ONTARIO QUARRIES Inc. 1177 Lonsdale Avenue Sudbury, Ontario Canada P3B1K3 tel.: (705) 688-6600 f 560-4846 fax: (705)524-9914 41I15SW0031 W9470.00014 PARKIN 010 SUBMISSION FOR ASSESSMENT CREDIT FOR PHYSICAL AND MECHANICAL WORK INVOLVING STRIPPING AND DRILLING HARAMA MARBLE QUARRY Parkin Twp District of Sudbury January, 1994

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

ONTARIO QUARRIES Inc.

1177 Lonsdale Avenue Sudbury, Ontario Canada P3B1K3

tel.: (705) 688-6600 f 560-4846 fax: (705)524-9914

41I15SW0031 W9470.00014 PARKIN 010

SUBMISSION FOR ASSESSMENT CREDITFOR PHYSICAL AND MECHANICAL WORK

INVOLVING STRIPPING AND DRILLING

HARAMA MARBLE QUARRY

Parkin Twp District of Sudbury

January, 1994

Page 2: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PREFACE

This submission is for assessment credit for physical and mechanical work performed on claims

owned by Ontario Quarries Inc. in Parkin Township, District of Sudbury. The claims are the site of a

marble quarry which is currently under advanced exploration l development. Maps showing the site

and location of the work conducted are contained in Appendix B.

I hereby certify that I was present on days when the work was done and I can attest to the equipment

and labour that was present as reflected on the invoices presented by the contractor (copies enclosed in

Appendix A).

Rachel Prudhomme, M.Sc., P.Eng.

January 14,1994

Page 3: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

INTRODUCTION

Ontario Quarries Inc. acquired a block of contiguous claims in Parkin Township north of Capreol, Ont. in

the fall of 1992 from Mr. John G. Brady. The claims contain a beautiful, competent and unique "marble"

according to the industrial definition of the term. Since the claims were acquired, there has been a

tremendous amount of physical, mechanical and research work conducted to determine the extent of the

marble deposit, the quality, consistency, colour and texture of the stone, the engineering properties of the

stone, its marketability in domestic and international markets and the potential environmental impact of a

quarry and the environmental baseline values for contaminants. In summary, it has been determined that

the deposit contains a stone that is highly desirable and unique in the dimension stone markets in America

and abroad and is very significant in terms of its volume. The stone has excellent physical properties as it

meets or exceeds all ASTM standards for marble dimension stone for exterior use. There is quite a

variation in colour, texture and pattern of stone within the same deposit. The deposit is workable in terms

of its accessibility, feasibility and environmental comparability.

A very large amount of the exploration and development work conducted on this block of claims in the

last year and several months has been supported by financial incentives from MNDM who have been

indispensable in continuing our work on this dimension stone project. MNDM has been very supportive

in encouraging us to continue in our efforts to develop a fully producing marble quarry. Financial

incentives received were in the form of a Norfund "pre-feasibility" project in the amount of S 164,400

(level of assistance: 575,000), a N.O.R.T. project of 5394,849 which is now 90 percent complete (level

of assistance: 5195,000), a 1993 O.M.I.P. project designation in the amount of 5509,250 (level of

assistance: 5152,775) and a Norfund project to purchase and operate two specially engineered diamond

wire saws in order to permit the proper extraction of full-sized test blocks for marketing and technical

studies (level of assistance: 550,000). The saws were purchased and imported from a manufacturer in

Italy as they are not available anywhere in North America.

Most of the work to date has focussed on 9 claims that were originally purchased by Ontario Quarries Inc.

The entire contiguous block presently owned by Ontario Quarries Inc. consists of 32 mining claims (31 in

Parkin Twp. and one in Hutton Twp.).

ONTARIO QUARRIES INC. l 1 994

Page 4: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

SUMMARY OF MECHANICAL STRIPPING Si DRILLING CONDUCTED ON MINING CLAIMS FROM OCT. 3 1992 TO OCT. 18,1992

Mechanical stripping and exploration drilling for test blocks were conducted on claims S734218 and

S865266 between Oct. 3 and Oct. 18,1992. The purpose of this work was to determine the extent,

consistency, colour, quality, physical properties and trend of the Harama marble deposit which has

already been proven to have good commercial value and excellent potential for international export.

The stripping and exploration drilling effaces was followed by sampling for A.S.T.M. testing of

engineering properties for one type of marble as conducted by Ortech International of Mississauga, Ont.

in Dec. 1992 and Jan, 1993. The report and results of the A.S.T.M. testing conducted on samples from

the areas mechanically stripped and drilled were previously presented for assessment credit under work

report No. W9370.00047. Mechanical stripping and exploration drilling activity was also followed by

detailed geological mapping and deposit evaluation by an independent geological consultant (Norwin

Geological of Sudbury) in Nov. and Dec. 1992. The reports and maps produced by Norwin as a result

of the work were previously submitted for assessment credit under work report No. W9370.00048.

General maps showing the location of the mechanical stripping and the exploration drilling of faces and

blocks conducted are included in this work report. Detailed maps can be found in the previously

mentioned work reports. The reader can refer to those reports for details of the mapping, A.S.T.M.

testing, geological assessment and recommendations for future work on the deposit.

The contractor hired to supply equipment and labour for mechanical stripping and exploration drilliing

was: F.H.R. Construction Ltd.1290 Bancroft Dr., Suite F421 Sudbury, Ont. P3B 4G9 tel.: 560-9340 or 670-4444

All work was supervised by Ontario Quarries Inc., the registered owner of the claims. Rachel

Prudhomme P.Eng., a licensed professional mining engineer and President of Ontario Quarries Inc.,

attended the worksite to provide professional and technical guidance and direction for stripping, drilling

of faces, sampling and prospecting, while Frank Villano, Vice-President, conducted field supervision of

equipment and labour sent by F.H.R. Construction Ltd.

A detailed summary of the cost of the mechanical stripping and exploration drilling work is included on

the following page. Copies of invoices from F.H.R. Construction Ltd. for this work are also included.

ONTARIO QUARRIES INC. ; 1994

Page 5: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

ME

CH

AN

ICA

L S

TRIP

PIN

G A

ND

EX

PLO

RA

TIO

N D

RIL

LIN

G C

OS

TS

--

CLA

IM 8

6526

6

DAT

E

Oct

. 3

792

Oct

. 3

/92

Oct

. 4

792

Oct

. 4

792

Oct

. 5

792

Oct

. 5

792

Sub

tota

l

Invo

ice

#

58

51

n/a

58

52

n7a

58

53

n/a

EQ

UIP

ME

NT

7 LA

BO

UR

850

Cas

e B

ulld

ozer

H-

Ope

rato

r22

0 C

ase

Exc

avat

or +

Ope

rato

rFl

oat

(2 m

oves

)Fo

rem

an

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r /

pros

pect

or

850

Cas

e B

ulld

ozer

+ O

pera

tor

71 0

Joh

n D

eere

Bac

khoe

+ O

pera

tor

W30

Cas

e P

aylo

ader

+ O

pera

tor

220

Cas

e E

xcav

ator

+ O

pera

tor

Floa

t (3

mov

es)

Fore

man

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r /

pros

pect

or

850

Cas

e B

ulld

ozer

+ O

pera

tor

71 0

Joh

n D

eere

Bac

khoe

+ O

pera

tor

W30

Cas

e P

aylo

ader

+ O

pera

tor

220

Cas

e E

xcav

ator

+ O

pera

tor

Com

pres

sor

Gas

ope

rate

d pu

mp

81 ho

ses

Labo

urer

s (2

)Fo

rem

anse

rvic

e tr

ucks

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r /

pros

pect

or

HO

UR

S

1 1 7 1 0

10 2 1 1 8 8 9 1 1

1 0 3 1 1

1 1

1 1

1 1

1 da

y1

day

22 1 1

1 1 2

RAT

E

38

0/h

r3

12

0/h

r36

50 e

a.340/h

r

34

0/h

r31

00

38

0/h

r3

80

/hr

380/h

r3120/h

r36

50 e

a.340/h

r

34

0/h

r3

10

0/h

r

380/h

r3

80

/hr

38

0/h

r3

12

0/h

r3250/d

ay

3107/d

ay

320/h

r3

40

/hr

34

0/h

r3100/h

r

DET

AILS

claim

865266

N

M

H

(t

H

It

II

mob

iliza

tion

of e

quip

men

tcl

aim

86

5266

GST supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

claim

865266

H

H

II

fi

II

H

M

H

H

H

M

M

M

II

mob

iliza

tion

of e

quip

men

tcl

aim

86

5266

GST

supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

cla

im

865266

fi

II

H

H

M

H

II

H

II

II

II

H

H

M

mis

cella

neou

s si

te t

rips

G3T

supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

TOTA

L

3880.0

0S

840.

008

1,3

00

.00

S40

0.00

S23

9.40

S40

0.00

S20

0.00

3880.0

03640.0

0S

640.

003

1,0

80

.00

31

,95

0.0

03440.0

03394.1

0

3400.0

03300.0

0

3880.0

03880.0

03880.0

03

1,3

20

.00

3250.0

03107.0

03440.0

03440.0

0no

cha

rge

3363

.79

3440.0

03200.0

0

S1 7

,1 8

4.29

ON

TA

RIO

QU

AR

RIE

S In

c.,

1994

Page 6: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

ME

CH

AN

ICA

L S

TR

IPP

ING

AN

D E

XP

LOR

ATI

ON

DR

ILLI

NG

CO

ST

S -

C

LAIM

734

218

DAT

E

Oct

. 6

792

Oct

. 6

792

Oct

. 7

792

Oct

. 7

792

Sub

tota

l

Invo

ice

#

58

54

n/a

58

55

EQ

UIP

ME

NT

7 LA

BO

UR

850

Cas

e B

ulld

ozer

* O

pera

tor

710

John

Dee

re B

ackh

oe *

Ope

rato

rW

30 C

ase

Pay

load

er +

Ope

rato

r22

0 C

ase

Exc

avat

or +

Ope

rato

rC

ompr

esso

rG

as o

pera

ted

pum

p A

hose

sLa

bour

ers

(2)

Fore

man

serv

ice

truck

s

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r 7

pros

pect

or

850

Cas

e B

ulld

ozer

+ O

pera

tor

71 0

Joh

n D

eere

Bac

khoe

+ O

pera

tor

W30

Cas

e P

aylo

ader

+ O

pera

tor

220

Cas

e E

xcav

ator

+ O

pera

tor

Com

pres

sor

Gas

ope

rate

d pu

mp

b ho

ses

Labo

urer

s (3

)Fo

rem

anse

rvic

e tru

cks

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r 7

pros

pect

or

HOUR

S

11 11 1 1

1 1

1 da

y1

day

22 1 1

1 1 2 1 1

1 1

1 1

1 1

1 da

y1

day

33 1 1

1 1 2

RAT

E

580/h

r580/h

r580/h

r5

12

0/h

r5250/d

ay

5107

/day

520/h

r540/h

r

540/h

r5

10

0/h

r

580/h

r580/h

r580/h

r5

12

0/h

r5250/d

ay

5107

/day

520/h

r540/h

r

540/h

r5100/h

r

DET

AILS

claim

73

4218

II

II

II

H

II

II

H

mis

cella

neou

s si

te t

rips

GST

supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

claim

73

4218

mis

cella

neou

s si

te t

rips

GST

supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

TOTA

L

3880

.00

3880.0

0S

880.

003

1,3

20

.00

3250.0

031

07.0

03440.0

03440.0

0no

cha

rge

3363

.79

3440.0

052

00.0

0

3880

.00

3880.0

03880.0

03

1,3

20

.00

3250.0

051

07.0

03660.0

054

40.0

0no

cha

rge

5379

.19

5440

.00

5200

.00

312,

636.

98

ON

TA

RIO

QU

AR

RIE

S In

c.,

1994

Page 7: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

ME

CH

AN

ICA

L S

TRIP

PIN

G A

ND

EX

PLO

RA

TIO

N D

RIL

LIN

G C

OS

TS

--

CLA

IM 7

3421

8

DAT

E

Oct

. 8/

92

Oct

. 8

792

Oct

. 9

792

Oct

. 9

/92

Sub

tota

l

Invo

ice

#

5856

n/a

5857

EQ

UIP

ME

NT

1 LA

BO

UR

850

Cas

e B

ulld

ozer

+ O

pera

tor

710

John

Dee

re B

ackh

oe +

Ope

rato

r12

80 C

ase

Exa

/hyd

r. d

rill

+ O

pera

tor

220

Cas

e E

xcav

ator

+ O

pera

tor

Com

pres

sor

Gas

ope

rate

d pu

mp

b ho

ses

Floa

t (1

m

ove

for

hydr

. dr

ill 1

exc

av.)

Labo

urer

s (2

)Fo

rem

anse

rvic

e tr

ucks

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r 1

pros

pect

or

850

Cas

e B

ulld

ozer

+ O

pera

tor

71 0

Joh

n D

eere

Bac

khoe

+ O

pera

tor

1280

Cas

e E

xcV

hydr

. dr

ill +

Ope

rato

r22

0 C

ase

Exc

avat

or +

Ope

rato

rC

ompr

esso

rG

as o

pera

ted

pum

p S

hose

sLa

bour

ers

(2)

Fore

man

serv

ice

truc

ks

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r 1

pros

pect

or

HOUR

S

1 1

1 1 7 1 1

1 da

y1

day

22 1 1

1 1 2 1 1

1 1

1 1

1 1

1 da

y1

day

22 1 1

1 1 2

RAT

E

380/h

r3

80

/hr

34

25

/hr

3120/h

r3250/d

ay

3107/d

ay

3700

ea.

32

0/h

r3

40

/hr

34

0/h

r3100/h

r

380/h

r380/h

r3

42

5/h

r3120/h

r3250/d

ay

3107/d

av

320/h

r340/h

r

34

0/h

r3100/h

r

DET

AILS

cla

im

8652

66

H

M

II

M

H

H

H

mob

iliza

tion

of

exca

v./d

rill

M

H

II

II

fi

H

ft

mis

cella

neou

s si

te t

rips

GST

supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

cla

im

8652

66

M

If

H

II

II

M

H

mis

cella

neou

s si

te t

rips

GST

supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

TOTA

L

3880.0

038

80.0

03

2,9

75

.00

S1,

32

0.0

0S

250.

00S1

07.

00S

700.

00

S44

0.00

S44

0.00

no c

harg

e35

59.4

4

S44

0.00

S20

0.00

S88

0.00

S88

0.00

S4,

675.

00S

1. 3

20

.00

S25

0.00

S1 0

7.00

3440.0

03440.0

0no

cha

rge

3629

.44

3440.0

03200.0

0

$1

9,4

52

.88

ON

TA

RIO

QU

AR

RIE

S I

nc.,

1994

Page 8: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

ME

CH

AN

ICA

L S

TR

IPP

ING

AN

D E

XP

LOR

ATI

ON

DR

ILLI

NG

CO

ST

S -

- C

LAIM

865

266

DAT

E

Oct

. 17/9

2

Oct

. 17/9

2

Oct

. 18

/92

Sub

tota

l

Invo

ice

#

5858

n/a

5859

EQ

UIP

ME

NT

/LA

BO

UR

710

John

Dee

re B

ackh

oe +

Ope

rato

r12

80 C

ase

Exc

^hyd

r. dr

ill +

Ope

rato

rC

ompr

esso

rLa

bour

ers

(2)

Fore

man

serv

ice

truck

s

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r /

pros

pect

or

71 0

Joh

n D

eere

Bac

khoe

+ O

pera

tor

1280

Cas

e E

xc^h

ydr.

drill

+ O

pera

tor

Com

pres

sor

Labo

urer

(1

)Fo

rem

anse

rvic

e tr

ucks

Ont

ario

Qua

rrie

s Fi

eld

Sup

ervi

sion

Eng

inee

r /

pros

pect

or

HOUR

S

1 1

1 1

1 da

y22 1

1

1 1 4 10 10 1

day

10 10 10 1

RATE

SB

O/h

r8425/h

rS

250^a

y8

20

/hr

34

0/h

r

34

0/h

r8100/h

r

38

0/h

r3425/h

rS

250A

Jav

S20^r

34

0/h

r

340/h

rS

lOO

/hr

DET

AILS

claim

86

5266

mis

cella

neou

s si

te t

rips

GST

supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

claim

86

5266

mis

cella

neou

s si

te t

rips

GST supe

rvis

e fie

ld w

ork

tech

nica

l di

rect

ion

TOTA

L

S88

0.00

84

.67

5.0

0S

250.

003440.0

0S

440.

00no

cha

rge

S46

7.95

S44

0.00

S40

0.00

ssoo

.oo

S4,2

50.0

0S

250.

00S

200.

00S

400.

00no

cha

rge

S41

3.00

S40

0.00

S1 0

0.0

0

$14,8

05.9

5

ON

TA

RIO

QU

AR

RIE

S I

nc.,

1994

Page 9: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

SUMMARY OF DIRECT STRIPPING AND DRILLING COSTS

CLAIM No. DATES TOTAL DIRECT COSTS

S865266 Oct. 3,4, 5, 8,9,17 A 18 (1992) S 51,443.12

S734218 Oct. 6 A l ( 1992) $ 1 2,636.98

TOTAL S64,080.10

ONTARIO QUARRIES Inc. 11994

Page 10: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

APPENDIX A Copies of Contractor's Invoices

Page 11: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

rCONSTRLCnONl CO. LTU

SEWER AND WATER — INSTALLATION 6. REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL

439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3

DATE O C

NAME

MAILING ADDRESS

JOB l-M/te r C4

Type of Equipment Time Rate Amount

BULLDOZER g S" 0

BACKHQE 510, 580

PAYLOADER

BACKHQE 780, 680

BACKHOE/SHOVELS*?!^ o oFROST BREAKER

COMPRESSOR

TRUCK Single

TRUCK Tandem

FLOAT

FQIK M ii ^ - 00

LABOUR

HO

Customer's Signature

Operator's Signature

5851

Page 12: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

'CONSTRUCTONl CO. LTD

SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL

439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3

ofu A (2 1. ( e, t M

MAILING ADDRESS .

JOB \-\A l? A 1M rt I) P, bo l — ±ntt d fJ'T"

Type of Equipment Time Rate Amount

BULLDOZER eso 11BACKHOE ^40*00PAYLOADER "i O

BACKHOE 780, 680

BACKHOE/SHOVEL^'i^

FROST BREAKER

COMPRESSOR

TRUCK Single

TRUCK Tandem

FLOAT

LABOUR

Customer's Signature

Operator's Signature

/l /l

5852

Page 13: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

NAME Q

SEWER AND WATER — INSTALLATION 6. REPAIR

EXCAVATING CONTRACTOR - SNOW REMOVAL

439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3

DATE O CT - ft S*

(lift 1^0 A gfci F ^

MAILING ADDRESS

T T) 12

Type of Equipment Time Rate Amount

BULLDOZERS* 0 h

BACKHOE t #0-00HW :80-00

BACKHOE 780, 680

BACKHOE/SHOVE liFROST BREAKER

COMPRESSOR i

TRUCK Tandem

FLOAT 0-00

MA hi 1 \ \7. 00

LABOUR

73-Ul- . 79

Customer's Signature .

Operator's Signature .

/l /J

5853

Page 14: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

CO. LTD ,

SEWER AND WATER — INSTALLATION 4 REPAIR l 3 l 2- l O

EXCAVATING CONTRACTOR — SNOW REMOVAL

439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3

DATE OCT .19

NAME \ M e.MAILING ADDRESS .

MAIA ivJOBType of Equipment Time Rate Amount

BULLDOZER fiBACKHOE li • 00PAYLOADER 1 •t^ 80-'BACKHOE 780, 680

BACKHOE/SHOVEL K toFROST BREAKER

COMPRESSOR

0!TRUCK Tandem

FLOAT

•^9,0.00 . 0 0

fV) 1 1 . on*r7. oo

LABOUR 3B. 7?. 7?-

Customer's Signature

Operator's Signature

5854

Page 15: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

v CQ LTD. J

SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL

439 PINE STREET SUDBURY, ONTARIO P3C 1Y3

9 l*-

PATE*7

.19

ft M -m a iMAILING ADDRESS

JOB M a fi AM A HAtLbkt tbEfros/'r— CA\Xt\Ql*-Qtfl

Type of Equipment Time Rate Amount

BULLDOZER

BACKHOE ft ,flf)PAYLOADER -i J? j? o-doBACKHOE 780, 680

BACKHOE/SHOVELJ? JJ,g 3 A 0 - 0FROST BREAKER

COMPRESSOR

f 0*7-TRUCK Tandem

FLOAT

II i\ q 0*00

3LABOUR

Customer's Signature

Operator's Signature

5855

Page 16: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

CONSTRUCTION]OQ IJD ^

SEWER AND WATER — INSTALLATION 4 REPAIR O l C. ' "T.L L EXCAVATING CONTRACTOR — SNOW REMOVAL C? v -^ "^ ̂ ^439 PINE STREET — SUDBURY, ONTARIO

P3C 1Y3

DATEoe-T

NAME (V fO TM g i Q CfeU A l /Z i gj t /OMAILING ADDRESS .

ftType of Equipment Time Rate Amount

BULLDOZER ^ S^ O ^SO-ObBACKHOE 510, Seiof/0 t IMS #90.60

3.3 7BACKHOE 780, 680

3AQo?t i.;"? aFROST BREAKER

COMPRESSOR t±t 07-60

TRUCK Tandem

H O ve wt -7 oo-oow A

5.0.00^0*00

7?92. 00LABOUR 55- 9^* yy

oWiCustomer's Signature

Operator's Signature

5856

Page 17: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL

439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3

DATE

NAME

oer S 9 Yj A /? fi ii j- .g

O.19 7

MAILING ADDRESS .

Type of Equipment Time Rate Amount

BULLDOZER

BACKHOE l/PAYLQADER

BACKHOE ^ toli-ttw

BACKHOE/SHOVE l/.Mrr ^tkFROST BREAKER

COMPRESSOR

107-0* •i . oTRUCK Tandem

FLOAT

St- /At *1 0-00

. M

5T9 ?2LABOUR

Customer's Signature

Operator's Signature

5857

Page 18: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

SEWER AND WATER — INSTALLATION S, REPAIREXCAVATING CONTRACTOR — SNOW REMOVAL

439 PINE STREET — SUDBURY, ONTARIOP3C 1Y3

DATE Q er \iNAME G

MAILING ADDRESS ——

JOB kliJllSJtfLA.Type of Equipment Time Rate Amount

BULLDOZER

BACKHOE f/to-tg 8^0.00PAYLOADER

BACKHOE 780, 680

MFROST BREAKER

COMPRESSOR 1 TTRUCK Single

TRUCK Tandem

FLOAT

A /\J

LABOUR

7 IS t.Customer's Signature .

Operator's Signature J(. i

5858

Page 19: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

PHONE 673-5171

SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL

439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3

DATE ..9

NAME

MAILING ADDRESS ——

iHflg/i MdJOB j

Type of Equipment Time Rate Amount

BULLDOZER

BACKHOE f O H (iPAYLOADER

BACKHOE 780, 680

BACKHOE/SHQVELyl lff(

FROST BREAKER

COMPRESSOR \ D -Qfi-

TRUCK Single

TRUCK Tandem

FLOAT

l a00*00

. ooLABOUR . oo

Customer's Signature

Operator's Signature (

5859

Page 20: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

APPENDIX B Maps Showing Location of Work

Page 21: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

MILNET, ONTARIO(Edition 3)

Scale 1:50,000Contour Interval s 50 ft

Page 22: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

1179! 91l 9 2 x ' , ' '' * M' ) ^~*^ i , W t— — —— — —

- -- -, -g J. - - -VI *Z ±^- . -.4^11^65268-•"" l .' l - - \.\ .. . •S.-..^^xw^ , e VJ \ M L l \-.

Xfer4- -*/ 1 i' /A. r^"y*T"i ,'i'i ^t*****- i^- ;-^\ - ±J™"Ms /i \\fafifi*s8p--\V**- \ - 8*4**fr i 1/^7 \ 03^^ l ' ;|"-y.jjlllrf3l4.'"-|

^ Of?. i(

U-, -i-B4-H.-?..--11*4^: S V '9Jj^ f. , *"~" ; ' i' ' * i j ^ S !7 l/tiorvAA /^-A ' L--""N 'H-' S

It l l k i W74t.';' i l Si7X\\ ' \ ~~ ^--^~~ -' .^ ,,

®' ^^K^li— — . ~' ~ ~" * *'"/ ^- , -. l TTfr~~fi^'3\W!--

Page 23: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

Ministry ofNorthern Developmentand Mines

Ontario

Report of Work Conducted After Recording Claim

Mining Act

Transaction Number

Personal information collected on this form Is obtained under the authority of the Mli this collection should be directed to the Provincial Manager, Mining Lands. Mlnii Sudbury, Ontario, P3E 6A5, telephone (70S) 670-7264.

Instructions: - Please type or print and submit in duplicate. 4i,i 5swoo3i- Refer to the Mining Act and Regulations for requirements or imny

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.

900

Recorded Holder(s)

rDw~TY\^to Q\iAR.ft.iisS IMC..Address

1 \~~7~7 UotosDAL-c:, StxDBu ft.v P3B \K-3Mining Division '

^^*. i i ^*\ fs i \ jQ V/^nJj ^^fc *ix ^j xJ 1^— 7

Dates . Work From: /*S — . •J l G. ~* Performed CxC-T - J X T 2.

Township/AreaPAR-IOKV Mt^-r-ro/vJ

Client No.

Telephone No.

560-H84kM or G Plan No.

G. 'ZA \STot /^*N x~ T* 1 C? l G *^N (^^ t _ ̂ \ *- l O l | ^

Work Performed (Check One Work Group Only)Work Group

l/

Geotechnical Survey

'Physical Work, Including Drilling

Rehabilitation

Other Authorized Work

Assays

Assignment from Reserve

Type

Me~cHflfoicAt- STR vfPiMGiy E.x.pL.oR.iaci\cn^ D fttuuM**, pouje^UJASH/wtj ^ BL.OCO (NJQ FA^feS OP N\ARfeL.e- DEPOSIT

1

Total Assessment Work Claimed on the Attached Statement of Costs $ u? J 7 1 4 l ' 2.

REuuRDED.

J AN 20 1994

Rpreipf

O

Note: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address

F"" W R . CoioSTRu.c-aoKJ l— TD ,li-?-? P3&IK3

R. r RvxDrtorAH.e

(attach a schedule if necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse side1 certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.

Date

JAM,

Certification of Work Report

DBURYJNINGDIV

For Office Use Onlyrota) Value Cr. Recorded Date Recorded ETV E

Deemed Approval Date

0241 (03/91)

Page 24: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

Total Number of Claims en^

-^

-C

^

UN

s-

j:K

U)

(A

^

#

)0

W

OD

P

?

c/)

xp00

- —

, l isSsfjolaj|

li A 3

iH

i*ia-

!^ If

^T-TOo

X5OD 0 O

^Sk

O0

^

H o0

^

C30O 0

\hx^

-Cx.

— .l0

--ftOb

b00

,iihifia

""

m

|

1i|

P0o

s"^-t-

M O

'

5x00

p

p0) 0 0

o"

0?

Ob

bCO

1*^O9(5';rI3 i g

V"" — ^3)|||iBS?"

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:

1. S/Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. D Credits are to be cut back as priorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1 : Examples of beneficial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc. , with respect to the mining claims.

Note 2: If work has been performed on patented or leased land, please complete the following:___ ____________ .;'-.-. ;. g ^a.^. ( ______ B ________ f J V^W'/'V- "" "l

l certify that the recorded holder had a benofidal interest In the patented or leased land at the time the work was performed.

Date

Page 25: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

Ontario

Ministry ofNorthern Developmentsnd Mines

Ministers du Developpemenl du Nord et des mines

Statement of Costs for Assessment CreditIztat des coQts aux fins du credit devaluation

Mining Act/Loi sur les mines

Transaction No./N" de transaction

Personal information collected on this form is obtained under the authority of the M ining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.

Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Lol sur les mines et serviront a tenir a jour un registre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministere du DeVeloppement du Nord et des Mines, 159, rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.

1. Direct Costs/CoOts directs

Type

Wages Salalres

Contractor's and Consultant's Fees Orolts de ('entrepreneur et de I'expert- consell

Supplies Used Fournltures utlllsees

Equipment Rental Location de materiel

Description

Labour Main-d'oeuvreField Supervision Supervision sur le terrain

TypeP W . (t CoKiSTduC-TICwU)

R.PRuDHoMMe P.^NCt-

Type

Type

Amount Montant

38Ho5^?zHO'lo

2. , Ooo -

Total Direct Costs Total des couts directs

Totals Total global

38HO

^OfiHO'lo

,, : ;..*5#ifc;i:X-•, , ."KtZ: ." . ,. ;

.6^.08**

2. Indirect Costs/CoOts indirects** Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation.

Type

Transportation Transport

Food and Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation

Description

Type

18 TR\PS

MeAu-S

Amount Montant

Gil- lo

M5o

Sub Total of Indirect Costs Total partiel des couts Indirects

Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excedant pas 20 H des coats directs)

Total Value of Assessment Credit Valeur totale du credit (Total of Direct and Allowable d'evaluation Indirect costa) (Total de* coOts direct*

Totals Total global

6IMO

tf^O'Oo

l,0t,l.|0

tfteiobSjIHI-lO

et Indirect* admissible*

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.

Note : Le titulaire enregistre sera tenu de verifier les defenses demandees dans le present etat des couts dans les 30 jours suivant une demande a cet effet. Si la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux devaluation presented.

Filing Discounts Remises pour depdt

1. Work filed within two years of completion is claimed at 1000yb of the above Total Value of Assessment Credit.

1. Les travaux deposes dans les deux ans suivant leur achievement sont rembourses a 100 "to de la valeur totale susmentionnee du credit d'evaluation.

2. Work filed three, four or five years after completion is claimed at SO1?* of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimed

x 0.50

2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembourses a 50 "to de la valeur totale du credit d'evaluation susmentionne. Voir les calculs ci-dessous.

Valeur totale du credit d'evaluationx 0,50

Evaluation totale demandee

Certification Verifying Statement of Costs

l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

that as(Recorded Holder, Agent, Position in Company)

to make this certification

Attestation de l'etat des coQtsi

J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.

^ l am authorized Et qu'a litre de je suis autorise(titulaire enregistre, representant, poste occup6 dans la compagnie)

a faire cette attestation.

0212 (04/91) Nota : Dans cette formule, lorsqu'il designe des personnes, le masculin est utilise au sens neutre

Page 26: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

FRALE TOWNSIHP

r-rr - ~

6 53 8 5

l- -J'L - -L.- - ...li,

,,, 983984 ' 963951^ ,

LV.,' . ("

1 1042969. ll l

__ __ ^ __ - -—

865267 ' 869269

75421* ' 73424BW' 7*4Ztt

7\i^U*Jl\

-~- l 6 48926

~ ~ i - ~ ~ ~ ~ •'T "~ c. ~S-1 rr ~ ~ ~" hl 7S4708 y 7 *4710

I042BB4 ' 7*4208| 648327

l ' --\

M )tl 7 )

994723 i,'l y; \j

—•L l ~ **

98436^1/6484601^^48328 l VMIfl^ ' t*T*66

9 662229 682226 .J B429l •-" — \ l

J

,; f ' j 847603

--•^f"

894699 i 8947001 l 984354 ' 984355

' \ M (*\ \ m-V *-l- -*tM~..—— —t—— !—— . —— -,-\r i?1 T"- -- )'. ^ /

7(f l 5401 l J \,f!B4SO 647601C82277 , *68276/! 68^275, i f

J|^ -/4 -r,a - - ^a, ' "~ l/Mt , r' f,

IM7463 ^ ""464

|S .' i ,

T.;L---.-"LfS'\- ' l l l l l ^V-l V

4^ - .-L-. *-u-(fe*1 r i ^K^C82282 6B22BI "7664 1/17683.

NOR M AW TOWNSHIP

_ Resources and Mines Ontario ^.^

PUT INTO SERVICE MARCH 16, 1994 jfa

INDEX IV LAND DISPOSITION

PUN

G-2915TOWNSHIP '

PARKIN

-"S~ssv(

-* **

M.N.R. ADMINISTRATIVE DISTRICT

SUDBURYMINING UuiSION

SUDBURYUN( -,sLES7REGISTRY DIVISION

SUDBURY

Seal* 1:20 000

looo 1000 2000IMm

1000 1000 2000 3000 4000 WOO MOO 7000 MOO MOO 10MO

Contour Interval 10 Metres

SYMBOLSBnij.idary

Township. Meridian, Baseline

Road allowance, surveyed

shoreline

Lot/Concession, surveyed

unsi'rveycd

Parcel, surveyed

unsurveyed

Right-of-way, road

railway

utility

Reservation

Cliff, Pit, Pile

Contour

interpolated

Approximate

Dep, ." ion

C ntrol point (horizontal)

Flooded land

Mine head frame

Pipeline (above ground)

Railway, single track

double track

abandoned

Road, highway, county, township

access

trail, bush

S!~ ^'Dline (original)

Transmission line

Wooded area

DISPOSmON OF CROWN U^DS3atent

f urtac'3 i Mining Rights

Mining Rights Only

Lease3- Jaco S Mining Rights

Surface Righ'-, Only

Mining Rights Onlv

! MCn of Occupation

Order-m-Council

Cancoi.ed

reservation

Sand 4 Gravel

e e

HnT

OC

Map base and land disposition drafting by Surveys and Mapping Branch, Ministry of Natural Resources

AREAS WITHDRAWN FROM DISPOSITION

MRO- M ining Rights Only

SRO- Surface Rights Only

M t- S - Mining and Surface Rights

SEC U/00

OntorNo

•.7/iJ

DM*

7/4/83 M 4 S

FM*

I1B95S

THF INFOHMA1ION THAT APPEARS ON THIS MAP MAS BEEN COMPILED FROM VARIOUS SOURCES. AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKF MIN ING CLAIMS SHOULD CON SULT WITH THF MINING RECORDER, MINISTRY OF NORTHERN DEVFLOP MENT AND MINF.S, FOR AD DITIONAL INFORMATION ON THE STATUS OF THF LANDS SHOWN HERFON

NOTE TOWNSHIP SUBDIVISION PARTIALLY

ANNULLEDMarch 8, 1949

IN AREA MARKED THUS f //// S T AKING ALLOWED

AS IN UNSUBDIVIDEJ} TOWNSHIP

The disposition of land, location of lot fabric and parcel boundaries on this index was compiled for administrative purposes only

JQ

OJrouo

41I15SW0031 W9470 00014 PARKIN 200

Page 27: HARAMA MARBLE QUARRY · 312,636.98 ONTARIO QUARRIES Inc., 1994. MECHANICAL STRIPPING AND EXPLORATION DRILLING COSTS -- CLAIM 734218 DATE Oct. 8/92 Oct. 8 792 Oct. 9 792 Oct. 9 /92

M

O

O C

DD

O Ui o o

o -k r, r O

(D ro rv)

D

O)

Cu OJ4

- r\) (X*

(T)

OD Cu

o sD

ON

TAR

IO Q

UAR

RIE

S IN

C.

HA

RA

MA

MA

RB

LE P

RO

PE

RTY

PAR

KIN

TO

WN

SHIP

O

NTA

RIO

GE

NE

RA

L LO

CA

TIO

N M

AP

BY:

NO

RW

IN G

EOLO

GIC

AL L

TD.

PREP

ARED

BY:

E.S

D

RAW

N B

Y: E

.P.

SC

ALE

: l

: 2500

DAT

E:

NO

V.,

1993

5010

015

0 l

MET

RES

200

300