high voltage esp systems - sdec · high voltage esp systems. ebv-159-01 what is a high voltage esp...

15
EBV-159-01 Aðalsteinn Möller R&D Manager District Heating Sustainable District Energy Conference 2019 High Voltage ESP Systems

Upload: others

Post on 20-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

  • EB

    V-1

    59-0

    1

    Aðalsteinn Möller R&D Manager District HeatingSustainable District Energy Conference 2019

    High Voltage ESP Systems

  • EB

    V-1

    59-0

    1

    What is a High Voltage ESP System

    • Centrifugal pump for deep well installation

    • Installation depht up to 3000 m

    • Standard Temperature rating 160°C

    • Motor voltage 1000-4000V

    Electrical Submersible Pump System

  • EB

    V-1

    59-0

    1

    Deep well gauge

    Electrical motor

    Motor main cable

    Protector(s)

    Pump intake

    Discharge head

    Variable speed drive

    Well top

    TransformerPLC

    Multistage centrifugal pump

    Production tubing

    3 phase choke

    From Top to Bottom

    Or Bottom to Top…

  • EB

    V-1

    59-0

    1

    Surface Equipment

    400V

    50 Hz

    VSD

    400V

    20-60 Hz1000-4000V

    20-60 Hz

    3 phase choke

    I/O signal

    Transformer

    PLC

    I/O signal To district heating system

    Wellhead

    Surface crossover

  • EB

    V-1

    59-0

    1

    Downhole EquipmentMotor

    • AC type

    • 3 phase

    • 2 poles

    • Squirrel cage

    induction motor

    • Oil filled

  • EB

    V-1

    59-0

    1

    • Labryrinth type

    • Bag type

    • Axial thrust bearing

    • Oil filled

    • Accumulator for

    thermal expansion of

    the motor oil

    Downhole EquipmentProtector

  • EB

    V-1

    59-0

    1

    • Cenrifugal • Multistage

    Downhole EquipmentPump

  • EB

    V-1

    59-0

    1

    • Flat type

    • Round type

    • EPDM insulation

    • Galvanized armour

    • Monel armour

    • Diameter 30-50mm

    Downhole EquipmentCable

  • EB

    V-1

    59-0

    1

    • Downhole temperature

    • Suction pressure

    • Discharge pressure

    • Current leakage

    • Motor winding temperature

    • Motor bearing vibration

    Downhole EquipmentGauge

  • EB

    V-1

    59-0

    1

    Monitoring of reservoir and downhole equipment

  • EB

    V-1

    59-0

    1

    Monitoring of reservoir and downhole equipment

  • EB

    V-1

    59-0

    1

    Monitoring of reservoir and downhole equipment

  • EB

    V-1

    59-0

    1

    ESP program

    LL-06BA-01

    HS-08

    HS-09RG-20

    RV-41

    2018 LL-06 98°C

    2019 BA-01 125°C

    RV-41 97°C

    HS-08 180°C

    RG-20 130°C

    2020 HS-09 180°C

    LWN-04 90°C

    4 wells capital area

    2021 5 wells capital area

    2022 5-10 wells capital area

  • EB

    V-1

    59-0

    1

    Why ESP for geothermal?

    • Higher temperature

    • Greater depth

    • Higher flow rate

    • Increased monitoring

    • Optimizing production supporting sustainable reservoir utilization

    • Shorter installation time

    • Improved efficiency

    • Smart well control

    • Less investment cost for new wells

  • EB

    V-1

    59-0

    1

    Thank you for your attention