![Page 1: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/1.jpg)
1
OPEN HOUSE PRESENTATION
November 8, 2007
HOUGHTON ROAD
22nd Street to Valencia Road
PROJECT OVERVIEW
• Houghton Corridor
– Development in the area along Houghton Road
and in southeast Pima County has accelerated
and generated concerns about traffic
congestion.
– Several long range plans were developed to
address these concerns
![Page 2: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/2.jpg)
2
HOUGHTON CORRIDOR
– The HAMP planned for areas south of Irvington
– ADOT’s Houghton Corridor Study looked specifically
at the transportation issues along the entire corridor.
– The RTA authorized funding for transportation needs
• Improved cross-town mobility, reduce congestion,
improved safety and more alternative mode
choices.
CORRIDOR AREAS
• The Houghton Corridor improvements currently
underway : I-10 to Speedway
• This area has been divided into three segments:
– Southern Segment: I-10 to Valencia
– Central Segment: Valencia to 22nd Street
– Northern Segment: 22nd to Speedway
![Page 3: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/3.jpg)
3
CURRENT WORK
• We are building on all the previous planning
• We are moving forward with design and
construction of the 12 miles of roadway over the
next 12 years
• As we mentioned at our last Open House, we are
currently preparing a Design Concept Report and
30% design plans
– This will be completed the first part of 2008
• you may have noticed surveying, geotechnical
investigations and NPPO work
CENTRAL SEGMENT- 22ND St. to Valencia Rd.
What is planned:
• 6-lane roadway
• Median for access control
• Dual path “greenway” for pedestrians and bikes
• Improved intersections
• New bridge over Pantano wash
• Improved drainage
• Maintain desert feel with native landscaping
![Page 4: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/4.jpg)
4
ACHIEVING THE PROJECT GOALS
• Improve cross-town mobility, reduce congestion,
improve safety and more alternative mode choices.– Widen road to allow move vehicles to pass
through the area
– Add bike lanes, sidewalks, dual path greenway,
and bus pullouts
– Manage access to allow vehicles to pass through
the area, but also access the developed land in
the area.
WHAT IS ACCESS MANAGEMENT?
– Balances the need for safety and mobility through the area with reasonable access to adjacent land uses
• Freeway - moves lots of traffic through an area with few opportunities for access
• Cul-de-Sac- unlimited access, but doesn’t move traffic through the area very well
– Managing access improves travel times, road capacity and safety
![Page 5: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/5.jpg)
5
ACCESS
– Corridor Access Goals
• Signalized intersections every mile
• Median openings every ½ mile
0%
5%
10%
15%
20%
25%
30%
35%
40%
TRAVEL TIME INCREASE
(RELATIVE TO 2 SIGNALS/MI)
3 4 5 6 7 8
SIGNALS/MI
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0 10 20 30 40 50 60
ACCESS POINTS/MI
CRASH RATE INDEX
What We Presented at the June Open House
• Aerial photos showing existing roadway alignment
• Proposed cross sections for 4 and 6 lanes
• Current Traffic counts
• We collected comments from you...
![Page 6: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/6.jpg)
6
June 2007 Open House Comments
• Most common comments:
• Build 6 lanes now
– Will build ultimate (6-lane) facility instead of interim (4-lane) road
• Mitigate noise
– Road will be paved with rubberized asphalt
• Need for pedestrian and bicycle facilities
– Road will have multi-use lanes in each direction
– Greenway (dual paths) on east side
– Sidewalk on west side
– Bus Pullouts for future bus service
• Access concerns
– Most common: Austin Point, Civano, Mesquite Ranch, McGraw’s, Secrist MS
June 2007 Open House Comments
• Construction timeline/phasing– Currently being evaluated
– Will discuss at next open house
• Pedestrian improvements at Secrist– Met with school representatives
– Agreed to provide pedestrian signal for students
– Median opening for student drop-off
– Improved bus circulation
• Property acquisition concerns– Goal is to minimize acquisitions
– Preliminary alignment shown today is not taking any structures
![Page 7: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/7.jpg)
7
June 2007 Open House Comments
• Bus pullouts
– Pullouts included in preliminary alignment at major intersections, school
• Drainage concerns
– Will eliminate all dip crossings
– Increase the size of culverts to handle 100-yr. event
– Some large culverts will accommodate wildlife
Additional information on comments received is on website: www.houghtonroad.info
What we are presenting today
Three stations around the room with:
• Proposed Access Management
• Preliminary Alignment
![Page 8: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/8.jpg)
8
Preliminary Alignment
• Alignment design is an iterative process
IDENTIFY
DESIGN
CONTROLS
DETERMINE
TYPICAL ROAD
SECTION
EVALUATE
HORIZONTAL
CONSTRAINTS
PRELIMINARY
HORIZONTAL
ALIGNMENT
ANALYZE
VERTICAL
LIMITATIONS
PRELIMINARY
VERTICAL
ALIGNMENT
MINIMIZE
CONFLICTS
MINIMIZE
CONFLICTS
Preliminary Alignment
• Major challenges in this segment:
• Available right of way
– City owns 150 feet along most of the segment
• Utilities
– Gas, telephone, water, electric
– WAPA electric line
• Environmental issues/permitting
– Pantano wash
• Drainage
– Many existing culverts are undersized
• Topography
– Hill north of Pantano will require retaining walls
![Page 9: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/9.jpg)
9
What’s Next...
• Evaluate your comments from tonight
• Evaluate construction phasing based on:
– Costs
– Benefits
– Schedule constraints (permitting, utility relocations)
• Next open house in Spring 2008
– Refined alignment
– Proposed construction phasing
![Page 10: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/10.jpg)
10
![Page 11: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/11.jpg)
11
![Page 12: HOUGHTON ROAD 22nd Street to Valencia Road€¦ · 08/11/2007 · OPEN HOUSE PRESENTATION November 8, 2007 HOUGHTON ROAD 22nd Street to Valencia Road PROJECT OVERVIEW • Houghton](https://reader034.vdocuments.net/reader034/viewer/2022052011/60276848b47bcf7ec239cea3/html5/thumbnails/12.jpg)
12
Q&A
Please take a look around the room
Talk to team members
Find our Fact Sheets
Feel free to submit comments!
THANK YOU FOR COMING!