HIGHWAY PROGRAM FY 2019-2020 SORTED BY PARISH FOR LEGISLATIVE REVIEW AND APPROVAL This public document is published at a total cost of $3.12. 205 copies of this public document were published in this second printing at a cost of $639.60. The total cost of all printings of this document including reprints is $795.60. This document was published by the Louisiana Department of Transportation reproduction unit, 1201 Capitol Access Road, Baton Rouge, LA 70802. This material was printed in accordance with standards for printing by state agencies established in R.S. 43.31.

Upload: others

Post on 08-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

HIGHWAY PROGRAM

FY 2019-2020

SORTED BY PARISH

FOR LEGISLATIVE REVIEW

AND APPROVAL This public document is published at a total cost of $3.12. 205 copies of this public document were published in this second printing at a cost of

$639.60. The total cost of all printings of this document including reprints is $795.60. This document was published by the Louisiana

Department of Transportation reproduction unit, 1201 Capitol Access Road, Baton Rouge, LA 70802. This material was printed in accordance with standards for printing by state agencies established in R.S. 43.31.

Page 2: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4
Page 3: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

INTRODUCTION

1. R.S. 48:229.1, 230 states that “the Department shall provide the Legislature and public with this program which shall list projects to be constructed in the ensuing fiscal year”… that considers the “anticipated revenues to be appropriated by the legislature.” The Department shall also provide the Legislature a list of projects “which are in various stages of planning and preparation.”

2. In compliance with this statute, the attached Highway Program identifies the

projects that are scheduled for construction letting in FY 2019-20. These are denoted as being in Stage 4. Projects being developed in the other stages are also included in the document.

3. There are many projects remaining to be let prior to the end of the current

fiscal year, FY 2018-19. For informational purposes, these projects are also listed in this document. In the event any of these projects cannot be let as planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year.

4. The one year construction program and the list of other projects in various

stages are combined into this document which is called the Highway Priority Program or Highway Program. These projects are also submitted to the Federal Highway Administration along with the Transit Program. The two programs together are referred to as the State Transportation Improvement Program (STIP). The Public Hearings held each year in each Highway District fulfill both the State and Federal requirements for public involvement regarding these programs.

5. DOTD has based this preliminary Highway Program on anticipated revenues.

If funding above the expected amount is made available, funding may be used on projects listed in Stages 0, 1, 2, or 3.

6. In the event all of the projects listed for letting in FY 2019-20 cannot be let to

construction due to funding issues or unforeseen problems encountered in the pre-construction process, the affected project(s) will be let as soon as practicable in the following year and other projects listed in Stages 0, 1, 2, or 3 may be advanced into FY 2019-20.

7. Construction estimates are for informational purposes only and are subject to

change.

Page 4: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD’s Project Delivery Process

Elected Officials

MPO

Long Range Plan

Districts

Public

STAGE 0: Feasibility

One Year

STAGE 1: Planning / Environmental

One to Two Years

STAGE 2: Funding

Project Prioritization

Indefinite Period STAGE 3: Final Design Process

One to Three Years

STAGE 4: Letting

One Year

STAGE 5: Construction

One to Three Years

Feasibility Analysis of

the Proposed Project Reject

Detailed Planning and

Environmental Analysis

Funding Allocation for

Design & Construction

Development of Final

Plans & Specifications

Bid Letting Process

Construction of Project

STAGE 6: Operation

Indefinite Period

On-going Monitoring

of Operation &

Maintenance

Page 5: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

NON-INTERSTATE (PAVEMENT)(STP) 46.7

NON-INTERSTATE (PAVEMENT) (NHS) 63.2

NON-INTERSTATE (PAVEMENT) (non-federal aid) 42.7

ROAD PREVENTIVE MAINTENANCE 7.5

INTERSTATE (PAVEMENT) 76.0

BRIDGE (ON SYSTEM) 130.8

BRIDGE (OFF SYSTEM) 13.0

SUB-TOTAL 379.9

ITS (regular & earmarks) 11.0

TRAFFIC CONTROL DEVICES 14.8

ROADWAY FLOODING 3.7

WEIGH STATIONS 0.0

TRANSPORTATION SYSTEMS MANAGEMENT 7.4

INTERSTATE LIGHTING 1.9

REST AREAS 0.0

ACCESS MANAGEMENT 8.1

FERRIES/MAJOR REPAIRS 3.2

MOVABLE BRIDGE PREVENTIVE MAINTENANCE 1.9

ADA PROGRAM 0.0

SUB-TOTAL 52.0

HWY. PROGRAM 36.5

RR CROSSING UPGRADES & SEPARATIONS 24.0

SUB-TOTAL 60.5

REGULAR PROGRAM 0.0

CORRIDOR UPGRADE 0.0

SUB-TOTAL 0.0

TRANSPORTATION ALTERNATIVES PROJECTS 4.4

URBAN SYSTEMS, CONGESTION MITIGATION & AIR QUALITY, LOCAL ROAD

SAFETY PROGRAM, SAFE ROUTES TO SCHOOLS, URBAN TRANSIT,

DEMAND MANAGEMENT 77.1

FED EARMARKS (DEMO,...) 6.3

OTHER (BONDS, TOLLS, LOCAL ) 15.5

INTERMODAL CONNECTOR 15.1

ROAD TRANSFER 20.5

PPP/GARVEE CONSTRUCTION 280.0

GARVEE PROGRAM 28.7

SUB-TOTAL 447.6

GRAND TOTAL 940.0

Subject to funding availability.

MISC.

PRESERVATION

OPERATIONS

SAFETY

CAPACITY

TENTATIVE FY 19-20 BUDGET PARTITION

(COSTS IN MILLION DOLLARS)

CONSTRUCTION

PROPOSEDCATEGORY SUB-CATEGORY

Page 6: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

FUNDING TYPES FEDERAL

NHPP (NATIONAL HIGHWAY PERFORMANCE PROGRAM)

STP (SURFACE TRANSPORTATION PROGRAM) STP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,

LAFAYETTE) STP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,

MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) STPFLEX (FLEXIBLE) STP<5K (RURAL AREAS) FBROFF (OFF SYSTEM BRIDGE MAP 21)

TAP (TRANSPORTATION ALTERNATIVES PROGRAM) TAP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,

LAFAYETTE) TAP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,

MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) TAPFLEX (FLEXIBLE) TAP<5K (RURAL AREAS)

HSIP, HSIPPEN, SR2S, HRRR, SATRANS (SAFETY FUNDS, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, SAFETY TRANSFER)

RAIL HE, RAIL PD (ELIMINATIONS OF HAZARDS AT RAILWAY-HIGHWAY CROSSINGS)

CM (CONGESTION MITIGATION AIR QUALITY – EAST BATON ROUGE, WEST BATON ROUGE, LIVINGSTON, ASCENSION, AND IBERVILLE)

DEMO (FEDERAL DEMONSTRATION AND HIGH PRIORITY PROJECTS – DEFINED BY U.S. CONGRESS)

ER (FEDERAL EMERGENCY RELIEF PROGRAM FUNDING)

FEMA (FEDERAL EMERGENCY MANAGEMENT AGENCY FUNDS)

STATE / LOCAL

NFA (STATE TRANSPORTATION FUNDS FOR NON-FEDERAL AID ROUTES)

NFABOND (STATE BONDS FOR NON-FEDERAL AID ROUTES)

STCASH (STATE TRANSPORTATON TRUST FUNDS FOR STATE FUNDED CONSTRUCTION)

TIME (TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT)

STBONDS (STATE GENERAL OBLIGATION BONDS)

STGEN (STATE GENERAL FUNDS CASH)

TOLLS

LOCAL (FUNDS PROVIDED BY LOCAL GOVERNMENT)

OTHER (OTHER SOURCE NOT LISTED)

NFI (NO FUNDING IDENTIFIED)

Page 7: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

Statewide prioritization process for the Highway Priority Program beginning FY2017-2018 According to Louisiana Revised Statute 48:229.1.A the construction projects included in the Highway Priority Program should accomplish the following: Goal 1: Preserve/Sustain the System (1) Brings the state highway system into a good state of repair and optimizes the usage and efficiency of existing transportation facilities. Prospective Outcome 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.1.6, 3.2.1

Goal 2: Operate the System (3) Supports resiliency in the transportation system, including safe evacuation of populations when necessitated by catastrophic events such as hurricanes and floods. Prospective Outcome 3.2.1

(7) Encourages innovation and the use of technology. Prospective Outcome 3.2.1

Goal 3: Improve the Safety of the System (2) Improves safety for motorized and non-motorized highway users and communities. Prospective Outcome 3.2.1, 3.2.2, 3.2.3

Goal 4: Expand the System (4) Increases accessibility for people, goods, and services. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 (5) Fosters diverse economic development and job growth, international and domestic commerce, and tourism. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 Goal 5: Improve Quality of Life (6) Fosters multimodalism, promotes a variety of transportation and travel options, and encourages intermodal connectivity. Prospective Outcome 3.2.1 (8) Protects the environment, reduces emissions, and improves public health and quality of life. Prospective Outcome 3.2.1

Per R.S. 48:229.1.C, the following factors must be considered when selecting projects for inclusion in the Highway Priority Program: (1) The condition of the roads, streets, and structures making up the state highway system and the relative urgency of the improvements considering in their order of general needs. (2) The type and volume of traffic on a particular segment of roadway, highway, or bridge. (3) The crash records for a particular segment of roadway, highway, or bridge. (4) The technical difficulties in the preparation of plans and the procurement of rights-of-way for a particular segment of roadway, highway, or bridge. (5) Whether unforeseeable emergencies such as floods have created an immediate need for improvement or reconstruction. (6) Whether capacity improvements are warranted due to population or traffic volume increases in specific geographic areas. (7) Whether or not the highway or bridge is or will be on an evacuation route utilized to evacuate large populations due to catastrophic events such as hurricanes or flooding. (8) Whether the improvement to or addition of a highway or bridge will benefit the economic development potential of the state.

Page 8: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

In accordance with R.S. 48:229.1.D, projects must be screened to determine whether they are consistent with the most recent Statewide Transportation Plan and warrant inclusion in the Program. Per R.S. 48:229.1.E, the Department shall identify and report prospective outcomes of each program. The Department shall evaluate the actual outcomes of each program and establish revised prospective outcomes of each program on a biennial basis. 3.1.1. Prospective Outcome: To effectively sustain and improve the Interstate Highway System so that 97% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 98.5% Expected percent fair or better on June 30, 2018 = 97% or more Outcome Achieved: 97.33% Expected percent fair or better on June 30, 2020 = 97% or more Outcome Achieved:

3.1.2. Prospective Outcome: To effectively maintain and improve the National Highway System so that 95% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 91.7% Expected percent fair or better on June 30, 2018 = 95% or more Outcome Achieved: 90.31% Expected percent fair or better on June 30, 2020 = 95% or more Outcome Achieved: 3.1.3. Prospective Outcome: To effectively maintain and improve the Highways of Statewide Significance so that 80% in SFY 2015-2016 of the system pavement stays in fair or better condition each fiscal year. In SFY 2017-2018 the goal was increased to 90%. Percent fair or better as of June 30, 2016 = 95.81% Expected percent fair or better on June 30, 2018 = 90% or more Outcome Achieved: 94.61% Expected percent fair or better on June 30, 2020 = 90% or more Outcome Achieved:

3.1.4. Prospective Outcome: To effectively maintain and improve the Regional Highway System so that 80% in SFY 2015-2016 of the system pavement stays in fair or better condition each fiscal year. In SFY 2017-2018 the goal was decreased to 70%. Percent fair or better as of June 30, 2016 = 89.41% Expected percent fair or better on June 30, 2018 = 70% or more Outcome Achieved: 87.4% Expected percent fair or better on June 30, 2020 = 70% or more Outcome Achieved:

3.1.5. Prospective Outcome: To sustain the condition and safety of Louisiana’s On-System (State-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 9.5% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved: 8.9% Expected percent fair or better on June 30, 2020 = 10% or less Outcome Achieved:

3.1.6. Prospective Outcome: To sustain the condition and safety of Louisiana’s Off-System (Locally-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 8.7% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved: 9.0% Expected percent fair or better on June 30, 2020 = 10% or less Outcome Achieved:

Page 9: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

3.2.1. Prospective Outcome: Implement an average of three percent of the Louisiana Statewide Transportation Plan each fiscal year. Cumulative percent of Plan implemented as of June 30, 2016 = 3.3% Expected cumulative percent of Plan implemented on June 30, 2018 = 9% Outcome Achieved: 9.9% Expected cumulative percent of Plan implemented on June 30, 2020 = 15% Outcome Achieved: 3.2.2. Prospective Outcome: To reduce the total number of fatalities on Louisiana public roads by six percent each calendar year through 2030. Expected number of fatalities in 2015 = 845 Actual number of fatalities in 2015 = 752 Expected number of fatalities in 2017 = 796 Actual number of fatalities in 2017 = 773 Percent reduction = increased 2.79% Outcome Achieved: Total number of fatalities increased which is similar trend nationally. Most states are seeing increases. Expected number of fatalities in 2019 = 748 Actual number of fatalities in 2019 = Percent reduction = Outcome Achieved: 3.2.3. Prospective Outcome: To achieve at least a 25 % reduction in fatal and non-fatal crashes at selected crash locations through the implementation of safety improvements each year. Average percent reduction in crash rates at all safety improvement project locations on June 30, 2016 = 23.8% Expected percent reduction in fatal and non-fatal crash rates from safety improvements on June 30, 2018 = 25% or greater Outcome Achieved: 10.8% Expected percent reduction in fatal and non-fatal crash rates from safety improvements on June 30, 2020= 25% or greater Outcome Achieved: 3.2.5. Prospective Outcome: Maintain 90% or greater of the Interstate Highway System in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 88% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved: 80% Expected percent uncongested on June 30, 2020 = 90% or more Outcome Achieved: 3.2.6. Prospective Outcome: Maintain 90% or greater of the National Highway System (NHS) in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 97% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved: 98% Expected percent uncongested on June 30, 2020 = 90% or more Outcome Achieved:

Page 10: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4
Page 11: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

4 – SCHEDULED FOR LETTING

Per RS 48:229.1, the following is the list of “…projects to be

constructed in the ensuing fiscal year…”

Per RS 48:231.A(6), “When this final construction program

is communicated to the legislature for funding for the

coming fiscal year, any project which the legislature

determines is not in the proper order of priority in

accordance with the factors stated in R.S. 48:229 may be

deleted by the legislature. However, the legislature shall not

add any projects to this final construction program, nor

shall the legislature make substitutions for projects which

have been removed.”

Page 12: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4
Page 13: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012968

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 370 801-28 NFA 2,213 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 18-19

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 370: LA 91 - LA 3070

ACADIA

H.013800

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 98 389-01 STCASH 281 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

PROVIDE $281,000 IN FUNDS TO THE CITY OF RAYNE.PORTER BETTS, CONNIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 98: CITY OF RAYNE (RT)

H.009628

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 92 385-04 STPFLEX 1,520 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

VERMILION LA 92 385-05 STPFLEX 150 PRESERVATION - NON-INTERSTATEON STP SYSTEM

ASPHALT CONCRETE OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA92:LA 13 - 0.108 MI E OF VERMILION P/L

H.011323

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 HSIP 769 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

CONSTRUCT A NEW RR XING BETWEEN TWO XINGS THAT WILL CLOSELUKE, SHAWN Remrks:

Typ Imp:LOCAL FUNDS AND MATCH FROM RAILROAD

Project:Prj Mgr:

NIGHTHAWK/SPAN TRL:BNSF RR XINGS(ACADIA)

H.012917

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 754 394-01 NFA 1,465 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 754: LA 95 - ST LANDRY P/L

H.002077

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN LA 383 197-04 NFA 1,768 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 18-19

PATCH AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:AC WITH NFA

Project:Prj Mgr:

LA 383:JEFFERSON DAVIS P/L-LAKEVIEW LOOP

ALLEN

H.013858

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN 000-02 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

INSTALL SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

WARD RD: UP RR XING (ALLEN)

H.013859

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN 000-02 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

INSTALL SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH BY RAILROAD

Project:Prj Mgr:

GUILLORY AVE: UP RR XING (OBERLIN)

Page 1 - 1 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 14: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.000337

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION US 61 007-07 NHPP 1,700 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

E BATON ROUGE US 61 007-08 NHPP 10,300 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGESTOURRES, VALERIE Remrks:

Typ Imp:007-07-0058;JT W/007-08-0040

Project:Prj Mgr:

US 61:BAYOU MANCHAC & FRANCOIS BRS.

ASCENSION

H.013843

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 930 803-14 STCASH 1,740 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19ASCENSION LA 934 803-20 STCASH 1,043 ROAD TRANSFER ASCENSION LA 934 803-20 STCASH 1,043 ROAD TRANSFER ASCENSION LA 934 803-20 STCASH 1,043 ROAD TRANSFER

PROVIDE $4,869,503 IN FUNDS TO ASCENSION PARISH OVER 4 FYSPORTER BETTS, CONNIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 930 - LA 934: ASCENSION PARISH (RT)

H.012934

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 936 803-22 NFA 2,166 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

MILL, STABILIZE, OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 936: W JCT LA 22 - E JCT LA 22

H.010443

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 308 407-07 SATRANS 1,369 SAFETY 4-SCHEDULED IN CURRENT FY 18-19ASSUMPTION LA 308 407-08 SATRANS 865 SAFETY

REALIGN CURVE AND ADD SHOULDERSGARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308: CURVE REALIGN AND SHOULDERS

ASSUMPTION

H.013871

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 1 064-09 STCASH 151 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19ASSUMPTION LA 401 233-01 STCASH 99 OTHER / MISCELLANEOUS

INSTALL DRAINAGE STRUCTURES AND REPAIR EMBANKMENTNEYLAND, CODI Remrks:

Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUND

Project:Prj Mgr:

LA 1 @ LA 401 EMER. DRAINAGE REPAIR

H.011767

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION 000-04 FBROFF 675 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:USE TTF AS MATCH

Project:Prj Mgr:

BAYOU CRAB ROAD BRIDGE

H.012927

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 998 804-07 NFA 339 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

MINOR OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 998: LA 1 - END CONTROL

Page 1 - 2 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 15: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012143

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 451 374-02 NFA 1,203 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 18-19

AVOYELLES LA 451 374-02 HRRR 3,225 SAFETY

WIDENING, PATCH, MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 451: LA 114 TO P LABORDE ROAD

AVOYELLES

H.006016

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 550 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

AVOYELLES 000-05 FBROFF 450 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

LIL RIVER & E. BRYANT ROAD BRIDGES

H.011522

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 669 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

AVOYELLES 000-05 FBROFF 737 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

FAITH BAPTIST MISSION & BILL BELT ROADS

H.011523

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 582 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

AVOYELLES 000-05 FBROFF 273 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

CARL HUNT & GERMAN BAYOU ROAD BRIDGES

H.011524

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 363 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

AVOYELLES 000-05 FBROFF 263 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

KATIE LANE & LEO MORROW ROAD BRIDGES

H.013251

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 114 145-01 STPFLEX 408 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 19-20

REPLACE EXISTING CROSS DRAINGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 114: X-DRAIN REPLACE WEST OF HESSMER

H.013847

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES US 71 008-07 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

INSTALL SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:USE TTF FOR MATCH

Project:Prj Mgr:

US 71: AKDN RR XING (BUNKIE)

Page 1 - 3 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 16: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012948

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 109 377-02 NHPP 1,073 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

MICROSURFACESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 109: LA 389 - LA 27

BEAUREGARD

H.013262

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 190 028-03 NHPP 6,398 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: LA 111 - US 171

H.013807

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 190 028-03 HSIPPEN 89 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

STRIPING AND PAVEMENT MARKINGSCORMIER, CLAYTON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190:0.04 MI W OF S FRUSHA DR - US 171

H.009615

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 26 028-04 STPFLEX 8,071 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

CP 2", OVERLAY 4", 2" SHLDBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 26: US 171 - ALLEN P/L

H.013231

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 389 187-04 NFA 1,369 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

PATCH, WIDEN AND THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:AC WITH NFA

Project:Prj Mgr:

LA 389: MATTIE MEADOWS RD - HOOSIER RD

H.013259

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 171 024-05 NHPP 260 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: US 190 - 0.03 MI N WEST DR

H.001537

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 4 067-03 STPFLEX 2,770 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

NEW BRIDGEYANG, LI Remrks:

Typ Imp:067-03-0014

Project:Prj Mgr:

LA 4: BEE BRANCH BRIDGE

BIENVILLE

H.010273

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 154 090-04 STPFLEX 1,450 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: EAST JCT LA 4 TO JCT LA 792

Page 1 - 4 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 17: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012961

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 154 090-03 STPFLEX 427 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: BOSSIER PL TO LA 4

H.012953

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 157 082-03 STPFLEX 285 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 157: OAKLAND TO KCS R/R TRACKS

BOSSIER

H.000118

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER US 80 001-03 STPFLEX 4,008 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:

Typ Imp:001-03-0095

Project:Prj Mgr:

BAYOU FIFI BRIDGE (HBI)

H.012013

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 STP>200K 8,576 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

MAJOR WIDENINGLEBAS, MELISSA Remrks:

Typ Imp:BOSSIER CITY PROVIDING MATCH

Project:Prj Mgr:

VIKING DR WIDENING (LA3105-SWAN LAKE RD)

H.013021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 HSIPPEN 100 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

INSTALL MEDIAN AT XINGSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

BENTON RD: KCS RR XING (BOSSIER CITY)

H.013492

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3227 808-08 STPFLEX 950 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

REALIGNMENT, EARTHWORK, ASPHALT PAVEMENT, AND STRIPINGSTURDIVANT, PHILLIP Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3227: INTERSECTION REALIGN AT LA 157

H.013581

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 4,350 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 19-20WEBSTER I-20 451-03 NHPP 6,679 PRESERVATION - INTERSTATE BIENVILLE I-20 451-04 NHPP 1,619 PRESERVATION - INTERSTATE

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: US 80 OPASS - CRAWFORD ST OPASS

H.013708

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 STPFLEX 75 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

REMOVE RR CROSSING AND FILL IN WITH ASPHALTSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

BARKSDALE BLVD: UP XING (BOSSIER CITY)

H.001623

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3049 079-01 NFA 1,278 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTMOORE, DARRELL Remrks:

Typ Imp:079-01-0034;USE NFA AS MATCH PHASES 1 TO 5

Project:Prj Mgr:

CREEK BRIDGE & IRISH BAYOU BRIDGE

CADDO

Page 1 - 5 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 18: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.011917

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-49 455-09 HSIPPEN 5,623 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

INSTALLING CABLE BARRIERALLEN, JEFFREY Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 CB: MLK DR. TO ARKANSAS S/L

H.013253

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 79 048-01 NHPP 5,526 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

CADDO US 80 001-01 STPFLEX 1,397 PRESERVATION - NON-INTERSTATEON STP SYSTEM

MILL, PATCH AND OVERLAY WITH HMACSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79/US 80:TEXAS STATE LINE - JCT US 80

H.013426

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 011-01 NHPP 675 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

REHAB/REPLACE PIPE FROM US 71 TO GRIMMETT DRIVESTURDIVANT, PHILLIP Remrks:

Typ Imp:

Project:Prj Mgr:

GRIMMETT DR PIPE REHAB

H.013673

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 392 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

4-SCHEDULED IN CURRENT FY 18-19

SCALE REHAB OF THE STATIC PIT SCALEBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

REHAB OF GREENWOOD PIT SCALE

H.013879

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 79 048-01 NHPP 420 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

ASPHALT WIDENING AND OVERALYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79: TX S/L TO 0.2 MI E OF TX S/L

H.013893

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

BOSSIER I-20 451-02 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

CADDO I-49 455-08 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20:I-220-I-220 & I-49:LA3132-I-20 RPM

H.001661

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 530 085-01 FBROFF 2,973 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:085-01-0022

Project:Prj Mgr:

BLACK BAYOU BRIDGE

Page 1 - 6 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 19: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.010206

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3132 427-01 NHPP 1,183 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

CADDO LA 523 103-01 NHPP 1,147 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

EXTEND CONTROL OF ACCESS LA 3132 AT LA 523BRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3132 AT LA 523: EXTEND C OF A

H.011420

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3132 427-01 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

EXTENDING ACCELERATION LANE FROM ENTRANCE RAMPSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3132: EB ENTRANCE LANE EXTENSION

H.012979

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 169 048-03 STPFLEX 448 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 169: LONGWOOD TO MOORINGSPORT

H.013254

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 011-04 NHPP 7,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH AND OVERLAY WITH HMACSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71 - JCT LA 2 - ARKANSAS STATE LINE

H.013854

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 512 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

BOSSIER I-20 451-02 NHPP 246 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

CADDO US 71 053-09 NHPP 118 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGN UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 & US 71: OVERHEAD SIGN UPGRADE

H.007113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 580 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:742-10-0125

Project:Prj Mgr:

J.BENNETT JOHNSTON AVENUE

CALCASIEU

H.009620

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 13,323 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19CALCASIEU I-10 450-91 NHPP 8,284 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 NHPP 5,889 PRESERVATION - BRIDGE (ON

SYSTEM)

BRIDGE REPLACEMENT, PAVEMENT REPLACMNT, MILL&OVERLAY & WIDBALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

I-10:WEST OF LA 108 TO I-210 INTERCHANGE

Page 1 - 7 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 20: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.009751

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 196-01 TAPFLEX 60 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 18-19

SIDEWALKS, SUBSURFACE DRAINAGE, WARNING LIGHTS &RELATED WOMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

BELL CITY SCHOOL SIDEWALK

H.010241

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 12 012-04 STPFLEX 1,425 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

PATCH, CP2", 4" OVERLAY RDWY, 2" PAVED SHOULDERSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 12: 0.6 MI NE AIRPORT DR-BUXTON CREEK

H.011546

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 FBROFF 1,085 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

NURSERY STREET / BUXTON CREEK

H.012603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 031-04 STP<200K 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 18-19

MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:

Typ Imp:

Project:Prj Mgr:

ELLENDER BR BEARING AND SPAN LOCK REHAB.

H.012878

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

4-SCHEDULED IN CURRENT FY 18-19

RENOVATIONSANDERS, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

TOOMEY NATURE WALK

H.002075

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 383 197-02 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

PAVEMENT WIDENINGSPURLOCK, DLON Remrks:

Typ Imp:197-02-0023;ON GRANDFATHER LIST FOR FED FUNDS

Project:Prj Mgr:

PAVEMENT WIDENING-MP42.7-I-10 FR RD

H.003184

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 43,411 CORRIDOR 4-SCHEDULED FOR LETTING FY 19-20CALCASIEU I-10 450-91 NHPP 33,011 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 FREIGHT-HY 40,904 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 NHPP 5,500 PRESERVATION - BRIDGE (ON

SYSTEM)

WIDEN TO 6 LANESJUDICE, ANDREW Remrks:

Typ Imp:450-91-0078

Project:Prj Mgr:

I-10: TEXAS STATE LINE-E. OF COONE GULLY

H.005967

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STGEN 2,500 INTERMODAL CONNECTOR 4-SCHEDULED FOR LETTING FY 19-20CALCASIEU 000-10 NHPP 10,000 INTERMODAL CONNECTOR CALCASIEU 000-10 DEMO 18,300 DEMO / HIGH PRIORITY

NEW ROAD & BRIDGEBRIGNAC, CHRISTINA Remrks:

Typ Imp:706-10-0001;TEA-21. STA 87.USE STGEN$ FOR ENG

Project:Prj Mgr:

NELSON RD EXT & BRIDGE

Page 1 - 8 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 21: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.011500

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 NHPP 6,075 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

CALCASIEU I-10 450-91 NHPP 364 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

INSTALLING CAMERAS & DMSS ALONG I-210KIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

LAKE CHARLES ITS PHASE 3

H.011838

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 1,384 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SULPHUR PROVIDING MATCH

Project:Prj Mgr:

RUTH/HUNTINGTON OVERLAY

H.011839

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 348 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SULPHUR PROVIDING MATCH

Project:Prj Mgr:

HENNING DR/WEEKLY RD OVERLAY

H.012053

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 STPFLEX 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ADD TURN LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378: SB RT TURN LANE @ PHILLIPS RD

H.013430

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 RAIL PD 0 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20CALCASIEU LA 378 810-12 RAIL HE 300 RAILROADS CALCASIEU LA 378 810-12 STPFLEX 400 RAILROADS

CONSTRUCT RAISED MEDIAN, OVERLAY, UPGRADE RR WARNING DEVICLUKE, SHAWN Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

LA 378: UP RR CROSSING (WESTLAKE)

H.013806

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STCASH 52 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

REMOVAL OF CATIONIC TANKSCORMIER, CLAYTON Remrks:

Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED

Project:Prj Mgr:

D07 CATIONIC TANK REMOVAL

H.013844

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

CALCASIEU US 171 024-01 NHPP 160 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGN UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 & US 171: LAKE CHARLES SIGN UPGRADE

H.013574

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 3239 811-12 NFA 1,912 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

STABILIZE AND OVERLAYZIECKER, MATTHEW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3239: LA 126 - LA 4

CALDWELL

Page 1 - 9 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 22: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.001557

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 4 068-04 HSIPPEN 1,400 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

WIDENING & OVERLAYZIECKER, MATTHEW Remrks:

Typ Imp:068-04-0030

Project:Prj Mgr:

LA 4: BANKS SPRINGS - JCT. US 165

H.012988

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 133 171-01 STPFLEX 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 133: HEBERT - VESTIL LANE

H.011545

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON 000-12 FBROFF 345 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

LITTLE CHENIER RD / LITTLE CHENIER BAYOU

CAMERON

H.013232

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 384 195-01 STP<5K 1,793 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

PATCH AND THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 384: LA 27 - LA 385

H.012888

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124 041-01 STPFLEX 476 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

CATAHOULA LA 124 143-06 STPFLEX 211 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE LA 8 152-02 STPFLEX 131 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

CATAHOULA LA 8 152-03 STPFLEX 222 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

CATAHOULA LA 126 353-03 STPFLEX 296 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

58 AST: CATAHOULA AND LASALLE PARISHES

CATAHOULA

H.001140

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124 041-03 FBROFF 2,047 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTBALLMER, SARAH Remrks:

Typ Imp:041-03-0025; USE NFA AS MATCH

Project:Prj Mgr:

LA 124: HOOTER CREEK BRIDGE

H.010815

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124-P 143-03 NFA 6,939 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20CATAHOULA LA 124 143-04 NFA 574 ROAD TRANSFER CATAHOULA 000-13 NFA 349 ROAD TRANSFER CATAHOULA LA 3102 813-24 NFA 325 ROAD TRANSFER

CONSTRUCTION ON NEW ALIGNMENT OF AN EXISTING ROUTEMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 124 EXTENSION (SEGMENT 1)

Page 1 - 10 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 23: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013273

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 8 039-04 STPFLEX 2,000 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

MITIGATION RELATED TO BANK EROSION AND BRIDGE PIER SCOURCAVALIER, STEPHANIE Remrks:

Typ Imp:OTHER FUNDS FROM USACE

Project:Prj Mgr:

LA 8: OUACHITA RIVER BRIDGE SCOUR REPAIR

H.012960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 154 088-06 STPFLEX 243 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: BIENVILLE PL TO ATHENS

CLAIBORNE

H.001749

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 5 098-03 HSIPPEN 1,200 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

CURVE REALIGNMENTSTURDIVANT, PHILLIP Remrks:

Typ Imp:

Project:Prj Mgr:

LA 5 REALIGNMENT AND CROSS SLOPE IMPROVE

DESOTO

H.010285

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 483 301-02 STP<5K 1,931 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 512 & LA 483: US 171 TO LA 175

H.012965

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 175 035-03 STPFLEX 748 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: SABINE PL TO 4.16 MI S OF US 84

H.013759

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 3276 816-11 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL, BASE STABILIZATION AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3276: US 171 - I-49

H.006380

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIP 400 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19

UPGRADE RR SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

GREENWELL SPRINGS: IC RR (BATON ROUGE)

EAST BATON ROUGE

H.010565

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-02 STPFLEX 816 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 18-19

REPLACE/UPGRADE PUMPHOUSE COMPONENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

ACADIAN STREET PUMPING STATION

Page 1 - 11 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 24: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.010869

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 256 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19E BATON ROUGE 000-17 LOCAL 140 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEKNUNES, BRIAN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

WARDS CREEK TRAIL - BLUEBONNET EXTENSION

H.011261

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-02 HSIPPEN 3,349 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

INTERSECTION IMPRS, MEDIAN MODS, OVERLAYREVIERE, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA427: S.ACADIAN THRUWAY, I-10-LA73 (BR)

H.012469

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 190 007-10 NHPP 200 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

E BATON ROUGE US 190 007-10 OTHER 200 PRESERVATION - BRIDGE (ONSYSTEM)

NAVIGATIONAL LIGHTING SYSTEM REPLACEMENTGUIDRY, CHRIS Remrks:

Typ Imp:OTHER FUNDS ARE FROM RAILROAD

Project:Prj Mgr:

US 190: MRB - NAVIG LIGHT REPL (HBI)

H.012640

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 NHPP 4 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

E BATON ROUGE LA 3246 817-40 NHPP 139 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 61 PERFORMANCE MEASURE

H.012902

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 327 817-16 STPFLEX 730 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

SAWCUT, PCC PATCHING, SIDEWALKS, CURBS AND RESTRIPE; RR WORMOSS, SARAH Remrks:

Typ Imp:MATCH FOR RR SURFACE WORK IS FROM THE RR AND TTF

Project:Prj Mgr:

LA 327: S. RIVER RD- LA 30

H.013320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 257-04 NHPP 5,550 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

PCCP PATCHING AND MAJOR REHAB OF EB. MILL AND OVERLAY WBMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: GARDERE LANE - LA 30 (RT II)

H.013331

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-02 NHPP 2,753 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

PCCP PATCHING, AND MILL AND OVERLAYMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 427: LA 3064 -ACADIAN THRUWAY (RT II)

H.013830

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 NHPP 2,000 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

EBR SIGNAL DETECTION UPGRADE

Page 1 - 12 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 25: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.002320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 3034 255-30 LOCAL 0 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE LA 3034 255-30 STBONDS 9,310 OTHER / MISCELLANEOUS E BATON ROUGE LA 3034 255-30 STPFLEX 3,000 PRESERVATION - NON-INTERSTATE

ON STP SYSTEM

4 LN DIVIDED CONC HWY RAISED MEDIANREVIERE, RYAN Remrks:

Typ Imp:255-30-0014;GREEN LIGHT PROJ; PR NI PROJ INCLUDED SEE NOTES

Project:Prj Mgr:

SULLIVAN RD (WAX - HOOPER)

H.007160

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 6,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

TRAFFIC SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:

Typ Imp:742-17-0159;CHOCTAW @ CHIPPEWA ST. & N.CHOCTAW@

Project:Prj Mgr:

EBR COMPUTERIZED TRAFFIC SIGNAL, PH VB

H.010253

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 1248 258-33 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 19-20

REPLACE PUMP STATION FLOAT SYSTEMGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

BLUEBONNET BLVD. PUMP STAT. IMP LA 1248

H.011098

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 30 414-01 NHPP 1,319 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

E BATON ROUGE LA 30 414-01 NHPP 1,080 ROAD TRANSFER E BATON ROUGE LA 30 414-01 NHPP 10,000 ROAD TRANSFER

MEDIAN AND PAVEMENT WIDENING, AND RELATED WORKMCMILLAN, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 30: SOUTH BLVD - W CHIMES ST

H.011496

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 220 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE LA 427 258-02 CM 220 CONGESTION MITIGATION

CONSTRUCT RIGHT TURN LANE ON NORTHBOUND QUAIL DRLAI, QUANG Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

QUAIL DR: TURN LANE AT PERKINS (LA 427)

H.011842

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 4,645 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:EAST BATON ROUGE PROVIDING MATCH

Project:Prj Mgr:

CHOCTAW DRIVE PAVEMENT PRESERVATION

H.012344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPFLEX 1,250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

RR ACTIVE WARNING DEVICESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

IC SEVERAL RR XINGS (BATON ROUGE)

H.012374

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-12 454-01 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

LIVINGSTON I-12 454-02 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

IMPROVE EXISTING RAMP METER SYSTEM TO ALLOW VARIABLE TIMINGKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

I-12 RAMP METER UPGRADES

Page 1 - 13 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 26: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012449

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 OTHER 1,300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE US 61-X 013-04 OTHER 200 RAILROADS E BATON ROUGE LA 73 077-05 OTHER 200 RAILROADS

UPGRADE WARNINGS, ADD MEDIANS, REPLACE SURFACES, CLOSE XINLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

KCS XINGS BETWN NORTH ST & LOUISE (BTR)

H.013261

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

INSTALL ITS EQUIPMENT ALONG I-110NICHOLS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-110 ITS DEPLOYMENT

H.013482

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-09 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

W BATON ROUGE I-10 450-08 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

E BATON ROUGE I-10 450-10 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

IBERVILLE I-10 450-07 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

I-10 WBR QUEUE WARNING SYSTEMSOLLIE, CARRYN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 WBR QUEUE WARNING SYSTEM PROJECT

H.013682

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 190 013-05 HSIP 200 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

INSTALL 1 TURN LANE AND 2 PARTIAL MEDIAN OPENING ISLANDSKELLEY, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: RCUT @ LONGBOW DR

H.013731

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 NHPP 5,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL AND OVERLAYTONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: FLORIDA BLVD - GREENWELL ST

H.013837

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 NFA 900 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

RAISE & WIDEN RR BRIDGE, RAISE RR, RAISE GRADE OF VALLEY STNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

GRADE RAISING ON VALLEY ST

H.013897

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 GARVEE 31,222 CAPACITY 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE I-12 454-01 GARVEE 2,000 CAPACITY

NEW FLYOVER RAMP AND NEW SERVICE ROADS/EXIT TO COLLEGEMASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 & I-12 COLLEGE DR FLYOVER RAMP

H.013869

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 882 818-06 NFA 6,400 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

STABILIZE BASE AND OVERLAYHICKS, MELVIN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 882: S JCT LA 134 - N JCT LA 134

EAST CARROLL

Page 1 - 14 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 27: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.010562

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA 000-19 FBROFF 853 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

E FELICIANA 000-19 FBROFF 451 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

BANK STREET & SINGLETARY STREET BRIDGES

EAST FELICIANA

H.013643

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 951 819-29 FEMA 1,689 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

REPAIR OF CROSS DRAIN, EMBANKMENT, ROADWAY, AND SHOULDERSPURLOCK, DLON Remrks:

Typ Imp:PW 01064

Project:Prj Mgr:

LA 951: ROADWAY WASHOUT REPAIRS

H.012969

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 374 820-02 NFA 1,585 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 18-19

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 374: LA 13 - JCT LOCAL RD

EVANGELINE

H.013092

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 376 820-07 NFA 2,756 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

COLD PLANE, STABILIZE BASE, AND ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 376: LA 1172 - US 167

H.013853

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE 000-20 HSIP 250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

INSTALL SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

INDUSTRIAL PARK RD:AKDN XING(EVANGELINE)

H.012886

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 869 821-21 NFA 1,200 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 869: E. JCT LA 618 - W. JCT LA 618

FRANKLIN

H.013003

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 865 349-03 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

FRANKLIN LA 865 349-03 NFA 800 PRESERVATION - NON-INTERSTATENFA

PATCH AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:PR NF NFA; PR NS TTF AS MATCH

Project:Prj Mgr:

LA 865: LA 4 - END MAINT.

Page 1 - 15 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 28: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013258

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 858 821-02 NFA 140 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

FRANKLIN LA 859 821-04 NFA 163 PRESERVATION - NON-INTERSTATENFA

FRANKLIN LA 865 821-17 NFA 23 PRESERVATION - NON-INTERSTATENFA

FRANKLIN LA 865 349-02 NFA 79 PRESERVATION - NON-INTERSTATENFA

LASALLE LA 774 830-10 NFA 53 PRESERVATION - NON-INTERSTATENFA

CONCORDIA LA 566 355-03 NFA 196 PRESERVATION - NON-INTERSTATENFA

CALDWELL LA 850 811-02 NFA 276 PRESERVATION - NON-INTERSTATENFA

CHIP SEALSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA858,LA859,LA865,LA774,LA566,LA850: AST

H.013760

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 128 170-01 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

FRANKLIN LA 562 165-03 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

INTERSECTION IMPROVEMENTSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4 INTERSECTON IMPROVEMENTS

H.012916

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT LA 158 822-12 NFA 3,033 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 18-19

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 158: US 71 TO VINEY RIDGE RD

GRANT

H.001842

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT LA 471 123-01 FBROFF 3,534 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

NEW BRIDGEPAINE, PEGGY JO Remrks:

Typ Imp:NFA AS MATCH FOR PHASES 1 TO 6

Project:Prj Mgr:

LA 471: DARTIGO CREEK & CREEK BRIDGES

H.011655

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 DEMO 490 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 18-19IBERIA LA 675 823-02 STPFLEX 82 PRESERVATION - ROAD PREVENTIVE

MAINTENANCE

DRAINAGE STRUCTURES, PATCH & THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 675: 0.53 MI SE US 90 - LA 674

IBERIA

H.011989

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NHPP 2,776 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REHABILIATIONWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LDRR AND LA329 OVERPASS

Page 1 - 16 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 29: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013685

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 87 241-01 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

REPAIR CROSS DRAINDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 87 CROSS DRAIN REPAIR @ LM 0.455

H.002765

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 400-31 STPFLEX 1,025 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:400-31-0013; 400-31 MATCH TTF

Project:Prj Mgr:

LA 86: LA 347 - LA 31

H.009860

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 1,644 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERIA 000-23 LOCAL 411 RAILROADS

INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0102

Project:Prj Mgr:

BNSF SEVERAL RR XINGS (NEW IBERIA)

H.009861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL HE 889 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERIA 000-23 LOCAL 311 RAILROADS

TRACK WORK FROM LA 14 TO FRENCH ST. (RAIL HE)SHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0105

Project:Prj Mgr:

BNSF (NEW IBERIA) LA 14/CENTER/FRENCH ST

H.009862

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL HE 44 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERIA 000-23 LOCAL 6 RAILROADS

REMOVE RAILROAD CROSSINGSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0108

Project:Prj Mgr:

BNSF (NEW IBERIA) CAROLINE ST.

H.011781

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 NHPP 838 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20IBERIA LA 87 823-26 STPFLEX 468 ROAD TRANSFER IBERIA LA 675 823-02 NHPP 1,773 OTHER / MISCELLANEOUS

COLD PLANE, PATCH, OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 675 & LA 87 IMP. IN NEW IBERIA (RT)

H.012016

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 STP>200K 455 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF LOREAUVILLE PROVIDING MATCH

Project:Prj Mgr:

ED BROUSSARD RD. SIDEWALKS

H.012627

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 997 230-04 NFA 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 19-20

ROADWAY EMBANKMENT, BASE COURSE, & SUPERPAVE ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 997: 2 MI S IBERV PL-3 MI S IBERV PL

H.012792

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 STP>200K 1,250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20IBERIA US 90 424-04 STP>200K 1,250 URBAN SYSTEMS

ROUNDABOUTBANKSTON, TANYA Remrks:

Typ Imp:IBERIA PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA 675 @ AIRPORT RD ROUNDABOUT

Page 1 - 17 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 30: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013265

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NHPP 2,560 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

CONCRETE PAVEMENT REHAB, ASPHALT SHOULDERS & RELATED WORSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 14 - LEWIS STREET

H.013640

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 STCASH 375 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

IMPROVE DRAINAGE IN THE AREADOMINGUE, CHRISTOPHER Remrks:

Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS PROJECT

Project:Prj Mgr:

US90 W FR. DRAINAGE IMP. @ SEGURA CANAL

H.013770

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 0 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP SIGNING AND STRIPING (IBERIA)

H.012604

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 77 219-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 18-19

MOVABLE BRIDGE MACHINERY REPAIRS, HYDRAULIC REPAIRSMICHIELS, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 77: GROSSE TETE BR HYD REPAIRS (HBI)

IBERVILLE

H.013243

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 997 230-03 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 18-19

MOVABLE BRIDGE MACHINERY REPAIRSMICHIELS, JASON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

BAYOU PIGEON PONTOON BR ELECTRIC WINCHE

H.012235

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 SR2S 290 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 19-20IBERVILLE 000-24 SR2S 25 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS, DRAINAGE, STRIPING, AND RELATED ACTIVITIESRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

WHITE CASTLE SIDEWALKS

H.012456

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 77 219-01 OTHER 913 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20IBERVILLE LA 77 219-01 STCASH 494 OTHER / MISCELLANEOUS

REPAIR BAYOU PLAQUEMINE STREAM EROSION TO STABILIZE ROADWANICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 77 BANK REPAIR AT BAYOU PLAQUEMINE

H.013438

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERVILLE 000-24 RAIL HE 100 RAILROADS

INSTALL GATES & CONC SURFACE ON DORCYSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

DORCY ST: UP RR XING (IBERVILLE)

Page 1 - 18 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 31: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013727

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 30 414-02 NHPP 1,834 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 30: LA 74 - ASCENSION P/L

H.013833

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE I-10 450-07 NHPP 783 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

SIGN UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: EXIT 127 OVERHEAD SIGN UPGRADE

H.010388

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 155 319-30 STPFLEX 2,067 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

JACKSON LA 155 090-06 STPFLEX 90 PRESERVATION - NON-INTERSTATENFA

OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:USE NFA AS MATCH ON CS 090-06

Project:Prj Mgr:

LA 155: LA 542 - QUITMAN HWY

JACKSON

H.012236

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 SR2S 198 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 18-19JEFFERSON 000-26 HSIPPEN 126 SAFETY - SAFE ROUTES TO PUBLIC

PLACES

SIDEWALKS, SAFETY IMPROVEMENTS AND OTHER RELATED ACTIVITIESMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

NORTH KENNER PEDESTRIAN SAFETY IMPR

JEFFERSON

H.012989

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NHPP 288 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

ORLEANS LA 428 410-01 NHPP 239 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ST CHARLES US 90 005-09 NHPP 383 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

APPROACH SLAB LEVELING WITH ASPHALT CONCRETEBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02 APPROACH SLAB LEVELING

H.013846

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 STGEN 68 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19JEFFERSON I-10 450-15 REIMB 5 OTHER / MISCELLANEOUS

TEMP. SHORING FOR EB I-10JOHNSON, ENNIS Remrks:

Typ Imp:SECRETARY'S EMERGENCY FUND LETTER DATED 1/16/2019

Project:Prj Mgr:

EMERGENCY TEMP. SHORING I-10 FIRE DAMAGE

H.007181

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 4,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

NEW ROADWAY AND ALIGNMENTLEBAS, MELISSA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

L&A ROAD IMPROVEMENTS

Page 1 - 19 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 32: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.007208

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3017 826-11 STP>200K 1,537 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON 000-26 STP>200K 13,040 URBAN SYSTEMS

NEW ROADWAY EXTENSIONLEBAS, MELISSA Remrks:

Typ Imp:742-26-0073; SEE NOTES

Project:Prj Mgr:

HARVEY BLVD EXT(PETERS RD-MANHATTAN

H.010626

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 FBROFF 1,033 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

SAUVE ROAD / SONIAT CANAL BRIDGE

H.011534

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 FBROFF 545 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

JEFFERSON 000-26 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

WEST LOYOLA & METAIRIE HEIGHTS BRIDGES

H.011670

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 GARVEE 100,000 INTERMODAL CONNECTOR 4-SCHEDULED FOR LETTING FY 19-20

INTERCHANGE IMPROVEMENTNICKEL, TIM Remrks:

Typ Imp:STIP PH 6 AC W/GARVEE. SEE NOTES FOR CONVERSION PLAN

Project:Prj Mgr:

I-10 / LOYOLA INTERCHANGE IMPROVEMENT

H.011797

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 1,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

COLD-MILL AND OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

AMES BLVD (WB EXPY - HAPPY ST)

H.012012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 1,434 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

CONCRETE OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH PROVIDING MATCH

Project:Prj Mgr:

RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR)

H.012571

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3152 826-03 NHPP 1,391 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

COLD PLANE AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3152: W. METAIRIE - ARGONNE ST.

H.012595

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3154 826-44 NHPP 291 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ADD RIGHT TURN LANE BY WIDENING ON LA 3154 AT DOCK STBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3154: RIGHT TURN LANE AT DOCK ST

H.012596

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 23 062-01 NHPP 499 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ADD AN ADDITIONAL LEFT TURN LANE ON LA 23 AT GRETNA BLVDBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 23: INTERSECTION IMP @ GRETNA BLVD

Page 1 - 20 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 33: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013292

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 466 063-02 STPFLEX 47 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON LA 466 063-02 LOCAL 7 RAILROADS

REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 466: NOGC RR XING (GRETNA)

H.013339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90 006-02 STPFLEX 134 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON US 90 006-02 LOCAL 19 RAILROADS

REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RR

Project:Prj Mgr:

US 90: IC/NOPB RR XING (JEFFERSON)

H.013435

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 611-9 826-04 STPFLEX 50 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 611-9 @ FOCIS ST.: NS RR (METAIRIE)

H.013706

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 NHPP 2,500 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

REPLACEMENT OF TUNNEL LIGHTING SYSTEMRODY, WALTER Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z: HARVEY TUNNEL LIGHTING REPL.

H.013768

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 HSIP 500 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

ALLIANCE ST: IC & KCS RR XINGS (KENNER)

H.013829

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NHPP 522 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

ORLEANS I-10 450-90 NHPP 1,043 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ORLEANS LA 47 148-02 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGN UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 & LA 47: OVERHEAD SIGN UPGRADE

H.013839

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

JEFFERSON I-10 450-15 NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

SLAB SPAN SUPERSTRUCTURE REPAIRPATTON, HEATHER Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LOYOLA BRIDGES (SLAB SPAN REPAIR)

H.013840

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 REIMB 100 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

JEFFERSON I-10 450-15 NHPP 100 PRESERVATION - BRIDGE (ONSYSTEM)

SLAB SPAN FIRE DAMAGE REPAIRPATTON, HEATHER Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: EB VETS BLVD BRIDGE (FIRE REPAIR)

Page 1 - 21 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 34: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013842

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3046 423-01 STP>200K 2,481 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON LA 3046 423-01 NHPP 6,800 PRESERVATION - BRIDGE (ON

SYSTEM)

JEFFERSON LA 3046 423-01 NHPP 11,950 OTHER / MISCELLANEOUS JEFFERSON LA 3046 423-01 NFI 1,659 OTHER / MISCELLANEOUS JEFFERSON LA 3046 423-01 LOCAL 250 OTHER / MISCELLANEOUS JEFFERSON LA 3139 430-01 STP>200K 1,456 URBAN SYSTEMS JEFFERSON 000-26 STP>200K 2,800 URBAN SYSTEMS JEFFERSON 000-26 STP>200K 3,073 URBAN SYSTEMS JEFFERSON LA 3046 423-01 STP>200K 985 URBAN SYSTEMS

REHABILITATION BRIDGE AND ROAD AND ADD ONRAMPYANG, LI Remrks:

Typ Imp:JEFFERSON PARISH PROVIDES THE MATCH

Project:Prj Mgr:

CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1

H.013849

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STBONDS 2,347 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON 000-26 NFI 2,653 OTHER / MISCELLANEOUS

NEW ROADWAYSHANKS, ANNA Remrks:

Typ Imp:

Project:Prj Mgr:

LAND RDWYS @ LOUIS ARMSTRONG INTL N TERM

H.012805

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS LA 102 827-17 STPFLEX 263 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFF DAVIS LA 102 827-17 LOCAL 38 RAILROADS JEFF DAVIS 000-27 STPFLEX 219 RAILROADS JEFF DAVIS 000-27 LOCAL 31 RAILROADS JEFF DAVIS LA 26 054-05 STPFLEX 219 RAILROADS JEFF DAVIS LA 26 054-05 LOCAL 31 RAILROADS

UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

BNSF SEVERAL RR XINGS (JENNINGS)

JEFFERSON DAVIS

H.012872

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 RAIL PD 311 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFF DAVIS 000-27 RAIL HE 44 RAILROADS JEFF DAVIS 000-27 LOCAL 39 RAILROADS JEFF DAVIS 000-27 LOCAL 6 RAILROADS

INSTALL NEW F/L'S, GATES, AND BELLS AND CLOSE DOYLE ST. XINGSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

PLAQ/DOYLE: BNSF RR XINGS (JENNINGS)

H.006531

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 HSIP 500 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 18-19LAFAYETTE 000-28 STP>200K 242 URBAN SYSTEMS

CONSTRUCTION OF A ROUNDABOUTRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDABOUT AT GIRARD PK AND HOSPITAL DR

LAFAYETTE

H.010557

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

LAJAUNIE RD / LATERAL 1 BAYOU ST. CLAIR

Page 1 - 22 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 35: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012286

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 339 828-12 STPFLEX 675 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

TURN LANE WIDENING, MILL, PATCH, OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 339: 0.41 MI W LA 182 - LA 182

H.012980

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3073 828-39 NHPP 3,535 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3073: US 167 - LA 3095

H.006538

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 SR2S 440 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 19-20

CONSTRUCTION OF SIDEWALKS AND CROSSWALKSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LAFAYETTE CONSOLIDATED GOVT SIDEWALKS

H.007233

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

PAVEMENT MARKINGSBANKSTON, TANYA Remrks:

Typ Imp:742-28-0007

Project:Prj Mgr:

LAFAYETTE MPO NON STATE PVT MARKING

H.010207

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 94 080-03 STPFLEX 540 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

ST MARTIN LA 94 080-04 NHPP 2,365 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

ST MARTIN LA 94 850-32 NHPP 290 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

COLD PLANE, PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 94: LA 353 - LA 328

H.011748

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 731 828-21 STPFLEX 675 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20LAFAYETTE LA 731-S 828-47 STPFLEX 150 ROAD TRANSFER

ASPHALT OVERLAY AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 731 & LA 731-S IMPROVEMENTS

H.011832

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 003-11 STP>200K 2,682 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

OVERLAY WITH ISOLATED RECONSTRUCTION WHERE NECESSARYBANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: CAMERON ST. OVERLAY

H.011833

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 3,600 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SCOTT PROVIDING MATCH

Project:Prj Mgr:

ST. MARY STREET SIDEWALKS

H.012018

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 2,157 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20LAFAYETTE 000-28 STP>200K 1,213 URBAN SYSTEMS

ADAPTIVE SIGNAL IMPLEMENTATIONFILLASTRE, ANDRE Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T PROVIDING MATCH ON LOCAL ROA

Project:Prj Mgr:

LAFAYETTE ADAPTIVE SIGNAL IMPLEMENTATION

Page 1 - 23 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 36: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012304

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STPFLEX 3,568 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

OVERLAY AND REHABILITATEBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH

Project:Prj Mgr:

LCG ROAD OVERLAY PROGRAM

H.012861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 348 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF CARENCRO WILL PROVIDE MATCH

Project:Prj Mgr:

PREJEAN ROAD PAVEMENT PRESERVATION

H.012864

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 94 080-03 STP>200K 522 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

CONSTRUCTION OF SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH

Project:Prj Mgr:

LA 94/CARMEL DRIVE SIDEWALKS

H.012866

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3025 828-23 STP>200K 532 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

CONSTRUCT SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH

Project:Prj Mgr:

SOUTH COLLEGE RD (LA 3025) SIDEWALKS

H.012890

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3073 828-39 NHPP 120 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ADDING A LEFT TURN LANE & MODIFYING MEDIAN OPENINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3073: MEDIAN IMPROVEMENTS

H.012915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ROADWAY WIDENING FOR CONTINUOUS TURN LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: PONT DES MOUTON - PREJEAN RD

H.012997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 343 393-03 STPFLEX 617 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

THIN LIFT OVERLAY OGFCSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 343: VERMILION PL - 0.6 MI S US 90

H.013097

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 93 828-15 STPFLEX 1,380 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

PATCH, COLD PLANE, OVERLAY, & RELATED WORKMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 93: 1.53 MI S US 90 - US 90

H.013256

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-10 450-05 STPFLEX 175 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

ACADIA I-10 450-04 STPFLEX 725 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

JEFF DAVIS I-10 450-03 STPFLEX 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

INSTALL ITS EQUIPMENT ON I-10 BETWEEN SCOTT AND LAKE CHARLESNICHOLS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 ITS SCOTT TO LAKE CHARLES

Page 1 - 24 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 37: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013360

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 93 433-01 STPFLEX 700 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

WIDENING, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 93: US 90 - BENOIT PATIN RD

H.008118

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 653 829-12 FBROFF 3,661 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:829-12-0021

Project:Prj Mgr:

LA 653: BAYOU DUMAR BRIDGE REPLACEMENT

LAFOURCHE

H.010109

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 76 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 18-19LAFOURCHE LA 316 412-02 HSIPPEN 1,116 SAFETY - SAFE ROUTES TO SCHOOLS LAFOURCHE LA 308 407-04 HSIPPEN 348 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALK IMPROVMENTS, CROSSWALK, SPEED DETECTION DEVICESMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

RACELAND AND BAYOU BLUE SIDEWALKS

H.010404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE US 90 005-07 NHPP 5,449 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: 2.5 MI E LA 182 - ST CHARLES P/L

H.010688

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 3235 829-26 HSIP 3,674 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

MEDIAN OPENINGS, TURN LANES, ACCEL/DECEL LANES, AND SIGNALSROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3235: IMP @ LA 3162, LA 3161 & LA 657

H.013084

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 186 SAFETY - SAFE ROUTES TO PUBLICPLACES

4-SCHEDULED IN CURRENT FY 18-19

CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

PELTIER PARK SIDEWALK

H.013134

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 3235 829-26 STPFLEX 137 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 18-19

INSTALL EMEG. GENERATOR AT LA 1 TOLL OPER. CSCRUNDELL, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1 TOLL CSC - EMERGENCY GENERATOR

H.013377

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 182 005-07 STPFLEX 1,378 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

MILLING AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: LA 308 - US 90

H.013818

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

MOVABLE BRIDGE MECHANICAL, ELECTRICAL, STRUCTURAL REHABGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308:BYU LAFOURCHE MB-GOLDEN MED.(HBI)

Page 1 - 25 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 38: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.009320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 20 065-05 HSIP 4,618 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

5 LEGGED ROUNDABOUTBANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

ACADIAN ROAD ROUNDABOUT

H.013225

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-90 NHPP 7,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: LA 1 BRIDGE -ST LOUIS STREET

H.013250

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE US 90 424-08 NHPP 4,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

LAFOURCHE US 90 005-07 NHPP 4,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL, PATCH, AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 308 - 2.3 MI E LA 182

H.013384

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-02 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

ARMORING TEST SECTIONROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1 ARMORING: LA 3090 - 3.3 MILES EAST

H.013429

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 STP<200K 193 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

ENHANCEMENTS - UPGRADE SIDEWALKS TO ADABANKSTON, TANYA Remrks:

Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH

Project:Prj Mgr:

DOWNTOWN THIBODAUX SIDEWALKS

H.000754

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-04 NHPP 7,280 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:022-04-0033

Project:Prj Mgr:

US 84: UP RAILROAD OVERPASS (HBI)

LASALLE

H.013541

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 125 131-01 STPFLEX 250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

TO INSTALL FLASHING LIGHTS, GATES AND BELLSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 125: UP RR CROSSING (LASALLE)

H.010009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 507 308-04 FBROFF 3,247 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

REPLACEMENT OF SUPERSTRUCTUREBUCCI, MARK Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 507 OVER I-20 BRIDGE REHABILITATION

LINCOLN

H.000133

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 STPFLEX 4,500 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:001-07-0026

Project:Prj Mgr:

US 80 OVERPASS @ KCS RR

Page 1 - 26 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 39: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.001679

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 146 085-09 STPFLEX 1,270 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

NEW BRIDGESUMEOZULU, JOE Remrks:

Typ Imp:085-09-0017;3 BRIDGES

Project:Prj Mgr:

LA 146 BRIDGES NEAR VIENNA

H.010472

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 STPFLEX 1,245 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: 0.9 MILES E. OF LA 818 - US 167

H.012220

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 147 043-03 STPFLEX 2,285 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 147: BIENVILLE P.L. - BIENVILLE P.L.

H.012704

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 545 308-08 NFA 3,686 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 545: LISBON HWY - LA 152

H.012711

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 151 317-04 NFA 3,123 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

UNION LA 151 317-03 NFA 107 PRESERVATION - NON-INTERSTATENFA

UNION LA 151 317-05 NFA 252 PRESERVATION - NON-INTERSTATENFA

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 151: LA 145 - LA 33

H.004634

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 832-13 STBONDS 7,460 CAPACITY 4-SCHEDULED IN CURRENT FY 18-19

WIDENING (CONC PAVEMENT)PAINE, PEGGY JO Remrks:

Typ Imp:832-13-0019;700-32-0122 ENGINEERING ($800.000)

Project:Prj Mgr:

JUBAN RD WIDENING (I-12 - US 190)

LIVINGSTON

H.011278

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 HSIP 3,836 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

MEDIAN CABLE BARRIER INSTALLATIONTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-12:MEDIAN CABLE BARRIER

H.011528

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 FBROFF 1,087 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

LIVINGSTON 000-32 FBROFF 394 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

GEORGE MASHON RD & TRAVIS STREET BRIDGES

Page 1 - 27 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 40: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.011824

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STPFLEX 804 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED IN CURRENT FY 18-19

LIVINGSTON LA 1026 832-13 STPFLEX 2,753 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INTERSECTION IMPROVEMENTHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: ROUNDABOUT AT BUDDY ELLIS RD

H.011825

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STPFLEX 1,894 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19LIVINGSTON 000-32 STP>200K 1,596 URBAN SYSTEMS

BRIDGE REPLACEMENT AND OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

BUDDY ELLIS ROAD IMPROVEMENTS

H.012875

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 NHPP 1,341 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

4-SCHEDULED IN CURRENT FY 18-19

PROVIDE NEW INTERSTATE LIGHTING SYSTEMARMENTOR, MICHAEL Remrks:

Typ Imp:ENTITY (CITY OF DENHAM SPRINGS) TO PROVIDE MATCH

Project:Prj Mgr:

I-12: LA 1026 (JUBAN RD) INTCHG LIGHTING

H.013635

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 444 832-18 STCASH 200 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

REPLACE EXISTING CROSS DRAIN AND HEADWALLTASSIN, BEN Remrks:

Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS PROJECT

Project:Prj Mgr:

LA 444: CROSS DRAIN REPLACEMENT

H.002375

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 260-02 STPFLEX 23,124 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

NEW BRIDGETONEY, PATRICK Remrks:

Typ Imp:260-02-0040

Project:Prj Mgr:

AMITE R.BR. NEAR FRENCH SETTLEMENT

H.002381

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 43 260-07 STPFLEX 651 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

NEW BRIDGEISEMANN, ROBERT Remrks:

Typ Imp:260-07-0025

Project:Prj Mgr:

LA 43 CREEK BRIDGE NEAR ALBANY

H.011827

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 3,446 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH PROVIDING MATCH

Project:Prj Mgr:

DUNN ROAD IMPROVEMENTS

H.011828

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 2,265 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENT AND OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH PROVIDING MATCH

Project:Prj Mgr:

FORREST DELATTE ROAD IMPROVEMENTS

H.012308

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 DEMO 9,447 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 19-20

CONCRETE PAVEMENT, DRAINAGE, BRIDGE, SIDEWALKS, EARTHWORKMASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

COOK ROAD IMP: LA16 TO JUBAN CROSSING

Page 1 - 28 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 41: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013158

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 344 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LINDER ROAD BRIDGE REPLACEMENT

H.013531

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 691 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:CITY OF WALKER TO PROVIDE MATCH.

Project:Prj Mgr:

PEAK LANE IMPROVEMENTS

H.013532

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 HSIPPEN 260 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNS, STRIPING & FLASHING BEACONSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

DENHAM SPRINGS ROAD SIGNING & STRIPING

H.013724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 STPFLEX 900 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

THIN LIFT OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: LA 42 TO LA 1026

H.012739

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-09 NHPP 21,508 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

MADISON I-20 451-09 OTHER 21,508 OTHER / MISCELLANEOUS

BRIDGE REHABILITATIOND'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 MRB AT VICKSBURG OVERLAY AND REHAB

MADISON

H.012746

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 FLH 322 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19MADISON I-20 451-08 STP<5K 171 PRESERVATION - INTERSTATE

PAVEMENT REPLACEMENT ON EXISTING ALIGNMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: QUEBEC ROAD OVERPASS APPROACHES

H.006170

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE 000-34 FBROFF 1,081 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

MARTIN LUTHER KING SOUTH BRIDGE

MOREHOUSE

H.012941

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 425 071-04 STPFLEX 750 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: LA 134 - LA 2

Page 1 - 29 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 42: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012920

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1226 359-02 NFA 3,210 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 18-19

NATCHITOCHES LA 1227 835-19 NFA 367 PRESERVATION - NON-INTERSTATENFA

PATCHING, MILLING, OVERLAY, AND BASE REHABSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1226 & LA 1227: US 84 - PLACID OIL RD

NATCHITOCHES

H.010357

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 153 088-01 STPFLEX 2,750 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

STABILIZED BASE AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 153: JCT LA 9 - FIVE FORKS ROAD

H.012144

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 478 116-02 NFA 2,345 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 478: VOWELLS MILL TO LA 117

H.012145

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 120 042-07 STP<5K 2,651 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 120: LA 117 - 830' E OF BENNETT ROAD

H.013832

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-06 NHPP 1,750 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

HYDRO-DEMOLITION AND OVERLAY OF EXISTING MAIN SPAN DECKD'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

LA 6: GRAND ECORE BRIDGE DECK REPAIR

H.009354

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 RTP 89 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19ORLEANS 000-36 LOCAL 11 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF BIKE LANES, A MULTI-USE PATH AND CROSSINGSNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

BROAD STREET CORRIDOR BIKEWAY

ORLEANS

H.010872

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 RTP 146 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19ORLEANS 000-36 LOCAL 30 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 2.3 MILES OF BIKE LANENUNES, BRIAN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

EARHART CORRIDOR BIKEWAY LINKAGE

H.012371

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 3,708 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19

REHABILITATION ASPHALT OVERLAY AND ADA CURB WORKLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH TO PROVIDE THE MATCH

Project:Prj Mgr:

MARCONI DRIVE: CITY PARK AVE - I-610

Page 1 - 30 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 43: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012901

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 NHPP 8,006 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

PERMANENT SIGN REPLACEMENTNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z (MAGNOLIA STREET - BODENGER BLVD)

H.012956

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 39 046-31 NHPP 1,221 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 18-19

MECHANICAL REHAB OF SPAN LIFT MACHINERYMICHIELS, JASON Remrks:

Typ Imp:HISTORIC BRIDGE IMPROVEMENT (HBI)

Project:Prj Mgr:

LA 39: JUDGE SEEBER BR MECH REHAB (HBI)

H.013586

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 HSIPPEN 1,849 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

HIGH FRICTION SURFACE TREATMENTROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 HFST: CANAL ST - ST. PHILIP ST

H.013824

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 1264 836-15 STCASH 26 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

TAKING AND TESTING GIRDER SAMPLESJOHNSON, ENNIS Remrks:

Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED

Project:Prj Mgr:

TED HICKEY BRIDGE: GIRDER SAMPLES

H.007272

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 DEMO 3,226 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 19-20

NEW 2-LANE ROADWAYBRIGNAC, CHRISTINA Remrks:

Typ Imp:742-36-0136;CITY OWNS R/W

Project:Prj Mgr:

HOWARD AVENUE EXTENSION

H.007273

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 3,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:742-36-0137; USE LOCAL AS MATCH

Project:Prj Mgr:

MAGAZINE ST (BROADWAY TO EAST DRIVE)

H.007274

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:742-36-0139; USE LOCAL AS MATCH

Project:Prj Mgr:

MAGAZINE ST (EAST DRIVE TO NASHVILLE)

H.010018

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 21,000 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO EAST DRAIN CANAL BRIDGE REPLACE

H.010405

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-90 STPFLEX 2,358 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: 900' W INDUSTRIAL PKWY-FLOOD GATE

Page 1 - 31 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 44: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.010414

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 1253 419-02 STPFLEX 250 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

PCC REHABSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1253: DOWNMAN RD - I-10 FRONTAGE RD

H.010634

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 NHPP 4,410 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

JEFFERSON US 90-Z 283-09 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

UPGRADING SIGNS ENTIRE LIMITS.UPGRADING STRUCTURES AS NEEDNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z (BODENGER BLVD - STUMPF BLVD)

H.012370

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 6,618 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

PRESERVATION ASPHALT OVERLAY AND RELATED ADA CURB WORKLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH TO PROVIDE MATCH

Project:Prj Mgr:

MORRISON RD: MAYO AVE - READ AVE

H.012372

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 4,412 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

CONCRETE PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH TO PROVIDE MATCH

Project:Prj Mgr:

MORRISON RD: READ AVE - BULLARD AVE

H.012373

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 4,483 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

REHABILITATION ASPHALT OVERLAY AND ADA COMPLIANT CURBSLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH PROVIDING MATCH

Project:Prj Mgr:

ML KING BLVD: S CLAIBORNE - ST. CHARLES

H.012473

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 700 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIDEWALKS AND OTHER SAFETY ENHANCEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

ZACHARY TAYLOR & MARCONI DR SIDEWALKS

H.012676

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-610 450-34 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

EXTEND LEFT TURN LANE AND STORAGE OF I-610 AT WEST ENDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-610: OFF RAMP IMPROVEMENTS @ WEST END

H.012682

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 1,731 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20

INSTALL PEDESTRIAN COUNTDOWN SIGNALSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

PEDESTRIAN CROSSWALK ENH. (NO PH 2)

H.012993

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 39 046-31 NHPP 1,400 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

COLD PLANE AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: ST. BERNARD AVE. - CLAIBORNE BR.

Page 1 - 32 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 45: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013211

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 46 046-02 NHPP 3,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

ORLEANS LA 46 046-02 HSIPPEN 276 SAFETY

MILL, PATCH, OVERLAY AND HANDICAPPED CURB RAMPSBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 46: LA 39 - ST. BERNARD P/L

H.013391

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 1,610 SAFETY 4-SCHEDULED FOR LETTING FY 19-20ORLEANS 000-36 STPFLEX 1,610 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

JEFFERSON 000-26 HSIPPEN 210 SAFETY JEFFERSON 000-26 STPFLEX 210 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

ST BERNARD 000-44 HSIPPEN 280 SAFETY ST BERNARD 000-44 STPFLEX 280 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02BC FLASHING YELLOW ARROW PART 2

H.013442

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 1,737 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

4-SCHEDULED FOR LETTING FY 19-20

PROVIDE ROADWAY LIGHTINGARMENTOR, MICHAEL Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CROWDER BLVD INTERSTATE LIGHTING

H.013587

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 HSIPPEN 1,100 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

HIGH FRICTION SURFACE TREATMENTROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 HFST @ MORRISON RD

H.013746

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 STPFLEX 1,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

ORLEANS US 90 006-03 NHPP 300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILLING AND OVERLAY WITH ASPHALT CONCRETEBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 SERVICE ROAD: POYDRAS-ST BERNARD

H.008221

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 134 837-06 STPFLEX 1,615 CAPACITY 4-SCHEDULED IN CURRENT FY 18-19OUACHITA 000-37 STPFLEX 602 CAPACITY

REALIGN THE INTERSECTION OF LA 134 & US 165GARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 134 IMPROVEMENTS AT US 165

OUACHITA

H.011739

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 165 015-31 STP<200K 659 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19

LIGHTINGBANKSTON, TANYA Remrks:

Typ Imp:CITY OF MONROE WILL PROVIDE MATCH

Project:Prj Mgr:

US 165 SOUTH LIGHTING

Page 1 - 33 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 46: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013040

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19OUACHITA 000-37 LOCAL 169 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 6,445' LONG BY 6' WIDE WALKING TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

TRENTON NATURE TRAIL

H.013564

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA I-20 451-06 NHPP 850 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: PAVEMENT MARKING REPLACEMENT VII

H.013683

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 594 326-02 RAIL PD 232 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19OUACHITA LA 594 326-02 LOCAL 29 RAILROADS

UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 594: UP RR XING (OUACHITA)

H.009297

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 SR2S 632 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 19-20OUACHITA LA 3033 837-12 SR2S 59 SAFETY - SAFE ROUTES TO SCHOOLS OUACHITA LA 840-1 837-21 SR2S 93 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS/PED PATHSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

OUACHITA PAR. POLICE JURY SIDEWALKS

H.010012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 STPFLEX 7,871 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

REPLACEMENT OF BRIDGE OVERPASSCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: US 80 OVERPASS BRIDGE REPLACEMENT

H.010287

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 3249 837-19 HSIP 5,287 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

ROUNDABOUT AT I-20/WELL RDGARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3249: ROUNDABOUT @ I-20/WELL RD.

H.012297

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 HSIPPEN 115 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20

IMPR TRAFFIC FLOW REPL STRIPING, ADD PED. SIG & TRAFFIC SIGMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

MCMILLAN RD/BLANCHARD ST IMPROVEMENTS

H.012439

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20OUACHITA 000-37 STPFLEX 0 RAILROADS OUACHITA LA 151 317-01 RAIL PD 300 RAILROADS

RR SIGNALIZATIONSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RR

Project:Prj Mgr:

LA 151 & CALHOUN RD: KCS XINGS(CALHOUN)

H.012852

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA I-20 451-06 HSIP 450 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

CONCRETE PAVING, SIGNAL WORK, SIGN RELOCATIONBALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 WB OFF RAMP @ LA 617 (THOMAS ROAD)

Page 1 - 34 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 47: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013392

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 611 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

MILL AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

MANE STREET REHABILITATION PHASE 2

H.013394

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 1,248 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

RECONSTRUCT 2-LANE ROADWAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.

Project:Prj Mgr:

MANE STREET REHABILITATION PHASE 1

H.013395

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 474 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.

Project:Prj Mgr:

PARKWOOD DR REHAB: GLENWOOD - LA 143

H.013577

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 165 015-31 HSIP 500 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIDEWALKSHICKS, MELVIN Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: RICHWOOD SIDEWALKS

H.013776

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 345 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH

Project:Prj Mgr:

WELL ROAD (NEW NATCH. RD - I-20 INT.)

H.013791

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 335 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH

Project:Prj Mgr:

HADLEY ST (U.S. HWY 165 - NUTLAND RD)

H.013796

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 156 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH

Project:Prj Mgr:

TANGLEWOOD DRIVE (LA 15 - DELLWOOD DR.)

H.013798

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 686 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH

Project:Prj Mgr:

HARRELL ROAD (US 80 - ARKANSAS RD)

H.012725

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES 000-38 HSIP 378 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19

INSTALL GATESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

AVENUE G: NOGC XING(BELLE CHASE)

PLAQUEMINES

H.013778

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-06 STCASH 29 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

DRAINAGE IMPROVEMENTSJOHNSON, ENNIS Remrks:

Typ Imp:LETTER BID IN DISTRICT

Project:Prj Mgr:

LA 23: DRAINAGE IMPROVEMENTS BOOTHVILLE

Page 1 - 35 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 48: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.004791

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 NHPP 5,529 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20PLAQUEMINES LA 23 062-02 NHPP 5,900 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 NHPP 16,328 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 GARVEE 12,500 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 EARMARK 56,250 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 STP>200K 12,000 URBAN SYSTEMS PLAQUEMINES LA 23 062-02 NHPP 25,143 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 TOLLS 24,110 OTHER / MISCELLANEOUS

REPLACE BRIDGE AND TUNNELOLIVIER, NICHOLAS Remrks:

Typ Imp:SEE NOTES FOR CONVERSION PLAN.STIP PH 6 AC-ED W FUNDS SHOW

Project:Prj Mgr:

LA 23: BELLE CHASSE BRIDGE & TUNNEL(HBI)

H.010724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE 000-39 FBROFF 1,045 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

PECAN ISLAND ROAD BRIDGE OVER THE CHENAL

POINTE COUPEE

H.012936

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 78 229-05 STPFLEX 1,476 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

PATCH, THIN ASPHALTIC CONCRETE OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 78: US 190 - LA 1

H.011505

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-09 NHPP 447 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 18-19

RAPIDES US 71 008-30 NHPP 1,041 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

RAPIDES US 71 840-43 NHPP 212 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

RAPIDES US 165 014-06 NHPP 227 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

RAPIDES LA 28 417-02 NHPP 203 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

INSTALLING CCTVS AND DMSSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

ALEXANDRIA ITS PHASE 3

RAPIDES

H.012963

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-30 NHPP 118 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

RAPIDES US 167 023-01 NHPP 147 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 623 149-01 STPFLEX 179 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 3100 840-29 STPFLEX 534 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 3100-S 840-40 STPFLEX 259 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 1208-1 840-48 STPFLEX 382 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

PCCP PATCHING, JOINT AND CRACK SEAL, CURB REPAIRSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

CONCRETE PATCHING RAPIDES PARISH

Page 1 - 36 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 49: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013568

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 677 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: PAVEMENT MARKING REPLACEMENT VII

H.013831

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NFA 1,030 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

PATCH, MILL, AND OVERLAYRACHAL, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 SERVICE ROADS REPAIR: RAPIDES (RT)

H.013878

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 28 417-02 NHPP 219 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 28 SIGNAL PERFORMANCE MEASURES

H.000577

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165-X 015-01 NHPP 1,763 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REMOVAL. REPLACE WITH AT GRADE CROSSINGMUSA, ELNUR Remrks:

Typ Imp:015-01-0049;SCOPE CHANGED

Project:Prj Mgr:

US 165-X: KCS RAILWAY OVERPASS

H.008263

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 3144 840-34 HSIP 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

ROUNDABOUTRACHAL, JASON Remrks:

Typ Imp:840-34-0008

Project:Prj Mgr:

LA 3144/SUSEK DRIVE ROUNDABOUT

H.011526

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 FBROFF 620 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

RAPIDES 000-40 FBROFF 610 PRESERVATION - BRIDGE (OFFSYSTEM)

RAPIDES 000-40 FBROFF 614 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

CASTOR PLNGE/H.STRANGE/PALMER CHPL BRDG

H.011531

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 FBROFF 536 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

RAPIDES 000-40 FBROFF 445 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

DIXIE CHURCH & SETLIFF ROAD BRIDGES

H.012559

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 STP<200K 605 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

PATCHING, COLD PLANNING AND RESURFACINGBANKSTON, TANYA Remrks:

Typ Imp:CITY OF ALEXANDRIA PROVIDING MATCH

Project:Prj Mgr:

INDUSTRIAL PARK SITE ROAD RECONSTRUCTION

Page 1 - 37 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 50: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012967

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 112 073-03 STPFLEX 1,320 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

ULTRATHIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 112: US 165-RUTH FORD DR - ULTRATHIN

H.013288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 107 142-04 STPFLEX 68 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20RAPIDES LA 107 142-04 LOCAL 41 RAILROADS

REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 107: KCS RR XING (PINEVILLE)

H.013440

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 RAIL PD 350 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

INSTALL FLASHING LIGHTS, GATES & BELLS AT POWELL & KARLASHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

POWELL & KARLA: UP RR XINGS (RAPIDES)

H.013452

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 STP<200K 3,107 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

ASPHALT REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF ALEXANDRIA TO PROVIDE MATCH.

Project:Prj Mgr:

HORSESHOE DRIVE ROADWAY IMPROVEMENTS

H.013856

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 506 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

SIGN UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 @ US 165: RAMP TRUSS REPLACEMENT

H.011087

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER 000-41 FBROFF 1,794 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:DOTD PROVIDES THE MATCH FOR THE OFF-SYSTEM HWY BR PROGRA

Project:Prj Mgr:

WESTDALE PLANTATION ROAD / BAYOU PIERRE

RED RIVER

H.001972

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 135 167-02 STPFLEX 1,431 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

NEW BRIDGEGARY, VERTIE Remrks:

Typ Imp:167-02-0016

Project:Prj Mgr:

MUDDY BAYOU BRIDGE

RICHLAND

H.000974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 15 026-09 STPFLEX 6,550 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:026-09-0024

Project:Prj Mgr:

BOEUF RIVER BRIDGE

Page 1 - 38 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 51: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.010204

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND US 425 071-01 HSIP 2,334 SAFETY 4-SCHEDULED FOR LETTING FY 19-20RICHLAND 000-42 HSIP 915 SAFETY

INSTALL ROUNDABOUTJESCLARD, TREY Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: ROUNDABOUT @ JULIA & LOUISA

H.012707

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 622 341-02 NFA 2,079 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 622: LA 576 - LA 576

H.010366

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 175 035-01 STPFLEX 3,785 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: 300' S OF SHIRWILLIS DR - LA 120

SABINE

H.011525

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE 000-43 FBROFF 420 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

SNEED ROAD / TORO CREEK

H.010696

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE 000-43 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

INSTALL F/L'S & GATESSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

GANDY RD: KCS RR XING (SABINE)

H.012305

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 FBROFF 1,220 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

VIRTUE STREET / GUICHARD CANAL

ST BERNARD

H.012612

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 39 046-32 NHPP 138 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 18-19

ADD RIGHT TURN LANE ON LA 39 AT DR MERAUX BLVDBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: RIGHT TURN LANE @ DR MERAUX BLVD

H.012752

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 46 046-03 STP>200K 230 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20ST BERNARD 000-44 STP>200K 938 URBAN SYSTEMS

INTERSECTION IMPROVEMENTLEBAS, MELISSA Remrks:

Typ Imp:PORT OF ST. BERNARD WILL PROVIDE THE MATCH FOR CS 000-44

Project:Prj Mgr:

LA 46 @ WEINBERGER RD INTERSECTION

Page 1 - 39 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 52: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013560

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 47 148-01 NHPP 2,488 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

ORLEANS LA 47 148-02 NHPP 719 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 47: LA 46 - ORLEANS PL

H.000320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES US 61 007-03 STP>200K 1,400 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19ST CHARLES US 61 007-03 STP>200K 1,590 URBAN SYSTEMS ST CHARLES US 61 007-03 LOCAL 1,133 URBAN SYSTEMS ST CHARLES US 61 007-03 NHPP 658 PRESERVATION - NON-INTERSTATE

ON NHS SYSTEM

JEFFERSON US 61 007-02 NHPP 675 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL AND OVERLAYGAUDET, COREY Remrks:

Typ Imp:007-03-0060

Project:Prj Mgr:

US 61: RR OVERPASS - LA 50

ST CHARLES

H.012600

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 18 063-05 STPFLEX 427 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 18-19

ADD LEFT TURN LANE ON LA 18 AT LA 3060BROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 18: LEFT TURN LANE @ LA 3060

H.012836

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 3127 428-03 STPFLEX 176 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 18-19

ADD RIGHT TURN LANE ON LA 3127 AT LA 3141BROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3127: RIGHT TURN LANE AT LA 3141

H.011553

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 632 845-09 STP<5K 400 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

ST CHARLES LA 632 845-09 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM

ASPHALT OVERLAY, PATCHING, STRIPINGBROWN, JOSEPH C. Remrks:

Typ Imp:PR NF NFA AS MATCH; PR NI TTF AS MATCH

Project:Prj Mgr:

LA 632: LA 306 - LA 631

H.012051

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES US 90 005-09 NHPP 627 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

JEFFERSON US 90 005-10 NHPP 67 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

TURN LANESBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: FLOODWALL - S KENNER AVE

Page 1 - 40 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 53: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012617

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-38 NHPP 1,750 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 19-20ST CHARLES I-310 450-36 NHPP 500 PRESERVATION - INTERSTATE

COLD PLANE AND 2" OVERLAY AND PCCP REHABMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-310: 0.75 MI N OF LULING BR - US 90

H.013567

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-36 NHPP 700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

ST CHARLES I-310 450-38 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-310: PAVMENT MARKING REPLACEMENT I

H.002407

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 63 262-30 STPFLEX 2,132 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

NEW BRIDGEWINDMANN, ANDREW Remrks:

Typ Imp:262-30-0008

Project:Prj Mgr:

LA 63: PIGEON CREEK BRIDGE

ST HELENA

H.008312

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 1042 846-03 FBROFF 3,153 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTUMEOZULU, JOE Remrks:

Typ Imp:846-03-0014;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

LA 1042 BRIDGES NEAR GREENSBURG

H.009481

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 20 065-07 STPFLEX 6,320 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 20 BAYOU CHEVREUIL BRIDGE

ST JAMES

H.012075

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 3125 426-31 STPFLEX 1,167 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ADD EB AND WB LEFT TURN LANES ON LA 3125SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3125: IMPROVEMENTS AT LA 642

H.012983

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 640 848-01 STPFLEX 453 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

THIN LIFT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 640: LA 18 - LA 3127

ST JOHN

Page 1 - 41 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 54: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013876

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN I-10 450-13 STCASH 38 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19ST JOHN I-10 450-13 REIMB 38 OTHER / MISCELLANEOUS ST JOHN I-10 450-13 STCASH 38 OTHER / MISCELLANEOUS ST JOHN I-10 450-13 REIMB 38 OTHER / MISCELLANEOUS

BRIDGE RAIL REPAIRHARPER, CALEB Remrks:

Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS

Project:Prj Mgr:

I-10: RESERVE RELIEF CANAL BRIDGE REPAIR

H.011515

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 44 256-01 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 19-20

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 44: PALM ST & BEECH ST DRAINAGE

H.013291

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 STPFLEX 476 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

JUDSON WALSH DRIVE OVER DRAINAGE BAYOU

ST LANDRY

H.008332

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 360 849-11 FBROFF 2,800 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTKEMP, KELLY Remrks:

Typ Imp:849-11-0010; USE NFA AS MATCH

Project:Prj Mgr:

LA 360: ROUGE BAYOU BRIDGE REPLACEMENT

H.012558

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 182 032-03 STPFLEX 2,440 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

COLD PLANE, OVERLAY, PATCHING, AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: END ONE WAY COUPLET - US 167

H.013198

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 NHPP 6,450 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH, OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 EB & WB: MPRR OPASS - LA 742

H.013200

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 NHPP 3,075 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH, OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 (EB): LA 742 - BAYOU COURTABLEU

H.013811

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 104 202-03 STPFLEX 1,830 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL, BASE STABILIZATION, AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 104: 2.5 MI NW US 190 - US 190

Page 1 - 42 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 55: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013860

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 742 012-30 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20

UPGRADE RR SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 742: UP RR XING (ST LANDRY)

H.010601

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN I-10 450-06 NHPP 34,861 CORRIDOR 4-SCHEDULED IN CURRENT FY 18-19ST MARTIN I-10 450-06 NHPP 3,567 CORRIDOR ST MARTIN I-10 450-06 NHPP 6,921 CORRIDOR ST MARTIN I-10 450-06 FREIGHT-HY 19,129 CORRIDOR ST MARTIN 000-50 NHPP 8,616 CORRIDOR

INTERSTATE WIDENING AND REHABILITATIONOLIVIER, NICHOLAS Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LA 328 TO LA 347

ST MARTIN

H.011485

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 336-1 056-04 NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

CLEANING AND PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA336-1: BAYOU TECHE BRIDGE REHAB (HBI)

H.012574

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 96 238-02 STPFLEX 3,107 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

LAFAYETTE LA 96 238-01 STPFLEX 580 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE, BASE REHABILITATION, OVERLAY, AND RELATED WORKBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 96: LA 182 - 0.56 MI. W. OF LA 31

H.012863

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 STP>200K 1,364 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:ST. MARTIN PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

CYPRESS ISLAND HWY PAVEMENT PRESERVATIO

H.013247

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN I-10 450-06 NHPP 1,200 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 19-20

EMBANKMENT, COLD PLANE, PATCH, OVERLAY, AND RELATED WORWKMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 RAMPS @ BUTTE LA ROSE

H.013327

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 336-1 850-25 STPFLEX 100 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

MILL, PATCH, OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 336-1: 0.19 MI SW LA 31- LA 31

Page 1 - 43 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 56: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013851

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN I-10 450-06 NHPP 193 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

LAFAYETTE US 167 424-02 NHPP 165 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ST MARY US 90 424-05 NHPP 260 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGN UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10, US 90 & 167: OVERHEAD SIGN UPGRADE

H.010829

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 19-20ST MARY 000-51 LOCAL 38 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF MULTI-USE TRAILHEADSNUNES, BRIAN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

ST. MARY PARISH BAYOU TECHE TRAILHEADS

ST MARY

H.011487

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 005-01 STPFLEX 15,000 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BERWICK BAY BRIDGE REHAB (HBI)

H.002446

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 40 269-07 STPFLEX 3,739 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

TANGIPAHOA LA 40 269-06 STPFLEX 855 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGEBUCCI, MARK Remrks:

Typ Imp:269-07-0012

Project:Prj Mgr:

LA 40: TCHEFUNCTE RIVER BRIDGE

ST TAMMANY

H.009460

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 HSIPPEN 531 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 18-19

SIGNAGEMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

ST. TAMMANY PARISH SIGNING & STRIPING

H.011855

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAPFLEX 638 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 18-19ST TAMMANY 000-52 LOCAL 246 ENHANCEMENTS

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF MANDEVILLE

Project:Prj Mgr:

MANDEVILLE: W CAUSEWAY APPROACH PATH

H.011921

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 STPFLEX 1,146 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

HWY 41 SPUR BRIDGE / GUM CREEK

Page 1 - 44 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 57: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012947

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-07 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 18-19

WIRE ROPE REPLACEMENTLAMBERT, JARRETT Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: WEST PEARL BR WIRE ROPE REPL

H.013314

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 21 059-01 STPFLEX 363 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

ASPHALT MILL AND 3" OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 21: 13TH AVE TO US190B

H.010668

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

ST TAMMANY 000-52 FBROFF 1,500 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

MILLION DOLLAR RD/HOSMER MILL RD BRIDGES

H.011216

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 HSIPPEN 377 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20

PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12 LOCAL ROADSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CITY OF SLIDELL PAVEMENT MARKINGS

H.011260

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190-X 013-10 HSIP 948 SAFETY 4-SCHEDULED FOR LETTING FY 19-20ST TAMMANY 000-52 HSIP 948 SAFETY

ROUNDABOUT CONSTRUCTIONTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

US 190B @ JEFFERSON AVE. ROUNDABOUT

H.011721

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 013-12 STP<200K 2,134 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20ST TAMMANY LA 22 261-06 STP<200K 1,066 URBAN SYSTEMS

INTERSECTION IMPROVEMENTSBANKSTON, TANYA Remrks:

Typ Imp:USE TTF AS MATCH

Project:Prj Mgr:

US 190/LA 22 IMPROVEMENTS

H.012064

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 030-31 NHPP 2,584 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

WIDEN TO THREE LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: US 190B - LA 25

H.012856

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 STP<200K 798 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SLIDELL WILL PROVIDE MATCH

Project:Prj Mgr:

NATCHEZ DRIVE REHABILITATION

H.013151

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 852-24 STP<200K 624 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

SIDEWALK IMPROVEMENTSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH

Project:Prj Mgr:

US 190(GAUSE BLVD) SIDEWALK IMPROVEMENTS

Page 1 - 45 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 58: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013381

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 STP<200K 277 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH

Project:Prj Mgr:

LINDBERG DRIVE @ US 190(GAUSE BLVD)

H.013711

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 NHPP 1,900 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

ST TAMMANY US 190 013-11 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

NEW ITS EQUIPMENT, UPGRADE ITS EQUIPMENT, FIBER OPTIC CABLEESTEVEN, ROY Remrks:

Typ Imp:

Project:Prj Mgr:

NORTHSHORE PHASE 3 ITS DEPLOYMENT

H.013728

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 41 058-01 STPFLEX 3,100 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

MILL & OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 41: DUMP ROAD - LA 436

H.013845

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-10 450-18 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

ST JOHN I-55 452-01 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGN UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 & I-55: OVERHEAD SIGN UPGRADE

H.010645

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 38 263-04 STPFLEX 1,500 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19

RAILROAD SIGNALS AND SURFACE WORKSHREWSBERRY,BILL Remrks:

Typ Imp:SEE NOTES FOR FUNDING. STBONDS AVAILABLE FOR MATCH

Project:Prj Mgr:

IC(KENTWOOD) LA 38 RR X-ING IN KENTWOOD

TANGIPAHOA

H.012874

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA I-55 452-90 NHPP 2,409 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

4-SCHEDULED IN CURRENT FY 18-19

PROVIDE ROADWAY LIGHTINGFUNG, AGNES Remrks:

Typ Imp:

Project:Prj Mgr:

I-55: LA 22 INTERSTATE LIGHTING

H.013077

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA I-55 452-90 STCASH 250 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

SEWER FACILITY REPAIRSBERNER, DARRICK Remrks:

Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED

Project:Prj Mgr:

I-55 REST AREA SEWER FACILITY REPAIR

H.013260

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA I-55 452-90 NHPP 3,103 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19

SLOPE FAILURE REPAIRBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

I-55: .2 MILE S US 190 OVP SLOPE REPAIR

Page 1 - 46 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 59: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013266

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-04 NHPP 149 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

TANGIPAHOA US 51-X 853-36 NHPP 132 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

TANGIPAHOA LA 3234 853-40 NHPP 333 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

TANGIPAHOA US 51-X 013-08 NHPP 296 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

TANGIPAHOA US 190 013-09 NHPP 115 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MINOR REHABBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 51, 51-X, 190, LA 3234: CONC SPOT REP

H.013814

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 440 276-04 STCASH 100 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

REPAIR TO BOX CULVERTS WITH INVERT ERROR ON LA 440TASSIN, BEN Remrks:

Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS PROJECT

Project:Prj Mgr:

LA 440: BOX CULVERT REPAIR

H.011512

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-05 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 19-20

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 51 @ SYCAMORE ST AMITE CITY DRAINAGE

H.011519

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 1063 853-34 STPFLEX 225 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 19-20

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1063: GLENDALE DR - US 51 DRAINAGE

H.013113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-03 STP<200K 2,920 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20LIVINGSTON LA 22 261-02 STP<200K 80 URBAN SYSTEMS

ADDING CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:DOTD WILL PROVIDE THE MATCH

Project:Prj Mgr:

LA 22: LA 42 - YELLOW WATER RIVER

H.013334

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 16 047-01 STPFLEX 62 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20TANGIPAHOA LA 16 047-01 LOCAL 37 RAILROADS

REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 16: IC RR XING (AMITE)

H.013476

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 1059 853-15 NFA 550 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

ASPHALT OVERLAYTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1059: LA 1058 TO RIVER RD

H.013478

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 3272 870-22 NFA 584 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20

CEMENT TREATED BASE COURSE AND OVERLAYTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

S. RIVER ROAD: LA 10 - VERNON TOWN RD

Page 1 - 47 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 60: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.011734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 573 186-04 STP<5K 1,103 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

TENSAS LA 568 075-03 STP<5K 337 PRESERVATION - NON-INTERSTATENFA

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 568, LA573: US 65 - BIG CHOCTAW BAYOU

TENSAS

H.013235

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 608 854-06 NFA 2,700 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 608: LA 887 - N. JCT LA 605

H.013742

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 575 351-01 NFA 3,000 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 575: LA 4 - LA 888

H.010890

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 182 005-05 STPFLEX 1,051 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED IN CURRENT FY 18-19

TERREBONNE 000-55 STPFLEX 442 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ADD ROUNDABOUTHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: ROUNDABOUT AT HOLLYWOOD RD

TERREBONNE

H.012338

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STP<200K 368 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19

NEW SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH PROVIDING THE MATCH

Project:Prj Mgr:

CIVIC CENTER SIDEWALKS

H.012949

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 315 245-90 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 18-19

MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:

Typ Imp:

Project:Prj Mgr:

DULARGE BR LOCK BAR REHABILITATION

H.012957

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 18-19

ELECTRICAL REHABRODY, WALTER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 24: PRESQUE ISLE BR ELEC REHAB

Page 1 - 48 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 61: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.001498

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 STPFLEX 31,565 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTPAINE, PEGGY JO Remrks:

Typ Imp:065-91-0017;STAGE 0 FEASIBILITY STUDY

Project:Prj Mgr:

LA 24 & LA 316: COMPANY CANAL BRIDGE

H.010410

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-04 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 24: LA 20 - LA 664 (SB)

H.011533

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 FBROFF 729 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

N. BAYOU BLACK DRIVE / HANSON CANAL

H.012337

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STP<200K 263 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20

NEW SIDEWALKBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH PROVIDING MATCH

Project:Prj Mgr:

PROSPECT BLVD SIDEWALKS

H.012339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-04 STP<200K 781 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20TERREBONNE LA 182 005-05 STP<200K 319 URBAN SYSTEMS

SIDEWALK REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA 24 SIDEWALK REHAB

H.013756

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 311 413-01 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ADD LEFT TURN LANE AT LA 311 AND ELLENDALE BLVDBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 311: LEFT TURN LANE AT ELLENDALE

H.013761

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 315 245-90 STPFLEX 375 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

LAFOURCHE LA 24 065-01 STPFLEX 375 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

APPROACH SLAB LEVELING WITH ASPHALT CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 315 & LA 24 APPROACH SLAB LEVELING

H.011530

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION 000-56 FBROFF 585 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

CYPRESS CREEK ROAD / BOATWRIGHT CREEK

UNION

Page 1 - 49 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 62: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013079

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION 000-56 HSIPPEN 670 SAFETY - SAFE ROUTES TO PUBLICPLACES

4-SCHEDULED FOR LETTING FY 19-20

CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

TOWN OF FARMERVILLE SIDEWALKS

H.009792

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 35 207-03 TAP<5K 284 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 18-19VERMILION LA 35 207-03 TAP<5K 286 ENHANCEMENTS VERMILION LA 35 207-03 LOCAL 0 ENHANCEMENTS

SIDEWALKS W/ LANDSCAPING, SUBSURFACE DRAINAGE & RELATED WOMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

LA 35: KAPLAN SIDEWALKS, PHASES I & II

VERMILION

H.010353

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION US 167 080-01 HSIP 649 SAFETY 4-SCHEDULED IN CURRENT FY 18-19LAFAYETTE US 167 080-02 HSIP 12,583 SAFETY

ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNSDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: ACCESS MANAGEMENT (LFT TURN LNS)

H.010867

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION 000-57 FBROFF 502 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

VERMILION 000-57 FBROFF 759 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

JUDE & PLACIDE ROAD BRIDGES

H.001883

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 465 137-02 NFA 336 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 19-20

CHIP SEAL, MILL, BASE REHAB & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:137-02-0017

Project:Prj Mgr:

LA 465: LA 8 - LA 28

VERNON

H.006339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 FBROFF 795 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

BRIDGE REPLACEMENT - ROADWAY REALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

SECTION LINE ROAD BRIDGE

H.011909

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON US 171 024-06 NHPP 2,302 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

VERNON 000-58 STPFLEX 2,302 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INTERSECTION IMPROVEMENTHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDABOUT: US 171 AT BOONE ST.

Page 1 - 50 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 63: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013067

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 436 274-01 STPFLEX 4,874 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

WASHINGTON LA 436 859-08 NFA 3,150 PRESERVATION - NON-INTERSTATENFA

COLD PLANE AND 3.5 INCH OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 436: BURCH CREEK - MONROE CREEK RD

WASHINGTON

H.010008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 532 860-07 FBROFF 3,517 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 18-19

BRIDGE REPLACEMENTGUIDRY, CHRIS Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 532 OVER I-20 BRIDGE REPLACEMENT

WEBSTER

H.013002

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 531 111-01 STPFLEX 330 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 19-20

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 531: LA 792 TO LA 532

H.012323

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 990 861-15 NFA 518 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19

MILL, PATCH, OVERLAY, AND DRAINAGEGARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA990: 6TH-ED LEJEUNE (OVERLAY-DRAINAGE)

W BATON ROUGE

H.012395

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 013-01 NHPP 3,548 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

W BATON ROUGE LA 415 013-01 STPFLEX 65 PRESERVATION - NON-INTERSTATEON STP SYSTEM

W BATON ROUGE US 190 008-01 NHPP 1,377 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

W BATON ROUGE LA 415 861-22 NHPP 154 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL, OVERLAY AND PCCP REHABSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 415 & US 190: OVERLAY & PATCHING

H.013852

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NHPP 819 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED IN CURRENT FY 18-19

ASPHALT PATCHING, MILLING, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: SHOULDER IMPROVEMENTS

H.013867

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE I-10 450-08 NHPP 606 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19

BASE AND SURFACING REMOVAL, BASE COURSE, PCC PAVEMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 WB: LA 415 EXIT RAMP IMPROVEMENTS

Page 1 - 51 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 64: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013892

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 STGEN 175 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19

GIRDER REPAIRHAMMACK, TERRI ROBISON Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED 3/20/2019

Project:Prj Mgr:

LA 1:EMERGENCY REPAIR SB INTRACOASTAL BR

H.010654

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 861-22 STP>200K 207 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20W BATON ROUGE 000-61 LOCAL 323 URBAN SYSTEMS

PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

LA 415:I-10 TO APPROXIMATELY 0.41M SOUTH

H.011558

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 CM 610 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 19-20

CONSTRUCT ACADIAN TRAILHANKS, ANNA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

ACADIAN TRAIL (WEST BATON ROUGE)

H.012076

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 013-01 NHPP 202 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 19-20

ADD NB RIGHT TURN LANE ON LA 415SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 415: IMPROVEMENTS AT PLANTATION AVE

H.012212

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 19-20W BATON ROUGE 000-61 LOCAL 59 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1055' CONCRETE TRAIL & 800 SQ.FT. OVERLOOKNUNES, BRIAN Remrks:

Typ Imp:CRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WEST BATON ROUGE MUSEUM LEVEE TRAIL

H.012834

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 988 861-14 CM 86 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 19-20W BATON ROUGE 000-61 CM 345 CONGESTION MITIGATION

CONSTRUCT TRAILMUSA, ELNUR Remrks:

Typ Imp:ENTITY PROVIDES THE MATCH

Project:Prj Mgr:

JOLIET TRAIL (BRUSLY)

H.013191

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NHPP 7,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 19-20

IBERVILLE LA 1 050-06 NHPP 700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL, PATCH & OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: LA 75 - PORT ALLEN CANAL BR

H.010597

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 FBROFF 3,879 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 19-20

W FELICIANA 000-63 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

SLIGO ROAD BRIDGES

W FELICIANA

Page 1 - 52 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 65: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013278

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 4,911 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02BC FLASHING YELLOW ARROW PART 1

DISTRICT 02

H.009054

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 19-20

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MAKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PAVEMENT MARKING REPLACEMENT IX

H.013594

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 SATRANS 105 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02 LOW COST SAFETY IMPR. PH. 2

H.013595

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 SATRANS 350 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 03 LOW COST SAFETY IMPR. PH. 2

DISTRICT 03

H.013601

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 SATRANS 145 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 04 LOW COST SAFETY IMPR. PH. 2

DISTRICT 04

H.013602

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 SATRANS 170 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 05 LOW COST SAFETY IMPR. PH. 2

DISTRICT 05

H.013603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 SATRANS 50 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 07 LOW COST SAFETY IMPR. PH. 2

DISTRICT 07

H.013604

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 SATRANS 300 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 LOW COST SAFETY IMPR. PH. 2

DISTRICT 08

Page 1 - 53 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 66: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.012464

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 58 FLASHING YELLOW ARROW

DISTRICT 58

H.013605

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 SATRANS 55 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 58 LOW COST SAFETY IMPR. PH. 2

H.013096

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 FEMA 798 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

RETROFIT EXISTING WINDOWS TO 21 BUILDINGS IN DISTRICT 61NEYLAND, CODI Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 HURRICANE PROTECTION SCREENS

DISTRICT 61

H.013606

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 SATRANS 185 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 61 LOW COST SAFETY IMPR. PH. 2

H.012650

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 925 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 18-19

LIVINGSTON I-12 454-02 NHPP 499 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

TANGIPAHOA I-55 452-90 NHPP 178 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

TANGIPAHOA LA 1063 853-34 STPFLEX 59 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

DISTRICT-WIDE REPAIRS TO VARIOUS BRIDGESTULLIER, DANNY Remrks:

Typ Imp:USE NFA AS MATCH ON CS 853-34

Project:Prj Mgr:

DISTRICT 62 -DISTRICTWIDE BRIDGE REPAIRS

DISTRICT 62

H.012670

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 166 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 18-19

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 PERFORMANCE MEASURE

H.013607

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 SATRANS 225 SAFETY 4-SCHEDULED FOR LETTING FY 19-20

SIGNINGLEBLANC, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 LOW COST SAFETY IMPR. PH. 2

Page 1 - 54 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 67: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.010691

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 FB DISCR 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 18-19

DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWERSIBLEY, STEVEN Remrks:

Typ Imp:FUNDS TRANSFERRED FROM FHWA TO FTA

Project:Prj Mgr:

MV STUMPF: DRY-DOCK: 5 YR EXAM & REPOWER

STATEWIDE

H.013396

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

LRSP TECH ASSISTANCE CRASH DATA ENGRRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP/SR2PP CRASH DATA ENG 2018-2023

H.013464

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

SHSP LAW ENFORCEMENT EXPERTCOSTELLO, BRYAN Remrks:

Typ Imp:

Project:Prj Mgr:

SHSP LAW ENFORCEMENT EXPERT SFY2019-2021

H.013533

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

LRSP/SR2PP ENGINEERRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP/SR2PP ENGINEER 2 2019-2023

H.013535

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19

LRSP/SR2PP ENGINEERRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP/SR2PP ENGINEER 1 2019-2023

H.013801

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 FB DISCR 750 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 18-19

DRYDOCK FOR USCG EXAM AND REPAIRSSIBLEY, STEVEN Remrks:

Typ Imp:PLAQUEMINES PARISH GOVERNMENT TO PROVIDE MATCH

Project:Prj Mgr:

M/V BELLE CHASSE II DRYDOCK & USCG EXAM

H.012164

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 OTHER 700 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

4-SCHEDULED FOR LETTING FY 19-20

VIRTUAL WEIGH STATION INSTALLATIONBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

STATE WIDE VIRTUAL WEIGH STATION

H.012692

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 FB DISCR 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED FOR LETTING FY 19-20

DRYDOCK FOR USCG EXAM AND OTHER MAINTENANCE & REPAIRSMILLET, WALTER Remrks:

Typ Imp:

Project:Prj Mgr:

MV CAMERON II: REPOWER & USCG EXAM 2019

H.013841

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

SEA, RFP DEVELOPMENT AND IMPLEMENTATION OF REPLACEMENT VDSOLLIE, CARRYN Remrks:

Typ Imp:

Project:Prj Mgr:

VDMS SYSTEM REPLACEMENT

Page 1 - 55 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 68: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING

H.013848

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

ATMS INET ENHANCEMENTS PROJECTSOLLIE, CARRYN Remrks:

Typ Imp:

Project:Prj Mgr:

ATMS INET ENHANCEMENTS PROJECT

H.013868

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

MANAGEMENT, OPERATIONS, AND MAINTENANCE OF ITS DEVICESSMITH, ERIK Remrks:

Typ Imp:

Project:Prj Mgr:

ITS MGMT, OPERATIONS, & MAINT STATEWIDE

H.013885

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

CAV STRATEGIC BUSNESS PLANSOLLIE, CARRYN Remrks:

Typ Imp:

Project:Prj Mgr:

CAV STRATEGIC BUSINESS PLAN

L.000006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 2,100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 19-20

- STP>200K 2,800 URBAN SYSTEMS - STP<200K 690 URBAN SYSTEMS

MAPNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MOTORIST ASSISTANCE PATROL

L-PROJECTS

L.000028

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 5,000 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

HOT MIX, PIPE, BRIDGE MATERIAL, ETCNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MAINTENANCE MATERIALS

L.000030

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 1,500 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

IMPACT ATTENUATOR REPLACEMENT/REPAIR

L.000059

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 1,250 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

CABLE BARRIER REPLACEMENT/REPAIR

L.000098

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 2,500 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

GUARDRAIL REPLACEMENT/REPAIR

Page 1 - 56 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 69: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

PROJECTS IN DEVELOPMENT

Per RS 48:230, the following is “…an additional list of

projects proposed to be commenced within the ensuing four

years which are in various stages of planning and

preparation. This list shall be subject to change by the

department until the department finally approves each

project for construction.”

Page 70: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4
Page 71: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.002123

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 35 207-07 TAP<200K 434 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS, LIGHTING AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:207-07-0028

Project:Prj Mgr:

RAYNE SIDEWALKS, PH. III

ACADIA

H.007369

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA US 90 003-10 TAP<200K 265 ENHANCEMENTS 3-DESIGN/DEVELOPMENTACADIA LA 35 207-07 TAP<200K 155 ENHANCEMENTS

CONCRETE WALKS AND DRIVES AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:744-01-0013

Project:Prj Mgr:

RAYNE SIDEWALKS, PH. II

H.010222

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 97 201-03 STPFLEX 4,130 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 97: LA 98 - LA 368

H.010962

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA I-10 450-04 HSIP 4,041 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE I-10 450-05 HSIP 1,478 SAFETY

INSTALL MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CABLE BARRIER (LAFAYETTE/ACADIA)

H.011829

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA I-10 450-04 STPFLEX 2,500 ROAD TRANSFER 3-DESIGN/DEVELOPMENTACADIA LA 100 211-01 LOCAL 75 ROAD TRANSFER

WIDENING, CLASS II BASE, BASE REHAB, AND ASPHALT OVERLAYMCMILLAN, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

IMP@LA13 & LA100 & I-10 ACC.RD (CROWLEY)

H.011922

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 STP<5K 1,179 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

PATCH, WIDEN, BASE REHAB, ASPHALT OVERLAY, DRAIN., & RELATEDMCMILLAN, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1112 - LA 13 (ROAD TRANSFER IMP.)

H.012021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA US 90 003-10 TAP<200K 459 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK IMPROVEMENTSNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF RAYNE.

Project:Prj Mgr:

US 90: ADAMS AVE SW IMPROVEMENTS, PH IV

H.012024

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 TAP<200K 761 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK IMPROVEMENTSNUNES, BRIAN Remrks:

Typ Imp:LOCAL MATCH PROVIDED BY THE CITY OF CROWLEY

Project:Prj Mgr:

CROWLEY: PARKERSON AVE SW IMPROVEMENTS

H.012174

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA I-10 450-04 NHPP 14,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTLAFAYETTE I-10 450-05 NHPP 6,000 PRESERVATION - INTERSTATE

OGFC, APPROACH SLAB & EMBANKMENT SLIDE REPAIR & RELATEDMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR)

Page 2 - 1 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 72: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012892

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 1123 801-04 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

ACADIA LA 3116 801-61 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)

LAFAYETTE LA 723 828-03 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)

ST MARTIN LA 321 850-19 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST03:ABC BR REPLACE AC,LAF,ST MAR PARS

H.012919

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 100 211-30 NFA 4,390 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 100: LA 97 - LA 91

H.012923

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 91 801-11 STPFLEX 1,006 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ACADIA LA 91 211-04 STPFLEX 559 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ACADIA LA 91 211-03 STPFLEX 671 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

THIN ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 91: LA 3067 - W JCT ST LANDRY PL

H.013195

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 98 210-04 HSIP 1,042 SAFETY 3-DESIGN/DEVELOPMENTACADIA LA 98 210-04 STPFLEX 1,500 PRESERVATION - NON-INTERSTATE

NFA

ACADIA LA 98 210-04 STPFLEX 1,415 PRESERVATION - BRIDGE (ONSYSTEM)

BASE STABILIZATION, OVERLAY, AND CURVE REALIGNMENTMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 98 CURVE REALIGNMENT

H.013363

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 1111 801-30 STPFLEX 1,600 ROAD TRANSFER 3-DESIGN/DEVELOPMENTACADIA LA 1111 801-30 STPFLEX 900 ROAD TRANSFER

WIDEN LA 1111 TO ADD A CONTINUOUS TURN LANENUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1111 WIDENING: LA 13 - LA 1111-S

H.013526

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTACADIA 000-01 LOCAL 23 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1800' WALKING TRAILNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF CROWLEY WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

BAYOU BLANC NATURE TRAIL

H.013772

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

SYSTEMIC CURVE SIGNING (ACADIA)

Page 2 - 2 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 73: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 98 389-01 STPFLEX 1,200 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY WITH ISOLATED RECONSTRUCTIONPORTER BETTS, CONNIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 98: LA 35 - LLAMA RD

H.009298

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN 000-02 SR2S 262 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

SIDEWALK IMPROVMENTS, MARKED CROSSINGSRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

TOWN OF OBERLIN SIDEWALKS

ALLEN

H.012899

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN LA 10 066-04 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BEAUREGARD LA 389 187-04 STPFLEX 2,280 PRESERVATION - BRIDGE (ONSYSTEM)

BEAUREGARD LA 1147 806-02 NFA 2,040 PRESERVATION - BRIDGE (ONSYSTEM)

BEAUREGARD LA 27 031-09 NHPP 600 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST07:ABC BR REP ALLEN, BEA, J DAV PARS

H.012039

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN LA 372 802-05 NFA 1,121 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 372: CREEK BRIDGE

H.006457

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 HSIPPEN 1,000 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

ROUNDABOUT CONSTRUCTIONRIGGS, LAURA Remrks:

Typ Imp:737-03-0104

Project:Prj Mgr:

ROUNDABOUT @ PR 929 & PARKER ROADS

ASCENSION

H.006459

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 HSIPPEN 1,000 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

ROUNDABOUTRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDABOUT AT CHURCHPOINT RD AND RODDY

H.010074

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 3089 426-01 RAIL HE 250 RAILROADS 3-DESIGN/DEVELOPMENT

ROAD WORK AROUND CROSSING TO MAKE SAFERSHREWSBERRY,BILL Remrks:

Typ Imp:426-01-0026

Project:Prj Mgr:

UP (DONALDSONVILLE) LA 3089 SERVICE RD.

H.010795

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 42 260-01 HSIP 1,497 SAFETY 3-DESIGN/DEVELOPMENTASCENSION 000-03 HSIP 966 SAFETY

INSTALL SINGLE LANE ROUNDABOUTMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: ROUNDABOUT AT JOE SEVARIO ROAD

Page 2 - 3 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 74: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010909

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 44 265-01 NFI 1,200 SAFETY 3-DESIGN/DEVELOPMENTASCENSION LA 941 803-27 NFI 600 SAFETY ASCENSION 000-03 NFI 200 SAFETY

CONST. RAB NEAR LA44/LA941, WIDEN LA44 B/W I-10 & CONWAY RABHANKS, ANNA Remrks:

Typ Imp:FEASIBILITY STUDY FUNDED WITH SATRANS

Project:Prj Mgr:

LA 44: WIDENING AND ROUNDABOUT AT LA 941

H.010960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 30 414-03 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

3-DESIGN/DEVELOPMENT

ASCENSION I-10 450-11 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ASCENSION 000-03 STPFLEX 2,660 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPSHARROUCH, JOSHUA Remrks:

Typ Imp:PROJECT DEPENDENT ON OUTCOME OF H.010572 CORRIDOR STUDY

Project:Prj Mgr:

LA 30 ROUNDABOUTS @ TANGER MALL & I-10

H.011577

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 18 063-10 STPFLEX 2,278 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ST JAMES LA 18 063-09 STPFLEX 222 PRESERVATION - NON-INTERSTATENFA

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 18: SUNSHINE BR - LA 3120

H.012713

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 74 264-03 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASCENSION LA 74 264-02 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 74: IBERVILLE P/L - US 61

H.013012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 943 803-01 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

ASCENSION LA 621 803-08 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

ASCENSION LA 934 803-12 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

ASCENSION LA 935 803-21 STPFLEX 512 PRESERVATION - BRIDGE (ONSYSTEM)

ASSUMPTION LA 308 407-08 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

E FELICIANA LA 963 819-19 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

POINTE COUPEE LA 970 839-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

POINTE COUPEE LA 81 839-08 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

W BATON ROUGE LA 986 228-07 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST61:ABC BR RP AC,AS,E FL,P CO,WBR PAR

Page 2 - 4 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 75: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013458

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

ASCENSION 000-03 FBROFF 256 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

MANCHAC ACRES RD & H H WILSON RD BRIDGES

H.013621

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 HSIPPEN 166 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

SIGNS, STRIPING, TURN LANES, CROSS OVERSRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP SIGNS, STRIPING & X-OVERS(GONZALES)

H.013710

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION I-10 450-11 NHPP 427 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

ST JAMES I-10 450-12 NHPP 939 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

ST JOHN I-10 450-13 NHPP 1,839 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

DEPLOY FIBER OPTIC CABLE AND CAMERAS WITH POLESESTEVEN, ROY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: US 61 TO LAPLACE ITS DEPLOYMENT

H.013726

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 70 232-31 STPFLEX 1,020 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASCENSION LA 70 426-01 NHPP 1,780 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

ST JAMES LA 70 426-02 NHPP 4,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: ASCENSION P/L W - ASCENSION P/L E

H.013779

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 HSIPPEN 400 RAILROADS 3-DESIGN/DEVELOPMENT

EXTEND REINE ST. AND CLOSE RAILROAD ST. XING OF KCSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

REINE EXT & RAILRD ST:KCS XING(SORRENTO)

H.013793

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 STP>200K 3,600 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASCENSION PARISH PROVIDING MATCHLEBAS, MELISSA Remrks:

Typ Imp:RECONSTRUCTION

Project:Prj Mgr:

GERMANY RD WIDENING (US 61 TO LA 44)

H.013850

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 STP>200K 2,970 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

MINOR WIDENINGLEBAS, MELISSA Remrks:

Typ Imp:ASCENSION PARISH TO PROVIDE THE MATCH

Project:Prj Mgr:

DUPLESSIS RD WIDENING (US 61 - LA 73)

H.012057

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 431 267-02 STPFLEX 1,301 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 431:VILLAR CANAL AND DRAINAGE BRIDGES

Page 2 - 5 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 76: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012607

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 933 803-18 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTSTONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 933: HENDERSON BAYOU BRIDGE

H.011160

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 73 077-02 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

CORRIDOR STUDY TO COLLECT DATA AND DEVELOP ALTERNATIVESMASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: LA 74 TO LA 621 CORRIDOR STUDY

H.012311

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION I-10 450-11 0 CAPACITY 0-FEASIBILITY/SCOPINGASCENSION LA 429 077-30 0 CAPACITY

STUDY FOR PROPOSED NEW CONNECTOR ROADZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 429 CONNECTOR (LA 30/LA 73 TO US 61)

H.010007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 STPFLEX 750 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

CLEANING & PAINTINGTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70:PIERRE PART BAY BR REHAB (HBI)

ASSUMPTION

H.012575

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 STPFLEX 6,502 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: LA 1 - LA 1015-1

H.013001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 308 407-08 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308: LA 70 - ASCENSION P/L

H.013493

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION 000-04 STP<200K 80 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ADA COMPLIANT SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE

Project:Prj Mgr:

WASHINGTON STREET SIDEWALKS

H.013500

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION 000-04 STP<200K 96 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ADA COMPLIANT SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE

Project:Prj Mgr:

DR. MARTIN LUTHER KING PHASE 1

H.013501

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION 000-04 STP<200K 96 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ADA COMPLIANT SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE

Project:Prj Mgr:

DR MARTIN LUTHER KING PHASE 2

Page 2 - 6 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 77: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013786

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 1247 804-43 NFA 800 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

OVERLAY AND STABILIZE BASE COURSEMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1247: LA 1 - LA 1010

H.011289

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 STPFLEX 15,280 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTALASSUMPTION LA 69 406-01 STPFLEX 1,063 OTHER / MISCELLANEOUS

CONSTRUCTION OF A DETOUR ROUTE FOR LA 70 IF NECESSARYNICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: DETOUR ROAD

H.007873

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 1176 805-09 FBROFF 2,375 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:805-09-0007;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

BAYOU BOEUF & TURNER CANAL BRIDGES

AVOYELLES

H.009497

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 106 204-04 STPFLEX 2,600 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTDELATTE, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 106: BAYOU BOEUF BRIDGE

H.012909

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 107 142-02 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

RAPIDES LA 1203 369-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

RAPIDES LA 1206 840-01 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

RAPIDES LA 1200 840-26 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

RAPIDES LA 1199 840-27 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)

RAPIDES LA 1243 840-46 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST08:ABC BR REP AVOYELLE, RAPIDES PARS

H.012998

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 1 052-30 STPFLEX 1,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

AVOYELLES LA 1 052-07 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: MOREAU ST - END FOUR LANE SECTION

H.013143

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 869 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

CARBON PLANT ROAD OVER BAYOU BOEUF

Page 2 - 7 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 78: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012542

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 114 145-01 STPFLEX 3,770 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

AVOYELLES LA 107 147-03 STPFLEX 1,902 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA114,LA107:BELLE DEAU & B JACK RL BRS

H.012545

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 454 370-01 STPFLEX 1,883 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 454: WIGGINS BAYOU BRIDGE

H.012556

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES US 71 008-07 STPFLEX 2,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: ST LANDRY P/L TO 740' S OF T&P RR

H.009482

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 113 139-03 STPFLEX 950 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: JIM BURNEY BRANCH BRIDGE

BEAUREGARD

H.010244

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 113 139-04 STPFLEX 2,187 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: LA 26 - LA 112

H.010245

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 389 187-04 STPFLEX 7,117 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 389: MONROE WHITMAN RD - US 190

H.010246

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 112 188-02 STPFLEX 2,163 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 112: LA 399 - LA 113

H.013257

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 190 028-02 NHPP 3,937 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: TEXAS S/L - LA 111

Page 2 - 8 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 79: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012040

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 12 012-05 STPFLEX 2,219 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BEAUREGARD LA 394 189-01 NFA 1,472 PRESERVATION - BRIDGE (ONSYSTEM)

BEAUREGARD LA 110 190-01 STPFLEX 1,782 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA12, LA394, LA110: COWPEN & CREEK BRS

H.012569

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 113 139-04 STPFLEX 1,600 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTALLEN, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: LITTLE SUGAR CREEK BRIDGE

H.001707

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 507 090-05 FBROFF 1,178 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:090-05-0030

Project:Prj Mgr:

LA 507: SALINE BAYOU RELIEF BRIDGE

BIENVILLE

H.012050

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE I-20 451-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

LENGTHING HIGHWAY EXIT DECELERATION LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: WB EXIT RAMP EXTENSION AT ARCADIA

H.012893

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 4 067-02 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BIENVILLE LA 4 067-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

BIENVILLE LA 4 067-04 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)

BIENVILLE LA 517 089-30 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

BIENVILLE LA 154 090-03 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

BIENVILLE LA 501 093-02 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)

BIENVILLE LA 516 294-04 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:USE NFA AS MATCH ON CS 089-30

Project:Prj Mgr:

DIST 04:ABC BR REPLACE BIENVILLE PARISH

H.012942

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 797 807-05 NFA 1,032 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 797: LA 507 TO LINCOLN PL

Page 2 - 9 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 80: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012973

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 792 293-02 STPFLEX 360 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 792: LA 154 TO WEBSTER PL

H.013000

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 516 294-04 NFA 2,406 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 516: US 371 TO LA 154

H.013534

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE 000-07 RTP 197 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

MAINT, RESTOR, & CONST OF ATV TRAILS & TRAILHEAD INFRASTRNUNES, BRIAN Remrks:

Typ Imp:L & A TRAILS, INC. WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

RESTOR OF TRAIL BTWN JAMESTOWN & SIBLEY

H.013769

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE 000-07 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LOCAL ROAD SIGNING (BIENVILLE)

H.012566

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 154 088-04 STPFLEX 358 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: LA 507 TO LA 793

H.012925

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 4 067-03 STPFLEX 560 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: CASTOR TO LUCKY

H.007400

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 TAP>200K 434 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

NORTH BOSSIER SHARED USE TRAIL, PHASE II

BOSSIER

H.011599

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 529 808-01 STPFLEX 2,900 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 529: LA 160 TO LA 2

H.012171

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-220 451-31 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

APPROACH SLAB REPLACEMENT AND PCC PAVEMENT PATCHINGMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-220: RED RIVER BRIDGE TO I-20

Page 2 - 10 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 81: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 STPFLEX 20 RAILROADS 3-DESIGN/DEVELOPMENT

CONNECT TRAFFIC SIGNAL AND WARNING DEVICES FOR PREEMPTIONLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

OLD PLN DLING RD.: UP PREEMPT (BENTON)

H.012889

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 23,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

PAVEMENT REHABILITATIONYANG, LI Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 REHAB (W OF LA 3 TO AIRLINE DR)

H.012896

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 157 082-04 STPFLEX 3,987 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BOSSIER LA 160 085-03 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)

BOSSIER LA 537 808-05 NFA 1,560 PRESERVATION - BRIDGE (ONSYSTEM)

CADDO LA 2 045-30 STPFLEX 4,514 PRESERVATION - BRIDGE (ONSYSTEM)

CADDO LA 169 048-02 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)

CADDO LA 789 809-07 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)

RED RIVER LA 155 091-01 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

RED RIVER LA 783 303-01 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST04:ABC BR REP BOSS,CADD,RED RIV PARS

H.012913

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

EXTENDING EXISTING INTERSTATE EXIT LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 EB: EXIT RAMP EXTENSION AT LA 157

H.013129

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 FBROFF 2,340 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

LINTON ROAD OVER BLACK BAYOU RESERVOIR

H.013186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 STPFLEX 1,300 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

RECONSTRUCT ROAD WITH CURB & GUTTER DRAINAGE AND SIDEWALKUMEOZULU, JOE Remrks:

Typ Imp:

Project:Prj Mgr:

BOSSIER CITY RT: COLEMAN ST IMPROVEMENTS

H.001779

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 511 102-03 NFI 65,144 CAPACITY 1-PLANNING/ENVIRONMENTALCADDO LA 511 102-02 NFI 16,286 CAPACITY

REPLACEMENT\REHABILITATION (HBI)MASTIN, CATHERINE Remrks:

Typ Imp:102-03-0010

Project:Prj Mgr:

JIMMIE DAVIS BRIDGE (LA 511) (HBI)

Page 2 - 11 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 82: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012004

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER US 80 001-03 NHPP 4,415 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BIENVILLE US 80 001-06 STPFLEX 1,991 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US 80:CROWS CR & ALLIGATOR BAYOU BRIDGES

H.012537

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 154 090-01 STPFLEX 2,964 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: RED CHUTE BAYOU BRIDGE

H.012538

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 164 122-01 STPFLEX 2,921 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BOSSIER LA 164 122-01 STPFLEX 1,949 PRESERVATION - BRIDGE (ONSYSTEM)

BOSSIER LA 164 122-01 STPFLEX 2,192 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 164: BRIDGES

H.012638

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ACCESS MANAGEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3105: GREENACRES BLVD - LA 72 PHASE 2

H.012659

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ACCESS MANAGEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3105: GREENACRES BLVD - LA 72 PHASE 3

H.013538

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 511 102-03 NHPP 25,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

MAJOR BRIDGE REHABILITATIONMASTIN, CATHERINE Remrks:

Typ Imp:REFERENCE H.010662 FOR ADDITIONAL PHASE INFORMATION.

Project:Prj Mgr:

LA 511: JIMMIE DAVIS BRIDGE REHAB (HBI)

H.011424

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 157 082-04 0 SAFETY 0-FEASIBILITY/SCOPINGBOSSIER LA 157 082-03 0 SAFETY

ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA157: BOOKER RD TO LA614 CORRIDOR STUDY

H.011428

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 0 SAFETY 0-FEASIBILITY/SCOPING

ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA3105:GREENACRES TO LA72 CORRIDOR STUDY

Page 2 - 12 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 83: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.000413

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 011-01 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:011-01-0054

Project:Prj Mgr:

CROSS BAYOU BRIDGE REPLACEMENT

CADDO

H.001166

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 045-01 STPFLEX 21,398 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:

Typ Imp:045-01-0029; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

CADDO LAKE BRIDGE (HBI)

H.006472

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 HSIPPEN 216 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL POWER GENERATOR INSTRIGGS, LAURA Remrks:

Typ Imp:737-09-0104

Project:Prj Mgr:

CITY OF SHREVEPORT TRAFFIC SIG BKUP

H.006475

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 HSIPPEN 158 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL POWER GENERATORRIGGS, LAURA Remrks:

Typ Imp:737-09-0108

Project:Prj Mgr:

CITY OF SHRVPRT TRAFFIC SIGNAL BKUP

H.007404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 530 809-14 TAP>200K 118 ENHANCEMENTS 3-DESIGN/DEVELOPMENTCADDO 000-09 TAP>200K 118 ENHANCEMENTS

SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

OIL CITY SHARED USE PATH

H.010271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 045-01 STPFLEX 1,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

OVERLAY, SHOULDER STABILIZATION AND STRIPINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: SUNDOWN ROAD TO JCT LA 538

H.010279

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 173 094-02 STPFLEX 900 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 173: LA 1 TO US 71

H.010468

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 15,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PCCMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: WEST END HUDSON ST. BRIDGE TO I-49

H.010475

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 20,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PCCMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: MONKHOUSE TO W END OF HUDSON ST BR

Page 2 - 13 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 84: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011112

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 053-08 STPFLEX 15 RAILROADS 3-DESIGN/DEVELOPMENT

UPGRADE RR WARNING DEVICESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: UP RR XING (CADDO)

H.011510

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

BOSSIER I-20 451-02 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

DEPLOY ITS EQUIPMENT AND COMMUNICATIONSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

SHREVEPORT ITS PHASE 4

H.012930

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3049 079-01 NFA 310 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3049: COWHIDE BAYOU TO LA 530

H.013315

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 STPENH 425 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SCENIC BYWAY VIEWING AREAMEEK, STEPHEN Remrks:

Typ Imp:CADDO PARISH WILL PROVIDE THE MATCH.

Project:Prj Mgr:

BOOM OR BUST SCENIC VIEWING AREA

H.013389

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 STPENH 346 ENHANCEMENTS 3-DESIGN/DEVELOPMENTCADDO LA 525 097-01 STPENH 5 ENHANCEMENTS

SIGNINGNUNES, BRIAN Remrks:

Typ Imp:CADDO PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

CADDO PARISH BICYCLIST AWARENESS SIGNAGE

H.013420

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 HSIPPEN 2,250 SAFETY 3-DESIGN/DEVELOPMENTCADDO 000-09 STPFLEX 2,250 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 04 FLASHING YELLOW ARROW PART 1

H.013890

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3132 427-01 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3132:LA 523 - I-20(PAVEMENT MARKINGS)

H.003915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

STAGE 0 AND ENVIRONMENTALBROUSSARD, DAN Remrks:

Typ Imp:USE STATE SURPLUS AS MATCH

Project:Prj Mgr:

I-49 INNER CITY CONNECTOR

Page 2 - 14 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 85: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.006474

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 526 809-08 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

1-PLANNING/ENVIRONMENTAL

CADDO I-49 455-08 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

CADDO LA 3132 427-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

DEVELOP SEA FOR ITS EQUIPMENT DEPLOYMENTKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

SHREVEPORT IMMEDIATE ITS PHASE 2B

H.009213

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3132 427-01 NFI 150,000 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

EXTENSION OF EXISTING ROADWAYUMEOZULU, JOE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3132 (INNER LOOP) EXTENSION

H.010286

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 538 078-04 STPFLEX 1,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 538: JCT US 71 TO LA 1

H.010288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 789 809-07 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 789: PRESTON ROAD TO LA 169

H.010292

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 79 048-01 STPFLEX 1,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, ASPHALTIC OVERLAY, PAVEMENT STRIPINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79: TEXAS STATE LINE TO US 80

H.011094

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3094 025-08 NHPP 2,700 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

REPLACE SUPERSTRUCTURE, RAISE GRADE, ROADWAY & EMBANKMEND'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3094: HEARNE AV BR REHAB

H.011733

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 80 001-02 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

US 80 TRAFFIC CONTROL UPGRADES

H.012005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 80 001-02 STPFLEX 3,567 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT/REHABILITATIONMUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

US80: KCS RR OVERPASS (HBI)

Page 2 - 15 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 86: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 053-08 STPFLEX 2,785 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: PRAIRIE RIVER BRIDGE

H.012009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 053-09 NHPP 12,831 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTS/REHABILITATIONGAUDRY, CARL Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: MARKET ST BRIDGE OVER ICG RR(HBI)

H.012011

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 525 097-01 STPFLEX 2,545 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

CADDO LA 173 094-01 STPFLEX 1,225 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA525, LA173: BOGGY BAYOU AND CR BRIDGES

H.012932

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 789 809-07 STPFLEX 70 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 789: DESOTO PL TO PRESTON RD

H.012937

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3049 079-01 NFA 1,122 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

CADDO LA 3049 079-01 STPFLEX 141 PRESERVATION - NON-INTERSTATEON STP SYSTEM

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3049: GRIMMIT DR TO GEORGE RD

H.013034

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 80 001-01 STPFLEX 7,286 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: I-20 INTERCHANGE (GREENWOOD)

H.012007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: KCS RAILROAD OVERPASS

H.012008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

HISTORIC BRIDGE PRESERVATION PRIORITY FEASIBILITY STUDYGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

US 71:ICG RAILROAD OVERPASS REHAB (HBI)

Page 2 - 16 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 87: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012027

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REPLACMENT OR REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

I 20: MISSOURI PACIFIC RR OVERPASS

H.012028

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REHABILITATIONMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

I 20:LAKE SHORE DRIVE/KCS OVERPASS REHAB

H.013766

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LOCAL ROAD SIGNS & STRIPING (CADDO)

H.000186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 90 003-04 NHPP 12,248 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:003-04-0064

Project:Prj Mgr:

US 90 OVER I-10 RAMPS @ LOCKMOOR (HBI)

CALCASIEU

H.000425

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 12 012-01 STPFLEX 1,739 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

CALCASIEU 000-10 LOCAL 1,739 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGEMASTIN, CATHERINE Remrks:

Typ Imp:012-01-0004;JOINT PROJECT WITH TEXAS

Project:Prj Mgr:

LA 12 SABINE RIVER BRIDGE

H.007122

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 1,582 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SURFACE WIDENING AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:742-10-0136

Project:Prj Mgr:

MYRTLE SPRINGS ROAD

H.010001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 031-04 STPFLEX 1,800 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

LA27 ICWW ELLENDERS BRIDGE CLEAN & PAINT

H.010865

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 HSIP 939 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU I-210 450-30 NHPP 3,500 PRESERVATION - INTERSTATE

CABLE BARRIER AND OGFCMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-210: COVE LN INTG - E JCT I-10

Page 2 - 17 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 88: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011065

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 1138-2 810-06 STBONDS 6,000 CAPACITY 3-DESIGN/DEVELOPMENTCALCASIEU I-210 450-30 STBONDS 1,000 CAPACITY CALCASIEU I-210 450-30 LOCAL 7,800 CAPACITY

IMPROVEMENTS TO THE NELSON INTERCHANGEBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

NELSON INTERCHANGE IMPROVEMENTS

H.011196

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 HSIPPEN 408 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

SIDEWALKS, STRIPING AND SIGNINGRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LAKE CHARLES SRTS PROJ. - BARBE ELEM.

H.011509

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

INSTALL DMSS AND CCTVSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

LAKE CHARLES ITS PHASE 4

H.011802

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 TAP<200K 358 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CALCASIEU PARISH POLICE JURY

Project:Prj Mgr:

PINECONE DRIVE SIDEWALK

H.012052

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 3092 810-28 HSIP 1,000 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU 000-10 HSIP 1,000 SAFETY

ADD A ROUNDABOUT TO AID IN TRAFFIC FLOWBALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3092: ROUNDABOUT

H.012083

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE INTERIM REPAIRSCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CALCASIEU RIVER BRIDGE INT REPAIRS

H.012108

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 383 197-02 STPFLEX 380 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

CALCASIEU I-10 450-91 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

ADD TURN LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 & LA 383:TURN LANE@ EB EXIT 43 RAMP

H.012238

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

INTERSECTION IMPROVEMENTSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378: INT IMPROVEMENT @ PHILLIPS RD

Page 2 - 18 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 89: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012589

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 108 810-19 STPFLEX 3,292 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

CALCASIEU LA 108 810-19 NHPP 766 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

PATCH, CP AND OLSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 108: I-10 - LA 1256

H.012791

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 3063 810-25 STPFLEX 50 RAILROADS 3-DESIGN/DEVELOPMENT

PREEMPTING 768-140B WITH ADJACENT TRAFFIC SIGNALLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3063: UP PREEMPTION (VINTON)

H.012900

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 3256 810-15 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

CALCASIEU LA 3063 810-25 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

CAMERON LA 717 812-01 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

CAMERON LA 384 812-04 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST07:ABC BR REP CALCASIEU, CAMERON PAR

H.012928

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 031-06 STPFLEX 791 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

MICROSURFACESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 27: HIGH HOPE RD-RIGMAIDEN CEMETERYRD

H.013344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 193-06 HSIP 613 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU LA 14 193-05 HSIP 613 SAFETY CALCASIEU LA 397 193-31 HSIP 613 SAFETY CALCASIEU 000-10 HSIP 613 SAFETY

INSTALL SINGLE LANE ROUNDABOUTTONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14 @ LA 397 ROUNDABOUT

H.013734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 90 003-05 NHPP 5,613 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 14 - LA 165

H.013744

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 385 195-04 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADJUST LEFT TURNSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 385: LEFT TURN LANE @ COLLEGE ST.

Page 2 - 19 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 90: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013812

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 7,270 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTCALCASIEU 000-10 LOCAL 485 URBAN SYSTEMS

ROADWAY WIDENINGBANKSTON, TANYA Remrks:

Typ Imp:CITY OF LAKE CHARLES TO PROVIDE MATCH

Project:Prj Mgr:

IHLES ROAD: W PRIEN LAKE - COUNTRY CLUB

H.013870

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 1,093 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

PATCH, OVERLAY AND MILLBANKSTON, TANYA Remrks:

Typ Imp:CITY OF LAKE CHARLES TO PROVIDE MATCH

Project:Prj Mgr:

ENTERPRISE OVERLAY: 12TH ST TO BROAD ST.

H.003931

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NFI 0 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)

FEASIBILITY & ENVIRON. STUDYUMEOZULU, JOE Remrks:

Typ Imp:700-10-0115;INCL. UPRR GRADE SEPARATION

Project:Prj Mgr:

CALCASIEU RIVER BRIDGE (HBI)

H.009455

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 NHPP 3,400 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

CLEANING & PAINTINGTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-210 BRIDGE CLEANING & PAINTING

H.009488

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

STAGE 0 STUDY TO WIDEN LA 378 (WESTLAKE TO MOSS BLUFF)LANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378 WIDENING (WESTLAKE TO MOSS BLUFF)

H.009613

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 193-06 STPFLEX 4,926 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PCCP RECONSTRUCTIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: MC NEESE ST - E. PRIEN LAKE RD

H.010000

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 171 024-01 NHPP 1,700 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

US171:CALCASIEU RVR BR REHAB (HBI)

H.012041

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 109 187-01 STPFLEX 1,220 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTPATTON, HEATHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 109: GULLY BRIDGE

H.011242

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 384 382-05 0 SAFETY 0-FEASIBILITY/SCOPING

TBD BY FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 384 (BIG LAKE RD TO MCNEESE ST)

Page 2 - 20 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 91: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012042

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 384 382-04 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REPLACEMENTBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 384: ICWW BLACK BAYOU MOVABLE BRIDGE

H.012043

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378:W FORK CALCASIEU RIV REHAB (HBI)

H.012632

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 171 024-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

TRAFFIC STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: MLK BLVD TRAFFIC STUDY

H.012685

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 385 195-04 HSIPPEN 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 385 RYAN ST. FEASIBILITY STUDY

H.011293

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 126 091-09 STPFLEX 50 RAILROADS 3-DESIGN/DEVELOPMENT

RR SIGNAL PREEMPTIONLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 126: UP RR XING (GRAYSON)

CALDWELL

H.012599

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 851 811-10 NFA 2,000 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 851: LA 126 - LA 849

H.013011

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 126 041-05 STPFLEX 1,920 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

CALDWELL LA 4 068-04 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)

CALDWELL LA 127 127-04 STPFLEX 3,720 PRESERVATION - BRIDGE (ONSYSTEM)

CALDWELL LA 506 345-03 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)

CALDWELL LA 506 345-04 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)

CALDWELL LA 850 811-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST58: ABC BR REPLACE CALDWELL PARISH

Page 2 - 21 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 92: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013027

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL 000-11 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTCALDWELL 000-11 LOCAL 522 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 3600' LONG BY 5' WIDE ASPHALT TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

SHERMAN LAKE TRAILS

H.013202

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL US 165 015-07 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: COLUMBIA - 7 MILES NORTH

H.009602

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 557 159-02 STPFLEX 1,276 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

MICROSURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 557: LA 4 - OUACHITA LINE

H.012508

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON 000-12 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

GUARDRAIL REPAIR/REPLACE/INSTALLATIONRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

PARISH WIDE GUARDRAIL (CAMERON)

CAMERON

H.012568

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 27 031-03 STPFLEX 1,627 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:

Project:Prj Mgr:

LA 27: KELSO BAYOU MOVABLE BR REHAB

H.009470

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 82 194-02 STPFLEX 11,161 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - MOVEABLE BRIDGEBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 82: SUPERIOR CANAL BRIDGE (HBI)

H.012044

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 384 195-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA384:ICWW GR LAKE PONTOON MB REHAB (HBI

H.012167

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA US 84 022-06 NHPP 3,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 84: LA 28 - JONESVILLE

CATAHOULA

Page 2 - 22 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 93: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012842

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124-P 143-03 NFA 8,149 ROAD TRANSFER 3-DESIGN/DEVELOPMENTCATAHOULA LA 3102 813-24 NFA 1,941 ROAD TRANSFER

NEW ROADWAY CONSTRUCTION/RE-CONSTRUCTION, BRIDGE REPLACEMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA3102 @ LARTO LAKE & LA124 EXT(SEG 2&3)

H.013006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124 143-04 STPFLEX 2,520 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

CATAHOULA LA 126 353-03 STPFLEX 2,414 PRESERVATION - BRIDGE (ONSYSTEM)

CONCORDIA LA 568 075-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

FRANKLIN LA 135 167-01 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

FRANKLIN LA 577 344-01 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

TENSAS LA 605 020-30 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)

TENSAS LA 569 176-03 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

LASALLE LA 772 039-01 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)

LASALLE LA 127 149-05 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

LASALLE LA 778 830-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST58:ABC BR REPL CA,CO,FR,TN,LA PARISH

H.013031

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA 000-13 RTP 130 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

RESTORATION OF 3.1 MILES OF ATV TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

DEWEY WILLS WMA - JAKEY ATV TRAIL

H.013750

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 126 353-02 STPFLEX 264 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

LASALLE US 84 022-05 NHPP 246 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE LA 8 040-04 STPFLEX 294 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE LA 126 130-02 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE LA 8 830-08 STPFLEX 113 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 84, LA 8 & LA 126 AST

H.012736

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA US 425 026-04 NHPP 6,870 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: TENSAS RIVER BRIDGE @ CLAYTON

Page 2 - 23 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 94: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.001674

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 146 085-08 STPFLEX 6,068 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESPATTON, HEATHER Remrks:

Typ Imp:085-08-0032;4 BRIDGES

Project:Prj Mgr:

LA 146 BRIDGES NEAR HOMER

CLAIBORNE

H.010281

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 2 085-07 STPFLEX 3,350 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE, ASPHALTIC OVERLAY, CTB SHOULDERS, PAVEMENT STRISPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: WEBSTER P/L TO LA 3062

H.012894

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 808 084-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

CLAIBORNE LA 146 085-08 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

CLAIBORNE LA 520 101-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

CLAIBORNE LA 518 109-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

CLAIBORNE LA 534 289-03 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

CLAIBORNE LA 615 814-04 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)

WEBSTER LA 3008 288-02 NFA 4,440 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST04:ABC BR REP CLA, WEB PARISHES

H.012943

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 2-A 083-10 STPFLEX 370 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2A: LA 9 TO UNION PARISH LINE

H.012986

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 534 290-01 NFA 867 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 534: LA 534 SPUR - LOG MILE 5.33

H.013201

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 425 026-03 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: LA 903 - US 65

CONCORDIA

H.010462

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA LA 15 177-05 STPFLEX 3,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: LA 131 - US 84

Page 2 - 24 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 95: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011930

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 84 026-02 0 SAFETY 0-FEASIBILITY/SCOPINGCONCORDIA US 425 026-03 0 SAFETY

CORRIDOR STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 425/US 84: CORRIDOR STUDY

H.012227

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 5 049-01 STPFLEX 2,635 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 5: LA 3015 TO LA 172

DESOTO

H.012614

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 175 035-04 STPFLEX 5,300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: LA 509 TO LA 5

H.012939

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 3015 298-03 NFA 2,048 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3015: US 171 TO LA 175

H.012982

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 3248 816-07 NFA 1,100 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3248: NABORTON LOOP

H.011860

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO I-49 455-07 NHPP 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

CADDO I-49 455-08 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: NATCHITOCHES P/L TO INNER LOOP

H.002337

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 327-S 257-03 STPFLEX 1,182 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

E BATON ROUGE LA 327-S 257-03 HSIP 1,297 SAFETY

NEW BRIDGEMOORE, DARRELL Remrks:

Typ Imp:257-03-0025

Project:Prj Mgr:

LA 327-S: BAYOU FOUNTAIN

EAST BATON ROUGE

H.002825

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 30 414-01 STP>200K 8,588 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 30 414-01 HSIPPEN 3,160 SAFETY

WIDEN TO 4 LANES WITH MEDIANLEBAS, MELISSA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 30(NICHOLSON DR): BRIGHTSIDE-GOURRIER

Page 2 - 25 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 96: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.003047

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 LOCAL 0 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 0 DEMO / HIGH PRIORITY

NEW INTERCHANGEMUSA, ELNUR Remrks:

Typ Imp:450-10-0161

Project:Prj Mgr:

PECUE LANE/I-10 INTERCHANGE

H.004100

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 GARVEE 360,000 CAPACITY 3-DESIGN/DEVELOPMENT

INCREASE CAPACITY(STAGE 3, 4 AND 5)KENDRICK, BRIAN Remrks:

Typ Imp:700-17-0209; INNOVATIVE PROCUREMENT STAGES 3, 4 AND 5

Project:Prj Mgr:

I-10: LA 415 TO ESSEN ON I-10 AND I-12

H.006499

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 421 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

CONSTRUCTION OF BIKEPATH AND PURCHASE OF SPEED FEEDBACK SIRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

WESTDALE & BERNARD TERRACE SIDEWALKS

H.007439

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 609 ENHANCEMENTS 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 596 ENHANCEMENTS

WIDENING EXISTING ROAD TO CONSTRUCT BIKE LANESNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

HYACINTH AVENUE BIKE LANES

H.007963

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 410 817-05 STPFLEX 1,811 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEGAUDRY, CARL Remrks:

Typ Imp:817-05-0017

Project:Prj Mgr:

BLACKWATER BAYOU BRIDGE

H.009290

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 SR2S 190 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

BICYCLE LANES AND EDUCATION AND ENCOURAGEMENT ACTIVITIESMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LSU LABORATORY SCHOOL SRTS PROJECT

H.009489

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: JEFFERSON HIGHWAY OVERPASS

H.010251

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 817-20 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REPLACE/UPGRADE PUMP HOUSE COMPONENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

CHIPPEWA ST PUMP STATION IMP US61/190-X

H.010652

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 73 077-05 NHPP 3,500 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

PCCP PATCHINGFELDER, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: US 61 (AIRLINE) - ESSEN LANE

Page 2 - 26 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 97: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011684

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPFLEX 7,350 ROAD TRANSFER 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 327-S 257-03 STPFLEX 2,450 ROAD TRANSFER

EXTEND 4-LANE DIVIDED ROADWAYREVIERE, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 327 SPUR: STARING LANE EXTENSION

H.011695

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 19 250-01 0 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

WIDENING OF LA 19MOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 19 WIDENING: LA 64 - SUNSET BLVD

H.011791

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS

BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:

Typ Imp:EAST BATON ROUGE WILL PROVIDE MATCH

Project:Prj Mgr:

CAL RD AND MOSS SIDE LN BR REPLACEMENTS

H.011843

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 2,700 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ACCESS MANAGEMENTLEBAS, MELISSA Remrks:

Typ Imp:EAST BATON ROUGE PROVIDING MATCH

Project:Prj Mgr:

S. SHERWOOD FOREST BLVD SUPERSTREET MO

H.011859

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 817-20 TAP>200K 126 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK, STREET SCAPINGNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF BATON ROUGE

Project:Prj Mgr:

BR: RIVER ROAD MULTI-USE CORRIDOR

H.012022

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 1,200 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

MULTI-USE PATHMEEK, STEPHEN Remrks:

Typ Imp:LOCAL MATCH PROVIDED BY BREC

Project:Prj Mgr:

BREC: GREENWOOD MULTI-USE TRAIL, PHASE 2

H.012499

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 236 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 5,700' LONG BY 12' WIDE PED/BIKE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WARDS CREEK TRAIL - PECUE EXTENSION

H.012693

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD RIGHT TURNLANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42 AT I-10: ADD RIGHT TURNLANE

H.012964

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 NHPP 4,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

THIN ASPHALTIC CONCRETEMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: BLUEBONNET BLVD - S END US 190

Page 2 - 27 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 98: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013035

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 768 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1.35 MILE LONG 12' MULTI-USE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

MANSIONS TO PERKINS TRAIL

H.013037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 565 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1.35 MILE BY 12' MULTI USE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WARDS CREEK BRIDGE TO MALL TRAIL

H.013042

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM

RESTORATION AND CONSTRUCTION OF TRAILS IN LARGE PUBLIC PARKNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

LSU AGCENTER RESTORATION TRAILS

H.013328

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 73 077-05 NHPP 1,000 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

FULL/PARTIAL PCCP PATCHING, REPAIR SIDEWALKS, CURBSRICHARD, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: LA 3064 / ESSEN - LA 426 (RT II)

H.013330

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-31 NHPP 4,623 ROAD TRANSFER 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 42 257-04 NHPP 377 ROAD TRANSFER

PCCP PATCHING AND MAJOR REHAB OF EB. MILL AND OVERLAY WBRICHARD, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: LA 3246 - STARING LANE (RT II)

H.013366

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPENH 509 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS, BIKE LANES, STRIPING AND LANDSCAPINGNUNES, BRIAN Remrks:

Typ Imp:EAST BATON ROUGE AND THE DDD WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

DOWNTOWN GREENWY LOUISIANA CONNECTOR

H.013367

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPENH 1,479 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:EAST BATON ROUGE WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

ELM GROVE GARDEN DR PED IMPROVEMENT EBR

H.013368

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 327-S 257-03 STPENH 309 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:EAST BATON ROUGE PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 327 S GARDERE LANE SHARED USE PATH

H.013373

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 013-04 STPENH 1,862 ENHANCEMENTS 3-DESIGN/DEVELOPMENTE BATON ROUGE US 190 013-05 STPENH 132 ENHANCEMENTS E BATON ROUGE 000-17 STPENH 495 ENHANCEMENTS

STATIONS AND HUBS ON A NEW RAPID TRANSIT ROUTENUNES, BRIAN Remrks:

Typ Imp:CATS WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

US 61 BUS: BUS RAPID TRANSIT STATIONS

Page 2 - 28 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 99: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013387

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 2,218 SAFETY 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 STPFLEX 2,218 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

E BATON ROUGE 000-17 HSIPPEN 32 SAFETY IBERVILLE 000-24 STPFLEX 32 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 FLASHING YELLOW ARROW PART 1

H.013410

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 975 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT

CONSTRUCT ROUNDABOUTMCMILLAN, RYAN Remrks:

Typ Imp:CITY OF BATON ROUGE TO PROVIDE MATCH

Project:Prj Mgr:

LEE DR AT HYACINTH AVE ROUNDABOUT

H.013422

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 2,070 SAFETY 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STPFLEX 2,070 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 FLASHING YELLOW ARROW PART 2

H.013504

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 350 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

CONSTRUCTION OF 3,696' X 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:

Typ Imp:BREC OF BATON ROUGE WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

BRG TO ESSEN TRAIL

H.013512

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 810 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 5,808' X 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:

Typ Imp:BREC OF BATON ROUGE WILL PROVIDE LOCAL MATCH

Project:Prj Mgr:

PERKINS TO PAULET TRAIL

H.013542

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 2,119 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT (OFF-SYSTEM)LEBAS, MELISSA Remrks:

Typ Imp:EAST BATON ROUGE TO PROVIDE MATCH.

Project:Prj Mgr:

CHEVELLE AND SARASOTA DR BR REPLACEMENT

H.013546

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 1,275 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:CITY OF CENTRAL TO PROVIDE MATCH.

Project:Prj Mgr:

THIBODEAUX ROAD IMPROVEMENTS

H.013733

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 013-04 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 61-X: FOSTER DR - I-110

Page 2 - 29 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 100: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013755

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 0 CAPACITY 3-DESIGN/DEVELOPMENT

AMICABLE ADVANCE RIGHT OF WAY ACQUISITIONKENDRICK, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10:NICHOLSON - ACADIAN R/W ACQUISITION

H.013864

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 019-01 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT

UPGRADE RR CROSSING'S SIGNALSHREWSBERRY,BILL Remrks:

Typ Imp:USE TTF FOR MATCH

Project:Prj Mgr:

US 61: IC RR XING (BATON ROUGE)

H.010051

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 267 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS W/LIGHTING & LANDSCAPINGMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

LSU HIGHLAND RD PED CORRIDOR, PHASE I

H.010319

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 NHPP 24,000 PRESERVATION - INTERSTATE 1-PLANNING/ENVIRONMENTAL

RECONSTRUCT JCP @ GRADEMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

I-110: NORTH ST. - PLANK RD.

H.010729

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 67 060-01 CM 4,413 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE LA 73 077-05 CM 232 CONGESTION MITIGATION E BATON ROUGE US 61-X 013-04 CM 697 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 2,787 CONGESTION MITIGATION

TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATIONHANKS, ANNA Remrks:

Typ Imp:EBR WILL PROVIDE 20% MATCH

Project:Prj Mgr:

TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)

H.011186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 019-01 STPFLEX 375 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

E BATON ROUGE US 61-X 013-04 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

E BATON ROUGE LA 67 060-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNALS TO BE UPGRADE TO CURRENT DOTD STANDARDSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 TRAFFIC CONTROL UPGRADE 3

H.011310

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 3244-1 870-18 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL

CONSTRUCTION OF NEW ROADWAY (DETAILS TBD BY STUDY)MASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

FORD STREET EXTENSION

Page 2 - 30 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 101: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011543

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 3164 019-01 CM 3,421 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61 019-02 CM 540 CONGESTION MITIGATION E BATON ROUGE LA 408 255-01 CM 398 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 1,385 CONGESTION MITIGATION E BATON ROUGE LA 37 254-01 CM 1,014 CONGESTION MITIGATION E BATON ROUGE LA 37 254-02 CM 1,022 CONGESTION MITIGATION

TRAFFIC SIGNAL COORDINATION AND SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

TRAFFIC SIGNAL COORD & SYNCH PH VII(EBR)

H.012059

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 37 254-03 STPFLEX 3,307 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

E BATON ROUGE LA 19 250-01 NHPP 3,159 PRESERVATION - BRIDGE (ONSYSTEM)

LA. 19 & LA. 37 BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

COPPER MILL B, N CANAL, & SANDY CR BRS

H.013053

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

REPLACE EXISTING OVERHEAD SIGN TRUSS AND SIGN FACESNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10/I-110 SPLIT OH SIGN TRUSS UPGRADE

H.013267

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 4,026 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61-X 019-01 CM 76 CONGESTION MITIGATION E BATON ROUGE I-110 450-92 CM 25 CONGESTION MITIGATION

CONSTRUCT PEDESTRIAN/BIKE PATHSMUSA, ELNUR Remrks:

Typ Imp:BREC WILL PROVIDE MATCH

Project:Prj Mgr:

SCOTLANDVILLE PKWY TO DWTN BR TRAIL-PH 1

H.013797

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 30 414-01 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTALIBERVILLE LA 30 414-02 0 URBAN SYSTEMS ASCENSION LA 30 414-03 0 URBAN SYSTEMS

ENVIRONMENTAL ANALYSIS FOR CORRIDOR WIDENINGLEBAS, MELISSA Remrks:

Typ Imp:CRPC TO PROVIDE MATCH

Project:Prj Mgr:

LA 30 WIDENING: BRIGHTSIDE - AIRLINE

H.002297

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 37 254-02 NFI 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGE BATON ROUGE LA 37 254-03 NFI 0 OTHER / MISCELLANEOUS

RECON W/GEOMETRIC IMPROVEMENTSBALLMER, SARAH Remrks:

Typ Imp:254-02-0040;SAFETY TRANSFER FUNDS-4 MILLION MAX

Project:Prj Mgr:

LA 37: SULLIVAN ROAD - LIBERTY ROAD

H.011690

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 ROAD TRANSFER 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY TO WIDEN PORT HUDSON PRIDE RDMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

PORT HUDSON PRIDE RD: LA 964-LA 19 STUDY

Page 2 - 31 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 102: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012025

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 0 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

0-FEASIBILITY/SCOPING

BRIDGE PREVENTIVE MAINTENANCE WORKTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-110 IN BATON ROUGE BRIDGE REPAIRS

H.012306

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-31 0 ROAD TRANSFER 0-FEASIBILITY/SCOPINGE BATON ROUGE 000-17 0 ROAD TRANSFER

INTERSECTION IMPROVEMENTSZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: HIGHLAND ROAD AT PECUE LANE

H.012324

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 0 SAFETY 0-FEASIBILITY/SCOPING

TRAFFIC STUDYTONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

US61:FL BLVD-MISS RIVER BR(TRAFFIC STDY)

H.012357

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-12 454-01 0 SAFETY 0-FEASIBILITY/SCOPINGLIVINGSTON I-12 454-02 0 SAFETY

FEASIBILITY STUDYGLASCOCK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-12 SHOULDER FEASIBILITY STUDY

H.012563

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 73 077-04 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY TO DETERMINE REHABILITATION/REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: BAYOU MANCHAC BRIDGE (HBI)

H.013029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 SAFETY 0-FEASIBILITY/SCOPING

SAFETY STUDY FOR INTERSECTION IMPROV. FOCUSED ON PED/BIKESRENARD, APRIL Remrks:

Typ Imp:

Project:Prj Mgr:

BATON ROUGE PED/BIKE SAFETY ACTION PLAN

H.013073

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 173 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

E BATON ROUGE LA 37 254-01 HSIPPEN 403 SAFETY - SAFE ROUTES TO PUBLICPLACES

FEASIBILITY STUDY FOR SIDEWALKS AND BICYCLE PATHS CONSTRUCTRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 37 & WOODDALE BLVD: PED IMP (BR)

H.013622

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP ARDENWOOD DR ROAD DIET

H.013751

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

DOWNTOWN GREENWAY LA CONNECTOR (BR)

Page 2 - 32 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 103: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.001961

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 134 161-08 STPFLEX 2,873 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESMISTICH, BRADLEY Remrks:

Typ Imp:161-08-0022;2 BRIDGES

Project:Prj Mgr:

JOES BAYOU & CARRAWAY LAKE BRIDGES

EAST CARROLL

H.012895

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 580 818-01 STPFLEX 2,040 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

W CARROLL LA 585 185-03 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)

W CARROLL LA 582 333-01 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

W CARROLL LA 877 337-03 NFA 640 PRESERVATION - BRIDGE (ONSYSTEM)

MOREHOUSE LA 554 160-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:USE NFA AS MATCH ON CS 818-01

Project:Prj Mgr:

DIST05:ABC BR REP E CAR,W CAR,MOR PARISH

H.012952

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 2 037-04 STPFLEX 416 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: WEST CARROLL PL - US 65

H.012954

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 585 332-05 STPFLEX 133 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 585: WEST CARROLL PL - US 65

H.012031

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 585 332-05 STPFLEX 1,334 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 585: DRAINAGE CANAL BRIDGE

H.002365

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 63 259-01 STPFLEX 5,497 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESBRAUNER, KURT Remrks:

Typ Imp:259-01-0011;3 BRIDGES

Project:Prj Mgr:

LA 63 BRIDGES NEAR BLUFF CREEK

EAST FELICIANA

H.009633

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 67 060-03 STPFLEX 4,938 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 67:EBR P/L TO 6.5 MI NORTH OF EBR P/L

Page 2 - 33 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 104: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012110

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 68 252-02 STPFLEX 2,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 68: US 61 - LA 964

H.002280

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 19 250-04 STPFLEX 2,122 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 19: LA 10 - WILSON-CLINTON RD

H.012554

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 67 060-04 STPFLEX 2,963 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 67: LA 432 - MISS ST LN

H.012995

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 67 060-04 STPFLEX 5,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 67: LA 10 - LA 432

H.010219

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 104 200-02 STPFLEX 2,286 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABLIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 104: ALLEN P/L - LA 3277

EVANGELINE

H.013009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 104 202-01 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

EVANGELINE LA 3149 820-42 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

EVANGELINE LA 3187 820-43 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)

ST LANDRY LA 752 849-07 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

ST LANDRY LA 358 849-18 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)

ST LANDRY LA 755-S 849-48 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)

IBERIA LA 85 236-02 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)

IBERIA LA 682 823-34 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

VERMILION LA 700 207-04 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST03:ABC BR REP EV,ST LA,IB,VER PARS

Page 2 - 34 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 105: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013141

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE 000-20 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

GREEN VALLEY ROAD OVER PETITE PASSE

H.013789

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE 000-20 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

CURVE SIGNING & STRIPING (EVANGELINE)

H.013460

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE US 167 066-07 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR REALIGNMENT OF US 167ZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: ENOLA STREET TO ROSS ROAD

H.012199

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN US 425 026-06 NHPP 1,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

FRANKLIN US 425 026-07 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: WINNSBORO 5-LANE

FRANKLIN

H.013236

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 17 051-02 STPFLEX 2,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 17: WINNSBORO - LA 577

H.009583

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 4 036-02 STPFLEX 452 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCHING & SINGLE LIFT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: LA 562 - LA 128

H.009605

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 4 036-03 STPFLEX 1,716 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

CHIP SEALSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: LA 128 - LA 15

H.011564

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 857 168-01 STPFLEX 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 857: LA 15 - LA 132

Page 2 - 35 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 106: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012910

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT US 167 023-03 NHPP 1,290 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

GRANT LA 472 365-01 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)

NATCHITOCHES LA 119 118-02 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

NATCHITOCHES LA 1226 359-01 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 126 091-07 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 124 125-01 STPFLEX 2,640 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 499 126-02 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 505 321-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1229 864-13 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1234 864-14 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST08:ABC BR REP GRAN, NATCH, WINN PARS

GRANT

H.013205

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT US 165 015-04 NHPP 800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: SB LANE - LA 1230 TO LASALLE P/L

H.013206

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT US 165 015-04 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: SB LANE - LA 524 TO LA 123

H.012543

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT LA 8 040-03 STPFLEX 4,985 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: BIG CREEK BRIDGE

H.002762

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 400-01 STPFLEX 3,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:400-01-0007; 400-01 NFA MATCH

Project:Prj Mgr:

LA 86: LA 3242 - LA 347

IBERIA

H.006128

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 FBROFF 4,177 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:

Typ Imp:713-23-0001;MOVEABLE BRIDGE

Project:Prj Mgr:

VIDA SHAW BRIDGE OVER BAYOU TECHE

Page 2 - 36 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 107: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.007453

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 TAP>200K 865 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

NEW SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

HOPKINS STREET SIDEWALKS, PHASE II

H.009856

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS

INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0100

Project:Prj Mgr:

BNSF (NEW IBERIA) JULIA ST.

H.009857

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS

INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0101

Project:Prj Mgr:

BNSF (NEW IBERIA) IBERIA ST.

H.009891

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS

INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0099

Project:Prj Mgr:

BNSF (NEW IBERIA) WEEKS ST.

H.009892

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 STPFLEX 340 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA US 90 424-04 LOCAL 10 RAILROADS

NEW XING PER DISTRICT 03 & NEW IBERIABANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

LDRR (NEW IBERIA) US 90 FR

H.010004

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 320 823-12 STPFLEX 3,642 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NOT ASSIGNED 400-30 STPFLEX 4,199 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATION#MULTIVALUE Remrks:

Typ Imp:NFA AS MATCH TO C.S. 823-12; TTF AS MATCH TO C.S 400-30

Project:Prj Mgr:

LA 320:BYU TECHE MB (OLIVIER) (NO HBI)

H.010100

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 HSIPPEN 209 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

SIDEWALK CONSTRUCTION, MARKINGS,MORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

PESSON ELEMENTARY SIDEWALKS

H.010155

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NHPP 25,000 RAILROADS - GRADE SEPARATION 3-DESIGN/DEVELOPMENT

BRIDGE OVERPASSPAINE, PEGGY JO Remrks:

Typ Imp:STBONDS AND UNCLAIMED PROPERTY FUNDS AS MATCH

Project:Prj Mgr:

US 90 RAILROAD OVERPASS SE OF LA 85

H.010922

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 88 397-05 HSIP 3,254 SAFETY 3-DESIGN/DEVELOPMENT

REALIGN 2 CURVES ON LA 88 IN COTEAUDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:USE HSIP FUNDS

Project:Prj Mgr:

LA 88: REALIGN CURVES IN COTEAU

Page 2 - 37 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 108: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011026

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 182 004-04 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT, ROADWAY WORGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182 WB: LASALLE ST. - VINE ST.

H.011495

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 88 397-05 HSIP 3,840 SAFETY 3-DESIGN/DEVELOPMENTIBERIA US 90 424-04 HSIP 960 SAFETY

ROUNDABOUTS, J-TURNS, U-TURNS, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: RAMPS @ LA 88 ROUNDABOUTS

H.013140

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

EIGHTY ARPENT ROAD OVER UNNAMED COULEE

H.013522

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 STP>200K 1,776 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:IBERIA PARISH TO PROVIDE MATCH.

Project:Prj Mgr:

S LEWIS ST WIDENING

H.011987

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 182 004-05 STPFLEX 1,333 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: SANDAGER CANAL BRIDGE

H.012295

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 182 004-04 STPFLEX 2,850 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

1-PLANNING/ENVIRONMENTAL

IBERIA LA 182 004-05 STPFLEX 2,929 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

SIDEWALK IMPROVEMENTS AND ADA RAMPSBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182 NEW IBERIA SIDEWALKS

H.012991

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 87 823-27 STPFLEX 1,530 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

IBERIA LA 87 241-01 STPFLEX 510 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE, PATCH, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 87: LA 3182 - ST MARY P/L

H.011988

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 237-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 86: BAYOU TECHE MB REHAB (HBI)

Page 2 - 38 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 109: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011991

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 400-31 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 86:BAYOU TECHE MB DASPIT REHAB (HBI)

H.012738

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 3195 823-44 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

IBERIA LA 344 823-14 0 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:

Project:Prj Mgr:

NELSON CANAL & MORBIHAN BRIDGE REH (HBI)

H.013083

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 HSIPPEN 272 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY TO STUDY INSTALLATION OF SIDEWALKMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

JEFFERSON ISLAND SIDEWALK

H.009484

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 75 257-01 FBROFF 1,381 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 75: BAYOU BREAUX BRIDGE

IBERVILLE

H.011686

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 3066 230-02 NFA 4,399 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

REPAIR AND REALINGMENT OF LA 3066. A PORTION SLID INTO GIWWMASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3066 REPAIR REALIGN: LA 3066-S -LA 75

H.012512

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RTP 76 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE LA 69 231-02 RTP 38 RECREATIONAL TRAILS PROGRAM IBERVILLE 000-24 LOCAL 13 RECREATIONAL TRAILS PROGRAM IBERVILLE LA 69 231-02 LOCAL 13 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 2,640' SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WHITE CASTLE MISS RIVER LEVEE TRAIL

H.012789

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 74 264-01 STPFLEX 20 RAILROADS 3-DESIGN/DEVELOPMENT

PREEMPTING 302-964M WITH ADJACENT TRAFFIC SIGNALLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 74: IC RR PREEMPTION (ST. GABRIEL)

H.012851

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RAIL PD 1,400 RAILROADS 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 RAIL HE 400 RAILROADS IBERVILLE LA 3066 230-01 RAIL PD 300 RAILROADS

UPGRADE WARNINGS AND CLOSE SOME UP CROSSINGS IN PLAQUEMINSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

UP RR CORRIDOR (PLAQUEMINE)

Page 2 - 39 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 110: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013242

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 75 230-03 STPFLEX 550 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

RAISE ROADWAY ELEVATION TO PREVENT FLOODINGGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 75 ROADWAY FLOODING: 3 MI N LA 404

H.013509

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RTP 202 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 LOCAL 115 RECREATIONAL TRAILS PROGRAM

CONST. OF 1400' PED/BIKE TRAIL ON TOP OF LEVEENUNES, BRIAN Remrks:

Typ Imp:CITY OF PLAQUEMINE WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

PLAQUEMINE RIVERFRONT RECREATIONAL TRAIL

H.013715

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 77 219-01 RAIL HE 600 RAILROADS 3-DESIGN/DEVELOPMENTIBERVILLE LA 75 824-02 RAIL HE 300 RAILROADS

ROAD WORK & UPGRADE WARNINGLUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 77 & 75: UP RR XINGS (IBERVILLE)

H.013764

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RAIL PD 500 RAILROADS 3-DESIGN/DEVELOPMENT

UPGRADE AND INSTALL SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

WEST & HOMESTEAD: UP RR XINGS(IBERVILLE)

H.013861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RAIL PD 200 RAILROADS 3-DESIGN/DEVELOPMENT

UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH BY RAILROAD

Project:Prj Mgr:

BARROW ST: UP RR XING (IBERVILLE)

H.013862

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE I-10 450-07 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PAVEMENT MARKER REPLACEMENT III

H.012060

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 75-S 824-18 FBROFF 15,535 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

MOVABLE BRIDGE REPLACEMENT/REHABILITATIONBRIGNAC, CHRISTINA Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA75S:BAYOU SORREL MOVABLE BRIDGE (HBI)

H.012588

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE I-10 450-07 NHPP 13,000 PRESERVATION - INTERSTATE 1-PLANNING/ENVIRONMENTAL

GRADE RAISINGMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: ATCH BASIN BR - W BATON ROUGE P/L

Page 2 - 40 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 111: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.001553

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 146 068-02 STPFLEX 4,696 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

JACKSON LA 4 068-03 STPFLEX 2,954 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGESMISTICH, BRADLEY Remrks:

Typ Imp:068-02-0017;3 BRIDGES & JT W/068-03-0021 2BRS

Project:Prj Mgr:

LA 146 BRIDGES NEAR KELLEYS

JACKSON

H.010452

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 144 318-01 STPFLEX 1,500 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

JACKSON LA 144 319-04 STPFLEX 500 PRESERVATION - NON-INTERSTATENFA

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 144: EROS (LA 34) - OUACHITA P/L

H.012897

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 148 316-02 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

JACKSON LA 144 318-01 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)

JACKSON LA 556 318-02 NFA 2,880 PRESERVATION - BRIDGE (ONSYSTEM)

JACKSON LA 542 319-01 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)

JACKSON LA 810 825-04 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN LA 507 308-04 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN LA 3061 831-13 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)

UNION LA 550 311-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST05:ABC BR REP JACK,LIN,UNION PARISH

H.012962

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 155 090-06 STPFLEX 217 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 155: BIENVILLE PL - US 167

H.002861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NFI 70,000 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTJEFFERSON LA 3046 423-01 0 DEMO / HIGH PRIORITY

NEW INTERCHANGEYANG, LI Remrks:

Typ Imp:430-01-0013;JEFF. PH CONSULTANT WORKING (E)

Project:Prj Mgr:

CAUSEWAY BLVD - EARHART EXPRESSWAY INTE

JEFFERSON

H.004424

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 61 007-02 STP>200K 3,800 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTJEFFERSON LA 3152 826-03 STP>200K 500 URBAN SYSTEMS

INTERSECTION IMPROVEMENT, WIDENING, SUBSURFACE DRAINAGELANDRY, COREY Remrks:

Typ Imp:USE TTF AS MATCH FOR PHASES 4 AND 6.

Project:Prj Mgr:

AIRLINE AT CLEARVIEW INTERSECTION IMPROV

Page 2 - 41 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 112: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010017

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:USE CCCD TOLL CREDITS AS MATCH

Project:Prj Mgr:

US 90Z: WESTBANK EXPRESSWAY REHAB

H.010418

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 611-1 826-14 STPFLEX 200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

JEFFERSON LA 611-3 826-16 STPFLEX 500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

JEFFERSON LA 611-3 826-16 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM

JEFFERSON LA 611-1 826-17 STPFLEX 325 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 611-1 & LA 611-3:COLD PLANE & OVERLAY

H.010570

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 49 283-30 STP>200K 3,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTJEFFERSON LA 49 283-30 HSIP 3,200 SAFETY

ACCESS MANAGEMENT/SAFETY IMPROVEMENTS, BIKE LANES, SIDEWALFUSILIER, JACOB Remrks:

Typ Imp:MATCH FROM THE CITY OF KENNER

Project:Prj Mgr:

LA 49/WILLIAMS BLVD CORRIDOR IMPROVS

H.010673

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 NHPP 10,160 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

JEFFERSON US 90-Z 283-09 STP>200K 2,540 URBAN SYSTEMS

CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILITATIFUSILIER, JACOB Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO.

Project:Prj Mgr:

US90Z:HARVEY CANAL TUNNEL REHABILITATION

H.011732

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 6,557 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE LANES; SIDEWALKS AND CROSSWALKSLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH PROVIDING MATCH

Project:Prj Mgr:

JEFFERSON PARISH: CANAL ST. IMPROVEMENTS

H.011752

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 7,962 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND BIKELANESLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

SEVERN AVE: VETERANS - W. ESPLANADE

H.011779

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 TAP>200K 2,011 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

MULTI-USE PATHNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF KENNER.

Project:Prj Mgr:

POWER BLVD MEDIAN IMPROVEMENTS

H.011780

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 TAP>200K 344 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON 000-26 LOCAL 65 ENHANCEMENTS

PEDESTRIAN PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH

Project:Prj Mgr:

LAKEFRONT PEDESTRIAN PATH

Page 2 - 42 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 113: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011805

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 TAP>200K 481 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON LA 541 826-13 TAP>200K 141 ENHANCEMENTS

MULTI-USE PATHNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH

Project:Prj Mgr:

JEFFERSON WB MISS RIVER MU PATH 3B & 3C

H.012489

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTJEFFERSON I-10 450-15 LOCAL 66 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 3,665' LONG BY 13' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

I-10 TRAIL WIDENING, JEFFERSON PARISH

H.012594

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3134 429-02 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD J TURNS & U TURNS AT THE INTERSECTION OF LA 3134 & LA 45SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3134: INTERSECTION IMP @ LA 45

H.012619

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 006-30 NHPP 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 48 @ PLANTATION RD

H.012620

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 006-30 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 48: EVANS RD - EDWARDS AVE

H.012885

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 466 063-02 STP>200K 4,364 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE LANES, MULTI-USE PATHS, ADA SIDEWALKSLEBAS, MELISSA Remrks:

Typ Imp:CITY OF GRETNA WILL PROVIDE MATCH

Project:Prj Mgr:

LA 466: 5TH ST IMPROVEMENTS (GRETNA)

H.012918

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NHPP 500 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

CONCRETE REHAB PATCH AND JOINT SEALINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3139: DICKORY AVE. - ORLEANS P/L

H.012978

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 301 826-06 NFA 600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

JEFFERSON LA 301 826-06 STPFLEX 30 PRESERVATION - NON-INTERSTATEON STP SYSTEM

MILLING AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:PR NF NFA; PR NS TTF AS MATCH

Project:Prj Mgr:

LA 301: 280' W MCMURTY - LA 45

Page 2 - 43 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 114: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013090

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 18 063-02 HSIPPEN 120 SAFETY - SAFE ROUTES TO PUBLICPLACES

3-DESIGN/DEVELOPMENT

JEFFERSON LA 18 063-02 STPFLEX 96 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

SIDEWALKS, ADA RAMPS, DRAINAGE STRUCTURES, PED ISLANDSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

GRETNA DOWNTOWN PEDESTRIAN IMPROVEMEN

H.013209

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 61 007-02 NHPP 1,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: WILLIAMS BLVD - AIRPORT ACCESS RD

H.013345

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STPENH 546 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIGNING, STRIPING AND BRIDGENUNES, BRIAN Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

KAWANEE AVENUE BIKE ROUTE PHASE I

H.013346

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STPENH 572 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

PEDESTRIAN IMPROVEMENTSNUNES, BRIAN Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE LOCAL MATCH.

Project:Prj Mgr:

MANHATTEN BLVD PEDESTRIAN IMPROVEMENTS

H.013347

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 18 063-02 STPENH 517 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

BIKE PATHSNUNES, BRIAN Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 18: 4TH ST BIKE PATH JEFFERSON PARISH

H.013365

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 303 826-07 STPENH 551 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON LA 45 249-90 STPENH 643 ENHANCEMENTS

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:THE TOWN OF JEAN LAFITTE WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 45/LA 303 ROSETHORNE PATH (LAFITTE)

H.013370

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 282-01 STPENH 282 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS, BICYCLE FACILITIES, LANDSCAPING AND BUS SHELTERSNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF KENNER WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 48: KENNER LEVEE TRAILHEAD EXPANSION

H.013411

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 006-30 TAP>200K 423 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS, DRAINAGEMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF HARAHAN WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 48 PED IMPROVEMENTS CITY OF HARAHAN

H.013558

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90 005-10 NHPP 150 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

WHITE-TOPPING CONCRETE REPAIRINGBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: WHITE-TOPPING AT LAPALCO REPAIR

Page 2 - 44 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 115: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013745

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3017 826-11 STPFLEX 1,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL, OVERLAY, AND RESTRIPINGBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3017: 4TH ST - LAPALCO BLVD

H.013757

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90 006-02 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: HUEY P-ORLEANS P/L

H.013762

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 61 007-02 NHPP 1,900 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILLING AND OVERLAY OF US 61 FROM ORLEANS PL TO LABARRESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: LABARRE RD - ORLEANS PL

H.013813

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 1,667 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

MUTLI USE PATHLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH TO PROVIDE THE MATCH

Project:Prj Mgr:

VINTAGE DR MU PATH: POWER - WILSON

H.013825

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 HSIP 500 RAILROADS 3-DESIGN/DEVELOPMENT

INSTALL RR ACTIVE WARNINGSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

NOPB RR XINGS (JEFFERSON PARISH)

H.008065

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3154 826-44 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

JEFFERSON 000-26 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INSTALLATIONHARROUCH, JOSHUA Remrks:

Typ Imp:826-44-0032

Project:Prj Mgr:

LA 3154 @ DOCK ST. ROUNDABOUT

H.013718

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 23 062-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 23: 23RD ST - GRETNA BLVD PED IMPR

H.013765

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LOYOLA AVE & SAL LENTINI PKWYBIKE LANES

Page 2 - 45 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 116: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.002980

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS I-10 450-03 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESDELATTE, BRIAN Remrks:

Typ Imp:450-03-0085;PARALLEL BRIDGES

Project:Prj Mgr:

I-10 OVERPASS OVER US 165 & MP R.R

JEFFERSON DAVIS

H.006528

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 SR2S 198 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

SIDEWALK CONSTRUCTION AND CROSSWALKSRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

FENTON ELEMENTARY SIDEWALKS

H.009486

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS US 90 003-07 STPFLEX 1,370 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: BAYOU BRIDGE

H.012621

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS I-10 450-03 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

APPROACH SLAB REPLACEMENTMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: JEFF DAVIS APP. SLAB REPLACEMENTS

H.013255

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS US 165 014-02 NHPP 6,860 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAY (SOUTHBOUND ONLY)SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: 0.26 M N I-10 - ALLEN P/L

H.013855

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 RAIL PD 200 RAILROADS 3-DESIGN/DEVELOPMENT

INSTALL SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

GRO RACCA RD: UP XING (JEFFERSON DAVIS)

H.013857

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 RAIL PD 200 RAILROADS 3-DESIGN/DEVELOPMENT

INSTALL SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

ESTES RD: UP RR XING (JEFFERSON DAVIS)

H.002091

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS LA 97 201-01 STPFLEX 6,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:201-01-0008;PROJECT TO BE SCOPED

Project:Prj Mgr:

LA 97 OVERPASS (I-10)

H.002151

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 339-S 216-02 FBROFF 2,500 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTJUDICE, ANDREW Remrks:

Typ Imp:216-02-0016; USE NFA AS MATCH

Project:Prj Mgr:

BAYOU PARC PERDU AND CREEK BRIDGES

LAFAYETTE

Page 2 - 46 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 117: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.002735

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 1252 391-04 FBROFF 2,335 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTLAI, QUANG Remrks:

Typ Imp:391-04-0018; USE NFA AS MATCH

Project:Prj Mgr:

BAYOU VERMILION BRIDGE

H.003459

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-49 455-01 HSIP 0 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE LA 726 828-44 HSIP 496 SAFETY LAFAYETTE 000-28 HSIP 676 SAFETY LAFAYETTE LA 98 391-02 HSIP 352 SAFETY

INTERCHANGE IMPROVEMENTSTONEY, PATRICK Remrks:

Typ Imp:455-01-0054 AND 828-44-0015

Project:Prj Mgr:

I-49 INTERCH:LA726/LA98/PONT DES MOUTON

H.009629

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 167 424-02 NHPP 8,813 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

P.C.C.P. REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90 (EB):RR JCT-JCT US 90BUS (PINHOOK)

H.010005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 733 828-14 STPFLEX 4,568 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

VERMILION LA 82 194-07 STPFLEX 3,418 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

VERMILLION RIVER MOVABLE BRS REHAB (HBI)

H.011904

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182-2 828-50 STPFLEX 2,846 ROAD TRANSFER 3-DESIGN/DEVELOPMENTLAFAYETTE LA 182-2 828-50 LOCAL 487 ROAD TRANSFER

COLD PLANE, OVERLAY INCLUDING WIDENING, DRAINAGE STRMCMILLAN, RYAN Remrks:

Typ Imp:LOCAL FUNDS PROVIDED BY CITY OF BROUSSARD

Project:Prj Mgr:

LA 182: ST DE PORRES-ALBERTSONS PKWY(RT)

H.011932

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 89-1 216-03 STPFLEX 750 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 89-1:N IBERIA ST-HEART D FARM RD(RT)

H.011971

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 176 828-20 STPFLEX 277 ROAD TRANSFER 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 LOCAL 258 OTHER / MISCELLANEOUS LAFAYETTE LA 176 828-05 LOCAL 77 OTHER / MISCELLANEOUS

STREETSCAPE IMPROVEMENTS, COLD PLANE, OVERLAY, CONC. REHABBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 176: DT LFT ST. & SW. CONS. PHASE 3

H.012231

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3025-S 828-38 STP>200K 835 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 3025-S 828-38 TAP>200K 583 URBAN SYSTEMS

ENHANCEMENTSBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH.

Project:Prj Mgr:

BERTRAND DRIVE STREETSCAPE

Page 2 - 47 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 118: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012393

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 98 391-02 HSIP 683 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 HSIP 683 SAFETY

THE EXISTING INTERSECTION WILL BE CONVERTED TO A ROUNDABOUTTONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 98: ROUNDABOUT AT MILLS STREET

H.012611

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 167 424-02 NHPP 351 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

LAFAYETTE I-49 455-01 NHPP 49 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

OFFSET TURN LANES, EXTEND MEDIAN ISLAND, REMOVE HURR. XOVERSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 167 @ CHALMETTE/I-49 HURR. CROSSOVER

H.012800

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 HSIPPEN 301 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

HIGH FRICTION SURFACE TREATMENTRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LOCAL ROADS HFST (LAFAYETTE)

H.012867

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 1,938 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ADD CENTER TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH

Project:Prj Mgr:

S LARRIVIERE RD: LA 92 - CHEMIN METAIRIE

H.012868

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 1,020 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH

Project:Prj Mgr:

FORTUNE ROAD PAVEMENT PRESERVATION

H.012869

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 STP>200K 1,650 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 723 828-03 STP>200K 1,650 URBAN SYSTEMS

ROUNDABOUTBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH

Project:Prj Mgr:

LA 182(UNIV) @ LA 723(RENAUD) ROUNDABOUT

H.012870

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 93 217-01 STP>200K 4,400 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ADDING TURNING LANESBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SCOTT WILL PROVIDE MATCH

Project:Prj Mgr:

LA 93: I-10 RAMP - RENAUD

H.012871

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 1,250 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

PRESERVATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH

Project:Prj Mgr:

DETENTE ROAD PAVEMENT PRESERVATION

H.012880

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 FBROFF 700 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

HAPSBURG LANE / COULEE

Page 2 - 48 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 119: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012914

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3073 828-39 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

EXTENDING TURN LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3073: AMBASSADOR @ BONIN IMPROVEMENTS

H.013303

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATE AND ADD CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH

Project:Prj Mgr:

W MAIN STREET: S BERNARD TO CLARA

H.013304

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 3,780 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATE AND MINOR WIDENING - ADD CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH

Project:Prj Mgr:

MAIN STREET: CLARA TO ST. DEPORRES

H.013412

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 TAP>200K 356 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

SIXTH STREET SIDEWALKS LAFAYETTE

H.013413

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 TAPFLEX 262 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

PEDESTRIAN AND BIKE PATHNUNES, BRIAN Remrks:

Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

NORTHSIDE HS PED BIKEWAY PLAZA LAFAYETTE

H.013443

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 TAP>200K 701 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

NEW SIDEWALK CONSTRUCTIONMEEK, STEPHEN Remrks:

Typ Imp:LOCAL MATCH FROM CITY OF YOUNGSVILLE.

Project:Prj Mgr:

IBERIA STREET SIDEWALK, PH 1 YOUNGSVILLE

H.013517

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 202 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF CARENCRO TO PROVIDE MATCH

Project:Prj Mgr:

E ST PETER ST SIDEWALKS

H.004490

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP<200K 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

STAGE 0 STUDYDUET, JASON Remrks:

Typ Imp:700-28-0221; MATCH BY LAF MPO

Project:Prj Mgr:

STAGE 0 STUDY FOR VARIOUS ROUNDABOUTS

H.006534

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 1-PLANNING/ENVIRONMENTAL

CONSTRUCT A ROUNDABOUTRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDABOUT ON DULLES DR. AT NORTH DOMIN

H.009500

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

PLAN IMPLEMENTATION AND ACTION PLANBROUSSARD, DAN Remrks:

Typ Imp:

Project:Prj Mgr:

2040PLAN IMPLEMENTATION&I-49 ACTION PLAN

Page 2 - 49 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 120: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011992

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 343 393-03 STPFLEX 1,463 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTHERATH, SUBA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 343: INDIAN BAYOU BRIDGE

H.012533

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 1252 391-04 STPFLEX 1,871 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

NOT ASSIGNED 828-15 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTS#MULTIVALUE Remrks:

Typ Imp:

Project:Prj Mgr:

LA1252,LA93:BAYOU PT BRULE AND DITCH BRS

H.012665

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

US 90 RETIMING PROJECT

H.013537

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 93 828-15 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 93: DITCH BRIDGE

H.009997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 167 080-02 STP>200K 1,645 URBAN SYSTEMS 0-FEASIBILITY/SCOPINGLAFAYETTE US 167 080-02 HSIPPEN 3,013 SAFETY LAFAYETTE US 167 080-02 NHPP 3,013 OPER EFFICIENCY/MOTORIST

ASSISTANCE - ACCESSMANAGEMENT

LAFAYETTE US 167 080-02 STPFLEX 1,368 URBAN SYSTEMS

ACCESS MANAGEMENT AND OTHER SAFETY COUNTERMEASURESFUSILIER, JACOB Remrks:

Typ Imp:STUDY FUNDED WITH SAFETY TRANSFER FUNDS

Project:Prj Mgr:

US 167: JOHNSTON ST IMPROVEMENTS

H.011990

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 92 213-05 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 92: VERMILLION RIVER MB REHAB (HBI)

H.013025

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:ACADIANA MPO PROVIDING MATCH

Project:Prj Mgr:

LA 182 (UNIVERSITY AVE) CORRIDOR STUDY

H.013716

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 167 080-02 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: CAMELLIA BLVD-CHURCHILL DR (LAF)

Page 2 - 50 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 121: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.001461

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 TAP<200K 66 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLAFOURCHE US 90 424-08 TAP<200K 66 ENHANCEMENTS

SCENIC OVERLOOK AND PARKING LOTNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

LAFOURCHE-TERREBONNE SCENIC OVERLOOK

LAFOURCHE

H.002794

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-90 FBROFF 1,421 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:

Typ Imp:407-90-0018; USE NFA AS MATCH

Project:Prj Mgr:

VALENTINE CANAL BR. NEAR RACELAND

H.009662

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-01 STPFLEX 2,115 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308: GOLDEN MEADOW BR - GALLIANO BR

H.011517

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 654 829-10 NFA 700 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

RAISING ROADWAY ELEVATION BY ADDING ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 654: LA 308 - GREENS S. CUT RD.

H.011665

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-90 HSIPPEN 832 SAFETY 3-DESIGN/DEVELOPMENTLAFOURCHE LA 308 407-90 HSIPPEN 242 SAFETY

LA 308 REALIGNMENTROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308:BELLVIEW BRIDGE TO RITA BRIDGE

H.011915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 NFI 24,506 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 NFI 1,054 ROAD TRANSFER

NEW BRIDGE AND NEW ROAD BETWEEN LA 308 AND LA 3235HANKS, ANNA Remrks:

Typ Imp:

Project:Prj Mgr:

AIRPORT CONNECTOR ROAD AND BRIDGE

H.012447

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 182 005-07 STPFLEX 20,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

REPLACE EXISTING VERTICAL LIFT BRIDGEBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BAYOU LAF BR AT RACELAND (HBI)

H.013269

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 STP<200K 469 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH

Project:Prj Mgr:

AUDUBON AVE OVLY:LA 1 TO TERREBONNE P/L

H.013272

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 STP<200K 145 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

NEW MULTI-USE PATHBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

LAROSE MULTI-USE PATH

Page 2 - 51 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 122: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013369

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 STPENH 592 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS, SIGNS, STRIPING, PARKING AND LANDSCAPINGNUNES, BRIAN Remrks:

Typ Imp:LAFOURCHE PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA1: LAFOURCHE PARISH GVMT CTR TRAILHEAD

H.013402

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 STP<200K 110 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 STP<200K 74 URBAN SYSTEMS LAFOURCHE LA 308 407-90 STP<200K 36 URBAN SYSTEMS

SIDEWALK AND MULTIUSE PATHBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA1 &LA308 PED & MULTIUSE PATH(LOCKPORT)

H.013403

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 304 829-04 STP<200K 131 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFOURCHE LA 20 065-06 STP<200K 131 URBAN SYSTEMS

ADA SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA 20 & LA 304 SIDEWALK IMP (CHACKBAY)

H.013404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-04 STP<200K 117 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH PROVIDING MATCH

Project:Prj Mgr:

LA 1 SIDEWALKS (CUT-OFF)

H.013490

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 STP<200K 1,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

MULTI-USE PATHBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH PROVIDING MATCH

Project:Prj Mgr:

CENTRAL LAFOURCHE MULTI-USE PATH PH 1A

H.011963

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 648-S 829-29 STPFLEX 1,185 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 648: DRAIN CANAL BRIDGE

H.012530

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 20 065-06 STPFLEX 2,155 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

LAFOURCHE LA 3185 829-25 STPFLEX 1,242 PRESERVATION - BRIDGE (ONSYSTEM)

LAFOURCHE LA 3185 829-25 STPFLEX 1,284 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 20, LA 3185:40 ARPENT & CANAL BRIDGES

H.013388

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 1,140 SAFETY 1-PLANNING/ENVIRONMENTALLAFOURCHE 000-29 STPFLEX 1,140 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02H FLASHING YELLOW ARROW PART 1

Page 2 - 52 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 123: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011962

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

NOT ASSIGNED 407-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATION FEASIBILITY STUDY#MULTIVALUE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1:COMPANY CANAL MB-LOCKPORT(HBI)

H.012734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 307 829-15 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 307:BAYOU BOEUF BRIDGE REHABILITATION

H.009603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 3259 830-21 STPFLEX 294 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3259: LA 125 - US 165

LASALLE

H.012520

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE 000-30 RTP 194 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

RESTORE 4.5 MILES OF ATV TRAIL AND CONST. OF TRAILHEAD PARKNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

DEWEY WILLS WMA YEAR ROUND ATV TRAIL

H.013093

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE 000-30 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

BREITHAUPT CUTOFF RD OVER RHINEHART CRK

H.013221

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-05 NHPP 280 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

CATAHOULA US 425 026-05 NHPP 82 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

FRANKLIN US 425 026-06 NHPP 338 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 84 AND US 425 ASPHALT SURFACE TREATME

H.012048

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-04 NHPP 15,325 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

WINN US 84 022-03 NHPP 1,050 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US 84: CASTOR CREEK AND RELIEF BRIDGES

Page 2 - 53 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 124: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.007492

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 145 157-03 TAP<5K 204 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN US 80 001-08 TAP<5K 146 ENHANCEMENTS LINCOLN LA 145 157-02 TAP<5K 35 ENHANCEMENTS

SIDEWALK AND BIKE PATHMEEK, STEPHEN Remrks:

Typ Imp:15% OF MATCH IS TOLL CREDITS 5% IS LOCAL MATCH

Project:Prj Mgr:

CHOUDRANT SIDEWALK PROJECT

LINCOLN

H.008161

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 3072 831-14 FBROFF 1,199 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:831-14-0005; USE NFA AS MATCH

Project:Prj Mgr:

LA 3072: COLVIN CREEK BRIDGE

H.009871

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT

INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

KCS(SIMSBORO) WOODLAND DR.

H.010389

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 507 308-04 STPFLEX 735 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 507: US 80 - S. END OVERPASS I-20

H.011627

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN I-20 451-05 NHPP 11,900 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: BIENVILLE P/L - 1 MILE WEST LA 149

H.011772

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 824-3 831-21 TAPFLEX 41 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:MATCH BY THE TOWN OF DUBACH

Project:Prj Mgr:

LA 824-3: TOWN OF DUBACH SIDEWALKS

H.011803

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 TAP<200K 660 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND STREETSCAPINGNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF RUSTON.

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE VII

H.011804

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 TAP<200K 675 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND STREETSCAPINGNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF RUSTON

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE IX

H.012123

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 33 069-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

NB RIGHT TURN LANE AT LA 821SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 33: NB RIGHT TURN LANE AT LA 821

Page 2 - 54 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 125: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012695

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 STPFLEX 450 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD LEFT TURN LANE AT NUTMEGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: LEFT TURN LANE NUTMEG DRIVE

H.012697

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 NHPP 900 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADDITION OF TURN LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: LTURN LANES BARNETT/WESLEY CHAPLE

H.013033

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLINCOLN 000-31 LOCAL 305 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 10,078' LONG BY 12' WIDE, MULTI-USE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ROCK ISLAND GREENWAY, PHASE 2

H.013086

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES

3-DESIGN/DEVELOPMENT

LINCOLN 000-31 LOCAL 115 SAFETY - SAFE ROUTES TO PUBLICPLACES

CONSTRUCT SIDEWALKS, DRAINAGE, AND OTHER SAFETY IMPROVEMEMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

I.A. LEWIS ELEM SIDEWALK - PHASE 2

H.013409

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 544 296-03 TAPFLEX 30 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN 000-31 TAPFLEX 16 ENHANCEMENTS LINCOLN LA 150 831-07 TAPFLEX 45 ENHANCEMENTS

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:LA TECH UNIVERSITY WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA TECH UNIV N CAMPUS TRAILS RUSTON

H.013414

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 TAP<200K 406 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN US 80 001-08 TAP<200K 296 ENHANCEMENTS

PED IMPROVEMENTS (SIDEWALKS, LANDSCAPING AND STREETSCAPINNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF RUSTON WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE X

H.013524

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLINCOLN 000-31 LOCAL 174 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 1250' LONG BY 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:

Typ Imp:CITY OF RUSTON WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

ROCK ISLAND GREENWAY, PHASE 4

Page 2 - 55 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 126: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010616

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 544 296-03 STPFLEX 6,500 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

LINCOLN LA 544 296-03 STPFLEX 4,590 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

LINCOLN LA 544 296-03 LOCAL 4,500 PRESERVATION - BRIDGE (ONSYSTEM)

OVERPASS REHABILITATIONFUSILIER, JACOB Remrks:

Typ Imp:

Project:Prj Mgr:

I 20: LA 544 OVERPASS REPLACEMENT

H.012540

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 151 317-04 STPFLEX 2,319 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 151: CYPRESS CREEK BRIDGE

H.012740

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: REPLACE FIVE OVERPASSES (LINCOLN)

H.013720

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

BONNER ST BRIDGE PED IMPR (RUSTON)

H.003425

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 NHPP 7,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

C.P. AND OVERLAYMAY, BRIAN Remrks:

Typ Imp:454-02-0077

Project:Prj Mgr:

I-12: LA 63 - TANGIPAHOA PARISH LINE

LIVINGSTON

H.008170

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1024 832-10 FBROFF 1,302 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:

Typ Imp:832-10-0019;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

LA 1024 CREEK BRS. NEAR FRIENDSHIP

H.010384

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 442 269-01 STPFLEX 2,420 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

LIVINGSTON LA 441 270-02 STPFLEX 190 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 442: LA 63 - W. JCT. LA 441

Page 2 - 56 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 127: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011520

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1019 832-02 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1019: LA 16-CALMES RD DRAINAGE

H.012348

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 273-03 STPFLEX 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

3-DESIGN/DEVELOPMENT

LIVINGSTON 000-32 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INTERSECTION IMPROVEMENTSISEMANN, ROBERT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: ROUNDABOUT @ EDEN CHURCH ROAD

H.012573

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 832-13 STPFLEX 1,725 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

IN PLACE STABILIZATION AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: LA 16 - FORREST DELATTE RD.

H.012622

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 NHPP 16,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

I-12 APPROACH SLAB REPLACEMENT AT HOG BRANCH BRIDGEBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

I-12:LIVINGSTON PAR APPROACH SLAB REP P3

H.013010

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 449 271-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

LIVINGSTON LA 63 272-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

LIVINGSTON LA 1027 273-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

LIVINGSTON LA 1032 832-12 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)

ST HELENA LA 37 254-05 STPFLEX 2,760 PRESERVATION - BRIDGE (ONSYSTEM)

ST HELENA LA 38 263-01 STPFLEX 1,200 PRESERVATION - BRIDGE (ONSYSTEM)

ST HELENA LA 38 263-02 STPFLEX 1,440 PRESERVATION - BRIDGE (ONSYSTEM)

ST HELENA LA 1042 846-03 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)

ST HELENA LA 1047 846-07 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST62:ABC BR REPL LIVING, ST HELENA PAR

H.013088

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1031 832-11 HSIPPEN 305 SAFETY - SAFE ROUTES TO PUBLICPLACES

3-DESIGN/DEVELOPMENT

CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

HATCHELL LANE SIDEWALKS

Page 2 - 57 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 128: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013166

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 FBROFF 1,145 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

WHITTINGTON ROAD OVER GRAYS CREEK

H.013454

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 TAP>200K 281 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

NEW SIDEWALK CONSTURCTIONNUNES, BRIAN Remrks:

Typ Imp:LOCAL ENTITY (CITY OF DENHAM SPRINGS) TO PROVIDE 20% MATCH.

Project:Prj Mgr:

CENTERVILLE ST. SIDEWALKS DENHAM SPRINGS

H.013543

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 3,594 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAY AND CLOSED DRAINAGELEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH PROVIDING THE MATCH.

Project:Prj Mgr:

SIMS ROAD IMPROVEMENTS

H.013545

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 471 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:DENHAM SPRINGS TO PROVIDE MATCH.

Project:Prj Mgr:

EDGEWOOD DRIVE IMPROVEMENTS

H.013553

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 1,296 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAY AND SIDEWALKLEBAS, MELISSA Remrks:

Typ Imp:CITY OF WALKER TO PROVIDE MATCH.

Project:Prj Mgr:

PENDARVIS LANE IMPROVEMENTS PHASE 1

H.013555

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 879 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAY AND SIDEWALKSLEBAS, MELISSA Remrks:

Typ Imp:CITY OF WALKER TO PROVIDE MATCH.

Project:Prj Mgr:

PENDARVIS LANE IMPROVEMENTS PHASE II

H.013557

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 1,318 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAY AND SIDEWALKSLEBAS, MELISSA Remrks:

Typ Imp:CITY OF WALKER TO PROVIDE MATCH.

Project:Prj Mgr:

PENDARVIS LANE IMPROVEMENTS PHASE III

H.013674

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 771 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:CITY OF DENHAM SPRINGS TO PROVIDE MATCH

Project:Prj Mgr:

BENTON LANE IMPROVEMENTS

H.013738

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 441 270-01 STPFLEX 900 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 441: LA 42 - 1-12 COA

H.013739

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 63 272-03 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 63: LA 449 - LA 442

Page 2 - 58 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 129: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.002397

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALLIVINGSTON I-12 454-02 0 DEMO / HIGH PRIORITY

INTERCHANGE IMPROVEMENTSMASTIN, CATHERINE Remrks:

Typ Imp:262-01-0037

Project:Prj Mgr:

PETE'S HWY(LA 16)INTERCHANGE @ I-12

H.009552

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 STPFLEX 1,405 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

MAINTENANCE RESTORATION & REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

JCT. LA 1034 - JCT. US 190

H.009837

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 64 262-31 NFI 1,667 CAPACITY 1-PLANNING/ENVIRONMENTALLIVINGSTON LA 1019 832-05 NFI 1,667 CAPACITY LIVINGSTON LA 64 273-03 NFI 1,667 CAPACITY

CAPACITY AND SAFETY IMPROVEMENTS AT LA 64 AND LA 1019MOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 64: ROUNDABOUT @ LA 1019

H.010551

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-02 STPFLEX 199 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PCCP REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: LA 64/LA 1026 - AMITE CHURCH RD.

H.010672

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

TRAFFIC STUDY ON LA 3002, LA 16, AND LA 1034COLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3002 & LA 16 CORRIDOR STUDY

H.012068

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 273-03 STPFLEX 1,067 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: CREEK BRIDGE

H.012069

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 STPFLEX 1,491 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: CANAL BRIDGE

Page 2 - 59 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 130: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012971

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 42 260-02 STPFLEX 233 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

LIVINGSTON LA 16 262-01 STPFLEX 32 PRESERVATION - NON-INTERSTATEON STP SYSTEM

PATCH, MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42/LA 16:AMITE RIVER-MAIN ST.

H.011645

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CORRIDOR STUDY FOR ACCESS MANAGEMENT IMPROVEMENTSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA3002:LA16:LA1034:CORRIDOR STUDY PHASE2

H.010897

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-09 NHPP 13,500 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MADISON 000-33 OTHER 13,500 PRESERVATION - BRIDGE (ONSYSTEM)

REHABILITATIOND'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: MRB ISLAND ANCHORING PIER E1

MADISON

H.011446

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON 000-33 NHPP 9,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

3-DESIGN/DEVELOPMENT

REST AREA RENOVATIONGUINN, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

MOUND REST AREA RENOVATIONS

H.011623

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 NHPP 14,200 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: LA 577 - WALNUT BAYOU

H.011628

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 NHPP 6,395 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRICHLAND I-20 451-07 NHPP 1,305 PRESERVATION - INTERSTATE

ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: LA 17 - LA 577

H.011861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-09 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

MADISON I-20 451-08 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING AND SIGN STRUCTURE REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: US 80 TO MISSISSIPPI STATE LINE

Page 2 - 60 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 131: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.000665

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 165 016-05 STPFLEX 21,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEMASTIN, CATHERINE Remrks:

Typ Imp:016-05-0031

Project:Prj Mgr:

UP R.R. OVERPASS NEAR BONITA (HBI)

MOREHOUSE

H.008203

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 835 834-07 STPFLEX 2,892 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MOREHOUSE LA 835 834-07 STPFLEX 120 PRESERVATION - NON-INTERSTATEON STP SYSTEM

NEW BRIDGESMASTIN, CATHERINE Remrks:

Typ Imp:834-07-0022;2 BRIDGES

Project:Prj Mgr:

LA 835 CREEK BRIDGES

H.010470

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 138 330-01 STPFLEX 5,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 138: JCT LA 593 TO JCT LA 2

H.011613

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 425 038-03 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

SUBSURFACE DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: DRAINAGE IMPROV AT EAST PINE AVE

H.012950

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 3051 834-17 STPFLEX 180 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

MOREHOUSE LA 3051 834-17 NFA 186 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3051: US 165 - LA 133

H.013118

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE 000-34 FBROFF 266 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

HILL AVENUE OVER DRAINAGE CANAL

H.012032

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 2 037-01 STPFLEX 2,047 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: BAYOU GALION BRIDGE

H.001145

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 120 042-05 STPFLEX 3,812 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 120: SABINE PARISH LINE TO LA 6

NATCHITOCHES

Page 2 - 61 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 132: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.001270

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 CAPACITY 3-DESIGN/DEVELOPMENTNATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 PRESERVATION - BRIDGE (ON

SYSTEM)

WIDEN TO 3 LANESTONEY, PATRICK Remrks:

Typ Imp:053-04-0025

Project:Prj Mgr:

LA 1X: 200' S WOODYARD DR - HANCOCK AVE.

H.001820

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 485 115-01 FBROFF 5,159 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NATCHITOCHES LA 485 115-02 FBROFF 2,085 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:115-01-0017;4 NEW BRIDGES.JT W/115-02-0011

Project:Prj Mgr:

LA 485: BRIDGES NEAR ALLEN

H.010346

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 487 113-03 STPFLEX 3,844 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 487: LA 120 - LA 174

H.010365

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 117 114-03 STPFLEX 1,288 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 117: BELLWOOD - LA 478

H.012972

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1225 835-02 NFA 1,904 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MILLING, CEMENT TREATED BASE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1225: US 71 TO LA 6

H.012999

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1 034-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

REMOVAL OF PCCP, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: FOUR LANE SECTION TO LA 6

H.013032

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

NEW AGGREGATE TRAIL SURFACE AND MAINTAIN EXISTING TRAILSNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANGAER

Project:Prj Mgr:

LOUISIANA TRAILS RESTORATION

H.013204

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-05 NHPP 2,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 6: LA 504 TO LA 1

H.013498

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES 000-35 RTP 312 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

CONSTRUCTION OF 3,488' OF WALKING TRAIL THROUGH URBAN PARKNUNES, BRIAN Remrks:

Typ Imp:CITY OF NATCHITOCHES WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

NATCHITOCHES RECREATIONAL TRAILS

Page 2 - 62 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 133: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013514

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

NON-ROUTINE MAINTENANCE, RESTOR. & CONST. OF ATV TRAILSNUNES, BRIAN Remrks:

Typ Imp:L&A TRAILS WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

RESTOR. OF TRAIL BTWN WINNFIELD & SIBLEY

H.013743

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 493 835-03 NFA 1,357 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 493: MONTROSE RD. TO LA 1

H.013821

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-05 NHPP 375 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NATCHITOCHES LA 6 034-05 NHPP 375 PRESERVATION - BRIDGE (ONSYSTEM)

ABUTMENT REPAIR AND/OR BRIDGE LENGTHENINGVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 6: YOUNGS BAYOU BRIDGES REHAB

H.001271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1-X 053-04 NHPP 4,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:

Typ Imp:053-04-0031;STAGE 0

Project:Prj Mgr:

CANE RIVER BRIDGE AT CHURCH STREET

H.010342

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 155 091-02 STPFLEX 1,939 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 155: RED RIVER P/L - S JCT LA 153

H.010343

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 174 112-06 STPFLEX 1,925 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 174: DESOTO P/L - I-49 INTERCHANGE

H.012683

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES I-49 455-06 NHPP 420 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

I-49 SIGN UPGRADE FROM LA 6 TO DESOTO P/LFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: LA 6 TO DESOTO PARISH LINE

H.012307

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-05 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 6 FEASIBILITY STUDY

Page 2 - 63 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 134: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.009308

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 936 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTORLEANS US 90 006-03 HSIPPEN 234 SAFETY - SAFE ROUTES TO SCHOOLS

BICYCLE & PEDESTRAIN CROSSING IMPROVEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

NEW ORLEANS DPW SRTS SIDEWALK PROJECT

ORLEANS

H.010331

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-90 STPFLEX 1,119 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

RAISING ROADWAY GRADE TO CONSISTENT ELEVATION BY ADDING ASGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: FLOODWALL - VICTORY RD

H.011219

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NFI 3,970 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

JEFFERSON I-10 450-15 NFI 30 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO CBD1 I610-CARROLLTON

H.011221

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NFI 5,700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO CBD3 POYDRAS - LOUISA

H.011447

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-03 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

INTERSECTION IMPROVEMENTS ON US 90 AT MLK BLVDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: INTERSECTION IMP AT MLK BLVD

H.011823

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 TAP>200K 287 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

TRAILHEADNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY PARK IMPROVEMENT ASSOCIATION

Project:Prj Mgr:

NO CITY PARK: HARRISON AVENUE TRAILHEAD

H.011841

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 TAP>200K 348 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

PEDESTRIAN IMPROVEMENTSNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO

Project:Prj Mgr:

NO: LAKESHORE DR. REC/OPERATIONAL IMPR

H.011965

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 47 148-02 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

CLEANING, PAINTING, AND STRUCTURAL REPAIRSKEMP, KELLY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 47: IWGO BRIDGE REHABILITATION (HBI)

Page 2 - 64 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 135: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012591

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 20,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

2" OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PARIS RD - LAKE PONTCHARTRAIN

H.013041

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTORLEANS 000-36 LOCAL 16 RECREATIONAL TRAILS PROGRAM

RESTORATION AND CONST. OF A 6325' LONG X 10' WIDE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

CITY PARK NATURE TRAILS (NOLA)

H.013094

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-03 HSIPPEN 342 SAFETY - SAFE ROUTES TO PUBLICPLACES

3-DESIGN/DEVELOPMENT

ORLEANS US 90 006-03 STPFLEX 743 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

ORLEANS I-10 450-90 HSIPPEN 453 SAFETY - SAFE ROUTES TO PUBLICPLACES

SIDEWALKS, MULTIUSE PATHS, RAMPS, PED SIGNALS, STRIPINGMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

BROAD ST - READ BLVD PED IMPROVEMENTS

H.013150

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 1,743 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BICYCLE AND SIDEWALK IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:CITY OF NEW ORLEANS TO MATCH

Project:Prj Mgr:

ANDREW HIGGINS DR STREETSCAPES

H.013364

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STPENH 229 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:THE CPIA WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

CITY PARK PALM DRIVE SIDEWALKS (NO)

H.013511

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTORLEANS 000-36 LOCAL 28 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1000' X 10' WIDE MULTI-USE TRIALNUNES, BRIAN Remrks:

Typ Imp:CITY OF NEW ORLEANS WILL PROVIDE LOCAL MATCH

Project:Prj Mgr:

HOLLYGROVE GREENLINE TRAIL

H.013617

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 2,200 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

3-DESIGN/DEVELOPMENT

PROVIDE ROADWAY LIGHTINGDOUGLAS, JOSEPH Remrks:

Typ Imp:ENTITY MATCH PHASE 6

Project:Prj Mgr:

I-10: I-610E INTERCHANGE LIGHTING

H.000304

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 61 007-01 NHPP 4,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REHABILITATIOND'ANDREA, ARTUR Remrks:

Typ Imp:007-01-0022;STAGE 0 PROJECT FEASIBILITY STUDY

Project:Prj Mgr:

I 10 - US 61 OVERPASS

H.005720

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 0 TIME 1-PLANNING/ENVIRONMENTAL

FLORIDA AVENUE EXPRESSWAY - ENVIRONMENTAL ASSESSMENTUMEOZULU, JOE Remrks:

Typ Imp:TTF AS MATCH TO PHASE 2

Project:Prj Mgr:

FLORIDA AVENUE EXPRESSWAY

Page 2 - 65 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 136: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011222

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 5,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO CBD4 LOUISA - I-510

H.011223

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 2,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

ORLEANS I-10 450-17 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING & SIGNING STRUCTURES REPLACEMENT &UPGRADENGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CBD5 (I-510 TO END OF TWIN SPAN)

H.011836

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 TAP>200K 499 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO

Project:Prj Mgr:

NEW ORLEANS: LAKE VISTA, SIDEWALKS

H.011964

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 39 046-31 NHPP 2,271 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REHABILITATIONDELATTE, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: INDUSTRIAL CANAL BRIDGE REHAB

H.011967

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRCAVALIER, STEPHANIE Remrks:

Typ Imp:PHASE 1 CCCD TOLL CREDITS AS MATCH

Project:Prj Mgr:

US 90Z: GNO1 BRIDGE & APP REHABILITATION

H.011968

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRDELATTE, BRIAN Remrks:

Typ Imp:PHASE 1 CCCD TOLL CREDITS AS MATCH

Project:Prj Mgr:

US90Z:GNO2 BRIDGE AND APP REHABILITATION

H.011969

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 1264 836-15 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1264: TED HICKEY MOVABLE BRIDGE REHAB

H.012837

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING

STUDY WILL ADDRESS CONGESTION ON I-10 CORRIDOR INTO PORT/NONGUYEN, WAYNE Remrks:

Typ Imp:MATCH FROM NO RPC

Project:Prj Mgr:

I-10 NEW ORLEANS MASTER PLAN

Page 2 - 66 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 137: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013719

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 61 007-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

US 61 @ I-10 EB OFF RAMP PED IMPR (NO)

H.013753

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 428 410-01 HSIPPEN 3 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR INTERSECTION AND PED/BIKE IMPROVEMENTSRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 428: GEN DEGAULLE - OLD BEHRMAN

H.007300

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STPFLEX 642 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENTOUACHITA 000-37 DEMO 6,672 DEMO / HIGH PRIORITY OUACHITA I-20 451-06 NHPP 5,417 INTERMODAL CONNECTOR OUACHITA I-20 451-06 STBONDS 5,803 OTHER / MISCELLANEOUS OUACHITA LA 594 326-01 STPFLEX 10,641 INTERMODAL CONNECTOR

RD CONNECTOR & INTERCHANGE IMPRVMNTMASTIN, CATHERINE Remrks:

Typ Imp:742-37-0028;4TH FUND SOURCE US $300K STP<200K

Project:Prj Mgr:

KANSAS LANE-GARRETT RD CONNECTOR

OUACHITA

H.007528

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 TAP<200K 1,396 ENHANCEMENTS 3-DESIGN/DEVELOPMENTOUACHITA US 80 001-09 LOCAL 152 ENHANCEMENTS

NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 80:6TH ST-LAMY LN STREETSCAPING

H.007530

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 TAP<200K 339 ENHANCEMENTS 3-DESIGN/DEVELOPMENTOUACHITA 000-37 LOCAL 199 ENHANCEMENTS OUACHITA US 165-Y 015-08 TAP<200K 339 ENHANCEMENTS OUACHITA US 165-Y 015-08 LOCAL 199 ENHANCEMENTS

NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

JACKSON STREET CORRIDOR ENHANCEMENT

H.008226

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 3033 837-12 STPFLEX 9,617 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMOSS, SARAH Remrks:

Typ Imp:837-12-0026

Project:Prj Mgr:

CHENIERE SPILLWAY & BRIDGE REPLACEMENT

H.008230

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 838 837-14 STPFLEX 1,055 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEWINDMANN, ANDREW Remrks:

Typ Imp:837-14-0009

Project:Prj Mgr:

LA 838: STEEP BAYOU BRIDGE REPLACEMENT

H.010015

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 143 315-02 STPFLEX 8,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 143: BAYOU D'ARBONNE BRIDGE

Page 2 - 67 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 138: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010430

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 594 326-01 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

THROUGH LANE WITH RIGHT TURN LANE AT HIGH SCHOOLSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 594: TURN LANE @ OUACHITA PAR HIGH

H.010698

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT

INSTALL F/L'S & GATES AT UP RIVERBARGE ST. CROSSINGSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RR

Project:Prj Mgr:

RIVERBARGE ST: UP RR XING (MONROE)

H.010989

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA I-20 451-06 NHPP 2,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTLINCOLN I-20 451-05 NHPP 1,500 PRESERVATION - INTERSTATE

RE-SURFACE SELECTED I-20 RAMPS IN LINCOLN & OUACHITA PARISHMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: LINCOLN/OUACHITA P. RAMP REHAB

H.011507

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

OUACHITA US 80 002-01 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

INSTALL CCTVS ALONG US 80KIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

MONROE ITS PHASE 3

H.011508

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 617 837-17 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

OUACHITA LA 840-6 837-04 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

INSTALL CCTVSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

MONROE ITS PHASE 4

H.011724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 208 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATION, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:WEST MONROE WILL PROVIDE MATCH

Project:Prj Mgr:

COLEMAN AVENUE REHABILITATION

H.011895

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 HSIP 60 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

INSTALL GAURD RAILMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CITY OF MONROE GUARD RAIL INSTALLATION

H.012247

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTOUACHITA 000-37 LOCAL 18 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1 MILE AGGREGATE LEVEE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

FORSYTHE POINT TRAIL

H.012279

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 HSIPPEN 557 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

IMPROVE SAFETY/OPERATION OF COLEMAN/RIVERFRONT ST INTERSECMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

ENDOM BRIDGE APPROACH REALIGNMENT

Page 2 - 68 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 139: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012438

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STPFLEX 300 RAILROADS 3-DESIGN/DEVELOPMENTOUACHITA 000-37 RAIL HE 0 RAILROADS

INSTALL RR SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

DESIARD/ELYSIAN FIELDS: ALM RR (MONROE)

H.012626

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 838 837-14 STPFLEX 105 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 838: DRAINAGE IMPROVEMENTS

H.012798

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 594 326-02 HSIP 750 SAFETY 3-DESIGN/DEVELOPMENTOUACHITA 000-37 HSIP 750 SAFETY

EXISTING INTERSECTION REPLACED WITH A ROUNDABOUT (SAFETY)TONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 594: ROUNDABOUT AT ROWLAND RD.

H.012898

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 151 317-02 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

OUACHITA LA 838 837-14 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)

OUACHITA LA 134 837-15 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

RICHLAND LA 132 166-05 STPFLEX 1,800 PRESERVATION - BRIDGE (ONSYSTEM)

RICHLAND LA 135 167-04 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

RICHLAND LA 3048 339-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

RICHLAND LA 576 341-01 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST05:ABC BR REP OUACHITA, RICH PARS

H.013101

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 HSIPPEN 175 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

PAVEMENT MARKINGS AND SIGNINGMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CONSTITUTION DR TRAFFIC STUDY

H.013122

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 475 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

OUACHITA 000-37 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

PINE ST. & HARRISON/COLLIER BRIDGES

H.013127

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

BRITTON RD & HERMAN DICKERSON RD BRS

Page 2 - 69 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 140: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013130

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

OUACHITA 000-37 FBROFF 787 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

RED CUT RD & CHARLES RAWLS RD BRIDGES

H.013137

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 470 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

OUACHITA 000-37 FBROFF 204 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

HARMON JOHNSON RD & GOOD HOPE RD BRS

H.013144

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

OUACHITA 000-37 FBROFF 235 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

PINE BLUFF RD & TACK ALLEN RD BRIDGES

H.013371

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STPENH 215 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS, TRUNCATED DOMES, SIGNS, STRIPING & FLASHING SIGNAMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF WEST MONROE WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

KIROLI RD SIDEWALKS AND PED IMPROVEMENTS

H.013398

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 269 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

COLEMAN AVE REHABILITATION

H.013400

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 585 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

NATCHITOCHES ST REHAB: TRENTON - N 7TH

H.013401

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 350 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

CROSELY ST REHAB: TRENTON - N 7TH

H.013518

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 408 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF MONROE TO PROVIDE MATCH.

Project:Prj Mgr:

OTIS STREET REHABILITATION

H.013802

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 340 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH

Project:Prj Mgr:

GARRETT ROAD ( LA 15 - AUSTIN ST.)

Page 2 - 70 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 141: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013803

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 475 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY PROVIDING MATCH

Project:Prj Mgr:

RICHWOOD RD NO. 2 (US 165 - BROWN ST)

H.013804

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 1,155 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLIC JURY TO PROVIDE MATCH

Project:Prj Mgr:

WALL WILLIAMS (GOOD HOPE - WHITES FERRY)

H.013805

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 1,330 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH

Project:Prj Mgr:

FINKS'S HIDE-A-WAY: BARKLEY - BAYOU OAKS

H.004782

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 NFI 328,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

CONNECTOR & OUACHITA R. BR.(ENGR)NICKEL, TIM Remrks:

Typ Imp:700-37-0129;STAGE O

Project:Prj Mgr:

LA 143 - US 165 CONNECTOR& OUACH

H.007289

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STBONDS 23,790 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALOUACHITA US 80 002-01 STBONDS 2,468 DEMO / HIGH PRIORITY OUACHITA US 165 016-01 STBONDS 1,336 DEMO / HIGH PRIORITY OUACHITA LA 840-6 837-23 STBONDS 717 DEMO / HIGH PRIORITY

ASPHALT NEW PAVEMENTMASTIN, CATHERINE Remrks:

Typ Imp:742-37-0016;US 80 - US 165. R/W & UTIL BY CITY

Project:Prj Mgr:

KANSAS LANE EXTENSION

H.009932

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 STPFLEX 7,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

WIDEN ROADWAY, ADD LANESBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: VANCIL ROAD - WELL ROAD

H.012033

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 143 315-02 STPFLEX 2,335 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

OUACHITA LA 594 326-02 STPFLEX 1,215 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 143, LA594:CROSS BAYOU & CANEY CR BRS

H.011440

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 165 015-31 0 SAFETY 0-FEASIBILITY/SCOPING

PEDESTRIAN CROSSING IMPROVEMENTSRENARD, APRIL Remrks:

Typ Imp:

Project:Prj Mgr:

US 165 PEDESTRIAN CROSSING STUDY

H.011688

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 165 015-31 0 SAFETY 0-FEASIBILITY/SCOPINGOUACHITA US 165 016-01 0 SAFETY

CORRIDOR STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: CORRIDOR STUDY US 165 BUS - LA 2

Page 2 - 71 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 142: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012541

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 594 326-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY REHABILITATION OR REPLACEMENTMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 594: OVERPASS I-20

H.011949

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES 000-38 HSIPPEN 150 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

PURCHASE AND INSTALL REGULATORY & WARNING SIGNS, ETCMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

RWD SIGNING PLAQUEMINES PARISH

PLAQUEMINES

H.012560

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 NHPP 2,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE AND OVERLAY. APPLY NEW STRIPING AND MARKERSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 23: TUNNEL - APRICOT (END OF ASPHALT)

H.012987

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 STPFLEX 174 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

PLAQUEMINES LA 23 062-03 STPFLEX 426 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 23: RAVENNA RD-LM 4.040

H.012079

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 NHPP 15,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

TUNNEL REPAIRSTOURRES, VALERIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA23:BELLE CHASSE TUNNEL INTERIM REPAIRS

H.002184

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 413 227-04 STPFLEX 4,395 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESMOORE, DARRELL Remrks:

Typ Imp:227-04-0019;2 BRIDGES

Project:Prj Mgr:

BAYOU CHENAL & BAYOU DISCHARGE BRS.

POINTE COUPEE

H.012215

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE 000-39 RTP 101 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTPOINTE COUPEE 000-39 LOCAL 18 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF CONNECTING TRAILS AND A TRAILHEADNUNES, BRIAN Remrks:

Typ Imp:CRT IS THE PROJECT MANAGER

Project:Prj Mgr:

NEW ROADS RECREATIONAL TRAIL & TRAILHEAD

H.013192

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE US 190 008-03 NHPP 5,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAY (EASTBOUND ONLY)SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: E GROSSE TETE BR-E ATCH RIVER BR

Page 2 - 72 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 143: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013196

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE US 190 008-02 NHPP 6,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: WBR P/L - E GROSSE TETE BR

H.013747

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 415 224-02 STPFLEX 700 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

MINOR OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 413 & LA 415: LA 981 - NEW ROADS ST

H.010434

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 15 177-01 STPFLEX 4,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: LA 1 - W. FELICIANA P/L

H.012061

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 1 052-04 STPFLEX 1,997 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBOURGEOIS, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: BAYOU MOREAU BRIDGE

H.012565

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 1 052-04 STPFLEX 1,433 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

E FELICIANA LA 963 819-19 STPFLEX 1,202 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 963, LA 1: BRIDGES

H.012063

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 15 177-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: OR NAV CANAL MB REHAB (HBI)

H.000574

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 TAP<200K 837 ENHANCEMENTS 3-DESIGN/DEVELOPMENTRAPIDES LA 1208-5 014-07 TAP<200K 59 ENHANCEMENTS

SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

MASONIC DRIVE STREETSCAPE, PHASE II

RAPIDES

H.008271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 STP<200K 2,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTRAPIDES 000-40 LOCAL 2,500 URBAN SYSTEMS

NEW CONSTRUCTION, 2-LANE WITH PAVED SHOULDERSBANKSTON, TANYA Remrks:

Typ Imp:840-37-0007

Project:Prj Mgr:

SUGARHOUSE RD EXTENSION

Page 2 - 73 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 144: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.009122

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 1204 840-31 STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESYANG, LI Remrks:

Typ Imp:840-31-0015; 3 BRIDGES

Project:Prj Mgr:

LA1204:BAYOU FLAGON & KITCHEN CR BRIDGES

H.009498

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 121 029-05 STPFLEX 8,900 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 121: CALCASIEU RIVER BRIDGE

H.011194

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165-X 015-01 HSIPPEN 165 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTRAPIDES 000-40 HSIPPEN 55 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS, SIGNING AND STRIPINGRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

PINEVILLE ELEMENTARY SIDEWALKS

H.011361

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-09 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

MILL, CONSTRUCT TURN LANES, AND INSTALL PAVEMENT STRIPINGRACHAL, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: TURN LANES FOR EMERG STAGING AREA

H.011504

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 167 023-01 NHPP 1,800 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

INSTALLING BRIDGE ADVISORIES, CCTVS, AND DMSSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

ALEXANDRIA ITS PHASE 2

H.011506

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

INSTALLING CCTVS AND DMSSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

ALEXANDRIA ITS PHASE 4

H.011536

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 4,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, & OVERLAY I-49 SHOULDERS AND RAMPSMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: 0.44 MI N US 167 TO EXIT 80

H.011565

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 7,400 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 340 PRESERVATION - INTERSTATE

PATCH, MILL, OLY (I-49 MAINELINE, SHOULDERS & RAMPS) & SIDEMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: N OF LA 498 TO 0.66 MI E LA 1200

H.011569

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,700 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 350 PRESERVATION - INTERSTATE

PATCH, MILL, & OLY (I-49 MAINLINE SHOULDERS, RAMP & SIDE RD)MAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: NORTH OF LA 8 TO NATCHITOCHES P/L

Page 2 - 74 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 145: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011597

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 8 134-03 STPFLEX 2,210 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, COLD PLANING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: VERNON PARISH LINE TO LA 119

H.011938

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

SIGNING AND RELATED WORKFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: 2 MILES N LA 3265 - 4 MILES N LA 1

H.012931

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 3128 840-33 STPFLEX 250 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

MICORSURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3128: LA 107 TO LA 28-ULTRATHIN

H.012935

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 121 029-06 STPFLEX 720 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 121: LA 112 TO LA 28- AST

H.013120

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

BETHEL ROAD OVER SLASH BAYOU TRIBUTARY

H.013153

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: PAVEMENT MARKING REPLACEMENT V

H.013207

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165 014-05 NHPP 350 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: NB LANE - MCNARY TO BOY SCOUT RD

H.013887

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 STP<200K 3,364 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF ALEXANDRIA TO PROVIDE MATCH

Project:Prj Mgr:

RAPIDES AVE AND 3RD ST ROAD IMPROVEMENTS

H.010341

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 115 033-04 STPFLEX 1,928 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 115: LA 1207 - LA 28

Page 2 - 75 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 146: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010824

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-09 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

RAPIDES US 71 840-43 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

RAPIDES US 71 008-30 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CONDUCT CORRIDOR STUDY ALONG US 71COLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

US 71 CORRIDOR STUDY

H.011942

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165 015-01 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

RAPIDES US 165 015-02 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

RAPIDES 000-40 STPFLEX 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CONSTRUCT ROUNDABOUT AND ADD TURN LANESHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: ROUNDABOUT AT PINECREST

H.012046

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 3170 840-35 STPFLEX 2,807 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

RAPIDES LA 1208-1 840-48 STPFLEX 2,376 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

CHATLIN LAKE & HORSESHOE CANAL BRIDGES

H.012468

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

AVOYELLES I-49 455-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

EVANGELINE I-49 455-92 NHPP 12 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGN UPGRADE ALONG I-49FILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 (ST LANDRY P/L - 2 MI. N. LA 3265)

H.011403

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 1208-3 368-03 0 SAFETY 0-FEASIBILITY/SCOPING

CORRIDOR STUDY FOR SAFETY & ACCESS MANAGEMENT IMPROVEMENHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA1208-3 TRAFFIC STUDY:VERSAILLES- LA488

H.001761

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 507 100-02 FBROFF 2,133 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:100-02-0013

Project:Prj Mgr:

LA 507 CREEK BRIDGE

RED RIVER

Page 2 - 76 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 147: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 480 305-04 NFA 214 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 480: US 84 TO US 371

H.011600

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 514 100-02 STPFLEX 1,260 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACING WITH MINOR WIDENISPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 514 & 507: US 371 TO BIENVILLE PL

H.012613

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 509 105-03 STPFLEX 144 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 509: DESOTO PL TO LA 1

H.012615

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER US 71 010-03 STPFLEX 2,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: COUSHATTA TO BOSSIER PARISH LINE

H.012974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 174 112-07 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 174: NATCHITOCHES PL TO LA 1

H.001970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 561 166-03 FBROFF 7,011 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTALLEN, BRIAN Remrks:

Typ Imp:166-03-0015

Project:Prj Mgr:

BOEUF RIVER BRIDGE NEAR HEBERT

RICHLAND

H.008288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 132 842-13 FBROFF 3,672 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:842-13-0009;USE NFA AS MATCH

Project:Prj Mgr:

BOEUF RIVER BRIDGE NEAR BUCKNER (HBI)

H.009529

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND US 80 002-02 STPFLEX 3,416 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

BASE STABILIZATION & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80:BAYOU LAFOURCHE BR. - 1.44 MILES E

H.011021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 17 051-04 STPFLEX 1,114 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE EXISTING SUBSURFACE DRAINAGE STRUCTURGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 17: SHARON STREET TO TENNESSEE STREET

Page 2 - 77 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 148: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 132 166-05 STPFLEX 913 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 132: LA 135 TO LA 576

H.012657

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 17 051-05 STPFLEX 102 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 17: DRAINAGE IMPROVEMENTS

H.012955

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 15 026-09 STPFLEX 829 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: US 425 - OUACHITA PL

H.013080

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND 000-42 FBROFF 1,727 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

MCLEMORE ROAD OVER BEE BAYOU

H.008793

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 183 185-01 NFI 95,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

INTERCHANGE IMPROV., NEW ROADWAY, ROADWAY WIDENINGLANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

FRANKLIN FARMS MEGA SITE

H.012036

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND US 80 002-03 STPFLEX 3,079 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: BOEUF RIVER BRIDGE

H.012926

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 135 167-04 STPFLEX 565 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

CHIP SEALSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 135: LA 15 - LA 137

H.012966

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE US 171 025-04 NHPP 850 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MIRCOSURFACINGLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: CONVERSE TO DESOTO P/L-MICORSURF

SABINE

Page 2 - 78 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 149: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 1215 132-07 NFA 2,760 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

VERNON LA 117 114-01 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)

VERNON LA 399 138-03 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)

VERNON LA 463 139-06 STPFLEX 2,520 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST08:ABC BR REP SABINE, VERNON PARS

H.010345

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 175 035-02 STPFLEX 1,973 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: N JCT LA 120 - RAY CANTO RD

H.012544

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 120 042-03 STPFLEX 1,630 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 120 042-03 STPFLEX 1,928 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 120 042-03 STPFLEX 1,646 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 474 120-01 STPFLEX 1,574 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 120, LA 474: BRIDGES

H.013763

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE 000-43 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPINGVERNON 000-58 0 SAFETY - LOCAL ROADS SAFETY

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP SIGNS & STRIPING (VERNON, SABINE)

H.009175

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 HSIPPEN 120 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

PURCHASE AND INSTALL SIGNS AND SOLAR BEACONSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CHALMETTE INTERSECTION SAFETY IMPROVE

ST BERNARD

H.011800

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 TAP>200K 1,022 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATH ON LEVEE TOPNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH GOVERNMENT

Project:Prj Mgr:

ST. BERNARD MISS RIVER TRAIL PH III

H.011820

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 TAP>200K 433 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH

Project:Prj Mgr:

JEAN LAFITTE PARKWAY SHARED USE PATH

Page 2 - 79 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 150: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012891

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 300 284-30 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

DIST02:ABC BR REPLACE LAFOUR,ST BER PARS

H.013343

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 STPENH 728 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:ST. BERNARD PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

ST. BERNARD MISS RIVER TRAIL, PH IV

H.013525

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 RTP 101 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST BERNARD 000-44 LOCAL 17 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 5597' X 10' WIDE, MULTI-USE TRAIL ON LEVEENUNES, BRIAN Remrks:

Typ Imp:ST. BERNARD PARISH GOVERNMENT WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

ST. BERNARD PARISH 40 ARPENT TRAIL, PH 1

H.013758

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 39 046-32 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

EXTEND EB DUAL LEFT TURN LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: LEFT TURN LANE AT LA 47

H.010413

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 48 282-02 STPFLEX 1,750 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 48: ORMOND PLANTATION - WESCO ST

ST CHARLES

H.010416

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 3127 428-03 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3127: ST. JOHN P/L - 3700' W I-310

H.010417

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 306 845-07 STPFLEX 3,600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

COLD PLANE, GEOGRID & 4" OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 306: LA 18 - LA 632

H.011801

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES 000-45 TAP>200K 2,602 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY ST. CHARLES PARISH

Project:Prj Mgr:

ST. CHARLES WB LEVEE PATH PH IV AND V

H.012992

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 631 845-06 NFA 175 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MILLING AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 631: OLD SPANISH TRAIL- LEVEE ROAD

Page 2 - 80 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 151: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013494

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 52 845-03 STP>200K 3,466 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:

Typ Imp:MATCH BY ST. CHARLES PARISH

Project:Prj Mgr:

LA 52 (PH1): BLUEBERRY HILL - ANGUS DR

H.013495

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 52 845-03 STP>200K 3,351 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:

Typ Imp:MATCH BY ST. CHARLES PARISH

Project:Prj Mgr:

LA 52 (PH2): US 190 - BLUEBERRY HILL

H.010753

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-38 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTALST CHARLES US 90 005-08 NFI 0 CAPACITY

RECONSTRUCTION OF INTERCHANGE OR NEW FLYOVER RAMPLANDRY, COREY Remrks:

Typ Imp:MATCH FOR ENVIRONMENTAL FROM DOTD SURPLUS

Project:Prj Mgr:

US 90/I-310 INTERCHANGE

H.012532

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 631 845-06 STPFLEX 1,498 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 631: DRAIN CANAL BRIDGE

H.013496

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 52 845-03 STP>200K 2,439 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:

Typ Imp:MATCH BY ST. CHARLES PARISH

Project:Prj Mgr:

LA 52 (PH3): ANGUS DR - LA 18

H.012977

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 432 846-10 STPFLEX 1,350 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

THIN LIFT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 432: DOUGHTY RD-LA 38

ST HELENA

H.013736

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 16 262-04 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: LIVINGSTON PL - LA 63

H.013116

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 20 065-07 HSIPPEN 4,822 SAFETY 3-DESIGN/DEVELOPMENTST JAMES LA 20 065-07 HSIPPEN 655 SAFETY LAFOURCHE LA 20 065-06 HSIPPEN 1,456 SAFETY

WIDENING LA 20 TO INCLUDE 8' SHOULDERSLANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 20 WIDEN: LA 307 - S. VACHERIE

ST JAMES

Page 2 - 81 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 152: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013730

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 3274 256-32 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD EB/WB TURN LANESMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3274: LEFT TURNLANES @ LA 3125

H.011717

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 70 426-02 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

PIER PROTECTION SYSTEMGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: SUNSHINE BRIDGE PIER PROTECTION

H.012066

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 3213 434-02 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3213: GRAMERCY BRIDGE REHABILITATION

H.002960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 3213 434-01 STPFLEX 15,652 RAILROADS - GRADE SEPARATION 3-DESIGN/DEVELOPMENT

GRADE SEPARATE EXISTING AT GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3213:GRAMERCY BRIDGE OVER UP RAILROAD

ST JOHN

H.010076

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN 000-48 HSIP 300 RAILROADS 3-DESIGN/DEVELOPMENT

RAILROAD SIGNALIZATIONSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

IC (RESERVE) W. 19TH ST.

H.010385

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 3127 428-02 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3127: ST. JAMES P/L - ST. CHARLES P/L

H.012074

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN US 51 256-12 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

RECONFIG STRIPING FOR OFF RAMP MERGESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 51 @ I-55 OFF RAMP

H.013017

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN 000-48 HSIP 1,500 RAILROADS 3-DESIGN/DEVELOPMENTST JOHN LA 636-1 848-05 RAIL PD 250 RAILROADS ST JOHN LA 3217 848-17 RAIL PD 250 RAILROADS

INSTALL F/L'S, GATES, AND BELLSSHREWSBERRY,BILL Remrks:

Typ Imp:USE TTF AS MATCH ON C.S. 848-05 & 848-17

Project:Prj Mgr:

IC RR CORRIDOR (ST JOHN THE BAPTIST)

H.013239

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN US 61 007-04 STP>200K 2,365 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE/PED IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:ST. JOHN PARISH TO PROVIDE MATCH

Project:Prj Mgr:

US 61:LA 3188-ORMOND BLVD,BIKE/PED IMP

Page 2 - 82 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 153: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013894

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN I-10 450-13 NHPP 50 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

ST CHARLES I-10 450-14 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: I-55 TO JEFFERSON P/L RPM

H.009594

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN I-10 450-13 NFI 0 PRESERVATION - INTERSTATE 1-PLANNING/ENVIRONMENTAL

GRADE RAISING AND CROSS DRAIN WORK FEASIBILITY STUDYHANKS, ANNA Remrks:

Typ Imp:

Project:Prj Mgr:

I-10:E END OF RESERVE RELIEF CANAL-US 51

H.010902

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN US 61 007-04 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRENARD, APRIL Remrks:

Typ Imp:FEASIBILITY STUDY FUNDED WITH SATRANS

Project:Prj Mgr:

US 61 FEASIBILITY STUDY

H.011136

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 44 256-02 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING

STAGE 0 FEASIBILITY STUDYNGUYEN, WAYNE Remrks:

Typ Imp:20% NON-FEDERAL MATCH PROVIDED BY RPC

Project:Prj Mgr:

MRT EXTENSION ST. JOHN PARISH

H.013481

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN I-10 450-13 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING

EXPLORATION OF EXISTING CROSS DRAIN PIPESTASSIN, BEN Remrks:

Typ Imp:PHASE 1 - OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED

Project:Prj Mgr:

I-10: CULVERT EXPLORATION LA 3188 -US 51

H.000445

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 NHPP 27,900 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REHAB.REDECK & MAYBE WIDENGAUDRY, CARL Remrks:

Typ Imp:012-13-0101

Project:Prj Mgr:

US 190: UPRR OVERPASS NEAR OPELOUSAS

ST LANDRY

H.002176

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 10 219-07 STPFLEX 4,950 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESBUCCI, MARK Remrks:

Typ Imp:219-07-0025;2 BRIDGES

Project:Prj Mgr:

LA 10 BRIDGES

H.010225

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 178 208-02 STPFLEX 700 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 178: ACADIA P/L - LA 357

H.011549

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-12 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE BASE & SURFACING, RECONSTRUCT AT HIGHER ELEVGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 EB: DRAINAGE IMPROVEMENTS

Page 2 - 83 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 154: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011550

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY I-49 455-02 NHPP 6,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

CONCRETE REMOVAL & REPLACEMENT, STONE BASE, SHLDER UNDERDDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: LA 93 OPASS(0.31 MI S - 0.37 MI N)

H.011808

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 10 219-07 STPFLEX 3,337 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPATTON, HEATHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10: PALMETTO COMPANY CANAL BR

H.011844

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 TAP<200K 115 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST LANDRY US 190 012-12 TAP<200K 58 ENHANCEMENTS

SIDEWALKMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF OPELOUSAS

Project:Prj Mgr:

US 190: MARKET - MAIN, SIDEWALKS

H.012681

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST LANDRY 000-49 LOCAL 39 RECREATIONAL TRAILS PROGRAM

1.6 M. OF PED-BIKE TRAIL, 1 M. OF SHARROW AND 3 TRAILHEADSNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

OPELOUSAS PARKS PED-BIKE TRAIL

H.013407

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 93 221-01 TAP<5K 498 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:THE TOWN OF GRAND COTEAU WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 93 (WMLK DR) SIDEWALKS GRAND COTEAU

H.013510

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 RTP 129 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

ACQUISTION OF TRAIL MAINTENANCE EQUIPMENTNUNES, BRIAN Remrks:

Typ Imp:LA WILDLIFE AND FISHERIES WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

OPELOUSAS REG.-TRAIL MAINT. EQUIP. ACQ.

H.011993

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 10 032-03 STPFLEX 1,984 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10: BAYOU CARRON BRIDGE

H.011994

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 167 066-08 STPFLEX 2,981 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: BAYOU GRAND LOUIS BRIDGE

H.012534

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 103 849-03 STPFLEX 1,238 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTGAUDRY, CARL Remrks:

Typ Imp:

Project:Prj Mgr:

LA103: DRAINAGE CANAL BRIDGE

Page 2 - 84 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 155: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011243

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 0 SAFETY 0-FEASIBILITY/SCOPING

TBD BY FEASIBILITY STUDYFUSILIER, JACOB Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 INTERCHANGE IMP. AT US 190 & LA 31

H.013459

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 167 066-08 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY TO 3 LANE SECTION OF US 167ZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: ELSIE STREET TO GILBERT DRIVE

H.013767

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPINGST MARTIN 000-50 0 SAFETY - LOCAL ROADS SAFETY

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

SIGNS & MARKINGS (ST LANDRY&ST MARTIN)

H.012130

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 347 404-03 STPFLEX 3,376 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

COLD PLANE, PATCH, OVERLAY, & RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 347: LA 328 - LA 686

ST MARTIN

H.012618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 347 056-04 STPFLEX 540 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

RAISE ROAD X-SECTION AND/OR REPLACE SUBDRAINAGE STRUCTUREGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 347 DRAINAGE IMPROVEMENTS

H.013142

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

CHES COURVILLE RD OVER COULEE NICOLE G.

H.013516

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 353 403-02 STP>200K 3,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

PAVEMENT PRESERVATIONBANKSTON, TANYA Remrks:

Typ Imp:DOTD TO PROVIDE MATCH.

Project:Prj Mgr:

LA 353 PAVEMENT PRESERVATION

H.013819

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 350 400-30 STPFLEX 3,642 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MOVABLE BRIDGE MECHANICAL, ELECTRICAL, STRUCTURAL REHABGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 350: BYU TECHE MB REHAB (PARKS) (HBI)

H.013863

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN I-10 450-06 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PAVEMENT MARKER REPLACEMENT IV

Page 2 - 85 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 156: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011279

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 328 404-02 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 328: LATIOLAIS DRIVE TO JULIE STREET

H.011995

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 96 238-03 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 96: BAYOU TECHE MB REHAB (HBI)

H.013023

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 328 404-02 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:ACADIANA MPO PROVIDING MATCH

Project:Prj Mgr:

LA 328 CORRIDOR STUDY IN BREAUX BRIDGE

H.013089

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR THE CONSTRUCTION OF SIDEWALKSRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

MARTIN STREET SIDEWALKS

H.011706

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 DEMO 585 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTST MARY 000-51 RAIL HE 452 RAILROADS ST MARY 000-51 LOCAL 63 RAILROADS

NEW ROAD CONSTRUCTION TO CLOSE THREE BNSF & LDRR CROSSINGLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

BNSF SEVERAL RR XINGS (BALDWIN)

ST MARY

H.011723

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 RAIL HE 350 RAILROADS 3-DESIGN/DEVELOPMENT

NEW ROAD CONSTRUCTION, RR CROSSING UPGRADE & RR CLOSURERAY, JARED Remrks:

Typ Imp:714-51-0010

Project:Prj Mgr:

COTTON & SILO: BNSF RR XINGS (ST MARY)

H.011937

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 HSIPPEN 550 SAFETY 3-DESIGN/DEVELOPMENTASSUMPTION US 90 424-06 HSIPPEN 440 SAFETY

MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: CABLE BARRIER IN ASSUMP & ST MARY

H.013203

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 NHPP 5,100 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

SEAL COAT, ASPHALT OVERLAY, ASPHALT SHOULDERS, & RELATED WRSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 318 - LA 83

Page 2 - 86 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 157: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013503

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST MARY 000-51 LOCAL 16 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 925' X 6' WIDE TRAIL THROUGH A CITY PARKNUNES, BRIAN Remrks:

Typ Imp:CITY OF PATTERSON WILL PROVIDE LOCAL MATCH

Project:Prj Mgr:

MOREY PARK TRAIL

H.011328

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

UPGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:

Typ Imp:REF. H.005171 FEASIBILITY

Project:Prj Mgr:

I-49 SOUTH (RICOHOC TO BERWICK)

H.012535

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 004-07 STPFLEX 1,408 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTALLEN, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: HANSON CANAL BRIDGE

H.012990

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 004-07 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, PATCH, ASPHALT OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: 0.45 MI S LA 3069 - LA 317

H.011996

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 004-06 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: CHARENTON BRIDGE REHAB (HBI)

H.013722

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

MORGAN CITY SIDEWALKS & SHARED USE PATH

H.000286

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-08 STPFLEX 22,400 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

ST TAMMANY US 90 006-07 STPFLEX 850 PRESERVATION - BRIDGE (ONSYSTEM)

ST TAMMANY US 90 006-08 OTHER 23,250 OTHER / MISCELLANEOUS

BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:

Typ Imp:006-08-0031;STAGE 0 PROJECT

Project:Prj Mgr:

EAST PEARL RIVER BRIDGE

ST TAMMANY

H.001344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 059-30 STP<200K 17,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

WIDEN TO 4 LANES, NEW BRIDGELANDRY, COREY Remrks:

Typ Imp:059-30-0008

Project:Prj Mgr:

US 190: LA 437 - US 190 BUS (PH 1)

Page 2 - 87 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 158: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.004113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 3241 852-33 NHPP 63,000 TIME 3-DESIGN/DEVELOPMENT

NEW 4-LANEUMEOZULU, JOE Remrks:

Typ Imp:852-33-0001;BL DATE 10-08 404 RE-SUBMITTED 3-96

Project:Prj Mgr:

LA 3241: LA 435 TO LA 40/LA 41

H.004435

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 3241 852-33 NHPP 92,000 TIME 3-DESIGN/DEVELOPMENT

NEW 4-LANEUMEOZULU, JOE Remrks:

Typ Imp:852-33-0003;BL DATE 7-08

Project:Prj Mgr:

LA 3241: LA 36 TO LA 435

H.004957

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 3241 852-33 NHPP 70,000 TIME 3-DESIGN/DEVELOPMENT

NEW 4-LANEUMEOZULU, JOE Remrks:

Typ Imp:852-33-0002;BL DATE 7-08

Project:Prj Mgr:

LA 3241:I-12/LA 434 INTERCHANGE TO LA 36

H.007588

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 156 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 36 ENHANCEMENTS

LANDSCAPING AND LIGHTING FOR SIDEWALKNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

GIROD STREET LANDSCAPING AND LIGHTING, P

H.008358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1077 852-13 FBROFF 1,854 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTGAUDRY, CARL Remrks:

Typ Imp:852-13-0017; USE NFA AS MATCH

Project:Prj Mgr:

BLACK BAYOU BR. NEAR MADISONVILLE

H.011775

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 11 018-03 TAP<200K 372 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

PED/BICYCLE CROSSWALKS, SIGNS AND SIGNALSNUNES, BRIAN Remrks:

Typ Imp:CITY OF SLIDELL PROVIDES MATCH

Project:Prj Mgr:

US 11 & US 190 BICYCLE AND PED CROSSINGS

H.011799

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 986 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF SLIDELL.

Project:Prj Mgr:

SPARTAN DRIVE SHARED USE PATH

H.011822

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 783 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY LA 21 059-01 TAP<200K 363 ENHANCEMENTS

SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY ST. TAMMANY PARISH

Project:Prj Mgr:

LA21: LA1085 - PINNACLE, SHARED USE PATH

H.012062

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 21 059-01 STPFLEX 2,814 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

WIDEN TO 3 LANESBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 21: LALANNE RD - BAYOU DEZAIRE

Page 2 - 88 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 159: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012497

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 RTP 110 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 15 RECREATIONAL TRAILS PROGRAM

CONSTRUCT A 3,160' LONG BY 4' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ABITA SPRINGS TRAILS, PHASE 2

H.012572

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 21 030-01 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 21: W. JCT. LA 1083-FAIRGROUNDS BLVD.

H.012812

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 STP<200K 6,655 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 STP<200K 300 URBAN SYSTEMS

ROUNDABOUT INTERSECTION IMPROVEMENTSFUSILIER, JACOB Remrks:

Typ Imp:DOTD TO PROVIDE MATCH

Project:Prj Mgr:

US 190 @ NORTHSHORE & CAMP VILLERE

H.013008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 16 058-03 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

ST TAMMANY LA 1129 279-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)

ST TAMMANY LA 36 280-03 STPFLEX 1,680 PRESERVATION - BRIDGE (ONSYSTEM)

ST TAMMANY LA 450 852-07 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)

ST TAMMANY LA 59 852-09 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

ST TAMMANY LA 434 852-12 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

WASHINGTON LA 16 058-04 STPFLEX 1,680 PRESERVATION - BRIDGE (ONSYSTEM)

WASHINGTON LA 438 275-02 STPFLEX 2,040 PRESERVATION - BRIDGE (ONSYSTEM)

WASHINGTON LA 436 859-08 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)

WASHINGTON LA 1072 859-21 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST62:ABC BR REPLACE ST TAM,WASH PARS

H.013082

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES

3-DESIGN/DEVELOPMENT

ST TAMMANY 000-52 LOCAL 315 SAFETY - SAFE ROUTES TO PUBLICPLACES

SIDEWALKS, ADA RAMPS, DRAINAGE STRUCTURES AND RELATED WORMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

BOOTLEGGER ROAD SIDEWALKS

H.013268

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1129 279-02 NFA 2,900 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH, MILL, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1129: LA 40 - LA TUNG RD

Page 2 - 89 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 160: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013406

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 419 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND BIKE PATHSNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF MANDEVILLE WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

W CAUSEWAY APPROACH BIKE/PED MANDEVILLE

H.013408

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 1,198 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF COVINGTON WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

JEFFERSON AVE SHARED USE PATH COVINGTON

H.013725

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 852-24 NHPP 1,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

P.C.C.P. REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: US 11 - I-10

H.013729

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-10 NHPP 2,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: LA 1077 - REDWOOD DR

H.013737

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 41 058-01 STPFLEX 1,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 41: LA 41 SPUR - LA 36

H.013866

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 EARMARK 11,250 CAPACITY 3-DESIGN/DEVELOPMENTST TAMMANY I-12 454-04 NHPP 5,750 CAPACITY ST TAMMANY I-12 454-04 EARMARK 10,000 CAPACITY ST TAMMANY I-12 454-04 EARMARK 10,000 CAPACITY

ROADWAY WIDENING INCLUDES BRIDGE WIDENING/REPLACEMENTFUSILIER, JACOB Remrks:

Typ Imp:ST. TAMMANY PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

I-12:LA21-US190 WIDEN EB/ADD AUX LN WB

H.013872

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 261-05 STP<200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY LA 1085 852-02 STP<200K 500 URBAN SYSTEMS

CONSTRUCT A ROUNDABOUTBANKSTON, TANYA Remrks:

Typ Imp:DOTD TO PROVIDE MATCH

Project:Prj Mgr:

LA 22 @ LA 1085 ROUNDABOUT

H.013880

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-10 450-18 STPFLEX 275 ROAD TRANSFER 3-DESIGN/DEVELOPMENTST TAMMANY I-10 450-18 STPFLEX 233 ROAD TRANSFER

MILL, PATCH, OVERLAY AND STRIPINGTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 SERVICE ROADS-SLIDELL ROAD TRANSFER

H.004981

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 434 852-12 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

PHASES 1 AND 2 ENVIRONMENTAL STUDYBANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 434 CORRIDOR

Page 2 - 90 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 161: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010116

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1088 852-11 STPFLEX 25,136 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

TRAFFIC STUDY ON LA 1088MUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1088 CORRIDOR STUDY

H.010377

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 36 280-03 STPFLEX 1,120 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 36: LA 41 - IGC RAILROAD

H.010380

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 433 018-30 STPFLEX 740 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 433: U-PASS I-10 - BEHRMAN STREET

H.010387

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-07 STPFLEX 3,323 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

RUBBILIZE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

U.S. 90: LA 433 - U.S. 190

H.012457

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-10 450-18 NHPP 1,770 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

ST TAMMANY I-10 450-19 NHPP 30 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

INSTALLATION OF SIGNS AND OTHER RELATED ITEMSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 SIGNING (TWIN SPAN TO STATE LINE)

H.012567

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 36 280-03 STPFLEX 771 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

REMOVE STRUCTURE CONSTRUCT ROADWAYMETCALF, WILLIAM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 36: ICG RAILROAD BRIDGE REMOVAL

H.012633

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1088 852-11 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

CONSTRUCT ROUNDABOUTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1088: FOREST BROOK BLVD ROUNDABOUT

H.012658

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 59 281-03 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ROUNDABOUTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 59: KOOP DRIVE ROUNDABOUT

Page 2 - 91 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 162: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012660

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 59 281-03 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ROUNDABOUTSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 59: LITTLE CREEK, I-12, DOVE RNBT

H.012662

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1088 852-11 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ACCESS MANAGEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1088: I-12 ROUNDABOUTS

H.012696

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 435-S 852-37 NFA 300 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 435S: LA 435 - LA 41

H.011454

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 261-06 0 SAFETY 0-FEASIBILITY/SCOPING

ACCESS MANAGEMENT AND SAFETY IMPROVEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA22:DALWILL-RODGER STORME CORRIDOR STU

H.012737

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 433 852-21 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:

Project:Prj Mgr:

LA433:BAYOU BONFOUCA MVBR REHABILITATION

H.013717

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

W 11TH AVENUE PED AND BICYCLE IMPR (COV)

H.007598

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 16 262-07 TAP<200K 302 ENHANCEMENTS 3-DESIGN/DEVELOPMENTTANGIPAHOA LA 16 047-01 TAP<200K 302 ENHANCEMENTS

NEW SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

AMITE LA 16 PEDESTRIAN PROJECT - PHASE I

TANGIPAHOA

H.009425

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 16 047-01 STPFLEX 1,311 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16 AMITE DRAINAGE IMPROVEMENTS

H.010108

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 SR2S 400 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

SIDEWALK IMPROVMENTS, CROSSING AND STRIPING, NON-INFRASTRUMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

INDEPENDENCE SRTS - PHASE II

Page 2 - 92 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 163: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010289

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-04 HSIP 1,652 SAFETY 3-DESIGN/DEVELOPMENTTANGIPAHOA 000-53 HSIP 28 SAFETY

CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELLBRANTON, JENNIFER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.

H.010702

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 HSIP 600 RAILROADS 3-DESIGN/DEVELOPMENT

INSTALL F/L'S & GATES AT SEVERAL IC CROSSINGS IN HAMMONDSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

IC SEVERAL RR XINGS (HAMMOND)

H.011856

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-04 TAP<200K 300 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK RECONSTRUCTIONNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF PONCHATOULA

Project:Prj Mgr:

LA 22: FIFTH ST - WAYNE STREET, SW

H.011858

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 TAP<200K 570 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF HAMMOND

Project:Prj Mgr:

HAMMOND: JW DAVIS & CM FAGAN SW

H.012996

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 10 061-09 STPFLEX 128 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

THIN LIFT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10:I-55 COA - US 51

H.013007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 38 263-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

TANGIPAHOA LA 442 269-04 STPFLEX 800 PRESERVATION - BRIDGE (ONSYSTEM)

TANGIPAHOA LA 40 415-02 STPFLEX 1,200 PRESERVATION - BRIDGE (ONSYSTEM)

TANGIPAHOA LA 1062 415-04 NFA 1,680 PRESERVATION - BRIDGE (ONSYSTEM)

TANGIPAHOA LA 1061 853-20 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)

TANGIPAHOA LA 1054 853-22 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST62:ABC BR REPLACE TANGIPAHOA PARISH

H.013163

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

WADESBORO ROAD OVER UNNAMED CREEK

H.013271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 HSIPPEN 1,900 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

INSTALL SIGNS, STRIPING, PAVEMENT MARKING & OTHER SAFETYIMPRMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

TANGIPAHOA PH LOCAL ROAD SAFETY UPGRADE

Page 2 - 93 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 164: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013372

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 STPENH 1,074 ENHANCEMENTS 3-DESIGN/DEVELOPMENTTANGIPAHOA LA 22 261-04 STPENH 668 ENHANCEMENTS

SIGNALS, LANDSCAPING, CURB AND GUTTER, PED IMPROVEMENTSNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF PONCHATOULA WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 22:PINE ST CORRIDOR IMPRV PONCHATOULA

H.013520

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 STP<200K 225 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF PONCHATOULA WILL PROVIDE MATCH.

Project:Prj Mgr:

BARRINGER DRIVE SIDEWALKS

H.013740

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 10 061-09 STPFLEX 480 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

THIN OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10: ST. HELENA PL - I-55 COA

H.013886

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 3158 853-39 STP<200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

TSM IMPROVEMENTSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF HAMMOND AND TANGIPAHOA PARISH

Project:Prj Mgr:

LA 3158: I-12 TO HIPARK RD

H.008399

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 NFI 40,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

WIDEN TO 4 LANESMOSS, SARAH Remrks:

Typ Imp:853-36-0031;PORTION OF PROJECT COMPLETED UNDER

Project:Prj Mgr:

US 51 BUSINESS: LA 22 TO CLUB DELUXE RD

H.008915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 3234 853-40 27,500 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL

FEASIBILITY STUDY FOR LA 3234 EXTENSIONFUSILIER, JACOB Remrks:

Typ Imp:

Project:Prj Mgr:

LA3234 EXT FROM LA1065 - HAMMOND AIRPORT

H.011618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

TANGIPAHOA LA 22 261-03 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

TANGIPAHOA LA 22 261-04 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CORRIDOR STUDY FOR ACCESS MGMNT/TRAFFIC OP IMPROVEMENTSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 22 CORRIDOR STUDY: ROU MAR NEI TO 1ST

H.012071

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-04 NHPP 2,017 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBOURGEOIS, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

US 51: YELLOW WATER RIVER BRIDGE

Page 2 - 94 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 165: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011401

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-04 0 SAFETY 0-FEASIBILITY/SCOPING

CORRIDOR/TRAFFIC STUDY FOR ACCESSMAN AND SAFETY IMPROVEMEHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 51: W UNIV AVE TO I55 CORRIDOR STUDY

H.011402

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 0 SAFETY 0-FEASIBILITY/SCOPING

TRAFFIC/CORRIDOR STUDY FOR ACCESS MGMT AND SAFETY IMPVEMEHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 51 BUS: I12 TO COLEMAN CORRIDOR STUDY

H.012113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS US 65 020-04 NHPP 3,800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

TENSAS US 65 020-02 NHPP 500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

COLD PLANE, BREAK & SEAT, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 65: SOUTH OF NEWELLTON

TENSAS

H.013735

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 573 186-04 STPFLEX 2,000 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 573:COOTER POINT RD-BIG CHOCTAW BAYOU

H.009585

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 128 036-06 STPFLEX 1,772 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 128: LA 573 - US 65

H.009591

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 4 173-01 STPFLEX 541 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: US 65 - LA 605

H.002238

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 56 247-01 NFA 1,200 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:247-01-0009

Project:Prj Mgr:

LA 56: ROBINSON CANAL BRIDGE

TERREBONNE

H.010006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 58 247-30 STPFLEX 6,928 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:

Typ Imp:BOTH CONTROL SECTIONS IN HOUMA MPO AREA.

Project:Prj Mgr:

LA 58: PETIT CAILLOU BR RH (SARAH) (HBI)

Page 2 - 95 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 166: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010411

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 24: LA 55 - PROSPECT STREET BRIDGE

H.012026

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 TAP<200K 146 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:LOCAL MATCH BY TERREBONNE PARISH CONSOLIDATED GOVERNMEN

Project:Prj Mgr:

BAYOU TERREBONNE EAST SW PROJECT, PH 2

H.012940

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 665 855-09 NFA 1,225 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALT CONCRETE OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 665: HOPE FARM RD.-L.M. 9.878

H.012994

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3197 855-18 NFA 175 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

RESURFACE EXISTING ROADWAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3197: BARROW ST - LA 182

H.013199

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STPFLEX 777 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

COUNTRY ESTATES DR OVER ST. LOUIS BAYOU

H.013213

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3040 065-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3040: 600' S HOLLYWOOD - LA 24

H.013319

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STPENH 238 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:TERREBONNE PARISH WILL PROVIDE LOCAL MATCH.

Project:Prj Mgr:

WILLIAMS AVE SHARED USE PATH (HOUMA)

H.013340

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STP<200K 973 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

MULTI-USE PATHBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH PROVIDING MATCH

Project:Prj Mgr:

VALHI BLVD, MULTI-USE TRAIL, PHASE 1

H.013453

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 316 412-04 STP<200K 126 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH TO PROVIDE THE MATCH.

Project:Prj Mgr:

BLUE BAYOU (LA 316) SIDEWALKS

Page 2 - 96 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 167: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013741

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 55 248-02 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAY AND PATCHINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 55: HUMBLE CANAL TO LA 58

H.010997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3185 855-17 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

TERREBONNE 000-55 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

INTERSECTION IMPROVEMENTSHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3185 @ MAIN PROJECT RD ROUNDABOUT

H.011970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 182 005-05 STPFLEX 2,697 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BAYOU TERREBONNE BRIDGES

H.013421

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 HSIPPEN 1,770 SAFETY 1-PLANNING/ENVIRONMENTALTERREBONNE 000-55 STPFLEX 1,770 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02H FLASHING YELLOW ARROW PART 2

H.002244

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 56 247-02 STPFLEX 30,000 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:

Typ Imp:247-02-0030

Project:Prj Mgr:

LA 56: BOUDREAUX CANAL BR REPLACEMENT

H.011972

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3040 065-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

TUNNEL REHABILITATIONTOURRES, VALERIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3040: ICW HOUMA TUNNEL REHABILITATION

H.011973

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 315 245-90 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

CLEANING, PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 315:ICWW DULARGE MOVABLE BRIDGE REHAB

H.011974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 57 246-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, AND REPAIRSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 57: BAYOU DULAC MOVABLE BRIDGE REHAB

Page 2 - 97 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 168: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011986

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 58 247-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY - MOVABLE BRIDGE REHABILITATION OR REPLACEGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 58: BAYOU TERREBONNE MB REHAB (HBI)

H.012735

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 182 005-05 STPFLEX 890 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

REPLACE THE EXISTING BRIDGEHERATH, SUBA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BARROW STREET BRIDGE

H.013322

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3040 065-30 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYCOSTELLO, BRYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3040 FEASIBILITY STUDY (HOUMA,LA)

H.013714

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

VALHI BLVD SHARED-USE PATH (HOUMA)

H.010392

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 550 311-01 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 550: LA 2 - LA 15

UNION

H.011661

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 33 069-03 STPFLEX 210 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

WIDEN INTERSECTION WITH ASPHALTIC CONCRETEHICKS, MELVIN Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSECTION IMPROVEMENT LA 33 @ LA 15

H.011662

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 2 070-04 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

INTERSECTION IMPROVEMENTSHICKS, MELVIN Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSECTION IMPROVEMENT LA 2 @ LA 15

H.011770

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 15 069-02 TAP<5K 291 ENHANCEMENTS 3-DESIGN/DEVELOPMENTUNION 000-56 TAP<5K 475 ENHANCEMENTS

RECONSTRUCTION OF EXISTING SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:TOWN OF FARMERVILLE PROVIDING MATCH

Project:Prj Mgr:

FARMERVILLE DOWNTOWN SW IMPROVEMENTS

Page 2 - 98 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 169: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012924

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 2 070-06 STPFLEX 514 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: 0.48 M W LA 143 - OUACHITA PL

H.012037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION US 63 023-11 NHPP 2,302 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

UNION LA 2 070-05 STPFLEX 1,047 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 167,LA2:MIDDLE SLOUGH & CREEK BRIDGES

H.012946

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 697 857-06 NFA 2,935 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 697: LA 343 - US 167

VERMILION

H.013014

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION 000-57 HSIPPEN 114 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

SIGNS, STRIPING, RUMBLE STRIPS, LIGHTING, STOP BARSRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LOCAL ROAD SIGNING(VERMILION)

H.013428

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 35 207-03 TAP<5K 696 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS, LANDSCAPING AND SIGNAGEMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF KAPLAN WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 35 REVITALIZATION PHASE III KAPLAN

H.013515

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 92 213-03 STP>200K 2,250 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

PAVEMENT PRESERVATION AND TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:DOTD TO PROVIDE MATCH.

Project:Prj Mgr:

LA 92: PAVEMENT PRESERVATION

H.009627

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 35 207-02 STPFLEX 2,234 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 35: LA 335 - LA 14

H.010226

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 82 215-01 STPFLEX 5,383 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 82: LA 35 - LA 333

H.012001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 339 216-01 STPFLEX 2,864 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 339: CANAL & CREEK BRIDGES

Page 2 - 99 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 170: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012099

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 13 057-01 STPFLEX 2,036 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, PATCH, OVERLAY, & RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 13: 2.7 MI. N. LA 14 - ACADIA P/L

H.011997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 14-X 055-06 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14X: VERMILION RIVER MB REHAB (HBI)

H.011998

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 14 055-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: VERMILION RIVER MB REHAB (HBI)

H.012000

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 82 207-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 82: OLD ICC MB REHABILITATION (HBI)

H.012003

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 330 397-03 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 330: BAYOU TIGRE MB REHAB (HBI)

H.001881

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 392 135-02 FBROFF 3,560 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTGAUDRY, CARL Remrks:

Typ Imp:135-02-0009;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

LA 392 BRIDGES NEAR HORNBECK

VERNON

H.006618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 NFI 96 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTVERNON 000-58 LOCAL 8 SAFETY - LOCAL ROADS SAFETY

SIDEWALK INSTALLATIONRIGGS, LAURA Remrks:

Typ Imp:737-58-0001

Project:Prj Mgr:

SIDEWALK ON HIGH SCHOOL DRIVE

H.006619

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 NFI 134 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTVERNON 000-58 LOCAL 13 SAFETY - LOCAL ROADS SAFETY

SIDEWALK INSTALLATIONRIGGS, LAURA Remrks:

Typ Imp:737-58-0002

Project:Prj Mgr:

SIDEWALK ON LOUISIANA AVENUE

H.009955

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 111 132-02 STPFLEX 4,167 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 111: BEAUREGARD LINE - C DAVIS LOOP

Page 2 - 100 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 171: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.011404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON US 171 024-06 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

CONSTRUCT ACCELERATION LANE SOUTH OF CRYER CEMETERY RDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: ADD ACCELERATION LANE CRYER RD

H.012933

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 111 132-03 STPFLEX 300 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 111: LA 8 TO JOHN KELL LOOP-AST

H.013098

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 FBROFF 1,942 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT; NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

JIM CRYER LANE OVER BAYOU ANACOCO

H.010348

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 8 029-02 STPFLEX 4,661 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: LA 464 - US 171

H.010358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 3226 858-11 STPFLEX 2,329 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3226: BEAUREGARD P/L - US 171

H.012058

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 8 029-02 NHPP 2,464 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMETCALF, WILLIAM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: FORKER CREEK BRIDGE

H.013817

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 117 114-01 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGNATCHITOCHES LA 117 114-02 0 OTHER / MISCELLANEOUS

FEASIBILITY STUDY FOR LANE AND SHOULDER WIDENINGZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 117 IMPROVEMENTS (LA 8 TO LA 118)

H.008449

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 450 859-04 FBROFF 1,093 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMOORE, DARRELL Remrks:

Typ Imp:859-04-0010;USE NFA AS MATCH

Project:Prj Mgr:

DRAIN BRIDGE NEAR STONEY POINT

WASHINGTON

Page 2 - 101 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 172: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.010980

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 10 047-04 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

LANE CONFIGURATION MODIFICATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10:CUMBERLAND ST- AUSTIN ST(BOGALUSA)

H.011202

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON 000-59 SR2S 225 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT

SIDEWALKS STRIPING AND SIGNAGEMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

FRANKLINTON JR HIGH SCHOOL SIDEWALKS

H.011835

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 25 059-04 TAPFLEX 276 ENHANCEMENTS 3-DESIGN/DEVELOPMENTWASHINGTON 000-59 TAPFLEX 69 ENHANCEMENTS

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY WASHINGTON PARISH

Project:Prj Mgr:

LA25: WASHINGTON PARISH SW, SEG B AND C

H.012159

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 430 859-26 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 430: LA 25 - LA 1069 DRAINAGE

H.012975

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 62 859-10 STPFLEX 1,150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

THIN LIFT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 62: LA 10 - LA 436

H.013732

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 450 859-05 STPFLEX 2,600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYBROWN, JOSEPH C. Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 450: LA 440 - LA 38

H.012072

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 60 279-04 STPFLEX 888 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 60: DRAIN BRIDGE

H.011280

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 10 047-04 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10 IMPROVEMENTS IN BOGALUSA

H.013713

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 60 279-04 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 60: BOGALUSA H.S. PED IMPROVEMENTS

Page 2 - 102 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 173: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.001666

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 160 085-05 FBROFF 4,100 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:085-05-0029

Project:Prj Mgr:

DORCHEAT BAYOU BRIDGE

WEBSTER

H.001798

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 531 111-01 STPFLEX 1,843 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEBUCCI, MARK Remrks:

Typ Imp:111-01-0018

Project:Prj Mgr:

LA 531: PARMERS CREEK BRIDGE

H.001799

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 531 111-02 STPFLEX 4,100 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

WEBSTER LA 531 111-02 STPFLEX 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

WEBSTER I-20 451-03 NHPP 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:

Typ Imp:451-03-0047;GEOM. STUDY UNDERWAY (E)

Project:Prj Mgr:

LA 531 OVERPASS

H.009513

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 164 122-03 STPFLEX 3,114 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RLEATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 164: JCT. LA 163 TO JCT. US 371

H.010974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER US 79 027-04 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADDING LEFT TURN LANE AT MILLER ROAD (WEBSTER PARISH)SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79: NB LEFT TURN LANE AT MILLER ROAD

H.012873

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER 000-60 RAIL HE 50 RAILROADS 3-DESIGN/DEVELOPMENT

REMOVE CROSSING AND ITS ROAD APPROACHESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

OLD US 80: LAS RR XING (WEBSTER)

H.013111

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER 000-60 FBROFF 797 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

DORCHEAT ROAD OVER CANEY CREEK

H.012029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER US 80 001-05 STPFLEX 2,325 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: COOLEY BRANCH AND CREEK BRIDGES

Page 2 - 103 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 174: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012030

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER US 371 027-03 STPFLEX 7,679 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTS/REHABILITATIONBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US371:ICG & KCS RAILROAD OVERPASSES HBI

H.012958

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 159 087-01 STPFLEX 315 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 159: COUNTRY CLUB DR TO BENSON RD

H.005121

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 NFI 100,357 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT

FEDERAL EARMARK FOR STUDYHANKS, ANNA Remrks:

Typ Imp:700-61-0113;STAGE 0 COMPLETED

Project:Prj Mgr:

LA 1/LA 415 CONNECTOR

W BATON ROUGE

H.011133

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 STPFLEX 300 RAILROADS 3-DESIGN/DEVELOPMENT

REMOVE CROSSINGLUKE, SHAWN Remrks:

Typ Imp:H.011133 MUST LET BEFORE H.009288

Project:Prj Mgr:

LA 1: UP RR XING (WEST BATON ROUGE)

H.012169

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE I-10 450-08 NHPP 13,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

GRADE RAISINGMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: IBERVILLE P/L - W END MISS BR

H.012587

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE I-10 450-08 NHPP 13,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

GRADE RAISINGMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: W END OF BR 290 - W END OF LA 415

H.013891

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE I-10 450-08 NHPP 60 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

IBERVILLE I-10 450-07 NHPP 40 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LA 415 TO RAMAH (RPMS)

H.012067

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 76 013-01 STPFLEX 1,352 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 76: NO NAME STREAM BRIDGE

H.012394

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 225-01 STPFLEX 1,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

THIN OVERLAYGARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 415: CSLM 1.67 TO LA 620

Page 2 - 104 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 175: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.008469

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 835 862-22 STPFLEX 3,551 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEBALLMER, SARAH Remrks:

Typ Imp:862-22-0006

Project:Prj Mgr:

LA 835: BOEUF RIVER BRIDGE NEAR CONCORD

W CARROLL

H.010393

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 582 333-02 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZED BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 582: JCT LA 17 TO EAST CARROLL LINE

H.012491

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 17 051-08 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW CARROLL LA 17 051-08 LOCAL 66 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 3,286' LONG BY 6' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

OAK GROVE RECREATIONAL TRAIL

H.012780

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 2 037-03 STPFLEX 313 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: DRAINAGE IMPROVEMENTS

H.013081

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL 000-62 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDHILL ROAD OVER LITTLE COLEWA BAYOU

H.011576

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA LA 965 863-06 STP<5K 1,600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 965: LA 966 TO LA 10

W FELICIANA

H.012498

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA 000-63 LOCAL 63 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A TRAILHEAD AND 3.2 MILES OF BIKE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ROSEDOWN BRANCH TRAIL-W FELICIANA PARISH

H.012505

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA LA 10 061-04 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA LA 10 061-04 LOCAL 39 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF TWO TRAILHEADS AND 6300' OF PED/BIKE TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

TOWN CENTER BRANCH TRAIL

Page 2 - 105 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 176: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012518

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 RTP 121 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT

RESTORE 2.7 MILES OF ATV TRAILNUNES, BRIAN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

TUNICA HILLS WMA YEAR ROUND TRAM TRAIL

H.012527

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 HSIPPEN 929 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

THERMOPLASTIC STRIPING AND SIGNSRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LOCAL ROAD SAFETY UPGRADES (W FELICIANA)

H.000382

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN US 71 009-04 STPFLEX 3,441 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NATCHITOCHES US 71 009-05 STPFLEX 5,709 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:009-04-0010

Project:Prj Mgr:

US 71: BRIDGES NEAR ST. MAURICE

WINN

H.001711

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 126 091-05 STPFLEX 3,023 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESYANG, LI Remrks:

Typ Imp:091-05-0014;2 BRIDGES

Project:Prj Mgr:

SALINE BAYOU RELIEF & MILL CR. BRS.

H.010356

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 126 091-07 STPFLEX 2,733 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 126: JCT LA 34 - NW JCT LA 499

H.012157

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 1228 864-04 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REPLACE CROSS DRAINS AND RAISE ROADWAY TO PREVENT FLOODINGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1228:CROSS DRAIN REPLACEMENT (WINN)

H.012951

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 126 091-08 STPFLEX 4,260 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 126: LA 1237 TO CALDWELL P/L

H.013820

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 501 093-01 STPFLEX 300 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPATTON, HEATHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 501: IRON BRANCH BRIDGE

H.009153

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN US 84 022-02 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALWINN US 84 022-03 NFI 0 DEMO / HIGH PRIORITY

MAJOR WIDENINGMASTIN, CATHERINE Remrks:

Typ Imp:STBONDS AS MATCH; $1.5M IN CLOC PRIORITY 1 AVAILABLE

Project:Prj Mgr:

US HWY 84 IMPROVEMENTS

Page 2 - 106 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 177: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012047

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN US 167 023-05 NHPP 2,822 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

US167: BIG CREEK BRIDGE

H.012562

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 1232 864-06 STPFLEX 1,228 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1232 864-06 STPFLEX 1,644 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1231-1 864-08 STPFLEX 1,377 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1232, LA 1231-1: BRIDGES

H.009186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAVISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PAVEMENT MARKING REPLACEMENT X

DISTRICT 02

H.005158

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

UPRGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:

Typ Imp:700-92-0011; EIS

Project:Prj Mgr:

FUTURE I-49 SOUTH (RACELAND TO WESTBANK

H.005168

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

EISGOODELL, DEAN Remrks:

Typ Imp:STATE & RR EACH PUTTING UP 10% OF MATCH FOR DEMO

Project:Prj Mgr:

NEW ORLEANS RAIL GATEWAY EIS

H.009731

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 NFI 4,427 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 02

H.012663

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02H TRAFFIC CONTROL UPGRADE Y3

Page 2 - 107 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 178: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012664

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y2

H.012680

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y3

H.013822

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 HSIPPEN 2,920 SAFETY 3-DESIGN/DEVELOPMENT

SAFETY IMPROVEMENT PROJECT TO INSTALL RUMBLESTRIPSFRUGE, NICHOLAS Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 03 RUMBLESTRIPS (NORTH)

DISTRICT 03

H.013823

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 HSIP 2,470 SAFETY 3-DESIGN/DEVELOPMENT

SAFETY IMPROVEMENT PROJECT TO INSTALL RUMBLESTRIPSFRUGE, NICHOLAS Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 03 RUMBLESTRIPS (SOUTH)

H.009732

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 NFI 3,712 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 03

H.012644

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 03 TRAFFIC CONTROL UPGRADE Y3

H.009189

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: PAVEMENT MARKING REPLACEMENT X

DISTRICT 04

H.012643

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNALSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 04 FLASHING YELLOW ARROW PART 2

Page 2 - 108 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 179: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012666

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 04 FLASHING YELLOW ARROW PART 3

H.009733

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 NFI 5,872 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 04

H.009191

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: PAVEMENT MARKING REPLACEMENT XI

DISTRICT 05

H.009734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 NFI 3,269 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 05

H.012642

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 05 TRAFFIC CONTROL UPGRADE Y3

H.012668

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 05 TRAFFIC CONTROL UPGRADE Y2

H.009056

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 NFI 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-210: PAVEMENT MARKER REPLACEMENT II

DISTRICT 07

H.009193

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PAVEMENT MARKING REPLACEMENT XI

Page 2 - 109 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 180: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.009735

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 NFI 2,326 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 07

H.012467

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL IMPROVEMENTSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 07 TRAFFIC CONTROL UPGRADE I

H.013826

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 0 SAFETY 0-FEASIBILITY/SCOPING

IDENTIFIY POTENTIAL SAFETY IMPROVEMENT PROJECTS IN D07DEVILLE, JESSICA Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 07 SAFETY INVESTMENT PLAN

H.012486

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 FLASHING YELLOW ARROW PART 1

DISTRICT 08

H.009194

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: PAVEMENT MARKING REPL. VIII

H.009736

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 NFI 2,848 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 08

H.011960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 STPFLEX 409 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

UPGRADE OF EXISTING SIGNAL CONTROLLERSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 CONTROLLER UPGRADES

H.012641

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 FLASHING YELLOW ARROW PART 2

Page 2 - 110 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 181: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.013264

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 0 SAFETY 0-FEASIBILITY/SCOPING

SAFETY PLAN TO PRIORITIZE POTENTIAL SAFETY PROJECTSDEVILLE, JESSICA Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 SAFETY INVESTMENT PLAN

H.009197

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: PAVEMENT MARKING REPLACEMENT VIII

DISTRICT 58

H.009052

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: PAVEMENT MARKING REPLACEMENT IX

H.009737

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 NFI 2,125 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 58

H.009199

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 NFI 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PAVEMENT MARKING REPLACEMENT XII

DISTRICT 61

H.012465

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 61 FLASHING YELLOW ARROW PART 3

H.009738

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 NFI 5,145 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 61

H.012667

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 61 TRAFFIC CONTROL UPGRADE Y2

Page 2 - 111 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 182: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012639

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 FLASHING YELLOW ARROW

DISTRICT 62

H.009739

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 NFI 5,747 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 62

H.012466

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 TRAFFIC CONTROL UPGRADE I

H.009884

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 250 RAILROADS 3-DESIGN/DEVELOPMENT

RELOCATING LED CROSSBUCK ASSEMBLIESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

NOGC (STATEWIDE)

STATEWIDE

H.012832

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

ADVANCED VEHICLE SYSTEM RESEARCH, DESIGN, AND IMPLEMENTATIKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

AV/CV TECHNOLOGY DEPLOYMENT PHASE 1

H.013164

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 5,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

ACQUIRE A NEW TOLL SYSTEMRUNDELL, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

STATEWIDE TOLL SYSTEM

H.013508

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 RTP 202 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTSTATEWIDE 000-99 LOCAL 43 RECREATIONAL TRAILS PROGRAM

CONST. OF 8 FLOATING DOCKS AND IMPROVEMENTS TO 6 TRAILHEADSNUNES, BRIAN Remrks:

Typ Imp:PROJECT SPONSOR: TECHE PROJECT WILL PROVIDE THE LOCAL MATC

Project:Prj Mgr:

BAYOU TECHE NATIONAL PADDLE TRAIL

H.011247

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING

UPDATE THE STATE GIS DATABASE FOR HISTORIC SITESARDOIN, NOEL Remrks:

Typ Imp:

Project:Prj Mgr:

UPDATES TO GIS HISTORIC SITES DATABASE

Page 2 - 112 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 183: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

H.012485

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

NFA BRIDGE RATINGFENG, DANA Remrks:

Typ Imp:

Project:Prj Mgr:

OFF-SYSTEM BRIDGE RATING

H.013513

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 RECREATIONAL TRAILS PROGRAM 0-FEASIBILITY/SCOPING

FEDERALLY REQUIRED RECREATIONAL TRAILS PLANNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

2018 STATEWIDE RECREATIONAL TRAILS PLAN

L.000001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 3,100 INTERMODAL CONNECTOR STAGES 4, 3, 2, 1, 0 - NHPP 6,200 INTERMODAL CONNECTOR

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INTERMODAL CONNECTORS PROGRAM

L-PROJECTS

L.000002

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,000 PRESERVATION - INTERSTATE STAGES 4, 3, 2, 1, 0

SURFACE IMP, PM, REPAIR FOR PAVEMENT/EMBANKMENTNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSTATE PAVEMENT PREVENTIVE MAINT

L.000003

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON NHS & STP SYSTEM

STAGES 4, 3, 2, 1, 0

PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

PREVENTIVE MAINTENANCE NON-INTERSTATE

L.000004

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NFA 2,500 PRESERVATION - NON-INTERSTATENFA

STAGES 4, 3, 2, 1, 0

PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

PREVENTIVE MAINT NON-INTERSTATE (NFA)

L.000005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 4,400 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

STAGES 4, 3, 2, 1, 0

- STCASH 6,000 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ROAD PREVENTIVE MAINTENANCE

L.000007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

STAGES 4, 3, 2, 1, 0

- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

TRANSPORTATION SYSTEMS MANAGEMENT

Page 2 - 113 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 184: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

L.000008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STP>200K 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 1,000 URBAN SYSTEMS

SELECTED BY MPO'SNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

URBAN SYSTEM PROJECTS

L.000009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STBONDS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

AS APPROVED BY LEGISLATURENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC BOND PROJECTS

L.000010

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- REIMB 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- NHPP 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

- STCASH 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

REIMBURSABLE AND NON-REIMBURSABLENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

URGENT BRIDGE REPAIR/REPLACEMENT

L.000011

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- STPFLEX 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)

MAINTENANCENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

BRIDGE PREVENTIVE MAINTENANCE

L.000012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)

MISC SITESNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

BRIDGE PAINTING PROGRAM

L.000013

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

STAGES 4, 3, 2, 1, 0

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MOVABLE BRIDGE PREVENTIVE MAINTENANCE

L.000014

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - STBONDS 500 OTHER / MISCELLANEOUS

IN CONJUNCTION WITH DEDNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC ECONOMIC DEVELOPMENT INITIATIVES

Page 2 - 114 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 185: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

L.000015

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- OTHER 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

STAGES 4, 3, 2, 1, 0

- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

REHABILITATION/REPAIRNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC FERRY PROJECTS

L.000016

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- HSIP 300 SAFETY STAGES 4, 3, 2, 1, 0 - STPFLEX 200 SAFETY - STCASH 100 SAFETY

MISC PROJECTSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

FEDERAL SAFETY PROGRAMS

L.000017

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

STAGES 4, 3, 2, 1, 0

- DEMO 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

- CM 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

ENGINEERING, CONSTRUCTION, MAINTENANCE, OPERATIONSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC ITS SYSTEMS

L.000018

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

STAGES 4, 3, 2, 1, 0

- STCASH 100 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

IN ACCORDANCE WITH MAINTENANCE AGREEMENTSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSTATE LIGHTING PROGRAM

L.000019

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STBONDS 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

OVERLAY/REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

STATE PARK ROADS

L.000020

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

STAGES 4, 3, 2, 1, 0

- STCASH 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

TO ALLEVIATE FLOODINGNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC DRAINAGE PROJECTS

L.000021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- FLH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

FEDERAL LANDS HIGHWAYS, ETC.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC FEDERAL PROJECTS/PROGRAMS

Page 2 - 115 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 186: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

L.000022

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- RAIL HE 3,000 RAILROADS STAGES 4, 3, 2, 1, 0 - RAIL PD 3,000 RAILROADS - STPFLEX 2,000 RAILROADS - STCASH 200 RAILROADS

FEDERAL RAILROAD CROSSING IMPROVEMENTS PROGRAMNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

RAILROAD CROSSING IMPROVEMENTS

L.000025

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- TOLLS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

ORLEANS AND JEFFERSON PARISHESNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

TOLL FUNDED PROJECTS

L.000026

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - TIME 1,000 OTHER / MISCELLANEOUS

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

WETLAND MITIGATION BANK

L.000027

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- ER 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

EMERGENCY RELIEFNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

EMERGENCY RELIEF PROVIDED BY CONGRESS

L.000029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- TAPFLEX 1,000 ENHANCEMENTS STAGES 4, 3, 2, 1, 0

MISC PROJECTSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

FEDERAL ENHANCEMENT PROGRAM

L.000031

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- DEMO 10,000 DEMO / HIGH PRIORITY STAGES 4, 3, 2, 1, 0

AS DEFINED BY FEDERAL GOVERNMENTNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

DEMO/HI-PRI/OTHER FEDERAL PROGRAMS

L.000032

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

STAGES 4, 3, 2, 1, 0

FACILITY REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

REST AREA REHABILITATION

L.000033

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

STAGES 4, 3, 2, 1, 0

- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC SIGNS, STRIPING, SIGNALS

Page 2 - 116 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 187: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

L.000034

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

STAGES 4, 3, 2, 1, 0

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INSTALL RAISED PAVEMENT MARKERS

L.000035

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 200 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTS/INSPECTIONSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC FEDERAL OFF-SYSTEM BRIDGES

L.000036

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,900 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

STAGES 4, 3, 2, 1, 0

MISC SITES STATEWIDENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

WEIGH STATION REHABILITATION/UPGRADE

L.000037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 2,000 SAFETY STAGES 4, 3, 2, 1, 0

RUMBLE STRIPSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

HIGHWAY SAFETY IMPROVEMENTS

L.000039

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 50 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

CONSTRUCT TEST SECTIONSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ACCELERATED LOADING FACILITY

L.000040

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 600 PRESERVATION - BRIDGE (ONSYSTEM)

INSPECTIONS, RATINGS, LOAD FACTORSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

FEDERAL BRIDGE INSPECTION PROGRAMS

L.000041

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

NON-ATTAINMENT AREASNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

CONGESTION MITIGATION PROJECTS

L.000042

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 500 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

IN LAKE CHARLES AS APPROVED BY FHWANot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC CONGESTION MITIGATION PROJ - LKC

L.000043

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

IN BATON ROUGE AS APPROVED BY FHWANot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC CONGESTION MITIGATION PROJ - BTR

Page 2 - 117 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 188: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

L.000068

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

STAGES 4, 3, 2, 1, 0

- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

- STPFLEX 8,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

- STPFLEX 8,100 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ACCESS MANAGEMENT PROJECTS

L.000069

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 1,000 ROAD TRANSFER STAGES 4, 3, 2, 1, 0 - STPFLEX 1,000 ROAD TRANSFER

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ROAD TRANSFER PROGRAM

L.000093

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 5,500 CONGESTION MITIGATION STAGES 4, 3, 2, 1, 0

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

STATEWIDE CONGESTION MITIGATION

L.000094

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 100 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 100 URBAN SYSTEMS - STPFLEX 100 URBAN SYSTEMS

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

URBAN TRANSIT(INCL TRANSFER TO AGENCIES)

L.000097

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

STAGES 4, 3, 2, 1, 0

- NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

ADA PROGRAMNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ADA PROGRAM

L.000024

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- HSIP 1,000 SAFETY STAGES 2, 1, 0 - STCASH 500 SAFETY

HANDLED THROUGH OPERATIONS BUDGETNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

SOFT SIDE SAFETY

L.000038

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- SPR MAND 7,000 OTHER / MISCELLANEOUS STAGES 2, 1, 0 - SPR OPT 7,000 OTHER / MISCELLANEOUS

HANDLED THROUGH OPERATING BUDGETNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

PLANNING, TRAINING AND RESEARCH

Page 2 - 118 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 189: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT

L.000023

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 400 OTHER / MISCELLANEOUS STAGES 1, 0 - STPFLEX 300 OTHER / MISCELLANEOUS - STCASH 300 OTHER / MISCELLANEOUS

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

SCOPING AND ENVIRONMENTAL STUDIES

Page 2 - 119 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 190: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4
Page 191: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

STAGE 2 – WAITING FOR FUNDING

This is a list of all projects in the program that can be funded

if additional revenues become available.

Projects in this list may also be funded in future fiscal years

with existing revenue sources if identified through the project

selection process as a high priority relative to other candidate

projects within the same category.

Page 192: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4
Page 193: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.002729

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 98 389-01 NFI 19,734 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGACADIA I-10 450-04 0 DEMO / HIGH PRIORITY

NEW BRIDGE. NEW CONCRETE PAVEMENTYANG, LI Remrks:

Typ Imp:389-01-0011

Project:Prj Mgr:

GRAND PRAIRIE HWY INTR.&FRONTAGE RD

ACADIA

H.003756

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

FED EARMARK FOR STUDYNGUYEN, WAYNE Remrks:

Typ Imp:700-01-0112;$993.500(IMD)&$110.000C.O.AVAILABLE

Project:Prj Mgr:

NEW INTERCHANGE LA 98 RAYNE

H.010885

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 91 801-09 0 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

REPLACEMENT OF PONTOON BRIDGEBRAUNER, KURT Remrks:

Typ Imp:CONSTRUCTION FUNDS WILL BE STATE BONDS

Project:Prj Mgr:

LA 91: BAYOU PLAQUEMINE BRULE BR REPLACE

H.003790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 930 803-14 NFI 5,300 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN LA 930 & ADD OPEN DITCHESMUSA, ELNUR Remrks:

Typ Imp:803-14-0005

Project:Prj Mgr:

LA 930: CAUSEY RD TO LA 42

ASCENSION

H.009266

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION I-10 450-11 NFI 46,700 CORRIDOR 2-WAITING FOR FUNDING

WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LA 73 TO LA 30

H.009276

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION I-10 450-11 NFI 50,300 CORRIDOR 2-WAITING FOR FUNDING

WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:

Typ Imp:LHIP USED FOR ENG

Project:Prj Mgr:

I-10: LA 30 TO LA 22

H.010571

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 NFI 140,000 CAPACITY 2-WAITING FOR FUNDING

STUDY FOR BYPASS ROAD FOR LA 70-PIERRE PART TO NEAR LA 69JONES, MATTHEW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70 BYPASS

ASSUMPTION

H.009493

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 107 147-03 NFI 2,322 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 107: LA 1179 - LA 1181

AVOYELLES

H.009741

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 NFI 338 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALK W/ LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGENUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

MARKSVILLE SIDEWALK IMPROVEMENTS

Page 3 - 1 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 194: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.003251

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NFI 61,140 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 69,390 PRESERVATION - BRIDGE (ON

SYSTEM)

BOSSIER I-20 451-02 NFI 26,360 CAPACITY

WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONOLIVIER, NICHOLAS Remrks:

Typ Imp:451-02-0078

Project:Prj Mgr:

I-20 (HAMILTON RD TO AIRLINE DR)

BOSSIER

H.003855

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 NFI 27,900 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

ROADWAY EXT (WINFIELD RD) STUDYOLIVIER, NICHOLAS Remrks:

Typ Imp:700-08-0130;STAGE 0

Project:Prj Mgr:

BOSSIER PAR CONG RELIEF WINFIELD RD

H.003857

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

ROAD EXTENSION (ENGINEERING) STUDYOLIVIER, NICHOLAS Remrks:

Typ Imp:700-08-0132

Project:Prj Mgr:

WAFER ROAD EXTENSION

H.005184

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGCADDO 000-09 0 DEMO / HIGH PRIORITY

ENVIRONMENTAL IMPACT STATEMENTMOSS, SARAH Remrks:

Typ Imp:700-94-0003;NCPD FUNDS

Project:Prj Mgr:

HIGH PRIORITY CORRIDOR NO. 18

H.009522

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 NFI 9,100 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 300 RAILROADS - GRADE SEPARATION

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3105:UNDERPASS@KCS S OF I-20(BOSSIER)

H.011319

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NFI 94,907 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 40,919 CAPACITY BOSSIER I-20 451-02 NFI 19,977 PRESERVATION - BRIDGE (ON

SYSTEM)

INTERSTATE WIDENINGMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: AIRLINE DR. TO I-220

H.001618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 538 078-02 NFI 5,604 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCADDO LA 173 094-01 0 OTHER / MISCELLANEOUS

RECONST.W/GEOMETRIC IMP NEED STAGE 0KENDRICK, BRIAN Remrks:

Typ Imp:078-02-0019;NEED FUNDS

Project:Prj Mgr:

JCT LA 173 - MIDDLE SCHOOL

CADDO

H.001724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 173 094-01 NFI 25,000 CAPACITY 2-WAITING FOR FUNDING

4 LANING (CONTINGENT ON BOND FUNDS)MCMILLAN, RYAN Remrks:

Typ Imp:094-01-0029;ORIGINATED BY DEPT OF ECON DEV.

Project:Prj Mgr:

SHREVEPORT-BLANCHARD HWY.

Page 3 - 2 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 195: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.001725

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 173 094-01 NFI 10,000 CAPACITY 2-WAITING FOR FUNDING

WIDENINGMCMILLAN, RYAN Remrks:

Typ Imp:094-01-0032

Project:Prj Mgr:

JCT. LA 3094 - JCT. I-220

H.006447

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

DESIGN AND ACQUIRE R/WBRIGNAC, CHRISTINA Remrks:

Typ Imp:736-99-1032

Project:Prj Mgr:

I-69: SIU 14 JCT I-20 TO US 82

H.009744

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 NFI 438 ENHANCEMENTS 2-WAITING FOR FUNDING

MULTI-USE TRAIL AND RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

OIL CITY MULTI-USE TRAIL, PHASE 2

H.011448

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 NFI 19,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

2-WAITING FOR FUNDING

DESIGN AND CONSTRUCT NEW REST AREAGUINN, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

IDA SAFETY REST AREA

H.009521

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 397 193-31 NFI 10,200 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 397: NEW BRIDGE AT UPRR

CALCASIEU

H.009750

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 NFI 145 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS, SUBSURFACE DRAINAGE, & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:ROW IS 80/20, CONSTRUCTION 95/5

Project:Prj Mgr:

TOPSY ROAD SIDEWALK

H.000762

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA US 84 022-06 NFI 6,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCATAHOULA US 84 022-06 NFI 6,000 CAPACITY

WIDEN TO 4 LANESMOORE, DARRELL Remrks:

Typ Imp:022-06-0038

Project:Prj Mgr:

JCT LA 28 - JCT LA 3037

CATAHOULA

H.011029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 559 813-29 STPFLEX 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCATAHOULA LA 559 346-01 STPFLEX 0 OTHER / MISCELLANEOUS

FEASIBILITY STUDY TO REPLACE DUTY FERRY WITH A BRIDGEWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 559: REPLACE DUTY FERRY WITH BRIDGE

H.000770

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 84 022-07 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMOORE, DARRELL Remrks:

Typ Imp:022-07-0053

Project:Prj Mgr:

JCT LA 565 - JCT LA 129

CONCORDIA

Page 3 - 3 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 196: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.000771

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 84 022-07 NFI 3,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:022-07-0054

Project:Prj Mgr:

LA 129 - US 65 (FERRIDAY)

H.001790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 509 105-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGRED RIVER LA 509 105-03 0 OTHER / MISCELLANEOUS

RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:

Typ Imp:105-02-0017;$.5 AVAIL. (ORIGINATED BY DED)

Project:Prj Mgr:

INT. PAPER PLANT - LA 1

DESOTO

H.002317

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 LOCAL 10,928 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

NEW 4 LANE DIVIDED CONCRETE HIGHWAY WITH RAISED MEDIANREVIERE, RYAN Remrks:

Typ Imp:GREEN LIGHT PROJECT

Project:Prj Mgr:

LA 408: HOOPER RD (JOOR RD-SULLIVAN RD)

EAST BATON ROUGE

H.002344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-01 LOCAL 44,552 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 4 LANESREVIERE, RYAN Remrks:

Typ Imp:258-01-0033;GREEN LIGHT PROJECT(LET BY CITY); STAGE 0 COMP

Project:Prj Mgr:

LA 427: PERKINS RD (SIEGEN - HIGHLAND)

H.002358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 3064 258-32 DEMO 14,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

(PHASE 2)(REQ DEMO FUNDS)REVIERE, RYAN Remrks:

Typ Imp:454-01-0068;IM-D $250K FY03.REQ MORE DEMO

Project:Prj Mgr:

ESSEN LANE INTERCHANGE (WB)

H.005403

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 NFI 108,100 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

EXTENSION OF HOOPER ROAD FROM LA 37 TO LA 16MOSS, SARAH Remrks:

Typ Imp:700-99-0527;GEN.OBLIGATION BOND(PR2=$100K & PR5=$900K)

Project:Prj Mgr:

LA408(HOOPER RD EXT)LA37-LA16

H.007970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 426 817-09 NFI 8,658 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN TO 4 LANESREVIERE, RYAN Remrks:

Typ Imp:817-09-0035; INCLUDES I'SECT @ FLANNERY

Project:Prj Mgr:

OLD HAMMOND (BLVD DE PROV-MILL)

H.007974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 426 817-09 LOCAL 9,681 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

NEW CONC PAVEMENTREVIERE, RYAN Remrks:

Typ Imp:817-09-0042; LET BY CITY. GREEN LIGHT PROJECT

Project:Prj Mgr:

OLD HAMMOND HWY(MILLERVILLE-O'NEAL)

H.008415

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 DEMO 600 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGE BATON ROUGE 000-17 OTHER 1,773 OTHER / MISCELLANEOUS

FEDERAL EARMARKUMEOZULU, JOE Remrks:

Typ Imp:DEMO$ & $ FROM SOUTHERN;AUTHORIZED

Project:Prj Mgr:

INFORMATION CENTER @ SOUTHERN UNIVERSIT

Page 3 - 4 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 197: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.008732

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

EISARDOIN, NOEL Remrks:

Typ Imp:EIS IS DEMO WITH MATCH FROM LOCALS

Project:Prj Mgr:

STUDY OF BATON ROUGE LOOP

H.009300

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 NFI 51,000 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO FOUR LANESMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

HOOPER ROAD WIDENING (LA 3034 - LA 37)

H.009327

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 NFI 10,139 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

E BATON ROUGE I-110 450-92 NFI 123 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

W BATON ROUGE I-10 450-08 NFI 4,432 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

EPOXY BRIDGE DECK OVERLAYTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10/110 EPOXY BR DECK OVERLAY-BTN ROUGE

H.010320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-31 NFI 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

E BATON ROUGE LA 42 257-04 NFI 4,100 PRESERVATION - NON-INTERSTATEON STP SYSTEM

PCC PATCHSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: JCT. HIGHLAND RD - LA 30

H.011892

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-09 NFI 35,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

CLEAINING & PAINTING BRIDGE APPROACHES AND MAIN SPAN STEELTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 MISS RIVER BRIDGE CLEAN & PAINT

H.011906

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 37 254-02 NFI 2,000 OTHER / MISCELLANEOUS

ROUNDABOUT AT HOOPER RD AND GREENWELL SPRINGS RDMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

HOOPER RD: ROUNDABOUT AT LA 37

H.011923

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 3034 255-30 NFI 2,000 OTHER / MISCELLANEOUS

ROUNDABOUT: INTERSECTION IMPROVEMENTMOSS, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

HOOPER RD: ROUNDABOUT AT SULLIVAN RD

H.012232

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 5,400 URBAN SYSTEMS 2-WAITING FOR FUNDINGE BATON ROUGE 000-17 LOCAL 2,700 URBAN SYSTEMS

NEW ALIGNMENTBRIGNAC, CHRISTINA Remrks:

Typ Imp:ENTITY WILL PROVIDE MATCH

Project:Prj Mgr:

LA 3064 TO LA 1248 PHASE 2

Page 3 - 5 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 198: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.009784

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN 000-21 TAP<5K 229 ENHANCEMENTS 2-WAITING FOR FUNDINGFRANKLIN 000-21 LOCAL 23 ENHANCEMENTS

SIDEWALKS W/LIGHTING, & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

WINNSBORO: ADAMS&COMMON ST STREETSCAPI

FRANKLIN

H.002893

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NFI 21,391 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTKEMP, KELLY Remrks:

Typ Imp:424-04-0059;EAST AND WEST BOUND LANES

Project:Prj Mgr:

US 90: LA 14 OVERPASS REPLACEMENT

IBERIA

H.002264

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 45 249-90 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGJEFFERSON LA 45 249-90 STPFLEX 6,289 PRESERVATION - BRIDGE (ON

SYSTEM)

JEFFERSON LA 302 826-39 FBROFF 86,521 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPL.(KERNER'S)YANG, LI Remrks:

Typ Imp:249-90-0041;TEA-21 KERNER'S FERRY BRIDGE

Project:Prj Mgr:

BAYOU BARATARIA BRIDGE@JEAN LAFITTE

JEFFERSON

H.002955

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NFI 5,000 URBAN SYSTEMS 2-WAITING FOR FUNDING

ACCESS IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:430-01-0016

Project:Prj Mgr:

EARHART EXPRESSWAY

H.002956

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NFI 2,375 URBAN SYSTEMS 2-WAITING FOR FUNDING

RAMP CONNECTOR (EB EARHART - DAKIN)LEBAS, MELISSA Remrks:

Typ Imp:430-01-0020; USE TTF AS MATCH

Project:Prj Mgr:

EARHART AT DAKIN

H.003074

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NFI 100,000 CORRIDOR 2-WAITING FOR FUNDING

MAJOR WIDENING - ADD TRAVEL LANESYANG, LI Remrks:

Typ Imp:450-15-0124; TOLL CREDITS USED AS MATCH FOR PART OF PHASE 5

Project:Prj Mgr:

I 10: WILLIAMS BLVD - VETERANS BLVD

H.004359

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3154 826-44 STBONDS 7,296 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGJEFFERSON LA 3154 826-44 OTHER 2,673 OTHER / MISCELLANEOUS

RELOCATION AND 4-LANINGYANG, LI Remrks:

Typ Imp:826-44-0027

Project:Prj Mgr:

HICKORY (LA 48 - MOUNES)

H.004367

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 125,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY

ENVIRONMENTAL. LINE & GRADE STUDYYANG, LI Remrks:

Typ Imp:700-26-0242;HP NO.1600 (SEE ALSO 736-92-0003)

Project:Prj Mgr:

LA3139:EARHART EXPRESSWAY EXT TO US 61

Page 3 - 6 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 199: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.006513

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 DEMO 6,750 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY ST CHARLES 000-45 0 DEMO / HIGH PRIORITY

ABANDONED RR R/W ACQ. (HP NO 1600)NGUYEN, WAYNE Remrks:

Typ Imp:737-26-0001;HP=$0.5M. >2OOK=$0.3M IN FY 2001

Project:Prj Mgr:

US 61 CORRIDOR PRESERVATION

H.007214

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 7,400 URBAN SYSTEMS 2-WAITING FOR FUNDING

WIDEN FROM 2 TO 3 LANESLEBAS, MELISSA Remrks:

Typ Imp:742-26-0080;OREGON DR.-BLANCHE DR

Project:Prj Mgr:

EAST AMES BOULEVARD IMPROVEMENTS

H.007223

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 7,100 URBAN SYSTEMS 2-WAITING FOR FUNDING

WIDEN TO 4 LANE URBAD SECT W MEDIANLEBAS, MELISSA Remrks:

Typ Imp:742-26-0090; USE LOCAL AS MATCH

Project:Prj Mgr:

HARVEY BLVD (MANHATTAN - WALL)

H.009087

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NFI 10,000 CORRIDOR 2-WAITING FOR FUNDING

MAJOR WIDENING - ADD TRAVEL LANESNICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LOYOLA DR. TO WILLIAMS BLVD.

H.009794

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 170 ENHANCEMENTS 2-WAITING FOR FUNDINGJEFFERSON US 90-Z 283-09 NFI 75 ENHANCEMENTS JEFFERSON LA 18 063-02 NFI 50 ENHANCEMENTS JEFFERSON LA 18 063-02 NFI 25 ENHANCEMENTS

SIGNING, PAVEMENT MARKINGS, M/U PATH & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

GRETNA BICYCLE ACCESS IMPROVEMENTS

H.009804

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 446 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS W/ LIGHTING, STREETSCPAING & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

KENNER: S WILLIAMS BLVD STREETSCAPING

H.011309

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 NFI 60,000 CAPACITY 2-WAITING FOR FUNDING

RELOCATE THE EXIT RAMP AND CONSTRUCT AN ENTRANCE RAMPYANG, LI Remrks:

Typ Imp:USE CCCD TOLL CREDITS AS MATCH TO THE PHASE 5 FUNDS

Project:Prj Mgr:

MACARTHUR INTERCHANGE COMPLETION PH. II

H.009420

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS US 165 014-02 NFI 1,000 SAFETY 2-WAITING FOR FUNDING

INSTALL J-TURN ON US 165 @ LA 101CORMIER, CLAYTON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: INSTALL J-TURN @ LA 101

JEFFERSON DAVIS

H.002868

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 NFI 105,000 CORRIDOR 2-WAITING FOR FUNDING

NEW INTERCHANGEPAINE, PEGGY JO Remrks:

Typ Imp:424-02-0090;ENG DEMO. RW/UTL S9$1.2M AVAILABLE.NFI FOR CONST

Project:Prj Mgr:

I-49 S:AMB CAFFERY/US90 INTERCHANGE

LAFAYETTE

Page 3 - 7 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 200: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.003454

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-49 455-01 NFI 850,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

IN LAFAYETTE NEW INTERSTATENICKEL, TIM Remrks:

Typ Imp:455-01-0035;ENGR 700-24-0073. R/W 455-01-0034

Project:Prj Mgr:

LAFAYETTE CONNECTOR

H.004492

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 0 URBAN SYSTEMS 2-WAITING FOR FUNDING

INTERCHANGE DESIGNUMEOZULU, JOE Remrks:

Typ Imp:700-28-0223;STUDY FED FY2013.ENGR FED FY2014

Project:Prj Mgr:

I-10 INTERCHANGE AT N AMBASSADOR CAFFERY

H.009214

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 339 828-11 0 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE LA 339 828-12 0 CAPACITY

WIDENINGBRIGNAC, CHRISTINA Remrks:

Typ Imp:LCG PROVIDE MATCH PHASE 2

Project:Prj Mgr:

LA 339: WIDENING (LA 82 TO LA 3073)

H.009215

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 0 CAPACITY 2-WAITING FOR FUNDING

WIDENINGBRIGNAC, CHRISTINA Remrks:

Typ Imp:LCG PROVIDE MATCH PHASE 2

Project:Prj Mgr:

LA182:WIDENING(W PONT DES MOUTON RD-I49)

H.009335

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 NFI 40,200 CAPACITY 2-WAITING FOR FUNDING

WIDENING AND ADDING TRAVEL LANES TO PROVIDE 4 LANE HIGHWAYBABIN, TEDDY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: I-10 TO WEST PONT DES MOUTON RD

H.009520

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3168 433-01 NFI 24,700 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3168:NEW BRIDGE@BNSF-US 90(LAFAYETTE)

H.009795

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 NFI 571 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: US 90-MLK DRIVE SIDEWALKS

H.011235

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 NFI 97,000 CAPACITY 2-WAITING FOR FUNDING

CONSTRUCT NEW INTERSECTION - CONCRETELANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 SOUTH @ VEROT SCHOOL ROAD

H.011303

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 NFI 6,000 CAPACITY 2-WAITING FOR FUNDING

FRONTAGE RD CONSTRUCTIONPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

US 90:ALBERTSON TO SOUTHPARK FRONTAGE R

H.008145

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 STBONDS 30,280 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLAFOURCHE LA 1 829-32 LOCAL 4,995 OTHER / MISCELLANEOUS

ROUTE LA 1 RELOCATIONNICKEL, TIM Remrks:

Typ Imp:829-32-0010;NEW BRIDGE.NEW ALIGNMENT; AC-ING WITH STBONDS

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2C

LAFOURCHE

Page 3 - 8 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 201: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.010152

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-90 STBONDS 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

DREDGE CANAL AND MITIGATION FOR LA 1 ELEVATED CONSTRUCTIONHANKS, ANNA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: CONSTRUCTION CANAL DREDGING

H.011207

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 NFI 69,989 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

CONSTRUCT RELOCATED LA 1 ON ELEVATED STRUCTUREHANKS, ANNA Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2A

H.011208

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 NFI 230,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

ELEVATED RELOCATED LA 1 -LEEVILLE TO GOLDEN MEADOW LEVEEHANKS, ANNA Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2B

H.011209

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 NFI 10,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

NEW TOLL FACILITY FOR LA 1 SOUTHBOUND AND APPROACHHANKS, ANNA Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2D

H.000758

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-05 NFI 43,940 CORRIDOR 2-WAITING FOR FUNDING

WIDENINGMASTIN, CATHERINE Remrks:

Typ Imp:022-05-0045

Project:Prj Mgr:

LA 772 - HAIR CREEK(JENA)

LASALLE

H.009644

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 125 131-01 NFI 1,384 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 125: US 165-PENTECOSTAL CHURCH ROAD

H.001550

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 146 068-01 0 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 5 LANESJESCLARD, TREY Remrks:

Typ Imp:068-01-0009;$200 BONDS AVAIL. FOR PE (E?)

Project:Prj Mgr:

CHATHAM RD. (RUSTON)

LINCOLN

H.004608

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 LOCAL 6,500 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

NEW SERVICE ROADPAINE, PEGGY JO Remrks:

Typ Imp:700-31-0121;STAGE 0 COMPLETED

Project:Prj Mgr:

CHOUDRANT I-20 SERVICE ROAD

H.008157

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 150 831-07 NFI 4,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS

RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:

Typ Imp:831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX

Project:Prj Mgr:

JCT US 80 - JCT LA 150

Page 3 - 9 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 202: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.009746

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 150 831-07 NFI 695 ENHANCEMENTS 2-WAITING FOR FUNDINGLINCOLN LA 150 831-07 LOCAL 150 OTHER / MISCELLANEOUS LINCOLN 000-31 NFI 1,210 ENHANCEMENTS LINCOLN 000-31 LOCAL 220 OTHER / MISCELLANEOUS LINCOLN US 80 001-08 NFI 277 ENHANCEMENTS LINCOLN US 80 001-08 LOCAL 9 OTHER / MISCELLANEOUS

SIDEWALK W/ LIGHTING, STREETSCAPING, & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:FEDERAL SHARE IS 80%. 15% MATCH TOLL CREDITS & 5% LOCAL

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE 6

H.000470

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 441 270-02 NFI 236 ENHANCEMENTS 2-WAITING FOR FUNDINGLIVINGSTON LA 441 270-02 LOCAL 16 ENHANCEMENTS

ENHANCEMENTMEEK, STEPHEN Remrks:

Typ Imp:744-32-0011

Project:Prj Mgr:

HOLDEN SIDEWALK PROGRAM

LIVINGSTON

H.011014

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 3002 832-32 NHPP 545 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

2-WAITING FOR FUNDING

ADD SOUTH BOUND U-TURN FOR LEFT TURNING VEHICLES EXITING CVHARROUCH, JOSHUA Remrks:

Typ Imp:RT CREDITS USED AS MATCH FOR PHASE 3; OE AM PROGRAM MATCH

Project:Prj Mgr:

LA 3002: U-TURN

H.001061

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-05 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGNATCHITOCHES LA 6 034-05 NFI 20,182 DEMO / HIGH PRIORITY

MAJOR WIDENING LA 117 TO I 49MASTIN, CATHERINE Remrks:

Typ Imp:034-05-0035;USING STBONDS AS MATCH TO DEMO TO ACQUIRE R/W

Project:Prj Mgr:

EL CAMINO EAST/WEST COR (EAST SEG )

NATCHITOCHES

H.001809

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 174 112-06 NFI 2,410 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

CURVE REALIGNMENTMOORE, DARRELL Remrks:

Typ Imp:112-06-0008;PROJECT TO BE RE-SCOPED

Project:Prj Mgr:

AJAX - I-49

H.010359

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 9 089-01 NFI 1,509 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 9: JCT US 71 - JCT LA 156

H.000263

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-05 NFI 47,348 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

ORLEANS US 90 006-90 NFI 42,343 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:

Typ Imp:006-05-0067;STAGE 1 PROJECT

Project:Prj Mgr:

CHEF MENTEUR PASS BRIDGE & APPROACH

ORLEANS

Page 3 - 10 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 203: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.007250

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 NFI 20,000 INTERMODAL CONNECTOR 2-WAITING FOR FUNDINGORLEANS 000-36 NFI 20,000 PRESERVATION - BRIDGE (ON

SYSTEM)

ORLEANS 000-36 OTHER 22,000 OTHER / MISCELLANEOUS

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:742-36-0104;OTHER FUNDS - PORT

Project:Prj Mgr:

ALMONASTER AVENUE BRIDGE REPLACEMENT

H.008220

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 406 836-14 NFI 1,500 URBAN SYSTEMS 2-WAITING FOR FUNDINGPLAQUEMINES LA 406 838-03 0 URBAN SYSTEMS PLAQUEMINES LA 406 838-06 0 URBAN SYSTEMS

WIDENINGLEBAS, MELISSA Remrks:

Typ Imp:836-14-0002;JT W 838-06-0002

Project:Prj Mgr:

LA406/WOODLAND HWY (LA23 - LA407)

H.009499

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 0 URBAN SYSTEMS 2-WAITING FOR FUNDING

PLANNING STUDYBROUSSARD, DAN Remrks:

Typ Imp:

Project:Prj Mgr:

LEAKE AVENUE IMPROVEMENTS

H.009752

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 NFI 513 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALK W/ LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

DESIARD ST: STREETSCAPING S GRAND-6TH ST

OUACHITA

H.001399

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-04 NFI 30,000 CORRIDOR 2-WAITING FOR FUNDING

WIDEN TO 4 LANESUMEOZULU, JOE Remrks:

Typ Imp:062-04-0029;$1M GS9$ FOR STUDY

Project:Prj Mgr:

HAPPY JACK - N.PORT SULPHUR

PLAQUEMINES

H.000790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 167 023-01 NFI 3,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

BRIDGE MAINTENANCERACHAL, JASON Remrks:

Typ Imp:023-01-0069;BRPM

Project:Prj Mgr:

US 167 BRIDGE MAINTENANCE

RAPIDES

H.004825

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 28 074-02 NFI 29,185 CAPACITY 2-WAITING FOR FUNDING

WIDEN FROM 3 TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:700-40-0145;FEASIBILITY/STAGE 0 WIDEN TO 4 LANE

Project:Prj Mgr:

WIDENING LA 28 EAST (LIBUSE TO HOLLOWAY)

H.008277

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 840-43 NFI 32,500 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

RED RIVER BRIDGEUMEOZULU, JOE Remrks:

Typ Imp:840-43-0014;PHASE 3 OF FORT BUHLOW RED RIVER BR

Project:Prj Mgr:

FT. BUHLOW BR (US 71/US 165)

Page 3 - 11 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 204: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.009543

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 113 140-02 NFI 3,449 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: VERNON LINE - LA 112

H.011598

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 8-S 134-04 NFI 4,626 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCHING, COLD PLANING, STABILIZING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: LA 119 TO LA 1

H.009402

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER US 371 021-30 NFI 535 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

2-WAITING FOR FUNDING

SUBSURFACE DRAINAGE AND OUTFALL CHANNEL IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

RDWY DRAINAGE IMP.-US 71 @ US 371 PH III

RED RIVER

H.002567

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 300 284-30 NFI 1,834 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTOLIVIER, NICHOLAS Remrks:

Typ Imp:284-30-0023

Project:Prj Mgr:

REGGIO CANAL BRIDGE

ST BERNARD

H.004876

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES 000-45 NFI 1,850 URBAN SYSTEMS 2-WAITING FOR FUNDINGST CHARLES 000-45 OTHER 1,850 URBAN SYSTEMS

SAFETY AND TSM IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:STAGE O COMPLETED UNDER DESIGN PHASE

Project:Prj Mgr:

LA 52: LA 18 - N OAK COURT

ST CHARLES

H.012531

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-37 NFI 55,697 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)

CLEANING, PAINTING, AND STRUCTURAL REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

I-310: LULING BRIDGE REHBILITATION

Page 3 - 12 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 205: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.002424

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 70 426-02 NFI 6,226 CAPACITY 2-WAITING FOR FUNDINGASCENSION LA 70 426-03 NFI 12,733 CAPACITY ST JAMES LA 3125 426-31 NFI 628 CAPACITY ASCENSION 000-03 NFI 63 CAPACITY

WIDEN TO 4 LANESFUSILIER, JACOB Remrks:

Typ Imp:426-02-0042;(C&G)426-02-52.426-03-05.NO FUNDING

Project:Prj Mgr:

LA 70: SUNSHINE BRIDGE - LA 22

ST JAMES

H.009483

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 3125 426-31 LOCAL 775 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST JAMES LA 44 256-05 LOCAL 620 OTHER / MISCELLANEOUS

ADDING TURN LANES ON LA 3125 AND REALIGNING LA 44WAGUESPACK, BRENT Remrks:

Typ Imp:

Project:Prj Mgr:

LA HIGHWAY 44 RE-ROUTE

H.009724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES 000-47 NFI 1,259 ENHANCEMENTS 2-WAITING FOR FUNDING

MULTI-USE PATH AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

ST JAMES MISS EBANK MULTI-USE TRAIL PH 1

H.011358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-12 NFI 6,384 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST LANDRY US 190 012-13 NFI 3,888 OTHER / MISCELLANEOUS

STAGE 0/FEASIBILITY STUDYHANKS, ANNA Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 (VINE STREET) RECONSTRUCTION

ST LANDRY

H.004924

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 NFI 0 URBAN SYSTEMS 2-WAITING FOR FUNDING

FEDERAL EARMARK FOR STUDYYANG, LI Remrks:

Typ Imp:700-50-0112;STAGE 0 COMPLETED

Project:Prj Mgr:

DEV.& CONST ST. MARTINVILLE BYPASS

ST MARTIN

H.011298

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN US 90 424-03 NFI 3,500 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE US 90 424-02 NFI 2,500 CAPACITY IBERIA US 90 424-04 NFI 1,500 CAPACITY

NEW CONSTRUCTION OF FRONTAGE RDSPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: CAPT CADE TO AMB CAFF FRONTAGE RD

H.009748

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 NFI 87 ENHANCEMENTS 2-WAITING FOR FUNDINGST MARY 000-51 LOCAL 58 ENHANCEMENTS

SIDEWALKS AND RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

BERWICK DOWNTOWN SIDEWALKS

ST MARY

Page 3 - 13 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 206: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.000284

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-07 NFI 40,733 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

NEW BRIDGESMASTIN, CATHERINE Remrks:

Typ Imp:006-07-0048; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

US 90: PEARL RIVER BRIDGES (HBI)

ST TAMMANY

H.000494

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 0 CORRIDOR 2-WAITING FOR FUNDING

WIDEN TO 4 LANESJESCLARD, TREY Remrks:

Typ Imp:013-12-0031;404 REQ.(E?). PUB.MT.TO BE HELD

Project:Prj Mgr:

LA 433 - US 11

H.000497

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 NFI 12,000 CORRIDOR 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMCMILLAN, RYAN Remrks:

Typ Imp:013-12-0039;PROJ ON XXX PER LIST FROM F.BORNE

Project:Prj Mgr:

US190: BAYOU CASTINE-SE LA HOSPITAL

H.000688

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 11 018-04 NFI 63,700 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTOLIVIER, NICHOLAS Remrks:

Typ Imp:018-04-0049; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

US 11 NORFOLK SOUTHERN RR OVERPASS (HBI)

H.002391

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 261-06 0 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY LA 22 261-06 0 OTHER / MISCELLANEOUS

WIDEN TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:261-06-0030;CITY/STATE AGREEMENT REQUIRED

Project:Prj Mgr:

TCHEFUNCTE - CAUSEWAY APPROACH

H.004983

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 11 018-03 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGST TAMMANY US 11 018-03 NFI 19,346 DEMO / HIGH PRIORITY

WIDENING WITH BIKE PATHOLIVIER, NICHOLAS Remrks:

Typ Imp:700-52-0196

Project:Prj Mgr:

US HIGHWAY 11 WIDENING

H.009793

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 NFI 954 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS W/LIGHTING, LANDSCAPING, & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

SLIDELL: OLDE TOWN STREETSCAPING

H.009934

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 NFI 218 ENHANCEMENTS 2-WAITING FOR FUNDINGST TAMMANY LA 435 281-04 NFI 82 ENHANCEMENTS

SIDEWALK LIGHTING & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

ABITA SPRINGS TOWN CTR SIDEWALK LIGHTING

H.010274

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

STAGE 0 FEASIBILITY STUDY FOR INTERIM CAPACITY IMPROVEMENTSNGUYEN, WAYNE Remrks:

Typ Imp:DUE TO HURRICANE ISAAC MPO CAN'T FORMALLY APPROVE PROJECT

Project:Prj Mgr:

US 190: US 11 TO LA 433

Page 3 - 14 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 207: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.010441

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1077 852-13 NFI 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

2-WAITING FOR FUNDING

DRAINAGEGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

GRADE RAISING ON LA 1077

H.011137

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 NFI 40,000 CAPACITY 2-WAITING FOR FUNDING

ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEMENTFUSILIER, JACOB Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: LA 1077 TO US 190

H.011152

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 NFI 10,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY I-12 454-04 NFI 10,000 PRESERVATION - INTERSTATE ST TAMMANY I-12 454-04 NFI 25,000 PRESERVATION - BRIDGE (ON

SYSTEM)

ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: US 190 TO LA 59

H.012382

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 059-30 NFI 16,000 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 4 LANES, 5 ROUNDABOUTSLANDRY, COREY Remrks:

Typ Imp:059-30-0008

Project:Prj Mgr:

US 190: LA 25 - BOGUE FALAYA (PH 2B)

H.012386

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 059-30 NFI 18,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 15,000 CAPACITY

WIDEN BRIDGE, 4 ROUNDABOUTSLANDRY, COREY Remrks:

Typ Imp:059-30-0008

Project:Prj Mgr:

US 190: LA 437 - US 190 BUS (PH 3)

H.012398

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 25 059-02 NFI 2,500 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 2,500 CAPACITY ST TAMMANY US 190 030-31 NFI 2,500 CAPACITY ST TAMMANY 000-52 NFI 1,200 CAPACITY

TWO LANE ROUNDABOUTLANDRY, COREY Remrks:

Typ Imp:059-30-0008

Project:Prj Mgr:

US 190 @ LA 25 ROUNDABOUT (PH 2A)

H.005043

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 311 413-01 NFI 38,000 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:700-55-0122

Project:Prj Mgr:

LA311: LA 664 (ST CHARLES ST)-SAVANNE RD

TERREBONNE

H.010328

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 659 855-04 NFI 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

2-WAITING FOR FUNDING

CB-06 TOP MODIFICATIONS, CROSS DRAIN REMOVAL AND REPLACEMENGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 659: HOWARD BRIDGE-DAIGLEVILLE BRIDGE

Page 3 - 15 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 208: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.009761

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 14 055-06 NFI 500 ENHANCEMENTS 2-WAITING FOR FUNDINGVERMILION LA 14 055-06 LOCAL 167 ENHANCEMENTS

SIDEWALKS W/LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: DOWNTOWN ABBEVILLE STREETSCAPING

VERMILION

H.000986

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 8 029-01 NFI 12,700 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:029-01-0004;ADMIN. BY TEXAS

Project:Prj Mgr:

SABINE RIVER BR (BURR FERRY)

VERNON

H.010339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 10 066-02 FLH 1,226 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10: LOOK OUT RD - 850' E BAILEY RD

H.010354

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 111 133-03 NFI 1,898 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 111: US 171 - LA 117

H.000358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE US 190 008-01 NFI 55,866 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

NEW BRIDGEHANKS, ANNA Remrks:

Typ Imp:008-01-0051; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

US 190 @ LA 415: LOBDELL INTER (HBI)

W BATON ROUGE

H.001234

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NFI 136,570 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTDELATTE, BRIAN Remrks:

Typ Imp:050-07-0066;2 STRUCTURES PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

PORT ALLEN CANAL BRIDGE (HBI)

H.009288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NFI 20,000 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:H.011133 MUST LET BEFORE H.009288

Project:Prj Mgr:

LA 1:NEW RR BRIDGE@DOW SPUR XING (WBR)

H.010037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 NFI 16,640 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

2-WAITING FOR FUNDING

CONSTRUCT NEW FERRY BOATSIBLEY, STEVEN Remrks:

Typ Imp:

Project:Prj Mgr:

NEW FERRY BOAT / CAMERON FERRY CROSSING

DISTRICT 07

Page 3 - 16 Version: 1.18.1 Report Date: 4/2/19 5:03 AM

Page 209: HIGHWAY PROGRAM FY 2019-2020 · 2019-04-14 · planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year. 4

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING

H.013284

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 NFI 0 CAPACITY 2-WAITING FOR FUNDING

NEW BRIDGE AND APPROACHES TO FEASIBILITY STUDYLOTT, ROBERT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1 TO LA 30 CONNECTOR

DISTRICT 61

H.009200

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 NFI 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: PAVEMENT MARKING REPLACEMENT II

DISTRICT 62

Page 3 - 17 Version: 1.18.1 Report Date: 4/2/19 5:03 AM