hcd_2010_inflexibility in flexible design

48
Inflexibility in Flexible Design Factors that Can Influence Performance of Design Health Care Design, Las Vegas, November 13-16, 2010

Upload: upali-nanda

Post on 16-Aug-2015

68 views

Category:

Design


1 download

TRANSCRIPT

Page 1: HCD_2010_Inflexibility in Flexible Design

Inflexibility in Flexible DesignFactors that Can Influence

Performance of Design

Health Care Design, Las Vegas, November 13-16, 2010

Page 2: HCD_2010_Inflexibility in Flexible Design

Presenters

Debajyoti PatiPhD, FIIA, LEED®AP, Vice President,

Director of Research, HKS Architects

Thomas E. Harvey JrFAIA, MPH, FACHA, LEED®AP, Senior Vice

President,

HKS Architects

Jennie EvansRN, BS, LEED®AP, Vice President, HKS

Architects

Doug BazuinME, Researcher,

Herman Miller

Page 3: HCD_2010_Inflexibility in Flexible Design

Learning Objectives

Understand the nine domains of design decision-making that impact

operational flexibility in acute care medical-surgical units.

Learn regarding extraneous factors that could obstruct optimization of

operational performance.

Learn regarding operational interventions that could address some of the

impediments.

Identify design process issues that could address some of the

impediments.

1

2

3

4

Page 4: HCD_2010_Inflexibility in Flexible Design

Agenda

• Nine domains that impact operational flexibility

• Study question and objectives

• Study methodology

• Factors affecting design for flexibility

• Questions

Page 5: HCD_2010_Inflexibility in Flexible Design

Acknowledgements

Herman Miller

Dr. P. Phillips Hospital, Orlando, FL

Homestead Hospital, Homestead, FL

St Joseph Mercy Hospital, Ann Arbor, MI

Methodist Charleton Medical Center, Dallas, TX

Page 6: HCD_2010_Inflexibility in Flexible Design

Degree

of

Success

of

Project

Owner Team

Contributions

Current culture

Change management

Transition planning

Design Team

Contributions

Know client

Lead process

Create alternatives

Communications

Collaboration

Learning Objectives

Page 7: HCD_2010_Inflexibility in Flexible Design

Degree

of

Success

of

Project

Owner Team

Contributions

Current culture

Change management

Transition planning

Design Team

Contributions

Know client

Lead process

Create alternatives

Communications

Collaboration

Learning Objectives

Page 8: HCD_2010_Inflexibility in Flexible Design

Introduction

9 DOMAINS OF DESIGN DECISION-MAKING

THAT IMPACT OPERATIONAL FLEXIBILITY

IN INPATIENT CARE UNITS

Page 9: HCD_2010_Inflexibility in Flexible Design

FLEXIBILITY …

TO ADAPT

Page 10: HCD_2010_Inflexibility in Flexible Design

Peer Lines-of-Sight

Operational issue

o Helping hand, mentoring,

socialization, de-stressing

Affects

o Nurse, respiratory therapist

Environmental correlates

o Caregiver work station,

corridor shape, corridor

configuration

Implications

o Simple shape units

o Corner location of caregiver

workstation in support core

o Back-stage corridors linking

caregiver workstations

o Simple circulation configuration

Page 11: HCD_2010_Inflexibility in Flexible Design

Patient Visibility

Operational issue

o Higher acuity, JCAHO regulations, non-contiguous patients

Affects

o Nurse, nursing administration, respiratory therapist

Environmental correlates

o Caregiver workstation, medication room, utility room

Implications

o Multiple caregiver work centers with proximal patient rooms

o Unobstructed sightline to patient rooms

o Outboard toilet location

Page 12: HCD_2010_Inflexibility in Flexible Design

MODIFIED

CORNERS =

PERCEIVED

BARRIER

Multiple Division/Zoning Option

Operational issue

o Perceived barriers

o Assignment problems

Affects

o Nurse, nursing administration

Environmental correlates

o Stairwell, support spaces, staff toilets

Implications

o Stairwell and support spaces located at end of an array of patient rooms, or inside the support core

o Simple circulation configuration

Page 13: HCD_2010_Inflexibility in Flexible Design

Proximity of Support

Operational issue

o Walking distance

o Stress, fatigue

Affects

o Nurse, nursing administration, environmental services, dietary services, materials management, respiratory therapy

Environmental correlates

o Patient room, support spaces

Implications

o Simple shape, symmetrical units

o Distributed nursing support spaces proximate to distributed caregiver workstations

o Decentralized room-side supply cabinets

Page 14: HCD_2010_Inflexibility in Flexible Design

Resilience to Move Services

Operational issue

o Long term census fluctuation

Affects

o Nurse, nursing administration

Environmental correlates

o Standardization

Implications

o Standardized room

o Standardized support core

Page 15: HCD_2010_Inflexibility in Flexible Design

Inter-Unit Movements

Operational issue

o Multi-unit caregiver responsibility

Affects

o Nurse, environmental services, dietary services, materials management, pharmacy, respiratory therapy

Environmental correlates

o Vertical circulation core, unit proximity, horizontal access

Implications

o Communicating stair inside unit

o Proximal location of vertical circulation core

o Back corridor inter-unit link

o Unobstructed horizontal circulation

Page 16: HCD_2010_Inflexibility in Flexible Design

Service Expansion Options

Operational issue

o Census fluctuations

o Unit-service misfit

Affects

o Nurse, nursing administration

Environmental correlates

o Unit size, unit configuration, unit adjacency

Implications

o Visual or geographic cues to help unit subdivisions

o Back corridor links between adjacent units

NN

N

C

SOFT SPACE

FOR

SUPPORT

CORE

EXPANSION/

SHARING

SERVICE

SPREAD

INTO

ADJOINING

UNIT

Page 17: HCD_2010_Inflexibility in Flexible Design

FLEXIBILITY …

TO CONVERT

Page 18: HCD_2010_Inflexibility in Flexible Design

Adjustable Support Core

Operational issue

o Supply and equipment storage

o Shape and size of rooms

Affects

o Nurse, nursing administration, environmental services, dietary services, materials management, pharmacy, respiratory therapy

Environmental correlates

o Cabinetry, support room shape, support room size

Implications

o Modular, movable compartments or cart system for storage

o Minimize walls with MEP elements

Page 19: HCD_2010_Inflexibility in Flexible Design

`

FLEXIBILITY …

TO EXPAND

Page 20: HCD_2010_Inflexibility in Flexible Design

Expandable Support Core

Operational issue

o Operational changes over time

Affects

o Nurse, nursing administration, environmental services, dietary services, materials management, pharmacy, respiratory therapy

Environmental correlates

o Adjacent functions

Implications

o Soft program adjacent spaces

NN

N

C

Page 21: HCD_2010_Inflexibility in Flexible Design

Question

WHAT IS HINDERING OPTIMIZING

OPERATIONAL FLEXIBILITY?

Page 22: HCD_2010_Inflexibility in Flexible Design

Research Method

SETTING

o Four hospitals

o Recent constructions

SAMPLING

o Purposive

o Maximize variability

DESIGN

o Exploratory

o Qualitative

Page 23: HCD_2010_Inflexibility in Flexible Design

Research Method

PARTICIPANTS

o Nursing, RT, Materials

Management, EVS,

Pharmacy, Dietary

TOOLS

o Gaming

o Semi-structured interviews

ANALYSIS

o Transcription

o Content analysis

123 8 7 6 5 4 3 2 1 12 11 10

3211211109121110

9

8

7

6

5

4

4

5

6

7

8

9

10

11

12

1

2

3

4

5

6

7

6

7

8

9

10

11

12

8 9 10 11 12 1 2 3 4 5

123456789

6

7

8

9

10

11

12

1

2

3

4

5

6 7

8

9

10

11

12

1

2

3

4

5

6

7

8910111212345

6

7

8

9

10

11

12 1

2

3

4

5

6

7

1

2

3

4

5

12

11

10

9

8

7

1

2

3

4

5

6

12

11

10

9

8

7 6 5 4 3 2 1 12 11 10 9 8 7 6

8

9

10

11

12

1

2

3

45 6 7

89

10

11

12

1

2

3

4

5

123456789101112

9 10 11 12 1 2 3 4

5

6

7

8

9

10

11

12

8

7

6

5

4

3

2

1

2 1 11 10 9

10 11 12 1 2 3

4 5 6 7 8

3

2

1

8

7

6

5

4

3

9

10

11

12

9

4

6

7

8

5

12

1234

9 10 11 12

12 11 10 9

1 2 3 4

5 6 7 8

4

3

2

1

9

10

11

12

5

6

7

85

6

7

8

123

8 9 10

4 5 6 7

1 2 3

10 9 8

4

5

6

7

1

2

3 8

9

10

4

5

6

7

1

2

34

5

6

9 10 11 12 13 14 15 16

24 23 22 21 20 19 18 17

87654321

2526272829303132

9 10 11 12 13 14 15 16

24 23 22 21 20 19 18 17

1

2

32

31

30 3

429

28 5

627

26

25

7

8

5 6 7 8

12 11 10 9

32 1

231

30

29

3

4

28272625

21222324

17 16

1518

19

20

14

13

123 8 7 6 5 4 3 2 1 12 11 10

3211211109121110

9

8

7

6

5

4

4

5

6

7

8

9

10

11

12

1

2

3

4

5

6

7

6

7

8

9

10

11

12

8 9 10 11 12 1 2 3 4 5

123456789

6

7

8

9

10

11

12

1

2

3

4

5

6 7

8

9

10

11

12

1

2

3

4

5

6

7

8910111212345

6

7

8

9

10

11

12 1

2

3

4

5

6

7

1

2

3

4

5

12

11

10

9

8

7

1

2

3

4

5

6

12

11

10

9

8

7 6 5 4 3 2 1 12 11 10 9 8 7 6

8

9

10

11

12

1

2

3

45 6 7

89

10

11

12

1

2

3

4

5

123456789101112

9 10 11 12 1 2 3 4

5

6

7

8

9

10

11

12

8

7

6

5

4

3

2

1

2 1 11 10 9

10 11 12 1 2 3

4 5 6 7 8

3

2

1

8

7

6

5

4

3

9

10

11

12

9

4

6

7

8

5

12

1234

9 10 11 12

12 11 10 9

1 2 3 4

5 6 7 8

4

3

2

1

9

10

11

12

5

6

7

85

6

7

8

123

8 9 10

4 5 6 7

1 2 3

10 9 8

4

5

6

7

1

2

3 8

9

10

4

5

6

7

1

2

34

5

6

9 10 11 12 13 14 15 16

24 23 22 21 20 19 18 17

87654321

2526272829303132

9 10 11 12 13 14 15 16

24 23 22 21 20 19 18 17

1

2

32

31

30 3

429

28 5

627

26

25

7

8

5 6 7 8

12 11 10 9

32 1

231

30

29

3

4

28272625

21222324

17 16

1518

19

20

14

13

Page 24: HCD_2010_Inflexibility in Flexible Design

Findings

FACTORS IMPEDING DESIGNING FOR

OPERATIONAL FLEXIBILITY

Page 25: HCD_2010_Inflexibility in Flexible Design

OPERATIONAL

FLEXIBILITY

Systemic

Cultural

HumanFinancial

Physical

Factor Types

Page 26: HCD_2010_Inflexibility in Flexible Design

Systemic

o Performance benchmark

o Anticipated IT support

o Infection control

o Regulations

Factors

Cultural

o Inertia

o Physician expectations

Page 27: HCD_2010_Inflexibility in Flexible Design

Human

o Psychology & perception

o Cognition

Financial

o Capital cost

o Personnel cost

o Return on investment (ROI)

Factors

Physical

o Pre-existing condition

Page 28: HCD_2010_Inflexibility in Flexible Design

EXAMPLES

Page 29: HCD_2010_Inflexibility in Flexible Design

Factors within Factors

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

DECISION TO BUILD OCCUPY THE BUILDING

Page 30: HCD_2010_Inflexibility in Flexible Design

Unanticipated Consequences of Information Technology Support

Hands-free Technology Conflicts with Regulatory Agency Requirements

Hands – free Technology not available for all staff

Visibility and Proximity of Support Affected

Systemic: Information Technology

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Clearly identify the problem

Thoroughly map operational use in various

situations

Failure Mode Effect Analysis (FMEA)

DECISION TO BUILD OCCUPY THE BUILDING

Information Technology

Operational Interventions

Page 31: HCD_2010_Inflexibility in Flexible Design

Unanticipated Consequences of Information Technology Support

Lack of Standardized Communication Platform

Service Expansion and Inter-Unit Movement Affected

Systemic: Information Technology

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Clearly identify the problem

Failure Mode Effects Analysis (FMEA)

Identify return on investment

DECISION TO BUILD OCCUPY THE BUILDING

Information Technology

Operational Interventions

Page 32: HCD_2010_Inflexibility in Flexible Design

Unanticipated Consequences of Information Technology Support

Assumptions are not implemented in time

Visibility, Proximity of Support and Support Core Affected

Systemic: Information Technology

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Understand how technology affects workflow

Design for interim model of care

Plan IT implementation concurrent with

building occupancy

DECISION TO BUILD OCCUPY THE BUILDING

Information Technology

Operational Interventions

Page 33: HCD_2010_Inflexibility in Flexible Design

Systemic: Performance Benchmarks

Performance Benchmarks are Independent – Not Interdependent

Individual departments are measured on individual performance

Visibility and Proximity of Support Affected

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Identify the return on investment

Create interdependent organization – wide

benchmarks

Create culture to eliminate the waste

DECISION TO BUILD OCCUPY THE BUILDING

Operational Interventions

Page 34: HCD_2010_Inflexibility in Flexible Design

Systemic: Infection Control

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Call for more empirical evidence

Identify and communicate case studies of

other facilities

DECISION TO BUILD OCCUPY THE BUILDING

Lack of Standardized Infection Control Guidelines

Infection Control Guidelines are not consistent

Visibility and Proximity of Support Affected

Operational Interventions

Page 35: HCD_2010_Inflexibility in Flexible Design

Systemic: Regulations

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Identify downstream regulatory restrictions early

Plan for future building growth

Plan for flexible use of space

DECISION TO BUILD OCCUPY THE BUILDING

Certificate of Need Restrictions

Restriction of Service Growth

Service Expansion Affected

Operational Interventions

Human Resources

Finance

Information Technology

Regulations

Design Process

Page 36: HCD_2010_Inflexibility in Flexible Design

Cultural: Inertia

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Commitment to ensure adoption

Early change management for all stakeholders

Education stakeholders on impact of non-

conformance

DECISION TO BUILD OCCUPY THE BUILDING

Lack of Adoption of New Technologies

Interdependence of team requires team adoption of technology

Visibility and Proximity of Support

Operational Interventions

Page 37: HCD_2010_Inflexibility in Flexible Design

Human: Perception

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Design Process

Education regarding effects of odd shapes on functionality

Checkpoint at conceptual level for operational functionality

Keep design process fluid by exploring alternatives

Provide time to evaluate design options

DECISION TO BUILD OCCUPY THE BUILDING

Some Shapes Attract More Than Others

Curves Attract!

Visibility, Proximity, and Adaptability Affected

Design Process

Page 38: HCD_2010_Inflexibility in Flexible Design

Human: Cognition

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Design Process

Create unit mock-ups

Preferably with walls and equipment

3D – visualization of rooms and units

Create virtual reality model

DECISION TO BUILD OCCUPY THE BUILDING

Cognition of Non-Designers

Translation of 2D to 3D

Peer Line of Sight, Visibility, Multiple Division Affected

Design Process

Page 39: HCD_2010_Inflexibility in Flexible Design

Human: Cognition

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology

Design Process

Mock-up “pods” or groups of rooms

Tape OK – walls better

Create virtual reality model

DECISION TO BUILD OCCUPY THE BUILDING

Cognition of Non-Designers

Scaling UP from Architectural Drawings

Visibility, Proximity of Support, Inter-Unit Movement Affected

Design Process

Page 40: HCD_2010_Inflexibility in Flexible Design

Financial: First Costs

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Information Technology

Design Process

Value stream map flow of materials, waste, linen,

patients

Create early study (not DD) of cost of material and

people flow

Identify return on investment for people movement

Finance

DECISION TO BUILD OCCUPY THE BUILDING

Vertical and Horizontal Connections

Location and Number Matters

Inter-Unit Movement, Service Expansion Affected

Finance

Design Process

Page 41: HCD_2010_Inflexibility in Flexible Design

Financial: Human Resources

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Information Technology

Finance

Design Process

Identify human resource changes early

Identify first costs with performance

benchmark improvements

Implement a culture to eliminate waste

DECISION TO BUILD OCCUPY THE BUILDING

Personnel Cost

Right People Doing the Right Job

Proximity of Support Affected

Page 42: HCD_2010_Inflexibility in Flexible Design

Financial: Return on Investment

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Information Technology

Finance

Design Process

Focused attempt to calculate Life Cycle

Cost

Identify new performance benchmarks

DECISION TO BUILD OCCUPY THE BUILDING

Missing Life Cycle Cost

Similar to Sustainability Challenges

All Domains Affected – Healthcare Design Could Change

Finance

Page 43: HCD_2010_Inflexibility in Flexible Design

Physical: Site Restrictions

CURRENT OPERATIONS

CU

LT

UR

E

Regulations

Design Process

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

Operational Interventions

Human Resources

Finance

Information Technology Identify downstream implications of site challenges

early

Verify master plan assumptions

Explore alternatives to optimize functionality of design

DECISION TO BUILD OCCUPY THE BUILDING

Form Dictates Function

Site Restrictions Require Particular Shape

All Domains Affected

Regulations

Design Process

Page 44: HCD_2010_Inflexibility in Flexible Design

Findings

WHAT DOES ALL THIS MEAN?

Page 45: HCD_2010_Inflexibility in Flexible Design

Summary

9 Domains of Operational Flexibility

Factors that Inhibit

Flexibility

Tactical Solutions

• Flexibility to Adapt• Flexibility to Convert• Flexibility to Expand

• Systemic• Physical• Financial• Cultural• Human

• Identify Life Cycle Costs• Breakdown Silos• Value Stream Mapping• FMEA and 5Y• Identify downstream risks

NN

N

C

Page 46: HCD_2010_Inflexibility in Flexible Design

Integrated Thinking

CURRENT OPERATIONS

CU

LT

UR

E

DESIGN AND CONSTRUCTION OCCUPANCY

FA

CT

OR

S

DECISION TO BUILD OCCUPY THE BUILDING

Finance

Information Technology

Design Process

Human Resources

Operational Interventions

Regulations

Page 47: HCD_2010_Inflexibility in Flexible Design

Process Rethinking

Establish Clear Goals

Ensure Compliance with Goals

Identify Metrics for Evaluation

Identify Strategic Checkpoints for

Operational Review (metrics)

Perform Functional Facility Reviews

Post Occupation

Begin Change Management At Decision

to Build or Before

Finance

Human Resources

Information Technology

Operations

Design Process

Regulations

Integrated Project Delivery for Operational Planning….