Docking and Attachment Test Norway - December 13, 2010. HiLoad during DP Operation – November 2010. Approach to Submersible Barge on DP. Attachment System Activated Maneuvering of Barge by HiLoad DP. HiLoad during DP Operation – November 2010. First Ballast Test – Oct 2010. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HiLoad during DP Operation – November 2010

1HiLoad during DP Operation – November 2010

Docking and Attachment Test Norway - December 13, 2010

Page 2: HiLoad during DP Operation – November 2010

2Approach to Submersible Barge on DP

Page 3: HiLoad during DP Operation – November 2010

3

Attachment System Activated Maneuvering of Barge by HiLoad DP

Page 4: HiLoad during DP Operation – November 2010

4HiLoad during DP Operation – November 2010

Page 5: HiLoad during DP Operation – November 2010

5

First Ballast Test – Oct 2010First Ballast Test – Oct 2010

Page 6: HiLoad during DP Operation – November 2010

6HiLoad during DP Operation – November 2010

Page 7: HiLoad during DP Operation – November 2010

7HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in NorwayHiLoad DP at 42 m draught (138 feet)

HiLoad DP No. 1 – In OperationHiLoad DP No. 1 – In Operation

Page 8: HiLoad during DP Operation – November 2010

8HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in Norway

28.0 m 27.0 m

42.0 m42.0 m

Min draught17.0 m