FEBRUARY 2020 | 37 HSBC Place Redevelopment RENDERINGS COURTESY EPIC INVESTMENT SERVICES HSBC PLACE REDEVELOPMENT by NATALIE BRUCKNER I t has been well documented that in order for Canada to reduce its carbon footprint, the existing building stock needs to be brought into an energy-efficient future . . . and so when you come across a major redevelopment project like the one currently happening to HSBC Place in Edmonton, you have to commend those who are forward-thinking enough to not only transform a 1980s’ building into a state-of-the-art com- mercial property, but who go that one step further and raise the bar when it comes to redeveloping buildings. As with any renovation of this scale, it is no easy task, and yet Alberta Investment Management Corporation (AIMCo), Epic Investment Services, and Cushman & Wakefield Asset Services, along with a highly skilled team have seized the opportunity with both hands and created what will become Edmonton’s newest “A A” class office building. HSBC Place is not only targeting LEED Platinum certifica- tion and WELL Gold certification, but is the first office building in Western Canada to be certified Wired Platinum … quite a resume! As Micheal Dal Bello, senior VP, real estate at AIMCo, rightly says, “A full redevelopment of this scale requires the expertise of many partners, and AIMCo is fortunate to utilize local and national expertise to see it through.” With a team that includes Dialog (architect), PCL Construction Management Inc. (general contractor), RJC Engineers (structural consultant), and Smith + Andersen (mechanical/ electrical consultant), it is fair to say AIMCo, Epic Investment Services, and Cushman & Wakefield Asset Services secured an extremely skilled team, well versed in renovations of this scale. AIMCo originally acquired HSBC Place – an 18-storey office tower located in the centre of Edmonton’s downtown business core – on behalf of its clients back in February 2017. Under the direction of Epic Investment Services, the project’s scope of work is extensive in that it involves stripping back the building to its concrete struc- ture and rebuilding it inside and out into a tech-forward and socially con- scious building. Once complete, the building will boast a triple glazed curtain wall sys- tem, floor-to-ceiling view glass in the office area, new mechanical and electrical systems, and a revitalized two-storey lobby featuring a digital art installation that is the first-of-its-kind in Western Canada. Adjacent to the building is a nine- storey parkade (which includes two levels below grade and seven levels above) that is being extensively rede- veloped. The parkade is undergoing a full concrete rehabilitation to parkade slabs and perimeter spandrels, the construction of a exterior metal clad- ding and stone cladding facade, the removal of existing asphalt to main floor and basement, new traffic coat- ings to the parking decks and ramps, as well as numerous mechanical and electrical upgrades. PCL, who was also part of the build- ing’s original construction team back in 1979/1980, began demolition work in June, 2018. This involved the removal of the curtain wall, which Darren King, senior project manager at PCL describes as, “tricky, especially around the data centre that needed to remain operational throughout construction. To protect the area we installed insu- lated freezer panels as a temporary wall to allow the curtain wall to be removed without impacting operations.” King explains that to increase effi- ciency, a temporary monorail system was installed around the entire roof to help remove the existing curtain wall and replace it with the floor-to-ceiling glass. Designed by Dialog, the entire facade uses thin vertical strips of per- forated aluminum to maximize the use of energy-efficient triple-glazed vision glass, which is not only estheti- cally pleasing but optimizes occupant comfort as it reduces solar gain during summer and heat loss during winter. Inside, the building has been completely stripped down, from the basement (also known as the con- course level from previous use) and the

Upload: others

Post on 31-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HSBC PLACE REDEVELOPMENT - RJC Engineers

F EB RUA RY 2020 | 37HSBC Place Redevelopment

REN

DER

ING

S CO

UR

TESY

EPI

C IN

VES

TMEN

T SE

RV

ICES

HSBC PLACE REDEVELOPMENT by NATALIE BRUCKNER

I t has been well documented that in order for Canada to reduce its carbon footprint, the existing

building stock needs to be brought into an energy-efficient future . . . and so when you come across a major redevelopment project like the one currently happening to HSBC Place in Edmonton, you have to commend those who are forward-thinking enough to not only transform a 1980s’ building into a state-of-the-art com-mercial property, but who go that one step further and raise the bar when it comes to redeveloping buildings.

As with any renovation of this scale, it is no easy task, and yet Alberta Investment Management Corporation (AIMCo), Epic Investment Services, and Cushman & Wakefield Asset Services, along with a highly skilled team have seized the opportunity with both hands and created what will become Edmonton’s newest “AA” class office building. HSBC Place is not only targeting LEED Platinum certifica-tion and WELL Gold certification, but is the first office building in Western Canada to be certified Wired Platinum … quite a resume!

As Micheal Dal Bello, senior VP, real estate at AIMCo, rightly says, “A full redevelopment of this scale requires the expertise of many partners,

and AIMCo is fortunate to utilize local and national expertise to see it through.” With a team that includes Dialog (architect), PCL Construction Management Inc. (general contractor), RJC Engineers (structural consultant), and Smith + Andersen (mechanical/electrical consultant), it is fair to say AIMCo, Epic Investment Services, and Cushman & Wakefield Asset Services secured an extremely skilled team, well versed in renovations of this scale.

AIMCo originally acquired HSBC Place – an 18-storey office tower located in the centre of Edmonton’s downtown business core – on behalf of its clients back in February 2017. Under the direction of Epic Investment Services, the project’s scope of work is extensive in that it involves stripping back the building to its concrete struc-ture and rebuilding it inside and out into a tech-forward and socially con-scious building.

Once complete, the building will boast a triple glazed curtain wall sys-tem, floor-to-ceiling view glass in the office area, new mechanical and electrical systems, and a revitalized two-storey lobby featuring a digital art installation that is the first-of-its-kind in Western Canada.

Adjacent to the building is a nine-storey parkade (which includes two

levels below grade and seven levels above) that is being extensively rede-veloped. The parkade is undergoing a full concrete rehabilitation to parkade slabs and perimeter spandrels, the construction of a exterior metal clad-ding and stone cladding facade, the removal of existing asphalt to main floor and basement, new traffic coat-ings to the parking decks and ramps, as well as numerous mechanical and electrical upgrades.

PCL, who was also part of the build-ing’s original construction team back in 1979/1980, began demolition work in June, 2018. This involved the removal of the curtain wall, which Darren King, senior project manager at PCL describes as, “tricky, especially around the data centre that needed to remain operational throughout construction.

To protect the area we installed insu-lated freezer panels as a temporary wall to allow the curtain wall to be removed without impacting operations.”

King explains that to increase effi-ciency, a temporary monorail system was installed around the entire roof to help remove the existing curtain wall and replace it with the floor-to-ceiling glass. Designed by Dialog, the entire facade uses thin vertical strips of per-forated aluminum to maximize the use of energy-efficient triple-glazed vision glass, which is not only estheti-cally pleasing but optimizes occupant comfort as it reduces solar gain during summer and heat loss during winter.

Inside, the building has been completely stripped down, from the basement (also known as the con-course level from previous use) and the

Specialists in customized commercial solutions of any size, including:• Fabrication/installation of glazing projects

• Aluminum door and hardware fabrication/installation

• Project management support for all projects

• Safety COR certified, bondable, and warranty supplied on work

To speak with one of our commercial specialists call 780-822-1280 or email [email protected]

Commercial Glass, Constructed to Last.

105, 51 East Lake AveAirdrie, T4A 2H1Our newest location! Now servicing Airdrie, Calgary, and surrounding areas.

9539 41 Ave NWEdmonton, T6E 5X7Commercial Division Headquarters.

AWD_February2020.indb 37 2020-02-13 10:27 AM

Page 2: HSBC PLACE REDEVELOPMENT - RJC Engineers

F EB RUA RY 2020 | 39

two podium levels (main lobby, fitness and conference centre on the 2nd floor) to the 16 floors of office space, and a two-storey mechanical penthouse.

In order to open up the lobby area, structural modifications were nec-essary to reinforce the columns and core, and a large section of the second floor concrete slab had to be removed. “The re-massed podium required the existing second floor to be demol-ished to create a two-storey open lobby space,” explains King. “The existing columns and elevator core needed to be strengthened before any demoli-tion could take place. We also removed the concrete floor to the second floor elevator lobby and replaced it with a glass walkway.”

Crystal Glass Canada (Commercial Division) provided the incredibly impressive interior glazing package to the HSBC Bank and office space which included office fronts, vestibule glass entrance doors, and an Engineered Glasswall System (designed by Dialog and Engineered through Crystal Glass).

“The highlight of our scope was the engineered 30-foot high Interior Vestibule Glasswall with 20-milli-metre thick clear laminated [safety] glass,” explains Dylan Schiewe, com-mercial (construction) division manager at Crystal Glass Canada Ltd. “We placed a Spider-Crane inside of HSBC to erect the structure, which is supported by stainless steel spider fit-tings and 24-millimetre thick clear laminated glass fins.”

For the building’s systems, a great deal of attention has been paid not just to the mechanical and electrical sys-tems (which have been replaced with energy-efficient technologies), but to the building’s security and commu-nication systems, helping make HSBC Place a highly intelligent building.

“As an integration provider, our objective is to take pieces from differ-ent puzzles and place them into one board. We integrated systems that typically remain independent such as HVAC, lighting, access control, build-ing management, and intercom and video [CCTV] into one single solution,” explains Eddison Sambury, project manager at Fibertel Communications Canada Inc.

For an added convenience the owner wanted to provide its tenants with the ability to access various areas of the building such as the parkade, wellness centre, and even the eleva-tors from their cell phones. “It was challenging as we are working on one building that has multiple systems and we had to make sure it would all come together seamlessly. This required close collaboration and input from multiple parties to ensure its success,” explains Sambury.

Perhaps one of the most challeng-ing aspects, not just for Fibertel but for all the teams working on the project, has been that during the renovation, the building was in part still occupied by tenants.

“We couldn’t just strip down the existing systems and replace them, we needed to ensure access to the building was not impeded. Working on the parkade for example, access and video [CCTV] surveillance for tenants was essential, because of this requirement FTC needed to employ a phased approach during installa-tion to ensure all tenants both new and existing were adequately cov-ered,” says Sambury. Again, this required a high level of co-ordina-tion throughout, and King credits the bank employees who “were incredibly patient throughout construction.”

When it comes to putting the ten-ant first, the owners have truly gone above and beyond with this building. From the gender neutral and acces-sible washrooms and electric vehicle charging stations, to the focus on indoor air quality and overall health and wellness of occupants.

With the project now in its final stages, the team are extremely proud of what they have achieved, and rightly so. “It has been an incredible journey and, considering the scope, the project was completed within a very short timeframe . . .18 months in total. Teamwork and having excellent relationships between all stakeholders was key to our success,” says King.

In conclusion, Dal Bello says: “Edmonton supports a vibrant down-town and our redeveloped HSBC Place builds off the energy of the current rejuvenation.” A

LOCATION103rd Avenue and 101st Street, Edmonton, Alberta

OWNER/DEVELOPERAlberta Investment Management Corporation (AIMCo)

ASSET AND PROPERTY MANAGEMENTEpic Investment Services

DEVELOPMENT MANAGEMENTCushman & Wakefield Asset Services

ARCHITECT/INTERIOR DESIGN/LANDSCAPE ARCHITECTDIALOG

GENERAL CONTRACTORPCL Construction Management Inc.

STRUCTURAL CONSULTANTRJC Engineers

MECHANICAL/ELECTRICAL CONSULTANTSmith + Andersen

BUILDING SCIENCE CONSULTANT/COMMISSIONINGMorrison Hershfield

TOTAL SIZE317,000 square feet

TOTAL COSTUndisclosed

HSBC Place Redevelopment

ARCHITECTURAL MILLWORKCUSTOM VENEERING & DOORS

14504 - 123 Avenue, Edmonton, AlbertaPh: (780) 454-6790 • Fax: (780) 453-5214

www.madsensmillwork.com

We are proudly associated with the HSBC Place Redevelopment project.

Madsens_AWARD_0220.indd 1 2/7/20 10:40 AM

• Asbestos Abatement • Mold Remediation • Lead Removal • Hazardous Material Disposal

• Interior Demolition

Request a quote today!780.292.0040 I [email protected]

• Demolition • Commercial• Residential • Infill

• Industrial • Crushed Concrete

Get in touch today!780.467.9378 I [email protected]

Allwestdemo.com

All West Demo_AWARD_0220.indd 1 2/10/20 11:41 AM

12849 - 141 STREET | Edmonton, Alberta | T5L 4N1780.455.2299 [email protected]

Proud to be the Mechanical Contractors for the HSBC Place Redevelopment project.

Industry Leading Mechanical. By Design.

INDUSTRIAL CONTRACTORS

Icon Industrial_AWARD_0220.indd 1 2/12/20 9:12 AM

AWD_February2020.indb 39 2020-02-13 10:28 AM