    March 2014

    Mega Prizma

    Hot Oil & Pumping Services

    Edgar Menge

    Hot Oil & Pumping Services Supervisor

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    2/34

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    3/34

    2

    Functions of the Mega Prizma Hot Oil Units

    There are 2 main functions of the Mega Prizma Hot Oil Unit.

    First is the heating function

    and second is the pumping function.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    4/34

    3

    Functions of the Mega Prizma Hot Oil Units

    The 2 functions to the Hot Oil Unit, Heating& Pumpingcombine to

    provide clients with a well rounded, multi purpose, multi tasking,

    heating & pumping unit.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    5/34

    4

    Uses for Mega Prizma Hot Oil Units

    The main use of a Hot Oil Unit is to heat & pump fluidsinto the well to remove wax built up on the productiontubing.

    Pumping hot fluids through coil tubing to clean outhydrates or waxed off production tubing, or by pumping

    through the coil tubing for well stimulation.

    Hot fluid is often pumped through tubulars to clean themprior to a work-over.

    Clean out wax and other material in pipelines. Pumping of flow line pigs & pipeline testing equipment

    (smart pigs), also for pressure testing of pipelines.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    6/34

    5

    Uses for Mega Prizma Hot Oil Units

    Hot fluids are circulated to thaw ice or coagulatedmaterial in cold climates.

    Hot fluids are used to pump through manifolding to cleanout obstructions & restrictive materials in piping or toclean out facilities prior to a turn around inspection.

    Refineries often use Hot Oil Units to clean out lines,circulate tanks and re-boilers, and to treat de-ethylene &distillation towers.

    Hot Oil Units are used around rigs to preheat tanks,transfer, and pump out fluids.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    7/346

    Uses for Mega Prizma Hot Oil Units

    Hydro-blasting and jetting for cleaning facility tanks & rig

    tanks.

    Pre-heating treatment fluids for well stimulation services

    such as fracturing & cementing operations.

    With the utilization of mixing equipment, the pumps on a

    Hot Oil unit can be used to mix a variety of chemicals to

    premix or mix on the fly during well stimulation or

    treatment.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    8/34

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    9/348

    Equipment Description - Heater

    The Heaters on the Mega Prizma Hot Oil Units are 1,465 kW (5,000,000 BTU)

    output, with a heating efficiency rating of 85%.

    The flow through the 3 heater coils

    can be changed from series to

    parallel to change maximum flow

    rates from 350 L/min in series to

    450 L/min in parallel.

    This allows the heater output to be geared tospecific flow & temperature requirements. In

    series, the output temperature is increased as

    the flow decreases. The opposite is true for

    the parallel flow.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    10/349

    Equipment Description - Heater Safety

    Control & Safety Equipment on the heater has been designed to prevent

    overheating of the fluid. The Mega Prizma Hot Oil Units are equippedwith a Kimray Thermostatic Controller which cuts off the fuel supply to

    the heater in the event of overheating of the fluid.

    This Kimray thermostat is calibrated

    before each heating job and set at the

    clients requested maximum workingtemperature. If the heater output

    temperature increases above the set

    point, the thermostat signals the fuel

    system master valve to cut fuel supply

    to the heater and extinguish the burner.

    Adjusted 5 to 7 degrees above average

    requested working temperature or at 80% of

    fluid flash point. It can also be used as

    thermostat when heating non-flammable fluids

    Safety First

    and

    Foremost

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    11/3410

    Equipment Description - Fire Safety

    With the safe operation of any equipment, the worst case scenario

    must be predicted and an action plan to resolve every possiblesituation. For this reason all of Mega Prizmas Equipment are

    equipped with a Fire Suppression systems. In case of a fire, the Mega

    Prizma Hot Oil Unit, has specific two fire extinguisher systems.

    First there is a 150 Lb., ABC, wheeled fire extinguisher

    that is unloaded by a winch and moved 10 meters fromthe unit before each job. This extinguisher is designed

    to control a fire outside the heater.

    Safety First

    and

    Foremost

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    12/3411

    Equipment Description - Fire Safety

    The second fire extinguisher is a 15 Liter

    CO2 extinguisher. This extinguisher isdesigned to control a fire inside the

    heater. In the unlikely even that a heater

    coil leaks flammable fluid into burner,

    this extinguisher will help to contain &

    quench the fire before it can spread.

    Safety First

    andForemost

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    13/3412

    Equipment Description - Pumps

    There are three pumps on the Mega

    Prizma Hot Oil Units. Each pump can

    be operated separately or in

    conjunction with the other 2 pumps

    simultaneously.

    The Roper Load / Unload Pump

    The Mission Circulation Pump

    And the SPM TriplexPressure Pump

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    14/3413

    Equipment Description - Pumps

    The Roper Pump is a hydraulically driven, variable speedpump, with a maximum output of 625 L/min. Mostly, thispump is used to load & un-load the unit tanks or to transferfluids.

    The pump is self priming

    and able to draw fluids froma source below the level ofthe pump. This is helpfulwhen transferring fluid frommud pits or fresh water from

    ground sources.

    Another function of the Roper pump is to act as a back uppump should the Centrifugal pump fail during heatingoperations.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    15/3414

    Equipment Description - Pumps

    The Mission pump is a 3X 4X 13centrifugalpump. This

    pump is driven with a variable speed hydraulic system andits main purpose is to supply fluid circulation for the heater& supercharge the suction of the triplex.

    The second use of this

    pump is to transfer fluid tothe unit tanks or betweenclient tanks when needed.

    At 2 m/min, the Missionmakes short work of large

    volumes of fluid to betransferred.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    16/3415

    Equipment Description - Pumps

    The SPM Model TWS600S triplex pump is 450 kW (600HHP) intermittent duty, and 260 kW (350 HHP) continuousduty.

    The maximum pressure

    rating of this pump is 15,000psi. With our standardplunger size of 3-1/2 thepressure rating is 10,000psi. The Mega Prizma Hot

    Oil Units can changeplunger sizes from 2-1/2 to4-1/2 for different flow &pressure ratings.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    17/3416

    Equipment Description - Relief Valve

    As with any pump, there needs to a Safety First system.

    The Mega Prizma Hot Oil units are equipped with a pressurerelief valve located directly after the pump. This valvedumps safely to the unit tanks.

    This SPM Safety Relief valveis adjustable from 100 psi to

    15,000 psi. This valve isadjusted appropriately beforeeach pumping job & tested toprotect the unit, the clientsequipment, and the personnel

    working on location.

    Safety First

    and

    Foremost

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    18/3417

    Equipment Description - Tanks

    The Hot Oil Units are equipped with 4 separate tanks. Eachtank is gauged for fluid level by a mechanical float & pointer.The tops of tanks can allow for top loading of fluids.

    The first 2 tanks are the main fluidtanks. Each tank has a capacity of

    4 m .

    The 3rd, Methanol or Chemical Tank,on the unit is used to store flushingfluids to keep the unit from freezing in

    the winter. The capacity of this tank is1.4 m.

    The rear most tank is the heater fuel tank & has a capacityof 2.2 m of diesel. This enables the unit to heat aroundthe clock, at maximum output, for 24 hours.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    19/34

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    20/3419

    Equipment Description - Instrumentation

    The unit is equipped with simple reliable gauges & meteringdevices to ensure readings are always correct and dependable.

    The Marten Decker main treating pressuregauge is mounted in the operatorspanel in

    clear view of the operator & the client.

    An electronic NuFlo MC II Flow Analyzeris also mounted on the operatorspanelin clear view of the operator & client.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    21/3420

    Equipment Description - Instrumentation

    Mechanical Temperature & Pressure gauges are installed atvarious points on the unit to clearly show condition of fluidsat various stages.

    Heater inlet &intermediate coiltemperature.

    Heater fuel mainpressure & throttledfuel pressuregauges.

    Heater outputtemperature &pressure gauges.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    22/3421

    Equipment Description - Instrumentation

    Each Hot Oil unit has a chart recorder on standby if

    needed. These Barton (circle chart) recorders arecertified, calibrated, & tested as per manufacturersspecification and Mega Prizma standards.

    The chart can be timed tovarious intervals of 1 hour to12 hours as needed, andprovide positive proof of

    pressure testing or processpressure to a maximum of700 Atm (10,000 psi).

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    23/3422

    Work Done in Kazakhstan - Heating

    We have heated fluids for many different clients. We have

    expanded the parameters of heating beyond themanufacturers expectations and have created newmilestones for Hot Oil Units.

    Heating of Well Treatment Mix Fluids

    In October of 2005 the unit was called for our first job forthe Hot Oil Unit as an independent department. The unitspent the next six months heating more than 100,000 mof water & diesel fuel for fracturing campaigns in the

    Aktobe region and at KPO in Aksai.

    Since that time the unit has heated fluids that werepumped ourselves for Lancaster Petroleum, AralPetroleum Capital, Sun Drilling, Oil Techno-Group, andMaersk Oil.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    24/34

    23

    Work Done in Kazakhstan - Heating

    Heating of rig Tanks

    In the Fall of 2006 the unit was called upon by Lancaster

    Petroleum to heat drilling fluid tanks. The unit first heated

    water in the rig tanks before the drilling fluid was

    prepared. We then were asked to heat through thesteam lines with hot water to keep the drilling fluids from

    freezing.

    On numerous occasions since that time, the units has

    been asked to heat mix waters for drilling rigs & to keepthe tanks warm in cold winter months, when the rigs

    steam system was not working.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    25/34

    24

    Work Done in Kazakhstan - Heating

    Hot Oil Well Treatments

    From the 19th of August to the 15th of November in

    2006 the unit completed 78 hot oil treatments for

    KKMOC (Lancaster Petroleum) in their Kumsai and

    Kokzhide fields. Most of the treatments were directly toremove wax from the production tubing, but many of

    the treatments were the first steps in the CHOPS

    system to increase the oil production of heavy oils in

    high water and high sand producing wells.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    26/34

    25

    Work Done in Kazakhstan - Pumping

    Since the fall of 2005, our unit has been called to pump

    many different types of fluids. Though these units are

    basically designed to pump water and hydrocarbons, we

    have proven that the units have pumping abilities far

    beyond the normal Hot Oil Unit.

    The fact that we have used an oilfield pump with a much higher

    Hydraulic Horse Power (HHp)rating than a normal Hot Oil Unit,has truly been an asset.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    27/34

    26

    Work Done in Kazakhstan - Pumping

    Pumping of Hydrocarbons

    We have pumped such hydrocarbons as crude oil, diesel fuel,xylene, gasoline, condensate, and produced sales oil. In mostcases this has been for well stimulation, but in some cases tocirculate the wells. We are often asked to pump these fluidsbecause of ability to coupe with the pressures and precise volume

    measurements needed & because we have our own tanks.

    Pumping Drilling Fluids

    We have often been asked to pump drilling fluids into a well tocirculate out heavy fluids out. Due to the high differential pressuresin wells of 4,000 to 7,000 meters, most rig pumps and Soviet pumptrucks, can not deal with the prolonged high pressure pumpingrequired to circulate drilling fluids to water.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    28/34

    27

    Work Done in Kazakhstan - Pumping

    Pumping Services for Coil Tubing

    In December of 2006, Aral Petroleum Capital asked that Hot Oil

    Unit to supply heating and pumping services to BJ ServicesCoil

    Tubing unit. The unit was able to heat on the fly while pumping at

    various rates to clean powdered Asphaltines. Our unit provided 4

    months of pumping services without any down time to the

    operation.

    Leak-off Testing

    Due to our cost effect services, our unit has preformed many

    pressure tests and leak off tests after our competitors have

    finished cementing operations.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    29/34

    28

    Work Done in Kazakhstan - Pumping

    Injectivity Testing

    Our unit has performed injectivity tests on many wells.The Mega Prizma Hot Oil unit is well adapted for thiswork with our wide range of pumping rates and preciseflow metering.

    Pumping Acid & Chemicals

    Our Hot Oil Unit has been tasked with providingeconomical acid & chemical pumping services on manyoccasions. The unit has mixed & pumped hydrochloricacid in volumes in excess of 100 m up to 20%solutions. We have also pumped a variety of chemicalsonce each chemical's compatibility has beenestablished.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    30/34

    29

    Work Done in Kazakhstan - Pumping

    Cement Plug Placement for Plug & Abandonment

    In October of 2008 our unit had the opportunity to diversify our

    services into a new area. Lancaster Petroleum made plans to plug

    and abandon 3 wells in Kokzhide.

    The unit was asked to supply pumping services to mix, accurately

    pump, and displace 3 cement plugs in this 4600 meter well. The clientsupplied batch mix tanks for the cement and our Hot Oil unit batch

    mixed and then pumped the slurry into the well precisely where

    required.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    31/34

    30

    Work Done in Kazakhstan - Pumping

    For a continuous pumping of injection or water flood, the our Hot OilUnit supplied economical pumping services over the short term. The

    unit can individually provided 285 available hydraulic horse power

    (212 kW) for this type of long term pumping.

    At Maersk Oil, one unit pumped 8 months, continuously, up to 700m/day at a pressure of 3,500 psi. We pumped more than 150,000 mduring this time.

    Water Injection & Water Flood

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    32/34

    31

    Work Done in Kazakhstan - Pressure Testing

    Pressure Testing

    We have been called to complete many pressure testing.

    Well Heads

    BOP (Blow Out Preventers)

    Drilling Surface Equipment Production Tubing

    Casing & Cement Integrity

    Packers

    Pipelines Facility Vessels & Piping

    Well Testing Equipment & Third Party Equipment

    Wireline Equipment (on well site & for Certification)

    W k D i K kh t L P

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    33/34

    32

    Work Done in Kazakhstan - Low PressurePumping

    Fluid Mixing

    The Mega Prizma Hot Oil Unit can supply fluid flow to rig mixingsystems. We have also used our large unit tank hatches to allowsalts and other non-corrosive dry & liquid chemicals to be mixed inour tanks.

    Fluid Transferring

    In many cases, Mega Prizma has been asked to transfer fluidsfrom rig tanks or drilling rig mud pits. Because we are able to selfprime our suction manifolds with our Roper Pump, we are able tothrow a hose in the top of a tank and transfer fluids around the rigwhenever needed.

    Fluid DisposalWe have been called many times to pump out flare pits, drillingfluid, and mud pits. Again, our Roper pump has come into play aswe are able to catch prime with the Roper pump, then switch to thecentrifugal pump on the fly to quickly pump fluids from pits totransport tank trucks.

  • 8/12/2019 Hot Oil Presentation 03-2014 Eng Short

    34/34

    In Closing

    The Mega Prizma Hot Oil & Pumping Services would like

    to offer your Company our uniquely effective services that

    can not be matched by other local companies.

    We would also like to offer your Company our pricing

    which is un-paralleled by other international servicecompanies.

    Please feel free to contact us at Mega Prizma for further

    information and a demonstration of our services.