hot coal process tech_international

37
Beijing HOT Mining Tech Co Ltd 北京浩沃特矿业技术有限公司 Beijing Chengdu Brisbane Calcutta Iskenderun Web: www.hot-mining.com

Upload: heng-huang

Post on 14-Apr-2017

198 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: HOT Coal Process Tech_International

Beijing HOT Mining Tech Co Ltd

北京浩沃特矿业技术有限公司

Beijing Chengdu Brisbane Calcutta Iskenderun

Web: www.hot-mining.com

Page 2: HOT Coal Process Tech_International

Contact Us Add. Room A1012, Building 4, Beijing INN, ChaoYangMenNei Street, Beijing, P.R.China Presented by Steven Huang Email: [email protected] (International Business)

Coal Preparation Engineering & Project Delivery Services

选煤工程技术服务

Page 3: HOT Coal Process Tech_International

浩特简介 About HOT

HOT Mining provide integrated engineering solutions to coal and minerals.

Our services include underground mining, open cut mining, mineral processing and

materials handling. We provide engineering, equipment, project delivery and operations

services for coal, iron ore, copper, gold, zinc, silver and other base metals.. 北京浩沃特矿业技术有限公司(后面简称『浩特』),致力于提供世界领先的

煤矿及非煤矿山的采、选服务,服务范围包括从开采到选矿的整套工程技术服务。

HOT is leading in 3D engineering and intelligent operation in coal preparation. We’re

The first company who developed 3D engineering methods successfully in China.

There are only 3 companies can provide the cloud-computing based intelligent operation system

For CHPP worldwide. HOT is one of them.

浩特是业内 三维工程和智能运营系统的领导者,在中国最早开发出用于矿物加工的

三维工程设计方法;世界范围内,仅有3家公司可以提供 基于云计算架构的选矿智能化系统,

浩特是其中之一。

Page 4: HOT Coal Process Tech_International

浩特简介 About HOT

Although HOT Mining is a young company, all our engineers come from famous international

process engineering companies, Engineering Team

Experienced in design, construction, project delivery in CHPP and mineral processing field.

浩特是一家年轻的公司,公司的工程师均来自业内知名的国际矿业工程公司,工程师团队

拥有超过60个大型煤炭清洁加工项目(选煤厂)的设计、建设及项目交付经验。

In last two years, our engineering capability has been recognized by mining giants. Our clients are

Anglo Gold Ashanti, Worley Pasons, Shenhua, Caledon, Rio Tinto (Engineering Supplier),etc.

浩特经过两年的发展,技术及服务已经获得国内外知名矿业公司的认可,客户包括:

中国神华、英美黄金、沃利派森、澳大利亚卡利登煤业、力拓(设计及项目类供应商资格)。

HOT has already established branch or office in India, Turkey, and Chile. And we’re planing

To set up an branch in Brisbane in 2015.

浩特在印度、土耳其、智利等主要矿业国家与当地知名服务商建立了办事处或分公司,

并正在筹建布里斯班办公室,预计与2015年成立浩特澳洲公司。

Page 5: HOT Coal Process Tech_International

业务板块 Four Major Business - 1

Open

Cut

Mining

露采

Page 6: HOT Coal Process Tech_International

业务板块 Four Major Business - 2

Underground Mining 井工开采

Page 7: HOT Coal Process Tech_International

业务板块 Four Major Business - 3

Process 矿物加工

Coal Washing Plant Screening & Crushing Sands Washing Slime Drying System

Page 8: HOT Coal Process Tech_International

业务板块 Four Major Business - 4

Materials Handling 物料输送系统

Tube Pipe Conveyor Express Load-Out Station

Page 9: HOT Coal Process Tech_International

ABOUT Our Services 专业的选煤技术服务

1. Pre-Feasibility Study, Feasibility Study, Concept Design, Engineering Design, Project Budget for Coal Preparation Projects;

(选煤工程的可研、初步设计、施工图设计、工程概预算等)

2. Project Delivery: EPC (China Only), EPs (Engineering, Procurement, Technical Services);

3. Equipments and Spare Parts——Screens, DMC Cyclone, Classifying Cyclone, Filters, Spiral, kinds of crushers, TBS,etc;

(部分采矿及选煤设备:各类筛机、重介旋流器、分级旋流器、螺旋分选溜槽、各类过滤脱水设备、煤泥分选机等)

4. Operations for CHPP (China Only);

(选煤厂托管运营管理)

5. Intelligent System for Mining and Coal Washery (CHPP);

(矿山智能化系统、选煤厂专家管理系统)

6. Materials Handling System & Express Train/Truck Loadout System.

(长距离物料输送系统、快速火车及汽车装车系统)

Page 10: HOT Coal Process Tech_International

1. Professional Mineral and Coal Preparation Engineering Company (专业 的选矿及选煤工程公司)

2. Wide diversity of experience both in design and operation

(丰富的设计和运行经验)

3. Innovative project designs (更新项目设计):

• Reduced capital costs (降低投资)

• Improved efficiency (增加效率)

• Reduced Operating Costs (减少运行成本)

4. Experts in heavy media circuit designs (重介选煤设计专家)

5. Our Special Intelligent System help our clients to achieve better profit and easier operation management.

(我们独特的“智能化系统”能够帮助客户更轻松的管理矿山和选煤厂,并获取更好的经济效益)

Advantages 优势

Page 11: HOT Coal Process Tech_International

• Our core competitiveness is the professional team includes process engineers, mechanical engineers, electrical engineers, controlling engineer, safety engineer, etc (180+ engineers based in Chengdu).

• Detailed drawing hub (outsourcing) in Chengdu.

• Technical Team and Highly Skilled Workers

in our OEM manufacture plant.

Professional Team 专业团队

Page 12: HOT Coal Process Tech_International

3D ENGINEERING 三维工程设计

DESIGN

3D Concept Design 3D Structural Design 3D Detialed Design

Page 13: HOT Coal Process Tech_International

3D DESIGN ON 三维非标件设计

FABRICATED PARTS

HMV Clean Coal Screen

Fabricated Design

Pressure Filter

Fabricated Design

Page 14: HOT Coal Process Tech_International

3D Coal Preparation Plant 三维设计的选煤厂

ENGINEERING

Page 15: HOT Coal Process Tech_International

3D ON STRUCTURAL 三维设计的钢结构

DESIGN

Fabricated Steel

Structure Design

Page 16: HOT Coal Process Tech_International

3D ON PIPELINE 三维管路设计

DESIGN

H.M.V

Feeding Pipeline

Magnetic Separator

Feeding Pipeline

Page 17: HOT Coal Process Tech_International

3D ON WHOLE 三维主厂房布置 CHPP

main process building-guojiahe

CHPP

Page 18: HOT Coal Process Tech_International

3D CHPP 三维全系统设计

ENGINEERING

Module A Module B

Module C

Thickener

Press Filter

Workshop

Air

Compressor

Page 19: HOT Coal Process Tech_International

Be Different, No Best

每一个项目都单独设计,没有最好的设计,只有最适合入洗煤质的设计。

Highest Clean Coal Recovery

精煤高回收率:基于适应入洗煤质的工艺、高效的设备配置

—Advanced Technology, High Efficient Equipments

Stable System

系统稳定

—Stable and Continuous Operations could guarantee CHPP Performance

Low Operation Costs

更低的运营成本

—Low Operation Cost could help CHPP meet better R.I.O

Design Philosophy 选煤设计理念

Page 20: HOT Coal Process Tech_International

HOT Mining Projects & Engineers Experiences

浩特公司选煤业绩及主要技术团队项目经验

Page 21: HOT Coal Process Tech_International

Project Team Experience 浩特矿业-选煤项目业绩(技术团队)

序号

Item

项 目 名 称

Clients & Projects

选煤厂类型

Type of CHPP

建设规模

Capacity

服务内容

Services

1 神华集团煤制油项目配套选煤厂

Shenhua Group Coal to Liquid (COL) CHPP

炼焦煤选煤厂

Coking CHPP 6.0 Mt/a

施工图 / 设备供货

Engineering / Supply

2 徐矿集团陕西郭家河选煤厂

Xuzhou Mining Group GuoJiaHe CHPP

动力煤选煤厂

Thermal CHPP 15.0 Mt/a

施工图 / 设备供货

Engineering / Supply

3 潞按矿业集团王庄矿选煤厂

Lu’an Energy Group WangZhuang CHPP Upgrade

炼焦煤选煤厂

Coking CHPP 6.0 Mt/a

施工图 / 设备供货

Engineering / Supply

4 吕家坨矿业分公司选煤厂末煤分选系统3.0Mt/a能力升级改造工程 Lvjiatuo Fine Coal System Upgrade

炼焦煤选煤厂

Coking CHPP 3.0Mt/a

施工图

Engineering Drawing

5 山西省大同市南郊区塔山矿井选煤厂

Shanxi Datong Nanjiao Tashan Mine CHPP

炼焦煤选煤厂

Coking CHPP 3.0Mt/a

施工图

Engineering Drawing

6 国投新集能源股份有限公司煤电一厂技术改造工程

SDIC Xinji Energy LLC No.1 CHPP Upgrade

炼焦煤选煤厂

Coking CHPP 3.0Mt/a

施工图

Engineering Drawing

7 神华宁夏煤业集团有限责任公司鸳鸯湖矿区梅花井煤矿选煤厂

Shenhua Group Meihuajing Mine CHPP

动力煤选煤厂

Thermal CHPP 4.0Mt/a

施工图

Engineering Drawing

8 山西金山能源有限公司柳林选煤厂

Jinshan Energy Co Ltd Liulin CHPP

炼焦煤选煤厂

Coking CHPP 3.0Mt/a

施工图

Engineering Drawing

9 鄂尔多斯市昊华精煤有限责任公司高家梁煤矿选煤厂

Ordos HaoHua Group Gaojialiang Mine CHPP

动力煤选煤厂

Thermal CHPP 6.0Mt/a

施工图

Engineering Drawing

10 内蒙古新源矿业有限责任公司胡家井矿井及选煤厂

Inner Mongolia Hujiajing Mine CHPP

动力煤选煤厂

Thermal CHPP 3.0Mt/a

初步设计

Concept Design

11 陕煤集团陕西彬长矿区开发建设有限责任公司小庄矿井 Shaanxi

Bingchang Group Xiaozhuang CHPP

动力煤选煤厂

Thermal CHPP 6.0Mt/a

初步设计

Concept Design

12 汾西矿业(集团)公司柳湾矿选煤厂

Shanxi Coking Coal Group Liuwan Mine CHPP

炼焦煤选煤厂

Coking CHPP 1.8Mt/a

施工图

Engineering Drawing

Page 22: HOT Coal Process Tech_International

序号

Item

项 目 名 称

Clients & Projects

选煤厂类型

Type of CHPP

建设规模

Capacity

服务内容

Services

13 神华集团木瓜界选煤厂

Shenhua Group Muguajie Mine CHPP

动力煤选煤厂

Thermal CHPP 4.0Mt/a

施工图 / 设备供货

Engineering / Supply

14 黑龙江鸡西矿业集团平岗矿选煤厂

Heilongjiang Jixi Mining Group Pinggang CHPP

炼焦煤选煤厂

Coking CHPP 1.2Mt/a

施工图

Engineering Drawing

15 淮南矿业(集团)公司潘东矿选煤厂

Huainan Mining Group Pandong Mine CHPP

炼焦煤选煤厂

Coking CHPP 2.6Mt/a

施工图 / 设备供货

Engineering / Supply

16 大同煤矿集团有限责任公司 四台矿选煤厂

Datong Coal Mine Group Sitai Mine CHPP

动力煤选煤厂

Thermal CHPP 4.5Mt/a

施工图 / 设备供货

Engineering / Supply

17 阳泉煤业集团新元矿选煤厂

Yangquan Coal Group Xinyuan Mine CHPP

动力煤选煤厂

Thermal CHPP 6.0Mt/a

施工图 / 设备供货

Engineering / Supply

18 新集(集团)公司刘庄矿选煤厂

Xinji Group Liuzhuang Mine CHPP

动力煤选煤厂

Thermal CHPP 6.0Mt/a

施工图 / 设备供货

Engineering / Supply

19 汾西矿业(集团)公司新阳矿选煤厂

Shanxi Coking Coal Group Xinyang Mine CHPP

炼焦煤选煤厂

Coking CHPP 6.0Mt/a

施工图

Engineering Drawing

20 盘江煤电集团松河矿井选煤厂

Panjiang Coal Power Group SongHe CHPP

炼焦煤选煤厂

Coking CHPP 3.0Mt/a

施工图 / 设备供货

Engineering / Supply

21 焦作煤业集团赵固矿选煤

Jiaozuo Coal Group Zhaogu Mine CHPP

炼焦煤选煤厂

Coking CHPP 3.0Mt/a

施工图

Engineering Drawing

22 甘肃省华亭煤业集团有限责任公司大柳矿井选煤厂

Gansu Huating Coal Group Daliu Mine CHPP

动力煤选煤厂

Thermal CHPP 2.4Mt/a

可行性研究

Feasibility Study

23

陕煤集团神木张家峁矿井有限公司张家峁矿井选煤厂

Shaanxi Coal-Chem Group Zhangjiamao Mine CHPP

动力煤选煤厂

Thermal CHPP 6.0Mt/a

可行性研究

Feasibility Study

Project Team Experience 浩特矿业-选煤项目业绩(技术团队)

Page 23: HOT Coal Process Tech_International

序号

Item

项 目 名 称

Clients & Projects

选煤厂类型

Type of CHPP

建设规模

Capacity

服务内容

Services

1 永晖焦化集团---策克选煤厂

Winsway---Ceke CHPP

炼焦煤选煤厂

Coking CHPP 4.0Mt/a

可研/初步设计/施工图

FD/CD/ED

International Projects Experience 国际项目业绩 (部分)

1 力拓猎人谷MTP选煤厂项目

Rio Tinto MTP Thermal Power CHPP

动力煤选煤厂

Thermal CHPP 10.5Mt/a

可研设计

Feasibility Study

2 英美黄金刚果(金)金矿选矿项目

Anglo Gold Ashanti ---DRC Mongbwalu Processing Plant 金矿选矿 250TPH

设计 / 供货 / 技术服务

Engineering, Supply,

Technical Services.

3 瑞士昆塔米纳资源---朝鲜选煤厂

QUINTERMINA AG---DPRK CHPP

动力煤选煤厂

Thermal CHPP 1.2Mt/a

可研/初设/施工图设计

FD/CD/ED

Company Project Experience Since 2012 浩特矿业-选煤项目业绩

4 澳大利亚卡利登 选煤厂

Caledon Cook CHPP --- Australia

(Xstrata & GRAM Joint Venture)

炼焦煤选煤厂

Coking CHPP

3.5 Mt/a 技术咨询 、采购支持

Engineering &

Sourcing Supports

Page 24: HOT Coal Process Tech_International

Client: Xuzhou Mining Group Location: Baoji, Shaan’xi Province

Work Order: 16 hours each day, 330 working days annual Project Period: 30th Nov 2010~30th Nov 2011

Value of Contract: About 53.51 million US Dollar (Total Project) Designed Capacity: R.O.M coal 10 Mt/a, Fine coal 5 Mt/a

Performance: Good, little down time, actually 12Mt/a plus Average ash: 24% before process, 12% after wash

Moisture: R.O.M coal 13%, Clean Coal 11%, Slime 15% Efficiency (数量效率): >=95%

=Designed Clean Coal Yield / Actual Clean Coal Yield

Page 25: HOT Coal Process Tech_International

Client: Lu’an Group Location: Changzhi, Shanxi Province

Work Order: 16 hours each day, 330 working days annual Project Period: 30th Jun 2008~30th Jun 2009

Value of Contract: About 42.55 million US Dollar (Main Process Building Only,仅主厂房工程项目)

Designed Capacity: 6 Mt/a Performance: Good, little down time, actually 12Mt/a plus

Average ash: 22% before process, 10.5% after wash Moisture: R.O.M coal 13%, Clean Coal 10%

Efficiency (数量效率): >=95%

=Designed Clean Coal Yield / Actual Clean Coal Yield

Page 26: HOT Coal Process Tech_International

Client: Huainan Power Group Location: Huainan, Anhui Province

Work Order: 16 hours each day, 330 working days annual Project Period: 30th Sep. 2005~30th Jan. 2007

Value of Contract: About 51.57 million US Dollar (Total project, 主厂房及场外栈桥工程项目)

Designed Capacity: 4 Mt/a Performance: Good, little down time, actually 6Mt/a plus

Average ash: 36% before process, 22% after wash Moisture: R.O.M coal 13%, Clean Coal 9%

Efficiency (数量效率): >=95%

=Designed Clean Coal Yield / Actual Clean Coal Yield

Page 27: HOT Coal Process Tech_International

PROJECT EXPERIENCE

CLIENT: HUOZHOU POWER

PROJECT: FANSHAN CHPP

LOCATION: HUOZHOU SHANXI

DESCRIPTION:4.0Mt/a

FEATURES

•R.O.M Coal Type: Coke Coal

•Primary desliming + Three

product heavy medium cyclone +

Floating

Page 28: HOT Coal Process Tech_International

Item Details Unit Index

1 Designed Capacity: Million Tons/Annual Mt/a 5.0Mt/a, 10.0Mt/a

2 Type Thermal Coal CHPP

3 Capacity Ton/Hour t/h 1894

4 Working Arrangement 330 days annual, 16 hours for each day, total:5280 Hours Annual

5 Water Consumption m3/Day 160

6 Water Consumption for Row Coal m3/ton R.O.M <0.01

7 Power Consumption for Row Coal kWh/ton R.O.M 3.08

8 Heavy Medium Consumption for Row Coal Kg/ton R.O.M 0.88

9 Workers Number of People 51

10 Labor Capacity

(1)Workers’ Capacity Ton/(Worker*Day) 918

(2) full efficiency Ton /(Worker*Day) 797

1. Appropriate Clean Coal Recovery (Reasonable Product Mix);

2. Low Operations Cost.

How to get best benefit?

Main Technical-Economical IndexesI---Guo Jia He CHPP 郭家河选煤厂

Page 29: HOT Coal Process Tech_International

KEY EQUIPMENT

SCREENS 各类筛机 Banana Screen,Linear Screen, HF Screen

Page 30: HOT Coal Process Tech_International

KEY EQUIPMENT HEAVY MEDIUM CYCLONE 旋流器

HEAVY MEDIUM CYCLONES are usually operated in a near-horizontal

orientation allowing for large apex sizes to be used for refuse removal

Page 31: HOT Coal Process Tech_International

Dense MEDIUM

CYCLONES are

usually operated in a

near-horizontal

orientation allowing

for large apex sizes

to be used for refuse

removal

Page 32: HOT Coal Process Tech_International

KEY EQUIPMENT

SPIRAL 螺旋分选机

Spiral

Model

Pitch in

degrees

Diameter in

mm

No of

turns

SX4 13 1000 4

SX7 13 1000 7

MX7 13 1000 7

Page 33: HOT Coal Process Tech_International

KEY EQUIPMENT TBS 煤泥分选机

Applicant to raw coal processing,

spiral product upgrading and froth

flotation tailings retreatment

Easy operate and lower maintenance

cost

High efficient separation

Long lifetime of 15-20 year

Page 34: HOT Coal Process Tech_International

High processing capacity,

high efficiency,

short installation time,

low construction cost,

low maintenance cost,

long operation lifespan

More will be customer-

tailored according to

your specific application

and requirement

HEAVY MEDIUM VESSEL

Page 35: HOT Coal Process Tech_International

KEY EQUIPMENT Rapid Train / Truck Loadout Station 快速装车站

Single Line: 3000 TPH-5500TPH

Double Line: 6000TPH-11000TPH

Page 36: HOT Coal Process Tech_International

MAIN TECHNICAL ECONOMICAL INDEXES

Appropriate Clean Coal Recovery (Reasonable Product Mix);

合理的产品结构,最高的精煤回收率;

Low Operations Cost.

最低的运营成本 (介耗、电耗、水耗、药剂……)

How to get best benefit?

如何获得最好的投资回报?

Page 37: HOT Coal Process Tech_International

THANK YOU 谢谢