Page 1: High-Tech vs. Old Infrastruction

HIGH-TECH - OLD INFRASTRUCTUREInstalling a state-of-the-art Robotic OR suite in a 60 year old hospital

Page 2: High-Tech vs. Old Infrastruction

AGENDA

1 Goals & Challenges

2 Design Process

3 Best Value Contract Award

4 Team Building/OAC Meetings

5 Working in a Live OR

6 Shutdowns

7 MEP Coordination

8 Summary

9 Questions

Page 3: High-Tech vs. Old Infrastruction

PRESENTERS▪ Tom Peterson, Architect The Design Partnership

▪ Sean Wilkins Ray L. Hellwig Mechanical

▪ Craig Moore Ray L. Hellwig Mechanical

▪ Rick Schaffel, Contractor TCB Builders, Inc.

▪ Bruce Mace, Director UCSF Medical Center Facilities

Page 4: High-Tech vs. Old Infrastruction

DESIGN

Page 5: High-Tech vs. Old Infrastruction

Existing infrastructure

New OR ceiling 9” below beams

GOALS & CHALLENGES

1

Goals

▪ Create a state-of-the-art robotic OR

▪ A model for the future at UCSF

▪ On time and on budget

Challenges

▪ Don’t disrupt existing infrastructure

▪ 12’-0” between floors, 10’-2” to bottom of beams

▪ Raise ceilings to 9’-6”

▪ Seismic upgrades required

▪ Integration of all systems

Page 6: High-Tech vs. Old Infrastruction

DESIGN PROCESS

Phase 1

▪ Replace HVAC

▪ Reorganize storage

2

Page 7: High-Tech vs. Old Infrastruction

Phase 2

▪ Built 600 sf/ft robotic OR room

▪ Reconfigure storage areas

▪ Added scrub room, & soiled holding

DESIGN PROCESS

Page 8: High-Tech vs. Old Infrastruction

DESIGN PROCESS

Phase 3

▪ Rebuilt OR 1 (Cysto Room)

▪ Demo and replace main desk

▪ New staff toilets

▪ Move corridor & rebuild storage

Page 9: High-Tech vs. Old Infrastruction

DESIGN PROCESS

Phase 4

▪ Finished two offices and removed barriers

Page 10: High-Tech vs. Old Infrastruction

building consensus

LISTEN TO EVERY USERTOUR SIMILAR FACILITIES

Page 11: High-Tech vs. Old Infrastruction

11

existing conditions

EXISTING OR 1

Page 12: High-Tech vs. Old Infrastruction

12

existing conditions

EXISTING FRONT DESK SPACEEXISTING OR 11 SPACE

Page 13: High-Tech vs. Old Infrastruction

laser scanning to validate the model

EXISTING MECHANICAL SYSTEMS

Page 14: High-Tech vs. Old Infrastruction

med modelingEXISTING OR SUITECase carts in corridorsStorage in all empty spacesPicking done in the OR

PROPOSED OR SUITEAdditional robotic OR

Redesigned central corewith modular storage system

Added storage on floor above

MedModeling simulated operations

Page 15: High-Tech vs. Old Infrastruction

15

med modeling

Page 16: High-Tech vs. Old Infrastruction

16Kavinsky Consulting, LLC 10/31/07 - 16

Number of Times each Preference Card Item was Used between 5/1/06 – 4/30/07

■ 776 items picked were never used during the year and should be eliminated from inventory.

■ 2467 items picked were only used 1-10 times / year and should be evaluated for staying in the inventory.

■ All preference cards need to be evaluated and updated based upon item usage data and physician input.

Number of Instrument and Supply Items Number of Times Items Used Breast GS GU Gyn GynOnc OHNS Ortho Pla RadOnc Other Total

0 40 113 83 107 91 99 103 72 3 65 776 1 - 10 98 385 344 241 287 255 480 131 30 216 2467

11 - 25 19 69 81 44 49 49 37 18 7 30 403 26 - 50 18 54 49 36 29 26 38 11 3 15 279

> 50 41 121 129 43 37 48 67 8 32 20 546

Total 216 742 686 471 493 477 725 240 75 346 4471

med modeling

Page 17: High-Tech vs. Old Infrastruction

central core remodeling

BEFORE

Page 18: High-Tech vs. Old Infrastruction

central core remodeling

AFTER

Page 19: High-Tech vs. Old Infrastruction

3d modeling

Page 20: High-Tech vs. Old Infrastruction

CONSTRUCTION

Page 21: High-Tech vs. Old Infrastruction

▪ Prequalification

▪ Bid Job – Bids Remain Sealed

▪ Submit Best Value Questionnaire Response Package – With MEP

▪ University to evaluate and score best value packages

▪ Sealed bids are opened

▪ Project is awarded on lowest dollar amount per point

BEST VALUE CONTRACT AWARD

3

Page 22: High-Tech vs. Old Infrastruction

best value results

Page 23: High-Tech vs. Old Infrastruction

TEAM BUILDING/OAC MEETINGS

▪ Team ownerarchitects

engineerscontractorkey subs

facilitiesvendorsmedical professionals medical support staff

▪ Team creation of schedules

▪ Real time meeting minutes

4

Page 24: High-Tech vs. Old Infrastruction

WORKING IN A LIVE OR

5

▪ Dust/infection control

▪ Noise mitigation

▪ Night and weekend work

▪ Hourly schedules

Page 25: High-Tech vs. Old Infrastruction

noise mitigation

WORKING DIRECTLY WITH OR STAFF

Page 26: High-Tech vs. Old Infrastruction

night and weekend work

WARMING CABINET INSTALLATION

Page 27: High-Tech vs. Old Infrastruction

27

hourly schedules

Page 28: High-Tech vs. Old Infrastruction

abatement conditions for demo

Page 29: High-Tech vs. Old Infrastruction

field verification/existing conditions

Page 30: High-Tech vs. Old Infrastruction

SHUTDOWNS

6

▪ 187 shutdown requests

▪ Communication (communication, communication, communication)

▪ Investigation, research and field visits

▪ Isolation and verification

▪ MOP – develop/review & verify/sign off

▪ Perform flawlessly

▪ SF-2 – shutdown and replacement

that which does not kill us… only makes us stronger

Page 31: High-Tech vs. Old Infrastruction

31

187 shutdown requestsNEW OLYMPIC AND WORLD RECORD!

Page 32: High-Tech vs. Old Infrastruction

32

shutdown requests

▪ Project number & descriptor

▪ Full contacts & emergency

▪ Request reasoning

▪ Type of request

▪ Location and description

▪ Attached photo documentation

▪ Estimated duration

▪ Target date & time

▪ Blue copy (internal)

▪ Scheduling (internal)

BOTH RECORDS STILL STANDING…

Page 33: High-Tech vs. Old Infrastruction

THE MOST IMPORTANT TOOL ON YOUR BELTcommunication

Page 34: High-Tech vs. Old Infrastruction

investigation60 YEARS, 2 BUILDINGS AND A LOT OF HISTORY

Page 35: High-Tech vs. Old Infrastruction

So tell me, punk… do you feel lucky?

investigation

Page 36: High-Tech vs. Old Infrastruction

isolation & verificationEVER SEVERED A LIVE FEED TO AN INTERVENTIONAL RADIOLOGY PROCEDURE?

Page 37: High-Tech vs. Old Infrastruction

37

method of proceduresINEXPENSIVE INSURANCE TO PROTECT EVERYTHING

Page 38: High-Tech vs. Old Infrastruction

perform flawlessly

▪ Do your homework thoroughly

▪ Don’t skip steps

▪ Communicate the plan with everyone and their mom

▪ Contingencies and redundancies as back-up

▪ Enforce the rules – prevent “creep”

▪ Safety is no accident

▪ Weekends & night time are your friends

▪ Communicate some more

▪ Trust, but verify

▪ In spite of all this – be flexible within the safety of your larger plan

PROPER PREPARATION PERMITS PERFECT PERFORMANCE

Page 39: High-Tech vs. Old Infrastruction

sf-2 shutdownRIPPING THE GUTS OUT OF A LIVING OR SUITE OVER THE WEEKEND

Page 40: High-Tech vs. Old Infrastruction

MEP COORDINATION

▪ Conventional drawing process

▪ BIM drawing process

▪ Clash detection

▪ BIM and facilities management

▪ BIM object information

▪ Importance of BIM

▪ Benefits of BIM for Facility Managers

7

Page 41: High-Tech vs. Old Infrastruction

▪ Created in 2D, on paper

▪ Multiple drawings required to represent 3D views

▪ Redundancy and open to errors

conventional drawing process

Page 42: High-Tech vs. Old Infrastruction

▪ Building and objects drawn in 2D and 3D

▪ 3D model easier to interpret and visualize

▪ Information attached to objects in the model

▪ 4D BIM – project scheduling incorporated into model

bim drawing process

Page 43: High-Tech vs. Old Infrastruction

clash detection

Page 44: High-Tech vs. Old Infrastruction

44

clash detection

MODELED

Page 45: High-Tech vs. Old Infrastruction

clash detection

BUILT

Page 46: High-Tech vs. Old Infrastruction

bim and facilities management

OR1

Page 47: High-Tech vs. Old Infrastruction

OR11

bim and facilities management

OR1

Page 48: High-Tech vs. Old Infrastruction

bim object information

Page 49: High-Tech vs. Old Infrastruction

importance of bim

Page 50: High-Tech vs. Old Infrastruction

importance of bim

Page 51: High-Tech vs. Old Infrastruction

benefits of bim for facility managers

▪ Improved space management

▪ Efficient use of energy

▪ Streamlined preventive maintenance

▪ Economical retrofits and renovations

▪ Enhanced lifecycle management

Page 52: High-Tech vs. Old Infrastruction

SUMMARY

8

▪ BIM works – even for remodels

▪ Have a contingency plan

▪ Worked as a cohesive team

▪ Maintained communication and sensitivity

▪ Project finished ahead of schedule

▪ Project was under budget

Page 53: High-Tech vs. Old Infrastruction