Page 1: HOW can India generate Power for All?

HOW can we have affordable, 24 hrs Power for All ?

!

!

The Analysis

Page 2: HOW can India generate Power for All?

Power for All The AnalysisWhere we are?

With more than 290 million people without access to electricity,!India has the largest unelectrified population in the world.!!

Source: International Energy Agency, 2012 paper on World Energy Outlook

Page 3: HOW can India generate Power for All?

Power for All The Analysis

The Rural household electrification numbers:!!

!

!

!

!

!

!

!

!

If we can progress at this growth rate we will reach 100% only in 2023!!HOW can we connect our villages faster?

Where do we want to be?

43%!2001 Census

66%!2010 NSSO

Page 4: HOW can India generate Power for All?

Power for All The Analysis

1 REACH!While cities and towns connect to the grid,!large parts of the hinterland still do not!!

!

!

!

!

!

!

!

!

The 3 Steps required

Page 5: HOW can India generate Power for All?

Power for All The Analysis

THOSE NOT REACHED!are opting to pay Rs 150 - Rs 200 per month to!entrepreneurial ‘Off Grid’(like solar) providers …!!

!

!

!

!

… this is between Rs 8 to 12/unit because they!value the ability to work or study in the evening!

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! … and because kerosene and diesel!! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! cost almost twice as much!!

How long can rural India wait for Power?!!

Examining REACH

Source: 2 October, 2013 Economic Times article by Biswarup Gooptu

Page 6: HOW can India generate Power for All?

Power for All The Analysis

2 SUPPLY!While some cities have 24 hours of power, !12 - 18 hours per day is normal !for most parts of India!!

!

!

!

!

!

!

!

!

The 3 Steps required

Page 7: HOW can India generate Power for All?

Power for All The AnalysisExamining SUPPLY

WHY UNDERSUPPLY?!Insufficient Capacity Addition!

!

!

!

!

!

Capacity doubled from 100 to 200 GW, between 2002 to 2012, but there is still 10% to 20% deficit even in major states. International norm: 30% surplus!!

How can we add Power Plants? !

+

Source: Ministry of Power and CEA

Page 8: HOW can India generate Power for All?

Power for All The AnalysisExamining SUPPLY

WHY UNDERSUPPLY?!Generation Capacity Usage at 60-70%!

!

!

!

!

!

Because of Fuel shortage - even though India has 3rd largest coal reserves - India is expected be largest coal importer which will increase cost.!

How can we supply more Coal to Power Plants?

Page 9: HOW can India generate Power for All?

Power for All The Analysis

What about the promise of Alternative Power sources?!!

!

!

!

!

!

!

!

!

!

… is the current and expected reality.!!

Lignite Gas/ Diesel Hydro Nuclear Others Coal3 13 13 2 5 64

3 12 10 3 5 66

3 9 10 2 6 69

Examining SUPPLY

2010

2012

2017 projected

Source: Analysis based on CEA data

Page 10: HOW can India generate Power for All?

Power for All The Analysis

3 EFFICIENCY!Since Power is a Natural Monopoly, there is little motivation to be efficient, then!

How can we ensure efficiency in a Monopoly environment? !!

!

!

!

!

!

!

!

Let us examine all the 3 major components of Power

The 3 Steps required

Raw material!Coal

Generation!Cost

Transmission!Cost & Losses

Page 11: HOW can India generate Power for All?

Power for All The Analysis

!

!

!

!

!

Monopoly Supplier: Coal India, but its costs are half of imported coal - and with imports, costs will rise.!

Examining EFFICIENCY

Monopoly squeeze!

!

!

!

!

Monopoly Transporter, Indian Railways already subsidises coal transport - can it continue to do so as volumes increase?

Raw Material Coal

How can we get required volume of coal to plants cheaper?

Page 12: HOW can India generate Power for All?

Power for All The Analysis

Inefficient Old Plants!

!

!

!

!

Over 25% capacity in major states comes from plants over 30 years old (international end-of-life norm). These plants require high maintenance and more fuel, to produce lesser power.!

How can we ensure lower costs as old plants are phased out and new capacity is added?

Generation Cost

Examining EFFICIENCY

Page 13: HOW can India generate Power for All?

Power for All The Analysis

Transmission Cost and Losses

Examining EFFICIENCY

Decrease Engineering Losses!

!

!

!

!

!

Basic physics suggests that as Power for All is rolled out, rural connectivity will mean increase in engineering losses

Decrease Theft!

!

!

!

!

!

Loss reduction possible with stricter monitoring of compliance and punitive measures against offenders.

How can we reduce engineering losses and eliminate power theft?

Page 14: HOW can India generate Power for All?

Power for All The Analysis

TARIFF

Examining Tariffs

Will Industry absorb?!

!

!

!

!

Agricultural power almost free, Domestic tariff below cost for most, only Industry pays 30% above cost!

If Industry pays more, then cost of goods will rise OR!

Industry will move to use of diesel gensets, which makes the distribution companies poorer.

Page 15: HOW can India generate Power for All?

Power for All The Analysis

Unpaid subsidies!

!

!

!

!

Subsidy: 20,000 cr paid: 15,000 cr unpaid!

When charges to consumers are cut, government has to pay subsidy to Power companies. And when subsidies are unpaid, Power company cannot invest in wires, towers and meters.

TARIFF

Examining Tariffs

Page 16: HOW can India generate Power for All?

Power for All The Analysis

All 3 major cost components go up !as we implement Power for All, so …!!

!

!

!

How can Tariffs for !Consumers be kept low?!

!

!

!

Understanding Tariffs

Raw material!Coal

Generation!Cost

Transmission!Cost & Losses

Page 17: HOW can India generate Power for All?

IN CONCLUSION!

Please Ask your Lok Sabha candidate

HOW can we provide !Power to the villages of !India at a faster pace?

HOW can we reduce engineering losses and !

eliminate theft?

HOW can we reduce!tariffs without lowering!

investments in education!and health care?

for m

ore AskH

ow An

alysis

plea

se se

arch !

“Ask

HowIndia” on

Face

book

www.AskHow

India.

org

HOW can we supply!more coal cheaply to !

Power plants?