housing design process

Upload: ar-tharini-natarajan

Post on 04-Jun-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Housing Design Process

    1/30

    HOUSING DESIGNPROCESS

  • 8/13/2019 Housing Design Process

    2/30

    The process ..

    1.Data feasibility studies Collection & Analysis

    Detailed studies

    2. Proposals Options Design

    Final Proposal

    3. Implimentation PhasingImplimentaions / Execution

    Monitoring

  • 8/13/2019 Housing Design Process

    3/30

    Data .. User (target population)

    Economic Aspects:

    Occupation

    Income (Gross & Net)

    Expenditure

    Saving

    Place of word

    Mode of travel

    Priorities to spend

    Size & type of plot and building

    Infrastructure

    - Utilities- Common facilities

    - Circulation

  • 8/13/2019 Housing Design Process

    4/30

    HOUSEHOLD :

    No. Of peopleage, sex

    TypeIndependentjointfamily

    Healthrelevant to

    environment

    Altitudes

    location

    tenure(free lease rental)

    -Area of plot frontage,

    building

    priorities

    No. Of new housesExtension to old buildings

    Type & size of buildings, open

    spaces

    Supporting facilities

  • 8/13/2019 Housing Design Process

    5/30

    COMMUNITY

    Controls(organisation)

    Caste,religion Self help(low imcome)

    Meeting places

    ShrinesCost effective buildings

  • 8/13/2019 Housing Design Process

    6/30

    DEMAND

    Affordability (actual)

    Expectation(potential)

    Preferences :

    Typology of houses

    TenureLocations

    Utilities

    Methods to obtain houses :

    Self help build

    Buy complete dwelling

    Build thro co-ops

  • 8/13/2019 Housing Design Process

    7/30

    Data .. Site ..

    LOCATION :

    Impact of urban

    development (existing

    &proposed)

    Potential for employment

    Distance to facilities

    Transportation link

    Potential for

    offsite,onsite,onplot

    infrastructure

    Cost

    DemandSuccessful implementation

  • 8/13/2019 Housing Design Process

    8/30

    AREA/SHAPE

    Accuracy

    Measuring,survey

    Design efficiency

  • 8/13/2019 Housing Design Process

    9/30

  • 8/13/2019 Housing Design Process

    10/30

    TOPOGRAPHIC/VEGETAT

    ION

    Areas unsuitable for

    buildings

    Drainage(low lying

    areas)

    Landscape

    details(tree,water

    bodies)

    Cost of development

    Environment

  • 8/13/2019 Housing Design Process

    11/30

    GROUND CONDITIONS

    Soil types

    Presence of groundwater

    rocks

    aggressive chemicals

    Construction

    CostCost of water supply

  • 8/13/2019 Housing Design Process

    12/30

    CLIMATE

    Temperature,relative

    humidity

    Rainfall

    Wind-direction/strength

    Seasonal variations

    comfort ranges

    Design of

    ShelterStreets

    Open spaces

  • 8/13/2019 Housing Design Process

    13/30

    EXISTING

    DEVELOPMENT

    Layout pattern

    Plot sizes,shapes

    Buildings

    Common-fecilities

    Commerce/industry

    Circulation/transportation

    Utilities,other land uses

    Trend of development

    To formulate designstandards.

  • 8/13/2019 Housing Design Process

    14/30

    INSTITUTION/FINANCE

    Agencies -Preparation

    -Planning

    -Implementation

    (promoter,building,archit

    ect etc)

    Project development as a

    whole

  • 8/13/2019 Housing Design Process

    15/30

    FINANCE

    Land cost -

    Influencing factors

    Market demand

    Tenure status

    Location

    Frontage to main road

    Land use controls zoning

    Level of services

    Key to success of the project

  • 8/13/2019 Housing Design Process

    16/30

    BUILDING COST

    Materials

    Construction

    Services

    ASSESSING THE ABILITY TO PAY .

    Affordability analysis

    Relating affordability to cost of land/building

  • 8/13/2019 Housing Design Process

    17/30

    ANALYSIS OF DETAILED STUDIES

    Design Guidelines

    TARGET POPULATION

    Type of houses

    Services(available)&need

    ed to

    ability to pay by

    Willingness to

    Site suitability (problems

    /opportunities)

    Financial implications

  • 8/13/2019 Housing Design Process

    18/30

    DESIGN.....OPTIONS....PROPOSALS.....HOUSIN

    G

    LAYOUT AND DENSITY

    Scaleneighbourhoodsay 5000 people

    Identifiable unit with provision for facilities

    Easy to administrate

  • 8/13/2019 Housing Design Process

    19/30

    GROSS DENSITY

    100/hect ------ low ----- individual houses more priv.&pub. Space

    200/hect-------- medium------- individual + multi occupancy ,adequate

    priv.&pub. Open space

    300/hect ----- high ----- more multi occupancy limited priv+ pub

    space

    600/hect ---- very high ---- multi storied , multi occupancy , restricted

    priv& pub space , Intensive use

  • 8/13/2019 Housing Design Process

    20/30

    POPULATION... DENSITY.... LAND.....

    EQUATIONS

    Popnet densityland in priv use(saleable)gross densityland

    area required

    5000308/hect65% - 200/hect25 hect

  • 8/13/2019 Housing Design Process

    21/30

  • 8/13/2019 Housing Design Process

    22/30

    A B C D

    6 7.5 9 12

    9

    12

    15

    18

  • 8/13/2019 Housing Design Process

    23/30

    BUILDINGS

    Type and minimumsuperstructure necessary(tostart with)

    (incremental esc. For lowincome)

    Cost of house to be related toaffordability

    ( find unit cost of building)

    Construction to be familiar andappropriate

    ( cost effective techniques)

    Labour and materials to suitlocal conditions

    PROVIDE RANGES

    INDEPENDENTTWIN

    ROW

    CLUSTER

    MEDIUM RISE

    LOW RISE

    HIGH RISE

  • 8/13/2019 Housing Design Process

    24/30

    Common facilities

    EDUCATION

    formation of housing standards relevant to

    scheme

    Or follow local/ national standards if available

    Ex: for 5000 population 1.primary school

    2. nursery schoolLocation ... acceptable option

    HEALTH FACILITIES

    Consult appropriate organisations

    Follow national/local standards (if any)

    COMMERCE / INDUSTRY

    Low income category

    Provides local employment

    Increased money spend within the project

    Attract investment to help cross subsidyTo improve quality of life

  • 8/13/2019 Housing Design Process

    25/30

    Common facilities

    GENERAL

    Commercial core to expand later (easily)

    Convenient shops integrated with houses in

    streetLarge scale activity to cater to residents as

    well as non residents

    Mixed development

    RECREATION

    local or international standards

    Formal (organised games)

    To suit the ability of target population who has

    to bear the cost

    Centrally located.... easily accessible

    (at the same time) avoid valuable land

    On formal(parks,play spaces)

    Large no. Of small open spaces taking care of

    childrens play suiting housing chuster

    LANDSCAPING

    To provide shady areas or for aesthetics?

    Cost consideration

    Who will maintain?

  • 8/13/2019 Housing Design Process

    26/30

    EFFICIENCY OF LAYOUT

    Public land roads, streets open spaces cost to be born by

    residents 20-25%

    Semi public land institutions cost by institutions 15-

    18%

    Private land houses,private street commerce 55-65%

  • 8/13/2019 Housing Design Process

    27/30

    CIRCULATION AND TRANSPORTATION

    Lane, street,roads,parking

    Standards per reg.

    Hierarchy of streets width to tolerate to diff.

    Width to relate to diff. Modes under Indian condition

    Shorting each road to reduce impact on housing unitsand to reduce costs

    Parking to relate directly to each unit withoutcompromising environmental quality

    Design roads to assure buffering and integration withother plan elements

  • 8/13/2019 Housing Design Process

    28/30

    UTILITIES

    Considering cost, may be implemented ina phased manner

    To meet the objective

    Water supply

    . Source of water - tank,well,municipal supply

    . Public stand pipe---- individual piped supply Sewage disposal ---- septic tank---- water born sewage

    Surface drainage

    Electricity ---- stret lightning , individual connections

    Carbage disposal--- communal disposal point, on plotcollection

    Telephone---- communal provision, plot connection

    ( Prepare layout diagrams with alternatives )

  • 8/13/2019 Housing Design Process

    29/30

    DETAILED PROPOSALS

    Based on the option approved by the user and authorities

    To be prepared for the first phase only

    Changes as a result of experience can be incorporated in later

    design

    Detailed design not only prepared to meet the initial levels butdesigned to take care of the likely final levels.

    THEN COMES YOUR IMPLEMENTATIONS AND

    MONITORING ..

  • 8/13/2019 Housing Design Process

    30/30

    tHANK yOU .