT APR 002 H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25
H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24
H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24
SULPHUR RECOVERY UNIT APR 002 H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24
SULPHUR RECOVERY UNIT APR 002 H360-009-1B123 ~ 1B124
SULPHUR RECOVERY UNIT APR 002 H360-009-1B254 ~ 1B255
H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209
H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209
SULPHUR RECOVERY UNIT APR 002 H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209
04/18/2023 23:19:04
Page 76 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
205 RIL/PTH-J3-0205 BUNDLE 68 2.67 11.36 1087 1278 2964 279.99
206 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0206 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1CT27 4 0.05 0.18 352 289 312 0.13
207 33 2.09 6.41 1372 1314 5964 354.81
208 H360-009-1CT28 ~ 1CT32 H360-009-1CT28 ~ 1CT32 RIL/PTH-J3-0208 BUNDLE 9 0.32 1.60 1180 1457 1988 30.76
209 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B114 1 0.05 0.09 680 375 1463 0.37
210 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B117 1 0.11 0.16 682 591 3093 1.25
211 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B122 1 0.05 0.08 403 333 1463 0.20
212 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B125 1 0.08 0.12 403 333 2899 0.39
213 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B126 1 0.08 0.12 403 333 2963 0.40
214 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B127 1 0.05 0.09 403 333 1459 0.20
215 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B129 1 0.10 0.13 403 333 2964 0.40
216 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B130 1 0.09 0.13 403 333 2964 0.40
217 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B131 1 0.09 0.12 403 333 2964 0.40
H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219
H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219
SULPHUR RECOVERY UNIT APR 002 H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219
H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3
H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3
SULPHUR RECOVERY UNIT APR 002 H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3
SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32
04/18/2023 23:19:04
Page 77 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
218 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B132 1 0.09 0.12 403 333 2964 0.40
219 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B137 1 0.05 0.09 403 333 1459 0.20
220 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B144 1 0.04 0.08 403 333 1411 0.19
221 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B148 1 0.10 0.13 403 333 2860 0.38
222 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0222 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B149 1 0.09 0.13 403 333 2860 0.38
223 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0223 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B150 2 0.10 0.17 403 333 1461 0.39
224 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B152 1 0.06 0.09 403 333 1348 0.18
225 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B153 1 0.12 0.15 403 333 3093 0.42
226 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B155 1 0.15 0.19 403 333 5464 0.73
227 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B156 1 0.17 0.20 403 333 5964 0.80
228 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B159 1 0.07 0.11 403 333 2364 0.32
229 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B160 1 0.08 0.11 403 333 2364 0.32
230 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B162 1 0.23 0.27 403 333 7882 1.06
231 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B259 1 0.09 0.13 403 333 3062 0.41
232 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR6 1 0.35 0.39 403 333 1744 0.23
233 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR7 1 0.19 0.22 403 333 647 0.09
234 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR8 1 0.18 0.21 403 333 647 0.09
04/18/2023 23:19:04
Page 78 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
235 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0235 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR9 1 0.16 0.19 403 333 1850 0.25
236 RIL/PTH-J3-0236 BUNDLE 21 3.37 6.03 1218 1262 5963 192.48
237 RIL/PTH-J3-0237 BUNDLE 24 2.56 7.11 1121 2042 5461 300.02
238 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0238 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B46 2 0.14 0.24 456 566 1464 0.76
239 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B47 1 0.22 0.28 456 787 5460 1.96
240 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B48 1 0.23 0.29 455 885 5460 2.20
241 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B51 1 0.25 0.31 455 845 5462 2.10
242 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B53 1 0.18 0.23 455 696 3962 1.25
243 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0243 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B54 1 0.18 0.23 456 699 3963 1.26
244 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0244 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B55 5 1.19 1.39 634 456 5585 8.07
245 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B61 1 0.28 0.35 851 1010 5462 4.69
246 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B62 1 0.23 0.29 850 822 5462 3.82
247 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0247 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B63 1 0.23 0.28 850 612 5462 2.84
248 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0248 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B64 5 1.07 1.25 641 346 5462 6.06
249 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B65 1 0.22 0.28 456 817 5462 2.03
250 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B66 1 0.23 0.29 455 814 5462 2.02
H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57
H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57
SULPHUR RECOVERY UNIT APR 002 H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57
H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4
H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4
SULPHUR RECOVERY UNIT APR 002 H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4
04/18/2023 23:19:04
Page 79 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
251 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B67 1 0.22 0.27 456 574 5462 1.43
252 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0252 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B68 1 0.23 0.29 456 847 5462 2.11
253 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0253 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B70 3 0.67 0.86 456 849 5462 6.34
SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88 62400
E. H361-009 SULPHUR RECOVERY UNIT APR 002
254 RIL/PTH-J3-0254 BUNDLE 48 3.00 5.36 698 610 3940 80.52
255 RIL/PTH-J3-0255 BUNDLE 9 0.13 0.43 326 319 2409 2.25
256 RIL/PTH-J3-0256 BUNDLE 83 1.58 7.79 585 624 3480 105.44
257 H361-009-1B123 ~ 1B124 H360-009-1B123 ~ 1B124 RIL/PTH-J3-0257 BUNDLE 4 0.04 0.16 330 229 1099 0.33
258 H361-009-1B254 ~ 1B255 H360-009-1B254 ~ 1B255 RIL/PTH-J3-0258 BUNDLE 2 0.03 0.09 386 254 969 0.19
259 RIL/PTH-J3-0259 BUNDLE 36 2.39 4.76 950 920 2961 93.16
H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26
H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26
SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26
H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25
H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25
SULPHUR RECOVERY UNIT APR 002 H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25
H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24
H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24
SULPHUR RECOVERY UNIT APR 002 H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24
SULPHUR RECOVERY UNIT APR 002 H361-009-1B123 ~ 1B124
SULPHUR RECOVERY UNIT APR 002 H361-009-1B254 ~ 1B255
H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209
H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209
SULPHUR RECOVERY UNIT APR 002 H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209
04/18/2023 23:19:04
Page 80 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
260 RIL/PTH-J3-0260 BUNDLE 68 2.67 11.36 1087 1278 2964 279.99
261 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0261 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1CT27 4 0.05 0.18 352 289 312 0.13
262 RIL/PTH-J3-0262 33 2.09 6.41 1372 1314 5964 354.81
263 H361-009-1CT28 ~ 1CT32 H361-009-1CT28 ~ 1CT32 RIL/PTH-J3-0263 BUNDLE 9 0.32 1.60 1180 1457 1988 30.76
264 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B114 1 0.05 0.09 680 375 1463 0.37
265 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B117 1 0.11 0.16 682 591 3093 1.25
266 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B122 1 0.05 0.08 403 333 1463 0.20
267 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B125 1 0.08 0.12 403 333 2899 0.39
268 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B126 1 0.08 0.12 403 333 2963 0.40
269 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B127 1 0.05 0.09 403 333 1459 0.20
270 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B129 1 0.10 0.13 403 333 2964 0.40
271 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B130 1 0.09 0.13 403 333 2964 0.40
272 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B131 1 0.09 0.12 403 333 2964 0.40
H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219
H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219
SULPHUR RECOVERY UNIT APR 002 H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219
H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3
H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3
SULPHUR RECOVERY UNIT APR 002 H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3
SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32
04/18/2023 23:19:04
Page 81 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
273 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B132 1 0.09 0.12 403 333 2964 0.40
274 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B137 1 0.05 0.09 403 333 1459 0.20
275 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B144 1 0.04 0.08 403 333 1411 0.19
276 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B148 1 0.10 0.13 403 333 2860 0.38
277 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0277 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B149 1 0.09 0.13 403 333 2860 0.38
278 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0278 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B150 2 0.10 0.17 403 333 1461 0.39
279 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B152 1 0.06 0.09 403 333 1348 0.18
280 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B153 1 0.12 0.15 403 333 3093 0.42
281 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B155 1 0.15 0.19 403 333 5464 0.73
282 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B156 1 0.17 0.20 403 333 5964 0.80
283 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B159 1 0.07 0.11 403 333 2364 0.32
284 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B160 1 0.08 0.11 403 333 2364 0.32
285 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B162 1 0.23 0.27 403 333 7882 1.06
286 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B259 1 0.09 0.13 403 333 3062 0.41
287 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR6 1 0.35 0.39 403 333 1744 0.23
288 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR7 1 0.19 0.22 403 333 647 0.09
289 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR8 1 0.18 0.21 403 333 647 0.09
04/18/2023 23:19:04
Page 82 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
290 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0290 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR9 1 0.16 0.19 403 333 1850 0.25
291 RIL/PTH-J3-0291 BUNDLE 21 3.37 6.03 1218 1262 5963 192.48
292 RIL/PTH-J3-0292 BUNDLE 24 2.56 7.11 1121 2042 5461 300.02
293 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0293 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B46 2 0.14 0.24 456 566 1464 0.76
294 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B47 1 0.22 0.28 456 787 5460 1.96
295 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B48 1 0.23 0.29 455 885 5460 2.20
296 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B51 1 0.25 0.31 455 845 5462 2.10
297 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B53 1 0.18 0.23 455 696 3962 1.25
298 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0298 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B54 1 0.18 0.23 456 699 3963 1.26
299 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0299 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B55 5 1.19 1.39 634 456 5585 8.07
300 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B61 1 0.28 0.35 851 1010 5462 4.69
301 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B62 1 0.23 0.29 850 822 5462 3.82
302 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0302 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B63 1 0.23 0.28 850 612 5462 2.84
303 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0303 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B64 5 1.07 1.25 641 346 5462 6.06
304 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B65 1 0.22 0.28 456 817 5462 2.03
H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57
H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57
SULPHUR RECOVERY UNIT APR 002 H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57
H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4
H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4
SULPHUR RECOVERY UNIT APR 002 H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4
04/18/2023 23:19:04
Page 83 of 83
SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT
Purchase Order Number : 1J/3HM/7558812
Item Code : 4500190308
Description : Fabrication Steel Structures
Quantity : 308 Pckgs
Quantity of Weight : 1012.12 TONS
Quantity of Cubic Meters : 5075.49 CBM
Shipped from : Hanjung Private Jetty, Lampung INDONESIA
Shipped to : Kandla, INDIA
Date of Shipment to India : 22-March-2015 11-Mar-15
REV.02
PACK NO. DRAWING NO. MARKING NO.PACKAGE
TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)
CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH
305 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B66 1 0.23 0.29 455 814 5462 2.02
306 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B67 1 0.22 0.27 456 574 5462 1.43
307 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0307 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B68 1 0.23 0.29 456 847 5462 2.11
308 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0308 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B70 3 0.67 0.86 456 849 5462 6.34
SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88
GRAND TOTAL 1256 1012.12 1122.86 5075.49