Kitsap County Department of Community Development
619 Division Street, MS-36, Port Orchard, WA 98366-4682
(360) 337-5777 | www.kitsapgov.com/dcd
Hearing Examiner Staff Report and Recommendation
Report Date: June 15, 2020 Application Submittal Date: November 4, 2019 Hearing Date: June 23, 2020 Application Complete Date: November 18, 2019 Project Name: Dachel Accessory Dwelling Unit (ADU) Type of Application: Conditional Use Permit (CUP) Permit Number: 19-05147 Project Location 8070 Tieton Place NW Silverdale, WA 98383 Central Kitsap County Commissioner District 3 Assessor's Account # 242501-3-037-1001 Applicant/Owner of Record Peter & Hedy Dachel 6889 NW Olympic View Court Silverdale, WA 98383 Authorized Agent James Mack Pearl 6479 NE Brigham Road Bainbridge Island, WA 98110 Recommendation Summary Approved subject to 35 conditions listed under section 13 of this report. 1. Background The Department of Community Development has reviewed the applicant's Conditional Use Permit (CUP) application to construct a 900 square foot accessory dwelling unit (ADU); ADU Building Permit (BP) 19-05145. The applicant has also been issued a building permit to build a 3,220 square foot, 1-story, single-family residence (SFR) plus a 620 square foot attached 2-car garage; SFR BP 19-05141. According to the Assessor's records, the subject property is undeveloped, 5.01 acres and zoned Rural Protection (RP). The parcel is located at 8070 Tieton Place NW in Silverdale. The project will be served by public water provided by Kitsap Public Utility District #1 and an on-site septic system.
VICINITY MAP
Staff Report: 19-05147 Dachel ADU CUP 2 June 15, 2020 2. Project Request
The request is to construct a 900 square foot ADU. The ADU will be served by public water and on-site septic system.
3. SEPA (State Environmental Policy Act)
The State Environmental Policy Act (SEPA), found in Chapter 43.21C RCW (Revised Code of Washington), is a state law that requires the County to conduct an environmental impact review of any action that might have a significant, adverse impact on the environment. The review includes the completion of an Environmental Checklist by the applicant and a review of that checklist by the County. If it is determined that there will be environmental impacts, conditions are imposed upon the applicant to mitigate those impacts below the threshold of “major” environmental impacts. If the impacts cannot be mitigated, an environmental impact statement (EIS) must be prepared. The decision following environmental review, which may result in a Determination of Nonsignificance (DNS), Mitigated DNS, or the necessity for an EIS is called a threshold determination. A separate notice of the threshold determination is given by the County. If it is not appealed, it becomes part of the hearing record as it was issued, since it cannot be changed by the Hearing Examiner. Pursuant to WAC 197-11-355, the optional DNS process was utilized for this project The SEPA Comment period previously occurred concurrent with the Notice of Application dated November 29, 2019 (Exhibit 15). A Determination of Nonsignificance (DNS) was issued on May 26, 2020 (Exhibit 19). SEPA noted the proposal will be conditioned for Stormwater Control per Kitsap County Code Title 12 and for Critical Areas per Kitsap County Code Title 19. The SEPA appeal period expired June 9, 2020. No appeals were filed; therefore, the SEPA determination is final.
4. Physical Characteristics The nearly rectangular 5.01-acre parcel is under construction of the SFR. The property contains an area of steep slopes within a ravine in the east portion of the parcel, which contains a fork of Anderson Creek, a Type F or fish-bearing stream. The property generally slopes from the west downward to the east. The steep slopes are associated with moderate landslide and high erosion hazard area. A majority of the perimeter is forested with a mix of evergreen and deciduous trees. The entire parcel is located over Category I Critical Aquifer Recharge Areas (Exhibits 23, 24, 25 and 27).
Table 1 - Comprehensive Plan Designation and Zoning
Comprehensive Plan: Rural Protection Zone: Rural Protection (RP)
Standard Proposed
Minimum Density Not Applicable (NA) NA
Staff Report: 19-05147 Dachel ADU CUP 3 June 15, 2020
Applicable footnotes: none Table 2 - Setback for Zoning District
Standard Proposed
Front (West) 50 feet Over 200 feet
Side (North) 20-feet, 5 feet for accessory structure, ADU = 5 feet
Approximately 49 feet
Side (South) 20-feet, 5 feet for accessory structure, ADU = 5 feet
Over 250 feet
Rear (East) 20-feet, 5 feet for accessory structure, ADU = 5 feet
Over 300 feet
Applicable footnotes: Footnote 29 "One-hundred-foot setback required for single-family buildings abutting FRL or RW zones". Staff Comment: The subject property does not abut a FLR or RW zone. Table 3 - Surrounding Land Use and Zoning
Surrounding Property
Land Use Zoning
North Undeveloped Rural Protection (RP)
South Single-family residences RP
East Tax title strip: undeveloped; SFR RP
West Undeveloped RP
Table 4 - Public Utilities and Services
Maximum Density 1 dwelling unit (DU)/10 acres
Minimum Lot Size 10 acres for newly created lots
NA
Maximum Lot Size NA NA
Minimum Lot Width 140 feet NA, existing, >500 feet
Minimum Lot Depth 140 feet NA, existing, >300 feet
Maximum Height 35 feet 1 story, <35 feet
Maximum Impervious Surface Coverage
NA Not calculated
Maximum Lot Coverage NA Not calculated
Provider
Water Kitsap PUD #1
Power Puget Sound Energy
Sewer On-site septic system
Police Kitsap County Sheriff
Staff Report: 19-05147 Dachel ADU CUP 4 June 15, 2020
5. Access Access to the site is from a paved private easement that originates from Tieton Place NW, which is classified as Rural Local Access and is a paved county maintained road.
6. Site Design
The acreage parcel is undergoing construction of the single-story SFR. The proposed ADU will also be a stick-built single-story building. There will be parking available for the SFR in front of the 2-car garage as well as on the circular drive and there will be separate parking available next to and for the ADU.
7. Policies and Regulations Applicable to the Subject Proposal
The Growth Management Act of the State of Washington, RCW 36.70A, requires that the County adopt a Comprehensive Plan, and then implement that plan by adopting development regulations. The development regulations must be consistent with the Comprehensive Plan. The Comprehensive Plan process includes public involvement as required by law, so that those who are impacted by development regulations have an opportunity to help shape the Comprehensive Plan which is then used to prepare development regulations.
Kitsap County Comprehensive Plan, adopted June 30, 2016
The following Comprehensive Plan goals and policies are most relevant to this application:
Land Use Goal 13 Protect Kitsap County's unique rural character. Land Use Policy 50 Limit the designated rural area to low residential densities that can be sustained by minimal infrastructure improvements, cause minimal environmental degradation, and that will not cumulatively create the future necessity or expectation of urban levels of service. Land Use Policy 51 Permit residential uses in rural areas consistent with the planned rural character of the surrounding area. Land Use Policy 53
Fire Central Kitsap Fire & Rescue
School Central Kitsap School District #401
Staff Report: 19-05147 Dachel ADU CUP 5 June 15, 2020
Outside of the Type III Limited Area of More Intensive Rural Development (LAMIRD), limit development only to that which serves rural residential or resource needs and does not draw population from Urban Growth Areas. This policy is implemented through Comprehensive Plan Land Use designations, zoning designations, and zoning code provisions. Housing and Human Services Goal 2 Increase affordable housing units and ensure that a broad range of housing types are available. Housing, Human Svcs Policy 5 Use regulatory strategies to incentivize and provide flexibility for development of affordable and special needs housing. Housing, Human Svcs Policy 7 Adopt regulatory changes to allow non-traditional housing types. Housing and Human Services Goal 4 Ensure that all people have fair and equal access to housing and services. Housing, Human Svcs Policy 11 Promote fair housing to ensure that all residents of Kitsap County have an equal and fair opportunity to obtain safe and sanitary housing suitable to their needs and financial resources, regardless of race, religion, gender, sexual orientation, age, national origin, family status, income, disability, or other protected class. Housing, Human Svcs Policy 12 Identify and remove regulatory barriers that limits access to or the provision of a diverse affordable housing supply. Housing, Human Svcs Policy 14 Disperse affordable housing opportunities throughout the County.
The County’s development regulations are contained within the Kitsap County Code. The following development regulations are most relevant to this application:
Code Reference Subject
Title 12 Storm Water Drainage
Title 13 Water and Sewers
Title 14 Buildings and Construction
Title 17 Zoning
Chapter 18.04 State Environmental Policy Act (SEPA)
Title 19 Critical Areas Ordinance
Staff Report: 19-05147 Dachel ADU CUP 6 June 15, 2020
Chapter 20.04 Transportation Facilities Concurrency Ordinance
Chapter 21.04 Land Use and Development Procedures
8. Documents Consulted in the Analysis
A complete index of exhibits is located in the project file. To date, the index to the record consists of Exhibits 1-27.
Exhibit # Document Dated Date
Received
3 Binding Water Letter 11.08.2019
4 Concurrency Test 11.08.2019
1 CUP - ADU Application 11.08.2019
2 Elevations - ADU 11.08.2019
10 Elevations - SFR Plans 11.08.2019
5 Drainage Report 10.23.2019 11.08.2019
2 Floor Plans - ADU 11.08.2019
10 Floor Plans - SFR 11.08.2019
7 Geologic Report 10.27.2019 11.08.2019
17 Health District Building Site Application (BSA) 05.21.2020
13 Narrative 11.12.2019
10 Site Plan - Architect 11.08.2019
18 Site Plan - BSA Approved 05.21.2020
6 Site Plan - Engineered Drainage/SWPPP 11.08.2019
9 State Environmental Policy Act (SEPA) Checklist 11.08.2019
16 Stormwater Memo 01.14.2020
12 Stormwater Worksheet 11.08.2019
8 SWPPP Narrative 11.08.2019
9. Public Outreach and Comments
No written comments received as of 06.12.2020.
Issue Ref. No.
Summary of Concern (See corresponding responses in the next table)
Comment Letter Exhibit
Reference No.
Issue Ref. No.
Issue Staff Response
Staff Report: 19-05147 Dachel ADU CUP 7 June 15, 2020
10. Analysis
a. Planning/Zoning An accessory dwelling unit within the RR zone requires a Conditional Use Permit as specified in Kitsap County Code (KCC) 17.410.042(A) Rural, resource, and urban residential zones use table subject to footnote 1. Footnote 1 indicates an ADU is subject to compliance with Section 17.410.060 Provisions applying to special uses. Accessory Dwelling Unit (ADU) Standards An ADU is required to meet the provisions and requirements outlined in KCC 17.410.060(B)(3) – Provisions applying to special uses; Accessory Dwelling Unit (ADU). In order to encourage the provision of affordable and independent housing for a variety of households, an accessory dwelling unit may be located in residential zones. Criteria from KCC 17.410.060(B)(3) are listed below, with a staff response of the individual standard immediately following:
a. An ADU shall be allowed as a permitted use in those areas contained within an urban growth boundary.
Staff Response: The proposed ADU is not within an urban growth boundary. Therefore, the ADU cannot be permitted in conjunction with a building permit as an outright use. Land use approval is required for this ADU.
b. An ADU shall be subject to a conditional use permit in those areas outside an urban growth boundary.
Staff Response: The subject property is outside an urban growth boundary. As a result, the applicant has applied for and is requesting approval of a conditional use permit as required by the KCC.
c. Only one ADU shall be allowed per lot.
Staff Response: Only one ADU is proposed for the subject lot. The applicant has applied for a building permit (BP) for the ADU and SFR; ADU BP 19-05145 and SFR BP 19-05141.
d. Owner of the property must reside in either the primary residence or the ADU.
Staff Response: The owners of the property, Peter and Hedy Dachel, currently reside off-site. They plan to reside in the SFR after it is built and the certificate of occupancy is issued. Their daughter, Elisha Weinberg, will initially reside in the ADU after construction and the certificate of occupancy is issued.
Staff Report: 19-05147 Dachel ADU CUP 8 June 15, 2020
e. The ADU shall not exceed fifty percent of the square footage of the habitable area of primary residence or 900 square feet, whichever is smaller. Dimensions are determined by exterior measurements.
Staff Response: According to the submitted plans, the primary residence (SFR) under construction will be over 3,000 square feet of habitable area and is exclusive of the 620 square foot garage (Exhibit 10). Therefore, the ADU is limited to 900 square feet and the submitted plans indicate the ADU will be 900 square feet (Exhibit 2).
f. The ADU shall be located within 150 feet of the primary residence or shall be the conversion of an existing detached structure (i.e., garage).
Staff Response: According to the application, the ADU building is proposed to be located 80 feet from the SFR (Exhibit 1). According to the site plan, the ADU scales less than 50 feet from the primary residence (Exhibit 10). In either case the ADU will be in compliance with the KCC.
g. The ADU shall be designed to maintain the appearance of the primary residence.
Staff Response: The primary residence and ADU are planned to be similar in appearance. Both buildings will be a rambler style, have a pitched metal roof, lap composite cement siding, open pane vinyl windows, and both residences will be painted to match (Exhibits 1, 2, 10 and 13).
h. All setback requirements for the zone in which the ADU is located shall apply.
Staff Response: The ADU front yard setback, along the west property line is over 200 feet. The north side yard setback is shown as over 30 feet, and the south side yard setback is over 250 feet. The rear yard setback, along the east property line, is over 300 feet (Exhibit 18). All required zoning setbacks as delineated for the ADU will be in compliance with the KCC.
i. The ADU shall meet the applicable health district standards for water and sewage disposal.
Staff Response: The Health District has indicated they have an approved Building Site Application that matches this proposal. The Health District approved the Redesign Building Site Application (BSA) for the ADU with no conditions on 11.18.2019 (Refer to Health Officer Decision, Memo #45943, Exhibit 17).
j. No mobile homes or recreational vehicles shall be allowed as an ADU.
Staff Report: 19-05147 Dachel ADU CUP 9 June 15, 2020
Staff Response: The applicant has proposed a stick-built ADU; therefore, no mobile home or recreational vehicle is proposed for the ADU.
k. An ADU shall use the same side street entrance as the primary residence and shall provide additional off-street parking.
Staff Response: The property owner shall revegetate all secondary access or potential access locations from the west property line at the southerly location and from all locations along the north property line. There appear to be 2 locations along the north property line. A landscape plan shall be submitted as part of the ADU BP application. Revegetation with native trees and shrubs shall occur prior to final inspection of the ADU BP. At least 1 additional space, as shown on the site plan, will be available next to the ADU (Exhibit 18).
l. An ADU is not permitted on the same lot where an accessory living quarters exists.
Staff Response: Based on the SFR floor plans, the structure will not have accessory living quarters (Exhibit 10).
b. Lighting
Not applicable; there are no lighting requirements for an ADU.
c. Off-Street Parking Three parking spaces are required for the single-family residence and one additional parking space is required for the ADU. There are 2 spaces available in front of the 2-car garage and 3 spaces on the proposed circular driveway for the SFR. There is at least 1 space next to the ADU (Exhibit 18).
Table 5 - Parking Table
Use Identified in 17.490.030
Standard Required Spaces Proposed Spaces/Existing
Spaces
Single-Family (attached or detached)
3 per dwelling unit + 1 per ADU
3 spaces - SFR 1 space - ADU
5 spaces - SFR 1 space - ADU
Total 4 spaces 6 spaces
d. Signage
Staff Report: 19-05147 Dachel ADU CUP 10 June 15, 2020
Not applicable; there is no signage requirements for an ADU, and none is proposed.
e. Landscaping Not applicable; there are no landscaping requirements for an ADU. However, revegetation of existing and potential secondary access points will be required prior to issuance/final inspection of the ADU. Table 6 - Landscaping Table
Required Proposed
Required Landscaping (Sq. Ft.) 15% of Site
NA
Required Buffer(s)
North
South
East
West
Street Trees
f. Frontage Improvements
Not applicable; there are no frontage improvement requirements for an ADU. However, there are access requirements that limit access to one road approach. This is addressed below under the access heading.
g. Design Districts/Requirements Not applicable; the subject property is not located within a design district.
h. Development Engineering/Stormwater The information provided demonstrates this proposal is a Small Project as defined in Kitsap County Code Title 12, and as such will require the subsequent building permit site plan to demonstrate on-site stormwater design that meets the requirements of a Simplified Drainage Review - Engineered and compliance with Minimum Requirements #1-5, as outlined in the Kitsap County Stormwater Design Manual. This requirement will be addressed as an element of Building Permit 19-05145 for the ADU.
i. Environmental The county's geographic information system (GIS) indicates the property contains an area of steep slopes within a ravine in the east portion of the parcel, which contains a
Staff Report: 19-05147 Dachel ADU CUP 11 June 15, 2020
fork of Anderson Creek, a Type F or fish-bearing stream. A 150-foot buffer and 15-foot building setback are required for a Type F stream and a 25-foot top of slope buffer and 15-foot building setback is required to both the SFR and ADU; the ADU will be outside of and approximately 100 feet from the required environmental buffers and associated building setbacks. The steep slopes are associated with moderate landslide and high erosion hazard area (Exhibit 27). The entire property is located over a Category I Critical Aquifer Recharge Area (Exhibit 25). The proposed residential use is not identified as "activities with potential threat to groundwater" at KCC 19.600.620; therefore, a hydrogeological report is not needed for this project. However, this project will be conditioned to prohibit any "activities with potential threat to groundwater" without additional review and approval by the Kitsap County Department of Community Development.
j. Access, Traffic and Roads Access to the site is from a paved private easement that originates from Tieton Place NW, which is classified as Rural Local Access and is a paved county maintained road. All rights of access for adjoining properties currently in existence shall be preserved. There appear to be 4 existing access points to the property; 2 from the west property line and 2 from the north property line. The southerly access point from the west property line shall be removed and all access or potential access points from the north property line shall be removed. All secondary access points shall be scarified using appropriate equipment that adequately tills the soil beneath the compacted driving surface. The area needs to be improved with 6-inches of soil amendment prior to the area being replanted with a sufficient number of native evergreen trees and shrubs to prevent future access. A residence is attributed 10 average daily trips (ADT). Traffic is expected to be an additional 10 ADT for the ADU. It is anticipated Tieton Place NW can accommodate the additional traffic generated by the proposed ADU without requiring any mitigation. A concurrency certificate will be required to attribute the additional traffic to the county road system created by the ADU. Any work within the county right-of-way will require a Public Works permit.
k. Fire Safety Not applicable; the building permit for the ADU will be evaluated to ensure compliance with fire safety requirements in the International Residential Code (IRC) and International Fire Code (IFC).
l. Solid Waste
Staff Report: 19-05147 Dachel ADU CUP 12 June 15, 2020
Waste Management is the local service provider. Solid waste generated by the ADU is expected to be picked up as part of the typical residential garbage collection.
m. Water/Sewer The SFR and ADU will be served by public water from Kitsap Public Utility District (PUD) #1 and an on-site septic system.
n. Kitsap Public Health District Kitsap Public Health District has reviewed the application and noted they have an approved BSA on file that matches the proposal.
11. Review Authority The Hearing Examiner has review authority for this Conditional Use Permit application under KCC, Sections 17.550.020 and 21.04.100. The Kitsap County Commissioners have determined that this application requires review and approval of the Hearing Examiner. The Hearing Examiner may approve, approve with conditions, or deny a Conditional Use Permit. The Hearing Examiner may also continue the hearing to allow for additional information necessary to make the proper decision. The powers of the Hearing Examiner are at KCC, Chapter 2.10.
12. Findings
1. The proposal is consistent with the Comprehensive Plan.
2. The proposal complies or will comply with requirements of KCC Title 17 and complies with or will comply with all of the other applicable provisions of Kitsap County Code and all other applicable regulations, including all applicable development standards and design guidelines, through the imposed conditions outlined in this report.
3. The proposal is not materially detrimental to existing or future uses or property in the immediate vicinity.
4. The proposal is compatible with and incorporates specific features, conditions, or revisions that ensure it responds appropriately to the existing character, appearance, quality or development, and physical characteristics of the subject property and the immediate vicinity.
13. Recommendation
Based upon the analysis above and the decision criteria found in KCC 17.550.030.A, the Department of Community Development recommends that the Conditional Use Permit request for Dachel Accessory Dwelling Unit be approved, subject to the following 35 conditions:
Staff Report: 19-05147 Dachel ADU CUP 13 June 15, 2020
a. Planning/Zoning All required permits shall be obtained prior to commencement of land clearing,
construction and/or occupancy.
The accessory dwelling unit (ADU) is subject to the payment of impact fees.
Impact fees must be paid at time of permit issuance, or if deferred, must be paid
prior to final inspection. No certificate of occupancy will be granted until all
impact fees are paid.
Any proposed modification (not including cosmetic work such as painting,
papering and similar finish work), remodel or expansion of the accessory
dwelling unit (ADU) building, regardless of whether a building permit is required,
shall be reviewed by the Department of Community Development and granted
approval prior to such modification, expansion, construction and/or issuance of a
building permit.
Only one accessory dwelling unit (ADU) shall be permitted on the subject
property.
The owner of the property must reside in either the primary residence or the
accessory dwelling unit (ADU) and only one of the structures may be rented at
any one time.
The accessory dwelling unit's (ADU) habitable area shall not exceed 50% of the
primary residence or 900 square feet, whichever is smaller. The primary
residence is over 3,000 square feet as indicated in Exhibit 10. The ADU is 900
square feet as indicated in Exhibit 2.
The accessory dwelling unit (ADU) shall be located within 150 feet of the primary
residence.
The accessory dwelling unit (ADU) shall be designed to maintain the appearance
of the primary residence.
This permit shall comply with all Kitsap Public Health District regulations and
conditions of approval.
No mobile home or recreational vehicle shall be allowed as an accessory
dwelling unit (ADU).
The accessory dwelling unit (ADU) shall use the same side street entrance as the
primary residence and shall provide one additional off-street parking space.
An accessory living quarters (ALQ) or guest house (GH) is not permitted on the
same lot unless the accessory dwelling unit (ADU) is removed and the ALQ or GH
complies with all requirements imposed by the Kitsap County Code (KCC).
A property with a primary residence and an accessory dwelling unit (ADU)
cannot be segregated to create two separate legal lots unless it complies with all
Staff Report: 19-05147 Dachel ADU CUP 14 June 15, 2020
subdivision, zoning and density requirements in place at the time of a complete
subdivision application.
The accessory dwelling unit (ADU) cannot be sold separately from the primary
residence unless it has legally been segregated onto its own lot.
The recipient of any conditional use permit shall file a Notice of Land Use Binder
with the county auditor prior to any of the following: initiation of any further site
work, issuance of any development/construction permits by the county, or
occupancy/use of the subject property or buildings thereon for the use or
activity authorized. The Notice of Land Use Binder shall serve both as an
acknowledgment of and agreement to abide by the terms and conditions of the
conditional use permit and as a notice to prospective purchasers of the existence
of the permit. The Binder shall be prepared and recorded by the Department at
the applicant's expense.
The uses of the subject property are limited to the uses proposed by the
applicant and any other uses will be subject to further review pursuant to the
requirements of the Kitsap County Code (KCC). Unless in conflict with the
conditions stated and/or any regulations, all terms and specifications of the
application shall be binding conditions of approval. Approval of this project shall
not, and is not, to be construed as approval for more extensive or other
utilization of the subject property.
The authorization granted herein is subject to all applicable federal, state, and
local laws, regulations, and ordinances. Compliance with such laws, regulations,
and ordinances is a condition to the approvals granted and is a continuing
requirement of such approvals. By accepting this/these approvals, the applicant
represents that the development and activities allowed will comply with such
laws, regulations, and ordinances. If, during the term of the approval granted,
the development and activities permitted do not comply with such laws,
regulations, or ordinances, the applicant agrees to promptly bring such
development or activities into compliance.
The decision set forth herein is based upon representations made and exhibits
contained in the project application 19-05147 Dachel Accessory Dwelling Unit
(ADU) Conditional Use Permit (CUP). Any change(s) or deviation(s) in such plans,
proposals, or conditions of approval imposed shall be subject to further review
and approval of the County and potentially the Hearing Examiner.
This Conditional Use Permit approval shall automatically become void if no
development permit application is accepted as complete by the Department of
Community Development within four years of the Notice of Decision date or the
resolution of any appeals.
Staff Report: 19-05147 Dachel ADU CUP 15 June 15, 2020
Any violation of the conditions of approval shall be grounds to initiate revocation
of this Conditional Use Permit.
Submit a landscape plan that complies with Kitsap County Code 17.500 with the
Building Permit 19-05145. The landscape plan shall demonstrate replanting of all
secondary access points.
Remove the southerly driveway access from the west property line and all
existing or potential access points from the north property line. All secondary
access points shall be scarified using appropriate equipment that adequately tills
the soil beneath the compacted driving surface. All areas shall be improved with
6-inches of soil amendment and replanted with a sufficient number of native
evergreen trees, planted in 2 off-set rows, and shrubs to prevent future access.
All existing or potential secondary access points shall be revegetated prior to
final inspection of the accessory dwelling unit (ADU) Building Permit 19-05145.
b. Development Engineering Construction plans and profiles for all roads, storm drainage facilities and
appurtenances prepared by the developer’s engineer shall be submitted to
Kitsap County for review and acceptance. No construction shall be started prior
to said plan acceptance
The information provided demonstrates this proposal is a Small Project as
defined in Kitsap County Code Title 12, and as such will require that the building
permit application materials demonstrate an on-site stormwater design that
meets the requirements of a Simplified Drainage Review-Engineered level of
review.
On-site Stormwater Management, and erosion and sedimentation control shall
be designed in accordance with Kitsap County Code Title 12 effective at the time
the Conditional Use Permit application was deemed complete, November 18,
2019. The submittal documents shall be prepared by a civil engineer licensed in
the State of Washington. The fees and submittal requirements shall be in
accordance with Kitsap County Ordinances in effect at the time of building
permit application.
The building permit application materials shall demonstrate that the project
follows the recommendations contained in the Geologic Report prepared by
Resolve Environmental & Geotechnical, Inc. dated October 27, 2019.
Soil amendment is required for all disturbed areas not covered by hard surface.
Any project that includes off site improvements that create additional
impervious surface such as lane widening, sidewalk or shoulder installation or
intersection channelization shall provide stormwater mitigation in accordance
Staff Report: 19-05147 Dachel ADU CUP 16 June 15, 2020
with Kitsap County Code Title 12 effective at the time the Conditional Use Permit
application was deemed complete, November 18, 2019.
If the project proposal is modified from that shown on the submitted site plan
dated November 19, 2019, Development Services and Engineering will require
additional review and potentially new conditions.
c. Environmental No uses that are identified as "activities with potential threat to groundwater" at
Kitsap County Code 19.600.620 shall occur prior to obtaining the required
approval from the Department of Community Development and/or the Hearing
Examiner.
Prior to final inspection of building permit(s), it must be demonstrated to the
inspector through the load ticket (provided by the logger) that the timber
harvest was under 5,000 board feet. If the harvest was over 5,000 board feet,
the income must be reported the Washington State Department of Revenue at
[email protected]. Proof of reporting must be demonstrated to
the inspector (copy of email, etc.) prior to final inspection approval.
The project shall follow the recommendations of the Geological Report by
Resolve Environmental, dated 10/27/19. A 25-foot vegetated buffer and
additional 15-foot building setback must be maintained from the top of slope, as
identified on the site plan.
d. Traffic and Roads Submit an Application for Concurrency Test (KCPW Form 1601) as required by
Chapter 20.04.030, Transportation Concurrency, of the Kitsap County Code. The
KCPW 1601 form reserves road capacity for the project.
All rights of access for adjoining properties currently in existence shall be
preserved. Any amendment to the existing easement rights of adjoining property
owners shall be properly executed and recorded prior to issuance of the building
permit.
Any work within the County right-of-way shall require a Public Works permit and
possibly a maintenance or performance bond. This application to perform work
in the right-of-way shall be submitted as part of the SDAP process or building
permit if no SDAP is required. The need for and scope of bonding will be
determined at that time.
Staff Report: 19-05147 Dachel ADU CUP 17 June 15, 2020 Report prepared by: _________________________________________________ 16 June 2020 Meg Sands, Staff Planner / Project Lead Date Report approved by: __________________________________________________ 06/16/2020 Shawn Alire, Department Manager / Supervisor Date Attachments: Attachment A – Building Elevations: ADU Attachment B – Building Elevations: SFR Attachment C – Floor Plan: ADU Attachment D – Floor Plan: SFR Attachment E – Zoning Map CC: Applicant/Owner: [email protected] Authorized Agent: [email protected] Engineer: [email protected] Interested Parties: none as of 06.12.2020 Kitsap County Health District, MS-30 Kitsap County Public Works Dept., MS-26 DCD Staff Planner: Meg Sands
Staff Report: 19-05147 Dachel ADU CUP 18 June 15, 2020
Site Plan
Firs
t Flo
or
0' -
0"
Roof
16' -
0"
Pla
te H
t.10' -
0"
BA
G
Firs
t Flo
or
0' -
0"
Roof
16' -
0"
Pla
te H
t.10' -
0"
13
4
H
C
Firs
t Flo
or
0' -
0"
Roof
16' -
0"
Pla
te H
t.10' -
0"
DE
Firs
t Flo
or
0' -
0"
Roof
16' -
0"
Pla
te H
t.10' -
0"
2
F
H
I
RE
GIS
TER
ED
AR
CH
ITEC
T
STA
TE O
F WA
SH
ING
TON
JAM
ES
MA
CK
PE
AR
L
5526
Scal
e Date
Dra
wn b
y
Checked b
y
PRINTED
J. MACK PEARL - ARCHITECT6479 NE BRIGHAM ROAD
BAINBRIDGE ISLAND, WA 98110
(206)842-8505 [email protected]
1/4
" = 1
'-0"
10/22/2019 10:28:29 AM
A4
Ele
vatio
ns
Fae Den ADU
06/0
4/1
6
Auth
or
Checker
8070 Tieton Place NWSilverdale, WA 98383
No
.D
escrip
tion
Date
1/4
" = 1
'-0"
1W
est
1/4
" = 1
'-0"
2S
outh
1/4
" = 1
'-0"
3E
ast
1/4
" = 1
'-0"
4N
orth
ATTA
CH
MEN
T A - A
DU
BU
ILDIN
G ELEVA
TION
SATTACHMENT A - ADU BUILDING ELEVATIONS
Firs
t Flo
or
0' -
0"
Cle
resto
ry13' -
5 1
/2"
Firs
t Flo
or P
late
Ht.
9' -
7"
Roof
20' -
0"
CB
FD
C1
N
M
M
DD
N
KK
KK
K
3
Firs
t Flo
or
0' -
0"
Cle
resto
ry13' -
5 1
/2"
Firs
t Flo
or P
late
Ht.
9' -
7"
Roof
20' -
0"
IG
IB
MN
KK
KK
K
All R
ake a
nd F
acia
board
s 5
/4x8 Note
: All T
rim P
rimed
Fin
ge
r Join
ted C
eda
r
Typic
al C
orn
er B
oard
5/4
x6
7 1
/4 x
5/1
6" S
mooth
Hard
i S
idin
g w
/ 6" e
xposure
Win
dow
and d
oor trim
5/4
x4 S
ides, 2
x6 to
p w
ith 1
/2" E
xte
nsio
ns,S
ill w/ 1
/2" e
xte
nsio
ns a
nd 5
/4x4 A
pro
n
Meta
l Roof w
/ Rid
ge V
ents
RE
GIS
TER
ED
AR
CH
ITEC
T
STA
TE O
F WA
SH
ING
TON
JAM
ES
MA
CK
PE
AR
L
5526
Scal
e Date
Dra
wn b
y
Checked b
y
PRINTED
J. MACK PEARL - ARCHITECT6479 NE BRIGHAM ROAD
BAINBRIDGE ISLAND, WA 98110
(206)842-8505 [email protected]
1/4
" = 1
'-0"
10/22/2019 10:24:24 AM
A5
Ele
vatio
ns
Dachel Residence
05/2
3/2
019
Auth
or
Checker
8070 Tieton Place NWSilverdale, Wa 98383
No
.D
escrip
tion
Date
1/4
" = 1
'-0"
1E
ast
1/4
" = 1
'-0"
2W
est
Note
: If dra
win
g is
redu
ced
to 1
1x17
S
cale
will b
e 1
/8" =
1'-0
"
ATTA
CH
MEN
T B - SFR
BU
ILDIN
G ELEVA
TION
S ATTACHMENT B - SFR BUILDING ELEVATIONS
DW
DW
35' - 6
"
6' - 0" 24' - 0" 12' - 0"
3A5
5A5
Murphy Bed
153 S
F
Kitc
hen
41 S
F
En
try
155 S
F
Liv
ing
Ro
om
89 S
F
Mu
d R
oo
m
125 S
F
Bed
roo
m
350 S
F
Co
vere
d P
orc
h
234 S
F
Carp
ort
Coats
Bench
Broom
6' - 0
"19' - 6
"16' - 0
"
6' - 0" 8' - 0" 8' - 0" 8' - 0" 11' - 6 1/2" 5 1/2"
1A5
110 S
F
Med
itatio
n
27 S
F
Pd
r
32 S
F
Walk
-in
84 S
F
Bath
Shelv
es
Shelves
Pantry
5 1
/2"
5' - 6
1/2
"5 1
/2"
11' - 1
"5 1
/2"
11' - 3
1/2
"5 1
/2"
11' - 3
1/2
"5 1
/2"
4A5
2A5
Pantry
6A5
Beam
@ 9
'-0" to
H
ang S
lidin
g W
all
2' - 8" 5' - 0" 4" 2' - 9" 2' - 6" 2' - 9" 4" 5' - 0" 2' - 8"
6' - 0
"12' - 0
"23' - 6
"
5 1
/2"
23' - 4
"3 1
/2"
10' - 1
1 1
/2"
5 1
/2"
2' - 4
1/2
"3' - 3
"
4 1
/2"
3' - 0
"6' - 0
"5' - 8
"6' - 0
"5' - 9
"6' - 0
"3' - 1
"
5 1
/2"
9' - 0
3/4
"5 1
/2"
9' - 0
3/4
"5 1
/2"
5 1
/2"
13' - 0
1/2
"3 1
/2"
10' - 0
"3 1
/2"
4' - 2
"3 1
/2"
6' - 6
"5 1
/2"
14' - 8
"2' - 1
1"
11' - 2
1/2
"6' - 0
"8 1
/2"
5 1/2" 11' - 4 3/4" 3 1/2" 11' - 4 3/4" 5 1/2"
2' - 3 1/2" 7' - 6" 10' - 6" 3' - 0" 8 1/2"
3' - 4 3/4" 8' - 0"
3 1
/2"
5' - 3
"3 1
/2"
6' - 0
"3 1
/2"
2' -
11"
5' - 0" 3 1/2"
3' - 6" 3 1/2"
1
34
2
B
7
9
8
D E
5
6
F
A
G
C
Egre
ss D
oor
Tem
pere
d G
lass
SC
SF-
Fan w
/ min
CF
M -
term
inate
all fa
ns
3'-0
" from
opera
ble
win
dow
all fa
ns
Panasonic
FV
-0511V
Q1 o
r equal
xx C
FM
-S
moke/C
arb
on M
onoxid
e D
ete
cto
rH
ard
wire
d-in
terc
onnecte
d w
/ Batte
ryB
ackup
-S
moke D
ete
cto
r Hard
wire
d-in
terc
onnecte
dw
/ Batte
ry B
ackup
S
SC
S S
F
110 C
FM
F
50 C
FM
F
50 C
FM
Whole
House F
an
Shoe S
helv
es
belo
w P
antry
's o
n
Mudro
om
Sid
e
Lazy S
usan B
elo
w
Dire
ct V
ent (T
hru
Wall) N
atu
ral G
as S
tove
Follo
w a
ll Manufa
ctu
res in
sta
llatio
n in
stru
ctio
ns
Skylig
ht
Above
Skylig
ht
Above
Tankle
ss W
ate
r Heate
r EF
0.9
1
RE
GIS
TER
ED
AR
CH
ITEC
T
STA
TE O
F WA
SH
ING
TON
JAM
ES
MA
CK
PE
AR
L
5526
Scal
e Date
Dra
wn b
y
Checked b
y
PRINTED
J. MACK PEARL - ARCHITECT6479 NE BRIGHAM ROAD
BAINBRIDGE ISLAND, WA 98110
(206)842-8505 [email protected]
1/4
" = 1
'-0"
10/22/2019 10:28:18 AM
A3
Firs
t Flo
or P
lan
Fae Den ADU
06/0
4/1
6
Auth
or
Checker
8070 Tieton Place NWSilverdale, WA 98383
1/4
" = 1
'-0"
1F
irst F
loor
No
.D
escrip
tion
Date
DO
OR
SC
HE
DU
LE
MA
RK
RE
MA
RK
SH
EIG
HT
WID
TH
TH
ICK
NE
SS
DE
SC
RIP
TIO
NLO
CA
TIO
NC
om
ments
16' - 1
0"
3' - 0
"0' - 1
3/4
"E
ntry
Door
Entry
2H
alf G
lass D
oor
6' - 8
"2' - 8
"0' - 1
3/4
"32" x
80"
Carp
ort
38' - 0
"6' - 0
"0' - 2
"S
lidin
g G
lass D
oor
Bedro
om
48' - 0
"6' - 0
"0' - 2
"S
lidin
g G
lass D
oor
Medita
tion
56' - 8
"2' - 6
"0' - 1
3/8
"4-P
anel
Bath
66' - 8
"2' - 4
"0' - 1
3/8
"4-P
anel
Walk
-in
76' - 8
"2' - 6
"0' - 1
3/8
"4-P
anel
Mud R
oom
86' - 8
"2' - 4
"0' - 1
3/8
"4-P
anel
Pdr
96' - 8
"2' - 6
"0' - 1
3/8
"4-P
anel
Bedro
om
WIN
DO
W S
CH
ED
ULE
MA
RK
NU
MB
ER
Rough O
penin
g
Descrip
tion
HD
HT
RE
MA
RK
SW
IDT
HH
EIG
HT
A1
2' - 6
"3' - 6
"C
asem
ent
8' - 0
"
B1
5' - 0
"3' - 6
"S
lider/F
ixed S
ash
8' - 0
"
C1
6' - 0
"3' - 6
"S
lider/F
ixed S
ash
8' - 0
"
D1
7' - 6
"4' - 6
"S
lider/F
ixed S
ash
8' - 0
"
E1
3' - 0
"5' - 0
"F
ixed S
ash
8' - 0
"
F1
6' - 0
"5' - 0
"S
lider/F
ixed S
ash
8' - 0
"
G1
5' - 0
"4' - 0
"S
lider/ F
ixed S
ash w
/ Arc
h-T
op
8' - 0
"
H2
3' - 8
3/4
"3' - 1
0 1
/4"
Velu
x S
06 o
r Equal 4
'x4'
I1
1' - 2
"1' - 2
"V
elu
x T
GR
14 S
un T
unnel
Gra
nd to
tal: 1
0
ATTA
CH
MEN
T C - A
DU
FLOO
R PLA
NATTACHMENT C - ADU FLOOR PLAN
WD
DW
WHD
BL
OV
EN
1
A7
2
A8
1
A9
26' - 0"52' - 0"
6' - 0"26' - 0"6' - 0"32' - 0"6' - 0"
2
A10
12' - 0
"36' - 0
"24' - 0
"10' - 0
"
8' - 0"8' - 0"
2
A7
16' - 0"22' - 0"14' - 0"
590 S
F
(2)
Car G
ara
ge
207 S
F
Med
ia R
oo
m
85 S
F
Bu
tler P
an
try
250 S
F
Kitc
hen
181 S
F
Su
n R
oo
m
318 S
F
Liv
ing
Ro
om
2
A9
1
A10
Stained Glass Window Centered on Windows
Queen
Sun T
unnel
1
A8
92 SF
Mechanical
215 SF
Guest Bedroom
Sun T
unnel
Bench
Murp
hy B
ed
174 S
F
Mu
d R
oo
m
80 S
F
Maste
r Clo
set
161 S
F
Maste
r Bath
235 S
F
Maste
r Bed
roo
m
34 SF
Pdr
57 S
F
Bath
2
53 SF
Guest Bath
177 S
F
Bed
roo
m 2
Coats
Skylight
Skylig
ht
Skylig
ht
166 S
F
Hall/ C
lere
sto
ry
136 S
F
En
try
200 S
F
Din
ing
Ro
om
140 S
F
Hall
3
A9
3
A7
Kin
g
Bench
156 S
F
Po
rch
Sun T
unnel
5 1/2"7' - 6 1/2"5 1/2"7' - 6 1/2"3' - 6"3' - 0"
6"
2' - 6"
6"
3' - 0"3' - 0"
1' - 6"
6' - 0"7' - 0"6' - 0"
1' - 6"
4' - 0"9' - 0"1' - 0"
5 1
/2"
7' - 6
1/2
"5 1
/2"
2' - 1
1"
7' - 6
"5' - 2
"7' - 6
"5' - 3
1/2
"6' - 8
1/2
"11"
13' - 4
"3 1
/2"
11' - 6
1/2
"3 1
/2"
2' - 1
"
5 1
/2"
8' - 0
"4' - 6
"6' - 0
"1' - 6
"
5 1
/2"
8' - 3
3/4
"5 1
/2"
8' - 3
3/4
"5 1
/2"
3' - 0
"
18' - 0
"
8 1
/2"
6' - 0
"3' - 3
1/2
"4' - 0
"3' - 3
"16' - 9
"
2' - 10 1/2"10' - 3"3"10' - 3"3' - 2 1/2"3' - 3"1' - 11"
5 1/2"5' - 6 1/2"5 1/2"16' - 7"5 1/2"14' - 0 1/2"5 1/2"
8 1/2"6' - 0"1' - 0"6' - 0"11' - 3 1/2"6' - 0"1' - 0"
2' - 3 1/2"3' - 0"
8 1/2"
5 1
/2"
10' - 1
0"
3 1
/2"
15' - 1
1 1
/2"
5 1
/2"
7"
5' -
0"
6' - 5
"2' - 6
"3' - 6
"3' - 6
"6' - 0
"2' - 1
1"
6' - 0
"2' - 1
1"
6' - 0
"8"
8' - 0
"3' - 0
"1' - 0
"
2' - 6
"6' - 0
"1' - 6
"
4 1/2"
3' - 3"
4 1/2"9' - 0"1' - 0"6' - 0
"1' - 0
"12' - 0
"1' - 0
"
9' - 6"7' - 6"9' - 0"
12' - 0
"5 1
/2"
5' - 6
1/2
"
6' -0"8' - 0"
1
26
I
C
13
12
15
5
16
E
B
B
10
87
6
F
D
21
20
14
23
24
28
11
22
19
G
30
GGG
29
18
25
C1
27
I
A A
B
B
17
D
D
H
9
4
2
3
A1
4' - 8
"3 1
/2"
3 1
/2"
5' - 0
"
3 1
/2"
1' - 8
1/2
"
2' - 1"
3 1
/2"
2' - 1
"
3 1
/2"
7' - 0
"
Return Air
5' - 8"
4' - 8
"
7' - 3"3 1/2"
8'-1" Tall
8' - 0"
16' - 0"6' - 0"16' - 0"
1' - 1"4' - 0"1' - 6"
1' - 0 1/2"5 1/2"5' - 0"3 1/2"8' - 9"
5' - 0
"
7' - 2
"6' - 1
1 1
/2"
1' - 6
"
5 1
/2"
2' - 1"
4' - 1 1/2"5' - 1 1/2"
3 1/2"
6' - 0"
6' - 6"
3' - 0
"
6' - 6
1/2
"3 1
/2"
8' - 8
1/2
"5 1
/2"
8'-1
" Tall W
all
12' - 0
"8' - 0
"
1' - 0
"
14' - 8 1/2" 12' - 4
"
8'-1
' Tall
5' - 5
"
6x6 to beam above
SC
SF-
Fan w
/ min
CF
M -
term
inate
all fa
ns
3'-0
" from
opera
ble
win
dow
all fa
ns
Panasonic
FV
-0511V
Q1 o
r equal
xx C
FM
-S
moke/C
arb
on M
onoxid
e D
ete
cto
rH
ard
wire
d-in
terc
onnecte
d w
/ Batte
ryB
ackup
-S
moke D
ete
cto
r Hard
wire
d-in
terc
onnecte
dw
/ Batte
ry B
ackup
SC
S
S S
S SS S
S S
S S
Panasonic FV-0511VQ1Whole House Fan
F
80 CFM
Natural Gas Hot Water Tank EF 0.91
Floor Drain w/ Trap Primer
F
110 C
FM
F
50 C
FM
F80 C
FM
F
50 C
FM
F
80 C
FM
1.0 GPM
1.75 GPM
HP Air Handler W/ natural Gas Backup heat (2) Zone Min.
1.75 GPM
1.0 GPM
1.7
5 G
PM
1.0 GPM
1.75 GPM
Tempered Glass
Egress Window
Egre
ss W
indow
Egre
ss W
indow
Dire
ct V
ent (T
hru
Wall) N
atu
ral
Gas F
irepla
ce
Follo
w a
ll Manufa
ctu
res
insta
llatio
n in
stru
ctio
ns
18' - 0
"
1' - 9"1' - 9"
Nitch
Nitch
Heat Pump Min. HSPF 9.0
Note
: Red
uced
air le
akag
e to
3.0
Air C
ha
ng
es P
er H
our
RE
GIS
TER
ED
AR
CH
ITEC
T
STA
TE O
F WA
SH
ING
TON
JAM
ES
MA
CK
PE
AR
L
5526
Scal
e Date
Dra
wn b
y
Checked b
y
PRINTED
J. MACK PEARL - ARCHITECT6479 NE BRIGHAM ROAD
BAINBRIDGE ISLAND, WA 98110
(206)842-8505 [email protected]
1/4
" = 1
'-0"
10/22/2019 10:24:02 AM
A3
Firs
t Flo
or P
lan
Dachel Residence
05/2
3/2
019
Auth
or
Checker
8070 Tieton Place NWSilverdale, Wa 98383
1/4" = 1'-0"1
First Floor
No
.D
escrip
tion
Date
Note
: If dra
win
g is
red
uced
to 1
1x1
7
Scale
will b
e 1
/8" =
1'-0
"
ATTACHMENT D - SFR FLO
OR PLAN
ATTACHMENT D - SFR FLOOR PLAN
Zoning DesignationsR
R - R
ura
l Re
sid
en
tial (1
DU
/5 A
c)
RP
- Ru
ral P
rote
ctio
n (1
DU
/10
Ac)
Park
Sub
ject P
arc
el(s
)
Rea
l Pro
pe
rty T
ax A
ccou
nts
Easem
en
t
!
Pla
t-Lin
e
Street Center LinesC
olle
cto
r / Arte
rial
Loca
l Access; L
ocal R
oad
!
!! !
!
!!
!!
!!
!
!!
!!
!!
!!!
!!
!!
!!!
!!
!!
!
!!
!!
!!!!
!!!
!!
!!
!
!!
!!
!!
!
!!
!!
!!
!
!!
!!
!!
!
!!
!
! !
!!
!!
!
!!!!
!!!!
!!
!
!!
!!
!!
!!
!!
!
!
! !
!
!
!!
!
!!
!
!
!
!
!
!!
!
!
!
!
!
!!!!!
!
!
!
!
!
!
!
!
!
!!
!
!
!!
!!!!
!
!
!
!
!
!
!
!
!!
!
!
!!
!
!
!
!!
!
!!
!!
!
!!
!!
!!
!
!
!
!
!!
!!
!!
!
!
!!
!
!!
!
!!
!
!
!
!
!!
!
!!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!!
!
!!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!!!
!
!
!
!
!
!
!
!!
!!
!!
!
!
!
!
!
!!!!
!
!!
!
!!!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!!
!
!
!
!
!!
!
!!
!!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!!
!
!
!
!
!
!
!
!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!!!
!
!!!!
!!
!
!
!
!
!
!!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! !
!
! ! !!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
! !
!
!
!
!!
!
!
!!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!!
!!
!!
!
!!!
!!
!!
!!
!
!!!
!!!!
!
!!
!!
!!
!
N NW W
N NE E
W WB B
E ER R
R RY Y
H HI IL L
L LR R
D D
OOUU TTBB AA CC KK AAVV EE NN WW
HHIIDDEE AA WWAAYY LLNN NNWW
IICCIICC
LLEE
PPLLNNWW
TTIIEETTOONNPPLL
NNWW
JEFFERY LNJEFFERY LN
NWNW
WWEENNAATTCCHHEEEE
PPLL
NNWW
NW
FIS
HH
OO
K L
NN
W F
ISH
HO
OK
LN
NW
IO
NH
SA
GT
SI
KT
AP
YU
CO
NT
19-05147 Dachel ADU CUP - Zoning
Hansv i l le Road NE
Banner Road SE
C le a r C r ee k R o a d N W
SE
Mu
llen
ix Ro
ad
D ew a t t o R o a d W
SW
Pin
e R
oa
d
SE
N
els
on
R
oa
d
SE
M
ile
H
ill D
riv
e
NW
N
ew
berry
H
ill R
oad
T ra c y to n B lv d N W
SE
B
urle
y O
la
lla R
oad
NE
Linco
ln Ro
ad
Sil ver dal e
Way
N W
Jackson A venue S E
Ri
dge
topBoule
vard
Illa
hee
Roa
dNE
SW
L
ak
e H
ele
na
R
oa
d
Se
ab
ec
k -Hol ly
Ro a d
NW
Seab
eck
Highw
ay
NW
NW
Ho
l ly
Ro
ad
NE
M
cW
illiam
s R
oa
d
NETw
inSpitsRoad
South
HansvilleRoadNE
HoodCanalDriveNE
NE
Eglo
nRoa
d
Mi l ler BayRo a d
N E
Sout hKings t o n Ro ad
NE
NW Pione
er Hill Rd
NE Gun
derson Road
NE Saw
dustHill Roa
d
Sylv
an W
ay
Per ry Ave N E
Sherida
n Road
Pin e Roa d NE
NE Rid
dell Road
KitsapW a
y
W Be lf ai r ValleyRoa d
S WOl d
C liftonR
oad
S u n n y sl o pe R o a d S W
SWLa ke
FloraRo a d
Phillips Road SE
NW
An
derson
Hill
Road
NE
Ho
stm
ark
S
tre
et
NW
Bu
ck
lin
H
ill
Rd
Ch ic o Way N W
NW Finn Hill R
oad
Lo f a ll R d N W
Ol
alla
Val
ley
Ro
ad
SE
SW
Lake
Flo
r aR
oa
d
Se
ab
eck
Hi g
hw
ay
NW
B i gVa
ll e
yR
o ad
NE
Phel ps R
oad N
E
Olympic
View
Roa
d
NW
Lid
er
Roa
dS
W
SELo
ng L a
keRo
adSE
SE
Sou
thw
orth
Drive
Wheaton Way
B r ow ns vi ll e
H i ghw a y N E
SW
W
ildw
oo
d Ro
ad
SW
B
err
y L
ak
e R
d
Co l c
h e s te r Dri v e
E
Go l dCre
ek R oad W
Wy
att
St
ree
t
Eagle
Harbo
rD
rive
Blakely Avenue
Su n r is e D r iv e N E
N M a d is on A ve n ue N E
Fa
irgro
und
s R
oa
d
SE Lake
Boule
vard
Wo o ds R oa d S E
NE
To
tten
Ro
ad
Big
V
alle
yRo
adNE
J. M . Dic kens on Road SW
Vi kin g
Way
NWA¤
NE
Lin
c ol n
Roa
d
Glenwood Road SW
Sidney Road SW
Beac h Driv e E
SE
S
ed
gw
ick
Ro
ad
No ll Ro ad N E
A u g us t a A v e N E
S to t tle m e y er R o a d N E
M i ll e r B a y R oa d N E
C en t r al V al l ey R o a d
C h ic o Wa y N
W
Pi one erW a
yNW
Il la he e R oa d N E
Indianola
RoadNE
NE
Lafa
yet
te A
ve
NE
King
ston
Ro
ad
M ill e
rR
o ad
NE
Hig
h S
cho
ol R
oa
d N
E
Er ic ks e n A ve N E
Ma
nito
uB
eac h
Dr
NE
Bethe l R oad SE
S E Ol a
l l a V a ll e y R oa d
Aå
Az
Aß
A¤
Av
Av
Ay
Ay
A}
Av
A{
A{
A|
A{
?v
AÄ
AÄ
Hansville
Silverdale
Bremerton
Poulsbo
Kingston
BainbridgeIsland
PortOrchard
Se
ab
ec
k
Th
is m
ap
was c
rea
ted
from
exis
ting m
ap
sou
rce
s, n
ot fro
m fie
ld s
urv
eys.
Dete
rmin
atio
n o
f fitne
ss fo
r use lie
s w
ith th
e
use
r, as d
oe
s th
e re
spo
nsib
lity fo
r
un
de
rsta
ndin
g th
e a
ccu
racy a
nd lim
itatio
ns
of th
is m
ap a
nd
da
ta.
Map
Pub
lish
ed
Date
: May 2
9, 2
02
0
Kits
ap C
oun
ty D
ep
artm
ent o
f
Com
mun
ity D
eve
lop
men
t
61
4 D
ivis
ion
Stre
et, M
S-3
6
Po
rt Orc
ha
rd, W
ashin
gto
n 9
836
6
VO
ICE
(36
0) 3
37
-57
77 *
http
s://w
ww
.kits
ap
gov.c
om
ATTACHMENT E - ZONING MAP