home technical articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. ·...

232
Home Technical Articles Read and Learn Electrical Engineering! 1. Technical Articles - EE Blog 2. Article categories (36) 3. Subscribe to technical articles 4. Become Contributor (write for EEP) Energy & Power 5. Energy and Power 6. T&D 7. Power Transformers 8. Power Substations HV/MV/LV 9. High Voltage 10. Medium Voltage 11. Low Voltage 12. Testing & Commission. Industry 13. Motor Applications 14. Variable Speed Drives 15. Automation in Industry 16. Energy Efficency

Upload: others

Post on 23-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Home

Technical Articles

Read and Learn Electrical Engineering!

1. Technical Articles - EE Blog

2. Article categories (36)

3. Subscribe to technical articles

4. Become Contributor (write for EEP)

Energy & Power

5. Energy and Power

6. T&D

7. Power Transformers

8. Power Substations

HV/MV/LV

9. High Voltage

10. Medium Voltage

11. Low Voltage

12. Testing & Commission.

Industry

13. Motor Applications

14. Variable Speed Drives

15. Automation in Industry

16. Energy Efficency

Page 2: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Power Grid

17. SCADA Systems

18. Smart Grid

19. Metering

20. Wind Power

Electrical Software & Guides

Excel Spreadsheets & Electrical Tools

1. MS Excel Calculation Spreadsheets

2. Electrical Software

3. HVAC Spreadsheets

4. Online Electrical Calculators

EE Books and Guides

5. Electrical Engineering in general (HV/MV/LV)

6. Power Substations

7. Relaying - Control and protection

8. Industry Automation (PLC, SCADA, VSD etc.)

Manufacturers

9. Schneider Electric CTs

10. ABB Drives Guides

11. Siemens basics of EE

12. Danfoss Heating Book

Other...

13. Alternative Energy

Page 3: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

14. HVAC Guides

15. Design Documentation (SLD, drawings etc.)

EE Lectures

Network Theorems and Laws

1. Ohm’s Laws

2. Kirchhoff’s Laws

3. Thévenin’s Theorem

4. Other theorems (Norton’s Theorems, etc.)

Electrical Courses / Video Lectures

5. Electrical Engineering in General

6. PLC Programming VIDEO Courses

7. Testing and Commissioning

Reasearch Papers

8. Researches and Projects (RaP)

Connect

Get in touch!

1. Contact Editorial Team

Advertisement

2. Advertisement

General

3. Sitemap

4. RSS Feed

5. Login

Page 4: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Social networks

6. Google+ Page

7. LinkedIn Page

8. Twitter

9. Facebook page

Home Technical Articles Article Categories Contact us Subscribe to articles Subscribe to downloads El. Enginering Guides

EE General guides

Power Substations

Schneider Electric CTs

Siemens Basics of EE

ABB Drives Guides

Industry Automation

Relay control/protection

Alternative Energy

Electrical Software MS Excel Spreadsheets Electrical Design Docs Engineering Resources

Video Lectures – Electrical Engineering

PLC Programming Training

Electric Testing and Maintenance (VIDEO)

Page 5: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Network Theorems and Laws

-

Home / Technical Articles / Quick estimation of the short-circuit current at the end of a feeder

Quick estimation of the short-circuit current at the end of a feederPosted Nov 21 2014 by Edvard in Energy and Power with 5 Comments

Quick estimation of the short-circuit current at the end of a feeder (photo credit: SIEMENS)

Rule of thumb for quick estimation

If we consider a branch circuit going away from the point of supply and follow it radially along all the connections and branches, we shall find that further away we are from the transformer, lower is the value of the maximum possible short-circuit current.

Page 6: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Each length of conductor or each device in the circuit provides an impedance which helps to reduce the short-circuit current.

Example of Isc at the end of feeder

A prospective short-circuit current of 50 kA at the secondary terminals of a transformer at 400 V,will be limited to about 10 kA at the end of a connecting lead with a length of 10 m and cross-section of 10 mm2. If the same feeder has a cross-section of 25 mm2, the length of the wire is to be 25 m for reducing the current down to 10 kA.

Figure 1 – Rule of thumb for a quick estimation of the short-circuit current at the end of a feeder

Specimen example //

Page 7: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Figure 2 – Arrangement of a section of an installation

The expected short-circuit current at the end of the feeder is expressed by the relation :

Where:

IK” - Short-circuit current [kA]

UNTrafo - Rated voltage of the supply transformer on the low-tension side [V]

ZTrafo - Impedance of the transformer

Page 8: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

ZConducting – Impedance of the conducting lead

However, short-circuit at the point 5 is according to the above mentioned formula:

The value calculated above is rather conservative and includes a factor of safety as other sources of current reduction like the arc voltage, the contact resistance and the internal resistances of the different devices in the path of the short-circuit were not considered.

Reference: Basics of circuit breakers – Rockwell

Recommended EE articles

Cooling is essential for long transformer lifeJanuary 9, 2015

8 NEC Basic Feeder Circuit Sizing RequirementsDecember 17, 2014

Page 9: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Transformer Routine Test – Partial Discharge MeasurementDecember 15, 2014

Electrical life (durability) of LV circuit breakers due to the switching operationsDecember 1, 2014

Article Tags //

arc voltage, cross-section, feeder, rated voltage, short-circuit, transformer, transformer impedance,

Filed Under Category //

Energy and Power

About Author //

Edvard Csanyi

Page 10: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Edvard - Electrical engineer, programmer and founder of EEP. Highly specialized for design of LV high power busbar trunking (<6300A) in power substations, buildings and industry fascilities. Designing of LV/MV switchgears. Professional in AutoCAD programming and web-design. Present on Google+

RSS Feed for Comments

5 Comments

1.Mustafa

Nov 26, 2014

Good Example but I dont understand some values. How are they calculated Uk , all R/mohm , X/mohm and all cable length and cross section best regards.

could you help me pls

best regards

(reply)

2.T.N.Ramesh

Nov 25, 2014

Yes I’m an Electrical Engineer

Page 11: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

(reply)

3.Girish

Nov 22, 2014

Nice article. The procedure is similar to IEC 60909 method, only the correction factor in case of the transformer and voltage is not considered. Nevertheless, it is a good way of estimating the short circuit current.

(reply)

4.Vicente Martinez

Nov 21, 2014

Those are very instructive articles, they help me a lot Thank you

(reply)

5.LALO EL HIPPIE

Nov 21, 2014

La simpleza hace hermoso los desarrollos matemáticos. Calculo con Melshort de Mitsubishi dio el mismo resultado

(reply)

RSS Feed for Comments

Leave a Comment

Tell us what you're thinking... we care about your opinion!and oh, not to forget - if you want a picture to show with your comment, go get a free Gravatar!

Page 12: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Name *

Email *

Website

We believe you're an engineer, but nevertheless ... *six + = 9

Sign me up for the newsletter

FOLLOW EEP!

Subscribe to Weekly Download Updates //(free electrical software, spreadsheets and EE guides)

Page 14: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Electrical EngineeringDaily Dose

Daily dose of knowledge and news fromElectrical Engineering World

Science at Glance

Our mission is to be the leading provider of scientific information in the field of power and engineering in general. We publish, we share and we spread the knowledge.

You're welcome to read, write and contribute to EEP in any way!

Energy Efficency

We see the results of power usage all around us. Every day, the generation and usage of energy produces more pollution than any other single industry.

It's our time to use energy on smart and more efficent way. EEP is on your side!

Electrical Software

Page 15: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Electrical design without appropriate software and tools is impossible to imagine. This section covers professional engineering software for design, MV and LV network and photometric calculations, voltage drop and short circuit calculations etc.

© 2014 EEP - Electrical Engineering Portal. All Rights Reserved | Privacy Policy | 30 queries in 0.223 seconds.Powered by CsanyiGroup

SHARE

TOPGetPDF

Page 16: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Power system design and simulation software (EDSA Paladin DesignBase)

EDSA Paladin® DesignBase™ is a collection of about 50 software modules which gives electrical engineering professionals the means to create a detailed design of their entire electrical distribution systems and then perform a set of simulations on the network.

EDSA

The integrated system EDSA Paladin® DesignBase™ represents a very powerful tool in power systems, from electrical system’s design to simulations and predictive maintenance solutions.

EnergoBit is the only distributor in Romania and Eastern Europe of EDSA Paladin® DesignBase™ software from EDSA Micro Corporation, one of leading innovator in electrical distribution design and simulation solutions.

Headquartered in San Diego, California, the Company’s worldwide operations include 30 sales, distribution, and support offices located throughout North America, South America, Europe, Asia, and Africa. EDSA is the only software firm whose products have been proven to meet the uncompromising quality standards from the International Standards Organization (ISO), the American National StandardsInstitute (ANSI), the Institute of Electrical and Electronics Engineers (IEEE) the Nuclear Regulatory Commission (NRC), the Nuclear Procurement Issues Committee (NUPIC), the Department of Defense (DoD), NATO, Det Norske Veritas (DNV), the National Fire Protection Association (NFPA), and others.

EDSA Micro Corporation’s products are proven in the most demanding industries and customer applications:

Energy transmission and distribution

Nuclear, thermo and hydro power facilities

Design and consultancy

Aerospace

Petrochemical industry (plants, refineries and deep sea oil platforms)

Military applications, submarines

Data centers, iron industry, paper industry

Healthcare and pharmaceutical, etc

Page 17: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Type of systems which can be designed

symmetrical and unbalanced three phase systems

three phase/single phase systems

single phase systems

AC/DC systems

DC systems

EDSA Paladin® DesignBase™ Highlights

Compliant to IEC and IEEE standards

Unlimited Bus Simulation (in the most powerful package)

Unlimited number of scenarios

No frequency limits, no impedance limits, no voltage limits,

100% AUTOCAD® compatible, 100% Microstation® compatible, 100% Microsoft Office compatible

ODBC Database Driven System

Over 45 000 symbols

There are thousands of well known manufacturer’s equipments in the database

Catalogs with user defined symbols can be created

Easy-to-use ACTRIX graphical interface

Import/export *.dwg, *.dxf, *.html, *.doc, *.xls etc.

Projects can be organized in multiple pages or drawings

Main applications of the results

To optimize the performance of the power system;

To found the optimal functionality of the electrical network;

To choose and design electrical equipments;

To design and coordinate the protective devices;

Page 18: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

To correct the power factor;

To reduce the power losses;

To reduce the harmonics from the network;

To analyze outages;

To reduce the maintenance costs of electrical equipments.

EDSA Paladin® DesignBase™ modules are:

Fault Analysis

AC Short Circuit – 3phase ANSI/IEEE&PDE and IEC909

AC Single Phase Short Circuit

AC&DC Arc Flash Evaluation - NFPA 70E-2004 & IEEE 1584

AC Short Circuit - IEC 363

DC Short Circuit Classical & IEC 61660

Fault Analysis Protection Coordination

AC & DC System Protective Device Coordination – 3phase

Distance Relays

Page 19: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Protection Coordination Power Flow Analysis

Advanced Power Flow

Advanced Single Phase Power Flow

Advanced Motor Starting

Power Flow Phase Dependent

AC Voltage Profile

Integrated AC/DC Load Flow

Object Oriented DC Load Flow

PSO – Power System Optimization

Voltage Stability & Contingency Analysis

Load Forecasting

Power Flow Analysis Power Quality Analysis and Mitigation

Harmonics Analysis with Automatic Filter Sizing

Distribution Worth Assessment Of Distribution System

Capacitor Sizing

Page 20: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Power Quality Analysis and Mitigation Dynamic Behavior Simulation

Advanced Transient St ability Analysis with model builder

Electromagnetic Transient Analysis – EMTAP

Dynamic Behavior Simulation Design Optimization

Electrical Schedules

Induction Motor Parameters

Computation of Impedance Parameters – Synchronous Motors

Advanced Substation Grounding Grid Design 3D Plotting

Cable Pulling

Cable Magnetic Field

Transmission Line Parameters

Shielding Effectiveness

Advanced Power Cable Ampacity

Page 21: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Design Optimization Sizing Optimization

Battery Sizing

NEC Wire Sizing

Generator Set Sizing

Bare Wire Sizing

Short Line Parameters

Transmission Line Sag and Tension

Sizing Optimization Additional (optional) modules Additional modules can be added to each EDSA Paladin® DesignBase™ package. Below are the most important modules which can be added to a package:

AC Short Circuit IEC 363

Power Flow Phase Dependent

AC & DC System Protective Device Coordination

Distance Relays

Advanced Transient Stability

Harmonics Analysis

Page 22: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

EMTAP (Electromagnetic Transient Analysis)

AC Voltage Profile

DC System (DC Short Circuit, DC Power Flow & Battery Sizing)

Reliability worth Assessment of Distribution Reliability

Advanced Power Cable Ampacity

Cable Pulling

Sag & Tension

Transmission Line Parameters

Advanced Ground Grid Design 3-D Plotting

Induction Motor Parameters

Capacitor Sizing

Load Forecasting

Voltage Stability

Bare Wire Sizing

Wire & Conduit Sizing

PSO (Power System Optimization)

Cable Magnetic Field

Pachete de soft - Tipuri de pachete Paladin® DesignBase

print favorites e-mail link reference contact

© 2007 EnergoBit Group. Legal.About us EnergoBit Group Products

CMD’s Message

About Us

Page 23: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Contact Us

~ TSSPDCL Employees' knowledge blog

Search:

Testing a Distribution/Power Transformer

25 Saturday Jan 2014

Posted by TSSPDCL in Operation & Maintenance

≈ 9 Comments

Tags

Continuity Test, Core Diameter, DC Resistance Test, DTR, PTR

I would like to share some of the tips which can help in ascertaining failure of a distribution/power transformer and also in repair of the same. SPM/TRE Engineers in particular must have these on finger tips.

All most all the three phase distribution/power transformers we have in the system are delta/star connected with capacity ranging from 16 KVA to 12500 KVA. We have to conduct many tests to establish failure of a transformer but we have to have alternate three phase/single phase supply which may not be available at the failure locations. At such instance a simple tong tester and insulation tester will be sufficient and serves the purpose in more than 90% of the cases

Page 24: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

1) Tests to be conducted:a) Continuity test:Tests the continuity of the winding (Healthy transformer must have continuity in all the phases but transformer with shorted windings can also have).

Testing terminals:HV LVRY r nYB y nBR b n

b) IR values:Tests insulation resistance between windings and winding to earth. A healthy transformer should have resistance >0 in Mega Ohms.

If HV—E=0 (HV winding is earthed)LV—E=0 (LV winding is earthed)HV—LV=0 (HV and LV winding are shorted)

Any of the HV three terminals and any of the LV four terminals can be used for conducting the tests (If continuity in winding is available).

We should never test charge a DTR/PTR if the IR values are 0 in any of the above three parameters.

c) DC resistance testA healthy transformer will have approximately same resistance in all the three phase in HV winding though its value changes with the capacity of the transformer. LV winding resistance cannot be measured with a tong tester since it has less number of turns and higher size conductor when compared to the HV winding. Continuity of the LV winding can only be established.

For example:a) If the resistance of coils in one phase is 30 Ohms then for a healthy transformer resistance between RY, YB & BR terminals will be equal and 20 Ohms.

i.e. 1/R=1/30+1/60=3/60=1/20

i.e. R=20 Ohms

Page 25: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

b) If winding is opened/cut in one phase.RY=60, YB=30, BR=30 (R winding is open)YB=60, BR=30, RY=30 (Y winding is open)BR=60, RY=30, YB=30 (B winding is open)

i.e. resistance measured is double across one winding in case the winding is open and other two winding are healthy.

c) In case two windings are open and one winding healthy.RY=30, YB=infinity, BR=infinity (Y&B windings open)YB=30, BR=infinity, RY=infinity (B&R windings open)BR=30, RY=infinity, YB=infinity (R&Y windings open)

From the above it is understood that:

When resistance values are equal in all the HV phases the PTR/DTR may be OK.

If resistance across one winding is double when compared to other individual winding it is clear that winding is open in one phase and PTR/DTR can be declared failed without going for other tests.

If one winding is showing resistance and others are showing open (infinity) it can be suspected that two phases are open and one phase is healthy.

Note: But it should be kept in mind that even opening of a jumper wire leading to HV bush rod may give similar value and can result in minor failure instead of two limb failure. So verification of jumper connection is to be done before declaration of a failure.

Page 26: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

The failure in windings causes erosion of winding material which results in collection of gas in bucholz relay and transformer tank.

If the DTR/PTR is still found healthy in above tests it can be subjected for further test like 1. ratio tests, 2. short circuit test, 3. magnetic balance test/arranging LT phase test supply to take final decision for declaration of failure/healthiness.

Design aspects in repairing of DTR/PTRLV & HV windings of a power transformer and LV winding of a failed distribution transformer will be generally reinsulated during repairs. Conductor to the extent of damaged portion will be replaced for PTRs and damaged HV winding coils will be replaced for distribution transformers.

For rewinding of coils after re-insulation the winder generally takes into consideration the dia-metre and height of the damaged coil. But the winder may endup with a coil with less/excessnumber of turns and slight variation in height and dia-metre. Hence the AE/Winder should havethe knowledge of minimum size of conductor, number of turns, number of conductors anycapacity distribution/power transformer should have to deliver the rated output.

a) Number of turns in LV winding:ET =K√QET =Voltage per turn that can be allowedQ=Rated KVAK=Constant (0.32 to 0.35 for aluminum transformer and 0.37 to 0.45 for copper transformer)

Example:For 100 KVA aluminum DTRET =0.32 √100=0.32 voltsLV turns =250V / 3.2V=78 turns (minimum)

Hence 100 KVA aluminum distribution transformer should have a minimum of 78 turns to have voltage/turn within limits.

Similarly,For 25 KVA aluminum DTRET =0.32 √25=1.6

Hence LV turns=250V/1.6V=156 turns

It means lesser capacity DTR/PTR will have more number of turns when compared to higher capacity transformer

Page 27: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Number of turns in HV winding can be easily arrived by formula.Number of turns in HV winding = voltage ratio X Number of turns in LV winding.= 11000/250V X LV turns= 44 X LV turns

b) Size of the conductor:The size of the conductor depends on the current density of the material used for winding. Current density that can be allowed is.

Aluminum = 1.5Amps/sqmmCopper = 3.0Amps/sqmm

Hence cross sections of LV conductor can be arrived at follows:

For 100 KVA Alu. DTR LV cross section = Rated phase current/current density= 133.3/1.5Amps=88.8 sqmmCross section for HV conductor = Rated phase current/current density= 3.03/1.5Amps=2.02 sqmm

The above values are minimum size of cross section the conductor that can be utilized for replacement of damaged conductor. However higher size can be utilized provided minimum clearances are maintained between windings and core.

c) Shape of conductor:If the dia-metre of the conductor comes more than 3.5mm dia, rectangular shaped strip to be usedsince strip has better surface length and more space factor than that of a round conductor.

Hence for distribution transformer round conductor is used for HV windings and rectangular strip is used for LV windings.

Example:For 100KVA HV winding wire, cross section of the conductor required is 2.02 sqmmi.e. ∏r2=2.02

r=√2.02/∏r=0.80diameter=1.6

The dia-metre of the HV conductor being used for a 100 KVA is 1.6mm i.e. 16 SWG.

Selection of size of rectangular strip of equal cross section is more importance since we can havemany sizes for the same cross section.

Page 28: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

In general for all practical purposes for easy handling.

Width of the strip is to be more than double the depth of the strip.

Minimum depth of the strip is to be 2.25mm

From the above it is evident that more number of conductor in parallel can be utilized instead of higher sized single connector. Utilization of multiple conductors results in more flexibility duringwinding and also decreases skin-effect since surface length of conductor is more with multiple conductors.

Example:For 100KVA aluminum transformer LV conductor of 88 sqmm cross section can be had by having two conductors of size 44 sqmm each in parallel. Depth of strip should be minimum a 2.25mm and width can be calculated to accommodate required number of the LV turns within theheight of LV coils in single layer or double layer.

d) Diameter of the core:Dia-metre of the core can be calculated by arriving at gross core area by using following formula:

Ag=Et/4.44 X f X Bm X 0.97 X 10-4

f=frequencyAg=gross core area in sqcmBm=maximum flex density in tesla = 1.6Et=phase voltage/turn0.97=stacking factor (assumed)Once Ag is calculated dia-metre of the core can be calculated by formulaAg=K1 X ∏d2 X ¼K1=0.92 for six step coreK1=0.925 for seven step coreK1=0.93 for eight step coreK1=0.935 for nine step core etc

By Er. K Sadasiva ReddySE/Operation/Mahaboobnagar

About these ads

Rate this:

2 Votes

Page 29: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Share

Print

Email

Like this:

Related

DTRs - Causes of Failures & Prevention (A practical approach)In "Operation & Maintenance"

Active Power Control on Transmission LinesIn "General"

HVDS Project – Features and AdvantagesIn "Projects"

Post navigation

← Previous post Next post →

9 thoughts on “Testing a Distribution/Power Transformer”

1. K. Durga Srinivas ADE/M&P/Jadcherla said:

February 19, 2014 at 7:33 PM

Thank u sir .U have provided very useful information to the all field engineers.

LikeLike

Reply

2. Krishna, Elect contractor/ Narayanpet/Mahabubnagar said:

March 7, 2014 at 7:43 PM

Page 30: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Sir, Testing of DTRs data provided by you is very useful for us in Repairing of DTRs at SPM Sheds and the failure of DTRs can be minimized by these testings and we will use the data for testing of DTR at Narayanpet SPM.

Thanking You Sir,

LikeLike

Reply

3. g.sudheer reddy said:

March 7, 2014 at 10:24 PM

Ok good

LikeLike

Reply

4. g.sudheer reddy said:

March 7, 2014 at 10:33 PM

Thank u sir. It will be helpful to farmers and prevents repeated failures.

LikeLike

Reply

5. MD.NAZEER KHAN said:

March 23, 2014 at 6:42 PM

Very Informative and useful in practical adoption in determining the condition of dtr/ptr. Sir, kINDLY PROVIDE few more articles for consumers and contractors like on PF,ENERGY CONSERVATION TECHNICS,ENRGY MEASUREING PRE FAILURE MEASURES ETC…… NAZEER KHAN,RELIANCE ENGINEERING WORKS,HYDERABAD

Page 31: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

LikeLike

Reply

6. mubeen said:

April 12, 2014 at 12:33 PM

a) Continuity test:Tests the continuity of the winding (Healthy transformer must have continuity in all the phases but transformer with shorted windings can also have).

my doubt is usually in sheds the first thing for a sick DTR continuity test is done ,as you said even if the windings are shorted it shows continuity is there any alternate method that shows the difference in continuity for shorted windings(any values)

LikeLike

Reply

7. mubeen said:

April 12, 2014 at 12:38 PM

thank you sir for such information

LikeLike

Reply

8. Vivek kumar vishwakarma said:

May 2, 2014 at 11:55 PM

Thank you sir

LikeLike

Reply

Page 34: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

January 2014

December 2013

November 2013

Categories

Commercial

Energy Conservation

General

Motivation & Training

Operation & Maintenance

P&MM

Projects

SAP

Uncategorized

Recent Posts

8-Channel Fuse Failure Indicator cum Annunciation System

Reduction of 11KV Interruptions – Middle Phase Raising

Need for Heater Failure Alarms in Indoor Sub-stations

Active Power Control on Transmission Lines

Non-Contact Voltage Tester – Handy Device to Reduce Electrical Accidents

Useful Guidelines for Public Information Officers under RTI Act 2005

How current flows at light speed when electrons move at snails speed? (Back to basics)

How Reorder Point Technique Ensures Availability of Stock at Stores?

HVDS Project – Features and Advantages

Page 35: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Additional Annunciation System for 33/11KV Substations

Technical Solutions for Pit Digging and Pole Erection

Testing a Distribution/Power Transformer

Direct Measurement of Energy Supplied to Agriculture

Conservation of Energy – A Social Responsibility

A Small Mistake May End Up In Big Loss

Definition Of Electrified Village

Availability Based Tariff (ABT) & ITs Positives

DTRs – Causes of Failures & Prevention (A practical approach)

A brief overview of SAP in APCPDCL

Power Interruptions & Breakdowns – Probable Causes

Cross Subsidy Surcharge Methodology

Blog Stats

8,231 hits

Create a free website or blog at WordPress.com. The Chateau Theme.

Follow

Follow “”

Get every new post delivered to your Inbox.

Join 53 other followers

Build a website with WordPress.com

Page 36: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

%d bloggers like this:

<img src="https://pixel.wp.com/b.gif?v=noscript" style="height:0px;width:0px;overflow:hidden" alt="" />

International Editions

CE USA

CE China

CE Europe

CE Russia

CE Poland

CE Czech

Top of Form

Forgot password?

Subscribe Manage Account

Bottom of Form

Advertise

Magazine

Newsletters

Page 37: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Webcasts

Research

Top of Form

×

powered by

Bottom of Form

Sponsored by:

Trending

New Products

Power

Fire, Life Safety

Electrical, Lighting

Building Types

Page 38: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Codes and Standards

HVAC

Education and Training

40 Under 40

Building Envelope

Case Study Database

Commissioning

Integration

MEP Giants

Projects in Progress

Product of the Year

Oil & Gas

All Products

Automation, Controls

Electrical

Fire, Life Safety

HVAC

Lighting

Plumbing

Power

Automation, Controls

Codes and Standards

Emerg, Standby, Backup

Energy Efficiency

Generation

Smart Grid

Page 39: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Automation, Controls

Codes and Standards

Emerg, Standby, Backup

MNS, ECS

Plumbing, Piping

Suppression Systems

Automation, Controls

Codes and Standards

Electrical Systems

Energy Efficiency

Lighting Systems

Data Centers

Educational

Hospitals

Labs, Research

Mission Critical

Office Buildings

Restaurant, Retail

Specialty Buildings

Electrical, Power

Energy Efficiency

Fire, Life Safety

HVAC

Lighting

Plumbing, Piping

Automation, Controls

Page 41: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 42: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Understanding standby power system grounding

Knowing how to apply proper grounding and bonding to electrical systems and transfer switches for common standby power system configurations can minimize power outages, equipment damage, and injuries.

David Chesley, PE, LEED AP, RCDD, Interface Engineering, Portland, Ore.

12/14/2011

Share

Page 43: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Electrical system grounding is an often misunderstood area of electrical system design and construction that can cause havoc when misapplied. This problem is even more pronounced with standby power systems. Circuit breakers trip, generators are dropped offline, and crucial standby and life safety loads are lost because of a hidden grounding problem made manifest during a power outage, just when backup power is needed most.

Despite this harrowing picture, most grounding issues can be resolved with attentive design, and then checked and avoided during the installation and testing stages of construction, eliminating most issues before a facility is occupied.

Know grounding and bonding terminology

Before discussing the challenges of grounding standby power systems, key terms are explained—as defined in the 2011 National Electric Code (NEC) (NFPA 70)—to offer a better understanding of why we ground electrical systems. Unless otherwise noted, the following definitions are cited from NEC, Article 100, “Definitions.”

Page 44: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Ground: The earth itself is taken as “ground”. Building grounding electrode systems are sunken into the earth.

The connecting of current-carrying equipment to the earth is the definition of grounding. NEC Article 250.4(A)(2) states:

Grounding of Electrical Equipment. Normally, non-current-carrying conductive materials enclosing electrical conductors or equipment, or forming part of such equipment, shall be connected to earth so as to limit the voltage to ground on thesematerials.

This is different from bonding, where adjacent conductive surfaces that do not normally carry electricity (such as chassis on a toaster, an x-ray, or a milling machine) are connected to another conductive object (such as the metallic racewaycontaining power wiring, nearby building steel, or an adjacent metallic water pipe) to create an electrically continuous, low-impedance path. NEC Article 250.4(A)(3) states:

Bonding of Electrical Equipment. Normally non-current carrying conductive materials enclosing electrical conductors or equipment, or forming part of such equipment, shall be connected together and to the electrical supply source in a manner that establishes an effective ground fault-current path.

Grounding electrode: A conducting object through which a direct connection to the earth is established.

Grounding electrodes in practice includes ground rods and (conductive) metallic water piping, and concrete-encased building steel (e.g., steel rebar embedded in concrete foundation in direct contact with the earth).

Grounding electrode conductor: A conductor used to connect the system-grounded conductor or the equipment to a grounding electrode or to a point on the grounding electrode system. This conductor connects the building grounding system to the earth by means of the grounding electrode.

Grounded (grounding): Connected to ground without inserting resistors or impedance devices. Grounded equipment or panels can trace a continuous conductive path from their chassis to an equipment grounding conductor, to the grounding electrode conductor, to the grounding electrode to the earth (ground) itself (see Figure 1).

Equipment grounding conductor (EGC): The conductive path(s) installed to connect normally non-current-carrying metal parts of equipment together and to the system grounding conductor or to the grounding electrode conductor, or both.

The EGC connects objects back to the grounding electrode system and to the earth.

Page 45: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Ground fault current path: From NEC, Article 250.2, an electrically conductive path from the point of a ground fault on a wiring system through normally non-current-carrying conductors, equipment, or the earth to the electrical supply source.

Effective ground fault current path: From NEC, Article 250.2, an intentionally constructed, low-impedance electrically conductive path designed and intended to carry current under ground fault conditions from the point of a ground fault on a wiring system to the electrical supply source and that facilitates the operation of theovercurrent protective device or ground fault detectors on high impedance grounded systems.

All current tries to return back to its source to complete the circuit. A live conductor striking an ungrounded conductive metal surface will go through whatever, or whoever, connects the metal object to earth, and back to the power source.

Because having large amounts of electrical current unintentionally going through people is generally a bad thing, we want the overcurrent protection device to trip asquickly as possible, removing the fault current before damage, injury, or death can occur. The best means of doing this for ground fault current is to provide a low enough impedance path such that ground fault current is high enough in magnitudeto quickly trip the overcurrent protective device.

Figure 1 shows this in practice. A ground fault in an appliance, rather than routing tothe earth through our unsuspecting victim, routes through the EGC back through the panelboard, and ultimately to the main service (utility transformer), completing the circuit.

Page 46: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

More importantly, because this is an effective ground fault current path, the fault current is high enough to allow the circuit breaker in the panelboard to open, cuttingthe fault current.

Separately derived system: A premises wiring system whose power is derived from a source of electrical energy or equipment other than a service. Such systems have no direct connection from circuit conductors of one system to circuit conductors of another system, other than connections through the earth, metal enclosures, metallic raceways, or equipment grounding conductors.

When using a backup source such as a generator, note that if a generator has a neutral conductor that is directly bonded to the utility service neutral (for example, a 3-pole transfer switch), the generator is not separately derived. On the other hand, if its neutral never comes in direct contact with the utility neutral (either because the neutral is switched at the transfer switch, or the generator is a 3-wire system without a neutral), it is a separately derived system.

System bonding jumper: The connection between the grounded circuit conductor (often called the neutral) and the supply-side bonding jumper, or the EGC, or both, at a separately derived system.

Simply put, the jumper ties the ground and neutral together at the generator. When this occurs at a utility service, we now use a different term to mean the same thing: supply-side bonding jumper.

Supply-side bonding jumper: From NEC, Article 250.2, a conductor installed on the supply side of a service or within a service equipment enclosure(s), or for a separately derived system, that ensures the required electrical conductivity between metal parts required to be electrically connected.

This term, introduced in the 2011 NEC, applies to both utility services and alternate sources of power such as a generator. This conductor is how return ground-fault current goes from the EGC to the neutral and back to the power source, completing the circuit, and hopefully tripping the overcurrent protection in minimal time.

Grounding standby power systems

Grounding systems are created to allow overcurrent devices to quickly open when a line-to-ground fault occurs. For this reason, bonding between the neutral and ground bus (or chassis) in the generator should not occur when a 3-pole transfer switch is used that directly bonds the main service panel neutral to the neutral bus of the generator.

Page 47: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Figure 2 shows the problem with this approach. Return current from the electrical load travels down to the transfer switch and then splits with part heading back to the utility service and part heading down to the generator. At the generator, this current then returns through the neutral-ground bond back over the grounding system to the utility service, leading to stray current potentially traveling over metallic raceway, piping, and even building structural steel to return to its source.

An added problem of connecting the neutral to ground at both the main service and the generator without transferring the neutral occurs with ground fault protection (GFP), which is required by NEC Article 240.13 on overcurrent protection at 480 V and more than 1,000 A.

GFP devices operate by measuring the outgoing and incoming current and looking at differences between the two, with the assumption that any current difference is stray return current that is traveling over the building grounding system. If the measured current difference is high enough, the GFP device is then set to trip open,

Page 48: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

cutting power to downstream loads and the ground fault causing the stray return current.

However, if stray return current is caused for other reasons, such as a condition where return neutral current from the load can travel over the neutral-to-ground bond at the generator, the GFP device can also trip, because the current difference can be the same as in an actual ground fault, especially if the generator is relativelyclose to the service.

If the GFP is then dialed to a higher current setting to minimize interruptions, one is left with current regularly running over the ground system from standby loads, and has reduced the protection from the GFP in the event of a real line-to-ground fault.

Note that the current routed from neutral to ground at the generator can be similar in magnitude to a line-to-ground fault at the standby load—especially if the impedance of the path from the load to the generator is relatively low. Thus, setting the GFP protection to a higher trip setting can mean that a real line-to-ground fault at the load may not cause the breaker to open, leading to a sustained ground fault in the electrical system.

This leads us to our first rule of standby power system grounding:

Rule No. 1: For a 3-phase, 4-wire system, do not bond the neutral and ground bus together at the generator unless the neutral is switched at the transfer switch together with the phase conductors.

Transferring the neutral can be accomplished by one of two means:

A 4-pole transfer switch that switches the load neutral between the utility source to the standby source

A 3-pole transfer switch with overlapping contacts for the neutral that overlaps the utility and standby neutrals very briefly at the time of switching.

Note that the bonding of a generator’s neutral and ground bus should not be confused with the question of whether a generator should have a grounding electrode system. If the generator is a separately derived system, the NEC requires a grounding electrode system at the generator per NEC Articles 250.30 and 250.52(A).

If the system is not separately derived, the grounding electrode system may be installed as a supplemental grounding electrode system, providing it is also bonded to the equipment ground conductor (NEC Article 250.54).

This leads us to the second rule of standby power system grounding:

Rule No. 2: A standby power source should have its own grounding electrode systemto facilitate ground fault current returning to the generator if a line-to-ground fault

Page 49: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

occurs when a generator is powering load. However, this grounding electrode system must always be bonded to the equipment ground conductor that is also bonded to grounding electrode conductor at the utility service disconnect.

This raises the question of whether there are times by code or design where the engineer must design the generator as a separately derived system with a neutral-ground bond at the generator.

One of the most common instances occurs when more than one level of GFP is used. This often happens in health care facilities where more than one transfer switch is used to isolate life safety, critical, and equipment branches from one another, and a second level of GFP is used on the overcurrent protection. Even when the generator does not have a neutral-ground bond and multiple 3-pole transfer switches are used, return current from the life safety branch returns on both its own neutral and on the neutral used by the equipment branch (see Figure 3).

Since outgoing phase and incoming neutral current are not the same, the GFP for both branches may perceive a line-to-ground fault and trip one or more branches offline. Again, adjusting the trip setting to a higher amperage level compromises theeffectiveness of the GFP when a real line-to-ground fault occurs.

This leads us to the third rule of standby power system grounding:

Page 50: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Rule No. 3: When using more than one transfer switch on a 3-phase, 4-wire system where any one transfer switch may have two or more levels of GFP protection upstream of itself, the generator should be grounded as a separately derived system, and transfer switches that can switch the neutral should be used for all transfer switches.

Because it is much less expensive to specify the generator with the proper grounding and install the correct transfer switches initially than do so as a retrofit, consideration of this approach should be used if there is a possibility that a future upgrade could create this condition that doesn’t exist initially in the building.

For example, if an owner advises the engineer on a project with a small life safety generator that it may be replaced in the future with a large generator capable of backing up most of the building, and that upgrade would require two levels of GFP for the non-life safety branch, the engineer will want to specify a 4-pole transfer switch for the life safety branch to avoid needing to replace that transfer switch during the future upgrade.

Because the problem of neutral current—whether under normal conditions or line-to-ground fault conditions—emerges where multiple transfer switches are used in one facility, we can generalize Rule No. 3 as follows:

Generalized Rule No. 3: When using more than one transfer switch on a 3-phase, 4-wire system where any one transfer switch may have two or more levels of GFP protection upstream of itself, all generators should be grounded as separately derived systems, and transfer switches that can switch the neutral should be used for all transfer switches. In the discussion to this point, all mention of GFP has been assumed to be on the utility side of the transfer switches. While generators can be specified with an output circuit breaker with GFP, this is normally avoided with good reason, because a ground fault trip would result in the loss of the standby power source when it is critically needed.

Instead, where a GFP would otherwise be required, generators should be specified with a ground fault annunciation feature on the output circuit breaker, to notify via the generator control panel and annunciator when a ground fault condition has occurred while the facility is running on backup power. This allows the facility manager to hunt down the source of the ground fault without cutting power to critical loads.

The oddballs you must know

There are numerous cases where a 3-phase, 3-wire system (no neutral) is used on the generator side.

Case No. 1—solidly grounded, 3-phase, 3-wire standby power system: In this case, atransformer may be used on the load side of the 3-pole transfer switch to derive a

Page 51: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

neutral for any line-to-ground loads on the standby power system (see Figure 4). However, the transfer switch sees only phase and ground connections from the utility, generator, and load connections to itself. Because there is no way for line-to-ground current to return on any path except the ground plane, we do not see a splitting of return ground fault current between a neutral and ground. Thus, a GFP can monitor just the phase conductors and trip properly if the current does not return through the same phase conductors.

Case No. 2—solidly grounded, 3-phase, 3-wire standby power system with interlocked circuit breakers used for load transfer: By definition, because the circuit breakers (unless they are 4-pole) can only switch the phase conductors and not the neutral, we would have the same problem of neutral current from the standby load returning on two pathways. One way of avoiding this problem is to connect only 3-phase, 3-wire loads (no neutral) to the common distribution board served from both sources (see Figure 5).

Page 52: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Case No. 3—high-resistance grounded, 3-phase, 3-wire standby power system: In this case, a high-resistance source between neutral and ground at the generator is used to limit any return ground fault current that may occur. This is often used in industrial settings where the owner does not want to interrupt power in the event ofthe ground fault, but also wants to reduce the fault current magnitude (and thus its inherent danger) while troubleshooting the location and source of the fault. Conditions of NEC Article 250.36 must also be met.

Much of the control the building owner, engineer, and electrician have over resolving grounding issues with the generator can be resolved with careful planning at the generator and transfer switch. Careful forethought and planning can do muchto maximize the ground fault protection of the power system, and minimize power outages due to stray currents.

Chesley is an associate principal and senior electrical engineer at Interface Engineering. He has been with the company since 1993. His engineering expertise includes building integration, renewable energy systems, telecommunications infrastructure, backup power systems, energy metering, and building dashboards.

Related News:

Specifying, applying load-bank systems - 02.03.2012 06:00

Page 54: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

40 Under Forty: Get Recognized

Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...

» More

MEP Giants Program

The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.

» More

January/February 2015

Page 55: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

VFDs, motors for energy efficiency: Specify to meet load conditions; Using ASHRAE 90.1 for integrated design; Seismic design of fire suppression pipes; Lighting controls

» More

December 2014

Commissioning lighting systems: Complex lighting controls; College, university roundtable; NFPA 3; Designing smoke control systems

» More

November 2014

Evaluating energy codes: Codes and standards tackle high-performance green buildings; Q&A on hospitals, health care facilities; Building envelope testing; Integrating fire protection, HVAC systems

» More

Page 56: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Winter 2014

Designing a CHP plant; Implementing energy storage for peak-load shifting; Designing modular data centers; Reviewing the 2014 NEC

» More

Fall 2014

Designing data center electrical distribution systems; Managing power through networked electrical systems; Integrating commercial buildings, utilities with the Smart Grid; Mitigating arc flash hazards

» More

Summer 2014

Page 57: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives

» More

Collaborating against counterfeit electrical products

As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...

» More

Engineering Change

Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.

» More

IEEE Power Perspectives

IEEE power industry experts bring their combined experience in the electrical powerindustry...

Page 58: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

» More

Understanding Specifications, Codes and Standards

Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.

» More

Recent News

Seismic design of fire suppression piping systems

Energy management motor starter

3 ways to tap millennial talent to engineer a next-generation workforce

Paralleling system based on transfer switchgear

Where do ideas come from?

Unit heater for commercial applications

VFD, motor strategies for energy efficiency

Common pitfalls in specifying motors and VFDs

Enclosed starter configurator

Top 5 Consulting-Specifying Engineer articles, January 12-18: Designing modular data centers, the 2014 NEC, 2015 business trends, more

» More News

Page 60: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Automation, Controls Codes & Standards Electrical Systems Fire & Life Safety HVAC/R Lighting Plumbing, Piping

Training, Tools

Apps for Engineers Career Smart Case Study Database Videos

Events and Awards

40 Under 40 MEP Giants Product of the Year Upcoming Events

News, Views, Blogs

Career Smart Collaborating against counterfeit electrical products Cut the Copper Engineering Change IEEE Power Perspectives Industry News Insights on Power Research Analyst Blogs RSS Feeds Social Media Understanding Specifications, Codes, and Standards

Newsletters

Codes & Standards Electrical Solutions Fire & Life Safety HVAC NewsWatch: Data Centers NewsWatch: Educational Facilities NewsWatch: Hospitals Pure Power

Advertising

Case Study Database Listing Contact Us Innovations from the Industry Internet Profiles Magazine CSE Product & Media Showcase

About Us

Terms of Use Apps for Engineers Control Engineering About CFE Media LLC. Advisory Board How to Contribute Contact Us Magazine Content Stream Magazine Archives EGSAOn-Peak Performance Plant Engineering Privacy Policy Pure Power Subscribe

Page 61: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Home

Technical Articles

Read and Learn Electrical Engineering!

1. Technical Articles - EE Blog

2. Article categories (36)

3. Subscribe to technical articles

4. Become Contributor (write for EEP)

Energy & Power

5. Energy and Power

6. T&D

7. Power Transformers

8. Power Substations

HV/MV/LV

9. High Voltage

10.Medium Voltage

11.Low Voltage

12.Testing & Commission.

Industry

13.Motor Applications

14.Variable Speed Drives

15.Automation in Industry

16.Energy Efficency

Power Grid

17.SCADA Systems

Page 62: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

18.Smart Grid

19.Metering

20.Wind Power

Electrical Software & Guides

Excel Spreadsheets & Electrical Tools

1. MS Excel Calculation Spreadsheets

2. Electrical Software

3. HVAC Spreadsheets

4. Online Electrical Calculators

EE Books and Guides

5. Electrical Engineering in general (HV/MV/LV)

6. Power Substations

7. Relaying - Control and protection

8. Industry Automation (PLC, SCADA, VSD etc.)

Manufacturers

9. Schneider Electric CTs

10.ABB Drives Guides

11.Siemens basics of EE

12.Danfoss Heating Book

Other...

13.Alternative Energy

14.HVAC Guides

15.Design Documentation (SLD, drawings etc.)

EE Lectures

Page 63: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Network Theorems and Laws

1. Ohm’s Laws

2. Kirchhoff’s Laws

3. Thévenin’s Theorem

4. Other theorems (Norton’s Theorems, etc.)

Electrical Courses / Video Lectures

5. Electrical Engineering in General

6. PLC Programming VIDEO Courses

7. Testing and Commissioning

Reasearch Papers

8. Researches and Projects (RaP)

Connect

Get in touch!

1. Contact Editorial Team

Advertisement

2. Advertisement

General

3. Sitemap

4. RSS Feed

5. Login

Social networks

6. Google+ Page

7. LinkedIn Page

8. Twitter

Page 64: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

9. Facebook page

Home Technical Articles Article Categories Contact us Subscribe to articles Subscribe to downloads El. Enginering Guides

EE General guides

Power Substations

Schneider Electric CTs

Siemens Basics of EE

ABB Drives Guides

Industry Automation

Relay control/protection

Alternative Energy

Electrical Software MS Excel Spreadsheets Electrical Design Docs Engineering Resources

Video Lectures – Electrical Engineering

PLC Programming Training

Electric Testing and Maintenance (VIDEO)

Network Theorems and Laws

-

Home / Technical Articles / Protection and Relays Used In Main Circuit Board at a Power Grid Substation

Page 65: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Protection and Relays Used In Main Circuit Board at a Power Grid Substation

Posted Feb 17 2012 by Bipul Raman in High Voltage, Medium Voltage, Protection with 5 Comments

Differential relay for transformer applications. Protection features include over-excitation (V/Hz), under/over-voltage, phase overcurrent, negative-sequence overcurrent, and breaker fail-to-trip/fail-to-close indicators. (pic by thomasnet.com)

1. High speed biased differential relay

The DMH type relay provides high speed biased differential protection for two or three windingtransformers. The relay is immune to high inrush current and has a high degree of stability against through faults. It requires a max of two cycles operating time for current above twice relay rated current. Instantaneous overcurrent protection clears heavy internal faults immediately. This relay is available in two forms.

Firstly for use with time Cts, the ratios of line which are matched to the load current to give zero differential current under normal working conditions. Secondly with tapped interposing transformers for use with standard line current transformers of any ratio.

2. Directional inverse time overcurrent and earth fault relays

The CDD type relays are applied for directional or earth fault protection of ring mains, parallel transformers or parallel feeders with the time graded principle. It is induction disc type relay withinduction cup used to add directional feature.

Page 66: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

3. Instantaneous voltage relay

The type VAG relay is an instantaneous protection against abnormal voltage conditions such as over voltage, under voltage or no voltage in AC and DC circuits and for definite time operation when used with a timer. It is an attracted armature type relay.

4. Auxiliary relays

The VAA/CAA type auxiliary relays are applied for control alarm, indication and other auxiliary duties in AC or DC systems. CAA is a current operated and VAA is a voltage operated relay.. it isattracted armature type.

5. High speed tripping relays

This VAJH type relay is employed with a high speed tripping duties where a number of simultaneous switching operations are required. This is a fast operating multi contact attracted armature relay.

6. Definite time delay relay

This VAT type relay is used in auto reclosing and control schemes and to provide a definite time feature for instantaneous protective relay. It is an Electro mechanical definite time relay. It has two pair of contacts. The shorter time setting is provided by a passing contact and longer time setting by the final contact.

7. Trip circuit supervision relay

This VAX relay is applied for after closing or continuous supervision of the trip circuit of circuit breakers.

They detect the following conditions:

1. Failure of trip relay

2. Open circuit of trip coil

3. Failure of mechanism to complete the tripping operation

8. Instantaneous over current and earth fault relay

An instantaneous phase or earth fault protection and for definite time operation when used with atimer. It is a CAG 12/12G standard attracted armature relay with adjustable settings. It may be a single pole or triple pole relay.

9. Inverse time over current and earth fault relay

Page 67: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

This CDG 11-type relay is applied for selective phase and earth fault protection in time graded systems for AC machines. Transformers, feeders etc. this is a non-directional relay with a definite minimum time which has an adjustable inverse time/current characteristics. It may be a single pole or triple pole relay.

10. Fuse failure relay

This VAP type relay is used to detect the failure or inadvertent removal of voltage transformer sec. fuses and to prevent incorrect tripping of circuit breaker. It is three units, instantaneous attracted armature type relay the coil of each unit connected across one of the VTs.

The secondary fuses under healthy conditions, the coil is SC by fuses and can’t be energized. Butone or more fuses blow the coil is energized and relay operates.

11. Instantaneous high stability circulating current relay

It is used to serve the following three purposes

1. Differential protection of Ac machines , reactors auto transformers and bus bars

2. Balanced and restricted earth fault protection of generator of generator and transformer windings

3. Transverse differential protection of generators and parallel feeders.

This CAG type relay is a standard attracted armature relay. In circulating current protection schemes, the sudden and often asymmetrical growth of the system current during external fault conditions can cause the protection current transformers to go into saturation, resulting in high unbalance current to insure stability under these conditions.

The modern practice is to use a voltage operated high impedance relay, set to operate at a voltageslightly higher than that developed by CT under max fault conditions. Hence this type of relay is used with a stabilizing resistor.

12. Local breaker back up relay

this is a CTIG type three phase or two phase earth fault instantaneous over current unit intended for use with a time delay unit to give back up protection in the event of a circuit breaker failure.

13. Poly-phase directional relay

The PGD relay is a high speed induction cup unit used to give directional properties to three phase IDMT over-current relays, for the protection of parallel feeders, inter connected networks

Page 68: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

and parallel transformers against phase to phase and three phase faults. Owing to low sensitivity on phase to earth faults the relay is used with discretion on solidly earthed systems.

14. Auto reclose relay

Five types of auto reclose relays are available:

a) VAR21 giving one reclosure. The dead time and reclaim time are adjustable form 5 to 25 secs. If the circuit breaker reopens during reclaim time, it remains open and locked out.

b) VAR41B is a single shot scheme for air blast circuit breakers. Reclaim time is fixed at between 15 to 20 secs. Dead time adjustment is from 0.1 to 1.0 sec of which first 300 millisec will be circuit breaker opening time.

c) VAR 42 giving four reclosure. It is precision timed from 0 to 60 sec. it can be set for max four enclosures at min intervals of 10 sec and instantaneous protection can be suppressed after the first reclosure so that persistent faults are referred to time graded protection.

d) VAR 71 giving single shot medium speed reclosure with alarm and lockout for circuit breaker.This allows up to 10 faults clearance before initiating an alarm. The alarm is followed by lockoutif selected no. of faults clearances exceed. If the circuit breaker reopens during reclaim time, it remains open and locked out. It offers delay in reclosing sequence. Instantaneous lockout on low current earth fault and suppressing instantaneous protection during reclamation time.

e) Var81 is a single shot high-speed reclosure with alarm and lockout for circuit breaker This allows up to 10 faults clearance before initiating an alarm.

Top

Reactance distance scheme

this scheme consists of the following relays, XCG22-3 for phase to phase and 3 for phase to ground, YCG17, mho starting unit one in each place, VAT51 along with timing unit for zone 2 and 3, 86-X aux. tripping relay and 30G, H, and J for 1st, 2nd and 3rd. Zone indication VAA51, CAG12 and VAA31. These schemes provide three zone phase and earth fault protection using reactance relays type XCG22 and also starting relays YCG17.

They are applicable to important line sections where high values of arc resistance would otherwise affect the accuracy of measurement and where high speed tripping is essential. High-speed protection is provided for phase and earth faults on 80-90% of the line section and faults on the remaining section are cleared in second zone, time. The third zone provides backup protection after further time interval.

Page 69: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Each mho starting unit Y3 and its auxiliary Y3 X is associated with one phase and operates for all faults involving this phase. Each reactance unit X is connected to measure phase or earth faultdistance, but is prevented from operating by short circuit across the polarizing coils. Under the phase fault conditions, the Y3 X units unblock the appropriate X1 reactance units, which initiate tripping immediately for faults within their setting.

Operation of the earth auxiliary relay 64 in conjunction with the Y3 X units selects the appropriate reactance units for measurement of earth faults. The reach of reactance units is extended by the timer, 2 after successive intervals to cover faults in zone 2 and 3.

Page 70: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

The principle of distance scheme - Block diagram

Discrimination is not affected by changing faults, for example a zone 2 earth fault which develops into a double phase to earth fault will be cleared correctly by the X1 (phase fault) units

Page 71: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

in zone 2 time. In the rare event of two faults occurring simultaneously at different points on the line; the scheme will measure to a distance approximately half way.

Source: Internet and several books of Electrical Engineering

Recommended EE articles

8 NEC Basic Feeder Circuit Sizing RequirementsDecember 17, 2014

Let’s analyse phase-to-earth faults in a single-incomer power systemOctober 17, 2014

What Is Earth And Why And How Do We Connect To It?October 6, 2014

Page 72: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Site selection considerations for the future power substationJuly 30, 2014

Article Tags //

auxiliary relays, differential relay, earth fault, grid, main circuit board, overcurrent, power substation, relays,

Filed Under Category //

High Voltage Medium Voltage Protection

About Author //

Bipul Raman

Bipul Raman - Bipul Raman (@BipulRaman), a graduate in Electrical Engineering had presented two research papers in National Conferences. He has overtaken and successfully completed a project to design an Automated CB Test-Rig for Light Combat Aircraft at Aircraft Research and Design Center (HAL). Apart from this, he has done several projects at NTPC and Grid Substation. Not only limited to Electrical Engineering, He is also very much passionate in Software Development. He has contributed few of his code to 'Codeplex' ( a Microsoft OpenSource software hosting website ). Visit his complete profile at http://bipul.in/about

Page 73: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

RSS Feed for Comments

5 Comments

1.sanjay goyal

Nov 12, 2014

We want a aux. relay for transformer protection. The relay details are as under. Auxiliary relay, Type: VAA. Model no: SPECM2ZG76B. Volts: 110VDC. Make: E.E. So kindly provide the dealer or shop from where we can purchase this relay.

(reply)

2.jobert moleno

Oct 20, 2014

Nice article very informative.

(reply)

3.Delayed Auto-Reclosing On EHV Systems | EEP

Dec 16, 2013

[...] is an unacceptable shock to the system.It is therefore usual practice to incorporate a synchronism check relay into the reclosing system to determine whether auto-reclosing should take place.After tripping on a [...]

(reply)

Page 74: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

4.jeewangarg

May 03, 2013

how to calculate the capacity of a contactor (high/low voltage cutoff).

(reply)

5.Connections Of Overcurrent Relay (part 2) | EEP

Feb 02, 2013

[...] 3 Nos O/C relay for overcurrent and earth fault protectionIt’s used for:3-phase faults the overcurrent relays in all the 3-phases act.Phase to phase faults the relays in only the affected phases operate.Single [...]

(reply)

RSS Feed for Comments

Leave a Comment

Tell us what you're thinking... we care about your opinion!and oh, not to forget - if you want a picture to show with your comment, go get a free Gravatar!

Name *

Email *

Website

Page 75: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

We believe you're an engineer, but nevertheless ... *

+ eight = 12

Sign me up for the newsletter

FOLLOW EEP!

Subscribe to Weekly Download Updates //(free electrical software, spreadsheets and EE guides)

Latest Technical Articles

Sizing a Static UPS System In Data CenterJanuary 23, 2015

Page 77: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Daily dose of knowledge and news fromElectrical Engineering World

Science at Glance

Our mission is to be the leading provider of scientific information in the field of power and engineering in general. We publish, we share and we spread the knowledge.

You're welcome to read, write and contribute to EEP in any way!

Energy Efficency

We see the results of power usage all around us. Every day, the generation and usage of energy produces more pollution than any other single industry.

It's our time to use energy on smart and more efficent way. EEP is on your side!

Electrical Software

Electrical design without appropriate software and tools is impossible to imagine. This section covers professional engineering software for design, MV and LV network and photometric calculations, voltage drop and short circuit calculations etc.

© 2014 EEP - Electrical Engineering Portal. All Rights Reserved | Privacy Policy | 34 queries in 0.210 seconds.

Powered by CsanyiGroup

SHARE

TOPGetPDF

Home

Technical Articles

Page 78: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Read and Learn Electrical Engineering!

1. Technical Articles - EE Blog

2. Article categories (36)

3. Subscribe to technical articles

4. Become Contributor (write for EEP)

Energy & Power

5. Energy and Power

6. T&D

7. Power Transformers

8. Power Substations

HV/MV/LV

9. High Voltage

10.Medium Voltage

11.Low Voltage

12.Testing & Commission.

Industry

13.Motor Applications

14.Variable Speed Drives

15.Automation in Industry

16.Energy Efficency

Power Grid

17.SCADA Systems

18.Smart Grid

19.Metering

Page 79: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

20.Wind Power

Electrical Software & Guides

Excel Spreadsheets & Electrical Tools

1. MS Excel Calculation Spreadsheets

2. Electrical Software

3. HVAC Spreadsheets

4. Online Electrical Calculators

EE Books and Guides

5. Electrical Engineering in general (HV/MV/LV)

6. Power Substations

7. Relaying - Control and protection

8. Industry Automation (PLC, SCADA, VSD etc.)

Manufacturers

9. Schneider Electric CTs

10.ABB Drives Guides

11.Siemens basics of EE

12.Danfoss Heating Book

Other...

13.Alternative Energy

14.HVAC Guides

15.Design Documentation (SLD, drawings etc.)

EE Lectures

Network Theorems and Laws

1. Ohm’s Laws

Page 80: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

2. Kirchhoff’s Laws

3. Thévenin’s Theorem

4. Other theorems (Norton’s Theorems, etc.)

Electrical Courses / Video Lectures

5. Electrical Engineering in General

6. PLC Programming VIDEO Courses

7. Testing and Commissioning

Reasearch Papers

8. Researches and Projects (RaP)

Connect

Get in touch!

1. Contact Editorial Team

Advertisement

2. Advertisement

General

3. Sitemap

4. RSS Feed

5. Login

Social networks

6. Google+ Page

7. LinkedIn Page

8. Twitter

9. Facebook page

Page 81: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Home Technical Articles Article Categories Contact us Subscribe to articles Subscribe to downloads El. Enginering Guides

EE General guides

Power Substations

Schneider Electric CTs

Siemens Basics of EE

ABB Drives Guides

Industry Automation

Relay control/protection

Alternative Energy

Electrical Software MS Excel Spreadsheets Electrical Design Docs Engineering Resources

Video Lectures – Electrical Engineering

PLC Programming Training

Electric Testing and Maintenance (VIDEO)

Network Theorems and Laws

-

Home / Technical Articles / Protection and Relays Used In Main Circuit Board at a Power Grid Substation

Protection and Relays Used In Main Circuit Board at a Power Grid Substation

Page 82: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Posted Feb 17 2012 by Bipul Raman in High Voltage, Medium Voltage, Protection with 5 Comments

Differential relay for transformer applications. Protection features include over-excitation (V/Hz), under/over-voltage, phase overcurrent, negative-sequence overcurrent, and breaker fail-to-trip/fail-to-close indicators. (pic by thomasnet.com)

1. High speed biased differential relay

The DMH type relay provides high speed biased differential protection for two or three windingtransformers. The relay is immune to high inrush current and has a high degree of stability against through faults. It requires a max of two cycles operating time for current above twice relay rated current. Instantaneous overcurrent protection clears heavy internal faults immediately. This relay is available in two forms.

Firstly for use with time Cts, the ratios of line which are matched to the load current to give zero differential current under normal working conditions. Secondly with tapped interposing transformers for use with standard line current transformers of any ratio.

2. Directional inverse time overcurrent and earth fault relays

The CDD type relays are applied for directional or earth fault protection of ring mains, parallel transformers or parallel feeders with the time graded principle. It is induction disc type relay withinduction cup used to add directional feature.

Page 83: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

3. Instantaneous voltage relay

The type VAG relay is an instantaneous protection against abnormal voltage conditions such as over voltage, under voltage or no voltage in AC and DC circuits and for definite time operation when used with a timer. It is an attracted armature type relay.

4. Auxiliary relays

The VAA/CAA type auxiliary relays are applied for control alarm, indication and other auxiliary duties in AC or DC systems. CAA is a current operated and VAA is a voltage operated relay.. it isattracted armature type.

5. High speed tripping relays

This VAJH type relay is employed with a high speed tripping duties where a number of simultaneous switching operations are required. This is a fast operating multi contact attracted armature relay.

6. Definite time delay relay

This VAT type relay is used in auto reclosing and control schemes and to provide a definite time feature for instantaneous protective relay. It is an Electro mechanical definite time relay. It has two pair of contacts. The shorter time setting is provided by a passing contact and longer time setting by the final contact.

7. Trip circuit supervision relay

This VAX relay is applied for after closing or continuous supervision of the trip circuit of circuit breakers.

They detect the following conditions:

1. Failure of trip relay

2. Open circuit of trip coil

3. Failure of mechanism to complete the tripping operation

8. Instantaneous over current and earth fault relay

An instantaneous phase or earth fault protection and for definite time operation when used with atimer. It is a CAG 12/12G standard attracted armature relay with adjustable settings. It may be a single pole or triple pole relay.

9. Inverse time over current and earth fault relay

Page 84: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

This CDG 11-type relay is applied for selective phase and earth fault protection in time graded systems for AC machines. Transformers, feeders etc. this is a non-directional relay with a definite minimum time which has an adjustable inverse time/current characteristics. It may be a single pole or triple pole relay.

10. Fuse failure relay

This VAP type relay is used to detect the failure or inadvertent removal of voltage transformer sec. fuses and to prevent incorrect tripping of circuit breaker. It is three units, instantaneous attracted armature type relay the coil of each unit connected across one of the VTs.

The secondary fuses under healthy conditions, the coil is SC by fuses and can’t be energized. Butone or more fuses blow the coil is energized and relay operates.

11. Instantaneous high stability circulating current relay

It is used to serve the following three purposes

1. Differential protection of Ac machines , reactors auto transformers and bus bars

2. Balanced and restricted earth fault protection of generator of generator and transformer windings

3. Transverse differential protection of generators and parallel feeders.

This CAG type relay is a standard attracted armature relay. In circulating current protection schemes, the sudden and often asymmetrical growth of the system current during external fault conditions can cause the protection current transformers to go into saturation, resulting in high unbalance current to insure stability under these conditions.

The modern practice is to use a voltage operated high impedance relay, set to operate at a voltageslightly higher than that developed by CT under max fault conditions. Hence this type of relay is used with a stabilizing resistor.

12. Local breaker back up relay

this is a CTIG type three phase or two phase earth fault instantaneous over current unit intended for use with a time delay unit to give back up protection in the event of a circuit breaker failure.

13. Poly-phase directional relay

The PGD relay is a high speed induction cup unit used to give directional properties to three phase IDMT over-current relays, for the protection of parallel feeders, inter connected networks

Page 85: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

and parallel transformers against phase to phase and three phase faults. Owing to low sensitivity on phase to earth faults the relay is used with discretion on solidly earthed systems.

14. Auto reclose relay

Five types of auto reclose relays are available:

a) VAR21 giving one reclosure. The dead time and reclaim time are adjustable form 5 to 25 secs. If the circuit breaker reopens during reclaim time, it remains open and locked out.

b) VAR41B is a single shot scheme for air blast circuit breakers. Reclaim time is fixed at between 15 to 20 secs. Dead time adjustment is from 0.1 to 1.0 sec of which first 300 millisec will be circuit breaker opening time.

c) VAR 42 giving four reclosure. It is precision timed from 0 to 60 sec. it can be set for max four enclosures at min intervals of 10 sec and instantaneous protection can be suppressed after the first reclosure so that persistent faults are referred to time graded protection.

d) VAR 71 giving single shot medium speed reclosure with alarm and lockout for circuit breaker.This allows up to 10 faults clearance before initiating an alarm. The alarm is followed by lockoutif selected no. of faults clearances exceed. If the circuit breaker reopens during reclaim time, it remains open and locked out. It offers delay in reclosing sequence. Instantaneous lockout on low current earth fault and suppressing instantaneous protection during reclamation time.

e) Var81 is a single shot high-speed reclosure with alarm and lockout for circuit breaker This allows up to 10 faults clearance before initiating an alarm.

Top

Reactance distance scheme

this scheme consists of the following relays, XCG22-3 for phase to phase and 3 for phase to ground, YCG17, mho starting unit one in each place, VAT51 along with timing unit for zone 2 and 3, 86-X aux. tripping relay and 30G, H, and J for 1st, 2nd and 3rd. Zone indication VAA51, CAG12 and VAA31. These schemes provide three zone phase and earth fault protection using reactance relays type XCG22 and also starting relays YCG17.

They are applicable to important line sections where high values of arc resistance would otherwise affect the accuracy of measurement and where high speed tripping is essential. High-speed protection is provided for phase and earth faults on 80-90% of the line section and faults on the remaining section are cleared in second zone, time. The third zone provides backup protection after further time interval.

Page 86: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Each mho starting unit Y3 and its auxiliary Y3 X is associated with one phase and operates for all faults involving this phase. Each reactance unit X is connected to measure phase or earth faultdistance, but is prevented from operating by short circuit across the polarizing coils. Under the phase fault conditions, the Y3 X units unblock the appropriate X1 reactance units, which initiate tripping immediately for faults within their setting.

Operation of the earth auxiliary relay 64 in conjunction with the Y3 X units selects the appropriate reactance units for measurement of earth faults. The reach of reactance units is extended by the timer, 2 after successive intervals to cover faults in zone 2 and 3.

Page 87: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

The principle of distance scheme - Block diagram

Discrimination is not affected by changing faults, for example a zone 2 earth fault which develops into a double phase to earth fault will be cleared correctly by the X1 (phase fault) units

Page 88: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

in zone 2 time. In the rare event of two faults occurring simultaneously at different points on the line; the scheme will measure to a distance approximately half way.

Source: Internet and several books of Electrical Engineering

Recommended EE articles

8 NEC Basic Feeder Circuit Sizing RequirementsDecember 17, 2014

Let’s analyse phase-to-earth faults in a single-incomer power systemOctober 17, 2014

What Is Earth And Why And How Do We Connect To It?October 6, 2014

Page 89: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Site selection considerations for the future power substationJuly 30, 2014

Article Tags //

auxiliary relays, differential relay, earth fault, grid, main circuit board, overcurrent, power substation, relays,

Filed Under Category //

High Voltage Medium Voltage Protection

About Author //

Bipul Raman

Bipul Raman - Bipul Raman (@BipulRaman), a graduate in Electrical Engineering had presented two research papers in National Conferences. He has overtaken and successfully completed a project to design an Automated CB Test-Rig for Light Combat Aircraft at Aircraft Research and Design Center (HAL). Apart from this, he has done several projects at NTPC and Grid Substation. Not only limited to Electrical Engineering, He is also very much passionate in Software Development. He has contributed few of his code to 'Codeplex' ( a Microsoft OpenSource software hosting website ). Visit his complete profile at http://bipul.in/about

Page 90: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

RSS Feed for Comments

5 Comments

1.sanjay goyal

Nov 12, 2014

We want a aux. relay for transformer protection. The relay details are as under. Auxiliary relay, Type: VAA. Model no: SPECM2ZG76B. Volts: 110VDC. Make: E.E. So kindly provide the dealer or shop from where we can purchase this relay.

(reply)

2.jobert moleno

Oct 20, 2014

Nice article very informative.

(reply)

3.Delayed Auto-Reclosing On EHV Systems | EEP

Dec 16, 2013

[...] is an unacceptable shock to the system.It is therefore usual practice to incorporate a synchronism check relay into the reclosing system to determine whether auto-reclosing should take place.After tripping on a [...]

(reply)

Page 91: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

4.jeewangarg

May 03, 2013

how to calculate the capacity of a contactor (high/low voltage cutoff).

(reply)

5.Connections Of Overcurrent Relay (part 2) | EEP

Feb 02, 2013

[...] 3 Nos O/C relay for overcurrent and earth fault protectionIt’s used for:3-phase faults the overcurrent relays in all the 3-phases act.Phase to phase faults the relays in only the affected phases operate.Single [...]

(reply)

RSS Feed for Comments

Leave a Comment

Tell us what you're thinking... we care about your opinion!and oh, not to forget - if you want a picture to show with your comment, go get a free Gravatar!

Name *

Email *

Website

Page 92: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

We believe you're an engineer, but nevertheless ... *

+ eight = 12

Sign me up for the newsletter

FOLLOW EEP!

Subscribe to Weekly Download Updates //(free electrical software, spreadsheets and EE guides)

Latest Technical Articles

Sizing a Static UPS System In Data CenterJanuary 23, 2015

Page 94: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Daily dose of knowledge and news fromElectrical Engineering World

Science at Glance

Our mission is to be the leading provider of scientific information in the field of power and engineering in general. We publish, we share and we spread the knowledge.

You're welcome to read, write and contribute to EEP in any way!

Energy Efficency

We see the results of power usage all around us. Every day, the generation and usage of energy produces more pollution than any other single industry.

It's our time to use energy on smart and more efficent way. EEP is on your side!

Electrical Software

Electrical design without appropriate software and tools is impossible to imagine. This section covers professional engineering software for design, MV and LV network and photometric calculations, voltage drop and short circuit calculations etc.

© 2014 EEP - Electrical Engineering Portal. All Rights Reserved | Privacy Policy | 34 queries in 0.210 seconds.

Powered by CsanyiGroup

SHARE

TOPGetPDF

Power Systems Engineering

Reading between the lines

Page 95: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Menu

Top of Form

Bottom of Form

Home

Power 101 Videos

Article Categories

Fundamentals Of Power Systems

Substation Engineering

Industrial Application Of Power Systems

How Stuff Works In A Power System

Professional Engineering Exam – Power Systems

Tools

About

Directional Comparison Blocking Scheme

By Admin On April 9, 2011 · Add Comment

The Directional Comparison Blocking (DCB) scheme is the most popular pilot relaying scheme, implemented to protect extra high voltage power lines. This scheme is more dependable than permissive transfer trip schemes because it trips the breaker even when there is no carrier signal from the remote end pilot relay. Ofcourse, the protective relays need to see the fault first.

Equipment needed for DCB scheme

Distance relay like the Schweitzer 421 and the carrier equipment Pulsar TC-10B.

Power line carrier equipment: line tuner, wave-traps, and hybrids. Output from the carrier equipment is coupled to the power line using line tuners. Hybrids are required to multiplex signals (Tx/Rx) from the carrier equipment. Wave-traps limit the carrier signals to the intended line section.

Implementation

Page 96: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Let’s examine the DCB scheme using the figure below and its scenarios.

Figure 1: Affect of internal vs external faults on relay operation

Fault @ F1 on T-line:This fault is internal to the circuit breakers CB1 and CB2. These breakers are the closest to the fault and tripping them will isolate the fault. In this scenario, CB1 and CB2 will be tripped without any delay by SEL-421.

Fault @ F2 on T-line:The fault is external to CB1 and CB2 but internal to CB3 and its remote end breaker(s). Since zone 2 protective element on the CB1 relay can trip on it, it shouldbe blocked from doing so. The intent is to trip the breakers local to the fault rather than taking out a larger portion of the system.

Thus, while CB3 takes measures to isolate the fault, CB2’s zone 3 element (which looks backwards) detects this fault as external and keys a “block from tripping” signal to CB1. It should be clear now that the SEL-421 at CB1 uses zone 1 and zone 2 to detect faults and that zone 2 is a time delayed logic that acts as a backup to CB3 when it fails to operate.

Fault @ Bus1CB’s 1, 4, and 5 should trip to isolate the fault on Bus 1. If CB1 fails and does not trip then its breaker failure logic will send a transfer trip signal to CB2. Typically, a bus lockout relay is tripped when a breaker connected to the bus fails. The lockout relay is capable of tripping multiple CB’s at the same time. A contact from this relay

Page 97: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

can be assigned to the 85 device at CB1 so that it can key the Direct Transfer Trip signal. See figure 2 for the oneline implementation of this scheme.

Figure 2: Directional Current Blocking Oneline

The DCB scheme is typically used as the first line of defense against faults on the high voltage or extra high voltage transmission lines. When using the power line carrier, the DCB logic is implemented by TC-10B equipment using RF frequency for both transmission and reception of carrier signal.

Advantage of DCB scheme

Dependable scheme since relays do not rely on trip signal from remote end substation to provide protection for internal faults on transmission line. However, to check the integrity of the communication channel, a test signal is transmitted 3 or 4times a day.

* * * * *

Page 98: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Tagged with → directional comparison blocking • line relaying • pilot relaying • pulsar TC10B • Substation Protection

Leave a Reply Cancel reply

Subscribe to Blog via Email

Top of Form

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 466 other subscribers

Email Address

Bottom of Form

From The Web

Recent Articles

Recent Posts

Tags

Choosing Between Resistor and Reactor for Neutral Ground Impedance

Page 102: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Ground Grid Design- Substation Below Grade Engineering

Archives

January 2013 (1)

December 2012 (1)

September 2012 (1)

June 2012 (5)

May 2012 (1)

March 2012 (1)

January 2012 (3)

November 2011 (1)

August 2011 (2)

July 2011 (1)

June 2011 (2)

May 2011 (5)

April 2011 (4)

March 2011 (5)

September 2010 (1)

July 2010 (1)

June 2010 (2)

Tag Cloud

AC system arc flash study arc flash test asymmetrical current base values cable shield grounding direct buried conduits direct transfer trip FACT generator swing Ground grid HVDC IEEE 1584 John Camara Juan L. Bala Lewis Blackburn lockout relays modern power system momentary rating NCEES Professional Engineering neutral

Page 103: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

grounding NFPA 70E OSHA 1910 Pass PE Exam permissive over reaching transfer trip per unit system PE Sample Problems pilot relaying power blackout power flow power system Power transformers PPE protective relaying reactive power support short circuit rating steady state stability substation conduit details symmetrical components symmetrical current system frequency thermal limitation transformers voltage drop limitation Zia A. Yamayee

Books on my Shelf

Protective Relaying by Lewis Blackburn & Thomas Domin

NEC 2011 Handbook by NFPA

Power System Analysis and Design by Duncan Glover and Mulukutla Sarma

Electrical Transmission and Distribution Reference Book by Westinghouse Engineers

Welcome to PE Guru

Your Host: Aleen Mohammed, MSEE, Professional Engineer.

About

Contact

Terms & Conditions

Privacy Policy

Site Map

Copyright © 2013 peguru.com. All Rights Reserved. All content posted are those of the authors alone subject to terms and conditions and do not necessarily represent Burns & McDonnell’s positions, strategies or opinions.

Page 104: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

0inShare

print

<iframe src="//www.googletagmanager.com/ns.html?id=OPTION('google_tag_manager_id')" height="0" width="0" style="display:none;visibility:hidden"></iframe>

Shopping cart 0 Items | US$ 0.00

English

Login

Home

Catalog

Help

Search

Upload papers

You are here: Homepage > Catalog > Engineering > Power Engineering

Read the ebook

Page 105: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Substation Faults and Protection

Technical Report, 2011, 17 Pages

Engineering - Power Engineering

Printing version for only US$ 0.99

Download immediately. Price incl. VAT

Format: PDF – for PC, Kindle, tablet, mobile

Add to cart

Category

Technical Report

Institution / College

Atlantic International University (Niger Delta University)

Grade

Page 106: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

A

Add comment

Excerpt

TABLE OF CONTENT

1.0 Introduction

2.0 General Analysis and Background Theory2.1 Protection Against Direct Over Voltage2.2 Protection Against Travelling Waves

3.0 Method of Study

4.0 Results

5.0 Discussion

6.0 Recommendation

7.0 Conclusion

8.0 References

SUBSTATION FAULTS AND PROTECTION

1.0 INTRODUCTION:

The purpose of this work is to establish the type of faults that may result when substations are sited in the region of the Niger Delta due to the prevailing climatic conditions. This will aimed atensuring as far as possible a small probability of damage to substation insulations.

For most transmission lines, relatively large numbers of yearly flashovers are permitted but such number of insulation damages is absolutely not allowed for substations. Flashover of insulation at substation means a short circuit on the busbar which even with the modern means of relay protection can cause most sever system damages. Substations unlike lines have very low probability of damage therefore a quantitative idea of the probability, the so called index of lightning resistance of a substation is used. It is equal to the calculated number of years during which a voltage dangerous for the substation installation does not occur. For modern high voltage substations, the index of lightning resistance is calculated as hundred or even as thousandyears which is a proof of attempts made by designers to ensure the largest degree of lightning resistance of substation (Rao,2008,U.S Dept of Agri.2001,Martinez and Castro 2003).

Page 107: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Substations must be protected from the direct lightning strokes and voltage waves travelling from the line as well as switching surges. In transmission lines the induced strokes (indirect strokes) due to lightning are important for 11kv lines only. For high voltage transmission lines (up to 220kv) the surges due direct lightning strokes determine the line insulations design. For extra high voltage (400kv and above) the severity of swiching surges is much more than that due to lightning (Gupta, 2008). Whether external or internal over voltage, for reliable operations of substation proper protection is necessary. There are factors that may not produce over voltage butare capable of affecting the operation of the equipments as well as lowering the flashover, these are humidity, rain temperature, pressure and to some extent contamination on the surface of insulator and equipments (outdoor).

For proper consideration of these factors with the external and internal over voltages, a proper selection of protective devices may be made for the safe operation of substation

2.0 GENERAL ANALYSIS AND BACKGROUND THEORY:

Substations can simply be seen as a combination of apparatus that transforms the characteristics of electrical energy from one form or level to another form with the provision of facilities for switching. There are various types of substations and are classified according to their services, design, voltage level and functions. Whatever function a substation is meant for, it is the most sensitive part of the supply system.

For any reliable operation of substation the basic functions must be performed.

- Protection against direct stroke- Protection over travelling surges- Proper earthing scheme must be maintained

2.1 Protection Against Direct Over Voltage:

The effectiveness of lightning protection schemes for high and extra high voltage (ehv) stations depends upon the degree of overhead shielding against direct strokes to the station area. Quantitatively, information on shielding efficiency in terms of shielding failure exposures as a function of shielding angle has been given in several literatures.

The two ways of protecting the equipment from direct stroke is one of the following ways:

(i) Overhead shielding screen (earthed) covering the outdoor substation and the overhead lines approaching the substation.(ii) Lightning masts installed at strategic location in the station. Lightning masts are preferred foroutdoor stations up to 33kv. For 66kv and above the lightning masts become too tall and uneconomical. The overhead shielding wires are preferred because they give adequate protection

Page 108: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

and the height of structures in the station provided with overhead shielding wires is comparatively less than that of lightning masts (Rao, 2008 Mousa 1991).

The height above the surface of ground at which the leader discharge finally orients itself on one of the objects on earth is called “the height of orientation of lightning H”, which in the first instance depend on the height of the lightning conductor h. It is customary to consider that for lightning conductor up to a height of 30m will be, H = kh, where the proportionality k has a value of 10-20 (Razevig 2003 Uppal and Rao 2009)

[...]

Excerpt out of 17 pages - scroll top

Printing version for only US$ 0.99

Download immediately. Price incl. VAT

Format: PDF – for PC, Kindle, tablet, mobile

Add to cart

Details

Title

Substation Faults and Protection

Course

SFP 673

Author

John Tarilanyo Afa

Year2011

Pages

17

Page 109: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Archive No.

V213055

ISBN (eBook)

978-3-656-41136-9

ISBN (Book)

978-3-656-41233-5

File size

901 KB

Language

English

Tags

substation faults protection

Quote paper

John Tarilanyo Afa

, 2011, Substation Faults and Protection, Munich, GRIN Publishing GmbH, http://www.grin.com/en/e-book/213055/substation-faults-and-protection

Similar texts

o

Formatvorlage (Microsoft Word) für eine Diplomarbeit, Masterarbeit,...

Für MS Word 2003 - Update 2010

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 24 Pages

Page 110: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

US$ 16.99

o

Formatvorlage (OpenOffice) für eine Diplomarbeit, Masterarbeit, Hau...

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 34 Pages

US$ 16.99

o

Formatvorlage / Vorlage zur Erstellung einer Diplomarbeit, Bachelor...

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 14 Pages

US$ 16.99

o

Formatvorlage / Vorlage für eine Diplomarbeit / Hausarbeit

Für MS Word 2007 - dotx

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 24 Pages

US$ 8.99

Page 111: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

o

Anleitung zum Erstellen schriftlicher Arbeiten: Der Aufbau einer wi...

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 19 Pages

US$ 16.99

o

Erstellen einer schriftlichen Hausarbeit

Vorlagen, Muster, Formulare, Infobroschüren

Term Paper, 13 Pages

US$ 16.99

o

Wissenschaftliches Arbeiten. Grundtechniken

Bibliografieren - Reden - S...

Vorlagen, Muster, Formulare, Infobroschüren

Script, 45 Pages

US$ 21.99

o

Ratgeber zur Erstellung wissenschaftlicher Arbeiten. Diplomarbeiten...

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 38 Pages

Page 112: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

US$ 0.99

Comments

No comments yet.

Send

Your comment is reviewed before being published

Page 113: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 114: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 115: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 116: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 117: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 118: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 119: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 120: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 121: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 122: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 123: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 124: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 125: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 126: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 127: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 128: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 129: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 130: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 131: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 132: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 133: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 134: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 135: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 136: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 137: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 138: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 139: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 140: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 141: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 142: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 143: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 144: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 145: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 146: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Page 147: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 148: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Upload your own papers! Earn money and win an iPhone 6.

Excerpt from 17 pages Author

John Tarilanyo Afa

eBooks

9

Country

Nigeria

Member since

04/14/2013

Upload Papers,win an iPhone 6

All GRIN-authors participate in our quarterly drawing to win an iPhone 6. Each text counts as one lot!

Publish now - it's free

Page 149: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Publish now - it's free

Similar texts

o

Formatvorlage (Microsoft Word) für eine Diplomarbeit, Masterarbeit,...

Für MS Word 2003 - Update 2010

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 24 Pages

US$ 16.99

o

Formatvorlage (OpenOffice) für eine Diplomarbeit, Masterarbeit, Hau...

Page 150: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 34 Pages

US$ 16.99

o

Formatvorlage / Vorlage zur Erstellung einer Diplomarbeit, Bachelor...

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 14 Pages

US$ 16.99

o

Formatvorlage / Vorlage für eine Diplomarbeit / Hausarbeit

Für MS Word 2007 - dotx

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 24 Pages

US$ 8.99

o

Anleitung zum Erstellen schriftlicher Arbeiten: Der Aufbau einer wi...

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 19 Pages

US$ 16.99

Page 151: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

o

Erstellen einer schriftlichen Hausarbeit

Vorlagen, Muster, Formulare, Infobroschüren

Term Paper, 13 Pages

US$ 16.99

o

Wissenschaftliches Arbeiten. Grundtechniken

Bibliografieren - Reden - S...

Vorlagen, Muster, Formulare, Infobroschüren

Script, 45 Pages

US$ 21.99

o

Ratgeber zur Erstellung wissenschaftlicher Arbeiten. Diplomarbeiten...

Vorlagen, Muster, Formulare, Infobroschüren

Elaboration, 38 Pages

US$ 0.99

General

Home

Upload

Catalog

Network

About us

Page 153: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Affiliate Programs

Become Ambassador

Dissertations

Publish your dissertation for free

Order author's copies at a reduced price

Which file formats?

FAQ

For Authors

For Buyers

Affiliate Program

My GRIN-Account

Copyright

© GRIN Verlag GmbH

All content copyright restricted. Copying and distribution prohibited.

[email protected]

Terms

Open Publishing

About GRINGRIN Publishing, located in Munich, Germany, has specialized since its foundation in 1998 in the publication of academic ebooks and books. The publishing website GRIN.com offer students,graduates and university professors the ideal platform for the presentation of scientific papers, such as research projects, theses, dissertations, and academic essays to a wide audience.

Free Publication of your term paper, essay, interpretation, bachelor's thesis, master's thesis, dissertation or textbook - upload now!

Follow GRIN on

Page 154: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

GRIN Verlag GmbH

o Nymphenburger Str. 86

o 80636

o Munich, Deutschland

+49 89-550559-0

+49 89-550559-10

[email protected]

Register or log inNew here?

For new authors:free, easy and fast

* Required Fields

First Name*

Last Name*

E-Mail*

Password*

Optional: Ambassador code

Our newsletter keeps you up to date with all new papers in your subjects

Page 155: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Get information via e-mail

You can unsubscribe any time

Register

Login

For registered authors

* Required Fields

E-Mail*

Password*

Forgot Password?

Login

The alternative

Connect with Facebook

Connect with Google

Forgot Password?

Request a new password via email.

E-Mail

Send

Power Systems Engineering

Reading between the lines

Page 156: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Menu

Top of Form

Bottom of Form

Home

Power 101 Videos

Article Categories

Fundamentals Of Power Systems

Substation Engineering

Industrial Application Of Power Systems

How Stuff Works In A Power System

Professional Engineering Exam – Power Systems

Tools

About

Permissive Overreaching Transfer Trip Scheme (POTT)

By Admin On January 9, 2012 · Add Comment

POTT scheme relies on receiving a trip signal from the remote end relay and the local relay to initiate breaker trip. The signal is keyed using a Frequency-Shift Keying(FSK) transmitter/receiver.

Under normal conditions, the relay transmits a “guard” frequency. This frequency disengages the relay from operating.

Under abnormal conditions, the relay switches to a higher or a lower frequency to transmit a “trip” signal. When relays on both ends of the line shift to the “trip” frequency, only then are the breakers tripped. The guard/trip frequencies are maintained and specified by the utility such that no two lines in the system use the same frequency.

Usually POTT schemes are not implemented using the power line carrier. A fault on the T-line may short out the trip signal and therefore inhibit relay operation. In this scenario, multi-phase coupling of the carrier signal provides the necessary redundancy for the secure operation of this scheme.

Page 157: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

* * * * *

Tagged with → FSK • permissive over reaching transfer trip • POTT • POTT scheme •Power Line Carrier

Leave a Reply Cancel reply

Subscribe to Blog via Email

Top of Form

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 466 other subscribers

Email Address

Bottom of Form

From The Web

Recent Articles

Recent Posts

Tags

Page 160: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

power flow

power system

Power transformers

PPE

protective relaying

reactive power support

short circuit rating

steady state stability

substation conduit details

symmetrical components

symmetrical current

system frequency

thermal limitation

transformers

voltage drop limitation

Zia A. Yamayee

Top Posts & Pages

Per Unit System - Practice Problem Solved For Easy Understanding

What Do Symmetrical, Asymmetrical, Momentary, Interrupting, Close & Latch Ratings Mean?

Power Circuit Breaker - Operation and Control Scheme

Page 161: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Ground Grid Design- Substation Below Grade Engineering

Permissive Overreaching Transfer Trip Scheme (POTT)

Archives

January 2013 (1)

December 2012 (1)

September 2012 (1)

June 2012 (5)

May 2012 (1)

March 2012 (1)

January 2012 (3)

November 2011 (1)

August 2011 (2)

July 2011 (1)

June 2011 (2)

May 2011 (5)

April 2011 (4)

March 2011 (5)

September 2010 (1)

July 2010 (1)

Page 162: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

June 2010 (2)

Tag Cloud

AC system arc flash study arc flash test asymmetrical current base values cable shield grounding direct buried conduits direct transfer trip FACT generator swing Ground grid HVDC IEEE 1584 John Camara Juan L. Bala Lewis Blackburn lockout relays modern power system momentary rating NCEES Professional Engineering neutral grounding NFPA 70E OSHA 1910 Pass PE Exam permissive over reaching transfer trip per unit system PE Sample Problems pilot relaying power blackout power flow power system Power transformers PPE protective relaying reactive power support short circuit rating steady state stability substation conduit details symmetrical components symmetrical current system frequency thermal limitation transformers voltage drop limitation Zia A. Yamayee

Books on my Shelf

Protective Relaying by Lewis Blackburn & Thomas Domin

NEC 2011 Handbook by NFPA

Power System Analysis and Design by Duncan Glover and Mulukutla Sarma

Electrical Transmission and Distribution Reference Book by Westinghouse Engineers

Welcome to PE Guru

Your Host: Aleen Mohammed, MSEE, Professional Engineer.

About

Contact

Terms & Conditions

Privacy Policy

Site Map

Page 163: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Copyright © 2013 peguru.com. All Rights Reserved. All content posted are those of the authors alone subject to terms and conditions and do not necessarily represent Burns & McDonnell’s positions, strategies or opinions.

0inShare

print

Power Systems Engineering

Reading between the lines

Menu

Top of Form

Bottom of Form

Home

Power 101 Videos

Article Categories

Fundamentals Of Power Systems

Substation Engineering

Industrial Application Of Power Systems

How Stuff Works In A Power System

Professional Engineering Exam – Power Systems

Tools

About

Page 164: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

What Do Symmetrical, Asymmetrical, Momentary, Interrupting, Close & Latch Ratings Mean?

By Admin On June 7, 2011 · 6 Comments

These terms were coined over the years to identify the appropriate short circuit current magnitude that engineers could use to rate the switchgears, switchboards, panelboards, circuit breakers, fuses, etc.

Without delving into details, the following is a simple explanation of these terms andwhen they are used. Note that these ratings are current ratings.

Symmetrical (RMS) Current

This term is widely used to identify the short circuit rating of breakers in low voltagesystems. This is because the low voltage breakers take 8 to 10 cycles to break a circuit. In 8 or more cycles (typically 15), the fault current will decay to a symmetrical waveform which, ofcourse, would have no DC offset.

Low voltage panels too are rated by their symmetrical current rating.

Most modern circuit breakers implicitly list their ratings in symmetrical amps.

Asymmetrical (RMS) Current

During the first half of a cycle, the fault current is at its largest magnitude – occurring at a moment when the voltage wave is passing the reference axis. This asymmetry is brought on by the DC offset current (see Figure 1 below.) At the half cycle mark, the peak RMS value of the asymmetrical current is about ~1.6 times thesymmetrical current.

Keep in mind that this magnitude is NOT the same as peak asymmetrical current. In 1987, the IEEE committee established this term (peak asymmetrical) to make it clear to the manufacturers that it is the peak current magnitude and not the RMS peak that generates destructive forces. How destructive? Well, peak asymmetrical current is about ~2.7 times the symmetrical current.

Realistically, the RMS quantity of any AC signal (voltage or current) is a phantom quantity. It is created to compare the AC magnitude to that of the DC i.e. making sure you are comparing apples to apples.

So, for example, a 5Amp RMS AC current is the same as a 5Amp DC current.

However, the peak value of the AC quantity will be .

Page 165: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every
Page 166: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Figure 1: Fault current magnitude following a fault

Momentary Rating

This rating is used in medium voltage and high voltage systems especially when calling out switchgears, switchboards and circuit breakers.

This is a half cycle rating and quite similar in meaning to peak RMS asymmetrical amps except it does not have the same unwieldy name.

Interrupting Rating

Quintessentially associated with medium voltage and high voltage circuit breakers and fuses.

It is the short circuit current a protective device can safely interrupt typically in 2 cycles to 5 cycles. The fault current magnitude is less than the momentary currents since the fault current would have decayed in this duration.

Interrupting rating can be specified as short circuit MVA too. This is given by the following:

where,

= Line to line voltage in kV

= Interrupting current in kA

Close & Latch Rating or Making Current

Again, used for high voltage and medium voltage circuit breakers. It is the capabilityof the breaker to close into a fault and stay in that position without destroying its poles. This rating is same as the peak asymmetrical current (during the first cycle) after the breaker closes.

Typically, in HV systems, the circuit breakers are programmed to automatically reclose after opening for approximately 15 to 50 cycles (depending on the operatingvoltage.) If the fault condition disappears in this duration then the breaker will remain closed otherwise the breaker is tripped and blocked from reclosing. Essentially, this rating determines if the breaker can stay closed or not.

One cycle is ‘ th of a second, assuming the system frequency is 60hz.

Tagged with → asymmetrical current • close and latch rating • interrupting rating • momentary rating • short circuit MVA • short circuit rating • symmetrical current

Page 167: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

6 Responses to What Do Symmetrical, Asymmetrical, Momentary, Interrupting, Close & Latch Ratings Mean?

Allan Camello says:

September 27, 2014 at 2:45 am

What is the difference between interrupting current and momentary current?

Solomon Cooper says:

July 7, 2014 at 3:09 pm

make and break current rating(IEC) is then associated synonymously with the close and latch current rating(ANSI).

ashok reddy reguri says:

January 29, 2014 at 9:57 am

Good information

dilip says:

November 23, 2013 at 9:09 pm

i want to check asymmetrical waveform in my relay with current source, how it is possible

Admin says:

January 30, 2013 at 10:58 pm

Got it.

Page 171: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

power flow

power system

Power transformers

PPE

protective relaying

reactive power support

short circuit rating

steady state stability

substation conduit details

symmetrical components

symmetrical current

system frequency

thermal limitation

transformers

voltage drop limitation

Zia A. Yamayee

Top Posts & Pages

Per Unit System - Practice Problem Solved For Easy Understanding

What Do Symmetrical, Asymmetrical, Momentary, Interrupting, Close & Latch Ratings Mean?

Power Circuit Breaker - Operation and Control Scheme

Page 172: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Permissive Overreaching Transfer Trip Scheme (POTT)

Ground Grid Design- Substation Below Grade Engineering

Archives

January 2013 (1)

December 2012 (1)

September 2012 (1)

June 2012 (5)

May 2012 (1)

March 2012 (1)

January 2012 (3)

November 2011 (1)

August 2011 (2)

July 2011 (1)

June 2011 (2)

May 2011 (5)

April 2011 (4)

March 2011 (5)

September 2010 (1)

July 2010 (1)

Page 173: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

June 2010 (2)

Tag Cloud

AC system arc flash study arc flash test asymmetrical current base values cable shield grounding direct buried conduits direct transfer trip FACT generator swing Ground grid HVDC IEEE 1584 John Camara Juan L. Bala Lewis Blackburn lockout relays modern power system momentary rating NCEES Professional Engineering neutral grounding NFPA 70E OSHA 1910 Pass PE Exam permissive over reaching transfer trip per unit system PE Sample Problems pilot relaying power blackout power flow power system Power transformers PPE protective relaying reactive power support short circuit rating steady state stability substation conduit details symmetrical components symmetrical current system frequency thermal limitation transformers voltage drop limitation Zia A. Yamayee

Books on my Shelf

Protective Relaying by Lewis Blackburn & Thomas Domin

NEC 2011 Handbook by NFPA

Power System Analysis and Design by Duncan Glover and Mulukutla Sarma

Electrical Transmission and Distribution Reference Book by Westinghouse Engineers

Welcome to PE Guru

Your Host: Aleen Mohammed, MSEE, Professional Engineer.

About

Contact

Terms & Conditions

Privacy Policy

Site Map

Page 174: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Copyright © 2013 peguru.com. All Rights Reserved. All content posted are those of the authors alone subject to terms and conditions and do not necessarily represent Burns & McDonnell’s positions, strategies or opinions.

0inShare

print

PreviousNext

CloseStart slideshow

Loading

PreviousNext

Skip to main content

LinkedIn Home

What is LinkedIn?

Join Today

Sign In

Power Plant - Discussion Point & Job Section

49 members

Join

When you join a group, other members will be able to see your profile and message you. The group logo will be visible on your profile unless you change that setting.

Page 175: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Information and settings

Discussions

Promotions

Jobs

Search

Have something to say? Join LinkedIn for free to participate in the conversation. When you join, you can comment and post your own discussions.

Ranveer

Lightining Arrester Why we take the rating of surge arrestor( KV) always less then system voltage? what's calculation involved?

Ranveer S.Power Engineer

I have raised this query in Electrical Professional Group And find following answer

Radomir Pistek • You can check next document: http://www.oez.com/file/402and calculation tool: http://www.oez.com/technical-support-software-support/computational-program-sichr

Michael Novev • Lightning arresters are always connected phase to ground. Rating is based on system grounding. Simplified calculation are if effectively grounding Uar=√2Usys÷√3, if isolated neutral Uar=√2Usys To be more precise you need better coordination study.

Page 176: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Radomir Pistek • for HV applications you can check this document: http://www05.abb.com/global/scot/scot245.nsf/veritydisplay/5e7929863c37055ac1257ab6004619da/$file/1HSM%209543%2012-00%20Surge%20Arresters%20Buyers%20Guide%20Edition%209.2%202012-08%20-%20English.pdf

Radomir Pistek • Yaw. I think there is missing from your side voltage level and application description. This is important for calculation. Based on my previous experience in this area I think that up to 1kV you can "calculate" solution in own way, but what can be higher there is better to ask for any producer for help. There is not problem to propose / calculate parameters, problems begin with design and realization (safe spaces around products, design for cabinets with this kind of equipment, possible customized standards defined by local regulators / country /world area and of course at the end customer standards).

Ranveer singh • Is it possible to have LA rating greater than the system voltage?

Michael Novev • Yes for isolated neutral system. In case of ground fault, line to ground voltage increases up to line to line or system voltage.

Michael Novev • Electrical selection of LA is based upon 3 major factors, system voltage, system grounding and ground fault duration. (or earthing instead of grounding as used in Europe). If system neutral is isolated in case of ground fault there is no ground fault current. The voltage between any of the healthy phases and ground raises up to line to line level (faulty phase becomes ground). System can operate in this condition for prolonged period of time in some cases. If ground fault condition can be extended beyond 2 hours recommended LA minimum value should be up to 1,25Usys. That's the reason why in my first response I used simplified calculation for effectively grounded system Uar=√2Usys÷√3, for isolated neutral Uar=√2Usys. These are basic simplified calculations, to be more precise full insulation coordination study is desirable. Then LA will be better coordinated. Some LA manufacturers also simplified selection. However it follows same principles.

Ajikumar Nair • LA(Lightning Arrester) protect power system and equipment from external surge voltages (lightning) and not depended on the power system characteristics(except the voltage level) and is sensitive to the frequency of the lightning surges.

Michael Novev • LA are intended to protect the equipment in two cases. First is as Mr. Ajikumar mentioned external surge voltage or lightning, second is commutation overvoltage. First one exceeds significantly system insulation level. Second are more difficult to predict, but not less dangerous. That's why LA should be designed at lower possible safe insulation level. This will

Page 177: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

definitely depend on system characteristics. If LA suitable for directly grounded system are used at same system voltage at insulated neutral system they will operate on the healthy phases at eachground fault.

Arshad Siddiqui • Actually surge arrestor should be rated as 80% maximum of the system voltage just like we take for the breakers loading as a tolerance factor. i.e 0.80xsystem voltage.Michael also has given this concept mathematically.But this is not applicable for isolatedneutral. In that case LA will be more than the system voltage.

Flag as Inappropriate

Like

Comment (2)

Share

Share this discussion

December 14, 2012

Close viewer

Comments

Dinesh K. likes this

2 comments

Chandra Sekhar

Chandra Sekhar ..

Page 178: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Senior Manager - Electrical, Thermal Power Generation professional.

You should consider system Phase to Earth voltage as Lightning arrester rating, as it will be connected in between phase and earth. However, arrester rating differs depending upon1). the type of system i.e., effectively grounded system or non-effectively grounded system and2). class of use i.e., station class or distribution class.

chandra sekhar, Mobile- +91 - 9492 7696 35

Naomi

Naomi M.

Maintenance Engineer at ZAMBIA National Broadcastinng Corporation

a question in line with this,how is the rating of a surge arrestor determined? example: single phase load: 220Vac,30A,at 700w or 3phase 400Vac,90A,and 700w

About

Feedback

Privacy & Terms

LinkedIn Corp. © 2015

Feedback

Help Center

About

o Press

o Blog

o Developers

Careers

Page 179: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Advertising

Talent Solutions

Sales Solutions

Small Business

Mobile

Language

o Bahasa Indonesia

o Bahasa Malaysia

o Čeština

o Dansk

o Deutsch

o English

o Español

o 正體中文

o Français

o 한국어

o Italiano

o 简体中文

o Nederlands

o 日本語

o Norsk

o Polski

o Português

o Română

Page 180: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

o Русский

o Svenska

o Tagalog

o ภาษาไทย

o Türkçe

SlideShare

LinkedIn Updates

LinkedIn Influencers

LinkedIn Jobs

Jobs Directory

Pulse Directory

Company Directory

Groups Directory

Universities Directory

Title Directory

LinkedIn Corporation © 2015

User Agreement

Privacy Policy

Community Guidelines

Cookie Policy

Copyright Policy

Unsubscribe

Page 181: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

< img src="https://sb" style="display:none" width="0" height="0" alt=""> < img src="https://static.licdn.com/scds/common/u/cgi-bin/m?ci=us-603751h&cg=0&cc=1&ts=noscript" width="1" height="1" alt="" style="display:none"> < img src="https://static.licdn.com/scds/common/u/csp/dtag?p=10" width="1" height="1"alt="" style="display:none">

My Account | My Orders | 0 item(s) |

Free Shipping | Low Price Guarantee | Volume Pricing

ALL CATEGORIES

RESOURCES

CFM CALCULATOR

Fan Categories

ACCESSORIES |

AIR CURTAINS |

AIR MOVERS |

BATHROOM FANS |

BLOWERS |

CEILING |

CIRCULATING |

CONFINED SPACE |

DUCT INLINE |

EVAPORATIVE COOLING |

EXHAUST - ROOF |

Page 183: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

FAN CFM CALCULATORQuestions? call 866-727-1060

ft. Length of Room

ft. Width of Room

ft. Height of Room

min. Frequency of Air Change

W x L x H / Minutes

CFM Fan(s) CFM Required

Note: You need to have Javascript enabled on your browser for the calculator to work.

EXHAUST / INTAKE VENTILATION GUIDE @ O" SP

CFM REQUIRED FOR VENTILATION = BUILDING CUBE / MINUTES PER AIR CHANGE

MINUTE AIR CHANGE CHART FOR COMMERCIAL AND INDUSTRIAL APPLICATION

-- TYPICAL RANGE -- TYPICAL RANGE -- TYPICAL RANGE

Assembly (6) 2-10 Engine Rooms (3) 1-5 Packing Houses (4) 3-5

Auditoriums (6) 1-20 Factories (7) 4-10 Plants (7) 4-10

Bakeries (2) 1-3 Foundries (5) 2-8 Plating Plants (4) 2-5

Banks (6) 3-10 Garages (7) 4-10 Print Shops (7) 4-10

Bars (4) 2-5 Generating Plants (4) 2-5 Restaurants (6) 2-10

Barns (15) 10-20 Glass Plants (2) 1-3 Rest Rooms (7) 4-10

Boiler Rooms (2) 1-3 Gymnasiums (6) 2-10 Schools (7) 4-10

Bowling Alley (3) 1-5 Hallways (8) 4-12 Stores (7) 4-10

Page 184: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Cafeteria (4) 3-5 Kitchens (Comm.) (3) 1-5 Theaters (6) 4-8

Churches (6) 2-10 Laboratories (3) 1-5 Transformer Rooms (3) 1-5

Classrooms (6) 4-8 Libraries (4) 2-5 Turbine Rooms (4) 2-5

Compressor Rooms (2) 1-3 Laundries (2) 1-3 Waiting Rooms (12) 10-15

Dance Halls (6) 2-10 Locker Rooms (6) 2-10 Warehouses (7) 4-10

Dairies (4) 2-5 Machine Shops (4) 2-5 Welding Rooms (3) 1-4

Dormitories (6) 4-8 Markets (6) 2-10 -- -- --

Dry Cleaning Plant (3) 1-5 Mills (4) 2-5 -- -- --

We accept Visa, Mastercard, Discover, American Express, Bank Wire,

Paypal and Net 30 (credit application)

Terms and Conditions | Privacy PolicyCopyright © 2014 IndustrialFansDirect.com - a division of Higher Power Supplies, Inc.

ACCESSORIESo ELECTRONICS

o MIST RINGSo SHUTTERS

o WEATHER HOODSo LIGHTING

AIR CURTAINS

AIR MOVERS

BATHROOM FANSo BATHROOM FANSo BATHROOM FAN KITS

o BATHROOM DUCT FANS

BLOWERS

o CAST ALUMINUM PRESSURE BLOWERS

Page 185: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

PRESSURE BLOWERS

VOLUME BLOWERS

o INDOOR-OUTDOOR DUCTo ROOFTOP BELT

o SWITCH RELUCTANCEo INDOOR DUCT

CEILING

CIRCULATINGo MULTI-MOUNT

o FLOOR AND PEDESTALo WALL

o CEILINGo INDOOR - OUTDOOR

o EXPLOSION PROOFo WASHDOWN DUTY

CONFINED SPACEo STANDARD AXIALo VOLUME AXIAL

o 12 VOLT DCo EXPLOSION PROOF

DUCT INLINEo MULTI-PURPOSEo SQUARE INLINE

o TUBE AXIAL BELT DRIVEo TUBE AXIAL DIRECT DRIVE

o SPRAY BOOTH EXHAUST

EXPLOSION PROOF

NON EXPLOSION PROOF

EVAPORATIVE COOLING

EXHAUST - ROOFo ARE DOWNBLAST - DIRECTo COM GRAVITY VENTILATOR

o DB DOWNBLAST - BELTo HRE DOWNBLAST - BELT

o RB UPBLAST - BELTo RD UPBLAST - DIRECT

o RED DOWNBLAST - DIRECTo RTA UPBLAST - BELT

o TXB UPBLAST - BELTo TXD UPBLAST - DIRECT

o WALL EXHAUST

WALL SHUTTER TYPE

WALL CABINET TYPE

WALL DOME TYPE

WALL PANEL TYPE

WALL POLY FIBERGLASS

WALL CENTRIFUGAL

EXPLOSION PROOF

EXHAUST - WALLo WALL - SHUTTER TYPE

o WALL - CABINET TYPE

INDUSTRIAL - BELT

Page 186: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

INDUSTRIAL I - BELT

INDUSTRIAL II - BELT

AGRICULTURE

o WALL - DOME TYPE

o WALL - PANEL TYPE

GENERAL USE - DIRECT

COMMERCIAL SS - DIRECT

COMMERCIAL II - BELT

INDUSTRIAL DIRECT

INDUSTRIAL I - BELT

INDUSTRIAL II - BELT

o WALL - POLY AND FIBERGLASSo WALL - CENTRIFUGAL

o FILTERED EXHAUSTo REVERSABLE SHUTTER TYPE

EXPLOSION PROOFo DOME WALL EXHAUSTo PANEL WALL EXHAUST

o SHUTTER WALL EXHAUSTo CABINET WALL EXHAUST

o COM ROOF EXHAUSTo BLOWER AND EXHAUSTER

o CIRCULATINGo PORTABLE COOLING

o EVAPORATIVE COOLING

o TUBE AXIAL BELT

TUBE AXIAL DRY EXP. PROOF

TUBE AXIAL WET EXP. PROOF

o FILTERED EXHAUST

o CAST ALUMINUM BLOWER

PRESSURE BLOWERS

VOLUME BLOWERS

o EXP. PROOF FILTERED SUPPLY

HIGH VELOCITY

MANCOOLERS

PORTABLE COOLING

SUPPLYo COM GRAVITY VENTILATORo ROOF - FILTERED

o ROOF - HOODED

o WALL - CABINET TYPE

INDUSTRIAL - BELT

INDUSTRIAL 1 - BELT

o WALL - PANEL TYPE

COMMERCIAL I - DIRECT

COMMERCIAL II - BELT

INDUSTRIAL II - BELT

o FILTERED SUPPLY

WHOLE HOUSEo WHOLE HOUSE FANSo ATTIC AND GABLE FANS

Page 189: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Frequently Asked Questions

Ceiling fans :

Q1. What should be the height of the ceiling fans from the floor?

A1. Minimum distance between ceiling fan &floor should be2.3 mtrs (approx 7.5 ft)

Q2. What should be the distance between ceiling & ceiling fan?

A2. Minimum distance between ceiling or a projecting beam & ceiling fan blades should be 0.25 mtrs(approx 9.5inches)

Q3. What should be the distance between ceiling fan & nearest wall?

A3. Horizontal distance between ceiling fan blade tip & nearest wall should be 0.5 times the fan size.

Q4. What should be the clearance between two nearest fans ,if more than one fan are required in a hall?

A4. Minimum clearance between two consecutive fan hooks should be twice the fan size to be fitted.

Q5. What is fan size?

A5. Fan size is the diameter of the circle traced out by the extreme tips of the fan blades, while rotating.

Q6. What are the standard sizes?

A6. Standard sizes available in the market are 600mm, 750mm, 900mm, 1050mm, 1200mm, 1400mm, 1500mm.

Q7. What is the air delivery?

A7. Air delivery is the volume of air swept out by the ceiling fan under test conditions as prescribed in IS-374.

Q8. What is the efficiency of the ceiling fan?

A8. Efficiency of the ceiling fan is a ratio of air delivered by fan in cubic mtrs per minute &electrical power inputs in watts,when fan isoperated at rated voltage.(this is known as the service value of the fan) Efficiency or service value is the air delivery per unit ofpower consumed and expressed as CMM/Watt or CFM/Watt.

Q9. What is rated voltage?

A9. Rated voltage is the voltage written on the rating plate of the fan. (and is normally equal to the supply voltage available in the house)

Page 190: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Click on a FAQ Topic Below

What is a SIS?

What is a SIF?What is SIL?What does functional safety mean?Why were the ANSI/ISA 84, IEC

61508, and IEC 61511 standardsdeveloped?

When do I need a SIF or a SIS?What is a proof-test interval?What is a Process Hazard Analysis

(PHA) and who conducts this?What voting configurations are

required for each SIL level?Will a SIL rated system require

increased maintenance?Can a F&G system be a SIF or SIS?What is SIL 4?Can an individual product be

SIL rated?

What type of communication buses

or protocols are applicable for SIL 2 or SIL 3 systems?

For General Monitors, how can I access the PFD and MTBF data forthe product?

Can a manufacturer state their

products are “SIL X certified” ratherthan “suitable for use in a SIL Xsystem”?

Can a manufacturer state their

products meet all parts of therequirements of IEC 61508 parts1 to 7?

What does "SIL X suitable" mean, is

this a valid statement as per thestandard IEC 61508 or can other wording be used?

1. What is a SIS?A SIS is a Safety Instrumented System. It is designed to prevent or mitigate hazardous events by taking the process to a safe state when predetermined conditions are violated. A SIS is composed of a combination of logic solver(s), sensor(s), and final element(s). Other common terms for SISs are safety interlock systems, emergency shutdown systems (ESD), and safety shutdown systems (SSD). A SIS can be one or more Safety Instrumented Functions (SIF).

2. What is a SIF? SIF stands for Safety Instrumented Function. A SIF is designed to prevent or mitigate a hazardous event by taking a process to a tolerable risk level. A SIF is composed of a combination of logic solver(s), sensor(s), and final element(s). A SIF has an assigned SIL level depending on the amount of risk that needs to be reduced. One or more SIFs comprise a SIS.

3. What is SIL? SIL stands for Safety Integrity Level. A SIL is a measure of safety system performance, or probability of failure on demand (PFD) for a SIF or SIS. There are four discrete integrity levels associated with SIL. The higher the SIL level, the lower the probability of failure on demand for the safety system and the better the system performance. It is important to also note that as the SIL level increases, typically the cost and complexity of the system also increase.

A SIL level applies to an entire system. Individual products or components do not have SIL ratings. SIL levels are used when implementing a SIF that must reduce an existing intolerable process risk level to a tolerable risk range.

4. What does functional safety mean?Functional safety is a term used to describe the safety system that is dependent on the correct functioning of the logicsolver, sensors, and final elements to achieve the desired risk reduction level. Functional safety is achieved when every SIF is successfully carried out and the process risk is reduced to the desired level.

5. Why were the ANSI/ISA 84, IEC 61508, and IEC 61511 standards developed? The standards were a natural evolution for the need to reduce process risk and improve safety through a more formalized and quantifiable methodology. Additionally, and specifically for IEC 61508, as the application and usage of software has evolved and proliferated, there was an increased need to develop a standard to guide system / product designers and developers in what they needed to do to ensure and “claim” that their systems / products were acceptably safe for their intended uses.

Page 191: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Click here for additional information on Standards.

6. When do I need a SIF or a SIS? The philosophy of the standards suggests that a SIS or SIF should be implemented only if there is no other non-instrumented way of adequately eliminating or mitigating process risk. Specifically, the ANSI/ISA-84.00.01-2004 (IEC 61511 Mod) recommends a multi-disciplined team approach that follows the Safety Lifecycle, conducts a process hazard analysis, designs a variety of layers of protection (i.e., LOPA), and finally implements a SIS when a hazardousevent cannot be prevented or mitigated with something other than instrumentation.

7. What is a proof-test interval? Proof testing is a requirement of safety instrumented systems to ensure that everything is working and performing as expected. Testing must include the verification of the entire system, logic solver, sensors, and final elements. The interval is the period of time that the testing occurs. The testing frequency varies for each SIS and is dependent on the technology, system architecture, and target SIL level. The proof-test interval is an important component of the probability of failure on demand calculation for the system.

8. What is a Process Hazard Analysis (PHA) and who conducts this?A PHA is an OSHA directive that identifies safety problems and risks within a process, develops corrective actions to respond to safety issues, and preplans alternative emergency actions if safety systems fail. The PHA must be conducted by a diverse team that has specific expertise in the process being analyzed. There are many consulting and engineering firms that also provide PHA services. PHA methodologies can include a What-If Analysis, Hazard and Operability Study (HAZOP), Failure Mode and Effects Analysis (FEMA), and a Fault Tree Analysis.

9. What voting configurations are required for each SIL level? Obtaining a desired SIL level is dependent on a multitude of factors. The type of technology employed, the number of system components, the probability of failure on demand (PFD) numbers for each component, the system architecture (e.g., redundancy, voting), and the proof testing intervals all play a significant role in the determination of a SIL level. There is not a standard answer for what voting configurations are required for each SIL level. The voting architecture must be analyzed in the context of all the factors noted above.

10. Will a SIL rated system require increased maintenance? SIL solutions are certainly not always the most cost-effective solutions for decreasing process risk. Many times, implementing a SIL solution will require increased equipment, which inevitably will require increased maintenance. Additionally, it is likely that the higher the SIL level, the more frequent the proof testing interval will be, which may ultimately increase the amount of system maintenance that is required. This is why the standards recommend a SIL based solution only when process risk cannot be reduced by other methods, as determined by LOPA.

11. Can a F&G system be a SIF or SIS? A Fire and Gas (F&G) system that automatically initiates process actions to prevent or mitigate a hazardous event and subsequently takes the process to a safe state can be considered a Safety Instrumented Function / Safety Instrumented System.

However, it is absolutely critical in a F&G system to ensure optimal sensor placement. If there is incorrect placement of the gas / flame detectors and hazardous gases and flames are not adequately detected, then the SIF / SIS will not be effective.

Correct sensor placement is more important than deciding whether a F&G SIF / SIS should be SIL 2 or SIL 3.

12. What is SIL 4?SIL 4 is the highest level of risk reduction that can be obtained through a Safety Instrumented System. However, in the process industry this is not a realistic level and currently there are few, if any, products / systems that support this safety integrity level.

SIL 4 systems are typically so complex and costly that they are not economically beneficial to implement. Additionally,if a process includes so much risk that a SIL 4 system is required to bring it to a safe state, then fundamentally there is a problem in the process design which needs to be addressed by a process change or other non-instrumented method.

13. Can an individual product be SIL rated? No. Individual products are only suitable for use in a SIL environment. A SIL level applies to a Safety Instrumented Function / Safety Instrumented System.

Page 192: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

14. What type of communication buses or protocols are applicable for SIL 2 or SIL 3 systems? The type of communication protocol that is suitable for a SIL 2 or SIL 3 system is really dependent on the type of platform that is being used. Options include, but are not limited to: 4-20 mA output signal, ControlNet (Allen Bradley), DeviceNet Safety (Allen Bradley), SafetyNet (MTL), and PROFIsafe. Currently, the ISA SP84 committee is working ondeveloping guidelines for a safety bus, to make sure that the foundations comply with IEC 61508, and IEC 61511 standards. The first devices with a safety bus should be available by 2008. The Fieldbus Foundation is actively involved in the committee and working on establishing Foundation Fieldbus Safety Instrumented Systems (FFSIS) project to work with vendors and end users to develop safety bus specifications.

15. For General Monitors, how can I access the PFD and MTBF data for the products? The General Monitors SIL certificates have the PFD, SFF, and SIL numbers that correspond to each product. MTBF data can be provided by request.

16. Can a manufacturer state their products are “SIL X certified” rather than “suitable for usein a SIL X system”? Individual products are only suitable for use in a SIL environment. A SIL level applies to a Safety Instrumented Function / Safety Instrumented System.

Product certificates are issued either by the manufacturer (self-certification), or other independent agency to show that the appropriate process is followed, calculations have been performed, and analysis has been completed on the individual products to indicate that they are compatible for use within a system of a given SIL level.

Full IEC 61508 certification can apply to a manufacturer’s processes. Full certification implies that a manufacturer’s product development process meets the standards set forth in the appropriate parts of sections 2 – 3 of IEC 61508 (including hardware / system and software). Receiving full certification from an accredited notifying body gives the end user confidence that the manufacturer’s engineering process has been reviewed and its product’s electrical content, firmware and logic have been assessed and conform to the guidelines set forth in the standard.

There are very few nationally accredited bodies that can issue nationally accredited certifications. Other consulting firms issue certificates that indicate that the product and / or process has been reviewed by an independent third party.

17. Can a manufacturer state their products meet all parts of the requirements of IEC 61508 parts 1 to 7?IEC 61508 consists of the following parts, under the general title Functional Safety of electrical/electronic/programmable electronic safety-related systems:Part 1: General requirementsPart 2: Requirements for electrical / electronic/programmable electronicsafety-related systemsPart 3: Software requirementsPart 4: Definitions and abbreviationsPart 5: Examples of methods for the determination of safety integrity levelsPart 6: Guidelines on the application of parts 2 and 3Part 7: Overview of techniques and measures

To be in compliance with the standard, it is necessary to conform to Parts 1 – 3. Parts 4 – 8 are informative only and can be useful in understanding and applying the standard, but do not have requirements for conformance.

Manufacturers of products generally meet Section 2 requirements to determine through a FMEDA analysis that their products are suitable for use within a given SIL level.

Companies choosing to certify their engineering processes and receive full IEC 61508 certification will also comply with Section 3 as it relates to software development.

18. What does SIL X suitable mean, is this a valid statement as per the standard IEC 61508 orcan any other wording be used?SIL stands for Safety Integrity Level. A SIL is a measure of safety system performance, or probability of failure on

Page 193: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

demand (PFD) for a SIF or SIS. There are four discrete integrity levels associated with SIL. The higher the SIL level, the lower the probability of failure on demand for the safety system and the better the system performance. It is important to also note that as the SIL level increases, typically the cost and complexity of the system also increase.

A SIL level applies to an entire system if it reduces the risk in the amount corresponding to an appropriate SIL level. Individual products or components do not have SIL ratings. SIL levels are used when implementing a SIF that must reduce an existing intolerable process risk level to a tolerable risk range.

To be compliant with the standards. It is up to the user to ensure that procedures have been followed properly, the proof testing is conducted correctly, and suitable documentation of the design, process, and procedures exists. The equipment or system must be used in the manner in which it was intended in order to successfully obtain the desired risk reduction level. Just buying SIL 2 or SIL 3 suitable components does not ensure a SIL 2 or SIL 3 system.

..

Page 194: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

< div class="c-box-warning full-width-element" style="text-align: center; "> <div style="margin: auto; padding:10px;" class="container"> <b>For full functionality of ResearchGate it is necessary to enable JavaScript. Here are the <a href="http://www.enable-javascript.com/" target="_blank"> instructions how to enable JavaScript in your web browser</a>.</b> </div>< /div>

Arun Khilnani

Larsen and Toubro

In an industrial set-up, why are the capacitors in a APFC Bank in LV systems connected in Delta, while in HV they are connected in Star?

Why do we use a delta connected capacitor bank for LV systems and a star connected capacitor bank for HV systems? Is it because the Shor Circuit current on LV side is more than HV ? Or has it something to do with in-rush currents ?

TOPICS

Electrical Design

7QUESTIONS

4FOLLOWERS

Electrical Engineering

1,015QUESTIONS

133,691FOLLOWERS

Page 195: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Electrical Power Systems

171QUESTIONS

387FOLLOWERS

Electrical Power Engineering

382QUESTIONS

16,501FOLLOWERS

Power Factor Correction

9QUESTIONS

70FOLLOWERS

Nov 5, 2014 Sha re

Facebook

Twitter

LinkedIn

Google+

0 / 0

POPULAR ANSWERS

Page 196: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Sujit K. Biswas · Jadavpur University

In AC circuits, any Star connection has an equivalent Delta connection, and vice versa. Thus, the actual connection is immaterial electrically, but there are practical conveniences involved.

AC Capacitors upto about 500volts AC rating are cheap and commonly available. Thus, on LT side, connection in Delta meets the voltage need of each capacitor while generating maximum kVAR of compensation per uF used. Capacitors can be easily paralleled to achieve the requirement.

On the HT side, capacitors have to be connected in series. Star connection gives the lower voltage rating requirement of each limb (line voltage divided by 1.732), which is created by series connectionof minimum capacitors. The less the number in series, more is the reliability against failure, requiring the smallest number of capacitor of a given uF to achieve the requirement. However, note that series connection of capacitors reduce the overall uF value of the series string, thus individual capacitors need to be of higher uF value !

Nov 5, 2014

All Answers (7)

Sujit K. Biswas · Jadavpur University

In AC circuits, any Star connection has an equivalent Delta connection, and vice versa. Thus, the actual connection isimmaterial electrically, but there are practical conveniences involved.

AC Capacitors upto about 500volts AC rating are cheap and commonly available. Thus, on LT side, connection in Delta meets the voltage need of each capacitor while generating maximum kVAR of compensation per uF used. Capacitors can be easily paralleled to achieve the requirement.

On the HT side, capacitors have to be connected in series. Star connection gives the lower voltage rating requirementof each limb (line voltage divided by 1.732), which is created by series connection of minimum capacitors. The less the number in series, more is the reliability against failure, requiring the smallest number of capacitor of a given uF to achieve the requirement. However, note that series connection of capacitors reduce the overall uF value of the series string, thus individual capacitors need to be of higher uF value !

Nov 5, 2014

Page 197: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Dhaval Patel · Gujarat Power Engineering and Research Institute

Higher the voltage rating higher is the cost of capacitor. the cost does increase with increase in capacitance value. But a major factor is the voltage rating. On LV side, both star and delta connections can be used. But on HV side, Starconnection is more preferable from the cost point of view as, one can use capacitors of voltage rating which is 1.732thof the HV line voltage, if the capacitor are connected in star.

Nov 6, 2014

Arun Khilnani · Larsen and Toubro

Dear Dhaval,

I got your point. Does the capacitance value has something to do with in-rush currents into the bank as well ?

Regards,

Arun.

Nov 6, 2014

Arun Khilnani · Larsen and Toubro

Dear Sujit Sir,

Thank you for answering. My doubts are quite clear now. Would it be possible to share some literature about this ?

Regards,

Arun.

Nov 6, 2014

Mojtaba Mirsalim · Amirkabir University of Technology

Page 198: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Dear Arun Khilnani, as the price of capacitors go up with the voltage rating, it is economical to use low voltage capacitors in delta connection. In order to use the same cheap capacitors for HV systems, we connect the capacitors in series and in star arrangement to have smaller voltage across each capacitor. As you know the voltage for a phase of a star is 1 over 1.73 the line voltage.

Nov 7, 2014

Arun Khilnani · Larsen and Toubro

Dear Mr. Mirsalim,

Thank you for your reply. That explains a lot.

Regards,

Arun.

Nov 8, 2014

Pravin Sonawane · K. K. Wagh Institute of Engineering Education and Research

Dear Arun Khilnani, as the price of capacitors go up with the voltage rating, and in star voltage rating is divided by 1.732 so in HV system less voltage and hence become economical.

In LV system voltage is already less where capacitor are available in low cost and you can generate more KVAR in this.

secondly, in delta third harmonic current can be circulated and hence harmonic current can not pass towards utility. whereas in star we need to take care of harmonic current through proper neutral grounding.

In both cases series and parallel resonance must be checked while designing circuit.

Nov 10, 2014

More questions, even more answers

Over 200 000 questions asked

Over 1 million answers provided

Page 199: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

75% of questions answered within 48 hours

Start getting answers

Question Followers (10)

Views 203

Followers 10

Answers 7

© 2008&dash;2015 researchgate.net. All rights reserved. About us · Contact us · Developers · News · Privacy · Terms

Already a member? Log in

Log in

Page 200: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Email

Password Forgot password?

Keep me logged in

Log in with Facebook

ResearchGate is the professional network for scientists and researchers.

Got a question you need answered quickly?

Technical questions like the one you've just found usually get answered within 48 hours on ResearchGate.

Sign up today to join our community of over 6 million scientific professionals.

Join for free

Page 202: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Power

Pumps & Valves

Surface Technology

Water Treatment

Welding Technology

Archives

2014

January

February

March

April

May

June

July

August

September

October

November

December

2013

January

February

March

April

May

June

Page 203: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

July

August

September

October

November

December

2012

January

August

September

October

November

December

Videos

Advertise

Subscribe

Print Subscription Rates

Download Form

Events

Contact Us

Home

About Us

About Publisher

About Magazine

Ad Listing

Product Listing

Page 204: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Air Compressors

Automation & Control

Bearings

Cable & Wires

Chemical & Process

Engineering

Gears & Motors

Industrial Cleaning Machines

Industrial Safety

Instrumentation

Logistics

Machine Tools

Material Handling

Metal & Steel Industry

Power

Pumps & Valves

Surface Technology

Water Treatment

Welding Technology

Archives

2014

January

February

March

April

May

Page 205: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

June

July

August

September

October

November

December

2013

January

February

March

April

May

June

July

August

September

October

November

December

2012

January

August

September

October

November

Page 206: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

December

Videos

Advertise

Subscribe

Print Subscription Rates

Download Form

Events

Contact Us

Home

About Us

About Publisher

About Magazine

Ad Listing

Product Listing

Air Compressors

Automation & Control

Bearings

Cable & Wires

Chemical & Process

Engineering

Gears & Motors

Industrial Cleaning Machines

Industrial Safety

Instrumentation

Logistics

Machine Tools

Page 207: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Material Handling

Metal & Steel Industry

Power

Pumps & Valves

Surface Technology

Water Treatment

Welding Technology

Archives

2014

January

February

March

April

May

June

July

August

September

October

November

December

2013

January

February

March

April

Page 208: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

May

June

July

August

September

October

November

December

2012

January

August

September

October

November

December

Videos

Advertise

Subscribe

Print Subscription Rates

Download Form

Events

Contact Us

Page 209: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Top of Form

Bottom of Form

Technology Updates

Zero cross over turn on - SCR firing card for Capacitor Bank

Libratherm offers SCR firing card model TSC-306 which is specially designed for APFC control applications to switch ON and OFF 3 phase capacitor banks, based on the command from the automatic power factor controller (APFC). These cards are developed to replace the electro-mechanical contactor based capacitor bank switch with the solid state switch using silicon controlled rectifiers (SCRs) or thyristors. The firing pulses are generated using zero cross over firing techniques and two sets of gate / cathode pulses are isolated using the on card ferrite core pulse transformers. Each card can simultaneously trigger 2 sets of back to back SCRs or 2 thyristor modules to switch 3 phase capacitor bank. TSC-306 accepts control signal in the form of relay contact or DC pulse from APFC, there by turning on or off the SCRs to connect or disconnect the capacitor bank to the incoming 3 phase power lines.

Page 210: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

TSC-306-S

TSC-360-D

Each TSC-306 card has the provision to accept 2 external thermostat contacts, which can be used to operate the cooling fan mounted on the heat sinks and to trip the circuit in case of over - heating. On card LED indicates the on/off status of incoming DC power supply, firing of capacitor banks and over temperature. Normally, each of the power factor controller gives 6 to 12 outputs to select that many capacitor banks of different KVAR depending on the total KVAR demand to maintain the unity power factor. Hence, for each output from APFC it will be requiredto use 6 to 12 nos. of TSC-306 cards.

Page 211: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

The APFC panel builders can use TSC-306 as an independent firing card and can wire the SCR modules separately mounted on the heat sink in the panel. The physical isolation of electronic cards and SCR modules makes the overall system more safe, reliable and it becomes easy to maintain and service. Libratherm has supplied more than 5000 cards, which are installed on the field giving satisfactory performance for power factor control application.

Technical Specifications:

Item Zero cross over SCR Firing Card for 3 phase capacitor bank selection.

Model TSC-306-S (Stud mounting) and TSC-306-D (DIN rail mounting)

Control Command

12 to 24DC pulse or potential free contact from APFC

Triggering Pulses

Gate/ Cathode pulses - isolated from the Input – suitable to fire 25A to 500A back to back connected SCRs

Page 212: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

modules G1K1+G2K2 and G3K3+G4K4

Triggering Technique

Guaranteed Zero cross over firing to prevent generation of transients during switching action.

Gate Current Max. 350 mA.

Switching time Min. 100mS (5 AC cycles @ 50Hz line frequency)

Load Configuration

Single capacitor bank in 3 phase delta configuration. (Detail wiring diagram as shown below)

Over Temperature Protection

Facility to accept 2 nos. of thermostat input for fan control and trip function.

LED Indications For Power ON, THY1 ON, THY2 ON, FAN ON, CB ON, Over Temperature.

Aux. Supply Voltage

12VDC @ 600mA max.

Three Phase Voltage

110 to 500VAC (Special cards are available for 690VAC supply)

Mounting Can be easily mounted on the 35 mm DIN rail or on the base plate.

Page 213: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Card Size 150 (l) x 109 (w) x 60 (h) mm. (with DIN rail frame)

Application:Following diagram shows – one of the application of using ZERO CROSS OVER firing card model: TSC-306 for Automatic power factor control – for selecting the capacitorbank using back to back connected SCRs. One such card will be required for each of the capacitor bank, which can be selected through APFC controller by giving relay contacts or DC pulse to this card. TSC-306 cards can be used by APFC panel buildersand OEMs. Using this card, one can make their own thyristor switch module for desired KVAR by appropriately choosing SCRs, Heat sinks and RC snubber circuits.

For more information,Web : www.libratherm.com

Page 214: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Follow Us

Facebook

Twitter

Linkedin

Youtube

Subscribe to our Monthly Newsletter

Top of Form

Page 215: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Bottom of Form

Product Listing

Air Compressors

Automation & Control

Bearings

Cable & Wires

Chemical & Process

Engineering

Gears & Motors

Industrial Cleaning Machines

Industrial Safety

Instrumentation

Logistics

Machine Tools

Material Handling

Metal & Steel Industry

Power

Pumps & Valves

Surface Technology

Water Treatment

Welding Technology

Water Treatment

Welding Technology

Engineering

Air Compressors

Surface Technology

Page 217: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Bottom of Form

</body>

Copyright © 2001-2014. Divya Media Publications Pvt. Ltd. All rights reserved

Privacy Policy | Terms and Conditions

<img height="1" width="1" border="0" alt="" src="http://googleads.g.doubleclick.net/pagead/viewthroughconversion/966398281/?frame=0&random=1422703705660&cv=7&fst=1422703705660&num=1&fmt=1&guid=ON&u_h=595&u_w=1058&u_ah=564&u_aw=1058&u_cd=24&u_his=1&u_tz=330&u_java=true&u_nplug=0&u_nmime=0&frm=0&url=http%3A//www.engrreview.com/Articles/Zero-cross-over-turn-on---SCR-firing-card-for-Capacitor-Bank/843675/47775/37800&ref=http%3A//www.google.co.in/url%3Fsa%3Dt%26rct%3Dj%26q%3D%26esrc%3Ds%26frm%3D1%26source%3Dweb%26cd%3D14%26cad%3Drja%26uact%3D8%26ved%3D0CC0QFjADOAo%26url%3Dhttp%253A%252F%252Fwww.engrreview.com%252FArticles%252FZero-cross-over-turn-on---SCR-firing-card-for-Capacitor-Bank%252F843675%252F47775%252F37800%26ei%3DObzMVPHrLcPdaq_cgrAP%26usg%3DAFQjCNHmfv7ajsaaYTLAR9ZGB90EZ8HurA%26bvm%3Dbv.85076809%2Cd.d2s&vis=0" />< div style="display:inline;">< img height="1" width="1" style="border-style:none;" alt="" src="//googleads.g.doubleclick.net/pagead/viewthroughconversion/966398281/?value=0&guid=ON&script=0"/>< /div>

Home

News & Analysis

Products & Suppliers

Standards Library

Reference Library

Engineering Community

IHS GlobalSpec is now

Top of Form

Community

Page 218: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

All

News & Analysis

Products & Suppliers

Standards Library

Reference Library

Community

Bottom of Form

CR4 - The Engineer's Place for News and Discussion®

Login|Register

HOME | CR4 | Electrical Engineering | Electrical Engineering

Previous in Forum: Effective Grounding and Bonding in Petrol Stations

Next in Forum: What is slope.

Top of Form

Comments Format:

Indented / nested by replies

Flat / chronological

Save setting as my default

Change Mode

Bottom of Form

Got Something to Say?

Ask a QuestionStart a Discussion

Search this Forum

Electrical Engineering:

Top of Form

Page 219: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Top of Form

Subscribe to Discussion:

CR4 allows you to "subscribe" to a discussionso that you can be notified of new comments tothe discussion via email.

Bottom of Form

Top of Form

Rating Vote:

Score 1

Score 2

Score 3

Score 4

Score 5

Add Vote

Bottom of Form

4 comments

Subscribe Rate this Comments: Nested

Mainathan Why PF improvement

Search this Forum

Go

Bottom of Form

CR4 Sections

Aerospace

BioMech & BioMed

Chemical & Material Science

Civil Engineering

Communications & Electronics

Education and Engineering Careers

Electrical Engineering

General

Instrumentation

Manufacturing

Mechanical Engineering

Page 220: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Member

Join Date: Jun 2011

Posts: 6

capacitors are in Delta connected? y not in Star?

12/20/2011 11:47 AM

Why PF improvement capacitors are in Delta connected? y not in Star?.

In Star-Delta starter, at which point it is better to connect capacitor for improving p.f.

@ delta contactor? or @ main contactor? or @ line side?....... pls guide me.........

Register to Reply

Top of Form

Bottom of Form

Interested in this topic? By joining CR4 you can "subscribe" tothis discussion and receive notification when new comments are added.

Join CR4, The Engineer's Place for News and Discussion!

Comments rated to be Good Answers:

These comments received enough positive ratings tomake them "good answers".

#3 "Re: Why PF improvement capacitors are in Deltaconnected? y not in Star?" by Ron Nombri on

CR4 Sections

New Technologies& Research

Software & Programming

Sustainable Engineering

Transportation

Site Directories

Forum DirectoryBlog DirectoryUser Group DirectoryRSS Feeds

CR4 Rules of ConductCR4 FAQSite Glossary

Who's Online (110 right now)Show Members

Advertisement

Page 221: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

12/22/2011 7:23 AM (score 2)

lyn

Guru

Join Date: Oct 2008

Location: Want to be: 34° 34' 21.60"N, 92° 55' 42.28" W Really am in Arizona

Posts: 30741

Good Answers: 1165

#1

Re: Why PF improvement capacitors are in Delta connected? y not in Star?

12/20/2011 11:58 AM

Isn't this in your text book?

Powerfactor - Wikipedia, the free encyclopedia

__________________Luck comes and goes. Skill is what you make of it. The supply of fools will always outstrip the demand .

Register to ReplyScore 1 for OffTopic

Mainathan

Member

Join Date: Jun 2011

Posts: 6

#2

Re: Why PF improvement capacitors are in Delta connected? y not in Star?

12/21/2011 12:29 PM

hello.......lyn..... i know about pf. understand my question...ok. dont answer as like that........

Register to Reply

Page 222: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

2

Ron Nombri

Power-User

Join Date: May 2007

Location: Papua New Guinea

Posts: 162

Good Answers: 3

#3

Re: Why PF improvement capacitors are in Delta connected? y not in Star?

12/22/2011 7:23 AM

Capacitor banks in PFC Units are connected in Delta because sums of stored KVARs are required in parallel across a three phase network to improve the power angle on the load. The summations of KVARs are done in electrical stepping sequences via the PFC Unit controller depending on the number of capacitor banks in the PFC Unit.

Where to connect capacitor to Star-Delta Starter?

Reasoning is used here; pleasefind out more before attempting.

Star-Delta Stater is soft starter for motors with high torque. To connect capacitor at the main contactor or the line side will be exposing the capacitor to instantaneous in-rush current magnitude and the rise in current magnitude switch fromstar to delta, which may in the long term have reducing effects on the life of the capacitor. Therefore, connect

Page 223: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

the capacitor to the delta contactor. So that the capacitor is working on the delta contactor when the motor in is full running. Where its power factor will be better improved at running load. The capacitor may still be connected to the line side, but as stated, its life may be reduced when exposed to in-rush current and the change incurrent magnitude from star-delta.

Another suggestion is that, it may be connected to the line side, via a capacitor contactor, protection fuses, and a timer. So that it may be switched in seconds after the motor runs in delta mode. Motor contactors will not withstand the arching energy release from capacitors, where a capacitor contactor must be used.

__________________Kind regards, Ron

Register to ReplyGood Answer (Score 2)

No more Good Answers.

electricalexpert65

Guru

Join Date: Oct 2009

#4

Re: Why PF improvement capacitors are in Delta connected? y not in Star?

Page 224: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Posts: 2015

Good Answers: 163

12/29/2011 6:33 AM

Draw the equivalent circuit of adelta connected capacitor. You will find that for the same cell capacitance (C), delta connection will give 1.5C between any two lines, whereas if they are star connected, you would only get 0.5C between any two lines. Which is cost effective?

Having said that, please note that this delta connection of capacitors is practised only in low voltage. All HV capacitors are invariably Star connected. Because, if HV capacitors too are Delta connected (for the total capacitance advantage, as in the case of LV Capacitors), the insulation has to be done for line voltage. Whereas if you connect it in star, you need only the phase voltage insultaion, which wouldgreatly reduce the cost.

In, LV there is no big cost difference between phase voltage (240V) insulation and Line Voltage (415V) insulation; so, you get cost-effective by going for delta connection so that you get a bigger line capacitance with a smaller cell capacitance.

Whereas in HV, there is considerable cost difference between phase voltage insulation and line voltage insultaion and this cost

Page 225: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

advantage far outweiighs any advantage that one gets from a bigger line capacitance, had it been connected in Delta.

Register to Reply

Register to Reply 4 comments

Back to top

Interested in this topic? By joining CR4 you can "subscribe" tothis discussion and receive notification when new comments are added.

Join CR4, The Engineer's Place for News and Discussion!

Comments rated to be Good Answers:

These comments received enough positive ratings tomake them "good answers".

#3 "Re: Why PF improvement capacitors are in Deltaconnected? y not in Star?" by Ron Nombri on 12/22/2011 7:23 AM (score 2)

Copy to Clipboard

Users who posted comments:

electricalexpert65 (1); lyn (1); Mainathan (1); Ron Nombri (1)

Previous in Forum: Effective Grounding and Bonding in Petrol Stations

Next in Forum: What is slope.

Page 226: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Advertisement

"The achievement of one goal should be the startingpoint of another." -- Alexander Graham Bell

All times are displayed in US/Eastern (EST) (Register to change time zone)

© 2015 IHS. All rights reserved. Reproduction in whole or in part without permission is prohibited. The information contained on this site is by users forusers and is provided for information purposes only and does not constitute advice. Any views or opinions expressed by users are personal to them and do not represent the views or opinions of IHS. You should check any information and use your own judgment or seek expert advice before doing or not doing anything on the basis of what you read here. IHS does not verify or warrant the accuracy or completeness of any information on this site and, to the extent permitted by law, IHS shall not be liable for any loss, damage or expense incurred by reliance on it or for any dealings you have with usersor other third parties that take place using or facilitated by this site.

<img src="http://pixel.quantserve.com/pixel/p-d4y1TYs46N1T2.gif" style="display: none;" border="0" height="1" width="1" alt="Quantcast"/>

</body>

Personal tools

Create account

Log in

Page 227: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Views

Page

Talk

View source

History

Languages

Русский

中文

About us> Collaborative platform brought to you bySchneider Electric> Helping to design electrical installations according to standards

Low voltage tariff and metering

From Electrical Installation Guide

Jump to: navigation , search

General rules of electrical installation design

Connection to the MV utility distribution network

Connection to the LV utility distribution network

Low voltage utility distribution networks

o Low-voltage consumers

o Low-voltage distribution networks

o The consumer-service connection

o Quality of supply voltage

Low voltage tariff and metering

MV and LV architecture selection guide for buildings

Page 228: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

as IEC60364> Our Experts continuously improve the content.> Collaboration is opento all.

To know more

Navigation

Mainpage

Howto browse and search

InteractionToolboxShare itShare on email

LV Distribution

Protection against electric shocks and electric fires

Sizing and protection of conductors

LV switchgear: functions and selection

Overvoltage protection

Energy Efficiency in electrical distribution

Power Factor Correction

Power harmonics management

Characteristics of particular sources and loads

PhotoVoltaic (PV) installation

Residential and other special locations

ElectroMagnetic Compatibility (EMC)

No attempt will be made in this guide to discuss particular tariffs, since there appears to be as many different tariff structures around the world as there are utilities.Some tariffs are very complicated in detail but certain elements are basic to all of them and are aimed at encouraging consumers to manage their power consumptionin a way which reduces the cost of generation, transmission and distribution.The two predominant ways in which the cost of supplying power to consumers canbe reduced, are:

Reduction of power losses in the generation, transmission and distribution of electrical energy. In principle the lowest losses in apower system are attained when all parts of the system operate at unity power factor

Reduction of the peak power demand, while increasing the demand at low-load periods, thereby exploiting the generating plant more fully, and minimizing plant redundancy

Contents

Page 229: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

[hide]

1 - Reduction of losses

2 - Reduction of peak power demand

3 - Meters

4 - Principle of kVA maximum demand metering

Reduction of losses

Although the ideal condition noted in the first possibility mentioned above cannot be realized in practice, many tariff structures are based partly on kVA demand, as well as on kWh consumed. Since, for a given kW loading, the minimum value of kVA occurs at unity power factor, the consumer can minimize billing costs by taking steps to improve the power factor of the load (as discussed in Chapter L). The kVA demand generally used for tariff purposes is the maximum average kVA demand occurring during each billing period, and is based on average kVA demands, over fixed periods (generally 10, 30 or 60 minute periods) and selecting the highest of these values. The principle is described below in “principle of kVA maximum-demand metering”.

Reduction of peak power demand

The second aim, i.e. that of reducing peak power demands, while increasing demand at low-load periods, has resulted in tariffs which offer substantial reduction in the cost of energy at:

Certain hours during the 24-hour day

Certain periods of the year

The simplest example is that of a residential consumer with a storage-type water heater (or storage-type space heater, etc.). The meter has two digital registers, one of which operates during the day and the other (switched over by a timing device) operates during the night. A contactor, operated by the same timing device, closes the circuit of the water heater, the consumption of which is then indicated on the register to which the cheaper rate applies. The heater can be switched on and off atany time during the day if required, but will then be metered at the normal rate. Large industrial consumers may have 3 or 4 rates which apply at different periods during a 24-hour interval, and a similar number for different periods of the year. Insuch schemes the ratio of cost per kWh during a period of peak demand for the

Page 230: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

year, and that for the lowest-load period of the year, may be as much as 10: 1.

Meters

It will be appreciated that high-quality instruments and devices are necessary to implement this kind of metering, when using classical electro-mechanical equipment. Recent developments in electronic metering and micro-processors, together with remote ripple-control(1) from an utility control centre (to change peak-period timing throughout the year, etc.) are now operational, and facilitate considerably the application of the principles discussed.In most countries, some tariffs, as noted above, are partly based on kVA demand, in addition to the kWh consumption, during the billing periods (often 3-monthly intervals). The maximum demand registered by the meter to be described, is, in fact, a maximum (i.e. the highest) average kVA demand registered for succeeding periods during the billing interval.

(1) Ripple control is a system of signalling in which a voice frequency current (commonly at 175 Hz) is injected into the LV mains at appropriate substations. The signal is injected as coded impulses, and relays which are tuned to the signal frequency and which recognize the particular code will operate to initiate a required function. In this way, up to 960 discrete control signals are available.

Figure C10 shows a typical kVA demand curve over a period of two hours dividedinto succeeding periods of 10 minutes. The meter measures the average value of kVA during each of these 10 minute periods.

Page 231: Home Technical Articlesdocshare01.docshare.tips/files/25518/255182258.pdf · 2016. 5. 28. · January 9, 2015 8 NEC Basic ... We see the results of power usage all around us. Every

Fig. C10: Maximum average value of kVA over an interval of 2 hours

Principle of kVA maximum demand metering

A kVAh meter is similar in all essentials to a kWh meter but the current and voltage phase relationship has been modified so that it effectively measures kVAh (kilo-volt-ampere-hours). Furthermore, instead of having a set of decade counter dials, as in the case of a conventional kWh meter, this instrument has a rotating pointer. When the pointer turns it is measuring kVAh and pushing a red indicator before it. At the end of 10 minutes the pointer will have moved part way round the dial (it is designed so that it can never complete one revolution in 10 minutes) and is then electrically reset to the zero position, to start another 10 minute period. The red indicator remains at the position reached by the measuring pointer, and that position, corresponds to the number of kVAh (kilo-volt-ampere-hours) taken by the load in 10 minutes. Instead of the dial being marked in kVAh at that point however it can be marked in units of average kVA. The following figures will clarify the matter.Supposing the point at which the red indicator reached corresponds to 5 kVAh. It isknown that a varying amount of kVA of apparent power has been flowing for 10 minutes, i.e. 1/6 hour.If now, the 5 kVAh is divided by the number of hours, then the average kVA for the period is obtained.In this case the average kVA for the period will be:

Every point around the dial will be similarly marked i.e. the figure for average kVA will be 6 times greater than the kVAh value at any given point. Similar reasoning can be applied to any other reset-time interval.At the end of the billing period, the red indicator will be at the maximum of all the average values occurring in the billing period.The red indicator will be reset to zero at the beginning of each billing period. Electro-mechanical meters of the kind described are rapidly being replaced by electronic instruments. The basic measuring principles on which these electronic meters depend however, are the same as those described above.

Retrieved from "http://www.electrical-installation.org/enw/index.php?title=Low_voltage_tariff_and_metering&oldid=14685"

Category: