historical perspective of faa-sponsored conflict resolution research © 1999 the mitre corporation....

14
Historical Perspective of FAA- Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The MITRE Corporation and was produced for the U.S. Government under Contract Number DTFA01-93-C-00001 and is subject to Federal Acquisition Regulation Clause 52.227-14, Rights in Data-General, Alt. III (JUN 1987) and Alt. IV (JUN 1987). No other use other than that granted to the U.S. Government, or to those acting on behalf of the U.S. Government, under that Clause is authorized without the express written permission of The MITRE Corporation. For further information, please contact The MITRE Corporation, Contracts Office, 1820 Dolley Madison Blvd., McLean, VA 22102, (703) 883-6000. Dan Kirk October 21, 1999

Upload: makayla-owens

Post on 27-Mar-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

Historical Perspective of FAA-Sponsored Conflict Resolution Research

© 1999 The MITRE Corporation. All rights reserved.

This is the copyright work of The MITRE Corporation and was produced for the U.S. Government under Contract Number DTFA01-93-C-00001 and is subject to Federal Acquisition Regulation Clause 52.227-14, Rights in Data-General, Alt. III (JUN 1987) and Alt. IV (JUN 1987). No other use other than that granted to the U.S. Government, or to those acting on behalf of the U.S. Government, under that Clause is authorized without the express written permission of The MITRE Corporation. For further information, please contact The MITRE Corporation, Contracts Office, 1820 Dolley Madison Blvd., McLean, VA 22102, (703) 883-6000.

Dan Kirk

October 21, 1999

Page 2: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

2

Copyright 1999, The MITRE Corporation

Overview

• Overview of AERA 1, AERA 2, AERA 3 functions

• Major differences between AERA 2 and URET• AERA chronology• Future plans

Page 3: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

3

Copyright 1999, The MITRE Corporation

Functionalities of AERA: Automated En Route ATC (1 of 2)

• AERA 1:– Trajectory Modeling– Automated Problem Detection

• Aircraft-to-Aircraft, Aircraft-to-Airspace• Flow Instruction problems, including No Directs, Specified

Airways/Fix, Miles-in-Trail, Meter Fix Time, Altitude constraints

• Both radar and non-radar airspace

– Conformance Monitoring and Reconformance– Trial Planning– Quick Trial Planning– Interfacility Data Exchange– Integrated R/D positions and Datalink interface

Page 4: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

4

Copyright 1999, The MITRE Corporation

Functionalities of AERA: Automated En Route ATC (2 of 2)

• AERA 2:– Built on top of AERA 1– Automated Problem Resolution (APR): Resolution of

Aircraft-to-Aircraft, and Aircraft-to-Airspace, Flow Instruction problems

– Both radar and non-radar airspace

• AERA 3: – Controller role changed to Traffic Manager– Different conflict detection and resolution algorithms

from AERA 2

Page 5: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

5

Copyright 1999, The MITRE Corporation

Major Functional Differences Between AERA 2 and URET Daily Use (DU) System

• Additional AERA 2 capabilities:– Automated Problem Resolution (APR)

• Automatically generates a set of resolutions to each problem alert (before alert notification)

• Alert goes to the sector that controls the aircraft maneuvered in the highest-ranked resolution

• Alert and resolution are presented simultaneously• APR may also be initiated manually

– Flow instruction problem detection, resolution– Automatic acceptance of handoff– Quick Trial Planning (in URET, not used in DU)

• AERA 2 had no URET red/yellow alert distinction– Was present in AERA 1

Page 6: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

6

Copyright 1999, The MITRE Corporation

Major Display Differences Between AERA 2 and URET Daily Use (DU) System

• Additional AERA 2 displays:– Controller reminders

• E.g., Transfer of Communication, Start Maneuver, Top of Descent, Planned Change to VFR

– Aircraft Conformance List• E.g., Missed Planned Maneuver, Early Maneuver

– Traffic Management Advisory List– Sector Activity Display

• No Aircraft List in AERA 2– Flight Data Entries displayed only on request or in

unusual situations

Page 7: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

7

Copyright 1999, The MITRE Corporation

Early AERA Chronology (1 of 2)

• Flight-plan based conflict detection work started in late 50’s– FAA/MITRE follow-on to Air Force/MITRE air defense

work

• 1974 - 1976 Automated IFR Traffic Control project– Trajectory Modeling, Problem Detection and

Resolution; Preliminary prototyping of algorithms

• 1977: Automated En Route ATC (AERA) start

Page 8: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

8

Copyright 1999, The MITRE Corporation

Early AERA Chronology (2 of 2)

• 1978: FAA/MITRE AERA Prototype started– AERA testbed prototyping spanned 1978 - 1992 to

support controller team evaluations– Legacy algorithms and SW baseline used in URET

(both conflict detection and resolution)

• Work in knowledge-based (expert systems) for conflict resolution, e.g., MITRE-funded AIRPAC– Advisor for the Intelligent Resolution of Predicted

Aircraft Conflicts

• 1985: AERA work closed at the end of FY85• 1986: AERA 2 Program Plan re-baselined

Page 9: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

9

Copyright 1999, The MITRE Corporation

AERA 1987 - 1992: Major events (1 of 4)

• AERA ATACT reassembled for AERA 2 operational evaluations

• AAS acquisition• AERA 2 System

Level Specs• AERA 2 CHI Specs

Page 10: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

10

Copyright 1999, The MITRE Corporation

AERA 1987 - 1992: Major events (2 of 4)

Conflict Resolution Prototyping (Symbolics Lisp Machine) to support ATACT Evaluations– 3 - 4 times a

year

Page 11: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

11

Copyright 1999, The MITRE Corporation

AERA 1987 - 1992: Major events (3 of 4)

• CHI Prototyping (VAX)

Page 12: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

12

Copyright 1999, The MITRE Corporation

AERA 1987 - 1992: Major events (4 of 4)

• APR concept, functional description and algorithmic requirements developed

• AERA restructure: Initial AERA services (IAS) and Full AERA services (FAS)

• 1992: – FAA/MITRE AERA facility closed, ATACT disbanded– AERA material archived and delivered to FAA

Page 13: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

13

Copyright 1999, The MITRE Corporation

Development and Deployment: 1992 -Present

• 1994: Initial AERA Field Evaluation System (IAFES; similar to URET; cancelled in 1 year)

• 1995: URET– Evaluations at ZID since February 1996, and ZME since

June 1997

• 1998: Problem Analysis, Resolution and Ranking (PARR) – AERA 2 legacy APR requirements and algorithms– Controller-initiated– Addresses aircraft-to-aircraft, aircraft-to-airspace, and

meter fix time problems– Integrated into a laboratory version of URET

Page 14: Historical Perspective of FAA-Sponsored Conflict Resolution Research © 1999 The MITRE Corporation. All rights reserved. This is the copyright work of The

14

Copyright 1999, The MITRE Corporation

Future Plans

• Continue current research areas and proceed with field trials for operational validation– Start the next spiral of the evolutionary development cycle

for FFP1+

• Investigate issues that surfaced within FFP1 URET program but beyond CCLD baseline

• Migration of Conflict Probe from D- to R-side• Investigate integration with other automation:

Datalink, Traffic Management Unit, and multi-sector planning position

• Additional details in “U.S. Future Perspectives” briefing