housing design process
TRANSCRIPT
-
8/13/2019 Housing Design Process
1/30
HOUSING DESIGNPROCESS
-
8/13/2019 Housing Design Process
2/30
The process ..
1.Data feasibility studies Collection & Analysis
Detailed studies
2. Proposals Options Design
Final Proposal
3. Implimentation PhasingImplimentaions / Execution
Monitoring
-
8/13/2019 Housing Design Process
3/30
Data .. User (target population)
Economic Aspects:
Occupation
Income (Gross & Net)
Expenditure
Saving
Place of word
Mode of travel
Priorities to spend
Size & type of plot and building
Infrastructure
- Utilities- Common facilities
- Circulation
-
8/13/2019 Housing Design Process
4/30
HOUSEHOLD :
No. Of peopleage, sex
TypeIndependentjointfamily
Healthrelevant to
environment
Altitudes
location
tenure(free lease rental)
-Area of plot frontage,
building
priorities
No. Of new housesExtension to old buildings
Type & size of buildings, open
spaces
Supporting facilities
-
8/13/2019 Housing Design Process
5/30
COMMUNITY
Controls(organisation)
Caste,religion Self help(low imcome)
Meeting places
ShrinesCost effective buildings
-
8/13/2019 Housing Design Process
6/30
DEMAND
Affordability (actual)
Expectation(potential)
Preferences :
Typology of houses
TenureLocations
Utilities
Methods to obtain houses :
Self help build
Buy complete dwelling
Build thro co-ops
-
8/13/2019 Housing Design Process
7/30
Data .. Site ..
LOCATION :
Impact of urban
development (existing
&proposed)
Potential for employment
Distance to facilities
Transportation link
Potential for
offsite,onsite,onplot
infrastructure
Cost
DemandSuccessful implementation
-
8/13/2019 Housing Design Process
8/30
AREA/SHAPE
Accuracy
Measuring,survey
Design efficiency
-
8/13/2019 Housing Design Process
9/30
-
8/13/2019 Housing Design Process
10/30
TOPOGRAPHIC/VEGETAT
ION
Areas unsuitable for
buildings
Drainage(low lying
areas)
Landscape
details(tree,water
bodies)
Cost of development
Environment
-
8/13/2019 Housing Design Process
11/30
GROUND CONDITIONS
Soil types
Presence of groundwater
rocks
aggressive chemicals
Construction
CostCost of water supply
-
8/13/2019 Housing Design Process
12/30
CLIMATE
Temperature,relative
humidity
Rainfall
Wind-direction/strength
Seasonal variations
comfort ranges
Design of
ShelterStreets
Open spaces
-
8/13/2019 Housing Design Process
13/30
EXISTING
DEVELOPMENT
Layout pattern
Plot sizes,shapes
Buildings
Common-fecilities
Commerce/industry
Circulation/transportation
Utilities,other land uses
Trend of development
To formulate designstandards.
-
8/13/2019 Housing Design Process
14/30
INSTITUTION/FINANCE
Agencies -Preparation
-Planning
-Implementation
(promoter,building,archit
ect etc)
Project development as a
whole
-
8/13/2019 Housing Design Process
15/30
FINANCE
Land cost -
Influencing factors
Market demand
Tenure status
Location
Frontage to main road
Land use controls zoning
Level of services
Key to success of the project
-
8/13/2019 Housing Design Process
16/30
BUILDING COST
Materials
Construction
Services
ASSESSING THE ABILITY TO PAY .
Affordability analysis
Relating affordability to cost of land/building
-
8/13/2019 Housing Design Process
17/30
ANALYSIS OF DETAILED STUDIES
Design Guidelines
TARGET POPULATION
Type of houses
Services(available)&need
ed to
ability to pay by
Willingness to
Site suitability (problems
/opportunities)
Financial implications
-
8/13/2019 Housing Design Process
18/30
DESIGN.....OPTIONS....PROPOSALS.....HOUSIN
G
LAYOUT AND DENSITY
Scaleneighbourhoodsay 5000 people
Identifiable unit with provision for facilities
Easy to administrate
-
8/13/2019 Housing Design Process
19/30
GROSS DENSITY
100/hect ------ low ----- individual houses more priv.&pub. Space
200/hect-------- medium------- individual + multi occupancy ,adequate
priv.&pub. Open space
300/hect ----- high ----- more multi occupancy limited priv+ pub
space
600/hect ---- very high ---- multi storied , multi occupancy , restricted
priv& pub space , Intensive use
-
8/13/2019 Housing Design Process
20/30
POPULATION... DENSITY.... LAND.....
EQUATIONS
Popnet densityland in priv use(saleable)gross densityland
area required
5000308/hect65% - 200/hect25 hect
-
8/13/2019 Housing Design Process
21/30
-
8/13/2019 Housing Design Process
22/30
A B C D
6 7.5 9 12
9
12
15
18
-
8/13/2019 Housing Design Process
23/30
BUILDINGS
Type and minimumsuperstructure necessary(tostart with)
(incremental esc. For lowincome)
Cost of house to be related toaffordability
( find unit cost of building)
Construction to be familiar andappropriate
( cost effective techniques)
Labour and materials to suitlocal conditions
PROVIDE RANGES
INDEPENDENTTWIN
ROW
CLUSTER
MEDIUM RISE
LOW RISE
HIGH RISE
-
8/13/2019 Housing Design Process
24/30
Common facilities
EDUCATION
formation of housing standards relevant to
scheme
Or follow local/ national standards if available
Ex: for 5000 population 1.primary school
2. nursery schoolLocation ... acceptable option
HEALTH FACILITIES
Consult appropriate organisations
Follow national/local standards (if any)
COMMERCE / INDUSTRY
Low income category
Provides local employment
Increased money spend within the project
Attract investment to help cross subsidyTo improve quality of life
-
8/13/2019 Housing Design Process
25/30
Common facilities
GENERAL
Commercial core to expand later (easily)
Convenient shops integrated with houses in
streetLarge scale activity to cater to residents as
well as non residents
Mixed development
RECREATION
local or international standards
Formal (organised games)
To suit the ability of target population who has
to bear the cost
Centrally located.... easily accessible
(at the same time) avoid valuable land
On formal(parks,play spaces)
Large no. Of small open spaces taking care of
childrens play suiting housing chuster
LANDSCAPING
To provide shady areas or for aesthetics?
Cost consideration
Who will maintain?
-
8/13/2019 Housing Design Process
26/30
EFFICIENCY OF LAYOUT
Public land roads, streets open spaces cost to be born by
residents 20-25%
Semi public land institutions cost by institutions 15-
18%
Private land houses,private street commerce 55-65%
-
8/13/2019 Housing Design Process
27/30
CIRCULATION AND TRANSPORTATION
Lane, street,roads,parking
Standards per reg.
Hierarchy of streets width to tolerate to diff.
Width to relate to diff. Modes under Indian condition
Shorting each road to reduce impact on housing unitsand to reduce costs
Parking to relate directly to each unit withoutcompromising environmental quality
Design roads to assure buffering and integration withother plan elements
-
8/13/2019 Housing Design Process
28/30
UTILITIES
Considering cost, may be implemented ina phased manner
To meet the objective
Water supply
. Source of water - tank,well,municipal supply
. Public stand pipe---- individual piped supply Sewage disposal ---- septic tank---- water born sewage
Surface drainage
Electricity ---- stret lightning , individual connections
Carbage disposal--- communal disposal point, on plotcollection
Telephone---- communal provision, plot connection
( Prepare layout diagrams with alternatives )
-
8/13/2019 Housing Design Process
29/30
DETAILED PROPOSALS
Based on the option approved by the user and authorities
To be prepared for the first phase only
Changes as a result of experience can be incorporated in later
design
Detailed design not only prepared to meet the initial levels butdesigned to take care of the likely final levels.
THEN COMES YOUR IMPLEMENTATIONS AND
MONITORING ..
-
8/13/2019 Housing Design Process
30/30
tHANK yOU .