hirlam-a status and plans j. onvlee ewglam meeting dubrovnik, 20071008

16
HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Upload: johnathan-rice

Post on 27-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

HIRLAM-A status and plans

J. Onvlee

EWGLAM meeting Dubrovnik, 20071008

Page 2: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

HIRLAM organization• Members: Dk, Est, Fi, Ic, Ir, Nl, No, Sp, Sw, (Fr)

– Estonian met service EMHI joined 1 Jan 2007– Latvian, Lithuanian met service to become acceding members

soon• Management Group: Programme manager, 5 PL’s for System and

Applications (Yang), DA/UO (Gustafsson), Ph (Tijm), Dyn (Hortal), Prob Forecasting (Iversen)

• Staff: ~80 researchers, ~25 fte, 6fte core group• Budget: ~550 kEuro• Reference System: basis for developments • Full code cooperation with ALADIN/AROME:

– Planning jointly with ALADIN/AROME; – common ASM/workshop; – “mirrored” organizational structure

Page 3: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

A-H organizational relations

HIRLAM Council ALADIN Assembly

Management Group Updated CSSI: 2 RC LACE 2 Météo-France 2 ALADIN-n-n

1-2 joint sessions/year => scientific plan for

common actions

All staff meeting ALADIN Workshop

Common maintenance

(following ECMWF-MF agreement)

Work plans

HAC (1 M-F, 1 ALADIN-n)

‘Consistency check’

HIRLAM-PL/ALADIN2-C

ALADIN PAC (1 HIRLAM)

LACE-SC (1 M-F, 1 ALADIN-n-n, 1 HIRLAM)

LACE Council

Page 4: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Overview model suites

hor res. Vert.levs nr.points versionDk: 0.15 40 610x568 7.1

0.05 40 550x378 6.3+Est: 0.10 40 114x100 6.1+Fi: 0.15 60 582x448 7.1 0.08 40 582x448 6.2.1Ir: 0.15 60 438x284 7.0

0.07 60 438x395 7.0Nl: 0.10 60 816x650 7.0No: 0.20 40 468x378 6.4.2

0.036 60 300x500 6.4.2Sp: 0.16 40 582x424 7.1

0.05 40 606x430 6.1.2Sw: 0.20 40 306x306 6.3.5+

0.05 60 294x441 6.3.5+Lith: 0.10 40 7.1

Page 5: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

NH mesoscale suites

• HARMONIE cy31, 32 at 2.5km hor. resolution in DMI, FMI, SMHI, KNMI.

• Implementation at INM, Met.no, MetEireann ongoing.• Several types of mesoscale models available at met.no

down to 1km• 3km NH HIRLAM mesoscale model at EMHI• Monitoring of NRT suites on hirlam.org

Page 6: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Mesoscale modelling• System aspects:

– HARMONIE reference repository created (presently Cy32t2; code,scripts,namelist setup, monitoring & evaluation tools).

– Aims: full cycling system, build/job submission tools with HIRLAM “look and feel”.

• Physics:– Combined TKE/convection scheme EDMF integrated, implemented in

ECMWF/AROME SCUM for extensive validation (Cabauw)– Training week for all HIRLAM physics staff on HARMONIE, kickoff for

experimentation and optimization – Suitable physics required for mesoscale (AROME) but also “grey zone”

(ALARO-1, HIRALD)

• Dynamics/Nesting/LBC: – Direct nesting in HIRLAM/ECMWF made possible.– VFE discretization– Possibility for transparent LBC in spectra model (Termonia) under discussion;

alternative (more frequent LBC coupling) under study.

Page 7: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Mesoscale modelling

Page 8: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Mesoscale modelling

Data assimilation:• Starting from ALADIN 3D-VAR, 4D-VAR in a nutshell.

Port experiences/methods for HIRLAM 4D-VAR to this.• Assimilation of hi-res obs: radar reflectivities/winds; GPS

slant delays; SEVIRI clear/cloudy radiances; IASI; binary cloud; hi-res AMDAR, RS. Common obs operators defined for most of these.

Surface:• Port snow/forest/sea/snow on ice/lake models to

SURFEX• Interface SURFEX to HIRALD• Work on mesoscale surface DA starting this fall.

Page 9: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Synoptic model

Assimilation and use of observations:• 4D-VAR preparation for implementation as default scheme

– Tuning of background error statistics– Experimentation with large scale and lateral boundary constraints,

new moisture variable, … – OpenMP parallellization efficiency improvements– Future: hybrid ensemble assimilation techniques

• Use of observations:– Coherent impact studies: for N Atl, Arctic, convective parameters;

3+4DV, syn+meso– Upgrade in RTTOV and AMSU treatment package– New types of obs included: AMSU-B, OSI-SAF SST/sea ice,

scatterometer, MODIS winds, AMSU-A over land and sea ice.

Page 10: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Synoptic model

Physics:• Surface scheme and orographically related

parametrizations: snow and forest, MSO/SSO, sloping surface radiation.

• Optimization/tuning to improve description of stable boundary layer (fog over sea, GABLS)

• Intercomparison STRACO - KF/RK convection schemes

Surface:• Snow and forest scheme additions: readied for RefSyst.• Sea ice, SST assimilation• Lake model; snow on ice parametrization

Page 11: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Coupling with chemistry

• Before 2007: activities in coupling HIRLAM one-way or two-way to atm. chemical transport (ACT) models started in several HIRLAM countries

• May 2007: HIRLAM side meeting at COST-725 workshop first attempt to create integrated plan for common activities

• Short-term: one-way coupling: improve usefulness of HIRLAM as input for ACT models– Provision of relevant input variables– Mass-conservation => more accurate advection scheme

• Longer term: two way coupling– HIRLAM-CHEM branch

Page 12: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

GLAMEPS:Joint multi-model EPS system for HIRLAM & ALADIN. Present status:• GLAMEPS initial laboratory setup (version 0) implemented at

ECMWF. Meteorological testing ongoing.• HIRLAM components of met.no, INM, KNMI:

ECMWF EPS/TEPS, physics perturbations, HIRLAM SVs as baseline for HIRLAM EPS• ALADIN contributions from ZAMG (LAEF),

met.hu (ALADIN SV)• Development of new ensemble generation

and postprocessing techniques on track• End 2007/begin 2008: determine configura-

tion for prototype distributed GLAMEPSsystem (v1). Continue parallel experimenta-

tion in laboratory• Continue pursuit of Eur. LAMEPS coopera- tion in TIGGE-LAM

Page 13: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

GLAMEPS

Model domain (for

HIRLAM components)

and ECMWF/TEPS

targeting areas

for Northern,

Middle and Southern

Europe

Page 14: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

HIRLAM Reference system

- Reference System repository is basis for HIRLAM developments- Two reference platforms: FMI RCR, ECMWF.- Routine monitoring of RS on Hexnet, together with national versions

- 2007: RS extended to include HARMONIE and EPS components- Aim: Integration of syn/meso/GLAMEPS system environment (build,

scheduling, monitoring and verification tools)

- Present versions: HIRLAM 7.1, HARMONIE Cy32. - HARMONIE code maintenance and updating together with AAA partners- Common pool of computer resources at ECMWF for testing Reference

System, GLAMEPS

Page 15: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Reference system

Release of HIRLAM 7.2 planned end 2007. New features:

• 4D-VAR (as default)• RTTOV-8/ATOVS upgrade• New snow and surface scheme• Improved openMP parallellization• Assimilation packages for AMV/MODIS, scatterometer,

OSI SAF sea ice, SST• Extended postprocessing package, incl “chemistry-

relevant” parameters

Page 16: HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik, 20071008

Mesoscale modelling