how to operate mobile asphalt plant
TRANSCRIPT
Mobile Asphalt Mixing Plant Site
Equipment management is very important among mobile asphalt plant management.
The main reason is any abnormal behavior will probably interrupt the whole production
line and affect the construction project. There are three major things to be attended to:
The production scheduling includes schedule on raw materials, shifts and transport team, and personnel
coordination and communication. Generally each shift should have one scheduler
to plan the material supply based on construction schedule, a transport team
to deliver adequate asphalt for construction requirement, and two mixing
towers for shift and batch arrangement according to the asphalt mix
aggregates.
Raw materials like bitumen, aggregate and gravel, and diesel etc should be co-controlled by materialists
and labratory personnel. The bitumen performance indicators such as softening point, penetration, and
ducticity should be sampling tested before feeding. The aggregate and
labratory personnel. The bitumen performance indicators like
softening point, penetration, and ducticity should be sampling
tested before feeding. The aggregate should go through
inspection like specification, sheet content and weathering
condition and sample text to confirm its mud content and
crushing value. Finished asphalt will be monitored by people
on shift and lab personnel. The shift team should strictly follow
the grading requirement and conduct appearance inspection
and temperature detection, and lab personnel should sample
finished product for test.
In order to guarantee the safety and security of machinery and personnel, effective measures must be
taken.