hdd large diameter pipeline crossings of highways

33
HDD Large Diameter Pipeline Crossings of Highways Protecting Everyone’s Assets Chris Mills, PE Marc 9, 2018

Upload: others

Post on 06-Jan-2022

12 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: HDD Large Diameter Pipeline Crossings of Highways

HDD Large Diameter Pipeline Crossings of HighwaysProtecting Everyone’s Assets

Chris Mills, PEMarc 9, 2018

Page 2: HDD Large Diameter Pipeline Crossings of Highways

General Stakeholders on HDD Highway Crossings Owners (DOTs & pipeline companies) Traveling public Engineer Various agencies Contractor

Page 3: HDD Large Diameter Pipeline Crossings of Highways

HDD Stakeholder Needs Pipeline companies

– Transfer product from point “A” to point “B”

DOTs– Keep highways operating safely for traveling public

Engineers– Identify risks of installing HDD at proposed location– Design HDD to be feasible, reduce risk– Make recommendations on how to mitigate identified risks

HDD Contractor– Follow best industry practices to complete HDD installation

while mitigating risks

Page 4: HDD Large Diameter Pipeline Crossings of Highways
Page 5: HDD Large Diameter Pipeline Crossings of Highways
Page 6: HDD Large Diameter Pipeline Crossings of Highways
Page 7: HDD Large Diameter Pipeline Crossings of Highways
Page 8: HDD Large Diameter Pipeline Crossings of Highways
Page 9: HDD Large Diameter Pipeline Crossings of Highways
Page 10: HDD Large Diameter Pipeline Crossings of Highways
Page 11: HDD Large Diameter Pipeline Crossings of Highways
Page 12: HDD Large Diameter Pipeline Crossings of Highways
Page 13: HDD Large Diameter Pipeline Crossings of Highways
Page 14: HDD Large Diameter Pipeline Crossings of Highways
Page 15: HDD Large Diameter Pipeline Crossings of Highways
Page 16: HDD Large Diameter Pipeline Crossings of Highways
Page 17: HDD Large Diameter Pipeline Crossings of Highways
Page 18: HDD Large Diameter Pipeline Crossings of Highways
Page 19: HDD Large Diameter Pipeline Crossings of Highways
Page 20: HDD Large Diameter Pipeline Crossings of Highways
Page 21: HDD Large Diameter Pipeline Crossings of Highways
Page 22: HDD Large Diameter Pipeline Crossings of Highways

Engineering Considerations Is proposed HDD alignment feasible? What type subsurfaces will be encountered during

drill?– Complete geotechnical exploration with soil borings and

laboratory testing

Does site location allow for proper layout of workspaces and are they accessible?

Page 23: HDD Large Diameter Pipeline Crossings of Highways
Page 24: HDD Large Diameter Pipeline Crossings of Highways
Page 25: HDD Large Diameter Pipeline Crossings of Highways

Engineering Identify risks and design HDD to reduce risks Inadvertent drilling fluid returns surfacing “Dry hole” from entry and exit point elevation

differential and cause hole stability issues

Page 26: HDD Large Diameter Pipeline Crossings of Highways
Page 27: HDD Large Diameter Pipeline Crossings of Highways
Page 28: HDD Large Diameter Pipeline Crossings of Highways
Page 29: HDD Large Diameter Pipeline Crossings of Highways
Page 30: HDD Large Diameter Pipeline Crossings of Highways
Page 31: HDD Large Diameter Pipeline Crossings of Highways
Page 32: HDD Large Diameter Pipeline Crossings of Highways
Page 33: HDD Large Diameter Pipeline Crossings of Highways

QUESTIONS???

Questions? Chris Mills, PE

– 417.799.2629– [email protected]