  • 8/8/2019 HSDP Progress 4th Quarter_20099

    1/23

    Sector: Health

    Dictrict:PDHS offfice

    Source of fund: WB

    1 Improvement of PDHS office (Equipment & furniture) PDHS office PDHS office 2,000,000 2,000,000

    2 Maintainanace of Vehicle PDHS office

    /Ministry of

    Health /

    RDHS Office

    PDHS office 2,000,000 2,000,000

    3 Improvement works for 5S practicing PDHS office PDHS office 200,000 200,000

    Description

    of work

    Project

    ID

    4th Quarter Progress Report

    Health Sector Development Project under World Bank Funding - HSDP 20

    Output

    with

    indicator

    Outcome

    with

    indicator

    Implementing

    Agency

    TEC Allocationlocation

    4 Fuel for vehicles PDHS office/

    Ministry ofHealth

    PDHS office 1,000,000 1,000,000

    5 Quarterly review meeting PDHS office PDHS office 100,000 100,000

    6 Operational Cost PDHS office PDHS office 2,000,000 2,000,000

    8 Training on Maternal & Child Health PDHS office 1,900,000 1,900,000

    9 Training on Quality care management PDHS office 3,300,000 3,300,000

    10 Training on Stewardship Management PDHS office 550,000 550,000

    11 Training on Management Information Systems PDHS office 1,000,000 1,000,000

    12 Training on Office Management system PDHS office 2,500,000 2,500,000

    14 Training on Maternal & Child Health Communicable &

    Non Communicable disease

    PDHS office 2,500,000 2,500,000

    15 Training on Hospital Management PDHS office 4,500,000 4,500,000

    16 Training on Planning & Project Management PDHS office 2,600,000 2,600,000

    17 Training on Financial Management PDHS office 2,400,000 2,400,000

    Unallocated fund 1,452,830 1,452,830

    Total30 002 830 30 002 830

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    2/23

    Sector: Health

    Dictrict: Jaffna

    Source of fund: WB

    1 Re-construction of Male & Femal ward DH Gurunagar RDHS Office 18,000,000 18,00

    2 Re-construction of hospital building DH Maruthankerny RDHS Office 10,000,000 10,00

    3 Re-construction of hospital building DH Ampan RDHS Office 10,000,000 10,00

    4 Imoprovement of Hospital Building BH Point Pedro RDHS Office 18,000,000 18,00

    5 Imoprovement of Hospital Building DH Punkuduthivu RDHS Office 10,000,000 10,00

    6Imoprovement of Hospital Building BH Chavakachcheri

    RDHS Office800,000 80

    7 Imoprovement of Hospital Building DH Atchuveli RDHS Office 600,000 60

    8 Imoprovement of Hospital Building DH Chankanai RDHS Office 900,000 90

    9 Imoprovement of Hospital Building DH Kopay RDHS Office 800,000 80

    10 Imoprovement of Hospital Building DH Pandatharuppu RDHS Office 800,000 80

    11 Imoprovement of Hospital Building DH Alaveddy RDHS Office 500,000 50

    12 Imoprovement of Hospital Building DH Kodikamam RDHS Office 600,000 60

    13 Imoprovement of Hospital Building DH Manipay RDHS Office 600,000 60

    14 Imoprovement of Hospital Building PMCU Erlalai RDHS Office 600,000 60

    15Imoprovement of Hospital Building PMCU

    PunnalaikaduvanRDHS Office

    1,000,000 1,00

    16 Imoprovement of Hospital Building PMCU Puttur RDHS Office 300,000 30

    17 Repairs of OPD block BH Tellippalai RDHS Office 500,000 50

    18 Repairs of OPD block PMCU Tholpuram RDHS Office 500,000 50

    Description

    of work

    Project

    ID

    Outcome

    with

    indicator

    Output

    with

    indicator

    4th Quarter Progress Report

    Health Sector Development Project under World Bank Funding - Additional H

    AllocaTECImplementing

    Agency

    location

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    3/23

    Description

    of work

    Project

    ID

    Outcome

    with

    indicator

    Output

    with

    indicator

    AllocaTECImplementing

    Agency

    location

    19 Repairs of MO quarters BH Kayts RDHS Office 500,000 50

    20 Maintenance of Plant and Machinery RDHS region RDHS Office 500,000 50

    21 Re-Construction of Maternity ward DH Kodikamam RDHS Office 15,000,000 15,00

    22 Re-Construction of Maternity ward DH Velanai RDHS Office 15,000,000 15,00

    23 Re-Construction of Maternity ward DH Karavedy RDHS Office 15,000,000 15,00

    24 Re-Construction of Maternity ward DH Vaddukodai RDHS Office 14,000,000 14,00

    25 Re-Construction of Maternity ward DH Kondavil RDHS Office 14,000,000 14,00

    26 Re-construction of Maternity ward PMCU Illavalai RDHS Office 14,000,000 14,00

    27 Provision of necessary Medical Equipment All Hospital RDHS Office 10,000,000 10,00

    28 Provision of stand by generator-01 No. BH Chavakachcheri RDHS Office 1,200,000 1,20

    29lab-reagents , testing kits with strips &

    equipments

    Selected HospitalRDHS Office

    700,000 70

    30

    Improvement of ETU in 5 Hospitals DH Kopay

    DH Vaddukoddai

    DH Pandathrripu

    DH Allaveddy

    DH Delft

    RDHS Office

    500,000 50

    31 Provision of Ambulance DH Ampan RDHS Office 7,000,000 7,00

    32 Maintenance of Ambulances Selected Hospital RDHS Office 400,000 40

    33Testing strips for NCD screening programmes RDHS region

    RDHS Office200,000 20

    34Provision of Drugs and supplies for dogs

    sterilization

    RDHS RegionRDHS Office

    200,000 20

    35Provision of mobile dental vehicle RDHS office

    RDHS Office15,000,000 15,000

    36Provision of necessary dental Instrument,

    equipment & filling materials

    School Dental clinicRDHS Office

    800,000 80

    37Printing Heath Education materials on dental

    care

    School Dental clinicRDHS Office

    100,000 10

    38 Provision of HB meter with strips All MOH RDHS Office 1,000,000 1,00

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    4/23

    Description

    of work

    Project

    ID

    Outcome

    with

    indicator

    Output

    with

    indicator

    AllocaTECImplementing

    Agency

    location

    39Provision of Infanto metre, Glucometres &

    Folding screen

    MCH Clinic centerRDHS Office

    500,000 50

    40 Provision of weighing scales for MCH Clinics All MCH clinics RDHS Office 400,000 40

    41 Provision of emergency tray to each clinics All MCH clinics RDHS Office 400,000 40

    42Conduct the Nutrition awareness programme &

    printing leaf lets

    All MOH areaRDHS Office

    100,000 10

    43

    Awreness creation among the teenagers and life-

    skill training for Adolescent at school and

    community levels

    RDHS region

    RDHS Office

    200,000 20

    44Establishment of Adolescent Clinics in each

    MOH

    MOH officeRDHS Office

    200,000 20

    45 Re-construction of MOH office MOH office Kayts RDHS Office 12,000,000 12,000

    46 Re-construction of MOH office MOH office Tellipalai RDHS Office 12,000,000 12,000

    47 Re-construction of BME unit BME UnitPannai RDHS Office 14,000,000 14,00

    48Improvement works for 5S practicing RDHS office

    BH Pointpedro

    MOH Kopay

    RDHS Office2,000,000 2,00

    49provision of office equipment ,

    furniture,stationeries & training

    RDHS officeRDHS Office

    1,000,000 1,00

    50 Providing computers with accessaries RDHS office RDHS Office 1,000,000 1,00

    51Additional expences for fuel for mobile clinic RDHS region

    RDHS Office300,000 30

    Unallocated fund RDHS Office 480,000 48

    Total 244,180,000 244,18

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    5/23

    Sector: Health

    Dictrict: Mannar

    Source of fund: WB

    1 Renovation of all damaged buildings DH Adampan RDHS Office 33,000,000 3

    2 Renovation of all damaged buildings

    (OPD, MOQ,Wards, MWQ)

    DH Viddathalthivu RDHS Office 7,000,000

    3 Renovation of hospital buildings DH Periyapandivirichan RDHS Office 2,000,000

    4 Repairs to OPD, MO Quarters & Midwife

    Quarters

    DH Chilawathurai RDHS Office 2,500,000

    5 Repairs to Primary Medical Care unit PMCU Vellankulam RDHS Office 1,500,000

    6 Re Construction of OPD block DH Periyapandivirichan RDHS Office 8,000,000

    7 Construction of 40 Roomed Nurses' Quarters GH Mannar RDHS Office 45,000,000 4

    8 Renovation of Water Supply System GH Mannar RDHS Office 3,000,000

    9 Construction of ambulance garage with

    drivers' duty room

    GH Mannar RDHS Office 5,000,000

    10 Construction of ambulance garage &

    Driver's duty room

    DH Nanattan RDHS Office 1,500,000

    11 Refurbishment of Surgical wards, Medical

    wards & Nurses'Quarters

    GH Mannar RDHS Office 6,000,000

    12 Reconstruction of Kitchen DH Pesalai RDHS Office 2,000,000

    13 Maintenance of MO quarters DH Talamannar RDHS Office 1,000,000

    14 Maintenance of Hospital building

    (OPD building)

    DH Pesalai RDHS Office 3,000,000

    15 Maintenance of Hospital building (Kitchen, Over

    head Tank & Mortuary)

    DH Murunkan RDHS Office 3,000,000

    4th Quarter Progress Report

    Health Sector Development Project under World Bank Funding - Additional H

    Description

    of work

    location Output

    with

    indicator

    Outcome

    with

    indicator

    Implementing

    Agency

    TECProject

    ID

    A

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    6/23

    Description

    of work

    location Output

    with

    indicator

    Outcome

    with

    indicator

    Implementing

    Agency

    TECProject

    ID

    A

    16 Maintenance of Hospital building - OPD

    toilets, Floor & MO Quarters

    DH Vankalai 3,000,000

    17 Maintenance of Hospital building -

    Maternity ward & clinic cente

    DH Erukalampiddy 1,500,000

    18 Supply of tools for Maintenance Unit GH Mannar 500,000

    19 Supply of Medical Equipment & Furniture DH Adampan 3,500,000

    20 Supply of Medical Equipment & Furniture DH Viddathalthivu 3,500,000

    21 Supply of Medical Equipment & Furniture DH Chilawathurai 1,000,000

    22 Supply of Medical Equipment & Furniture DH Periyapandivirichchan 1,000,000

    23 Supply of Medical Equipment & Furniture PMCU Therukeetheswaram 1,000,000

    24 Supply of Medical Equipment, Furniture,

    to Medical ward

    GH Mannar 1,725,000

    25 Supply of Medical Equipment, Furniture,

    to Medical ward

    DH Murunkan 285,000

    26 Supply of Medical Equipment, Furniture,

    to Medical ward

    DH Talaimannar 235,000

    27 Supply of Medical Equipment, Furniture,

    to Medical ward

    DH Pesalai 85,000

    28 Provision of Furniture GH Mannar 457,000

    29 Provision of Furniture DH Murunkan 198,000

    30 Supply of Generator (20KV) DH Adampan

    DH Viddathalthivu

    DH Periyapandivirichcha

    6,000,000

    31 Provision of Tablet counter machine GH Mannar 600,000

    32 Supply of Lab reagents Slected hospital 1,049,000

    33 Prvision of fax machine DH Murunkan 20,000

    34 Providing logistic support to laboratory

    networking

    DH Murunkan 80,000

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    7/23

    Description

    of work

    location Output

    with

    indicator

    Outcome

    with

    indicator

    Implementing

    Agency

    TECProject

    ID

    A

    35 Provision of Ambulance ( 3 Nos ) DH Adampan

    DH Periyapandivirichchan

    DH Viddathalthivu

    21,000,000 2

    36 Re Construction of Midwife Quarters DH Talaimannar 6,000,000

    37 Re Construction of Midwife Quarters DH Vankalai 6,000,000

    38 Supply of Medical Equipment, Furniture,

    to Obstetric ward

    GH Mannar 475,000

    39 Supply of Medical Equipment, Furniture,

    to Obstetric ward

    DH Murunkan 439,000

    40 Supply of Medical Equipment, Furniture,

    to Obstetric ward

    DH Talaimannar 41,000

    41 Supply of Medical Equipment, Furniture,

    to Obstetric ward

    DH Pesalai 41,000

    42 Constructin of Blood Bank GH Mannar 7,000,000

    43 Supply of Medical Equipment & furniture GHC Arripu 300,000

    44 Supply of Medical Equipment & furniture GHC Vidathal thivu 400,000

    45 Supply of Medical Equipment & furniture GHC Periyapandivirichen 300,000

    46 Re Construction of MOH Quarters Murunkan 7,000,000

    47 Repairs to MOH Quarters MOH Mannar 3,000,000

    48 Re Construction of stores MOH office Mannar 2,000,000

    49 Re Construction of stores MOH office Murunkan 2,000,000

    50 Completion of vehicle park RDHS Office 1,000,000

    51 Maintenance of vehicles RDHS Office 1,000,000

    Total 207,230,000 20

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    8/23

    Sector: Health

    Dictrict: Vavuniya

    Source of fund: WB

    1 Renovation of Divisional hospital DH Nedunkerny RDHS Office 17,400,000

    2 Renovation of Divisional hospital DH Puliyankulam RDHS Office 4,620,000

    3 Renovation of Divisional hospital DH Mamaduwa RDHS Office 1,000,000

    4 Renovation of Divisional hospital DH Ulukkulam RDHS Office 1,000,000

    5 Extension of Covered Way GH Vavuniya RDHS Office 6,000,000

    6 Extension of Pipe Medical Gas GH Vavuniya RDHS Office 1,300,000

    7 Water Supply and Electric for MO Quarters and

    Nurses Quarters

    GH Vavuniya RDHS Office 1,000,000

    8 Re Construction of Overhead Tank BH Cheddikulam RDHS Office 3,000,000

    9 Construction of X-Ray Room BH Cheddikulam RDHS Office 5,000,000

    10 Re construction of Divisional hospital & MO

    Quaters

    DH Pavatkulam RDHS Office 9,000,000

    11 Re Construction of Grade 3 Quarters DH Puliyankulam RDHS Office 4,375,000

    12 Re Construction of surgical Ward GH Vavuniya RDHS Office 5,000,000

    13 Re Construction of MS Quarters GH Vavuniya RDHS Office 5,000,000

    14 Improvement of electricity (Bulk Supply CEB) BH Cheddikulam RDHS Office 2,800,000

    15 Construction of Covered Way DH Nedunkerny RDHS Office 5,925,000

    16 Re Construction of Isolation Unit GH Vavuniya RDHS Office 2,171,000

    17 Maintenance of Plant & Machinery All hospital RDHS Office 4,000,000

    18 Re Construction of Pathology & BME Section GH Vavuniya RDHS Office 18,000,000

    19 Renovation of maternity ward GH Vavuniya RDHS Office 5,000,000

    20 Provision of Medical equipment All hospital RDHS Office 21,700,000

    4th Quarter Progress Report

    Health Sector Development Project under World Bank Funding - Additional

    ProjectID

    Description of work location ImplementingAgency

    TECOutputwith

    indicator

    Outcomewith

    indicator

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    9/23

    Project

    ID

    Description of work location Implementing

    Agency

    TECOutput

    with

    indicator

    Outcome

    with

    indicator

    21 Provision of Medical Equipments Histopathology

    Laboratory

    GH Vavuniya RDHS Office 6,000,000

    22 Provision of Furniture & Equipment DH Nedunkerney

    DH Puliyankulam

    RDHS Office 4,000,000

    23 Provision of 40 KV Generator DH Nedunkerney

    DH Puliyankulam

    RDHS Office 3,000,000

    24 Extension of CSSD Stage 1 GH Vavuniya RDHS Office 10,000,000

    25 Provision of Medical Reagents GH Vavuniya

    BH Cheddikulam

    RDHS Office 7,419,000

    26 Provision of Ambulance (2 nos) DH Nedunkerney

    DH Puliyankulam

    RDHS Office 14,000,000

    27 Provision of fogging machine RMO/AMC Vavuniya RDHS Office 1,200,000

    28 Renovation of GHC GHC Nainamadu RDHS Office 1,100,000

    29 Renovation of GHC GHC Kanakarayankulam RDHS Office 1,100,000

    30 Re Construction of GHC GHC Maruthodai RDHS Office 5,000,000

    31 Re Construction of GHC GHC Kulavisuddan RDHS Office 5,000,000

    32 Provision of pickup MOH North MOH Vavuniya North RDHS Office 6,000,000

    33 Renovation of MOH Office & quarters MOH Vavuniya North RDHS Office 6,320,000

    34 Improvement infrastructure MOH Offices MOH Vavuniya RDHS Office 2,000,000

    35 Improvement of infrastructure facilities RDHS office RDHS Office 4,000,000

    36 Re Construction of RE, MOMCH &

    MOOH Quarters 6 Unit

    RDHS office RDHS Office 25,000,000

    37 Provision of Office Equipments & Furniture MOH Vavuniya North RDHS Office 2,000,000

    38 Provision of 40 KV Generator MOH Vavuniya North RDHS Office 1,500,000

    39 Completion of NTS hostel RDHS Region RDHS Office 1,300,000

    40 Accommodation & Meals facilities for mobilizedofficers

    RDHS Region RDHS Office 1,000,000

    Unallocated fund 1,300,000

    Total 231,530,000

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    10/23

    Sector: Health

    Dictrict: Mullaitaivu

    Source of fund: WB

    1 Renovation of OPD block DH Mallavi RDHS Office 3,500,000

    2 Renovation of ward 1&2 DH Mallavi RDHS Office 3,500,000

    3 Renovation & repairs to OPD Covered way & Medical

    wards (02 Nos)

    DH Mallavi RDHS Office 6,000,000

    4 Reconstruction of Medical officers Quarters (02 Nos)&

    Canteen

    DH Mallavi RDHS Office 1,500,000

    5 Reconstruction of Clinic room and repairs to

    water tank

    DH Mallavi RDHS Office 3,000,000

    6 Reconstruction of RMO and Nurses quarters DH Mallavi RDHS Office 2,500,000

    7 Renovation & Refurbishment of Building DH Naddankandal RDHS Office 5,000,000

    8 Renovation of RMO quarters DH Naddankandal RDHS Office 3,000,000

    9 Rehabilitation of Hospital building with quarters PMCU Thunukkai RDHS Office 2,000,000

    10 Reconstruction of OPD, Clinic & Adm.complex DH Mankulam RDHS Office 10,000,000

    11 Renovation of Maternity ward DH Mallavi RDHS Office 5,000,000

    12 Renovation of Hospital building including Maternity

    ward and ETU

    DH Oddusuddan RDHS Office 7,000,000

    13 Provision of Medical Equipment DH Mallavi RDHS Office 7,000,000

    14 Provision of Medical Equipment DH Oddusuddan RDHS Office 5,000,000

    15 Provision of Medical Equipment DH Naddankandal RDHS Office 4,000,000

    16 Provition of Furniture and Equipment DH Mallavi RDHS Office 2,000,000

    17 Provision of Furniture and Equipment DH Oddusuddan RDHS Office 2,000,000

    18 Provision of Furniture and Equipment DH Naddankandal RDHS Office 2,000,000

    19 Provision of Furniture and Equipment PMCU Thunukkakai RDHS Office 3,000,000

    20 Renovation of ETU and operation Theatre DH Mallavi RDHS Office 2,700,000

    21 Renovation operation ward DH Oddusuddan RDHS Office 5,000,000

    Health Sector Development Project under World Bank Funding - Additional H

    4th Quarter Progress Report

    Project

    ID

    Description of work location Output

    with

    indicator

    Outcome

    with

    indicator

    Implementi

    ng

    Agency

    TEC

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    11/23

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    12/23

    Short Fall

    Code/

    Remarks

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    13/23

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    14/23

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    15/23

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    16/23

    44 Supply of Furnitur & Equipment GHC Konavil RDHS Office 500,000

    45 Supply of Furnitur & Equipment GHC Union Kulam RDHS Office 500,000

    46 Supply of Furnitur & Equipment GHC Puthumorippu RDHS Office 500,000

    47 Supply of Furnitur & Equipment GHC Sivanagar RDHS Office 500,000

    48 Supply of Furnitur & Equipment GHC Anaivilunthan RDHS Office 500,000

    49 Supply of Furnitur & Equipment GHC Nachchikuda RDHS Office 500,000

    50 Supply of Furnitur & Equipment GHC Kiranchi RDHS Office 500,000

    51 Supply of Furnitur & Equipment GHC veravil RDHS Office 500,000

    52 Provission of Equipments All GHC RDHS Office 200,000

    53 NRP Training for Health Staff Kilinochchi RDHS Office 200,000

    54 Conducting School Health Programme All MOH RDHS Office 200,000

    55 Re construction of Mental Health Unit Kilinochchi RDHS Office 500,000

    56 Supply of Furnitur & Equipment of Mental Health

    Unit

    Kilinochchi RDHS Office 500,000

    57 Renovation of MOH Office kilinochchi RDHS Office 1,000,000 1

    58 Renovation of MOH sub Office, Jeyapuram,

    Poonakary (Stage I)

    MOH Poonakery RDHS Office 6,100,000 6

    59 Renovation of Office Building RDHS Office RDHS Office 2,000,000 2

    60 Renovation of General Store RDHS Office RDHS Office 2,200,000 2

    61 Renovation of RMSD kilinochchi RDHS Office 1,000,000 1

    62 Renovation of RDHS & MOH Quaters kilinochchi RDHS Office 2,000,000 2

    63 Renovation of 5 Nos Doctors Quaters kilinochchi RDHS Office 2,200,000 2

    64 supply of Furniture & Equipment MOH Kilinochchi RDHS Office 1,000,000 1

    65 supply of Furniture & Equipment MOH Poonakari RDHS Office 1,000,000 1

    Unallocated 146,000

    Total 168,446,000 168

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    17/23

    District Allocation(mn.) Imprest Relesed

    Up to December

    E

    PDHS Office 30.00

    Jaffna 64.390

    Mannar 207.23 53.138

    Vavuniya 231.53 47.755

    Kilinochchi 168.45 41.095

    Mullaithivu 200.04 29.483

    Total 1,081.43 235.861

    Additional HSDP 2009/2010 -under World Bank FundingProgress Report Upto 13.12.2009

    Summary

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    18/23

    Physical Progress Code

    A Activity Identified

    B Preparation of Plan / Designs & BOQ's Bids etc.

    C Calling for Tender

    D Contract Awarded

    E Work Commencement

    F

    50 % CompletedG 100 % Completed

    H No Progress

    I Works Suspended

    Short Fall Code

    1 Materials Shortage

    2 Bad weather

    3 Delay in Land Acquisition

    4 Liquidity Problem

    5 Lack of Equipments / Problem of Mobilizing Machineries

    6 Inadequate Manpower

    7

    Delay in Approval8 Others

    L1 Last week Achievable mile stone

    L2 Last week Achieved mile stone

    R1 Reporting week Achievable mile stone

    R2 Reporting week Achieved mile stone

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    19/23

    District Allocation(mn.) Imprest Relesed Expenditure up

    PDHS Office 30,002,830.00

    Jaffna 244,180,000.0064,390,036.52 64,460,891.61

    Mannar 207,230,000.00 53,137,885.01 53,837,757.97

    Vavuniya 231,530,000.00 47,754,605.86 50,449,355.64

    Kilinochchi 168,446,000.00 41,095,481.04 41,096,779.00

    Mullaithivu 200,043,000.00 29,482,750.98 29,482,751

    Total 1,081,431,830.00 235,860,759.41 239,327,535.20

    Additional HSDP 2009 -under World Bank Funding

    Progress Report Upto 13.12.2009

    Summary

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    20/23

    Allocation(mn.) Imprest Relesed Expenditure 3rd Qu

    5,117,390.00 5,096,011.36 5,096,011.363,002,266.43

    32,396,875.75 32,396,875.75 32,326,020.6620,552,828.00

    27,343,186.55 27,343,186.55 26,643,313.5913,804,056.00

    38,190,347.70 38,190,347.70 35,495,597.9218,620,684.81

    5,410,215.00 5,410,215.00 5,408,917.042,100,679.10

    5,605,304.00 5,605,304.00 5,605,304.001,412,167.00

    114,063,319.00 114,041,940.36 110,575,164.5759,492,681.34

    349,902,699.77

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    21/23

    4th Qu Imprest

    Relesed

    3rd Qu 4th Qu Expenditure

    2,093,744.93 5,096,011.36 725,376.52 4,370,634.84 5,096,011.36

    76,234,084.27 96,786,912.27 16,038,381.37 80,748,530.90 96,786,912.27

    66,677,015.56 80,481,071.56 6,221,513.16 74,259,558.40 80,481,071.56

    67,324,268.75 85,944,953.56 12,489,670.28 73,455,283.28 85,944,953.56

    44,405,016.94 46,505,696.04 401,723.00 46,103,973.04 46,505,696.04

    33,675,887.98 35,088,054.98 726,600.00 34,361,454.98 35,088,054.98

    290,410,018.43 349,902,699.77 36,603,264.33 313,299,435.44 349,902,699.77

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    22/23

    District Allocation(mn.) Imprest ReleasedUp to December

    Ext

    PDHS Office 30.00

    Jaffna 118.000

    Mannar 207.23 81.060

    Vavuniya 231.53 98.040

    Kilinochchi 168.45 59.270

    Mullaithivu 200.04 66.770

    Total 1,081.43 423.140

    Additional HSDP 2009/2010 -under World Bank Funding

    Progress Report Upto 13.12.2009

    Summary

  • 8/8/2019 HSDP Progress 4th Quarter_20099

    23/23

    1 Recurrent Expenditure (Health) 1,572,159,500.00 1,571,990,823.03

    2 Recurrent Expenditure (IM) 48,876,000.00 48,399,150.00

    3 Capital Expenditure PSDG

    (Health)

    197,200,000.00 197,172,710.12

    4 Capital Expenditure P.S.D.G(Indigenous Medicine)

    32,000,000.00 24,340,643.44

    5 Capital Expenditure HSDP 553,000,000.00 355,496,595.64

    6 Capital Expenditure CBG (Health) 3,232,000.00 3,223,103.01

    7 Capital Expenditure CBG

    (Indigenous Medicine)

    37,500,000.00 34,107,614.21

    S. No Sector Provision (Rs.) Expenditure (Rs.)