How Proactive or Reactive to Be? Getting Ahead of the Curve on Preventive Maintenance JESSICA BROWN, P.E., FREESE AND NICHOLS, INC. SALLY MILLS-WRIGHT , CITY OF ARLINGTON BILL GASE, CITY OF ARLINGTON MAZEN KAWASMI, P.E., CFM GISP FREESE AND NICHOLS, INC.

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

How Proactive or Reactive to Be?Getting Ahead of the Curve on Preventive MaintenanceJESSICA BROWN, P.E., FREESE AND NICHOLS, INC.SALLY MILLS-WRIGHT, CITY OF ARLINGTON

BILL GASE, CITY OF ARLINGTON

MAZEN KAWASMI, P.E., CFM GISP FREESE AND NICHOLS, INC.

Page 2: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Agenda

• Background on Arlington’s Water System• Preventive Maintenance Survey Background• Preventive Maintenance Survey Results• Preventive Maintenance Best Practices and

Recommendations– PMs for Pumps, Valves and Pipelines– Testing Frequencies for Pumps, Motors, and Meters– Types of Pump and Meter Testing– Water lines and Valves

2

Page 3: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Agenda

• Background on Arlington’s Water System• Preventive Maintenance Survey Background• Preventive Maintenance Survey Results• Preventive Maintenance Best Practices and

Recommendations– PMs for Pumps, Valves and Pipelines– Testing Frequencies for Pumps, Motors, and Meters– Types of Pump and Meter Testing– Water lines and Valves

3

Page 4: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Background on City of Arlington’s Water System

• 1,565 miles of Treated Water Piping, from 1” to 54”

• 2 Water Treatment Plants• Pierce-Burch WTP (75 MGD)

• John F. Kubala WTP (97.5 MGD)

• 4 Pressure Planes

• Served population of 378,000

Entertainment Capital of Texas:Home of Dallas Cowboys,

Texas Rangers & Six Flags over Texas

4

Presenter
Presentation Notes
Sally
Page 5: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Agenda

• Background on Arlington’s Water System• Preventive Maintenance Survey Background• Preventive Maintenance Survey Results• Preventive Maintenance Best Practices and

Recommendations– PMs for Pumps, Valves and Pipelines– Testing Frequencies for Pumps, Motors, and Meters– Types of Pump and Meter Testing– Water lines and Valves

5

Page 6: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive MaintenanceSurvey Background

• Survey consisted of 57 questions targeting specific topics based on input from Treatment staff. – Utility Background– Staffing– CMMS– Pump Station PMs– Electrical PMs– Established PM schedules for clearwell, waterlines, and valves– Valve exercise program within WTP

• Hosted on SurveyMonkey.com • Invited 15 water utilities to take survey• 11 utilities completed survey

6

Page 7: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive MaintenanceSurvey Background

• Received responses from:– Denver Water Department– Seattle Public Utilities– Tacoma Water– Portland Water Bureau– Metropolitan Sewer District of Greater Cincinnati– Lincoln Water System– Columbus Department of Public Utilities– Las Vegas Valley Water District– St. Johns County Utilities Department– Raleigh Public Utilities Department – Tulsa Water

7

Page 8: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Agenda

• Background on Arlington’s Water System• Preventive Maintenance Survey Background• Preventive Maintenance Survey Results• Preventive Maintenance Best Practices and

Recommendations– PMs for Pumps, Valves and Pipelines– Testing Frequencies for Pumps, Motors, and Meters– Types of Pump and Meter Testing– Water Lines and Valves

8

Page 9: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Survey Results:Utility Background

Wholesale& Retail

Retail Only

9

Page 10: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

• 25% do Vibration, Thermal, and Efficiency Test on pumps

• 50% don’t have a PM to restore pumps to Original Equipment Manufacturer (OEM) condition

Preventive Maintenance Survey Results:Pumps

10

Page 11: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Survey Results:Pumps (Continued)

• 50% have a PM to inspect pump components.

• Of those, 2 have annual inspections, and 3 inspect as needed.

• Criticality• Historical Performance• Manufacturer Specs 11

Page 12: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Survey Results:Electrical Staff

• Large Pump Repair• HVAC 12

Page 13: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Survey Results:Electrical• 75% have a PM to inspect

electrical components.• Of those, 6 have annual

inspections, and 3 inspect as needed.

• Majority of Electrical PMs are done by Utility Staff

• Every 2 years• Manufacturer Specs• Varies based on Criticality

13

Page 14: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

• Majority have a PM to inspect pump station electrical components.

• Of those, the majority have annual inspections.

• Manufacturer Specs

Preventive Maintenance Survey Results:Electrical (Continued)

14

Page 15: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Survey Results:Water Lines & Valves

• Majority have a water line rehabilitation program.• Survey group was split on taking coupons to

assess the condition of water lines.

15

Page 16: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Survey Results:Water Lines & Valves

• Majority don’t have a valve rehabilitation program.

• 50% have a valve exercising program at water treatment plant

16

Page 17: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Agenda

• Background on Arlington’s Water System• Preventive Maintenance Survey Background• Preventive Maintenance Survey Results• Preventive Maintenance Best Practices and

Recommendations– PMs for Pumps, Valves and Pipelines– Testing Frequencies for Pumps, Motors, and Meters– Types of Pump and Meter Testing– Water Lines and Valves

17

Page 18: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Three Categories of Maintenance Activities

• Reactive Maintenance– Higher risk for near term savings– Appropriate for less critical assets

• Preventive Maintenance (PM)– Regularly scheduled activities to extend asset life

• Predictive Maintenance (PdM)– Detecting problems before affecting performance– Maintenance activity based on need vs. schedule

18

Page 19: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Maintenance for Pump Stations

Regular daily operational checks• Flow and pressure in “normal” range• Valve functionality• Leaks• Abnormal noise, vibration, heat, etc.• Clear dust and dirt• Other simple visual checks

19

Page 20: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Best Practices: Pumps

ActivityRecommended

Frequency*Arlington’s

ImplementationCheck bearing lubrication meets OEM specification Monthly Monthly

Check packing for wear Monthly Monthly

Start up and run every pump Monthly Monthly

Inspect bearings and impellers Every 3 Years Every 4 Years after initial PM

service

Perform field and vibration tests Yearly Yearly

Perform oil analysis Yearly Yearly

Conduct performance trending based on historical field, vibration, and oil test

Yearly Yearly

* Service at calendar time or OEM specified run time interval, whichever comes first20

Page 21: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Best Practices: Motors

ActivityRecommended

FrequencyArlington’s

ImplementationCheck bearing lubrication meets OEM

specification Monthly Monthly

Check alignment and mounting Monthly Monthly

Check electrical connection terminals Monthly Monthly

Clean motor Monthly -

Visually inspect bearings Yearly -

Perform temperature and vibration tests Yearly Yearly

Check power supply condition Yearly Yearly

Perform infrared (IR) thermography analysis Yearly Yearly

Conduct performance trending based on historical temperature, vibration, and IR test Yearly Yearly

21

Page 22: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Best Practices: Pipelines and Valves

ActivityRecommended

FrequencyArlington’s

ImplementationPipeline leak detection Every 5 years or based on

performance trendsEvery 5 years

Pipeline condition analysis Prioritized based on the RBA Every 5 years based on condition analysis (Pure

Technologies)

Inspect isolation valves: verify location, accessibility,

operational status*

Yearly Yearly

Inspect pump control valveand actuator system (motor

operators, gearboxes, hydraulic accumulators, etc)

Yearly Yearly

Inspect critical air valves on raw water pipelines and high

service pipelines

Yearly Yearly

22

Page 23: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Best Practices:Electrical & Instrumentation

ActivityRecommended

FrequencyArlington’s

ImplementationVisual inspection of low and medium voltage

electrical equipment3 months Quarterly

Exercise circuit breakers, switches, etc. 6 months N/A

Infrared inspection on all major electrical equipment.

Yearly Yearly

Perform dissolved gas analysis on liquid filled transformers

Yearly Analyzingrecommendation

Calibrate pressure, level, and temperature transmitters

Yearly Calibrate as needed if problems arise.

Perform testing/ maintenance of low and medium voltage electrical equipment

3 YearsEvery 2 years per

NETA standardTest solid state protective relays 3 Years

Test major transformers 3 Years Inspect for Oncor

Update Arc Flash Study 5 Years/after major modifications

As needed

23

Page 24: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Preventive Maintenance Best Practices:Meters

ActivityRecommended

FrequencyArlington’s

ImplementationCheck instrument settings regularly Monthly As needed

Calibrate pressure instruments on venturi meters

Yearly Yearly

Calibrate ultra-sonic and magnetic meters (limited)

Yearly Certified annually

Inspect meter vaults for standing water or structural issues

3 months Quarterly

24

Page 25: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Implementation of Recommendations from Asset Management Plan

Completed Projects• Electrical upgrade on High Service pumps• Electrical upgrade at the Raw Water Pump Station• Performance of a comprehensive condition assessment for various

water lines• Replacement of Raw Water High Service Pump #4

Short Term Projects• Rehabilitation/replacement of Raw Water High Service Pump #5• Clearwells #1, 2 and 3 rehabilitation• High Service Pump #1 (PED) under evaluation for rehabilitation

25

Page 26: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Additional Benefits Realized by the City

• Condition assessment of PB North WTP determined it needed to be decommissioned.

• Experience less incidents of mistakes utilizing GIS maps developed through the project.

• This effort highlighted the need for dedicated maintenance staff and placed higher urgency on filling vacancies.

• This effort highlighted some skill sets and helped identify training needed for the City to incorporate some of these practices in-house.

• This effort provided justification for developing on-going service agreements to ensure this work was provided in a timely fashion.

26

Page 27: How Proactive or Reactive to Be? Getting Ahead of the ... · • Preventive Maintenance Best Practices and Recommendations – PMs for Pumps, Valves and Pipelines ... Additional Benefits

Questions?

Contact Information:

Jessica Brown, [email protected](817) 735-7406

4055 International Plaza, Suite 200Fort Worth, TX 76109

Sally U. [email protected]

(817) 575-5972John F. Kubala Water Treatment

Plant7001 US Hwy. 287

Arlington, TX 76001