Page 1: Hoar Construction's 2014 Year In Review

2014 YEAR IN REVIEW

Page 2: Hoar Construction's 2014 Year In Review

LET’S BUILD SOMETHING BETTER.

MOMENTUM As we close out 2014, we’re fortunate to celebrate many blessings. We go into our 75th year stronger than ever, optimistic about our company and our future, grateful for our relationships with clients and partners, and ready to build better.

197 FULL TIME

EMPLOYEES

224TOTAL NEWASSOCIATES

HIRED IN 2014

28%INCREASE IN

YEAR OVER YEAR VOLUME

2013

2014

27INTERNS/CO-OPS

Page 3: Hoar Construction's 2014 Year In Review

HOAR CONSTRUCTION JOBS IN 2014

10.7 MILLION SF

LET’S BUILD SOMETHING BETTER.

VATICAN CITY

5.6 MILLION SF

100 FOOTBALL FIELDS

800,000 SF

* ESTIMATED COMBINED HEIGHT OF ALL BUILDINGS HOAR CONSTRUCTION PERFORMED WORK ON IN 2014

TOTAL HEIGHTOF HOAR

CONSTRUCTIONJOBS IN 2014*

4,015FEET

MOUNT EVEREST

29,029FEET

BURJKHALIFA

(WORLD’STALLEST

BUILDING)

2,717FEET

EIFFELTOWER

986FEETGREAT

PYRAMID

455FEET

ROBBURTON

6.1FEET

WHAT CAN YOU BUY WITH 1.5 BILLION DOLLARS?

ONE 20 OUNCE SODAEVERY DAY FOR

4,106,864 YEARS

75%OF A B2

STEALTH BOMBER

ALLOF THE PROJECTS

HOAR CONSTRUCTION WORKED ON IN 2014

Page 4: Hoar Construction's 2014 Year In Review

LET’S BUILD SOMETHING IMPACTFUL.

AUSTIN OFFICEOur core values teach us to leave each community we serve better off, with what we build and through what we contribute along the way. In 2014 the Austin office raised over $12,000 for Ronald McDonald House Charities and donated time to serving lunch at the House one Friday a month. We are Changing Communities.

AUSTIN

PROJECT DETAILS:

• 270,000 SF• New construction• 189 units in 15

apartment buildings • Pool and gazebo• Wood frame

construction with siding and stone veneer

OWNER:

Stoneleigh Companies, LLC

WATERFORD GLENKELLER, TEXAS

PROJECT DETAILS:

• New 75,000 SF critical access hospital

• 3,500 SF EMS facility• 8,000 SF wellness

center

OWNER:

Faith Community Hospital

FAITH COMMUNITY HOSPITALJACKSBORO, TEXAS

PROJECT DETAILS:

• A series of new construction projects and demolition work

• New football stadium• Onstead Center for

Science and Humanities• Halbert-Walling

Research Center

OWNER:

Abilene Christian University

VISION IN ACTIONPROJECTSABILENE, TEXAS

“Working with organizations like Hoar Construction who want to go beyond check writing, always has a significant impact on Ronald McDonald House Charities of Central Texas and the families we serve. We are thrilled to have Hoar Construction join our cause.”

Missy Strittmatter, Director of DevelopmentRonald McDonald House Charities of Central Texas

NOTABLE PROJECTS

HOURSVOLUNTEERED

BY THE AUSTIN OFFICE(OCTOBER 1, 2013 –

SEPTEMBER 30, 2014)

643.5TOTAL HOURS

RONALD MCDONALD HOUSE: 64

CHR

ISTM

AS IN

OCT

. SU

NSH

INE

CAM

P: 5

6

BIG

BRO

BIG

SIS:

22

DAV

IS E

LEM

ENTA

RY

SCH

OO

L: 1

50

AND

ERSO

N H

IGH

SCH

OOL:

50

CHUR

CH G

ROUP

S: 16

WES

TLAK

E H

IGH

SCH

OO

L: 1

0

CAN

STR

UCT

ION

: 10

IT’S

MY

PARK

DAY

: 8

OTHER: 257.5

Page 5: Hoar Construction's 2014 Year In Review

LET’S BUILD SOMETHING ESSENTIAL.

BIRMINGHAM OFFICEWe hold ourselves and our teams accountable – for being reliable, for keeping our promises, for planning and executing well. In 2014 the Birmingham office met the needs of 29 clients and handled over 44 jobs in progress. We are Principled Experts.

BIR

MIN

GHAM

PROJECT DETAILS:

• 250,000 SF of retail• 60,000 SF of office

space• 3 parking decks with a

total of 2,600 spaces• Coordinated with 60+

tenants

OWNER:

North American Properties

AVALON ALPHARETTA, GEORGIA

PROJECT DETAILS:

• 77,000 SF• 4-stories• Brick and limestone

structure• Self-performed

concrete work

OWNER:

Samford University

BROCK SCHOOL OF BUSINESS BIRMINGHAM, ALABAMA

PROJECT DETAILS:

• 1,234,000 SF mixed-use development

• 800,000 SF of retail space

• 3 parking decks• Interconnected

hardscapes• Green roof space

OWNER:

Steiner + Associates & Bucksbaum Retail Properties

LIBERTY TOWN CENTRECINCINNATI, OHIO

“Each person that Hoar introduced to our project was respectful and helpful. As an architect, I was very pleased to find that Hoar Construction’s approach to our project was not simply about building the least expensive building; it was about solving project needs in a manner acceptable to all involved.”

Jonathan D. Carn, AIA, LEED GA, PartnerBradley, Schmidt & Carn Architecture, PLLC

AvalonNorth American Properties tapped Hoar to build their 86-acre Avalon mixed-use development because we are experts in complex, multi-tenant coordination. Multiple tenants moving in before construction completes challenges any contractor to stay on schedule, while delivering a quality product. At Avalon, Hoar worked with over 60 tenants to provide their core and shell, and completed the project ahead of Avalon Go, the big Grand Opening celebration.

NOTABLE PROJECTS

APPLIED GRAVITY

ADVANCEDLEGOS

EVERYTHING YOU EVER WANTED TO KNOW ABOUT BUILDING LARGE

BUILDINGS BUT WERE AFRAID TO ASKTHE POINTY END OF THE DRILL

FOR SCHEDULING

VDC, BIM, & OTHER STRANGE LETTER COMBINATIONS

REAL WORK IN A VIRTUAL REALITY

101 USES FOR MIXED USE

bilt rill gud

BUILDING IT FORWARD

LEGOS FOR BIG BOYS

ARITHMETIC & ARTHRITIS

RAISING THE ROOF...WITH A CRANE!

BUILDIN’ ‘N’ FISHIN’

APPLIED CONSTRUCTIONERY

BUILDERATION 101not hammering your thumb &

other advanced safety tactics

IPAD FOR NON-DUMMIES

HOW TO WORK MIRACLESIN TIGHT SPACES

HOW TO TRAIN YOUR DRONE

USING WORMHOLESFOR SCHEDULING

S.S. PRINCIPLED EXPERT

FISHIN

’ & BU

ILDIN

’IN

ALA

BAM

MER

THEBIRMINGHAM

OFFICE HOSTEDOVER

4000HOURS OFTRAINING

IN 2014

Page 6: Hoar Construction's 2014 Year In Review

HO

USTO

NPROJECT DETAILS:

• 250,000 SF• 5-story office building• Tilt-wall construction• 64 panels• 4-story 800-car precast

parking garage

OWNER:Stream Realty

GREENHOUSE OFFICE PARKKATY, TEXAS

PROJECT DETAILS:

• 391-unit apartment community

• 703-space garage• 8 stories• Seeking LEED Silver

certification

OWNER:

The Woodlands Development Company

ONE LAKE’S EDGETHE WOODLANDS, TEXAS

PROJECT DETAILS:

• 10-building retail site• 280,000 SF lifestyle

center• 4-building 202,000 SF

power center• Renovation and

expansion

OWNER:

General Growth Propeties

BAYBROOK MALL EXPANSION FRIENDSWOOD, TEXAS

LET’S BUILD SOMETHING SIGNIFICANT.

HOUSTON OFFICEWe know when a teammate does well, we all do well. And we’re committed to our partners’ success as much as our own. Because of our Partnering Spirit and wonderful clients, we were able to grow our Houston team by 43% in 2014.

WHO IS THE

REAL JUSTIN BRODNAX?

There are 499,607 people with the first name Justinand 5,130 people with the last name Brodnax in the U.S.

But there are only 8 people named Justin Brodnax, and Hoar Construction happily employs 25% of them!

Greenhouse Office ParkAs with any project, a turning point came in the design process that challenged the aesthetic ambitions and budget realities of the team. The original design of the garage canopy exceeded the budget by $150,000, but the Hoar team partnered with the designers, and through value engineering and strategic problem solving, we were able to deliver a canopy that not only came in within budget, but was architecturally distinctive.

“The Hoar Construction team at One Lake’s Edge has been able to push the envelope and find innovative technologies to enhance the project, but still meet the budget and the critical timelines we have, and that’s the partner that we want. We are very happy with how Hoar has approached this project.”

Jim Carman, Director of Building DevelopmentThe Woodlands Development Company

NOTABLE PROJECTS

Page 7: Hoar Construction's 2014 Year In Review

LET’S BUILD SOMETHING DYNAMIC.

NASHVILLE OFFICEWe live for challenges, we are Progressive Thinkers. We love breaking boundaries, using new tools and technologies to create real value. We use technology to improve the process and the quality; for us, it’s no gimmick. Providing better tools and information to the field creates a safer, cleaner, better project. We like that.

NASH

VILLEPROJECT DETAILS:

• Senior assisted living facility

• 47,000 SF• 66 rooms• Prefabricated walls and

trusses• Complex coordination

OWNER:

Brookdale Senior Living

BROOKDALE PLACE AT UNIVERSITY PARKBIRMINGHAM, ALABAMA

PROJECT DETAILS:

• 200,000 SF• Live roof terrace• Anechoic chamber• Built to meet Tennessee

Sustainable Guidelines

OWNER:

Tennessee Board of Regents, University of Memphis

LOWENBERG SCHOOL OF NURSING MEMPHIS, TENNESSEE

PROJECT DETAILS

• 110,000 SF• Arts & humanities

building• Science technology

engineering mathematics building

• Student services building

OWNER

Tennessee Board of Regents, Columbia State Community College

COLUMBIA STATE CAMPUS RELOCATIONFRANKLIN, TENNESSEE

“Hoar is one of the few contractors we have seen fully embrace technology and the benefits have been huge. By utilizing our model, updating it with real-time construction detail, and sharing with their subcontractors, most potential conflicts are detected and resolved before they’re installed. This saves everyone time and money and makes for a very collaborative team approach and a project we can all be proud of.” Rebecca Conrad, AIA LEEP AP, PartnerANF Architects

Brookdale PlacePrefabricated roof trusses created significant spatial challenges for the overhead MEP systems. By using BIM, we were able to more effectively coordinate the attic space and install all the overhead systems more quickly while increasing quality and safety. The coordination efforts from BIM allowed tradesman in the field to clearly understand how the systems fit together, ensuring the first installation was the correct installation.

NOTABLE PROJECTS

USING PLANGRID(A MOBILE DOCUMENTMANAGEMENT APP),

THE NASHVILLE OFFICESAVED THE EQUIVALENT OF

2,600,000SHEETS OF PAPER.

Page 8: Hoar Construction's 2014 Year In Review

LET’S BUILD SOMETHING ICONIC.

ORLANDO OFFICEBetter relationships, better teams, better projects – that’s what our commitment to Changing the Industry is all about. In 2014 the Orlando office partnered with high profile clients to evaluate their projects, identify development options and create project plans that worked within budget and schedule parameters.

OR

LAND

OPROJECT DETAILS:

• 28,000 SF theater• Themed area

development• 3D BIM process• Managed design

and construction simultaneously for 15 months

OWNER:

Walt Disney Imagineering

THE HARAMBE THEATER BAY LAKE, FLORIDA

PROJECT DETAILS:

• 6,657 SF• Interior renovation• Completed within 14

weeks• Unique lighting

elements and finishes• High-end materials• Tight site requirements

OWNER:

Apple, Inc.

APPLE STOREATLANTA, GEORGIA

PROJECT DETAILS:

• 99,000 SF• 3-story core and shell

office building• Complex curtain wall• Space for future build-

out• 315 parking spaces

OWNER:

Lake Nona Property Holdings

GUIDEWELL INNOVATION CENTERORLANDO, FLORIDA

“We have had the fortunate opportunity to work with Hoar Construction on several projects. They have consistently demonstrated their sincere commitment to a team approach, ensuring a positive experience for all stakeholders. Hoar has cultivated a reputation of fairness, honesty and professional conduct. We are grateful for our relationship with this organization.”

Scott Maddox, PresidentErmco Electric

Harambe TheaterExpansion plans at Disney’s Animal Kingdom meant relocation of the existing “Festival of the Lion King” performance theater. The original plan was to carefully dismantle the theatre and move it to a new location near the Tusker House restaurant. At our suggestion, and working closely with WDI, Hoar provided an option to replace the structure while salvaging and reusing other critical portions of the facility. This fresh approach ultimately saved the project cost and schedule. It also allowed the existing show to remain in operation six months longer which helped our operations partners with guest capacity and ultimately guest satisfaction.

NOTABLE PROJECTS

10,000PEOPLE WERE IN ATTENDANCE FOR DISNEY

WORLD’S SOFT OPENING ON OCTOBER 1, 1971

9,000,000 PEOPLE WILL WALK THROUGH THE HARAMBE

THEATER DEVELOPMENT IN 2015

QUITE A “FEET”

Page 9: Hoar Construction's 2014 Year In Review

LET’S BUILD SOMETHINGMONUMENTAL.

WASHINGTON, D.C. OFFICETrue Attention to Detail means digging deeper than the drawings, and looking to see what’s not there. In 2014 the Washington, D.C. office worked on tight urban sites to precisely plan and monitor staging, deliveries, heavy equipment, and pedestrians and worker safety.

WASH

INGTO

N,

D.C.

PROJECT DETAILS:

• 394,000 SF of residential

• 17,000 SF of retail• 414 units• 500+ car parking garage• Seeking LEED Silver

certification

OWNER:

Lennar Multifamily Communities

TYSON’S CENTRALTYSON’S CORNER, VIRGINIA

PROJECT DETAILS:

• 66,500 SF• 12,500 SF of retail• 56 units• Seeking LEED Silver

certification

OWNER:

Madison Investments

ELYSIUM FOURTEEN WASHINGTON, D.C.

PROJECT DETAILS:

• 342,500 SF• 319 units• High-end finishes• First of seven phases• Seeking LEED Silver

certification

OWNER:

LCOR

THE COMMONSMCLEAN, VIRGINIA

“We are very excited to get this project underway.Elysium Fourteen will bring the newest in luxury design features to this neighborhood, and we are confident in Hoar’s ability to bring the absolute best in design and construction to this project.”

Sia Madani, President Madison Investments

NOTABLE PROJECTS

273 YEARS

TOTAL CONSTRUCTION

EXPERIENCE 238 YEARS

EXPERIENCE IN

D.C. MARKET

DEEP D.C. ROOTS

THE D.C.TEAMHAS:

Elysium FourteenThe adaptive reuse at the heart of Elysium Fourteen presents several unique challenges, including a tiny 10,000 SF project site. Two adjacent buildings, both approximately 100 years old, will be restored and adjoined to a newly-constructed LEED certified apartment building. To best preserve the historic structures the Hoar team had to underpin the adjacent property to the north and both existing buildings on the site to ensure structural stability. Soil issues forced the use of a mat slab, and several other challenges were presented by this historic urban infill project. We met all these issues head on and Hoar’s newest project in the District is off and running.

Page 10: Hoar Construction's 2014 Year In Review

75TH ANNIVERSARY

LET’S BUILD SOMETHING STRONGER.

YEAR IN REVIEW AND BEYOND75th Anniversary75 years: It’s a big milestone. We’re grateful to look forward to 2015 with fresh energy from our new associates, even as we continue to rely on and appreciate the dedication and wisdom of our veteran team members. We blend the best of hard-won lessons learned with cutting-edge tools and technologies that add value. We stay focused – on making it work, on getting the job done, on solving each problem and meeting each challenge. We stick to our core values, and we care about each other and our clients and partners. We cherish our relationships, both inside and outside the company. We know we’re nothing without the trust of our associates, partners and clients. We strive to earn that trust every day as we work to become the most respected and admired company in our industry and communities.

“We love our industry, and we love building. I’m proud to lead a company and teamtruly focused on improving our industry, improving the way we build, and changing theway we think about how we build. We know it’s not just about us. It’s not just about Hoarbeing bigger, but about Hoar being so good that we can literally change the industry. We’regoing to continue in the next 75 years to make sure our company is focused on being better.That’s what we’re all about. We want to be the best builders becausewe love the industry, and because that’s the kind of challenge thatmakes us tick.”

-Rob Burton, President, Hoar Construction

Austin (P) 512.490.6540(F) 512.490.65998000 Centre Park DriveSuite 340Austin, Texas 78754

Birmingham(P) 205.803.2121(F) 205.423.2323Two Metroplex DriveSuite 400Birmingham, Alabama 35209

Houston (P) 713.244.2200(F) 713.244.22443700 West Sam Houston Parkway SouthSuite 220Houston, Texas 77042

Nashville(P) 615.376.0749(F) 615.376.0789215 Centerview DriveSuite 300Brentwood, Tennessee 37027

Orlando(P) 407.650.8100 (F) 407.650.8150111 North Orange AvenueSuite 1150Orlando, Florida 32801

Washington D.C.(P) 703.225.7500(F) 703.225.75018614 Westwood Center DriveSuite 300Vienna, Virginia 22182

hoar.com

IN THE PAST FIVE YEARS WE’VE WORKED HARD

TO ADD

360MORE PRINCIPLED

EXPERTS TO OUR TEAM

Page 11: Hoar Construction's 2014 Year In Review