hera status hera-experiments coordination meeting, may 8, 2002 f. willeke, desy-mhe

15
HERA-Experiments Coordina tion, 8.5.2002 HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE e-Ring p-Ring Luminosity Operations Backgrounds Proposed Schedule

Upload: tass

Post on 16-Jan-2016

37 views

Category:

Documents


1 download

DESCRIPTION

HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE. e-Ring p-Ring Luminosity Operations Backgrounds Proposed Schedule. Status of the e-Ring. Beam Optics seems to be ok after fixing a quadrupole with a winding short - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

HERA StatusHERA-Experiments Coordination Meeting, May 8, 2002

F. Willeke, DESY-MHE

e-Ring

p-Ring

Luminosity Operations

Backgrounds

Proposed Schedule

Page 2: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Status of the e-Ring• Beam Optics seems to be ok after fixing a

quadrupole with a winding short

• Dynamic Aperture at 12GeV more than sufficient at 12GeV

• Injection efficiency ok for luminosity operation (though still not 100% as should be expected)

• Synchro-Betatron Resonances stronger than before (need to be avoided to avoid beam loss, ok)

• Luminosity optics tested at 12GeV without solenoid ok• Polarization tunes under luminosity conditions still a

problem under investigation

-0.5

-0.3

-0.1

0.1

0.3

0.5

0.7

0.9

1.1

1.3

1.5

0 1000 2000 3000 4000 5000 6000

Page 3: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

e-Ring High Intensity Commissioning

• Largest beam current so far : 31mA @12GeV22mA @27.5GeV

limited by vacuum conditions NR at present• RF and Feedback systems: No challenging beam currents yet

e-Beam Currents in April, full scale is 33mA

Page 4: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Getter Pumps NR6 & SR6 4 weeks in April

HP 6 SR

HP6 NR

HP6NR

HP6SR

Ie

E=27.5GeV

Sunday May 4, 13:00he-Vacuum Conditioning Sensitive Spot SR/ NR 6 m (lumi tagger position) Pressure increase with beam current at 12GeV (HOML) SR: slow improvement of base pressure from 1.2 10-9mbar to 6 10-10 mbar NR: base pressure getting worse 1.6 10-8mbar to 3.2 10-8 mbar

Page 5: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Summary e-Ring

• Machine conditions good enough for initial Luminosity operation with up to 20mA

• Vacuum problem cumbersome

• Beam lifetime at 27.5GeV still requires attention

Page 6: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Proton Ring Status

•Beam Optics at 40 GeV and 920GeV seems ok after a bug in saturation and remanence treatment of GB quadrupoles was discovered and fixed (ok still need to be confirmed by optics check)

•There is some non-understood breakdown of lifetime at 64GeV still to be studied

•Beam Lifetime and Injection Efficiency ok (90mA should be possible)

•No high intensity test of RF systems (weak spot)

• Beam tends to be more unstable at 40GeV than before (long.)

•Highest Beam Current so fas at 920GeV:45mA

Summary: Satisfactory for Luminosity operations

Page 7: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Operations

Horizontal Movement of the magnet bridge NL 7m horizontally over 7days (blue, magnet energy in red), scale is 0.2mm

Magnets on bridges and in detector move under magnetic forces and due to thermal stresses:

Handling of these during ramp no problem (after some fixing of ZEUS GO)

all this can be handled well by operational procedures

Beam Orbit control and orbit reproduction will be essential for efficient luminosity operation

Improvement of BPM system and software development for automatic orbit control well underway

Page 8: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Luminosity• We did not observe limitations due to beam beam effect yet (though intensity is still low, protons ~60% of design, Positrons ~65% of

the design)

• Measured Specific Luminosities

Lspec=(0.9-1.4) x 1030cm-2sec-1mA-2 ,

smaller than expected from measurement of beam optics and emittances (expect at least 1.4)

No luminosity scans 2002 yet

• Luminosity procedure still difficult (background control) and not (yet) well enough supported by software

TOO DIFFICULT FOR BKR TECHNICAL SHIFT CREW

Page 9: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Backgrounds

• Synchrotron Radiation backgrounds significantly reduced by the new absorbers and collimators

• Existance prove in case of H1:

• For low e+currents only, H1 background conditions like in y2000 achieved (ZEUS: factor of 5 missing)

• Beam based alignment converges and starts to be useful in background optimization procedure

Beam Orbit at 27.5GeV in IR Quadrupoles South after BBA

-1

-0.5

0

0.5

1

QL16 SL QL14 SL GJSL GISL: GO SL GG SR GI5 SR GI7 SR GJ SR QL14SR QL16SROrbi

t Dis

t. fro

m M

agn.

Axi

s /m

m

Beam Orbit at 27.5GeV in IR Quadrupoles South after BBA

-1

-0.5

0

0.5

1

QL16 SL QL14 SL GJSL GISL: GO SL GG SR GI5 SR GI7 SR GJ SR QL14SR QL16SROrbi

t Dis

t. fro

m M

agn.

Axi

s /m

m

Beam Orbit at 27.5GeV in IR Quadrupoles North after BBA

-4-3-2-101234

QL16 NL QL14 NL GJ NL GI NL: GO NL GG NR GI5 NR GI7 NR GJ NR QL14 NR QL16 NR

Beam Orbit at 27.5GeV in IR Quadrupoles North after BBA

-4-3-2-101234

QL16 NL QL14 NL GJ NL GI NL: GO NL GG NR GI5 NR GI7 NR GJ NR QL14 NR QL16 NR

Page 10: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Technical Readiness of HERA• Progress very much slowed down by

numerous technical failures: Since 11.4., more than 120 severe failures which caused loss of beam and delayed injection for at least an hour each

• ALL HARDWARE SYSTEMS DESY has not relearned yet how to keep

a machine like HERA running

Page 11: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

New Pressure Regulators(used in RF Cavitiy cooling systems)

Springs:

Probably have to

Replace alle the springs?

Under investigation

Page 12: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Manpower

Help from experiments is highly appreciated and the taskforces supported by accelerator physicists help to solved problems more quickly:

However there are not enough experienced machinephysicists and engineers working in the control room to make it all work!

Page 13: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Frequent Trips of cold VG/VO in H1 and ZEUS:Does detector field regulation talk to quench protection via

Magnetic Coupling?

Page 14: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

Proposed Procedure• Run without interruption through summer and fall to get decent

luminosity and background conditions with e+, thus give up the switching to e- in June

• Switch to electron in January in each case (if can‘t make e+ work until then, we should try to do a better job with e)

• Install the H1 VFPS in January-February• Introduce a maintenance day at June 4• Extend September maintenance day to 3day 27-29 of August to do service on 110keV switches (HEW)• Shift work on PETRA heat exchanger (no protons) to winter shut

down• We need a steady increase of intensity to solve the backgrounds at

high intensity

Page 15: HERA Status HERA-Experiments Coordination Meeting, May 8, 2002 F. Willeke, DESY-MHE

HERA-Experiments Coordination, 8.5.2002

January February March April

H1VPS

Switch to e- ?