how to create a roadmap from scratch
TRANSCRIPT
2
A roadmap is like a travel itinerary in that in gives you a rough idea of how to go from where you are to where you want
to be, including stops you want to make along the way. It breaks down an overwhelming set of work into smaller chunks
that can be implemented over time to reach your vision.
What’s a roadmap?
A roadmap is a guide
Starting point
Destination (vision of the
future)
Roadmap
The roadmap is flexible (just like a good itinerary) so you can always make changes if you learn something new, but the
structure it provides can help you stay focused and maximize your time.
3
Rework could be required if short-term decisions are made without knowledge of where the organization might go in the future.
Rework
It will be difficult for your team or for other teams to support the initiative if they don’t understand where you are trying to go and how the effort will be phased. Just like with your friends, springing something on them at the last minute isn’t always successful.
Coordination issues
Without a roadmap, the future of the project could be at the mercy of the whims of the day. Sharing a roadmap helps to explain what’s coming and align your whole team to that effort. By pointing to a roadmap, you can tell a story of what the future could be and discuss how the new item either complements or doesn’t fit into that narrative.
Direction shifts too often
Without a plan to reference, prioritization and decision making can take a lot longer, especially if there’s a large list
of possibilities to sort through.
Delayed decision making
Just like working out or eating well, tracking progress towards goals can help with compliance. If there’s no
roadmap or overview of your work, there’s potential to move down multiple paths slowly, resulting in minimal
progress towards any one goal.
Slow progress towards goals
People like to be part of a broader purpose, so if they don’t see the connection of their current work to the bigger
picture you might lose some of your best players.
Low team morale
What happens if you don’t have a roadmap?
Issues to watch out for
Does your team have a roadmap? If not, do you recognize any of these issues?
4
What’s an example of a roadmap?
Example roadmap
Phase 0“As-is”
Phase 1“Teacher resources”
Phase 2“Local impact”
Phase 3“National impact”
Students
Teachers
Parents
Worksheets
Customized reports & tips
Group programs
Tutoring
Homework guides
Teacher/Parent online portal
Here’s a sample roadmap for a fictional tutoring business.
Teacher/Parent online portal
Tutoring apps
Aggregate reports & tips
5
What are the parts of a roadmap?
The anatomy of a roadmap
Time scale
Categories Components
You can get creative with the formatting of your roadmap, but in general most roadmaps contain three major elements:
1) a time scale, 2) categories and 3) components. We’ll walk through more details about each one.
6
What are the parts of a roadmap?
Time scale
Phase 0“As-is”
Phase 1“Phase 1 title”
Phase 2“Phase 2 title”
Phase 3“Phase 3 title”
Category 1
Category 2
Category 3
Item B
Regardless of the roadmap design, the time scale usually runs with the near-term phases on the left and the long-term on the right.
3-5 phases is a good rule of thumb for executive presentations and high-level roadmaps. With more than that, people can get lost in the details and the big picture strategy gets muddled.
Item B
Item D
Item E
Item CItem A
Item F
Item HItem I
Item G
Item J
Starting with the current state can help you see what you’re working with. If you’re building something from scratch then start with Phase 1.
You could use phases, quarters, months, dates, or the phrases “near term”, “medium term”, and “long term” to label your time scale.
Consider adding phase titles to each phase to highlight the theme. This content is also useful for when you start publicizing the changes to your customers.
7
What are the parts of a roadmap?
Categories/swimlanes
Phase 0“As-is”
Phase 1“Phase 1 title”
Phase 2“Phase 2 title”
Phase 3“Phase 3 title”
Category 1
Category 2
Category 3
Categories could be organized by customer type, program, product, or any other category.
Categories or “swimlanes” are typically represented in horizontal rows.
Item B
Item D
Item E
Item CItem A
Item F
Item HItem I
Item G
Item J
8
What are the parts of a roadmap?
Components
Phase 0“As-is”
Phase 1“Phase 1 title”
Phase 2“Phase 2 title”
Phase 3“Phase 3 title”
Category 1
Category 2
Category 3
Item B
Item D
Item E
Item CItem A
Item F
Item HItem I
Item G
Item J
This is the core of your roadmap. Create a box for each initiative and place it in the corresponding phase and category. We’ll talk about how to determine which phase to choose in upcoming slides.
Fill in each box with the initiative title, value proposition, product, service, or feature name. Don’t forget any key research initiatives.
You could also add other information such as goals, effort, value, etc. with symbols, numbers, text, or color coding.
Dependencies are typically indicated with a solid arrow connecting the items.
9
First StepPick your roadmap
scope
Second StepOrganize your ideas
Third StepDefine your last
phase
Fourth StepDefine your first
phase
Fifth StepBuild out the
roadmap
Sixth StepBuild, measure,
learn, and adapt
How do I make a roadmap?
Overview of the process
10
A roll-up of all of the work you’ll be doing over
time to create new products for your customers.
Product Development Roadmap Product Roadmap
A view of all of the current and planned initiatives
for improving your customer relationships.
Customer Relationship Roadmap
All of the backend work needed to keep your
business humming and scalable.
Operations Roadmap
Product Roadmap
Consulting Roadmap
Marketing Roadmap
Infrastructure Roadmap
Training Roadmap
This graphic illustrates an example of how you could decompose the work you’re doing into different roadmaps.
Towards the right, you have your most detailed and specific roadmaps. Those could be consolidated into a combined
view within a particular theme, such as the examples in the middle. And finally, at the far left you have your enterprise
roadmap. Generally, detail increases from left to right and the type of detail is tweaked to appeal to the needs and
interests of decision makers who will be viewing the roadmap (ex. CEO vs. department lead, vs. team lead).
First Step: Pick your roadmap scope
Think about a hierarchy of roadmaps
Enterprise
Roadmap
11
By customer type
For example, if your product or business serves
doctors and patients, try drawing out a roadmap just
for the initiatives serving doctors.
By organizational structure
If you work in a department within a larger organization, make a roadmap that only
depicts what your department plans to accomplish.
Alternatively, create a high-level view of everything going on in
the organization.
By product or product line
Maybe your business includes selling both apparel
and apps. You could split your plan out into two
different product roadmaps.
By goal
Try out building a roadmap just including items related
to improving one metric. Examples could be
improving education levels or increasing profits.
First Step: Pick your roadmap scope
Some options for narrowing your scope
12
Sub-steps
Second Step: Organize your ideas
Plot value vs. complexity
Value
Complexity
Phase large and valuable initiatives
Implement quick wins
Avoid spending time or $ on anything low value and complex
Defer low value, simple changes
a) Draw out a value vs. complexity chart on a whiteboard or a large sheet of paper.
b) Write each relevant idea on a 3”x3” post-it.
c) Use a value framework or dot voting to determine the relative value and complexity of ideas.
d) Review the high value/complex initiatives. Brainstorm ways to break them apart or radically simplify the solution without sacrificing value.
13
Third Step: Define your last phase
Figure out where you want to end up
Phase 0“As-is”
Phase 1“Phase 1 title”
Phase 2“Phase 2 title”
Phase 3“Phase 3 title”
Category 1
Category 2
Category 3
Item I
Item G
Item JPut your most complex, highest investment, yet still valuable initiatives in this phase. Good candidates are anything that requires a lot of organizational buy-in, investment, or is dependent on the framework set up in earlier phases.
Put your most complex, highest investment, yet still valuable initiatives in this phase. Anything that requires a lot of organizational buy-in, investment, or is dependent on work to be completed in earlier phases.
This is also a good phase for any “nice to haves” or final upgrades that are slightly lower value.
14
Fourth Step: Define your first phase
Pick a starting place
Phase 0“As-is”
Phase 1“Phase 1 title”
Phase 2“Phase 2 title”
Phase 3“Phase 3 title”
Category 1
Category 2
Category 3
Item B
Item D
Item E
Item A
Item I
Item G
Item J
Describe your current state here. If you are building something completely new then you can remove this column.
Put your easiest, high value wins in the first phase. Make sure to add in methods to capture data so you can adjust future phases if necessary.
15
Fifth Step: Build out the phases
Complete the roadmap
Phase 0“As-is”
Phase 1“Phase 1 title”
Phase 2“Phase 2 title”
Phase 3“Phase 3 title”
Category 1
Category 2
Category 3
Item B
Item D
Item E
Item CItem A
Item F
Item HItem I
Item G
Item J
Fill in the middle phase(s) with anything that builds on phase 1 but is less complex than items in the last phase.
Don’t hesitate to move items between phases as you identify dependencies.
A good goal is for each phase to have a cohesive theme. Fill in all of the phase titles once you’re happy with the setup.
16
Sixth Step: Build, measure, learn, and adapt
Map out paths to alternative futures
Starting point
Destination B (alternative vision of
the future)
Roadmap B
Destination A (vision of the
future)
Roadmap A
Do you have lots of ideas of where you could end up? Go through the roadmapping exercise again, this time outlining a
path to an alternative end state.
17
Sixth Step: Build, measure, learn, and adapt
Track your progress and make adjustments if necessary
Starting point Destination B
(alternative vision of the future)
Roadmap B
Destination A (vision of the
future)
Roadmap A
Roadmap A
As you start moving down any roadmap set up opportunities to continually learn and gather feedback. Then you can
review the data to decide if you should continue down your original roadmap or pivot to another one.