Pine Lake, Stenson Himalayan Balsam Method Statement

TEP.5257.002 June 2015

Page 2: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including
Page 3: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

Prepared by:

TEP

Genesis Centre

Birchwood Science Park

Warrington

WA3 7BH

Tel: 01925 844004

Fax: 01925 844002

E-mail: [email protected]

For:

Foundation Matters Pine Lake

Barrow on Trent Derby

DE73 7GB

Written: Checked: Approved:

AMB DCS DCS

HIMALAYAN BALSAM METHOD STATEMENT FOR

PINE LAKE, STENSON

(Report Ref: TEP. 5257.002) June 2015 Version 2.0

Page 4: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

PINE LAKE, STENSON HIMALAYAN BALSAM METHOD STATEMENT

1.0 INTRODUCTION ........................................................................................... 1

2.0 METHOD STATEMENT ................................................................................. 2

APPENDICES Appendix 1: Phase 1 Habitat Map Appendix 2: Landscape Buffer Zones (TEP Ref: D4519.006)

Page 5: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

5257.002 1 June 2015 Version 2.0

1.0 INTRODUCTION

1.1 TEP was commissioned by Foundation Matters to prepare a Himalayan Balsam Method

Statement to comply with Condition 6 of planning permission (application ref:

9/2014/0955) for the extension to an existing children’s camp, creation of a recreation

lake and recreational facilities at Pine Lake, Stenson.

1.2 Condition 6 states:

“No development, including site clearance, shall take place until a detailed method statement for the management during the construction phase of the Himalayan balsam located on the site has been submitted to and approved in writing by the Local Planning Authority. The method statement shall include measures that will be used to prevent the spread of Himalayan balsam, Water fern and New Zealand pygmyweed during any operations for the duration of construction (e.g. mowing, strimming or soil movement). It shall also contain measures to ensure that any soils brought on to or removed from the site are free of the seeds/root/stem of any invasive plant listed under the Wildlife and Countryside Act 1981 (as amended). Development shall proceed in accordance with the approved method statement at all times.”

1.3 Water fern and New Zealand pygmyweed were not identified during site surveys and no

records of these species were returned during the desktop survey (TEP report ref.

4519.003 Pine Lake, Stenson, Ecological Assessment). Reference to these species in

Condition 6 appears to be in error; this method statement therefore only addresses

measures to avoid the spread of Himalayan balasam Impatiens glandulifera.

1.4 The locations of Himalayan balsam are shown on the Phase 1 Habitat Map (TEP Ref:

G4519.001) at Appendix 1. Himalayan balsam is present along the banks of Twyford

Brook, along a ditch surrounding an amenity grassland field in the east of the site and

within an area mapped as swamp habitat in the south east of the site.

1.5 Himalayan balsam is a non-native invasive plant and is listed on Schedule 9 of the

Wildlife and Countryside Act 1981. Under provisions made within the Wildlife and

Countryside Act 1981, it is an offence to spread Himalayan balsam. Liability may also

extend in situations where a landowner has knowingly permitted the spread of

Himalayan balsam onto neighbouring land.

1.6 Any waste containing Himalayan balsam is classed as Controlled Waste under the

Environmental Protection (Duty of Care) Regulations 1991, which requires all producers,

carriers and disposers of waste to follow a code of practice and keep records.

1.7 Failure to manage and dispose of invasive species in accordance with the above

legislation can lead to prosecution.

Page 6: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

5257.002 2 June 2015 Version 2.0

2.0 METHOD STATEMENT

2.1 All staff working on site will be made aware that Himalayan balsam is present on site; an

explanation of the content of this Method Statement will be included in the Site Induction.

This Method Statement will be on display in the Site Office for the duration of the works.

2.2 Fencing will be erected at 10m distance from the bank tops of Twyford Brook and

ditches. This is to prevent accidental encroachment onto and disturbance of the brook

banks, ditch banks and swamp and to prevent the spreading of Himalayan balsam to

other parts of the site. The area within the fencing is referred to as the Exclusion Zone

and is shown on the Landscape Buffer Zones plan (TEP Ref: D4519.006) at Appendix 2.

2.3 Where works require access to the Exclusion Zone, these works will be overseen by an

Ecological Clerk of Works.

2.4 Vehicles working within the Exclusion Zone will be cleaned within the Exclusion Zone

before being used in other parts of the site or before leaving the site. This is to prevent

contaminating other parts of the site or off-site areas.

2.5 Any material from within Exclusion Zone that is not reused within the Exclusion Zone will

be taken off-site and disposed of at a facility licensed to accept Controlled Waste. The

Ecological Clerk of Works will supervise the loading of Controlled Waste onto carrier

vehicles and will ensure that these loads are sealed before leaving the site. The

Ecological Clerk of Works will obtain signed receipts from carriers from all loads of

Controlled Waste that leave the site and will give these receipts to the Site Manager.

2.6 During construction, areas outside of the Exclusion Zone but within the site will be

monitored for Himalayan balsam by a suitably qualified person. Monitoring inspections

will be undertaken each month between April and September. If any Himalayan balsam

plants are identified outside of the Exclusion Zone, management measures will be

implemented to keep the species under control.

2.7 Management measures implemented outside of the Exclusion Zone will aim to prevent

Himalayan balsam plants from flowering and hence prevent the plants from setting seed.

Identified plants will either be cut with a scythe below the lowest node or sprayed with a

glyphosate-based herbicide. Plants will be cut or sprayed once every four weeks within

the monitoring period of April to September inclusive.

Page 7: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

5257.002 3 June 2015 Version 2.0

APPENDIX 1

Page 8: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

5257.002 4 June 2015 Version 2.0

Page 9: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

M MG G

M MG G

M M

M M

G G

G G

M M M M

M M M M

G G G G

G G G G

A A A A A

A A A A A

A A A A A

A A A A A

A A A A A

A A A A A

A A A A A

A A A A A

A A A A A

A A A A A

A A A A A

A

A

A

A

A A

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

A A A A A A A A

A A A A A A A A

A A A A A A A A

A A A A A A A A

A A A A A A A A

A A A A A A A A

A A A A A A A A

A A A A A A A A

M M M M

M M M M

M M M M

G G G G

G G G G

G G G G

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! !

D D D D D D D D DD D D D D D D D DD D D D D D D D DD D D D D D D D DD D D D D D D D DD D D D D D D D D

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

S S S S S S S S S S S S S

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I

S S S S S S S S S

S S S S S S S S S

S S S S S S S S S

S S S S S S S S S

S S S S S S S S S

S S S S S S S S S

S S S S S S S S S

S S S S S S S S S

S S S S S S S S S

I I I I I I I I I

I I I I I I I I I

I I I I I I I I I

I I I I I I I I I

I I I I I I I I I

I I I I I I I I I

I I I I I I I I I

I I I I I I I I I

I I I I I I I I I

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

S S S S S

S S S S S

S S S S S

S S S S S

S S S S S

S S S S S

I I I I I

I I I I I

I I I I I

I I I I I

I I I I I

I I I I I

S S S S

S S S S

I I I I

I I I I

S S S S S S

S S S S S S

S S S S S S

S S S S S S

S S S S S S

S S S S S S

I I I I I I

I I I I I I

I I I I I I

I I I I I I

I I I I I I

I I I I I I

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

S S S S S S S S S S S

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

M M M M M M M M M M M M M

M M M M M M M M M M M M M

M M M M M M M M M M M M M

M M M M M M M M M M M M M

M M M M M M M M M M M M M

M M M M M M M M M M M M M

M M M M M M M M M M M M M

M M M M M M M M M M M M M

G G G G G G G G G G G G G

G G G G G G G G G G G G G

G G G G G G G G G G G G G

G G G G G G G G G G G G G

G G G G G G G G G G G G G

G G G G G G G G G G G G G

G G G G G G G G G G G G G

G G G G G G G G G G G G G

A

A

A

A A

A A

A A

A

A

A A

A A

A A A A A A A A

A A A A A A A A

A A A A A A A AA A

A A

A A

A A A

A A A

A A A

A A A

A A A

VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VIVI VI VI VI VI VI VI VI VI VI VI VIVI VIVI VIVI VIVIVIVIVIVIVIVIVIVI

VIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVI

VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI

VI VI VI VI VI VI VI VI VI

VI VI VI VI

??

??

?

?

!!!

!!!

!!!!

!!!

! ! !

!

!!!!!!!!

!!!!!!!!!

!!

!!

!! ! !!

!

!!

!

!

!

!! !

!

!

!

!

!!

!

!

!

!

!

!

!!

!! ! !

!

!

!!

!!

!!!!

!!

!!

!!

!!

!!

!!

!!

!!

!!!!

!!!!

!!!!

!!

!!!!!!!!!!!!!!!!

!!

!!

!!

!!

EEEEEEEEEE EEEEE

EEEEE EE

EEEEEEEEEEE EE E E EE EEE E

EEE EEEE

EEEEEEEEEEEEE

EEEEEEEEEEEEEEEEEEEEEEEEE

EEEE

E

EE

EE

EEEE

EEE

EEE

EEE

EEE

EEE

EEE

EEE

EE

EE

EEE

EEEEEE E E E E E

EEEE E

EE

!(HB!(HB

!(HB !(HB

!(HB

!(HB

!(HB

!(HB

H

H

H

H

H

H

H

H

H

H

H

H

H

H

P1

P2

P3

P4

D1 D2

TN9

TN8

TN7

TN6

TN5

TN4

TN3

TN2

TN1

TN14

TN13

TN12

TN11

TN10

IH VG ??

16/07/2014

G4519.001

Phase 1 Habitat Map

Key

Rev Description Dwn Appvd Date

Pine Lake, Stenson

Drawn: Checked: Approved:

Date:Scale:

Map No.

Title:

Project:

@ A31:2,500

Genesis CentreBirchwood Science Park Warrington WA3 7BHTel 01925 844004Fax 01925 844002email [email protected]

Survey boundaryH Target notes (TN1 - TN14)!(HB Himalayan balsamE Scattered scrub! Scattered broad-leaved trees!! Broad-leaved tree with bat potential

Marginal vegetation? Running water

VI VI VI Native species-rich hedge and treesDry ditchSemi-natural broad-leaved woodlandPlantation broad-leaved woodland

D D D D D DD D D D D DD D D D D DD D D D D DScattered scrub

SISemi-improved neutral grassland

MG

Modified neutral grasslandTall ruderalSwampStanding waterRunning water

A A

A A Amenity grassland

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! !

Bare groundBuildingsHardstanding

0 100 200 300 40050Metres

Fizam

s Lan

e

SIMG

A

Contains Ordnance Survey data © Crown copyright and database right 2011

Page 10: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including
Page 11: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

5257.002 5 June 2015 Version 2.0

APPENDIX 2

Page 12: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including
Page 13: Himalayan Balsam Method Statement (Condition 6)planning.south-derbys.gov.uk/documents/am/9_2014_09… ·  · 2015-07-20Himalayan Balsam Method Statement TEP.5257.002 ... including

10m Buffer Zone from existing

watercourses and waterbodies

5m Buffer Zone from existing trees

and hedgerows

10m Buffer Zone from Himalayan

Balsam

Key

HB

HB

HB

HB

HB

HB

0m 10m 20m 50m 100m

Title

LG

Drawn

Scale

see scale bar @ A3

Drwg No

D4519.006

Landscape Buffer Zones

MW

Checked

MW

18/06/15

Approved

Date

Pine Lake, Stenson

Project

Genesis Centre

Birchwood Science Park Warrington

WA3 7BH

Tel 01925 844004

Fax 01925 844002

e-mail [email protected]

Description

Reproduced by permission of Ordnance Survey on behalf of Her Majesty's

Stationery Office.

© Crown Copyright and database right 2014. All rights reserved.