high security group presentation 6.10.08

14
“Bringing Physical & Electronic solutions together” 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Upload: richard-holmes

Post on 10-Feb-2017

486 views

Category:

Business


0 download

TRANSCRIPT

Page 1: High Security Group Presentation 6.10.08

“Bringing Physical & Electronic solutions together”

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Page 2: High Security Group Presentation 6.10.08

National Fire & Security ConvergenceSpecialists

• High Security Physical Ltd• (Manufacturing Plant in Birmingham)• High Security Ltd• Modular Doors Ltd• Total Fire Services Ltd 25 fire risk assessors• STAR LTD BS 7858 Vetting & Recruitment Company• 24 hour engineering central service & alarm response

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Page 3: High Security Group Presentation 6.10.08

Security ConvergenceSpecialists

• Bespoke Banking ATM protection physical attacks• Retail Loss prevention Electronic tagging IP CCTV• Commercial & Industrial Integrated systems• Personnel vetting & accreditation business

consultancy• Fire Risk assessments• Fire alarm design Installation0210/2008 High Security group Ltd Bringing Physical &

Electronic Security Together

Page 4: High Security Group Presentation 6.10.08

High Security Physical Ltd• Perimeter guard (electronic & physical protection)• High Security Perimeter Fencing• High Security Steel doors• High Security pods• Roller shutters• High speed doors• Grills/bars• Aluminium window shutters• Insulated roller garage doors

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Page 5: High Security Group Presentation 6.10.08

High Security Ltd

• Project Management• Monitored Intruder alarms• IP Digital CCTV Solutions• Access Control• Fire Alarms• Fire Extinguishing services• Door entry systems

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Page 6: High Security Group Presentation 6.10.08

High Security Ltd

• Fire Risk Assessment• Fire Alarm Design L1-L5• Fire Alarm Installation• Supply & Commission• Fire Alarm Maintenance• Fire Extinguishing services• Emergency Lighting Design & Installation & Maintenance

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Page 7: High Security Group Presentation 6.10.08

High Security Ltd

• Turn Key Security Solutions• Access Control• CCTV• Intruder• Door Entry Systems

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Page 8: High Security Group Presentation 6.10.08

Risk Assessment

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

SYSTEM DESIGN - RISK ASSESSMENT

PREMISES ACTIVITIESCONTENTS OF HOME/BUSINESS

Q Do you consider your home/business to be classed as a target for thieves? YES

TYPE OF STOCK/PROPERTY

Q Is your stock/property easy to dispose? YES

Q Does your stock/property pose an attraction to a burglar? YES

BULK/SIZE OF STOCK/PROPERTY

Q Is the stock/property easy to Remove/Transport? YES

Q Is there easy Access to premises (to aid removal of stock/property)? NO

STORAGE/CONTROL

Q Are High Value Goods quarantined? YES

Q Are High Value Goods restricted to certain personnel? YES

THEFT HISTORY

Q Have you been broken into before? YES

1SYSTEM DESIGN GRADE - based on risk assessment above 2

PD 6662 En 50131

Page 9: High Security Group Presentation 6.10.08

• Q Maximum probable value in a single loss? • • Q Daily Turnover of business? • • Q How long will it take to restock/resume normality? • • Projected loss of earnings until normal operation • • Q Cost Of Insurance Excess • • Q Cost By Vandalism Of Contents • • Total Cost of Burglary

• SYSTEM DESIGN GRADE - based on cost of loss• 2

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

CONSEQUENTIAL COST OF LOSS -

Page 10: High Security Group Presentation 6.10.08

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

Bigger Picture -LOCALITY

High crime risk area

Proximity of adjacent occupied premises

Presence of adjacent building to aid attack

Speed & quality of response to IAS

EXISTING SECURITY

Quality & extent of physical devices

Quality & extent of existing IAS

THEFT HISTORY

Methods of attack in previous break-ins

LOCAL LEGISLATION/REGULATION

Fire/Safety Requirements that may affect IAS design

Building Construction that may affect IAS design

SECURITY ENVIRONMENT

Location of Building - Rural or Urban area

Page 11: High Security Group Presentation 6.10.08

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

TIME -

Response

Police 20 MinutesKey Holder 20 MinutesManned Security 5 MinutesRemote Viewing 2 minutes + police/key-holderMSL in relation to the above

(Maximum single loss)

Page 12: High Security Group Presentation 6.10.08

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

TIME DELAY vs. LOSS -

• Physical Perimeter 2 minutes no alarm• Physical openings 30 seconds to 10 minutes• LPCB • Electronic detection ACPO delay

Page 13: High Security Group Presentation 6.10.08

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

PD6662 Grade 4 Security

Delay & DeterPhysical Perimeter 8 minutes with alarm• Physical openings 8 minutes with alarm• LPCB ,NSI, ACPO, SSAIB,Insurance Companies• Physical detection systems

Page 14: High Security Group Presentation 6.10.08

0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together

PD6662 Grade 4 Security

Integrated Electronic & physical products