HS5 Route and Service Plans v5.2 Page 1 of 34
HS5 Route and Service Plans
The Purpose, Background and Method
This article refers to and should be read in conjunction with my article ‘Towards a High Speed Network’.
That article sought to make the case for developing a network plan for all the HS routes which will
eventually be needed, and, as a contribution to getting the discussion started, gave my own thoughts of
what such a network could look like. Naturally, this involved describing a number of routes, in varying
but superficial detail. This lays me open to the charge, something on the lines of ‘That’s all very easy to
say, but how would you actually go about doing it?’ Accordingly, a decent respect to the opinions of the
interested public requires that I should go into more detail on the individual routes. The present article
deals with HS5, the route to various destinations south of London, but, popularly, ‘The Brighton High
Speed Line’.
The general route is decided on strategic and business grounds, thus which locations are to be served.
This gives the general alignment, at a very high, superficial level. I plan the detailed route using Ordnance
Survey maps, taking careful account of the shape of the landscape, from the contours. I note the location
of all significant infrastructure, thus tunnels (generally, over about a quarter mile in length), viaducts and
major river crossings. I simultaneously make a virtual tour of the route from my computer, via satellite
maps, to make sure, as far as possible, that there is actually room for my lines where I wish to put them,
and that, for example, a housing estate has not materialised in an inconvenient location since the (paper)
map was published. (I understand that the images used by satellite maps are up to a maximum of three
years old, so not exactly real-time, but still pretty good.) I make a great effort to avoid any housing. I’m
blasé about demolishing warehouses – after all, all that’s required there is to build a (better) new one
nearby, and the owners will be very happy. But I regard demolishing housing (or even getting very close
to it) as a thoroughly bad idea; people just don’t like it, and I understand their feelings. If ever I must
(knowingly) propose to demolish housing, I will point out the fact. And I really ought to know, working
with satellite maps to a magnification where, typically, individual cars are clearly visible, about 1mm in
length, (the scales of these maps, as displayed, are distinctly odd – this particular one comes out as 1 in
~2778!) but it’s not always possible to be certain, from above, of what an individual building actually is –
I have, on one noted occasion, mistaken as warehouses what subsequently turned out to be purpose-built
student accommodation; I refrain from further comment. (At the maximum magnification I have
available, the cars are about 1” in length, probably good enough for someone familiar with the subject to
identify make and model. But at these highest magnifications there is some loss of resolution – the edges
of objects become increasingly fuzzy. As noted earlier, these scales are strange; this maximum is 1 in
~179.)
These considerations apply in extreme form when, as in the present case, the route starts from London.
Here there are simply no free routes available. The design has to follow an existing route, widened where
there is space for it, (this involves searching, via satellite maps at a high magnification, where there is
space to fit extra tracks within the existing alignment or where there is adjoining space to widen the
alignment,) with recourse to tunnelling where there isn’t. In the present case, even this is insufficient, and
the entire route out of London has to be in tunnel as far as East Croydon!
In general I try to follow an existing alignment, railway or motorway, (or, very occasionally, of a non-
motorway road,) if there is a suitable one available, simply because it’s there already, in the right place,
with good layout, (somebody else has done all the hard work!) and, except in a very few places, there’s
-
HS5 Route and Service Plans v5.2 Page 2 of 34
plenty of room available adjacent to it. (In this context, motorways are particularly helpful. Nobody wants
to live close to one, so house builders don’t develop new estates at the side of motorways, leaving plenty
of space available for new railways.) Also, most importantly, it minimises disruption, and so I
(optimistically, perhaps) expect it to maximise public support and minimise opposition.
When I am following an existing alignment, (this obviously includes taking over the route and trackbed of
a former railway, now closed,) I don’t generally worry about gradients, confident that they will be well
within the capacity of HS trains. Very occasionally, when following a motorway or (more likely) non-
motorway road, the contour pattern suggests that there might be a problem, and then I do check the
gradients, (and state what these are, in the route plan). When I am obliged to design a completely new
alignment, then the gradient profile forms part of the design, and will be stated, (unless, from the
contours, it’s obviously essentially level, or undulating but with no significant underlying change of
level). The present article contains only one gradient – the approach to Brighton following the alignment
of the A23 over the South Downs.
I believe that this approach gives a route which in general terms is practicable and satisfies the
requirements, though obviously a lot of work, especially detailed surveying on the ground, would be
needed to turn it into an implementable design. Specifically, I can say nothing about cuttings and
embankments, though I may note that a particular piece of landscape is strongly undulating, so cuttings
and embankments will be required. Also, when I take the route alongside an existing railway or motorway
alignment, I don’t attempt to design it in any detail around (particularly motorway) junctions, although I
do note on which side it runs, and wherever it is necessary to cross over to the other side.
The Maps
Naturally, the chosen route must be illustrated with maps. I briefly describe the route, giving the map
reference of all significant points (invariably of tunnel end points and significant river bridges), but the
accompanying maps are the real definition. Mapping software can be very expensive, but fortunately the
Ordnance Survey makes available, free of charge, the OS OpenData product suite, of which I use two
components, the 1:250000 Scale Colour Raster data set and the Strategi Dataset. The former comes as a
set of TIFF files, each containing one of the standard National Grid 100km Reference squares. These are
easily converted into Microsoft Paint files and edited. These are, in other words, pure graphics, and are
the basis of the detailed maps in the ‘Route’ section. The maps reproduced in the text all represent an area
20km in width (unless noted otherwise) and 10 km high (if the detail I wish to show will fit within that,
but otherwise as high as necessary). They do actually contain contours, but not many; the scale is too
small for contours to be really informative. For the present purposes, this scale is adequate; if you need
more detail, use them as an index to the corresponding 1:50000 Landranger or 1:25000 Explorer maps.
The Strategi Dataset contains GIS (Geographical Information Systems) data, which has to be processed
by special software; I have used the Open Source QGIS product. This has been used to produce an overall
map of HS5. Also included there are maps of the overall HS Network.
In all the maps I use the following colour scheme for the various routes:
-
HS5 Route and Service Plans v5.2 Page 3 of 34
As the various route plans have been developed, the maps have been updated, so now they show all
routes, as relevant. The maps in the present article are thus not limited to HS5.
The Service Plans
The Route section of this document describes the complete lines in their final, full configuration (as far
ahead as the plans consider). The service plans explain how that final state is reached: the order in which
sections are opened, and the services which run on these partial configurations. The aim is always to get
useful services running as soon as possible, to maximise return on the investment.
The service plans deliberately envisage maximum frequencies, to give an impression of just how much
the system could accommodate. Initial services would certainly not be so intensive, probably no more
than half of the frequencies quoted.
A standard HS station has two island platforms, thus two platformed tracks in each direction. If some of
the services passing through the station are non-stop, then the main line must pass through the layout
without adjacent platforms, either through the centre of the alignment, in tunnel below or on viaduct
above, or the station must be on a branch loop off the main line, which thus bypasses it completely. In
fact, all HS5 stations are served by all services, so don’t need overtaking/avoiding lines. At the ends of a
multi-destination route, the traffic density on the branches may not be sufficiently high to warrant this
level of provision, so a single island platform (or two single platforms within some other arrangement)
would suffice; this is the case with HS5, for the Southampton, Eastbourne, Newhaven and Tunbridge
Wells branches.
Several service plans are developed, reflecting the piecemeal development of the network. As new
sections open, further services come into operation. In all cases, consideration is given to maximum
loadings – which section(s) are fully loaded and thus determine the maximum service frequencies. In
general I take 16tph as the maximum throughput; if this is ever exceeded, the fact will be highlighted.
-
HS5 Route and Service Plans v5.2 Page 4 of 34
Normally, two types of services are contained in the plans, those featuring High Speed trains (GC gauge
and classic-compatible) which travel on HS5 for at least part of their journey, and those featuring
Regional Metro (semi-fast) services on the corresponding classic route(s). Connections between the
services (both HS and RM) are shown for the relevant interchange stations (the connections are usually
cross-platform), together with the clock-face hourly departure plan. (Note that these plans are
representative; the actual times are determined by the coordination of interchanges at multiple
locations). HS5 is, however, unusual in that all its services are GC gauge, and travel on HS5’s various
routes for the whole of their journey. There are also no formal cross-platform connections planned
between HS and RM services, but given the frequency of services in the entire area served by HS5, this is
scarcely a deficiency; good, informal connections between HS and RM are available at Southampton,
Portsmouth and Southsea, Chichester, Horsham (connections with Thameslink, in particular), Brighton,
Lewes, Tunbridge Wells, Tonbridge, Gatwick Airport and East Croydon.
In the service plans I distinguish some of the GC gauge services as double deck. Originally this linked the
Brighton services of HS5 with the HS Metro services of HS5, to York and Preston. It’s all rather
arbitrary, at present. Provided that there are no difficult technical issues in running double deck trains at
300kph, 187.5mph, and that public reaction to them is favourable, I would like to see all GC gauge
services run with double deck trains. (The Swiss like them.)
It is important always to bear in mind that the HS network is not a separate, stand-alone system, but an
integral part of the complete railway network, hence the importance I attach to showing precisely how HS
services interact with classic (RM) ones. (In this context it is worth pointing out that if, when HS lines
come into service, the current ridiculous and illogical franchising system is still in operation, it will be
necessary to include the corresponding classic route(s) in the same franchise as a HS route, with a strict
contractual obligation on the franchisee to ensure close integration of HS and classic services. It certainly
won’t happen otherwise.)
Estimated Journey Times
Following the service plans, estimated journey times are produced for all GC-gauge services. The
assumptions and approximations made are explained.
HS5 Route – Introduction and Assumptions
HS5 closely follows existing alignments, railway and motorway, for most of the way.
HS5 begins at Pancras Cross, which it shares with HS3 and HS6, and HS5 services all continue as HS3 or
HS6 services, and vice versa; once Pancras Cross has become a through station, nothing terminates there.
Appendix A gives full details of Pancras Cross and its surroundings. HS5, unusually, has no classic-
compatible services.
The maximum speed for HS5 is 300kph, 187.5mph, throughout; the non-stop runs are not long enough to
take advantage of a higher speed, and 300kph is adequate, with no detriment to the service provided, and
with significant savings in construction costs.
-
HS5 Route and Service Plans v5.2 Page 5 of 34
West of Chichester, the Southampton branch of HS5, on an almost entirely new alignment, doesn’t even
pretend to be a HS line – there are several stations serving locations at present very poorly served or not
at all, which will see a major enhancement in accessibility. A maximum speed of 125 or even 100mph
would be adequate. A section near the end (not a new alignment) even has a freight service!
HS5 Route – Junctions
There are various junctions on the route of HS5, enabling it to divide for its several destinations. These
are identified in the description of the route, but it is convenient to list them all here, together with their
map references and identifying remarks, since, when discussing the capacity/loading of different sections
of route, the end points are usually junctions (occasionally stations). The junction names are my own
suggestions.
Winders Hill TQ352535 HS5 Tunbridge Wells branch diverges from the main line.
Finches Shaw TQ259327 HS5 Southampton branch diverges from the main line.
Tortington TQ005050 HS5 Littlehampton branch diverges from the Southampton branch.
Ford East TQ012035 HS5 joins and takes over the classic Littlehampton branch,
enlarging it to GC gauge.
Barnham HS SU962043 HS5 Bognor branch diverges from the Southampton branch.
Barnham SU955043 HS5 joins and takes over the classic Littlehampton branch,
South enlarging it to GC gauge.
Hickstead TQ269197 HS5 Eastbourne / Newhaven branch diverges from the main line.
Southerham TQ426091 HS5 Newhaven branch diverges from Eastbourne branch.
HS
There are various other links between HS5 and classic lines, for operational purposes and not intended for
regular services, so not relevant in the present context.
There now follows the definition of the actual route, in several logical sections.
-
HS5 Route and Service Plans v5.2 Page 6 of 34
1. Pancras Cross – East Croydon
1.1 Pancras Cross – East Croydon Contains Ordnance Survey data © Crown copyright and database right 2013
HS5 begins at Pancras Cross station. It passes beneath London to a low level station under Victoria. There
are 3 HS platform faces in each direction, (with passive provision for a fourth,) as usual on the cross-
London inter-regional connections. Interchange is provided with Crossrail 4, which is dealt with in a
-
HS5 Route and Service Plans v5.2 Page 7 of 34
separate article. From Victoria (LL) to East Croydon, the simplest solution is an 8 mile tunnel directly
there, emerging at TQ328662, on the west side of the Brighton line alignment, immediately north of the
station. There is plenty of room on the west side of the station for the usual two HS island platforms.
I’ve tried various alternatives, bringing it to the surface at Wandsworth Common, Tooting Bec Common
and in Streatham, but all that effort saves just 2 miles of tunnel (and would doubtless attract widespread
outrage and opposition). I’ve successfully devised plans for routes out of London to the north and west,
but South London is intractable. (You could of course simply bulldoze your way through it, but that’s an
option I would never consider.)
2. East Croydon – Gatwick Airport
2.1 Kenley – Gatwick Airport Contains Ordnance Survey data © Crown copyright and database right 2013
-
HS5 Route and Service Plans v5.2 Page 8 of 34
On leaving East Croydon, HS5 immediately enters a ¼ mile tunnel between TQ328657 and TQ329654
(Barclay Road), passing under the Brighton line to the east side of the alignment, then a ½ mile tunnel
between TQ329648 (Coombe Road) and TQ328643, leaving it on the east side of the line to Oxted. A
single property (flats?) will have to be demolished at TQ329638, at the end of Birchend Close, just before
the line from Addiscombe joins.
HS5 follows the east side of the Oxted line past Sanderstead (we’re clipping the ends of substantial
gardens on this stretch, but not threatening the houses; noise fences will be required) and Riddlesdown. A
very short tunnel will be required under Upper Warlingham station, to avoid the station buildings and car
park. At TQ353569 HS5 crosses to the west side of the classic alignment and diverges, following a new
alignment, along the 500ft contour to TQ359549 then through a ¾ mile tunnel, emerging at TQ352535.
Here, at Winders Hill Junction, it divides, the main line crossing the M25 and joining the south side of the
motorway alignment at TQ344527, while the Tunbridge Wells branch turns east and joins the north side
of the M25 alignment at TQ360528 (see later section). The main line follows the south side of the M25
until TQ325528, then takes a gentle curve to the south to join the east side of the M23 at TQ313518. It
follows the east side of the M23 alignment until TQ307427, just before junction 9 for Gatwick Airport,
where it crosses the main motorway and joins the north side of the Gatwick Airport motorway spur at
TQ300418, following this to TQ289417 and then curving south to the HS platforms on the east side of
Gatwick Airport station.
3. Gatwick Airport - Brighton
HS5 continues along the east side of the Brighton line to Three Bridges. A 1¼ mile tunnel under Three
Bridges station between TQ288372 and TQ288353 brings it out on the west side of the alignment, which
it follows for about 1 mile, diverging at TQ288348 and curving west and passing underneath the M23 to
join the south side of the motorway alignment at TQ285340. This it follows for 1½ miles to junction 11,
where the motorway merges into the A23. HS5 passes under the A23 between TQ263328 and TQ259327,
Finches Shaw Junction, where the branch to Horsham and on to Southampton diverges. The main line to
Brighton follows the west side of the A23. A short, ¼ mile tunnel is needed under Handcross, between
TQ260300 and TQ261295, but otherwise the alignment is free of obstructions. At Hickstead Junction,
TQ269197, the branch to Lewes, Eastbourne and Newhaven diverges. The main line follows the A23
until it crosses the classic Brighton line just above the southern exit from Clayton Tunnel; it diverges
from the A23 at TQ292123, and joins the west side of the Brighton line at TQ292119. (The section of
A23 just before this climbs from 200ft to 330ft at Pyecombe, 130ft in 1 mile – 1 in 40, steep but perfectly
reasonable.) HS5 follows the west side of the alignment as far as Preston Park station, with a 1 mile
tunnel thence to Brighton station, between TQ299069 and TQ308055, emerging just after the coast line
from Lewes has joined, and entering the HS platforms on the east side of the station, extended slightly
further to the north than the classic platforms, as dictated by the availability of space for them.
-
HS5 Route and Service Plans v5.2 Page 9 of 34
3.1 Tinsley Green – Hickstead Contains Ordnance Survey data © Crown copyright and database right 2013
-
HS5 Route and Service Plans v5.2 Page 10 of 34
3.2 Twineham – Brighton Contains Ordnance Survey data © Crown copyright and database right 2013
-
HS5 Route and Service Plans v5.2 Page 11 of 34
4. Hickstead Junction – Eastbourne and Newhaven
On leaving Hickstead Junction, the Eastbourne branch of HS5 crosses the A23 at TQ269200 and follows
a stream (the young River Adur?) for 3 miles, almost to its source. It crosses Cuckfield Road at
TQ283185, the A273 at TQ305174 and passes under the Brighton line at TQ310172. Between here and
its crossing of Spatham Lane (TQ340168) a short tunnel may be required, rather than a deep cutting. It
joins the southern side of the alignment of the Burgess Hill – Eastbourne line at TQ350167. A short (½
mile) tunnel between TQ363162 and TQ367160 at Plumpton station avoids the end of the racecourse, and
a few houses. The HS tunnel at Lewes begins at TQ412107, a little to the north of that on the classic line,
and crosses under it, to emerge on the north side at Lewes station, where there is plenty of room for the
4.1 Hickstead Junction – Lewes Contains Ordnance Survey data © Crown copyright and database right 2013
HS platforms (car parks, again). It follows the north side of the alignment to Southerham HS Junction
(TQ426091), a little before the classic one as the HS line to Newhaven has to cross the classic tracks,
following the east side of the Newhaven branch’s alignment. There is little further to remark on this, there
is plenty of room at Newhaven Town station (but the station buildings will have to be relocated east of the
HS platforms. The HS branch actually terminates at Newhaven Marine station. This is not used by the
Seaford branch service (which serves Harbour station, pretty much contiguous with it). There is one long
platform, and a bay, currently disused, on the east side of it. This is brought back into use to give HS5 a
two platform terminating island.
I leave it as an open question whether it would be preferable / worthwhile to take over the Newhaven
branch from Southerham HS Junction, and enlarge it to GC gauge, rather than adding HS tracks to the
alignment. It is proposed so to enlarge the Bognor and Littlehampton branches, but they are a good deal
shorter and simpler.
The Eastbourne branch continues beyond Southerham HS Junction, initially on the north side. It veers
slightly to the north at Glynde station, crossing Lacy’s Hill at TQ458088. It crosses to the south side of
the alignment at TQ470088, to avoid several properties on the north side, and remains on the south side
all the way to Eastbourne. It tunnels under Berwick station for ½ mile between TQ524069 and
TQ528066. It veers slightly south at Thornwell Road (TQ549055) and tunnels for 1 mile under Polegate
station, between TQ577048 and TQ591046. A further 1 mile tunnel is required under Hampden Park
-
HS5 Route and Service Plans v5.2 Page 12 of 34
station, between TQ604029 and TQ609015. There are no further obstructions, and plenty of room at
Eastbourne on the west side of the station for the HS platforms.
4.2 Lewes – Eastbourne Contains Ordnance Survey data © Crown copyright and database right 2013
5. Winders Hill Junction – Tunbridge Wells
As noted, HS5 Tunbridge Wells branch diverges from the main line at Winders Hill Junction, and joins
the north side of the M25 alignment, eastbound, at TQ360528. It follows this as far as TQ485564, shortly
before junction 5, where it curves in a gentle arc to the south east, crossing the motorway and joining the
west side of the A21 at TQ500556. This it follows until TQ560467, just before it crosses the Redhill –
Tonbridge line, where HS5 crosses the A21 and the railway, and joins the south side of the classic
alignment at TQ570460.
It is worth noting that in the entire section since Winders Hill Junction, HS5 has not encountered a single
obstruction. One of the advantages of using motorway alignments is that nobody wants to be near a
motorway, so new houses don’t get built near them, leaving plenty of room for HS railways. The contrast
with trying to get the line through Tonbridge is very stark. Here houses crowd the sides of the railway,
and there is no free space at all.
Just before the junction with the line from Sevenoaks, starting at TQ578460, is an extensive area of
sidings, on the north side of the alignment. The classic lines are slewed two track-widths to the north, and
HS5 takes over the classic tracks (enlarged to GC gauge as necessary). This allows it to get close enough
to Tonbridge station. The HS platforms (just one island) are slightly to the west of the classic platforms,
using the only bit of free space that there is on the south side of the alignment. HS5 enters a 1 mile tunnel
under Tonbridge station, between TQ584460 and TQ594447. It then follows the east side of the
alignment as far as TQ598422, just before High Brooms, where is enters a 2 mile tunnel all the way to
Tunbridge Wells station. This station is in a cutting (or, at least, the southbound track is, the road
immediately behind the station being at a considerably higher level. The HS platforms are located
-
HS5 Route and Service Plans v5.2 Page 13 of 34
underground, actually beneath Mount Pleasant Road. It would require very little further tunnelling,
passing underneath the classic route, to bring HS5 out to Tunbridge Wells West, and the Spa Valley
Railway, who would, I imagine, be very happy to provide servicing facilities, and a joint station.
5.1 Limpsfield – Tunbridge Wells Contains Ordnance Survey data © Crown copyright and database right 2013
Note that this map is slightly wider than 20km (c21.4km)
-
HS5 Route and Service Plans v5.2 Page 14 of 34
6. Finches Shaw Junction – Littlehampton, Bognor and
Southampton
After leaving Finches Shaw Junction, HS5 crosses the minor road at TQ240330, the A264 at TQ210336
and joins the south side of the classic line at TQ204334. It enters a 1 mile tunnel at TQ191327 to
Horsham station, emerging at TQ179311, taking over the three terminating sidings on the east side of the
station and crossing Station Road; the HS platforms (a single island platform is adequate on this section)
starting south of Station Road – lots of car parks there. Beyond the station is a ¾ mile tunnel between
TQ177307 and TQ169299.
6.1 Tinsley Green – Horsham Contains Ordnance Survey data © Crown copyright and database right 2013
HS5 continues along the south / east side of the alignment until Pulborough. There are very few
obstructions: either veer a short way south or demolish one house at TQ126267, a ½ mile tunnel required
under Billingshurst station between TQ090251 and TQ083247, either veer a short way south or demolish
2 houses at TQ060204. HS5 switches to the north side of the alignment at TQ051194 – to avoid
Pulborough. Likewise at TQ035176, either veer a short way west or demolish 3 houses.
HS5 diverges from the alignment at TQ025065 and passes slightly to the north of the classic Arundel
station, with the new HS station at TQ023063, avoiding the station buildings. It crosses the Arun at
TQ011058. At Tortington Junction, TQ005050, the Littlehampton branch diverges, crossing over the
classic lines just west of Ford, joining the Littlehampton branch at Ford East Junction, TQ012035, taking
over the Littlehampton branch and enlarging it to GC gauge. (Variable platforms will be required at
Littlehampton as the branch also carries classic trains.)
HS5 crosses the coast line at SU994044, just west of Ford, and joins the south side of the alignment. It
passes to the south side of Barnham station, crossing over the Bognor branch. The HS connection to the
Bognor branch diverges at SU962043, Barnham HS Junction. It joins the Bognor branch at SU955043,
taking it over and enlarging it to GC gauge. (Variable platforms will be required at Bognor as the branch
also carries classic trains.)
-
HS5 Route and Service Plans v5.2 Page 15 of 34
6.2 Itchingfield – North Stoke Contains Ordnance Survey data © Crown copyright and database right 2013
The Southampton branch follows the south side of the coast line alignment. A ¼ mile tunnel is required at
Woodgate, between SU940043 and SU937043, and a ¾ mile tunnel under Chichester, between
SU8700430and SU860043, to the HS platforms on the south side of Chichester station – plenty of room
(car parks).
-
HS5 Route and Service Plans v5.2 Page 16 of 34
6.3 South Stoke – Alldingbourne Contains Ordnance Survey data © Crown copyright and database right 2013
6.4 Chichester – South Hayling Contains Ordnance Survey data © Crown copyright and database right 2013
-
HS5 Route and Service Plans v5.2 Page 17 of 34
6.5 Portsmouth – Titchfield Contains Ordnance Survey data © Crown copyright and database right 2013
6.6 Portsmouth – Titchfield
Contains Ordnance Survey data © Crown copyright and database right 2013
To the south west of Chichester station is an area of warehouses, which HS5 can either tunnel under or
negotiate its way through. It crosses the A27 at SU851042, and heads south west, crossing Dell Quay
Road at SU841027. It passes east of the marina at SU836010, (not forgetting to provide an adequate
-
HS5 Route and Service Plans v5.2 Page 18 of 34
bridge over the Chichester Canal,) and, veering west, crosses two minor roads at SU824004 a SU820004.
It crosses the B2179 at SZ811993, and Piggery Hall Lane at SZ798986, and passes to the south of West
Wittering, entering a 2 mile tunnel under the entrance to Chichester Harbour at SZ767983. It emerges at
SZ721997, on Hayling Island, providing a station at SZ721997 and redeveloping the area around it. It
tunnels for ¾ mile beneath West Town, between SZ716997 and SZ706991, and enters a 3 mile tunnel
under the entrance to Langstone Harbour at SZ690995, emerging at SU645002, immediately before
Portsmouth and Southsea station, on the north side of the alignment. It needs a new island platform on the
north side of the station; currently a multi-storey car park is in the way. There is a problem here; perhaps
the platforms could be at a low level, in a cutting, particularly as a 2 mile tunnel begins immediately, at
SU642043, under the entrance to Portsmouth Harbour. It emerges in Gosport, at SU607002, where the
new Gosport station is located, and takes over the alignment of the former Gosport branch, which, from
this point, as Henry Court Way, is completely unobstructed. It follows this alignment until SU578045,
where it diverges and heads west. Several warehouses will need to be relocated. It crosses the B3385 at
SU574046, Peak Lane at SU556046, the B3334 at SU547045 and Posbrook Lane at SU533044. It enters
a 2 mile tunnel under Southampton Water at SU493047, emerging at SU460048, and joins the Fawley
branch at SU451050. This is enlarged to GC gauge and doubled, and a new station provided at Hythe, in
the original location at SU427077. It follows this alignment to SU414083, diverging to the north and
entering a 1½ mile tunnel under the Test at SU408103, emerging at SU415121, just to the east of
Southampton station. The HS platforms are on the south side of the station.
-
HS5 Route and Service Plans v5.2 Page 19 of 34
HS5 Contains Ordnance Survey data © Crown copyright and database right 2011
-
HS5 Route and Service Plans v5.2 Page 20 of 34
Complete HS Network, South Sheet Contains Ordnance Survey data © Crown copyright and database right 2011
-
HS5 Route and Service Plans v5.2 Page 21 of 34
Complete HS Network, Central Sheet Contains Ordnance Survey data © Crown copyright and database right 2011
-
HS5 Route and Service Plans v5.2 Page 22 of 34
Complete HS Network, North Sheet Contains Ordnance Survey data © Crown copyright and database right 2011
-
HS5 Route and Service Plans v5.2 Page 23 of 34
The Service Plans
A new service plan comes into effect when some significant change takes place which causes a change to
the service loadings of one or more sections of HS5 itself. This most commonly occurs when a new
section of HS5 opens, but it may also be a consequence of a change on some other HS route.
The service plans use the following notation:
tph trains per hour
G GC gauge train
GG GC gauge, double deck train
C classic-compatible train
R Regional Metro train, semi-fast service
RS Regional Metro train, stopping service (all stations)
Occasionally other notations are used; these will be defined when used.
As was mentioned earlier, the service plans deliberately envisage maximum frequencies. The results may
thus seem, at least initially, somewhat optimistic.
Service Plan 1
As has been explained, once Pancras Cross becomes a through station, all services are through services.
There are 5 services north from Pancras Cross when HS5 opens, thus there must be 5 balancing services
on HS5. All services on HS5 are GC gauge; there are no classic-compatibles.
Service Plan 1 comes into effect when HS5 opens to Brighton, Eastbourne and Newhaven. The following
services are introduced:
4tphGG Pancras Cross – Victoria (LL) – East Croydon – Gatwick Airport – Brighton
2tphG Pancras Cross – Victoria (LL) – East Croydon – Gatwick Airport – Lewes – Eastbourne
2tphG Pancras Cross – Victoria (LL) – East Croydon – Gatwick Airport – Lewes – Newhaven
Town – Newhaven Marine.
4tphG Pancras Cross – Victoria (LL) – East Croydon.
The full, inter-regional HS services are:
2tphGG Brighton – Pancras Cross – York (HS Metro)
2tphGG Brighton – Pancras Cross – Preston
2tphG Eastbourne – Pancras Cross – Glasgow
2tphG Newhaven – Pancras Cross – Newcastle
2tphG East Croydon – Pancras Cross – York (UHS)
2tphG East Croydon – Pancras Cross – Liverpool (UHS)
-
HS5 Route and Service Plans v5.2 Page 24 of 34
Service Plan 1A
This service plan comes into effect when HS5 opens to Tunbridge Wells. The service terminating at East
Croydon is extended to Tunbridge Wells:
4tphG Pancras Cross – Victoria (LL) – East Croydon – Tonbridge – Tunbridge Wells
The full, inter-regional HS services are now:
2tphGG Brighton – Pancras Cross – York (HS Metro)
2tphGG Brighton – Pancras Cross – Preston
2tphG Eastbourne – Pancras Cross – Glasgow
2tphG Newhaven – Pancras Cross – Newcastle
2tphG Tunbridge Wells – Pancras Cross – York (UHS)
2tphG Tunbridge Wells – Pancras Cross – Liverpool (UHS)
Service Plan 1 overall imposes the following loadings on HS5:
Pancras Cross – Winders Hill Junction 12tph
Winders Hill Junction – Tunbridge Wells 4tph
Winders Hill Junction – Finches Shaw Junction 8tph
Finches Shaw Junction – Southampton station 0tph
Finches Shaw Junction – Hickstead Junction 8tph
Hickstead Junction – Brighton station 4tph
Hickstead Junction – Southerham HS Junction 4tph
Southerham HS Junction – Eastbourne station 2tph
Southerham HS Junction – Newhaven station 2tph
Service Plan 2
Service Plan 2 comes into effect when the Southampton branch of HS5 opens as far as Bognor /
Littlehampton, and, simultaneously, HS6 opens from Pancras Cross to King’s Lynn.
The additional service is introduced:
2tphGG Pancras Cross – Victoria (LL) – East Croydon – Gatwick Airport – Horsham – Arundel
HS (splits/joins) –:
– Littlehampton
– Bognor
The full, inter-regional HS services are now:
2tphGG Brighton – Pancras Cross – York (HS Metro)
2tphGG Brighton – Pancras Cross – Preston
2tphG Eastbourne – Pancras Cross – Glasgow
2tphG Newhaven – Pancras Cross – Newcastle
2tphG Tunbridge Wells – Pancras Cross – York (UHS)
-
HS5 Route and Service Plans v5.2 Page 25 of 34
2tphG Tunbridge Wells – Pancras Cross – Liverpool (UHS)
2tphGG Bognor / Littlehampton – Pancras Cross – King’s Lynn
It imposes the following loadings on HS5:
Pancras Cross – Winders Hill Junction 14tph
Winders Hill Junction – Tunbridge Wells 4tph
Winders Hill Junction – Finches Shaw Junction 10tph
Finches Shaw Junction – Arundel HS station 2tph
Arundel HS station – Tortington Junction 4tph
Tortington Junction – Ford East Junction and Littlehampton 2tph
Tortington Junction – Barnham HS Junction 2tph
Barnham HS Junction – Barnham South Junction and Bognor 2tph
Barnham HS Junction – Southampton 0tph
Finches Shaw Junction – Hickstead Junction 8tph
Hickstead Junction – Brighton station 4tph
Hickstead Junction – Southerham HS Junction 4tph
Southerham HS Junction – Eastbourne station 2tph
Southerham HS Junction – Newhaven station 2tph
(The extra 2tph between Arundel HS station and Tortington Junction is because the Littlehampton and
Bognor services split at Arundel and travel separately over that section.)
Service Plan 3
Service Plan 3 comes into effect when:
HS5’s Southampton branch opens from Barnham HS Junction to Southampton.
HS6 opens from Ely to Norwich.
HS8 opens from Ely to Peterborough and Nottingham.
All other connections in the triangle of junctions at Ely open.
The additional service is introduced:
4tphGG Pancras Cross – Victoria (LL) – East Croydon – Gatwick Airport – Horsham – Arundel
HS – Chichester – Hayling Island – Portsmouth and Southsea – Gosport – Hythe – Southampton
The full, inter-regional HS services are now:
2tphGG Brighton – Pancras Cross – York (HS Metro)
2tphGG Brighton – Pancras Cross – Preston
2tphG Eastbourne – Pancras Cross – Glasgow
2tphG Newhaven – Pancras Cross – Newcastle
2tphG Tunbridge Wells – Pancras Cross – York (UHS)
2tphG Tunbridge Wells – Pancras Cross – Liverpool (UHS)
2tphGG Bognor / Littlehampton – Pancras Cross – King’s Lynn
2tphGG Southampton – Pancras Cross – Norwich
-
HS5 Route and Service Plans v5.2 Page 26 of 34
2tphGG Southampton – Pancras Cross – Peterborough (temporary, until HS10 opens)
Service Plan 3A
This service plan comes into effect when HS10 opens to Hull and the service terminating at Peterborough
in plan 3 is extended to Hull.
There are no further services on HS5, but the full, inter-regional HS services are now:
2tphGG Brighton – Pancras Cross – York (HS Metro)
2tphGG Brighton – Pancras Cross – Preston
2tphG Eastbourne – Pancras Cross – Edinburgh – Glasgow
2tphG Newhaven – Pancras Cross – Newcastle
2tphG Tunbridge Wells – Pancras Cross – York (UHS)
2tphG Tunbridge Wells – Pancras Cross – Liverpool (UHS)
2tphGG Bognor / Littlehampton – Pancras Cross – King’s Lynn
2tphGG Southampton – Pancras Cross – Norwich
2tphGG Southampton – Pancras Cross – Hull
Representative Hourly Cross-Platform Interchange Pattern at Pancras Cross:
00GG Brighton – York (HS Metro)
GG Southampton – Norwich
07G Newhaven – Newcastle (UHS)
G Tunbridge Wells – York (UHS)
15GG Brighton – Preston (HS Metro)
GG Southampton – Hull
23G Eastbourne – Glasgow (UHS)
G Tunbridge Wells – Liverpool (UHS)
GG Bognor / Littlehampton – King’s Lynn
– repeating at 30, 37, 45 and 53minutes past. Note that all pairs except Newhaven – Newcastle and
Tunbridge Wells – York have diverging routes from Pancras Cross.
Service Plan 3 overall imposes the following loadings on HS5:
Pancras Cross – Winders Hill Junction 18tph
Winders Hill Junction – Tunbridge Wells 4tph
Winders Hill Junction – Finches Shaw Junction 14tph
Finches Shaw Junction – Arundel HS station 6tph
Arundel HS station – Tortington Junction 8tph
Tortington Junction – Ford East Junction and Littlehampton 2tph
Tortington Junction – Barnham HS Junction 6tph
Barnham HS Junction – Barnham South Junction and Bognor 2tph
Barnham HS Junction – Southampton 4tph
Finches Shaw Junction – Hickstead Junction 8tph
-
HS5 Route and Service Plans v5.2 Page 27 of 34
Hickstead Junction – Brighton station 4tph
Hickstead Junction – Southerham HS Junction 4tph
Southerham HS Junction – Eastbourne station 2tph
Southerham HS Junction – Newhaven station 2tph
-
HS5 Route and Service Plans v5.2 Page 28 of 34
Estimated Journey Times
The conditions governing acceleration, deceleration, behaviour at junctions and line capacity of high
speed lines are dealt with exhaustively in appendix B of the article ‘Same Speed Railways’. Technically-
minded readers, who want all the hard details, should look there. Only the required results are quoted
here.
The following calculations are only approximate. Distances, to the nearest km, are derived from my own
maps. However, comparing my estimated distances with actual distances, where these are appropriate,
(thus Tonbridge – Tunbridge Wells, my estimate 8km, actual 8km; Horsham – Arundel my estimate
33km, actual 32.8km; Arundel - Chichester, my estimate 18km, actual 18.4km) leads me to believe they
are accurate to within 3%.
The crudest approximation, usually, is the assumption that, once line speed has been reached, that speed
(300kph) is maintained until it becomes necessary to decelerate for a junction or a station stop. In fact,
given the notably alignments of this particular route, I am considerably more confident of this assumption
than on certain other routes (Trans-Pennine, in particular).
The results are, in any case, valuable in giving a feel for the journey times possible.
My estimated distances (between stations) are:
Pancras Cross – Victoria Low Level 5km
Victoria Low Level – East Croydon 13km
East Croydon – Gatwick Airport 30km
Gatwick Airport – Brighton 39km
Gatwick Airport – Lewes 42km
Lewes – Newhaven Town 10km
Newhaven Town – Newhaven Marine 0.5km
Lewes – Eastbourne 24km
East Croydon – Tonbridge 42km
Tonbridge – Tunbridge Wells 8km
Tunbridge Wells - Tunbridge Wells West 1km
Gatwick Airport – Horsham 18km
Horsham – Arundel HS 33km
Arundel HS – Littlehampton 6km
Arundel HS – Bognor Regis 12km
Arundel HS – Chichester 18km
Chichester – Hayling Island 15km
Hayling Island – Portsmouth & Sothsea 8km
Portsmouth & Sothsea – Gosport 3km
Gosport – Hythe 21km
Hythe – Southampton 6km
Acceleration/deceleration distances and times (taken from ‘Same Speed Railways’ appendix B) are:
Acceleration from stationary to 300kphtakes 11.57km and 278 seconds
Deceleration from 300kph to stationary takes 6.945km and 167 seconds
-
HS5 Route and Service Plans v5.2 Page 29 of 34
Time to travel from Pancras Cross to Victoria Low Level (start to stop) is 231 seconds
Time to travel from Victoria Low Level to East Croydon (start to stop) is 372 seconds
Time to travel from Lewes to Newhaven Town (start to stop) is 327 seconds
Time to travel from Newhaven Town to Newhaven Marine (start to stop) is 73 seconds
Time to travel from Tonbridge to Tunbridge Wells (start to stop) is 292 seconds
Time to travel from Tunbridge Wells to Tunbridge Wells West (start to stop) is 103 seconds
Time to travel from Gatwick Airport to Horsham (start to stop) is 438 seconds
Time to travel from Arundel HS to Littlehampton (start to stop) is 253 seconds
Time to travel from Arundel HS to Bognor Regis (start to stop) is 358 seconds
Time to travel from Arundel HS to Chichester (start to stop) is 438 seconds
Time to travel from Chichester to Hayling Island (start to stop) is 400 seconds
Time to travel from Hayling Island to Portsmouth & Sothsea (start to stop) is 292 seconds
Time to travel from Portsmouth & Sothsea to Gosport (start to stop) is 179 seconds
Time to travel from Hythe to Southampton (start to stop) is 253 seconds
The final 14 times need elucidation. When the distance between stations is less than 18.5km, (and the line
speed is 300kph,) a train accelerating from the first station is not able to reach line speed, before it has to
begin decelerating for the next station. ‘Same Speed Railways’ contains a table of times taken to travel
between adjacent stations, for inter-station distances of up to 18.5km, and the above times are taken from
this.
The procedure in calculating journey times between station stops is to take the two values of acceleration
/ deceleration distance, and the two times, as given in the first 2 lines of the above list, and sum them, thus
acceleration / deceleration takes 11.57 + 6.95 = 18.52km and 278 + 167 = 445 seconds at line speed
300kph. The distance value is subtracted from the inter-station distance, and the remaining length is
assumed to be travelled at line speed, taking time = distance / speed. This time is then added to the
acceleration / deceleration time to obtain the actual journey time between the stations. This is all very
laborious (error-prone, too!) to perform manually, so I have developed spreadsheets to do the work and
present the results. For those sections less than 18.5km in length, the time-calculating formula in the
spreadsheet cell is replaced by the actual value, as given in the above list. The various section times are
accumulated to obtain the overall journey times. One further refinement: a standard wait time of 3
minutes is assumed at stations, and this is added into the accumulated time at each stop.
Certain sections of the route incur time penalties because of junctions. (Refer to the ‘Same Speed
Railways’ article, specifically the section ‘The Effect of Junctions’. These penalties apply only at
junctions which are taken at high speed, and not those on the approach to stations. Specifically:
East Croydon – Tonbridge incurs a time penalty of 26 seconds at Winders Hill Junction, where the
Tunbridge Wells branch diverges from the main line to Brighton.
Gatwick Airport – Horsham incurs a time penalty of 26 seconds at Finches Shaw Junction, where
the Southampton branch diverges from the main line.
Gatwick Airport – Lewes incurs a double-junction penalty of 26 seconds at Hickstead Junction,
where the branch to Newhaven and Eastbourne diverges from the main line.
The time penalties are simply added in as explicit amounts to the spreadsheet formula for the section
time.
-
HS5 Route and Service Plans v5.2 Page 30 of 34
We now proceed to the results.
Pancras Cross – Brighton / Newhaven / Eastbourne / Tunbridge Wells /
Littlehampton / Bognor / Southampton (3/5/4/4/5/5/10 stops):
Section Distance
(km)
Cumulative
Distance
(km)
Start -
Stop Time
(minutes)
Cumulative
Journey Time
(minutes)
Elapsed Time from
London, inc.
Station Wait Times
Pancras Cross - Victoria
Low Level
5 5 3.9 3.9 3.9
Victoria Low Level - East
Croydon
13 18 6.2 10.1 13.1
East Croydon - Gatwick
Airport
30 48 9.7 19.8 25.8
Gatwick Airport - Brighton 39 87 11.5 31.3 40.3
Gatwick Airport - Lewes 42 90 12.5 32.3 41.3
Lewes - Newhaven Town 10 100 5.5 37.8 49.8
Newhaven Town -
Newhaven Marine
1 101 1.2 39.0 54.0
Lewes - Eastbourne 24 114 8.5 40.8 52.8
East Croydon - Tonbridge 42 60 12.5 22.6 28.6
Tonbridge - Tunbridge
Wells
8 68 4.9 27.5 36.5
Tunbridge Wells -
Tunbridge Wells East
1 69 1.7 29.2 41.2
Gatwick Airport -
Horsham
18 66 7.8 27.6 36.6
Horsham - Arundel HS 33 99 10.3 37.9 49.9
Arundel HS -
Littlehampton
6 105 4.2 42.1 57.1
Arundel HS - Bognor
Regis
12 111 6.0 43.8 58.8
Arundel HS - Chichester 18 117 7.3 45.2 60.2
Chichester - Hayling
Island
15 132 6.7 51.8 69.8
Hayling Island -
Portsmouth and Southsea
8 140 4.9 56.7 77.7
Portsmouth and Southsea -
Gosport
3 143 3.0 59.7 83.7
Gosport - Hythe 21 164 7.9 67.6 94.6
Hythe - Southampton 6 170 4.2 71.8 101.8
-
HS5 Route and Service Plans v5.2 Page 31 of 34
Current fastest time (minutes) from London [and the above values] to:
Gatwick Airport 29 [26]
Brighton 54 [41]
Lewes 60 [42]
Newhaven 81 (1 change) [54]
Eastbourne 61 [53]
Tonbridge 40 [29]
Tunbridge Wells 54 [42]
Horsham 49 [37]
Littlehampton 99 [57]
Bognor Regis 98 [59]
Chichester 88 [61]
Portsmouth & Southsea 88 [78]
Southampton 74 [102]
-
HS5 Route and Service Plans v5.2 Page 32 of 34
Appendix A – Pancras Cross and the
Inter-Regional Connections
General
By routing the classic-compatible services of HS3 into St. Pancras West (the MML platforms), and of
HS6 into St. Pancras East (the ‘Javelin’ platforms), and all the GC-gauge services of both routes through
Pancras Cross and on to HS5 (which has no classic-compatible services), superlative cross-London inter-
regional HS services are enabled, between Scotland, the North East, Yorkshire and the East Midlands
(HS3), likewise West Anglia and Lincolnshire (HS6/HS10), and Sussex, West Kent and Hampshire.
Given the GC-gauge loadings of the London end of HS3 (10tph) and of HS6/HS10 (6tph), balancing
exactly those of HS5(16tph) – these are at the final service plans of each route – a single tunnel in each
direction and 6 platform faces, (passive provision for 8 recommended,) would suffice. That a single
Pancras Cross station, with a single pair of approach tunnels, would serve two HS inter-regional routes
should seriously enhance its business case.
The track diagram of Pancras Cross and its surroundings is on the next page. The layout is not especially
complicated, but there are a few points to note.
The middle two platform faces at Pancras Cross would ordinarily be used by HS6 trains and the two outer
pairs by HS3. The scissors crossovers are provided for operational flexibility, but should not normally be
used. I would like to see passive provision for 8 platforms, as is indicated in the diagram.
HS6’s GC-gauge services from Pancras Cross, and its classic-compatible services from St. Pancras East,
(and also HS1’s single classic-compatible service,) all join HS1’s GC-gauge route from St. Pancras
International, at York Way Junction. They then all share the same tracks as far as Stratford HS North
station (formerly Stratford International, which it never was). The track diagram for Stratford HS North is
deliberately simplified, omitting the extra through tracks and the connection to Temple Mills. The station
exists already, and has a single platformed track in each direction (a rather inadequate provision; it may
well prove necessary to add extra platform faces on the outside). This is served by all HS6/HS10 services,
and also by HS1’s single classic-compatible service. HS1’s international services pass through the centre,
as they always have. (HS1’s GC-gauge inter-regional services join HS1 later, from Euston Cross at
Woodgrange Road Junction.) HS6 diverges from HS1 at Hitchcock Lane Junction, immediately east of
the station, without rejoining the main lines of HS1. There is the existing connection from the platform
lines to the main lines, used by HS1’s classic-compatible service.
-
HS5 Route and Service Plans v5.2 Page 33 of 34
-
HS5 Route and Service Plans v5.2 Page 34 of 34