hendrik bohne head of sales - large projects asia & middle ... bohne.pdf · head of sales -...

49
Introduction to PV Technology Hendrik Bohne Head of Sales - Large Projects Asia & Middle East 10 December 2009

Upload: lynhu

Post on 17-Feb-2018

215 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

Introduction to PV Technology

Hendrik Bohne

Head of Sales - Large Projects Asia & Middle East

10 December 2009

Page 2: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

2#17-Dec-09

Agenda

| Introduction

| About Conergy

| Why PV?

| How does PV work?

| Introduction to the Technologies

| Motivation for PV and Possible Applications

| BIPV

| Large Scale Plants

| Case Studies

| Kingdom of Saudi Arabia – University Solar Power Pla nt

| US Embassy Geneva – Building Integrated PV

| Conclusions

Page 3: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

3#17-Dec-09

…with 10 years of experience in the photovoltaic bu siness

| 10 years of experiencein financing, project management and installation

| the largest solar parks of| in the world (4 MW, 2002)| in Asia (24 MW, 2008)| in Germany (1,6 MW, 2001)| in Northern Germany (4,2 MW, 2009)

Conergy 1999 - 2009

Close to the customer Strong in sales Experienced

| present in 14 countries on four continents

| sales and service networkclose to the customer

| 10,000 customerssuccessfully served

| 1.25 Gigawattrenewable energy sold

| almost 1 Gigawattsolar modules worldwide sold

| 460 Megawatt installed in solar projects

| founded in Hamburg in 1999

| listed company since 2005

| TecDAX listed since 2005

| € 1.006 billion revenue in 2008

| 1,700 employees

Conergy Key Facts

Conergy is one of Europe‘s leading solar companies…

Page 4: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

4#17-Dec-09

Conergy has a broad competence portfolio in the sol ar sector…

Own production Made in Germany Partnerships with manufacturers

Modules Inverters MountingSystems

Service-products

| Modules| Inverters| Mounting Systems

Projectdevelopment Financing

O&M

Installation

Engin-eering

Solar systems and solar parks Components, kits, services

| for project developers and investors

| for installers in the Conergy network

Page 5: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

5#17-Dec-09

Solar Thermal Solar Water Heater

PV Plants BIPV Solar Cooling

Hybrid System

Biomass

Geothermal

BIPV

PV is one of the available Renewable Energy solutio ns

Page 6: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

6#17-Dec-09

Why PV?

| Fast Construction

| Rapid Engagement

| Business Value

| Easy Project Cost Controlling (needs less components)

| Track record of achieving Cost Savings

| Proven, Reliable Technology

| Expected output is achieved

| Thousands of Installed Deployments

| Flexibility & Modularity

| Size & Space Demands

| Multiple Configurations & Applications

| Solar Plants

| Roof Top Installation

| Building Integrated

| Output Warranties

| Minimal O & M Requirements

| Huge Growth Potential

Page 7: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

7#17-Dec-09

Module price reduction will lead to grid parity by 2015

1

10

1 10 100 1,000 10,000 100,000

Euro/Wp

2

5

Module price in €/Wp vs. cumulated installed capacity[Source: Fraunhofer Institute]

Page 8: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

8#17-Dec-09

Solar Radiation Profile of the Middle East

Middle East

Source: Solarbuzz 2008 European Major PV Markets

Germany

Compared to most other countries, the Middle East h as rich solar resources which underscores the enormous market potential for PV.

Middle East vs. Other Regions

|Insolation rates in Germany range from 900 kWh/m2 per year in the north to 1,250 kWh/m2 per year in the south, averaging 1,075 kWh/m2 per year.

Source: IEA Greenhouse Gas R&D Program, 2003

| Solar radiation in Saudi Arabia varies between a min of 1630 kWh /m2 per yr at Tabuk and max of 2560 kWh/m2 per yr at Bisha with the mean ave at 2060 kWh/m2 per yr.

Source: German Aerospace Center (DLR), 2005

Page 9: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

9#17-Dec-09

How does PV work?

Page 10: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

10#17-Dec-09

Solar PowerSystems

Off-grid PV Systems

Grid-feeding PV Systems

Solar PVPower Plants

Page 11: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

11#17-Dec-09

Photovoltaic

Off-grid Photovoltaic

Grid-feeding Photovoltaic

• Campervan• Calculator battery• Parking Ticket machines• Satellites• Homes and applications far away from the grid

Photovoltaic produced energygets fed into the grid at once.The generators are 1 kWp to > 20 000 kWp big PV arrays

Page 12: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

12#17-Dec-09

Photovoltaic feed in system

Page 13: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

13#17-Dec-09

PV Feed in Systems

Necessary parts are:

| Modules| Inverter| Mounting Structure| DC disconnect| Electricity meter| Cables| AC appliances / Switchgear/ Substations

solar radiation

photovoltaic modules

direct current inverter alternative current public grid

Page 14: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

14#17-Dec-09

ModulesModules

Wafer technology85% market share

Thin-Film technology15 % market share

Other technologies

MonocrystallineEfficiency = 14-19%

Polycrystalline Efficiency = 13-14%

A-SI:H Efficiency = 6 - 9%

CDTeEfficiency = 10 %

CIS Efficiency = 7 - 12%

Page 15: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

15#17-Dec-09

Solar Cells

| Different cell structures with different appearance, transparency and energy efficiency

Monocrystalline Polycrystalline Amorpheus Thin Film

Page 16: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

16#17-Dec-09

PV Modules

| Many cells are combined within one module

| In series and in parallels

| Module build up:

| Aluminium coverage (frame)

| Sealing

| Glass

| EVA (transparent & electrically insulating)

| Cell

| Tedlar-foil (encapsulation)tedlar-foil

cell

EVAglass

sealing

aluminium coverage

Page 17: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

17#17-Dec-09

| Physical effect

| Semiconductors, mostly silicon

| Differently endowed

| Emergence of an electric field

| At incidence of light:

| Electrons swinging

| Positive and negative charges move to other side of the cell; electric voltage evolves

| Tap via metallic electrodes; when connecting a load electricity flows

negative electrode

positive electrode

n-endowed silicon

barrier layer

p-endowed silicon

PV Modules

Page 18: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

18#17-Dec-09

The yield depends on tilt azimuth and declination

2-11Unerschöpfliche Energie von der Sonne

W

SO

Süd

West Ost

NordJährliche Einstrahlung in %

Neigungs-winkel

Beispiel

Beispiel: 30°/45°Südwest/ ≈95%

Page 19: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

19#17-Dec-09

Temperature Effects on Module Types

3-14Photovoltaischer Effekt

Thinfilm is less prone to temperature losses

Cell Temperature is generally higher than ambient temperature!

Page 20: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

20#17-Dec-09

I V curve depending on the intension of the radiati on

3-15Photovoltaischer Effekt

UMPP-Bereich

Modulspannung U in V

Mod

ulst

rom

I in

A

Page 21: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

21#17-Dec-09

Sun movement on different days of the year (norther n hemisphere)

2-4

W

S

N

O

04:00

08:3306:20

21. Dezember

21. September

21. JuniZenit

21. März

Unerschöpfliche Energie von der Sonne

Page 22: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

22#17-Dec-09

What does this mean in numbers?

2-4Unerschöpfliche Energie von der Sonne

Rule of Thumb:

Output I can expect: 1,300 kWh per kWp installed ove r the course of a year

What area do I need: Crystalline Rooftop: 5 – 6 m2/ kWp (flat installation)

Crystalline Freefield: 8 – 13 m2/ kWp (due to shading )

Thinfilm: ~ 30% more area

Loss due to dust: 2-3% during the first one to two w eeks of dust built-up

Water usage: Water is not necessarily needed. Twice a year has proven to be

sufficient. Clean with dust wipers!

Page 23: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

23#17-Dec-09

The attachment of the modules

| Post latch plate systems | Facade hanger

Page 24: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

24#17-Dec-09

The attachment of the modules

| Rooftop Mounting | Free-field Mounting

Page 25: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

25#17-Dec-09

PV Wafer/Cell/Module Manufacturing Video

Page 26: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

26#17-Dec-09

Agenda

| Introduction

| Why PV?

| How does PV work?

| Introduction to the Technologies

| Motivation for PV and Possible Applications

| BIPV

| Large Scale Plants

| Case Studies

| Kingdom of Saudi Arabia – University Solar Power Pla nt

| US Embassy Geneva – Building Integrated PV

| Conclusions

Page 27: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

27#17-Dec-09

BIPV: Where can it be applied?R

oofin

gF

acade

Slopedroofs

Flatroofs

Overheadglazing

Canopies

Curtainwall

Claddingsystem

Sun-shades

Balconies

Page 28: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

28#17-Dec-09

BIPV - Roof Integrated Application (Slates – Tiles – Shingl es)

Page 29: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

29#17-Dec-09

BIPV - Shading Elements

| Sunscreens using translucent modules which are common for office and institutionial buildings

Page 30: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

30#17-Dec-09

BIPV - Facades

| Modules can be integrated as the outer skin

Page 31: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

31#17-Dec-09

Large Scale PV Plants

Page 32: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

32#17-Dec-09

Building Integrated PV Project – Switzerland

│ Location: St. Moritz

│ Start of operation: 2003

│ Output: 23.33 kWp

│ Covered surface: 212 m²

│ Integration type: Hung facade

│ Special modules from Creaglas

Successful implementation of a

PV-System in an extremely

demanding environment.

Page 33: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

33#17-Dec-09

Tracking System Project – Spain

│ Location: Chincilla

│ Start of operation: 2007

│ Output: 3 MWp

│ No of modules: 18,000

│ No of tracking systems: 390

│ Surface covered: 146,400 m²

Conergy SolarOptimus

Tracking System increases

energy yield by 30%.

Page 34: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

34#17-Dec-09

PV Power Plant Project – South Korea

│Location: SinAn

│Start of operation: June 2008

│Output: 18 MWp

│No of modules: 109,000

│Covers electricity needs

of 6,000 homes

The world’s largest solar power

plant with tracking systems.

Page 35: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

35#17-Dec-09

PV Power Plant Project – Spain

│Location: El Calaverón

│Start of operation: September 2008

│Output: 21.2 MWp

│No of modules: 96,000

│Surface covered: 100 hectares

It will produce approximately

40,000 MWh environment-friendly

power annually.

Page 36: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

36#17-Dec-09

PV Plant Project Elements

IntegratorExperience

Output Guarantee

BankTechnology

Radiation

Site

PPA

FiT

SCM

Design

Interest Rate

Cost of Power

Components Quality

PuR

O & MMW Installation

Page 37: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

37#17-Dec-09

Lessons Learned: Key Differentiators & Project Bene fits

Preparation Design Execution Operations

Site

Radiation

Bank Interest Rate

(FiT)

(CoP)

PPA

Integrator Support

Integrator Experience

Design

Technology

Component Quality

Reliability

PUR

SCM

Installation

Project Mgmt

O & M

Output Guarantee

FiT

CoP

Knowhow

Speed

Quality & Reliability

Business Value

Page 38: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

38#17-Dec-09

| On Roof: Agreement with the Owner | On Ground: PV Plant Authorizations

Project Phase Key Success Factors

| Quality of Components/Technology| Proven Track Record of System Integrator and Partners| Optimization of trade-offs among investment costs, completion timing and revenue

maximization | Finance Support/Loans| Attractiveness of Government Policy & Support

| World Class Supply Chain Management| Frame Contracts with Suppliers| Access to 1st class and reliable products

Key Success Factors for Large Scale PV Plants

Site Acquisition

Project Definition

Component Procurement

| Project Management is Critical| Relationship with Partners| Proper Training of Partners and Service Team

PV Plant Construction

Page 39: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

39#17-Dec-09

KSA University Solar PV Power Plant

Page 40: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

40#17-Dec-09

Project Name: KSA University Solar PV Power Plant

| Location: Thuwal, Saudi Arabia

| Project Area: 11,577 m2

| Capacity: 2 MWp

| System Type: 2 MW Roof Top Installation

| Module Type : Monocrystalline PV 215w: 9,306 modules

| Annual Output: 3,280MWh or 330 HH per year

| Other Components:

| Conergy SunTop III Mounting System

| Conergy IPG 280K Inverters

| Conergy Smart Connect Array Junction Box

| Conergy Smart Control DAS

| Construction Period

| January through September 2009

| The University power plant is the First PV facility in Saudi Arabia

Page 41: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

41#17-Dec-09

US Embassy BIPV – Geneva, Switzerland

│ Location: Geneva, Switzerland

│ Output: 120 kWp

│ No of modules: 836 on 995 m² surface

│ 3 Types of Integration:

│ Hung Façade

│ Mounting Frame

│ Flat Roof

Page 42: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

42#17-Dec-09

BIPV US Mission Project, Geneva Switzerland

| Special constructions with several different mounting techniques like sloping roof and flat roof

| 118 KWp (equivalent to the annual energy demand of 20 households)

| Installation Period: Oct 2004 to July 2005

Page 43: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

43#17-Dec-09

Bef

ore A

fter

BIPV US Mission Project, Geneva Switzerland

Page 44: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

44#17-Dec-09

US mission Geneva - 120 kWp integrated solar systems

Page 45: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

45#17-Dec-09

BIPV US Mission Project, Geneva Switzerland

Page 46: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

46#17-Dec-09

BIPV US Mission Project, Geneva Switzerland

Page 47: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

47#17-Dec-09

Agenda

| Introduction

| Why PV?

| How does PV work?

| Introduction to the Technologies

| Motivation for PV and Possible Applications

| BIPV

| Large Scale Plants

| Case Studies

| Kingdom of Saudi Arabia – University Solar Power Pla nt

| US Embassy Geneva – Building Integrated PV

| Conclusions

Page 48: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

48#17-Dec-09

l PV is a proven technology with a strong business outlook and sound

fundamentals.

l Grid-connect PV power plants can & will become a key component in the long

term energy mix

l The real cost for energy are not the ones you see on your electricity bill – in the

region we do not compare “apples to apples”

l Output of systems is impacted by dust and heat in the region but output is still

higher than those of todays leading Solar Countries

l Architects, Developers & Investors: Take into accou nt the O & M of PV

systems

Key Takeaways:

Page 49: Hendrik Bohne Head of Sales - Large Projects Asia & Middle ... Bohne.pdf · Head of Sales - Large Projects Asia & Middle East 10 December 2009. 17-Dec-09 #2 ... (encapsulation) tedlar-foil

49#17-Dec-09

THANK YOU FOR YOUR ATTENTION

OUR WORLD IS FULL OF ENERGY.