1PHASE 2 INSTALLATION BY FLEXIFORM

Page 2: HS2 Phase 2 (Birmingham) Installation Case Study

22

Page 3: HS2 Phase 2 (Birmingham) Installation Case Study

3

PROFILE: The High Speed Two rail network will bring the UK’s Victorian railway infrastructure dramatically into the 21st century, creating space on crowded lines, and bringing the whole country closer together. HS2 Limited was formed in 2009 in order to deliver this vision for the UK economy. The project will be carried out in two phases, ultimately linking London to Leeds and Manchester on high-speed lines. Speeds of up to 400kph will be possible when the line is built.PARTNERSHIP: Continuing partnershipCONTACT DETAILS: Please call Flexiform on 01274 706206 for contact details.

Page 4: HS2 Phase 2 (Birmingham) Installation Case Study

44

Page 5: HS2 Phase 2 (Birmingham) Installation Case Study

5

Page 6: HS2 Phase 2 (Birmingham) Installation Case Study

66

Page 7: HS2 Phase 2 (Birmingham) Installation Case Study

77

Page 8: HS2 Phase 2 (Birmingham) Installation Case Study

88

Page 9: HS2 Phase 2 (Birmingham) Installation Case Study

99

Page 10: HS2 Phase 2 (Birmingham) Installation Case Study

1010

CLIENT: High Speed Rail Two (HS2)LOCATION: Birmingham

SIZE: Three floorsPROJECT VALUE: Confidential

COMPLETION DATE: November 2015PROJECT LEADS: Nick Saunders

WE SUPPLIED: Pico workstations, task seating, meeting tables, meeting and breakout seating,

pods, and various storage solutions including lockers, tea points and breakout furniture

Page 11: HS2 Phase 2 (Birmingham) Installation Case Study

11

Page 12: HS2 Phase 2 (Birmingham) Installation Case Study

1212

Page 13: HS2 Phase 2 (Birmingham) Installation Case Study

1313

Page 14: HS2 Phase 2 (Birmingham) Installation Case Study

14

Following the highly successful project to supply HS2 Limited with furniture for their One Canada Square offices, Flexiform were selected via a competitive tender process to supply the furniture for the new HS2 Snow Hill offices in Birmingham.

Working closely with the same client project team that we worked with at Canada Square (and with Mace on the design and project management), Flexiform delivered a full interior furniture package for over 1,000 staff located in Birmingham.

Using reflective learning from the earlier project, a slightly revised furniture specification was created, incorporating the slightly differing needs of the Snow Hill space while also mirroring the look and feel of the Canary Wharf offices. This ensured that the corporate branding of the space was maintained, while also maximising the efficiency and effectiveness of the new building.

Analysis of the Canada Square offices revealed an increased need for small collaboration spaces, but Snow Hill has less enclosed meeting spaces. Flexiform therefore provided a number of meeting

and breakout “pods” – IT-equipped spaces that can be used for one-to-one meetings, small meetings and presentations, solo work, and an ideal space for ad-hoc discussions of any kind.

The formal meeting rooms are highly flexible, with mobile and folding tables allowing these rooms to be utilised in a number of ways, reflecting the agile nature of the open plan workplaces. The use of USB charge points on all workstations is designed to accommodate mobile technology much more effectively, providing agile, flexible working.

Personal lockers remove the need for pedestals at the workstation, while ensuring that all staff have a safe, private storage space. This again helps to reinforce the flexibility in the office, but also saves money on the overall scheme. Combination locks also eliminate issues with key management.

The project was installed over four phases, with all deliveries taking place at the weekend and installation being completed during the week.

Page 15: HS2 Phase 2 (Birmingham) Installation Case Study

1515

Page 16: HS2 Phase 2 (Birmingham) Installation Case Study

1616

Page 17: HS2 Phase 2 (Birmingham) Installation Case Study

17

Page 18: HS2 Phase 2 (Birmingham) Installation Case Study

1818

Page 19: HS2 Phase 2 (Birmingham) Installation Case Study

19

Page 20: HS2 Phase 2 (Birmingham) Installation Case Study

2020

Page 21: HS2 Phase 2 (Birmingham) Installation Case Study

2121

Page 22: HS2 Phase 2 (Birmingham) Installation Case Study

2222

Page 23: HS2 Phase 2 (Birmingham) Installation Case Study

23

Page 24: HS2 Phase 2 (Birmingham) Installation Case Study

2424

Page 25: HS2 Phase 2 (Birmingham) Installation Case Study

25

Pico DesksHS2 selected Pico back-to-back desking, with scalloped desks to allow for cables to feed below.

Additions 2 TablesTables from our Additions 2 range were provided in poseur height, for use as meeting tables. HS2 selected all-white tables, but the A2 and A3 legs are also available in chrome.

LockersHS2 selected the same lockers for Snow Hill as at Canada Square, but this time Flexiform also provided six and eight-door lockers to break up space, and create corridors.

Breakout SeatingWe delivered a range of breakout seating, provided by a number of our suppliers. Each pod featured a built in display screen for ad-hoc presenting. These were supplied in blue, to match the selected colour scheme.

Additions Pedestal TableAdditions Pedestal tables can be provided with cable management. Ideal as a meeting or breakout table, and available in various heights: 450mm, 740mm and 1050mm. HS2 selected all-white tables.

Flip-Top TablesReconfigurable flip-top tables are installed with power and data, us-ing a slinky to connect desk power to floor grommet.

Page 26: HS2 Phase 2 (Birmingham) Installation Case Study

2626

Page 27: HS2 Phase 2 (Birmingham) Installation Case Study

27

Page 28: HS2 Phase 2 (Birmingham) Installation Case Study

BradfordFlexiform1392 Leeds RoadBradfordWest YorkshireBD3 7AE

t: 01274 706206f: 01274 665760

LondonFlexiform1st Floor45 Gee StreetLondonEC1V 3RS

t: 0207 226 9955f: 0203 301 0435

ScotlandFlexiformUnit 7 Bloom FarmMain StreetLivingston VillageWest LothianEH54 7AF

t: 01506 417410f: 01274 665760

www.flexiform.co.uk