housingstagecert pam-penang 20120407
TRANSCRIPT
-
8/12/2019 HousingStageCert PAM-Penang 20120407
1/102
GUIDELINES ON THE 3rd SCHEDULE OF THESTANDARD SALE & PURCHASE AGREEMENTPAM Continuing Professional Development CPD Seminar
7th April 2011 PAM Northern Chapter Penang.
Pertubuhan Akitek Malaysia
Ar Chan Seong AunM Arch (Distinction), B Arch (Hons), B Bdg Sc (VUW, NZ), APAM, AIPDM, TAM
-
8/12/2019 HousingStageCert PAM-Penang 20120407
2/102
Architects Certification for Stage Completion
1. Housing Development Act 1966
2. Schedule-G Landed Properties
3. Schedule-H Subdivided Buildings
4. Issuance of CCC Certificate of Completion and Compliance
Pertubuhan Akitek Malaysia
5. FAQs Frequently Asked Questions
-
8/12/2019 HousingStageCert PAM-Penang 20120407
3/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
HOUSING DEVELOPMENT ACT1966
-
8/12/2019 HousingStageCert PAM-Penang 20120407
4/102
-
8/12/2019 HousingStageCert PAM-Penang 20120407
5/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
6/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
7/102
COMMITTEE MEMBERS OF THE OSCCHAIRMAN : MAYOR / YDPSECRETARY : OSC DIRECTOR / PLANNERMEMBERS AS BELOW
1. Deputy Mayor
2. Four Ordinary Members of the Council
3. Director of State Urban and Town Planning
Pertubuhan Akitek Malaysia
. rec or o nera an an
5. Land Administrator
6. Director of Public Works
7. Director of Department of Drainage and Irrigation
8. Director of Department of Environment
9. Director of Department of Fire Fighter and Life Saving
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
8/102
10. Director of Department of Sewage Services 11. Manager of Tenaga Nasional Berhad
12. Manager of Telekom Malaysia Berhad
13. Manager of Department of Planning
14. Manager of Department of Building
15. Manager of Department of Engineering
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
16. Manager of Department of Landscape
17. Manager of Department of Health
18. Technical Departments that are related are invited
-
8/12/2019 HousingStageCert PAM-Penang 20120407
9/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
10/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
11/102
Laws Controlling the HousingDevelopment Process
National Land Code (Act 56) 1965
Town & Country Planning Act
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
, ,
Sewerage Services Act
Street, Drainage & Building Act (Act 133), 1974
Uniform Building By-Laws 1984
-
8/12/2019 HousingStageCert PAM-Penang 20120407
12/102
Housing Developers (Control and Licensing) Act 1966 (Act 118)
Housing Developers (Control and Licensing) Regulations 1989
Housing Developers (Housing Development Account)
Regulations 1991
Housing Developers (Control and Licensing) (Amendment)Act 2002
Housing Developers (Control and Licensing) (Amendment)Regulations 2002
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Housing Developers (Housing Development Account)(Amendment) Regulations 2002
Strata Titles Act 1985 (ACT 318)
Strata Titles (Federal Territory of Kuala Lumpur) Rules 1988
-
8/12/2019 HousingStageCert PAM-Penang 20120407
13/102
Part I defines what is housing development more than 4 lots
Part II requires Developers to be licensed and minimum paid up capitalPart III defines the basic duties of a housing developer including the opening and
maintenance of the Housing Development Account
Part IV Investigation and enforcement
Principal HDA 1966
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Section 13A Controller to report the conduct of and Architect or Engineer
Part VI Tribunal for Home Buyers Claims
Part VII Miscellaneous covers fines for offences and liability of directors, managersand other officers
Section 24 empowers the Minister to make regulations
-
8/12/2019 HousingStageCert PAM-Penang 20120407
14/102
Housing DevelopmentAct 1966
Housing DevTribunal for
House Buyers
Housing Dev
Regulation
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Reg 2002
Strata Titles Act1985
1989
Strata Titles Act2007
-
8/12/2019 HousingStageCert PAM-Penang 20120407
15/102
Regulation 11 standard contract of sale required that the StandardSales and Purchase Agreement (Schedule G & H) must be used.
Schedule-G Standard Sale and Purchase Agreement for land and
buildingClause 4 Schedule of Payment
Part 1 Installment payments in the time and manner set out in ThirdSchedule of the SPA
Housing Development Regulations 1989
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Part 2 Notice to purchaser supported by certificate signed by vendorsArchitect or Engineer and this shall be sufficient proof of completion
Clause 13 Position and area of the lot
Part 2 states Vendor may claim up to maximum 2% deviations.
Part 4 No alterations are allowedClause 14 Materials and workmanship to conform to description
Building to be constructed in a good workmanlike manner
-
8/12/2019 HousingStageCert PAM-Penang 20120407
16/102
Clause 15 Restriction against variation by purchaser.
Until after CCC/CFO
Clause 16 Restriction against change of colour schemeClause 21 Compliance with written laws.
Architect has to ensure compliance with UBBL and Street DrainageBuilding Act
Housing Development Regulations 1989
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Clause 19 New laws affecting housing developmentDeveloper to absorb any additional costs
Clause 19 Time for handing over of vacant possession
24 months for landed property
Clause 21 Manner of delivery of vacant possession
Clause 20 Defects liability period
24 months from date of handing over vacant possession.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
17/102
Note
Building description as set out in Fourth Schedule - the
specifications of finishes, fixtures and fittingsApproved building plans as in Second Schedule Keydocument is the approved building plans
Housing Development Regulations 1989
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
o c anges or ev a ons w ou e wr en consen othe purchaser except as required by appropriate authority
If changes or deviations involve the substitution or use ofcheaper materials or omission of works, purchaser is
entitled to corresponding reduction in price or damages
-
8/12/2019 HousingStageCert PAM-Penang 20120407
18/102
Further References
Copies of the Housing Development (Control & Licensing ) Actscan be found at the following websites
www.rehda.org.my
www.hba.org.my
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Relevant Lembaga Arkitek Malaysia circulars:
General Circular 1/2008 (CCC)
General Circular 1/2010 (Borang-F1)
General Circular 3/2008 (Stage Cert Guide AFTER 1-12-07)
-
8/12/2019 HousingStageCert PAM-Penang 20120407
19/102
Major amendments to the Act on1st December 2002
Section 2(1)(a) Includes cooperative societies such as PKNS, etc
Section 8A Statutory Termination of S&P Agreement Works notstarted after 6 months & >75% Purchasers agree to terminate
Section 13A Controller can report unsatisfactory conduct of
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
rc tect or ng neer rect y to t e r respect ve oar s
Section 16(a) 16(I) Tribunal for House buyers Claims Claims upto RM 25,000. Decision of Tribunal to be final. Criminal penalty forfailure to comply
Third Schedule Stage 2(f) changed to 2(f), (g),(h) for sewerage,drains and roads.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
20/102
Major amendments to the Act on17th April 2007
Section 24 Delivey of VP changed from after COF application
is accepted by Local Authority to issuance of CCC by PrincipalSubmitting Person
Section 25 DLP has been extended from 18 to 24
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
applies to walls only, the internal & external finishes have tobe completed. This would include, the painting of walls andthe floor finishes and the building would be almost completedbefore Architects can certify for completion of this
Fourth schedule - Fencing and turfing is now optional under the
new amendment. Internal telephone trunking and cabling is notoptional
-
8/12/2019 HousingStageCert PAM-Penang 20120407
21/102
Core Reasons These LawsWere Passed.
The key reason for the Housing
Developers Licensing Act is to protectthe rights of the purchaser.
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
The key objective of the Uniform Buildingby-Laws is the protection of publicsafety and health.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
22/102
Preparing for Certification
Check to whether the project is within the COF or
CCC version of the Housing Developers Act. If BPapproval condition is COF, then apply for COF anduse Circular 4/2003
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
ec e e a s o e greemen s o ensurecompliance with approved building plans andcontract documents, especially dimensions, floorareas and description of finishes.
Check against Lembaga Arkitek Malaysia Circulars1/2008, 2/2010 & 4/2003 or 3/2008
-
8/12/2019 HousingStageCert PAM-Penang 20120407
23/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
H U IN ERTIFI ATI NSCHEDULE-G LANDED PROPERTIES
-
8/12/2019 HousingStageCert PAM-Penang 20120407
24/102
Stages of Certification Schedule-GLanded Properties
STAGE WORKS TO BECOMPLETED WORKS NEED NOT BECOMPLETED
2(a) The
foundation and
Foundation works below
lowest floor level
Retaining wall if it is not
art of the foundation
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
footing works ofthe said Building
10%
Piling & PilecapsRaft SlabFootingStumps
BackfillingLowest floor slab NOTpart of the foundationGround BeamsServices
C&S Engineer is to certify completion and compliance of structural
components before Architects Certification
-
8/12/2019 HousingStageCert PAM-Penang 20120407
25/102
STAGE 2(a) QUESTION
C&S Engineer has confirmed completion of the foundation works. Based onthe Engineers letter the Architect has certified completion of Stage 2(a)even though the stumps have not been completed. This is a mistake by theEngineer. Will the Architect still be held responsible?
YES. LAM can only hold the Architect responsible. LAM can not hold the
Engineer responsible no more than LAM can hold the Architects staffresponsible for any mistakes made by them.
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
The Engineer may be disciplined later by LJM but the Architect is notabsolved of the responsibility of checking for the completion of the works.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
26/102
STAGE WORKS TO BECOMPLETED
WORKS NEED NOT BECOMPLETED
2(b) The
Reinforced
concreteframework of thesaid building
15%
All Primary RC
structural elements above
lowest floor levelBeams, Columns &suspended slabsRoof Beams
Non-structural ground
floor slabs w or w/o BRC
StiffenersLintolsNon-structural RCHoods, aprons, gutters,
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Retaining walls formingpart of the structure
RC staircasesRC walls not part of theframe
Formworks do NOT need to be removed
Roof beams must be completed
C&S Engineer is to certify completion and compliance of structural
components before Architects Certification
-
8/12/2019 HousingStageCert PAM-Penang 20120407
27/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
28/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
If the roof structure doe not have sloping RC beams as in this structure,then the RC structure has been completed and stage 2(b) certificate can beissued. If however there is a sloping RC roof beam, then this beam must be
cast before RC structure can be considered to be completed.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
29/102
STAGE 2(b) QUESTION
The RC frame of a bungalow project has been completed. A week later thefirst floor beams observed to have some structural cracks. Engineer issuesadditional structural drawings.
Can the stage 2(b) certificate be issued prior to the completion of the
additional works / rectification works?
If the Architect has been kept informed about the status of the structural
works it is obvious that the structural works had NOT been satisfactoril
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
completed. NO certificate under stage 2(b) can therefore be issued.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
30/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(c) Walls of thesaid Building withwith Door &
Window Framesplaced in position
10%
Non-structural wallsAll Party Walls includingStiffeners
TIMBER Door &Window FramesFRAMEWORK forPartitioning excluding
Metal FramesDoor leavesWindow Panels
Window LouvresParapet wallsTimber door & windowframes where sub-
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Boundary wallsFence WallsClosing up of
construction openings
The above is for Circular 3/2008
Although metal window frames need not be installed at this stage,Architects often face complaints and queries from Purchasers
-
8/12/2019 HousingStageCert PAM-Penang 20120407
31/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
32/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
33/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(d) Roofing,Electrical wiring,plumbing,gas
piping, internaltelephone
trunking andcabling to the
Roof structure, roofing& flashing including carporches
Electrical wiringWater pipingSanitary piping incl
Ceiling boardsSwitch BoardsSwitches
Electrical fixtures &FittingsSanitary & Tap fixtures& Fittings
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
10%
Gas pipingTelephone trunking
Water tanksRain water down pipesGuttersWindow Hoods
-
8/12/2019 HousingStageCert PAM-Penang 20120407
34/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
35/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(e) Internal &ExternalPlastering of the
said Building
10%
All plastering to walls,soffits, slabs, beams,columns where specified
Wall tilesLinings, boards and
panels to framedpartitions
Floor screeding andfloor finishesPainting and other
finishes except wall tilesClosing up of temporary
construction openingsTiling or plastering to
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Ceiling to water tankarea
The above is for Circular 4/2003
-
8/12/2019 HousingStageCert PAM-Penang 20120407
36/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
37/102
STAGE 2(e) QUESTION
Wall tiling is not included in the S&P wording why does the LAMguideline specifically only tiling. What about other forms of tiling like marble,stone, etc. and other new wall finishing materials?
The LAM guidelines were formulated to reduce uncertainty for Architects intheir certification. Since the wall tiles are normally installed to replace the
plastering, it would be logical that these must also be completed along withthe plastering. The same would apply for any marble, stone and new
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
finishes that replace the plastering.
Note that wall paper, spray tiles, etc which replace painting are not includein this phase as they do not replace the plastering but are applied on top ofit.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
38/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(e) Internal &External Finishesof the said
Building includingthe wall finishes
10%
All plastering to walls,soffits, slabs, beams,columns where specified
Wall tiles & Other wallfinishesLinings, boards andpanels to framed
Closing up of temporaryconstruction openingsDoor & Window panels
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Floor screeding & otherfloor finishesPainting to internal &
external Walls Floors &Ceiling
The above is for Circular 1/2008
-
8/12/2019 HousingStageCert PAM-Penang 20120407
39/102
Pertubuhan Akitek Malaysia
Under the CCC system, ALL Building works have to be completedunder stage 2(e) except external works
-
8/12/2019 HousingStageCert PAM-Penang 20120407
40/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(f) Sewerageworks serving thesaid building
5%
Sewerage reticulationconnected toCompleted Sewage
Treatment Plant temp orPermanent approved by
the relevant authority
Testing &commissioningWater & electricity
connection
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Sewer Treatment Plant may be Permanent or Temporary
Sewer line must be connected to last manhole
Last Manhole must be completed. Inspection Chambers need NOT becompleted
-
8/12/2019 HousingStageCert PAM-Penang 20120407
41/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
42/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
43/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(g) Drainsserving the saidbuilding
5%
Drains & Main Drainsconnected to outfall
Metal gratings & draincovers
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Alignment of drains and outfall may be Permanent or Temporary asapproved by JPS or relevant Local Authority
Perimeter drains serving the said building
-
8/12/2019 HousingStageCert PAM-Penang 20120407
44/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(h) Roadsserving the saidbuilding
Paved Road leading tobuilding from existingroad
Permanent roadsaround the buildingEntrance culvert servingthe said building
FootpathsRoadside tablesFinal wearing course to
pre-mixed roadsRoad markingsRoad signages
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
Alignment of Roads may be Permanent or Temporary access asapproved by Local Authorities
-
8/12/2019 HousingStageCert PAM-Penang 20120407
45/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
46/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
47/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
H U IN ERTIFI ATI NSCHEDULE-H STRATA PROPERTIES
-
8/12/2019 HousingStageCert PAM-Penang 20120407
48/102
-
8/12/2019 HousingStageCert PAM-Penang 20120407
49/102
STAGE 2(a) QUESTION
The development consists of 4 wings of apartments interlinked to commonservice cores. Do the works below ground level of all 4 wings have to becompleted before we certify for stage 2(a) or can they be certified on a wingby wing basis.
If the 4 wings are structurally independent and they have been defined as
4 independent buildings / blocks they can be certified on a building bybuilding basis. If however they all sit on a common structural podium and
Pertubuhan Akitek Malaysia
is one integral structure, then the whole podium foundation must be
completed for certification for stage 2(a)
-
8/12/2019 HousingStageCert PAM-Penang 20120407
50/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
51/102
-
8/12/2019 HousingStageCert PAM-Penang 20120407
52/102
Pertubuhan Akitek Malaysia
Shear walls form part of the primary
RC structure and must be completedunder stage 2(b)
-
8/12/2019 HousingStageCert PAM-Penang 20120407
53/102
Pertubuhan Akitek Malaysia
Ground, 1st, 2nd and 3rd floor can be certified under stage 2(b)
-
8/12/2019 HousingStageCert PAM-Penang 20120407
54/102
-
8/12/2019 HousingStageCert PAM-Penang 20120407
55/102
Walls required for
-
8/12/2019 HousingStageCert PAM-Penang 20120407
56/102
Walls required forconstruction access need
NOT be completed for stage2(c)
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
57/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(d)Roofing/Ceiling,Electrical wiring,
plumbing,gaspiping, internal
telephonetrunking and
Roof structure, roofing& flashing, orFloor slab soffits &
ceiling framing of the saidparcel
Electrical wiring within
Ceiling boardsSwitch BoardsSwitchesElectrical fixtures &FittingsSanitary & Tap fixtures& Fittings
Pertubuhan Akitek Malaysia
said parcel10%
Water piping withinparcel
Sanitary piping within
parcelGas piping within parcel
Telephone trunking &cabling within parcel
Water tanksRain water down pipesGuttersWindow hoods
-
8/12/2019 HousingStageCert PAM-Penang 20120407
58/102
Pertubuhan Akitek Malaysia
1st floor has been completed to stage 2(d) if services are complete
STAGE WORKS TO BE WORKS NEED NOT BE
-
8/12/2019 HousingStageCert PAM-Penang 20120407
59/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(e) Internal &External Finishesof the said parcel
including the wallfinishes
10%
All pastering to walls,soffits, slabs, beams,columns where specified
Wall tiles & other wallfinishesLinings, boards andpanels to framed
Closing up of temporaryconstruction openingsDoor & window panels
Pertubuhan Akitek Malaysia
Floor screeding and/orother floor finishes
Painting to internal &
external walls, floors andceilings (if any)
STAGE WORKS TO BE WORKS NEED NOT BE
-
8/12/2019 HousingStageCert PAM-Penang 20120407
60/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(f) Sewerageworks serving thesaid building
5%
Sewerage worksincluding manholes fromthe building containing
the said parcel connectedto a completed sewerage
treatment system ( Thetreatment system may be
Testing &commissioningWater & electricity
connectionRefer page 18/18 of
circular
Pertubuhan Akitek Malaysia
as approved by therelevant authority)
Sewer Treatment Plant may be Permanent or Temporary
-
8/12/2019 HousingStageCert PAM-Penang 20120407
61/102
STAGE WORKS TO BE WORKS NEED NOT BE
-
8/12/2019 HousingStageCert PAM-Penang 20120407
62/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(g) Drainsserving the saidbuilding
5%
Drains & Main Drainsconnected to outfall(The alignment of drains
and outfall may bePermanent or Temporary
as approved by the localauthority)
Metal gratings & draincovers
Pertubuhan Akitek Malaysia
Perimeter drains serving the said building must be completed
STAGE WORKS TO BE WORKS NEED NOT BE
-
8/12/2019 HousingStageCert PAM-Penang 20120407
63/102
STAGE WORKS TO BE
COMPLETED
WORKS NEED NOT BE
COMPLETED
2(h) Roadsserving the saidbuilding
Paved Road leading tobuilding containing thesaid parcel from an
existing road.(Thealignment of Roads may
be Permanent orTemporary access as
FootpathsRoadside tabletsFinal wearing course to
pre-mixed roadsRoad markingsRoad signages
Pertubuhan Akitek Malaysia
Authorities)Permanent roadsaround the building
containing the said parcelEntrance culvert serving
the buildingKerbs
-
8/12/2019 HousingStageCert PAM-Penang 20120407
64/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
65/102
Pertubuhan Akitek Malaysia
Vacant possession can not
be issued yet as the bulkmeter has not been installedyet
-
8/12/2019 HousingStageCert PAM-Penang 20120407
66/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
CCCCERTIFICATE OF COMPLETION & COMPLIANCE
4 1 ISSUANCE OF CCC
-
8/12/2019 HousingStageCert PAM-Penang 20120407
67/102
CCC can only be issued by the Principal Submitting Person (PSP) after thefollowing have been secured:
1. All the certifications by the respective parties (professionals, contractorsand licensed tradesmen) based on the prescribed Form Gs under theMatrix of Responsibility (Forms G1 G21); and
4.1 ISSUANCE OF CCC
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
2. Clearances from the following authorities :Tenaga Nasional Berhad (TNB)
Water Authority
Sewerage Services Department (JPP)
Fire and Rescue Department (except for residential buildings of not morethan 18 meters high)
Department of Safety and Health (where applicable),
Relevant authorities/Public Works on Roads and Drainage.
ISSUANCE OF CCC
-
8/12/2019 HousingStageCert PAM-Penang 20120407
68/102
The local authorities still maintain their rights and power to enter the siteduring construction and issue an order to stop the issuance of CCC by thePSP if the construction on site is found to have breached the approved
building plans and/or against the provision of UBBL or conditions of buildingplans approval on health and safety issues until such time the fault is
corrected.
The issuance of CCC is restricted to onl technical issues concernin
ISSUANCE OF CCC
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
health, safety and essential services. The non-technical issues such as
bumiputra quota, low cost provision and contribution for public facilities etcare outside the purview of PSP and will have to be resolved between theOwner and the Local Authorities at the planning and building plans approvalstage or via other mechanism.
There will be only CCC (Form F) and Partial CCC (Form F1). There will be NO
Temporary CCC similar to Temporary CF.
The issuance of CCC will only apply to projects in which building plans aresubmitted after CCC came into force.
-
8/12/2019 HousingStageCert PAM-Penang 20120407
69/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
70/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
71/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
72/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
73/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
74/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
75/102
-
8/12/2019 HousingStageCert PAM-Penang 20120407
76/102
Pertubuhan Akitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
77/102
4.2 BUILDING QUALITY AND CCC
Can Architects issue the CCC whenthere are still outstanding defects?
Pertubuhan Akitek Malaysia
Can an Architect decide that a minordefect is acceptable under the Standard
S&P?
Contractual relationship of parties inHousing Sell then Build
-
8/12/2019 HousingStageCert PAM-Penang 20120407
78/102
ARCHITECT
HOUSE BUYER
TRIBUNAL
Housing Sell then Build
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
CONTRACTORHOUSING
DEVELOPER
HOUSE
BUYER
STDSPA
PAM
CONTRACT
STANDARD SALES & PURCHASE AGREEMENT FOR HOUSING
-
8/12/2019 HousingStageCert PAM-Penang 20120407
79/102
S S S & U C S G O OUS G
Clause (14) Materials and Workmanship to Conform to Description states
.shall be constructed in a good and workmanlike manner in accordance
with the description set out in the Fourth Schedule and in accordancewith theplans approved by the Appropriate Authority
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
The approved Building Plan is a very important point of reference
as far as quality is concernedThe Architect does not have the powers under the standard S&P to
make the final decision regarding quality - Tribunal for House has that
power
-
8/12/2019 HousingStageCert PAM-Penang 20120407
80/102
CERTIFICATE OF COMPLETION & COMPLIANCE
-
8/12/2019 HousingStageCert PAM-Penang 20120407
81/102
Why BCA issue Temporary Occupation Permit (TOP) whereworkmanship is poor?
The TOP signifies that the completed building works have complied
with the provisions of the building regulation, which focus primarilyon human safety, and with the requirements of the various technicalauthorities, so that the completed building can be occupied.
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
However, TOP does not ensure that materials have beenaccordance to the Sale & Purchase (S&P) agreement or quality ofworks as promised in sales document. These disputes should bebrought directly to and resolved with the developer.
PAM 98 CONTRACT
-
8/12/2019 HousingStageCert PAM-Penang 20120407
82/102
Quality standards in Architectural components cannot yet be definedabsolutely and requires the discretion of the Architect. The PAM98contract also empowers the Architect to make the final decisionon quality with reasonable discretion.
The powers of the Architect however are not absolute, as theContractor can refer any matter in the contract including quality
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
. ..matter or thing left by this contract to the discretion of the Architect.
Under the PAM form of Contract therefore the Architect decideswhether the quality of works are acceptable and NOT theEmployer
PAM 2006 CONTRACT
-
8/12/2019 HousingStageCert PAM-Penang 20120407
83/102
Quality standards in Architectural components cannot yet be definedabsolutely and requires the discretion of the Architect. The PAM2006contract also empowers the Architect to make the final decisionon quality but refers more to the Contract in clause 6.1 shall
be to the respective quality and standard described in thecontract document and required by the Architect.
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
,Contractor can refer any matter in the contract including quality
matters to arbitration as outlined in clause 34.5(b) .. any matter leftby the contract to the discretion of the Architect.
Under the PAM 2006 form of Contract also the Architect
decides whether the quality of works are acceptable and NOTthe Employer but quality shall be as described in the contract
-
8/12/2019 HousingStageCert PAM-Penang 20120407
84/102
%
%
%
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
%
%
%
%
%
Inspection Checklist for Clerk of Works
-
8/12/2019 HousingStageCert PAM-Penang 20120407
85/102
A comprehensive QCchecklist ensures worksa properly completed forevery stage of works.
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
CONDITIONS TO BE COMPLIED BEFORE VACANT
-
8/12/2019 HousingStageCert PAM-Penang 20120407
86/102
POSSESSION CAN BE GIVEN1. Architect has issued CCC - Certificate of Completion and
Compliance
2. Water and electricity supply is ready for connection
3. Purchaser has paid all monies due under clause 4(1) inaccordance with the 3rd schedule
4. Purchaser has performed and observed all terms and convenants
Pertubuhan Akitek Malaysia
on his part under the S&P
-
8/12/2019 HousingStageCert PAM-Penang 20120407
87/102
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
FAFREQUENTLY ASKED QUESTIONS
5.1WHAT ARE THE MOST COMMON HOUSE
-
8/12/2019 HousingStageCert PAM-Penang 20120407
88/102
WHAT ARE THE MOST COMMON HOUSEBUYER COMPLAINS ?
Late Delivery
Non- payment of compensation for late
Pertubuhan Akitek Malaysia
delivery
Defective workmanship & constructionquality
Non-conformance to approved plans
Number Of Complaints Received by States by Types For Year 2000
No. Types Of Complaints/States
SGR PLS P.P PRK KED N.S MEL JOH W.P KEL TRG PHG TOTAL
1. Defective Workmanship 82 0 26 12 1414
7 18 28 0 011 212
-
8/12/2019 HousingStageCert PAM-Penang 20120407
89/102
2. Compensation 124 0 28 14 6 4 0 0 60 0 1 10 247
3. Payment 20 0 15 6 4 8 9 7 23 0 0 0 92
4. CFO 47 0 4 3 1 1 0 1 26 2 1 9 95
5. Late Delivery Of Houses 97 0 38 24 1524
14 24 83 12 116 348
6. Interest 40 0 4 1 3 14 5 17 9 0 1 4 98
7. Not Conforming To Plan 14 0 10 6 1 0 1 3 98 0 0 2 135
8. Service 20 0 17 5 2 4 2 3 51 4 2 3 113
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
9. Cheating 2 0 1 3 1 2 0 0 8 0 0 0 17
10. Deposit/Ownership 21 1 5 2 11
4 4 13 0 02 54
11. Infrastructure 0 0 3 0 01
0 0 1 0 01 6
12. Contravene Act/Regulations 12 0 15 7 9 2 0 1 9 1 0 2 58
13. Others 177 1 50 27 159
0 5 32 4 325 348
Total656 2 216 110 72
8442 83 441 23 9
85 1823
5.2EOT UNDER HDA CLAUSE 32
-
8/12/2019 HousingStageCert PAM-Penang 20120407
90/102
EOT UNDER HDA CLAUSE 32
Are Developers entitled to request forwaiver of interest on late delivery if their
Pertubuhan Akitek Malaysia
shortage of materials for construction?
SEA Housing Sdn Bhd vs Lee Poh Choo[1982](2 MLJ 31) i hi h h h
-
8/12/2019 HousingStageCert PAM-Penang 20120407
91/102
[1982](2 MLJ 31) in which the purchasersued the developer for breach of contract
and for delivery of the title to a house hehad purchased. The property in questionwas com leted after 23 months instead
Pertubuhan Akitek Malaysia
of 18 months as stated in the SPA
The developer relied on Clause 32 of the
agreement which purported to exempt it if
-
8/12/2019 HousingStageCert PAM-Penang 20120407
92/102
agreement, which purported to exempt it ifnon-fulfillment of any term was caused bycircumstances beyond its control. The High
Court trial judge held that the 1966 Act andthe 1970 Rules were passed by the
Pertubuhan Akitek Malaysia
public and the developer could not contractout of the Rules. The developer's appeal tothe Federal Court was dismissed. To datethere have been no cases whereDevelopers have been exempted for latedelivery penalties.
Pertubuhan Akitek Malaysia
5.3CAN A DEVELOPER JUST PASS THE
-
8/12/2019 HousingStageCert PAM-Penang 20120407
93/102
The Contractor and House Buyer have NO
CAN A DEVELOPER JUST PASS THEHOUSE BUYER DEFECTS LIST TO THE
CONTRACTOR ?
Pertubuhan Akitek Malaysia
direct contractual relationship.
Contractors are therefore NOT obliged totake instructions from house buyersabout their defects complains
-
8/12/2019 HousingStageCert PAM-Penang 20120407
94/102
-
8/12/2019 HousingStageCert PAM-Penang 20120407
95/102
MANAGING CHANGES & UNCERTAINTY
-
8/12/2019 HousingStageCert PAM-Penang 20120407
96/102
MORALETHICAL
Pertubuhan Akitek MalaysiaPertubuhan Akitek Malaysia
STUTATORY
REQUIREMENTS CONTRACTURALISSUES
-
8/12/2019 HousingStageCert PAM-Penang 20120407
97/102
-
8/12/2019 HousingStageCert PAM-Penang 20120407
98/102
5.5 NON-COMFORMANCE TO APPROVED PLANS
What if the parcel height is constructed less than that shown in thed B ildi Pl ? C h P h NOT h ?
-
8/12/2019 HousingStageCert PAM-Penang 20120407
99/102
p gapproved Building Plan? Can the Purchaser NOT accept the apartment?
Clause 11(1) of the S&P allows for errors in position and area of the parceland states The position. Measurement, boundaries and area of the saidparcel as given are believed but not guaranteed to be correct and if its
measurement, boundaries and area as shown in the Building Plan shall bedifferent from that shown in the strata title when issued, the purchase price
Pertubuhan Akitek Malaysia
of the said parcel calculated at the rate stipulated in section 6 of the fifthschedule shall be adjusted accordingly.
Based on this clause, the Purchaser is entitled to pro rata compensationand according to clause 11(2) Any payment resulting from the adjustment
and required to be paid by the party concerned shall be so paid within 14
days of the issue of the strata title.
Housing Complains Against ArchitectsSource : Lembaga Arkitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
100/102
TYPE 1999 2000 2001 2002 2003 2004 2005 TOTAL %Certification 32 14 9 17 8 16 12 108 53%
Defects 5 9 4 2 2 4 0 26 13%
Supplanting 1 3 0 1 0 2 0 7 3%
Delay in Obtaining CFO 5 0 0 0 0 0 1 6 3%
Pertubuhan Akitek Malaysia
Collabration with
NonRegistered Person 1 0 0 0 0 0 0 1 0%
Non-approved Practice 0 0 0 0 0 0 0 0 0%Unprofessional Conduct 4 4 4 8 9 12 14 55 27%
TOTAL 48 30 17 28 19 34 27 203 100%
Housing Complains Against Architects1999-2005Source : Lembaga Arkitek Malaysia
-
8/12/2019 HousingStageCert PAM-Penang 20120407
101/102
Unprofess ional Conduct
27%
Pertubuhan Akitek Malaysia
Certification
54%
Defects
13%
Supplanting
3%
Delay in Obtaining CFO
3%
Collabration with NonRegistered
Person
0%
Non-approved Practice
0%
-
8/12/2019 HousingStageCert PAM-Penang 20120407
102/102
THANK YOU
Pertubuhan Akitek Malaysia