hp optus innovate final

6
Optu s GSMIS INPP DISC COO SMART PAY OLE MRE Incident Management Problem management (RCA/RFC) Change/Service Management CIP (Continuous improvement Plan) Application Availability Management

Upload: vivin-nl

Post on 12-Apr-2017

76 views

Category:

Documents


1 download

TRANSCRIPT

PowerPoint Presentation

Incident ManagementProblem management (RCA/RFC)Change/Service ManagementCIP (Continuous improvement Plan)Application Availability Management

Part - ing Ways The Daily Edge

I want 13I got 13but I am late13

Monthly

Daily System

I want 13I got 13so fast13

Monthly

Daily SystemPart - ing Ways The Daily Edge

123456789101112131415161718192021222324252627282930

91011121314151617181920212223242526272829303112345678

Drastically improved Stats Generation Backup time greatly reducedNumber of Major Incidents - ReducedQuery Performance - More Focused

Part - ing Ways The Daily Edge

Stats generation time is consistent of 5 to 6 minutes through out the month.Time taken Before Daily Partition : 58Hour/month.After Daily Partition : 4Hour/month. 14 times of Time Saved from Original.Reports generation time is significantly improved.Backup time is significantly reduced by approx 300%.Day to day Manageability is simplified.Results of a query can be achieved by accessing a subset of partitions, rather than the entire table which will improve the Query Performance.Major & Normal Incident Reduction.

Observations

Thank You