highland main line railway a9 - transport …...hotel westminster house 122 larch house barony house...

7
251 to 271 207 to 227 Aqueduct 183 181 273 to 293 185 to 205 155 to 175 229 to 249 177 179 El Sub Sta 153 MACKINTOSH ROAD 147 93 69 17 2 El Sub Sta 125 100 Heli-Pad 73 27.0m Posts Centre Community 16 1 FB A 9 3 66 1 to 21 38 44 39 23 to 43 52 27 2b 31 110 25 90 2 120 FB CHURCHILL ROAD ROAD 107 41 68 2c 40 10 13 1 78 2a 20 98 16 50 23 41 ASHTON Cairn (re-erected) 47 STRATTON ROAD El Sub Sta 67 1 51 109 31 112 75 2 11 23 11 CHATTAN AVENUE 59 19 61 92 91 28 15 TCB 27.2m 81 36 123 30 95 33 145 26 7 9 22 1 11 24 12 30 28 24 44 46 ASHTON ROAD CRESCENT El Sub Sta Posts 49 65 71 63 avall ment ntre Pond El Sub Sta Stoneyfield MP .50 Hotel House Inverness Retail and Business Park 1 Cowan House El Sub Sta HIGHLANDER WAY John D Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward Bdy Pond FB FB El Sub Sta Play Area FB For continuation see Figure 9.5b For continuation see Figure 9.5e 200 100 0 0 200 100 0 0 200 100 0 0 200 100 0 0 a b c e d f g Mixed Woodland Scrub Species Rich Grassland Individual Heavy Standard Trees Wet Grassland Mix A Proposed Scheme (DMRB Stage 3 Design) SuDS Wetlands B Bat Mitigation Area (woodland to be retained) for provision of boxes Landscape and Ecological Mitigation Proposals Ecological and Landscape Planting Proposals Ecological Planting Proposals Landscape Planting Proposals Cross Section Locations (see Figure 9.6) Visibility Splay Mix Dry Mammal Underpass Culvert with mammal provision Existing Vegetation to be Retained (inside draft CPO boundary and Scottish Ministers Land) Hedgerow Individual Feathered Trees Mammal Resistant Fencing Riparian Woodland A96 Dualling Inverness to Nairn (including Nairn Bypass) Scheme Proposals Consented Development Under Construction (as of April 2019) 95 Bothwell Street, Glasgow, G2 7HX, UK Tel:+44(0)141 243 8000 www.jacobs.com N A9/A96 Inshes to Smithton Figure 9.5a Sheet 1 of 7 Drawing Status Drawing number Scale BIM No. Jacobs No. Drawing title DO NOT SCALE Rev Project Client © Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in the document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party. C00 1:2,500 @ A3 B2103501 Figure 9.5a Legend © Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. INVERNESS INVERNESS CAMPUS A9 HIGHLAND MAIN LINE RAILWAY C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC Rev. Date Rev. Purpose of revision Orig/Dwn Check'd Apprv'd Rev'd DMRB Stage 3 EIAR Landscape and Ecological Mitigation 50 0 metres 100 200 300 400 500 A9-A96IS-JAC-EGN-XXX-FG-EN-0906 Legend Mixed woodland planting to replace existing vegetation lost due to the A9 southbound lane gain/drop. Existing vegetation to be retained where possible A - APPROVED AS STAGE COMPLETE

Upload: others

Post on 23-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIGHLAND MAIN LINE RAILWAY A9 - Transport …...Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward

251 to 271

207 to 227

Aqueduct183181

273 to 293185 to 205

155 to 175 229 to 249177179

ElSub Sta

153 M

AC

KIN

TOS

H R

OA

D147

93

69

17

2

El Sub Sta

125

100

Heli-Pad

7327.0m

Posts

Centre

Community

16

1

FB

A 9

3

66

1 to 21

38 44

39

23 to 43

52

27

2b

31

110

25

90

2

120

FB

CHURCHILL ROAD

ROAD

107

41

68

2c

40

10

13

1

78

2a

20

98

16

50

23

41

ASHTON

Cairn(re-erected)

47

STR

ATTO

N R

OAD

El Sub Sta

67

1

51

109

31

112

75

2

11

23

11

CHAT

TAN

AVEN

UE

59

19

61

92

9128

15

TCB27.2m81

36

123

30

95

33

145

26

7

9

22

1

11

24

12

30

2824

44

46

ASHTON

ROAD

CR

ESC

ENT

ElSub Sta

Posts

49

65

71

63

AS

HTO

N

Shenavall

Child Development

Centre

Pond

El Sub Sta

Stoneyfield

MP .50

Hotel

House

Inverness Retailand

Business Park

1

Cowa

n Ho

use

El Sub Sta

HIG

HLAN

DER

WAY

John

Dew

ar B

uild

ing

Hotel

Wes

tmins

ter H

ouse

122

Larch House

Barony House

Darach House

LB BusinessCentre

Stoneyfield

Willow House

Hazel House

Ward Bdy

Ward Bdy

Pond

FB

FB

El Sub Sta

Play Area

FB

For continuation seeFigure 9.5b

For c

ontin

uatio

n se

eFi

gure

9.5

e

200

100

0

0

200

100

0

0

200

100

0

0

200

100

0

0

200

100

0

0

a

b c

ed

f

g

Legend

Mixed Woodland

Scrub

Species Rich Grassland

Individual Heavy Standard Trees

Wet Grassland Mix

A

Proposed Scheme (DMRB Stage 3 Design)

SuDS Wetlands

B

Bat Mitigation Area (woodland to beretained) for provision of boxes

Landscape and Ecological Mitigation Proposals

Ecological and Landscape Planting Proposals

Ecological Planting Proposals

Landscape Planting Proposals

Cross Section Locations (see Figure 9.6)

Visibility Splay Mix

Dry Mammal Underpass

Culvert with mammal provision

Existing Vegetation to be Retained (inside draft

CPO boundary and Scottish Ministers Land)

Hedgerow

Individual Feathered Trees

Mammal Resistant Fencing

Riparian Woodland

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals

Consented Development Under Construction(as of April 2019)

95 Bothwell Street, Glasgow, G2 7HX, UKTel:+44(0)141 243 8000

www.jacobs.com

N

A9/A96 Inshes to Smithton

Figure 9.5a

Sheet 1 of 7

Drawing Status

Drawing number

Scale

BIM No.Jacobs No.

Drawing title

DO NOT SCALE

Rev

Project

Client

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in thedocument are the property of Jacobs. Use or copying of this document in whole or in partwithout the written permission of Jacobs constitutes an infringement of copyright. Limitation:This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, andis subject to, and issued in accordance with, the provisions of the contract between Jacobsand the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of,any use of, or reliance upon, this drawing by any third party.

C00

1:2,500 @ A3

B2103501

Figure 9.5a

Legend

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668.

INVERNESS

INVERNESS CAMPUS

A9

HIGHLAND MAIN LINE RAILWAY

C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC

Rev. DateRev. Purpose of revision Orig/Dwn Check'd Apprv'dRev'd

DMRB Stage 3 EIAR

Landscape and Ecological Mitigation

500 metres100 200 300 400 500

A9-A96IS-JAC-EGN-XXX-FG-EN-0906

Legend

Mixed woodland planting to replace

existing vegetation lost due to the A9

southbound lane gain/drop. Existing

vegetation to be retained where possible

A - APPROVED AS STAGE COMPLETE

Page 2: HIGHLAND MAIN LINE RAILWAY A9 - Transport …...Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward

Urquhart

SIR W

ALTER SCOTT D

RIVE

79

Motel

House

Torridon House

Kintail House

The Green House

PH

Lay-by

Posts

28.6m

L Twr

Nevis House

Beechwood House

Assynt House

El Sub Sta

Sta

PsPs

71

Tanks

El Sub

Path

Cairngorm House

House

INSHES

Affric

Issues

73

BEECHWOOD BUSINESS PARK

7a

Drain

Bernera

Posts

(re-erected)

28.6m

6a

Inshes

7

36.6m

28.1m

Smithy

Mar House

A 9

28.3m

31.0m

6

B 80

82

B 8082

B 80

82

Tks

El Sub Sta

7b

Ward Bdy

Thistle House

Pond

Pond

El Sub Sta

FB

El Sub Sta

El Sub Sta

B9006

EtiveHouse

Track

For continuation seeFigure 9.5a

For c

ontin

uatio

n se

eFi

gure

9.5

c

200

100

0

200

100

0

100

912

900

200

229

800

700

600

500

400

300

200

100

0

200

100

0

100

912

900

200

229

800

700

600

500

400

300

200

100

0

200

100

0

100

912

900

200

229

800

700

600

500

400

300

0

900

700

600

500

200

100

200

100

0

100

912

200

229

800

400

300

0

900

700

600

500

200

100

200

100

0

0

100

912

200

229

800

400

300

A

A

B

a

b c

ed

f

g

Legend

Mixed Woodland

Scrub

Species Rich Grassland

Individual Heavy Standard Trees

Wet Grassland Mix

A

Proposed Scheme (DMRB Stage 3 Design)

SuDS Wetlands

B

Bat Mitigation Area (woodland to beretained) for provision of boxes

Landscape and Ecological Mitigation Proposals

Ecological and Landscape Planting Proposals

Ecological Planting Proposals

Landscape Planting Proposals

Cross Section Locations (see Figure 9.6)

Visibility Splay Mix

Dry Mammal Underpass

Culvert with mammal provision

Existing Vegetation to be Retained (inside draft

CPO boundary and Scottish Ministers Land)

Hedgerow

Individual Feathered Trees

Mammal Resistant Fencing

Riparian Woodland

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals

Consented Development Under Construction(as of April 2019)

N

A9/A96 Inshes to Smithton

Figure 9.5b

Sheet 2 of 7

Drawing Status

Drawing number

Scale

BIM No.Jacobs No.

Drawing title

DO NOT SCALE

Rev

Project

Client

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in thedocument are the property of Jacobs. Use or copying of this document in whole or in partwithout the written permission of Jacobs constitutes an infringement of copyright. Limitation:This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, andis subject to, and issued in accordance with, the provisions of the contract between Jacobsand the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of,any use of, or reliance upon, this drawing by any third party.

1:2,500 @ A3

B2103501

Figure 9.5b

Legend

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668.

RAIGMORE

INVERNESS CAMPUS

A9

INSHES

Mixed woodland planting to replace existing

vegetation lost due to the A9 southbound

lane gain/drop and to screen traffic

movement from Inverness Campus. Existing

vegetation to be retained where possible

Blocks of mixed woodland to replace existing

vegetation lost due to the A9 southbound

lane gain/drop and screen traffic movement

on the A9 from Inverness Campus

95 Bothwell Street, Glasgow, G2 7HX, UKTel:+44(0)141 243 8000

www.jacobs.com

Rev. DateRev. Orig/Dwn Check'd Apprv'dRev'd

DMRB Stage 3 EIAR

Landscape and Ecological Mitigation

500 metres100 200 300 400 500

A9-A96IS-JAC-EGN-XXX-FG-EN-0907

C00

Individual feathered trees with year-round interest to

replace vegetation lost due to the A9 southbound

lane gain/drop, enhance the approach to Inverness

and allow intermittent views east from the A9

Scrub planting and individual feathered trees to

integrate the embankments into the existing

landscape and screen views of the traffic from

receptors to the south

Planting to be designed in consultation

with The Highland Council

C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC

Purpose of revision

A - APPROVED AS STAGE COMPLETE

Page 3: HIGHLAND MAIN LINE RAILWAY A9 - Transport …...Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward

Veterinary Centre5

5a

Inshes

Court

and Cattery

36.6m

39.8m

4a

Kennels

Tennis

Smithy

Castlehill

Castlehill Cottage

4

4b

5

5

El Sub Sta

Track

41.7m

2

Scretan BurnIssues

2624

30

34

3638

5052

54

28

58

El Sub Sta

El Sub Sta

Cradlehall Business ParkCAULFIELD ROAD NORTH

AlderHouse

10

4 15

89

1114

15

18

12a

CA

STLE

HILL D

RIV

E

CASTLEHILL COURT

20

2

8

26

3

107

1612

17

CASTLEHILL PARK

CRADLEHALL MEADOWS

9

8

5

3

Drai

n

Drain

1

59

15 17

35

41

30

20

10

2

711

ClavaHouse

CaulfieldHouse

ElmHouse

Track

8

CR

ADLE

HAL

LM

EAD

OW

S

1

2

16

14

CASTLEHILL DRIVE

24

30

1

19

29

50

3638

4042

11

25

15

Drain

Hope House

For continuation seeFigure 9.5d

For c

ontin

uatio

n se

eFi

gure

9.5

b

200

100

0

23920

0

100

0

208

200

306

300

100

0

200

100

0

0

200

100

0

23920

0

100

0

208

200

306

300

100

0

200

100

0

0

200

100

0

239

200

100

0

208

200

306

300

100

0

200

100

0

0

200

0

0

306300

0

100

239200

100

208

200

100

200

100

0

0

200

0

0

306300

0

100

239

200

100

208

200

100

200

100

0

0

B

B

A

B

B

C

a

b c

ed

f

g

Legend

Mixed Woodland

Scrub

Species Rich Grassland

Individual Heavy Standard Trees

Wet Grassland Mix

A

Proposed Scheme (DMRB Stage 3 Design)

SuDS Wetlands

B

Bat Mitigation Area (woodland to beretained) for provision of boxes

Landscape and Ecological Mitigation Proposals

Ecological and Landscape Planting Proposals

Ecological Planting Proposals

Landscape Planting Proposals

Cross Section Locations (see Figure 9.6)

Visibility Splay Mix

Dry Mammal Underpass

Culvert with mammal provision

Existing Vegetation to be Retained (inside draft

CPO boundary and Scottish Ministers Land)

Hedgerow

Individual Feathered Trees

Mammal Resistant Fencing

Riparian Woodland

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals

Consented Development Under Construction(as of April 2019)

N

A9/A96 Inshes to Smithton

Figure 9.5c

Sheet 3 of 7

Drawing Status

Drawing number

Scale

BIM No.Jacobs No.

Drawing title

DO NOT SCALE

Rev

Project

Client

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in thedocument are the property of Jacobs. Use or copying of this document in whole or in partwithout the written permission of Jacobs constitutes an infringement of copyright. Limitation:This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, andis subject to, and issued in accordance with, the provisions of the contract between Jacobsand the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of,any use of, or reliance upon, this drawing by any third party.

1:2,500 @ A3

B2103501

Figure 9.5c

Legend

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668.

INVERNESSCAMPUS

INSHES

CRADLEHALL

CASTLEHILL

Tops and bottoms of embankments

rounded off to help integrate them into the

landscape and reduce visual impacts

Avenue trees to aid integration into the

existing landscape and screen

traffic in views from the south and east

Mixed woodland planting to screen views

of the junction and traffic movement from

receptors to the south, southeast and east

SuDS to be designed in accordance with Appendix

A9.3 to assist their integration into the receiving

landscape whilst maximising their visual amenity

and biodiversity. Riparian woodland planting to

frame and integrate the SuDS into the landscape.

Earthworks in and around SuDS graded out with

access tracks unsurfaced and not bunded

95 Bothwell Street, Glasgow, G2 7HX, UKTel:+44(0)141 243 8000

www.jacobs.com

Rev. DateRev. Orig/Dwn Check'd Apprv'dRev'd

DMRB Stage 3 EIAR

Landscape and Ecological Mitigation

500 metres100 200 300 400 500

A9-A96IS-JAC-EGN-XXX-FG-EN-0908

C00

Avenue trees and hedgerows to aid integration

into the adjacent landscape and filter views

from Inverness Campus

Landscape proposals to adopt a

similar design approach to

Inverness Campus and tie into

the campus landscape

Mixed woodland planting to screen

and soften views from receptors to

the east whilst aiding integration into

the landscape

C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC

Purpose of revision

A - APPROVED AS STAGE COMPLETE

Page 4: HIGHLAND MAIN LINE RAILWAY A9 - Transport …...Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward

Trac

k

MP 116

Track

Scretan BurnIssues

CRADLEHALL MEADOWS

9

8

5

3

Ward Bdy

Glenbeag

Tigh-nan-Eisdeoran

The Meadows

Sarian

Ryecroft

Cradlehall Bungalow

50.1m

Trac

k

Track

MP .75

CRAD

LEHA

LL F

ARM

DRI

VE

2

10

Craigewen

2

Ashton Farm Cottages

1

Issues

Ashton Farm

32.3m

32.3m

FB

11

CR

ADLE

HAL

LM

EAD

OW

S

2

16

14

12

10

Ordview

For continuation seeFigure 9.5c

For c

ontin

uatio

n se

eFi

gure

9.5

e

For continuation seeFigure 9.5f

300

200

100

0

693

600

500

400

300

644

600

500

400

300

200

100

300

200

100

0

693

600

500

400

300

644

600

500

400

300

200

100

300

200

100

0

693

600

500

400

300

644

600

500

400

300

200

100

200

100

644

500

400

200

300

0

693

60050

0

400

300

600

300

100

200

100

644

500

400

200

300

0

693

60050

0

400

300

600

300

100 B

C

C

E

E

a

b c

ed

f

g

Legend

Mixed Woodland

Scrub

Species Rich Grassland

Individual Heavy Standard Trees

Wet Grassland Mix

A

Proposed Scheme (DMRB Stage 3 Design)

SuDS Wetlands

B

Bat Mitigation Area (woodland to beretained) for provision of boxes

Landscape and Ecological Mitigation Proposals

Ecological and Landscape Planting Proposals

Ecological Planting Proposals

Landscape Planting Proposals

Cross Section Locations (see Figure 9.6)

Visibility Splay Mix

Dry Mammal Underpass

Culvert with mammal provision

Existing Vegetation to be Retained (inside draft

CPO boundary and Scottish Ministers Land)

Hedgerow

Individual Feathered Trees

Mammal Resistant Fencing

Riparian Woodland

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals

Consented Development Under Construction(as of April 2019)

N

A9/A96 Inshes to Smithton

Figure 9.5d

Sheet 4 of 7

Drawing Status

Drawing number

Scale

BIM No.Jacobs No.

Drawing title

DO NOT SCALE

Rev

Project

Client

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in thedocument are the property of Jacobs. Use or copying of this document in whole or in partwithout the written permission of Jacobs constitutes an infringement of copyright. Limitation:This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, andis subject to, and issued in accordance with, the provisions of the contract between Jacobsand the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of,any use of, or reliance upon, this drawing by any third party.

1:2,500 @ A3

B2103501

Figure 9.5d

Legend

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668.

CRADLEHALL

HIGHLAND MAIN LINE RAILWAY

DRUMROSACHBRIDGE

Avenue tree planting and hedgerows to integrate the

embankments into the surrounding landscape character

and filter traffic movement in views from nearby receptors

Mixed woodland planting to screen views

from receptors to the east and south

Mixed woodland planting to provide

screening for path users and aid

integration into the landscape

Mixed woodland, scrub planting and species rich

grassland to provide screening for visual receptors to

the east and to aid integration into the landscape

Tops and bottoms of embankments

rounded to reduce landscape and visual

impacts on nearby receptors and help

integrate earthworks into the

surrounding landscape

Hedgerow to reflect local landscape

character, act as wildlife corridor, and

provide screening of embankments and

traffic movement in views from nearby

properties and footpaths

Avenue tree planting to fit with nearby formal

planting at Castlehill House and Inverness

Campus, emphasise sense of arrival to

Inverness, integrate the embankments into

the surrounding landscape and filter views

from nearby receptors

95 Bothwell Street, Glasgow, G2 7HX, UKTel:+44(0)141 243 8000

www.jacobs.com

Rev. DateRev. Orig/Dwn Check'd Apprv'dRev'd

DMRB Stage 3 EIAR

Landscape and Ecological Mitigation

500 metres100 200 300 400 500

A9-A96IS-JAC-EGN-XXX-FG-EN-0909

C00

Heavy standard trees toencourage bat use of crossing

point and maintain connectivity

Heavy standard trees and scrub planting

to encourage bat use of crossing point

and maintain connectivity

Heavy standard trees toencourage bat use of crossing

point and maintain connectivity

Riparian woodland planting

to improve the biodiversity of the

watercourse and enhance its presence

within the landscape setting

SuDS to be designed in accordance with Appendix

A9.3 to assist their integration into the receiving

landscape and maximise their visual amenity and

biodiversity. Riparian woodland planting to frame

and integrate the SuDS into the landscape

Earthworks in and around SuDS graded out with

access tracks unsurfaced and not bunded

C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC

Purpose of revision

A - APPROVED AS STAGE COMPLETE

Page 5: HIGHLAND MAIN LINE RAILWAY A9 - Transport …...Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward

El Sub Sta

2

Scretan Burn

El Sub Sta

El Sub Sta

MP 116

Cinema

EAST

FIEL

D W

AY

MP .25

1

Track

El Sub Sta

Hotel

Tk

3a 3b

7

6

Inverness Retailand

Business Park

1

Cowa

n Ho

use

El Sub Sta

El Sub Sta

HIG

HLAN

DER

WAY

John

Dew

ar B

uild

ing

Wes

tmins

ter H

ouse

BusinessStoneyfield Leisure Centre

Pond

FB

Ward Bdy

FB

For c

ontin

uatio

n se

eFi

gure

9.5

d

For c

ontin

uatio

n se

eFi

gure

9.5

f

500

400

300

200

100

0

500

400

300

200

100

0

500

400

300

200

100

0

100

0

500

400

300

200

100

0

500

400

300

200

D

D

a

b c

ed

f

g

Legend

Mixed Woodland

Scrub

Species Rich Grassland

Individual Heavy Standard Trees

Wet Grassland Mix

A

Proposed Scheme (DMRB Stage 3 Design)

SuDS Wetlands

B

Bat Mitigation Area (woodland to beretained) for provision of boxes

Landscape and Ecological Mitigation Proposals

Ecological and Landscape Planting Proposals

Ecological Planting Proposals

Landscape Planting Proposals

Cross Section Locations (see Figure 9.6)

Visibility Splay Mix

Dry Mammal Underpass

Culvert with mammal provision

Existing Vegetation to be Retained (inside draft

CPO boundary and Scottish Ministers Land)

Hedgerow

Individual Feathered Trees

Mammal Resistant Fencing

Riparian Woodland

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals

Consented Development Under Construction(as of April 2019)

N

A9/A96 Inshes to Smithton

Figure 9.5e

Sheet 5 of 7

Drawing Status

Drawing number

Scale

BIM No.Jacobs No.

Drawing title

DO NOT SCALE

Rev

Project

Client

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in thedocument are the property of Jacobs. Use or copying of this document in whole or in partwithout the written permission of Jacobs constitutes an infringement of copyright. Limitation:This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, andis subject to, and issued in accordance with, the provisions of the contract between Jacobsand the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of,any use of, or reliance upon, this drawing by any third party.

1:2,500 @ A3

B2103501

Figure 9.5e

Legend

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668.

HIGHLAND MAIN LINE RAILWAY

INVERNESS RETAILAND BUSINESS PARK

INVERNESS CAMPUS

Avenue tree planting to tie in with

Inverness Campus landscape and

screen the vehicles from NMUs

Avenue trees to aid integration into the

landscape and screen embankments

and traffic from nearby visual receptors

Tops and bottoms of embankments

rounded to assist integration of the

scheme into the surrounding landscape

95 Bothwell Street, Glasgow, G2 7HX, UKTel:+44(0)141 243 8000

www.jacobs.com

Rev. DateRev. Orig/Dwn Check'd Apprv'dRev'd

DMRB Stage 3 EIAR

Landscape and Ecological Mitigation

500 metres100 200 300 400 500

Mixed woodland planting to replace woodland lost

and integrate with adjacent riparian woodland,

and heavy standard trees to encourage use of the

culvert and to maintain connectivity for bats

A9-A96IS-JAC-EGN-XXX-FG-EN-0910

C00

SuDS to be designed in accordance with Appendix A9.3 to assist

their integration into the receiving landscape and maximise their

visual amenity and biodiversity. Riparian woodland planting to

frame and integrate the SuDS into the landscape

Earthworks in and around SuDS to be graded out with access

tracks unsurfaced and not bunded

C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC

Purpose of revision

A - APPROVED AS STAGE COMPLETE

Page 6: HIGHLAND MAIN LINE RAILWAY A9 - Transport …...Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward

5

25.7m

20.2m

Drain

Drain

Track

2

Cairnlaw Burn

Ashton Farm Cottages

1

Stratton

Spring

Sluice

Pond

Ashton Farm

32.3m

28.1m

32.3m

Track

For c

ontin

uatio

n se

eFi

gure

9.5

e

For continuation seeFigure 9.5g

For continuation seeFigure 9.5d

800

700

600

500

400

300

200

800

700

600

500

400

300

200

800

700

600

500

400

300

200200

800

700

600

500

400

300

200

800

700

600

500

400

300

E

E

a

b c

ed

f

g

Legend

Mixed Woodland

Scrub

Species Rich Grassland

Individual Heavy Standard Trees

Wet Grassland Mix

A

Proposed Scheme (DMRB Stage 3 Design)

SuDS Wetlands

B

Bat Mitigation Area (woodland to beretained) for provision of boxes

Landscape and Ecological Mitigation Proposals

Ecological and Landscape Planting Proposals

Ecological Planting Proposals

Landscape Planting Proposals

Cross Section Locations (see Figure 9.6)

Visibility Splay Mix

Dry Mammal Underpass

Culvert with mammal provision

Existing Vegetation to be Retained (inside draft

CPO boundary and Scottish Ministers Land)

Hedgerow

Individual Feathered Trees

Mammal Resistant Fencing

Riparian Woodland

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals

Consented Development Under Construction(as of April 2019)

N

A9/A96 Inshes to Smithton

Figure 9.5f

Sheet 6 of 7

Drawing Status

Drawing number

Scale

BIM No.Jacobs No.

Drawing title

DO NOT SCALE

Rev

Project

Client

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in thedocument are the property of Jacobs. Use or copying of this document in whole or in partwithout the written permission of Jacobs constitutes an infringement of copyright. Limitation:This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, andis subject to, and issued in accordance with, the provisions of the contract between Jacobsand the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of,any use of, or reliance upon, this drawing by any third party.

1:2,500 @ A3

B2103501

Figure 9.5f

Legend

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668.

Hedgerows and tree lines to reflect local

landscape pattern and provide screening

for nearby properties and NMUs

Embankments to be rounded off at the top and

bottom to aid integration into the landscape

95 Bothwell Street, Glasgow, G2 7HX, UKTel:+44(0)141 243 8000

www.jacobs.com

Rev. DateRev. Orig/Dwn Check'd Apprv'dRev'd

DMRB Stage 3 EIAR

Landscape and Ecological Mitigation

500 metres100 200 300 400 500

Heavy standard trees and hedgerows to

integrate the road and embankments into the

landscape and filter views of traffic movement

from nearby receptors

A9-A96IS-JAC-EGN-XXX-FG-EN-0911

C00

Heavy standard trees toencourage bat use of crossing

point and maintain connectivity

Heavy standard trees toencourage bat use of crossing

point and maintain connectivity

C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC

Purpose of revision

A - APPROVED AS STAGE COMPLETE

Page 7: HIGHLAND MAIN LINE RAILWAY A9 - Transport …...Hotel Westminster House 122 Larch House Barony House Darach House LB Business Centre Stoneyfield Willow House Hazel House Ward Bdy Ward

B

5

20.2mDrain

SL

Shingle

Scretan Burn

SM

MP 142

Spreads

4.1m

MLWS

Track

Cairnlaw Burn

Stratton

Spring

Sluice

Pond

Stratton Farm Cottage

Scre

tan

Stratton

Shingle

Cairnlaw

MP 141.75

Pond

7.8m

Roseacre

Firth View

Sand and

Scre

tan

A 96

The Brambles

FB

5.2m

Churchfield Cottage

Scretan Bridge

Burn

Lay-b

y

Shingle

MLW

S

BARN CHURCH ROAD

Track

Path

For continuation seeFigure 9.5f

1113

1100

1000

0

50

87

900

800

1113

1100

1000

0

50

87

900

800

1113

1100

1000

0

50

87

900

800

871113

1100

1000

0

50

900

800

8711131100

10000

50

900

800

a

b c

ed

f

g

Legend

Mixed Woodland

Scrub

Species Rich Grassland

Individual Heavy Standard Trees

Wet Grassland Mix

A

Proposed Scheme (DMRB Stage 3 Design)

SuDS Wetlands

B

Bat Mitigation Area (woodland to beretained) for provision of boxes

Landscape and Ecological Mitigation Proposals

Ecological and Landscape Planting Proposals

Ecological Planting Proposals

Landscape Planting Proposals

Cross Section Locations (see Figure 9.6)

Visibility Splay Mix

Dry Mammal Underpass

Culvert with mammal provision

Existing Vegetation to be Retained (inside draft

CPO boundary and Scottish Ministers Land)

Hedgerow

Individual Feathered Trees

Mammal Resistant Fencing

Riparian Woodland

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals

Consented Development Under Construction(as of April 2019)

N

A9/A96 Inshes to Smithton

Figure 9.5g

Sheet 7 of 7

Drawing Status

Drawing number

Scale

BIM No.Jacobs No.

Drawing title

DO NOT SCALE

Rev

Project

Client

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in thedocument are the property of Jacobs. Use or copying of this document in whole or in partwithout the written permission of Jacobs constitutes an infringement of copyright. Limitation:This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, andis subject to, and issued in accordance with, the provisions of the contract between Jacobsand the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of,any use of, or reliance upon, this drawing by any third party.

1:2,500 @ A3

B2103501

Figure 9.5g

Legend

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668.

A96

Mixed woodland planting

to replace woodland lost and

integrate grubbed-up road

Riparian woodland planting

to improve the biodiversity of the

watercourse and enhance its presence

within the landscape setting

Embankment slopes to be rounded off at top

and bottom to reduce landscape and visual

impacts on nearby receptors and aid

integration into the landscape

Existing woodland to be

protected and retained

95 Bothwell Street, Glasgow, G2 7HX, UKTel:+44(0)141 243 8000

www.jacobs.com

Rev. DateRev. Orig/Dwn Check'd Apprv'dRev'd

A - APPROVED AS STAGE COMPLETE

DMRB Stage 3 EIAR

Landscape and Ecological Mitigation

500 metres100 200 300 400 500

A9-A96IS-JAC-EGN-XXX-FG-EN-0912

C00

SuDS to be designed in accordance with Appendix A9.3 to assist

their integration into the receiving landscape and maximise their

visual amenity and biodiversity. Riparian woodland planting to

frame and integrate the SuDS into the landscape

Earthworks in and around SuDS to be graded out with access

tracks unsurfaced and not bunded

Mixed woodland planting to aid

integration of the embankments into

the landscape and reduce visibility of

traffic movement from nearby receptors

A96 Dualling Inverness to Nairn (including Nairn

Bypass) Landscape Mitigation Proposals

A96 Dualling Inverness to Nairn (including Nairn

Bypass) Landscape Mitigation Proposals

C00 SEPT 2019 EIAR Publication MK/MS KS KL DGC

Purpose of revision