Outline
• Monitoring and calibration HF Raddam monitoring HF Raddam with data HBHE raddam monitoring• Phi-symmetry• Offline shifts• Noise WG
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 3
HF Radiation damages measurements with raddam system
A.Volkov,D.Elumakhov
Take 8 periods
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 4
HF Radiation damages measurements with data
Data selected with HLT_Mu17_mu8as relative change of E deposited in HF rings and corrected by NPV and the energyCut (4 intervals in energy).2 methods: - Ratio of average energies, aveE2/aveE1, with aveE=E_tot_deposited(ieta,Nvtx)/Nevts(Nvtx) - Ratio of mean energies
Robert ChieleskiIgor Vodopianov See update tomorrow, August 17, HCAL DPG
Nvtx=[5-20] Nvtx=[10-20]
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 5
HBHE first raddam measurements
Depth1
L.TurchanovichN.KulaginV.SkvortsovV.TalovV.EpshteynD.Vishnevskyi
Need to recheckwith othermeasurements?
Need to have HPD correctionto verify what data see
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 6
HE raddam with data
Runs chosen with high instantaneous luminosity (~6e33):Period Runs datesp1 191718-191859 Apr 18-20p2 194314-194480 May 17-19p3 195913-195950 Jun 9-10p4 196431-196531 Jun 15-18p5 199318-199429 Jul 20-22
E>4 hits, p5 / p1 (Jul / Apr) vs ieta
Igor Vodopianov
Shuichi/EmineHT dataset
Muon stream
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 7
Phi-symmetry corrections in 2012
The phi-symmetry pass was done: for HF we use the weighted combination from NZS and iterative; for HBHE – only iterative method is used.
HFHB HE
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 8
Offline shifts
Pavel Bunin, Ted Kolberg
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 9
Noise WG
MinBias 2012 CaloMet
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 10
Back-up
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 11
HBHE drift from 2011 to 2012
Gain updates is done regularly by Hcal Ops and is uploaded into condition DB by Database group: we need to have the gain tag to start the first2012 calibration pass – this week or beginning of the next?
V.EpshteynD.Vishnevskyi
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 12
Calibration procedure from 2011 to 2012
HPD and PMT gain drift
HPD gain drift correction once per month (as in 2011)
PMT gain drift correction once per week (roughly each ~1/fb) due to much higher degradation rate of gains in PMT (change w.r.t. 2011)
HF Fibers degradation
Radiation damage correction in HF based on the radiation damage measurements once per month (depends on the measurement) (change w.r.t. 2011)
We consider HF is correctly calibrated with Z->ee corrections for the 2012 startup
The above corrections as HcalGain condition IOV will be uploaded by creation to _express, _prompt and _offline tags and (by agreement) to _hlt tag
August, 17 HCAL General Meeting S. Banerjee, O.Kodolova 13
Calibration procedure (continuation)
phi-symmetry corrections with iterative and NZS method (as in 2011) during technical stops while the needed statistics is available
Isolated track calibration (as in 2011) during technical technical stops
while the needed statistics is available
Absolute scale in HF with Z->ee corrections (Long fibers). Short fibers will be calibrated using Long fibers calibration and MC correction for ratio between Long and short taking into account RadDam estimation for Short fibers