DESCRIPTION

PROJECT: dV = 0  Step 1: In order to accomplish the project’s goal, the fundamental prerequisite is knowing the ACTUAL voltage we’re applying… Issue:Difference between DV, MV (mainframe) & actual voltage supplied Solution:Calibration Curves for all channels  Step 2: What voltage ends up being supplied to the GEM/Mesh? Issue:Resistor values only known by color code (…) Solution:Measurement of all resistors installed on divider board  Step 3: What is going to be The Mesh Voltage for RB?  Issue:Who knows?  Solution:1+1 Mesh Voltage Sweep during +/- config and ADC readout files for every sweep voltage  analysis  peak of PE vs. Mesh V. HBD HV Control & Monitoring System Manuel Proissl Page 3 of 6 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23 rd, 2008

TRANSCRIPT

Page 1: HBD HV Control and Monitoring System RESISTORS, CALIBRATION  CO. Manuel Proissl HBD Meeting 12/23/2008

HBD HV Controland Monitoring System

RESISTORS, CALIBRATION & CO.

Manuel ProisslHBD Meeting 12/23/2008

Page 2: HBD HV Control and Monitoring System RESISTORS, CALIBRATION  CO. Manuel Proissl HBD Meeting 12/23/2008

OUTLINE Project: dV = 0

Step 1: Calibration of LeCroy PS Step 2: Resistors on Divider Step 3: Mesh Voltage Sweep vs. ADC Readout

Project Progress Calibration Routine / Curves

Calibration Program in HV Control Divider(s)

Resistor Measurements on HBD Cable Coding (…)

Coming Up

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23rd, 2008

HBD HV Control & Monitoring System Manuel Proissl Page 2 of 6

Page 3: HBD HV Control and Monitoring System RESISTORS, CALIBRATION  CO. Manuel Proissl HBD Meeting 12/23/2008

PROJECT: dV = 0 Step 1: In order to accomplish the project’s goal, the fundamental prerequisite is

knowing the ACTUAL voltage we’re applying… Issue: Difference between DV, MV

(mainframe) & actual voltage supplied Solution: Calibration Curves for all channels

Step 2: What voltage ends up being supplied to the GEM/Mesh? Issue: Resistor values only known by color

code (…) Solution: Measurement of all resistors installed

on divider board

Step 3: What is going to be The Mesh Voltage for RB? Issue: Who knows? Solution: 1+1 Mesh Voltage Sweep during +/-

config and ADC readout files for every sweep voltage analysis peak of PE vs. Mesh V.

HBD HV Control & Monitoring System Manuel Proissl Page 3 of 6

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23rd, 2008

Page 4: HBD HV Control and Monitoring System RESISTORS, CALIBRATION  CO. Manuel Proissl HBD Meeting 12/23/2008

PROJECT PROGRESS Under IR Access > MF Calibration, HV Control runs a calibration procedure

automatically for every channel, while the Fluke via divider records every second (FlukeView) the output voltage of the particular channel on the LeCroy

After initial non-linearity problems (unknown current development), further calibration work will be done (…)

ALL resistors have been measured with Fluke in nS through FlukeView with 20 stable events each for average calculation These will be out shortly… available in the hvdb database

ALL take-out resistors have been labeled with an unique position code From now on, any future changes can be done safely without any mix-up!

HBD HV Control & Monitoring System Manuel Proissl Page 4 of 6

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23rd, 2008

Page 5: HBD HV Control and Monitoring System RESISTORS, CALIBRATION  CO. Manuel Proissl HBD Meeting 12/23/2008

THE RESISTOR CODEC

HBD HV Control & Monitoring System Manuel Proissl Page 5 of 6

E WView from IR Front

ES3ES4

ES5

EN3 EN5

EN4

WS3 WS4

WS5

WN3 WN5

WN4

ES1 ES2 EN2 EN1 WS1 WS2 WN2 WN1

S N S N

1 3

2

5 7

4 6 8

Resistor ID Code

HV Box(1-8)

ModuleNum.(1-5)

GEM(T, M, B)

Layer(1-3)

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23rd, 2008

Page 6: HBD HV Control and Monitoring System RESISTORS, CALIBRATION  CO. Manuel Proissl HBD Meeting 12/23/2008

COMING UP Resistor Values into hvdb database

Connecting to config system in HV Control HV remote testing until Jan 2nd

Correction Curves for 1471N Calibration: new divider setup… Distribution / Installation Files for Linux & XP/Vista

Platform independence Final installation files with Installation Wizard HV remote testing / system improvements until Jan 2nd