how the petal trial relates to the faa’s cpldc program atn 2001 focus on the reality of data link...

6
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson ATS User Team Lead Free Flight Program Office

Upload: harvey-chapman

Post on 24-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson

How the PETAL Trial Relates to the FAA’s CPLDC Program

ATN 2001

Focus on the Reality of Data LinkIEE London, England

18 September 2001

Gregg AndersonATS User Team Lead

Free Flight Program Office

Page 2: How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson

2

CPDLC Government-IndustryPartnerships

Both Programs Based Upon Relationship with Industry Organizations

• Consensus from the Aviation Community on path to ATN

• Have solid working relationships

• Shared responsibility for success

• Integration Teams (PIT/CIT)

– Integrated Schedule

– Cooperative Risk Management

– Integrated Test Planning and Execution

Page 3: How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson

3

En Route ATN CPDLC Build I Summary

• Single-site deployment– Key site: Miami air route traffic control center

(ARTCC)

– Key site initial daily use (IDU): June 2002

– Provides 4 operational services• Transfer of communication, Initial contact,

Altimeter setting, Informational menu text

• American Airlines is the launch airline• Uses ATN compliant VDL-2 as air-to-ground

sub-network• On schedule

Page 4: How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson

4

CPDLC BI and PETAL Similarities

• First ATN-based Data Link Communications System in United States and Europe

• Use Baseline 1 Message Sets – Developed in the PETAL Integration Team (PIT) Forum

• Use ATN-compliant VDL-2 air-to-ground subnetwork

• American Airlines Launch Airline

– Rockwell Collins ATN Avionics

– Certification Based on PETAL Safety and Performance and Interoperability Requirements.

Page 5: How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson

5

Lessons Learned from PETAL

• End-to-End Interoperability Testing

• Avionics Development/Certification

• Aircraft Certification Activities

– Flight Tests Needed

– Software Compliance

– Requirements Traceability

• VDL-2 Subnetwork Validation

• Detailed Coordination with Industry Partners

– Schedule, Technical, and Risk

Page 6: How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson

6

How we worked together…

• RTCA SC189-Eurocae WG53, Air Traffic Services Safety & Interoperability Requirements

• FAA/Eurocontrol Co-Developed CPDLC docs:– OHA– OED – SPR – ASOR

• Monthly Technical Interchange Meetings (TIMs) to Discuss Issues

• ATN CCB Panel Collaboration