hspk. 2012

112
REKAPITULASI ENGINEER ESTIMATE (E.E NAMA KEGIATAN : PERENCANAAN & PENGAWASAN GEDUNG PEMERI PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B KANTOR KELUR LOKASI : KOTA SURABAYA TAHUN : NO. URAIAN PEKERJAAN PEKERJAAN KANTOR BARU A LANTAI 1 I PEKERJAAN PERSIAPAN II PEKERJAAN TANAH III PEK. BETON (BEKESTING, BESI, BETON) IV PEK. PASANGAN & PLESTERAN V PEK. LANTAI DAN KERAMIK VI PEK. KUSEN DAN PENGGANTUNG VII PEK. PLAFOND VIII PEK. PENGECATAN IX PEKERJAAN TANGGA X PEK. INSTALASI LISTRIK XI PEK. SANITARY XII PEK. TANDON AIR, SEPTICTANK DAN RESAPAN B LANTAI 2 I PEK. BETON (BEKESTING, BESI, BETON) II PEK. PASANGAN & PLESTERAN III PEK. LANTAI DAN KERAMIK IV PEK. KUSEN DAN PENGGANTUNG V PEK. PLAFOND VI PEK. PENGECATAN VII PEKERJAAN ATAP VIII PEK. INSTALASI LISTRIK IX PEK. SANITARY PEKERJAAN KANTOR LAMA I PEK. KERAMIK DAN BATU KLINGKER II PEKERJAAN AKHIR J U M L A H P P N 10 % J U M L A H T O T A L D I B U L A T K A N TERBILANG

Upload: chubby99

Post on 11-Aug-2015

459 views

Category:

Documents


38 download

TRANSCRIPT

Page 1: hspk. 2012

REKAPITULASI ENGINEER ESTIMATE (E.E)

NAMA KEGIATAN : PERENCANAAN & PENGAWASAN GEDUNG PEMERINTAH, PEMERINTAH DAERAHPEKERJAAN : PEMBANGUNAN GEDUNG TYPE B KANTOR KELURAHAN BULAKLOKASI : KOTA SURABAYATAHUN :

NO. URAIAN PEKERJAANJUMLAH HARGA

(Rp.)PEKERJAAN KANTOR BARU

A LANTAI 1I PEKERJAAN PERSIAPAN Rp 6,100,027.80 II PEKERJAAN TANAH Rp 23,580,129.34 III PEK. BETON (BEKESTING, BESI, BETON) Rp 302,170,164.88 IV PEK. PASANGAN & PLESTERAN Rp 71,516,977.63 V PEK. LANTAI DAN KERAMIK Rp 44,315,785.36 VI PEK. KUSEN DAN PENGGANTUNG Rp 17,133,391.00 VII PEK. PLAFOND Rp 17,670,475.38 VIII PEK. PENGECATAN Rp 7,666,898.14 IX PEKERJAAN TANGGA Rp 30,498,624.83 X PEK. INSTALASI LISTRIK Rp 12,187,542.50 XI PEK. SANITARY Rp 6,337,227.10 XII PEK. TANDON AIR, SEPTICTANK DAN RESAPAN Rp 16,613,603.67 B LANTAI 2I PEK. BETON (BEKESTING, BESI, BETON) Rp 115,249,104.21 II PEK. PASANGAN & PLESTERAN Rp 83,113,011.19 III PEK. LANTAI DAN KERAMIK Rp 32,501,731.16 IV PEK. KUSEN DAN PENGGANTUNG Rp 30,720,126.04 V PEK. PLAFOND Rp 24,270,830.30 VI PEK. PENGECATAN Rp 15,690,839.61

VII PEKERJAAN ATAP Rp 151,607,584.49 VIII PEK. INSTALASI LISTRIK Rp 47,621,327.50

IX PEK. SANITARY Rp 11,690,585.30 PEKERJAAN KANTOR LAMA

I PEK. KERAMIK DAN BATU KLINGKER Rp 17,486,218.33 II PEKERJAAN AKHIR Rp 2,851,380.00

J U M L A H 1,088,593,585.77 P P N 10 % 108,859,358.58 J U M L A H T O T A L 1,197,452,944.35

D I B U L A T K A N 1,197,452,000.00

TERBILANG :

Surabaya, CV.GRIYA TEKNIKA

AGUS CAHYANTO., S.T.Direktur

Page 2: hspk. 2012

RENCANA ANGGARAN BIAYA

NAMA KEGIATAN : PERENCANAAN & PENGAWASAN GEDUNG PEMERINTAH, PEMERINTAH DAERAH

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B KANTOR KELURAHAN BULAK

LOKASI : KOTA SURABAYA

TAHUN :

NO JENIS PEKERJAAN VOL SAT. HARGA SATUAN JUMLAH

(Rp.) (Rp.) PEKERJAAN KANTOR BARU

A LANTAI 1I PEKERJAAN PERSIAPAN

1 Pembongkaran atap dan penutup atap tidak dipakai lagi 136.20 m2 Rp 4,515.00 Rp 614,943.00 2 Pembongkaran plafond dan rangka tidak dipakai kembali 112.50 m2 Rp 4,515.00 Rp 507,937.50 3 Pembongkaran dinding tembok dengan pembersihan 48.96 m3 Rp 45,150.00 Rp 2,210,544.00 4 Pembongkaran Beton 3.15 m3 Rp 70,554.00 Rp 222,245.10 5 Pembuatan bouwplank (Uitset) 28.50 m1 Rp 72,565.00 Rp 2,068,102.50 6 Uitset dengan waterpass & teodolit 291.60 m2 Rp 1,633.25 Rp 476,255.70

SUB TOTAL Rp 6,100,027.80 II PEKERJAAN TANAH

1 Galian Tanah 109.04 m3 Rp 40,635.00 Rp 4,430,956.21 2 Pengangkutan tanah keluar proyek 128.92 m3 Rp 26,725.00 Rp 3,445,447.93 3 Pengurugan tanah kembali 90.75 m3 Rp 13,545.00 Rp 1,229,179.63 4 Pengurugan pasir padat bawah poer & sloef t=10cm 11.37 m3 Rp 151,400.00 Rp 1,721,425.57 5 Pengurugan sirtu 72.00 m3 Rp 102,250.00 Rp 7,362,000.00 6 Pembuatan lubang strouss 70.00 ttk Rp 77,016.00 Rp 5,391,120.00

SUB TOTAL Rp 23,580,129.34 III PEK. BETON (BEKESTING, BESI, BETON)

1 Lantai kerja bawah poer & sloef t = 5 cm 5.69 m3 Rp 490,554.45 Rp 2,788,814.31 2 Pekerjaan beton strouss (Beton K225, Besi 109Kg) 19.78 m3 Rp 2,009,875.58 Rp 39,759,358.72 3 Beton PT1 (Beton K225, Besi 210Kg) 8.06 m3 Rp 3,602,867.70 Rp 29,053,525.13 4 Beton PT2 (Beton K225, Besi 342Kg) 2.02 m3 Rp 4,892,853.54 Rp 9,863,992.74 5 Sloof S1 30/50 (Beton K225, Besi 113Kg) 13.85 m3 Rp 2,894,441.06 Rp 40,095,244.78 6 Sloof S2 20/40 (Beton K225, Besi 194Kg) 2.40 m3 Rp 3,686,023.28 Rp 8,846,455.87 7 Sloof S3 20/30 (Beton K225, Besi 193kg) 0.42 m3 Rp 3,676,250.66 Rp 1,525,644.02 8 Kolom K1 30/40 (Beton K225, Besi 170kg) 6.97 m3 Rp 4,516,492.90 Rp 31,488,988.50 9 Kolom K2 25/25 (Beton K225, besi 215 kg) 2.24 m3 Rp 4,956,260.80 Rp 11,102,024.19

10 Kolom praktis 12/12 KP 66.40 m1 Rp 60,105.36 Rp 3,990,995.90 11 Balok B1 30/60 (Beton K225, Besi 151kg) 6.05 m3 Rp 4,548,155.62 Rp 27,507,245.19 12 Balok B2 20/40 (Beton K225, besi 187kg) 0.78 m3 Rp 4,899,969.94 Rp 3,841,576.43 13 Balok B3 20/40 (Beton K225, besi 154kg) 2.02 m3 Rp 4,577,473.48 Rp 9,228,186.54 14 Plat lantai tebal 12 cm (Beton K225, besi 189 kg) 15.91 m3 Rp 4,745,802.68 Rp 75,515,212.24 15 Balok latei 10/20 78.70 m1 Rp 96,097.84 Rp 7,562,900.30

SUB TOTAL Rp 302,170,164.88 IV PEK. PASANGAN & PLESTERAN

1 Pas. bata 1 : 4 286.76 m2 Rp 76,385.00 Rp 21,903,857.06 2 Plesteran dinding 1 : 4 t = 1,5 cm 428.65 m2 Rp 32,679.00 Rp 14,007,918.71 3 Acian 428.65 m2 Rp 18,705.00 Rp 8,017,935.66 4 Benangan 703.20 m1 Rp 30,252.00 Rp 21,273,206.40 5 Expose beton 337.56 m2 Rp 18,705.00 Rp 6,314,059.80

SUB TOTAL Rp 71,516,977.63 V PEK. LANTAI DAN KERAMIK

1 Urugan Pasir bawah lantai 10 cm 14.49 m3 Rp 151,400.00 Rp 2,193,786.00 2 Rabat lantai t = 5 cm 7.25 m3 Rp 490,554.45 Rp 3,554,066.99 3 Pas. Keramik 40 x 40 Motif (Ruangan & teras) 127.20 m2 Rp 113,506.28 Rp 14,437,998.82 4 Kol - kolan keramik 10x40 cm (ruangan & teras) 110.00 m1 Rp 19,330.00 Rp 2,126,300.00 5 Pas. Keramik 20x20 (toilet) 20.55 m2 Rp 118,185.00 Rp 2,428,701.75 6 Pas. Keramik 20x25 (Toilet) 144.86 m2 Rp 135,130.00 Rp 19,574,931.80

SUB TOTAL Rp 44,315,785.36

Page 3: hspk. 2012

NO JENIS PEKERJAAN VOL SAT. HARGA SATUAN JUMLAH

(Rp.) (Rp.) VI PEK. KUSEN DAN PENGGANTUNG

1 Kusen Aluminium 4" 104.60 m1 Rp 84,961.50 Rp 8,886,972.90 2 Pemasangan daun pintu, jendela slimar alumunium 3/8" 12.30 m1 Rp 93,211.50 Rp 1,146,501.45 3 Pemasangan jalusi (hollow alumunium 2x4cm) P1 & P2 16.00 m1 Rp 61,300.00 Rp 980,800.00 4 Pas. Kaca mati rayban 5mm 26.79 m2 Rp 97,827.25 Rp 2,621,202.90 5 Kunci tanam 2x putar (pintu) 9.00 bh Rp 124,344.00 Rp 1,119,096.00 6 Engsel pintu 13.50 stel Rp 30,230.50 Rp 408,111.75 7 Engsel jendela 8.00 stel Rp 30,251.50 Rp 242,012.00 8 Grendel jendela 8.00 bh Rp 41,814.00 Rp 334,512.00 9 Hak angin lurus 8.00 stel Rp 24,614.00 Rp 196,912.00

10 Pintu PVC toilet 3.00 bh Rp 399,090.00 Rp 1,197,270.00 SUB TOTAL Rp 17,133,391.00

VII PEK. PLAFOND1 Plafond Calciboard rangka hollow 132.45 m2 Rp 105,127.40 Rp 13,924,124.13 2 List gypsump 132.03 m' Rp 28,375.00 Rp 3,746,351.25

SUB TOTAL Rp 17,670,475.38 VIII PEK. PENGECATAN

1 Cat Dinding 555.21 m2 Rp 10,936.90 Rp 6,072,298.12 2 Cat plafond 145.80 m2 Rp 10,936.90 Rp 1,594,600.02

SUB TOTAL Rp 7,666,898.14 IX PEKERJAAN TANGGA

1 Balok bordes 20/40 (Beton K225, besi 239kg) 0.34 m3 Rp 5,408,146.18 Rp 1,817,137.12

2 3.44 m3 Rp 5,556,930.14 Rp 19,110,227.18

3 Pas. Keramik Tangga 40 x 40 cm motif kasar 19.09 m2 Rp 113,506.28 Rp 2,167,232.16 4 Pas. Step nosing keramik tangga 5x40 cm 31.05 m1 Rp 27,230.00 Rp 845,491.50 5 Kol - kolan keramik 10x40 cm 25.74 m1 Rp 19,330.00 Rp 497,554.20 6 Pas. Dinding Sandaran 1 Pc : 5 Ps 6.50 m2 Rp 74,643.00 Rp 484,880.93 7 Pas. Ringbalk pd. Sandaran 8.12 m1 Rp 96,097.84 Rp 780,314.49 8 Pas. Kolom praktis 12/12 cm 3.20 m1 Rp 60,105.36 Rp 192,337.15 9 Plesteran tembok 1 Pc : 5 Ps Dinding Sandaran 52.70 m2 Rp 31,513.00 Rp 1,660,672.07

10 Cat (Dinding Sandaran, plat tangga) 68.35 m2 Rp 10,936.90 Rp 747,580.86 11 Benangan sudut 30.30 m1 Rp 30,252.00 Rp 916,635.60 12 Acian 52.70 m2 Rp 18,705.00 Rp 985,716.09 13 expose beton 15.66 m2 Rp 18,705.00 Rp 292,845.48

SUB TOTAL Rp 30,498,624.83 X PEK. INSTALASI LISTRIK

1 Pemasang instalasi lampu 18.00 titik Rp 499,850.00 Rp 8,997,300.00 2 Lampu TL 20 Watt dengan fitting glass 11.00 bh Rp 40,000.00 Rp 440,000.00 3 Lampu SL 14 Watt dengan fitting glass 7.00 bh Rp 32,000.00 Rp 224,000.00 4 Saklar Ganda 7.00 bh Rp 49,392.50 Rp 345,747.50 5 Saklar tunggal 5.00 bh Rp 41,342.50 Rp 206,712.50 6 Stop kontak 8.00 bh Rp 204,342.50 Rp 1,634,740.00 7 Panel MCB 1.00 titik Rp 339,042.50 Rp 339,042.50

SUB TOTAL Rp 12,187,542.50 XI PEK. SANITARY

1 Pas. Closed Jongkok 3.00 bh Rp 376,100.00 Rp 1,128,300.00 2 Pas. Avour lantai metal 3.00 bh Rp 30,000.00 Rp 90,000.00 3 Pas. Kran air 6.00 bh Rp 46,950.00 Rp 281,700.00 4 Pas. Pipa PVC 3/4" (air bersih) 24.10 m' Rp 25,359.50 Rp 611,163.95 5 Pas. Pipa PVC 3" (air kotor) 28.70 m' Rp 45,964.50 Rp 1,319,181.15 6 Pas. Pipa PVC 4" (air Kotoran) 25.00 m' Rp 57,632.00 Rp 1,440,800.00 7 Pas. Wastafel 3.00 bh Rp 488,694.00 Rp 1,466,082.00

SUB TOTAL Rp 6,337,227.10

XII PEK. TANDON AIR, SEPTICTANK DAN RESAPAN

a. PEK. TANDON AIR

1 Galian tanah 15.94 m3 Rp 40,635.00 Rp 647,681.27 2 Lantai kerja t=5cm 0.38 m3 Rp 490,554.45 Rp 186,165.41 3 Plat beton t=15cm, besi 102kg 2.63 m3 Rp 2,547,424.74 Rp 6,692,084.79 4 Keramik 20x20 16.55 m2 Rp 118,185.00 Rp 1,955,961.75 5 Pek. Water profing tandon air 16.55 m2 Rp 28,808.75 Rp 476,784.81

Plat tangga tb. 12 cm,trap anak tangga (Beton K225, Besi 272kg)

Page 4: hspk. 2012

NO JENIS PEKERJAAN VOL SAT. HARGA SATUAN JUMLAH

(Rp.) (Rp.)

b. PEK. SEPTICTANK

1 Galian tanah 8.58 m3 Rp 40,635.00 Rp 348,648.30 2 Pek. Pas. Bata (1sm : 5ps) 20.80 m2 Rp 74,643.00 Rp 1,552,574.40 3 Pek. Plasteran (1sm : 5ps) 23.12 m2 Rp 31,513.00 Rp 728,580.56 4 Plat beton penutup t=15cm, besi 147kg 0.64 m3 Rp 2,987,192.64 Rp 1,922,258.46 5 Pek ring balok 2.60 m' Rp 96,097.84 Rp 249,854.39 6 Pipa sirkulasi PVC 3' 3.00 m' Rp 45,964.50 Rp 137,893.50

c. PEK. RESAPAN

1 Galian tanah 6.59 m3 Rp 40,635.00 Rp 267,947.19 2 Lantai kerja t=20cm 0.09 m3 Rp 490,554.45 Rp 46,210.23 3 Pek. Pas. Batu merah kosongan 1.08 m3 Rp 480,078.50 Rp 520,069.04 4 Pek. Urugan pasir 0.08 m2 Rp 151,400.00 Rp 11,647.20 5 Pek. Urugan kerikil 3.63 m3 Rp 156,970.00 Rp 569,283.10 6 Plat beton penutup t=15cm, besi 102kg 0.12 m3 Rp 2,547,424.74 Rp 299,959.26

SUB TOTAL Rp 16,613,603.67

B LANTAI 2I PEK. BETON (BEKESTING, BESI, BETON)

1 Kolom K3 30/40 (Beton K225, Besi 174kg) 6.72 m3 Rp 4,555,583.38 Rp 30,613,520.31 2 Kolom K2 25/25 (Beton K225, besi 215 kg) 3.48 m3 Rp 4,956,260.80 Rp 17,235,892.56 3 Kolom praktis 12/12 KP 56.00 m1 Rp 60,105.36 Rp 3,365,900.16 4 Balok B3 20/40 (Beton K225, besi 154kg) 4.76 m3 Rp 4,577,473.48 Rp 21,801,590.69 5 Plat lantai tebal 12 cm (Beton K225, besi 189 kg) 4.64 m3 Rp 4,745,802.68 Rp 22,039,507.65 6 Parapet atap (Beton K225, besi 146 kg) 1.34 m3 Rp 4,325,580.02 Rp 5,787,626.07 7 Balok latei 10/20 149.90 m1 Rp 96,097.84 Rp 14,405,066.78

SUB TOTAL Rp 115,249,104.21 II PEK. PASANGAN & PLESTERAN

1 Pas. bata 1 : 4 329.20 m2 Rp 76,385.00 Rp 25,146,094.77 2 Plesteran dinding 1 : 4 t = 1,5 cm 578.32 m2 Rp 32,679.00 Rp 18,899,050.00 3 Acian 578.32 m2 Rp 18,705.00 Rp 10,817,550.42 4 Benangan 816.80 m1 Rp 30,252.00 Rp 24,709,833.60 5 Expose beton 189.28 m2 Rp 18,705.00 Rp 3,540,482.40

SUB TOTAL Rp 83,113,011.19 III PEK. LANTAI DAN KERAMIK

1 Rabat lantai t = 5 cm 7.20 m3 Rp 490,554.45 Rp 3,531,992.04 2 Pas. Keramik 40 x 40 Motif 115.80 m2 Rp 113,506.28 Rp 13,144,027.22 3 Kol - kolan keramik 10x40 cm 125.00 m1 Rp 19,330.00 Rp 2,416,250.00 4 Pas. Keramik 20x20 (toilet) 21.90 m2 Rp 118,185.00 Rp 2,588,251.50 5 Pas. Keramik 20x25 (Toilet) 80.08 m2 Rp 135,130.00 Rp 10,821,210.40

SUB TOTAL Rp 32,501,731.16 IV PEK. KUSEN DAN PENGGANTUNG

1 Kusen Aluminium 4" 156.40 m1 Rp 84,961.50 Rp 13,287,978.60 2 Pemasangan daun pintu, jendela slimar alumunium 3/8" 97.70 m1 Rp 93,211.50 Rp 9,106,763.55 3 Pemasangan jalusi (hollow alumunium 2x4cm) P1 & P2 12.80 m1 Rp 61,300.00 Rp 784,640.00 4 Pas. Kaca rayban 5mm 39.23 m2 Rp 97,827.25 Rp 3,838,173.89 5 Kunci tanam 2x putar (pintu) 8.00 bh Rp 124,344.00 Rp 994,752.00 6 Engsel pintu 12.00 stel Rp 30,230.50 Rp 362,766.00 7 Engsel jendela 16.00 stel Rp 30,251.50 Rp 484,024.00 8 Grendel jendela 16.00 bh Rp 41,814.00 Rp 669,024.00 9 Hak angin lurus 16.00 stel Rp 24,614.00 Rp 393,824.00

10 Pintu PVC toilet 2.00 bh Rp 399,090.00 Rp 798,180.00 SUB TOTAL Rp 30,720,126.04

V PEK. PLAFOND1 Plafond Calciboard rangka hollow 184.50 m2 Rp 105,127.40 Rp 19,396,005.30 2 List gypsump 171.80 m' Rp 28,375.00 Rp 4,874,825.00

SUB TOTAL Rp 24,270,830.30 VI PEK. PENGECATAN

1 Cat Dinding 555.21 m2 Rp 10,936.90 Rp 6,072,298.12 2 Cat plafond 145.80 m2 Rp 10,936.90 Rp 1,594,600.02 3 Pelapisan water proofing toilet 21.90 m2 Rp 28,808.75 Rp 630,911.63 4 Pengecatan besi 165.60 m2 Rp 44,643.90 Rp 7,393,029.84

Page 5: hspk. 2012

NO JENIS PEKERJAAN VOL SAT. HARGA SATUAN JUMLAH

(Rp.) (Rp.) SUB TOTAL Rp 15,690,839.61

VII PEKERJAAN ATAP1 Kuda kuda WF.150.75.5.7 847.00 kg Rp 20,744.00 Rp 17,570,168.00 2 Gording CNP.125 1,103.40 kg Rp 20,744.00 Rp 22,888,929.60 3 Ikatan angin besi 16 72.62 kg Rp 20,744.00 Rp 1,506,362.90 4 Penggantung gording besi 12 52.80 kg Rp 20,744.00 Rp 1,095,283.20 5 Angkur diameter 16 44.24 kg Rp 20,744.00 Rp 917,714.56 6 Baut kuda-kuda 24.70 kg Rp 20,744.00 Rp 512,293.82 7 Plat plendes t=12mm 118.69 kg Rp 20,744.00 Rp 2,462,146.85 8 Plat pemyambung t=10mm 204.00 kg Rp 20,744.00 Rp 4,231,814.90 9 Plat rib t=6mm 74.18 kg Rp 20,744.00 Rp 1,538,841.78

10 Dudukan gording L.40.40.4 32.19 kg Rp 20,744.00 Rp 667,666.38 11 Batang tarik besi dia.16 77.42 kg Rp 20,744.00 Rp 1,606,000.48 12 Jarum keras 140.00 kg Rp 20,744.00 Rp 2,904,160.00 13 Baut gording 100.80 kg Rp 20,744.00 Rp 2,090,995.20 14 Hak talang L.40.40.4 165.53 kg Rp 20,744.00 Rp 3,433,712.83 15 Pek. Pasang usuk reng galvalum 165.60 m2 Rp 284,325.00 Rp 47,084,220.00 16 Pas. Genteng karang pilang 165.60 m2 Rp 136,410.00 Rp 22,589,496.00 17 Pas. Bubungan karang pilang 18.00 m1 Rp 91,589.00 Rp 1,648,602.00 18 Pek. Waterproofing plat atap 38.70 m2 Rp 28,808.75 Rp 1,114,898.62 19 Pek. Talang Pembuluh pipa 4' 112.00 m' Rp 77,624.53 Rp 8,693,947.36 20 Pas. Talang Tritisan BJLS 30 (lebar 90cm) 18.00 m' Rp 181,005.00 Rp 3,258,090.00 21 Pas. List plank 3/30 36.00 m' Rp 105,340.00 Rp 3,792,240.00

SUB TOTAL Rp 151,607,584.49 VIII PEK. INSTALASI LISTRIK

1 Pemasang instalasi lampu 17.00 titik Rp 499,850.00 Rp 8,497,450.00 2 Lampu TL 20 Watt dengan fitting glass 13.00 bh Rp 40,000.00 Rp 520,000.00 3 Lampu SL 14 Watt dengan fitting glass 4.00 bh Rp 32,000.00 Rp 128,000.00 4 Saklar Ganda 5.00 bh Rp 49,392.50 Rp 246,962.50 5 Saklar tunggal 2.00 bh Rp 41,342.50 Rp 82,685.00 6 Stop kontak 8.00 bh Rp 204,342.50 Rp 1,634,740.00 7 Panel MCB 1.00 titik Rp 339,042.50 Rp 339,042.50 8 Pas. Penangkal Petir 2.00 bh Rp 16,086,223.75 Rp 32,172,447.50 9 Pas. Pompa air 2.00 unit Rp 2,000,000.00 Rp 4,000,000.00

SUB TOTAL Rp 47,621,327.50 IX PEK. SANITARY

1 Pas. Closed Jongkok 2.00 bh Rp 376,100.00 Rp 752,200.00 2 Pas. Avour lantai metal 2.00 bh Rp 30,000.00 Rp 60,000.00 3 Pas. Kran air 6.00 bh Rp 46,950.00 Rp 281,700.00 4 Pas. Pipa PVC 3/4" (air bersih) 38.30 m' Rp 25,359.50 Rp 971,268.85 5 Pas. Pipa PVC 3" (air kotor) 11.30 m' Rp 45,964.50 Rp 519,398.85 6 Pas. Pipa PVC 4" (air Kotoran) 11.30 m' Rp 57,632.00 Rp 651,241.60 7 Pas. Wastafel 4.00 bh Rp 488,694.00 Rp 1,954,776.00 8 Pas. Tandon almunium air kap. 1000L 2.00 bh Rp 3,250,000.00 Rp 6,500,000.00

SUB TOTAL Rp 11,690,585.30

PEKERJAAN KANTOR LAMAI PEK. KERAMIK DAN BATU KLINGKER

1 Urugan Pasir bawah lantai 10 cm 5.18 m3 Rp 151,400.00 Rp 784,252.00 2 Rabat lantai t = 5 cm 2.59 m3 Rp 490,554.45 Rp 1,270,536.03 3 Pas. Keramik 40 x 40 Motif (Ruangan & teras) 51.80 m2 Rp 113,506.28 Rp 5,879,625.30 4 Pas. Batu klingker 32.25 m2 Rp 296,180.00 Rp 9,551,805.00

SUB TOTAL Rp 17,486,218.33 II PEKERJAAN AKHIR

1 Pembersihan Akhir 383.25 m2 Rp 7,440.00 Rp 2,851,380.00 SUB TOTAL Rp 2,851,380.00

Page 6: hspk. 2012

NO DESCRIPTION UNIT W H L RATE QTY TOTAL REMARKS

(lebar) (tinggi) (panjang)

m m m pcs

(a) (b) (a x b )

A LANTAI 1

I PEKERJAAN PERSIAPAN1 Pembongkaran atap dan penutup atap tidak dipakai lagi m2 9.08 15 136.20 1 136.20

2 Pembongkaran plafond dan rangka tidak dipakai kembali m2 7.5 15 112.50 1 112.50

3 Pembongkaran dinding tembok dengan pembersihan m3 0.15 4 15 9.00 3 27.00

m3 0.15 4 6.1 3.66 6 21.96

48.96

4 Pembongkaran Beton m3 0.15 0.15 4 0.09 20 1.80

0.15 0.2 15 0.45 2 0.90

0.15 0.2 7.5 0.22 2 0.45

3.15

5 Pembuatan bouwplank (Uitset) m1 8.5 20 28.50 1 28.50

6 Uitset dengan waterpass & teodolit m2 8.1 18 145.80 2 291.60

Page 7: hspk. 2012

II EARTH WORK

1 Galian Tanah m3PILE CAP

PT1 (1200x1200) m3 1.7 1.25 1.7 3.61 14 50.57

PT2 (600x1200) m3 1.1 1.25 1.7 2.34 7 16.36

TIE BEAM

S1 (300x500) m3 0.5 0.7 18 6.30 2 12.60

m3 0.5 0.7 8.05 2.82 7 19.72

S2 (200x400) m3 0.35 0.7 18 4.41 1 4.41

m3 0.35 0.7 3 0.73 4 2.94

S3 (200x300) m3 0.35 0.7 1.7 0.42 3 1.25

m3 0.35 0.7 1.6 0.39 2 0.78

m3 0.35 0.7 1.63 0.40 1 0.40

109.04

2 Pengangkutan tanah keluar proyek m3 87.23 2.52 39.17 128.92 1 128.92

3 Pengurugan tanah kembali m3 109.04 - 18.30 = 90.75

4 Pengurugan pasir padat bawah poer & sloef t=10cm

PILE CAP

PT1 (1200x1200) m3 1.7 0.1 1.7 0.29 14 4.05

PT2 (600x1200) m3 1.1 0.1 1.7 0.19 7 1.31

TIE BEAM

S1 (300x500) m3 0.5 0.1 18 0.90 2 1.80

Page 8: hspk. 2012

m3 0.5 0.1 8.05 0.40 7 2.82

S2 (200x400) m3 0.35 0.1 18 0.63 1 0.63

m3 0.35 0.1 3 0.10 4 0.42

S3 (200x300) m3 0.35 0.1 1.7 0.06 3 0.18

m3 0.35 0.1 1.6 0.06 2 0.11

m3 0.35 0.1 1.63 0.06 1 0.06

11.37

5 Pengurugan sirtu m3 8 0.5 18 72.00 1 72.00

6 Pembuatan lubang strouss

PT1 (1200x1200) ttk 4 4.00 14 56.00

PT2 (600x1200) ttk 2 2.00 7 14.0070.00

III PEK. BETON (BEKESTING, BESI, BETON)

Lean concrete m31 Lantai kerja bawah poer & sloef t = 5 cm

PILE CAP

PT1 (1200x1200) m3 1.7 0.05 1.7 0.14 14 2.02

PT2 (600x1200) m3 1.1 0.05 1.7 0.09 7 0.65

TIE BEAMS1 (300x500) m3 0.5 0.05 18 0.45 2 0.90

m3 0.5 0.05 8.05 0.20 7 1.41

S2 (200x400) m3 0.35 0.05 18 0.31 1 0.31

m3 0.35 0.05 3 0.05 4 0.21

Page 9: hspk. 2012

S3 (200x300) m3 0.35 0.05 1.7 0.03 3 0.09

m3 0.35 0.05 1.6 0.03 2 0.06

m3 0.35 0.05 1.63 0.03 1 0.03

5.69

2 Pekerjaan beton strouss (Beton K225, Besi 109Kg) m3 0.3 4 0.28 70.00 19.78

1 1.00 1

19.78

Pile cap

3 Beton PT1 (Beton K225, Besi 210Kg) m3 1.2 0.4 1.2 0.58 14 8.06

4 Beton PT2 (Beton K225, Besi 342Kg) m3 0.6 0.4 1.2 0.29 7 2.02

Tie beam

5 S1 (300x500) besi 113kg m3 0.3 0.5 18 2.70 2 5.40

0.3 0.5 8.05 1.21 7 8.45

13.85

6 S2 200x400 (Besi 193kg) m3 0.2 0.4 18 1.44 1 1.44

m3 0.2 0.4 3 0.24 4 0.96

2.40

7 S3 (200x300) m3 0.2 0.25 1.7 0.09 3 0.26

m3 0.2 0.25 1.6 0.08 2 0.16

m3 0.2 0.25 1.63 0.08 1 0.08

0.42

Coloumn

8 K1 (300x400) lt. 1 BESI 170kg m3 0.3 0.4 4.15 0.50 14 6.97

9 K2 (250x250) lt.1 m3 0.2 0.4 4 0.32 7 2.24

10 Kolom praktis KP 12/12 m' 1 4.15 4.15 16 66.40

Page 10: hspk. 2012

Beam

11 Balok B1 30/60 (Beton K225, Besi 151kg) m3 0.3 0.48 6 0.86 7 6.05

12 Balok B2 20/40 (Beton K225, besi 187kg) m3 0.2 0.28 2 0.11 7 0.78

0.78

13 Balok B3 20/40 (Beton K225, besi 154kg) M3 0.2 0.28 18 1.01 2 2.02

14 B4 200X300 (BESI 205KG) m3 0.2 0.18 18 0.65 2 1.30

0.2 0.18 3.73 0.13 1 0.13

1.43

Slab

14 Plat lantai tebal 12 cm (Beton K225, besi 189 kg) M3 8.05 0.12 18 17.39 1 17.39

17.39

VOID M3 3 0.12 4.1 1.48 1 1.48

1.48

VOLUME PLAT LANTAI 17.39 - 1.48 = 15.91

17 Balok latei 10/20 m' 1 18 18.00 2 36.00

m' 1 6.1 6.10 7 42.70

78.70

IV PEK. PASANGAN & PLESTERAN

1 Pas. bata 1 : 4 m2

Dinding keliling m2 3.7 18 66.60 2.00 133.20

Page 11: hspk. 2012

3.7 6.1 22.57 2.00 45.14

dinding sekat2 ruangan m2 3.7 6.1 22.57 4.00 90.28

m2 3.7 2.88 10.66 1.00 10.66

3.7 3 11.10 3.00 33.30

toilet m2 3.7 3.3 12.21 2.00 24.42

0.8 1.4 1.12 2.00 2.24

339.24

volume dinding bata l 339.24 - 52.48 = 286.76

Opening

P1 m2 0.9 2.6 2.34 2.00 4.68

P2 m2 0.8 2.6 2.08 3.00 6.24

PJ1 m2 0.8 2.6 2.08 4.00 8.32

m2 1.7 1.8 3.06 4.00 12.24

KONGLIONG m2 3 3.5 10.50 2.00 21.00

52.48

2 Plesteran dinding 1 : 4 t = 1,5 cm

plaster lt.1 m2 286.76 x 2.00 = 573.51

Volume plaster 573.51 - 144.86 = 428.65

3 Acian

acian lt.1 m2 286.76 x 2.00 = 573.51

Volume acian 573.51 - 144.86 = 428.65

4 Benangan

opening m' 0.9 2.6 14.00 2.00 28.00 P1

m' 0.8 2.6 13.60 3.00 40.80 P2

m' 0.8 2.6 13.60 4.00 54.40 PJ1

m' 1.7 1.8 14.00 4.00 56.00

Page 12: hspk. 2012

m' 3 3.5 26.00 2.00 52.00 KONGLIONG

kolom 8 8.00 7.00 56.00 K1

12 12.00 7.00 84.00 K1

16 16.00 7.00 112.00 K2

Balok 36 36.00 3.00 108.00

16 16.00 7.00 112.00

. 703.20

5 Expose beton m2

plat lt.2 8.05 18 144.90 1 144.90

144.90

VOID m2 3 4.1 12.30 1 12.30

12.30

VOLUME PLAT LANTAI 144.90 - 12.30 = 132.60

Balok B1 30/60 (Beton K225, Besi 151kg) m2 0.96 6 5.76 7.00 40.32

Balok B2 20/40 (Beton K225, besi 187kg) m2 0.56 2 1.12 7.00 7.84

Balok B3 20/40 (Beton K225, besi 154kg) m2 0.84 18 15.12 2.00 30.24

K1 (300x400) lt. 1 BESI 170kg m2 1.60 4.15 6.64 14.00 92.96

K2 (250x250) lt.1 m2 1.20 4 4.80 7.00 33.60

337.56

#REF! #REF! m2 1.50 18 27.00 1.00 27.00

VI PEK. LANTAI DAN KERAMIK

1 Urugan Pasir bawah lantai 10 cm m3 8.05 0.1 18 14.49 1.00 14.49

2 Rabat lantai t = 5 cm m3 8.05 0.05 18 7.25 1.00 7.25

3 Pas. Keramik 40 x 40 Motif (Ruangan & teras) m2

Page 13: hspk. 2012

Ruangan m2 3 6.1 18.30 4.00 73.20

Depan & bawah tangga m2 3 4.35 13.05 1.00 13.05

1.5 1.5 2.25 1.00 2.25

Teras m2 2.15 18 38.70 1.00 38.70

127.20

4 Kol - kolan keramik 10x40 cm (ruangan & teras) m'

Ruangan m' 3 6.1 18.20 4.00 72.80

teras m' 18 18.00 1.00 18.00

kolom teras 30/40 m' 0.3 0.3 0.60 7.00 4.20

kolom teras 30/30 m' 0.3 0.30 0.3 0.90 7.00 6.30

depan tangga & bawah tangga m' 4.35 4.35 8.70 1.00 8.70

110.00

3 Pas. Keramik 20x20 (toilet)

toilet m2 3 6.1 18.30 1.00 18.30

m2 1.5 1.5 2.25 1.00 2.25

20.55

4 Pas. Keramik 20x25 (Toilet) m2

m2 2.8 18.56 51.97 1.00 51.97

m2 2.8 18.36 51.41 1.00 51.41

m2 2.8 6 16.80 2.00 33.60

m2 0.9 1.46 2.63 3.00 7.88

144.86

VI PEK. KUSEN DAN PENGGANTUNG

1 Kusen Aluminium 4" m'

TYPE P1 m' 1.6 5.2 6.80 2.00 13.60

TYPE P2 m' 1.6 5.2 6.80 3.00 20.40

TYPE PJ1 m' 1.7 10.4 3.6 15.70 4.00 62.80

BV1 m' 0.5 0.8 2.60 3.00 7.80

Page 14: hspk. 2012

104.60

2 Pemasangan daun pintu, jendela slimar alumunium 3/8" m'

TYPE P1 m' 1.95 4.2 6.15 2.00 12.30

TYPE PJ1 m' 1.95 4.2 7.4 13.55 4.00 54.20

66.50

3 Pemasangan jalusi (hollow alumunium 2x4cm) P1 & P2 m'

P1 m' 0.8 3.20 2.00 6.40

P2 m' 0.8 3.20 3.00 9.60

16.00

4 Pas. Kaca mati rayban 5mm m2

TYPE P1 m2 0.8 0.4 0.32 2.00 0.64

m2 0.65 0.97 0.63 2.00 1.26

m2 1.04 1.14 1.19 2.00 2.37

TYPE PJ1 m2 0.4 0.8 0.96 4.00 3.84

m2 1.05 0.6 1.26 4.00 5.04

m2 0.65 0.97 0.63 4.00 2.52

m2 1.04 1.14 2.18 4.00 8.72

BV1 m' 0 0.5 0.8 0.80 3.00 2.40

26.79

5 Kunci tanam 2x putar (pintu) bh

TYPE P1 bh 1.00 2.00 2.00

TYPE PJ1 bh 1.00 4.00 4.00

TYPE P2 bh 1.00 3.00 3.00

9.00

Page 15: hspk. 2012

6 Engsel pintu

1 pintu = 1,5 stel engsel stel

TYPE P1 stel 1.50 2.00 3.00

TYPE PJ1 stel 1.50 4.00 6.00

TYPE P2 stel 1.50 3.00 4.50

13.50

7 Engsel jendela

1 jendela = 1 stel engsel stel

TYPE PJ1 stel 2.00 4.00 8.00

8 Grendel jendela bh

TYPE PJ1 bh 2.00 4.00 8.00

9 Hak angin lurus

TYPE PJ1 stel 2.00 4.00 8.00

10 Pintu PVC toilet bh 1.00 3.00 3.00

#REF! #REF!

#REF! #REF! m2 0.57 3 1.71 10.00 17.10

#REF! #REF! kg 2.41 4.8 11.57 7.00 80.98

Page 16: hspk. 2012

Ceiling

VII PEK. PLAFOND

1 Plafond Calciboard rangka hollow

Ruangan m2 3 6.1 18.30 4.00 73.20

Teras m2 2.15 18 38.70 1.00 38.70

toilet m2 3 6.10 18.30 1.00 18.30

m2 1.5 1.50 2.25 1.00 2.25

132.45

2 List gypsump m'

Teras m' 2.15 18 40.30 1.00 40.30

Ruangan m' 3 6.1 18.20 2.00 36.40

2.88 3.00 11.76 1.00 11.76

18.97 1.00 18.97

toilet m' 1.5 1.50 6.00 1.00 6.00

18.60 1.00 18.60

132.03

VIII PEK. PENGECATAN

1 Cat Dinding m2

K1 (300x400) lt. 1 BESI 170kg m2 1.60 4.15 6.64 14.00 92.96

K2 (250x250) lt.1 m2 1.20 4 4.80 7.00 33.60

dinding m2 428.65 1.00 428.65

555.21

2 Cat plafond m2

m2 8.1 18 145.80 1.00 145.80145.80

IX PEKERJAAN TANGGA

Page 17: hspk. 2012

1 Balok bordes 20/40 (Beton K225, besi 239kg) m3 0.2 0.28 3 0.17 2.00 0.34

2 Plat tangga t=12cm

Plat miring m3 1.35 0.12 4.06 0.66 2.00 1.32

anak tangga m3 0.3 0.17 1.35 0.07 23.00 1.58

bordes m3 1.5 0.12 3.00 0.54 1.00 0.54

3.44

3 Pas. Keramik Tangga 40 x 40 cm motif kasar m2

bordes m2 1.5 3.00 4.50 1.00 4.50

anak tangga m2 0.47 1.35 0.63 23.00 14.59

19.09

4 Pas. Step nosing keramik tangga 5x40 cm m' 1.35 1.35 23.00 31.05

5 Kol - kolan keramik 10x40 cm m'

bordes m' 3 3.00 6.00 1.00 6.00

anak tangga m' 0.47 21 9.87 2.00 19.74

25.74

6 Pas. Dinding Sandaran 1 Pc : 5 Ps m2 0.8 4.06 3.25 2.00 6.50

7 Pas. Ringbalk pd. Sandaran m' 4.06 4.06 2.00 8.12

8 Pas. Kolom praktis 12/12 cm m' 0.80 0.80 4.00 3.20

9 Plesteran tembok 1 Pc : 5 Ps Dinding Sandaran m2 25.74 2.00 51.48

0.15 4.06 0.61 2.00 1.22

52.70

10 Cat (Dinding Sandaran, plat tangga)

Page 18: hspk. 2012

dinding sandaran m2 25.74 2.00 51.48

m2 0.15 4.06 0.61 2.00 1.22

Plat tangga m2 1.3 4.06 5.28 2.00 10.56

bordes m2 1.7 3 5.10 1.00 5.10

68.35

11 Benangan sudut m' 4.8 25.5 30.30 1.00 30.30

12 Acian m2 25.74 2.00 51.48

m2 0.15 4.06 0.61 2.00 1.22

52.70

13 expose beton m2 1.3 4.06 5.28 2.00 10.56

m2 1.7 3 5.10 1.00 5.10

15.66

Mechanical & Electrical Work

X PEK. INSTALASI LISTRIK

1 Pemasang instalasi lampu ttk

ruangan ttk 1 1 1.00 8.00 8.00

toilet ttk 1 1 1.00 7.00 7.00

teras ttk 1 1 1.00 3.00 3.00

18.00

2 Lampu TL 20 Watt dengan fitting glass pcs 1 1 1.00 11.00 11.00

3 Lampu SL 14 Watt dengan fitting glass pcs 7.00 7.00

Page 19: hspk. 2012

4 Saklar ganda bh 1.00 7.00 7.00

5 Saklar tunggal bh 1.00 5.00 5.00

6 Stop kontak 1P, 13 A bh 1.00 8.00 8.00

7 Panel MCB bh 1.00 1.00 1.00

b. Mechanical Work

1 Pas. Closed Jongkok pcs 1 3 3.00 1.00 3.00

2 Pas. Avour lantai metal pcs 1 3 3.00 1.00 3.00

3 Pas. Kran air pcs 1 6 6.00 1.00 6.00

4 Pas. Pipa PVC 3/4" (air bersih) m'

m' 16.1 8 24.10 1.00 24.10

24.10

5 Pas. Pipa PVC 3" (air kotor) m'

m' 24.7 4 28.70 1.00 28.70

28.70

6 Pas. Pipa PVC 4" (air Kotoran) m'

m' 21 4 25.00 1.00 25.00

25.00

7 Pas. Wastafel bh 3.00 1.00 3.00

XII PEK. TANDON AIR, SEPTICTANK DAN RESAPAN

Page 20: hspk. 2012

a. PEK. TANDON AIR1 Galian tanah m3 2.30 2.10 3.30 15.94 1.00 15.94

2 Lantai kerja t=5cm m3 2.30 0.05 3.30 0.38 1.00 0.38

3 Plat beton t=15cm, besi 102kg m3dasar m3 2.1 0.1 3.1 0.65 1.00 0.65

samping m3 1.6 0.1 2.8 0.45 2.00 0.90m3 1.6 0.1 1.8 0.29 2.00 0.58

penutup atas m3 1.8 0.1 2.8 0.50 1.00 0.502.63

4 Keramik 20x20 m2dasar m3 1.5 2.5 3.75 1.00 3.75

samping m3 1.6 2.5 4.00 2.00 8.00m3 1.5 1.6 2.40 2.00 4.80

16.555 Pek. Water profing tandon air m2

dasar m3 1.5 2.5 3.75 1.00 3.75samping m3 1.6 2.5 4.00 2.00 8.00

m3 1.5 1.6 2.40 2.00 4.8016.55

b. PEK. SEPTICTANK1 Galian tanah m3 1.30 3.30 2.00 8.58 1.00 8.58

2 Pek. Pas. Bata (1sm : 5ps) m2dasar m2 1.3 3.3 4.29 1 4.29

dinding keliling m2 1.3 1.65 2.15 2 4.29m2 3 1.65 4.95 2 9.90

dinding sekat m2 1 1.1 1.10 1 1.10

Page 21: hspk. 2012

m2 1 1.22 1.22 1 1.2220.80

3 Pek. Plasteran (1sm : 5ps) m2dasar m2 4.29 1 4.29

dinding keliling m2 4.29 1 4.29m2 9.90 1 9.90

dinding sekat m2 1.10 2 2.20m2 1.22 2 2.44

23.12

4 Plat beton penutup t=15cm, besi 147kg m3 1.3 3.3 0.15 0.64 1 0.645 Pek ring balok m' 1.3 1.30 2 2.606 Pipa sirkulasi PVC 3' m' 1.5 1.50 2 3.00

c. PEK. RESAPAN1 Galian tanah m3 1.00 2.10 6.59 1.00 6.59

2 Lantai kerja t=20cm m3 1.88 0.05 0.09 1 0.093 Pek. Pas. Batu merah kosongan m3 0.54 2 1.08 1 1.084 Pek. Urugan pasir m3 0.35 0.2 0.08 1 0.085 Pek. Urugan kerikil m3 1.81 2 3.63 1 3.636 Plat beton penutup t=15cm, besi 102kg m3 0.50 0.15 0.12 1.00 0.12

B LANTAI 2I PEK. BETON (BEKESTING, BESI, BETON)

Coloumn

1 Kolom K3 30/40 (Beton K225, Besi 174kg) m3 0.3 0.4 4 0.48 14 6.72

2 Kolom K2 25/25 (Beton K225, besi 215 kg) m3 0.3 0.3 4 0.36 7 2.52

Page 22: hspk. 2012

0.3 0.3 1.52 0.14 7 0.96

3.48

3 Kolom praktis 12/12 KP m' 1 4 4.00 14 56.00

Beam

4 Balok B3 20/40 (Beton K225, besi 154kg) m3 0.2 0.28 18 1.01 3 3.02

0.2 0.28 8 0.45 2 0.90

0.2 0.28 2.15 0.12 7 0.84

4.76

Slab

5 Plat lantai tebal 12 cm (Beton K225, besi 189 kg) M3 2.15 0.12 18 4.64 1 4.64

6 Parapet atap (Beton K225, besi 146 kg) m3 0.15 0.4 22.3 1.34 1 1.34

7 Balok latei 10/20 m' 1 18 18.00 2 36.00

m' 1 6 6.00 5 30.00

TERAS HAND RAIL m' 1 22.3 22.30 1 22.30

SOFIE2 m' 1 8.8 8.80 7 61.60

149.90

II PEK. PASANGAN & PLESTERAN

1 Pas. bata 1 : 4 m2

Dinding keliling m2 3.7 18 66.60 2.00 133.20

3.7 6.1 22.57 2.00 45.14

DINDING SEKAT RUANGAN 3.7 6.1 22.57 5.00 112.85

toilet m2 3.7 9.65 35.71 1.00 35.71

0.8 1.4 1.12 2.00 2.24

TERAS HAND RAIL m2 1 18 18.00 1.00 18.00

TERAS HAND RAIL m2 1 2.15 2.15 1.00 2.15

Page 23: hspk. 2012

SOFIE-SOFIE m2 6.1 2.57 7.84 2.00 15.68

ATAS M2 0.44 18 7.92 2.00 15.84

380.80

volume dinding bata l 380.80 - 51.60 = 329.20

Opening

P1 m2 0.9 2.6 2.34 2.00 4.68

P2 m2 0.8 2.6 2.08 2.00 4.16

PJ1 m2 0.8 2.6 2.08 4.00 8.32

m2 1.7 1.8 3.06 4.00 12.24

KONGLIONG M2 3 3.7 11.10 2.00 22.20

51.60

2 Plesteran dinding 1 : 4 t = 1,5 cm

PLASTER m2 329.20 x 2.00 = 658.40

Volume plaster 658.40 - 80.08 = 578.32

3 Acian

acian lt.1 m2 329.20 x 2.00 = 658.40

Volume acian 658.40 - 80.08 = 578.32

4 Benangan

opening m' 2.6 8.40 11.00 2.00 22.00

m' 1.8 8.4 10.20 3.00 30.60

8 8.00 4.00 32.00

4.8 7.2 12.00 4.00 48.00

kolom 7.2 7.20 11.00 79.20

10.8 10.80 2.00 21.60

14.4 14.40 8.00 115.20

Balok 72 72.00 3.00 216.00

Page 24: hspk. 2012

19.4 19.40 13.00 252.20

. 816.80

5 Expose beton m2

plat lt.2 8.05 18 144.90 1 144.90

Balok BM1 35/70 m2 0.96 6 5.76 7.00 40.32

Balok BP1 20/40 m2 0.56 2 1.12 7.00 7.84

m2

m2

m2

m2

Balok BP2 20/40 m2 0.84 18 15.12 2.00 30.24

kolom k3 35/45 m2 1.60 3.6 5.76 14.00 80.64

kolom k2 30/30 m2 1.20 3.6 4.32 7.00 30.24

189.28

III PEK. LANTAI DAN KERAMIK

1 Rabat lantai t = 5 cm m3 8 0.05 18 7.20 1.00 7.20

2 Pas. Keramik 40 x 40 Motif (Ruangan & teras) m2

RUANGAN m2 3 6.1 18.30 4.00 73.20

Teras m2 2 18 36.00 1.00 36.00

DEPAN TOILET m2 2.2 3 6.60 1.00 6.60

115.80

3 Kol - kolan keramik 10x40 cm m'

RUANGAN m' 3 6.1 18.20 4.00 72.80

teras m' 34.3 34.30 1.00 34.30

DEPAN TOILET m' 7.4 7.40 1.00 7.40

kolom teras m' 0.3 0.3 0.60 7.00 4.20

Page 25: hspk. 2012

kolom teras KECIL m' 0.3 0.30 0.3 0.90 7.00 6.30

125.00

4 Pas. Keramik 20x20 (toilet)

toilet m2 3 3.65 10.95 2.00 21.90

21.90

5 Pas. Keramik 20x25 (Toilet) m2

dinding keliling m2 2.8 13.3 37.24 2.00 74.48

m2 1 1.4 1.40 4.00 5.60

80.08

IV PEK. KUSEN DAN PENGGANTUNG

1 Kusen Aluminium 4" m'

TYPE P1 m' 1.6 5.2 6.80 2.00 13.60

TYPE P2 m' 1.6 5.2 6.80 2.00 13.60 PVC DOORTYPE PJ1 m' 1.7 10.4 3.6 15.70 4.00 62.80

J1 m' 7.2 8.1 15.30 4.00 61.20

BV1 m' 0.5 0.8 2.60 2.00 5.20

156.40

2 Pemasangan daun pintu, jendela slimar alumunium 3/8" m'

TYPE P1 m' 1.95 4.2 6.15 2.00 12.30

TYPE PJ1 m' 1.95 4.2 7.4 13.55 4.00 54.20

J1 m' 3.4 4.4 7.80 4.00 31.20

97.70

3 Pemasangan jalusi (hollow alumunium 2x4cm) P1 & P2 m'

P1 m' 0.8 3.20 2.00 6.40

P2 m' 0.8 3.20 2.00 6.40

Page 26: hspk. 2012

12.80

4 Pas. Kaca rayban 5mm m2

TYPE P1 m2 0.8 0.4 0.32 2.00 0.64

0.65 0.97 0.63 2.00 1.26

1.04 1.14 1.19 2.00 2.37

TYPE PJ1 0.4 0.8 0.96 4.00 3.84

1.05 0.6 1.26 4.00 5.04

0.65 0.97 0.63 4.00 2.52

1.04 1.14 2.18 4.00 8.72

J1 m2 0.68 0.32 1.00 4.00 4.00

1.43 0.88 2.31 4.00 9.24

BV1 m' 0.5 0.8 0.80 2.00 1.60

39.23

5 Kunci tanam 2x putar (pintu) bh

TYPE P1 bh 1.00 2.00 2.00

TYPE PJ1 1.00 4.00 4.00

TYPE P2 bh 1.00 2.00 2.00

8.00

6 Engsel pintu

1 pintu = 1,5 stel engsel stel

TYPE P1 stel 1.50 2.00 3.00

TYPE PJ1 1.50 4.00 6.00

TYPE P2 stel 1.50 2.00 3.00

12.00

7 Engsel jendela

Page 27: hspk. 2012

1 jendela = 1 stel engsel stel

TYPE PJ1 stel 2.00 4.00 8.00

J2 2.00 4.00 8.00

16.00

8 Grendel jendela bh

TYPE PJ1 bh 2.00 4.00 8.00

J2 2.00 4.00 8.00

16.00

9 Hak angin lurus

TYPE PJ1 stel 2.00 4.00 8.00

J2 2.00 4.00 8.00

16.00

10 Pintu PVC toilet bh 1.00 2.00 2.00

#REF! #REF!

#REF! #REF! m 0.57 3 1.71 10.00 17.10

#REF! #REF! kg 2.41 4.8 11.57 7.00 80.98

#REF! #REF! kg 2.41 5.6 13.50 10.00 134.96

V PEK. PLAFOND

1 Plafond Calciboard rangka hollow

ruangan m2 3 6.10 18.30 5.00 91.50

teras m2 2.15 18.00 38.70 1.00 38.70

toilet m2 3 6.10 18.30 1.00 18.30

m2 1 18.00 18.00 2.00 36.00

Page 28: hspk. 2012

184.50

2 List gypsump m'

ruangan m' 3 6.10 18.20 5.00 91.00

teras m' 2.15 18.00 40.30 1.00 40.30

toilet 3 6.10 18.20 1.00 18.20

22.30 1.00 22.30

171.80

VI PEK. PENGECATAN

1 Cat Dinding m2

kolom besar m2 1.60 3.6 5.76 7.00 40.32

kolom kecil m2 1.20 3.6 4.32 7.00 30.24

dinding m2 578.32 1.00 578.32

648.88

2 Cat plafond m2

m2 8.1 18.00 145.80 1.00 145.80

145.80

3 Pelapisan water proofing toilet m2

toilet m2 3 3.65 10.95 2.00 21.90

21.90

4 Pengecatan besi 165.60

VII PEKERJAAN ATAP

STEEL STRUCTURE WORK BERAT

Rafter kg

1 RAFTER WF.150.75 kg 14 12.1 169.40 5 847.00

2 CNP 125 kg 6.13 18 110.34 10 1103.40

3 bracing 16 kg 1.58 3.83 6.05 12 72.62

4 zagrod kg 0.888 11.08 8.80 6 52.80

Page 29: hspk. 2012

5 anchor bolt dim 16 kg 1.58 4 6.32 7 44.24

6 rafter bolt kg 1.2 2.94 3.53 7 24.70

7 BASE PLATE (plate 12mm) kg 94.2 0.3 0.3 8.48 14 118.69

8 END PLATE (plate 10mm) kg 78.5 0.375 0.165 4.86 42 204.00

9 stifner (plate 6mm) kg 47.1 0.075 0.15 0.53 140 74.18

10 plate for purlin ( L.40.40.4 ) kg 2.42 0.04 0.15 0.46 70 32.19

11 batang tarik diameter 16 kg 1.58 7 11.06 7 77.42

12 walter moor kg 1 20 20.00 7 140.00

13 purlin bolt kg 1.2 0.6 0.72 140 100.80

2892.04

14 Hak talang L.40.40.4 kg 2.42 0.9 2.18 36 78.41

2.42 18 43.56 2 87.12

165.53

15 Pek. Pasang usuk reng galvalum m2 4.6 18 82.80 2 165.60

16 Pas. Genteng karang pilang m2 4.6 18 82.80 2 165.60

17 Pas. Bubungan karang pilang m' 1 18 18.00 1 18.00

18 Pek. Waterproofing plat atap

plat atap M2 2.15 18 38.70 1 38.70

38.70

19 Pek. Talang Pembuluh pipa 4' M' 8 8.00 14 112.00

21 Pas. List plank 3/30 M' 18 18.00 2 36.00

Mechanical & Electrical Work

Page 30: hspk. 2012

VIII PEK. INSTALASI LISTRIK

1 Pemasang instalasi lampu ttk

ruangan ttk 1 1 1.00 10.00 10.00

toilet ttk 1 1 1.00 4.00 4.00

teras ttk 1 1 1.00 3.00 3.00

17.00

2 Lampu TL 20 Watt dengan fitting glass pcs 1 1 1.00 13.00 13.00

3 Lampu SL 14 Watt dengan fitting glass pcs 4.00

4 Saklar Ganda bh 1.00 5.00 5.00

5 Saklar tunggal bh 1.00 2.00 2.00

6 Stop kontak bh 1.00 8.00 8.00

7 Panel MCB bh 1.00 1.00 1.00

IX PEK. SANITARY

1 Pas. Closed Jongkok pcs 1 5 5.00 2.00 10.00

2 Pas. Avour lantai metal pcs 1 5 5.00 2.00 10.00

3 Pas. Kran air pcs 1 5 5.00 2.00 10.00

4 Pas. Pipa PVC 3/4" (air bersih) m'

m' 30.3 8 38.30 1.00 38.30

38.30

5 Pas. Pipa PVC 3" (air kotor) m'

Page 31: hspk. 2012

m' 7.3 4 11.30 1.00 11.30

11.30

6 Pas. Pipa PVC 4" (air Kotoran) m'

m' 7.3 4 11.30 1.00 11.30

11.30

7 Pas. Wastafel bh 2.00 2.00 4.00

PEKERJAAN KANTOR LAMA

I PEK. KERAMIK DAN BATU KLINGKER1 Urugan Pasir bawah lantai 10 cm m3 7 0.1 7.4 5.18 1 5.18

2 Rabat lantai t = 5 cm m3 7 0.05 7.4 2.59 1 2.59

3 Pas. Keramik 40 x 40 Motif (Ruangan & teras) m' 7 7.4 51.80 1 51.80

#REF! #REF! m' 3.5 6.1 19.20 2 38.40m' 3.5 3.50 2 7.00

45.40

4 Pas. Batu klingker m2 1.5 21.5 32.25 1 32.25

Page 32: hspk. 2012
Page 33: hspk. 2012

platt=12

0.1214.808

7.9222822.73028

8.33333333189.419

PT1 PT2 strouss S1 S2 S3

Page 34: hspk. 2012

1200x1200 600X1200 DIM 300 300X500 200X400 200X3000.576 0.288 0.07065 0.15 0.08 0.06

60.672 60.672 3.702 11.56 11.56 6.3260.672 37.92 4.029 5.40492 3.92412 5.3062

121.344 98.592 7.731 16.96492 15.48412 11.62621.736111111 3.4722222222 14.15428167 6.66666666667 12.5 16.6666667210.6666667 342.33333333 109.42675159 113.099466667 193.5515 193.77

K1 K2 B1 B2 B3 B4300x400 250x250 300X600 200X400 200X400 200X300

0.12 0.0625 0.18 0.08 0.08 0.0615.8 9.48 19.92 11 8.4 8.4

4.66452 3.92412 7.25592 3.92412 3.92412 3.92412

Page 35: hspk. 2012

20.46452 13.40412 27.17592 14.92412 12.32412 12.324128.333333333 16 5.5555555556 12.5 12.5 16.6666667170.5376667 214.46592 150.97733333 186.5515 154.0515 205.402

Page 36: hspk. 2012

plat Balok bordest=12 200X400

0.12 0.0821.312 12.64

11.40192 6.540232.71392 19.1802

8.3333333333 12.5272.616 239.7525

Page 37: hspk. 2012

plat tandon plat septictank t=15 t=15

0.15 0.157.404 10.656

7.92228 11.4019215.32628 22.05792

6.666666667 6.6666666667102.1752 147.0528

Page 38: hspk. 2012

K3 K2 plat B3300x400 300X300 t=12 200X400

0.12 0.09 0.12 0.0812.64 12.64 14.808 11.56

5.40492 3.92412 7.92228 3.9241218.04492 16.56412 22.73028 15.48412

8.333333333 11.111111111 8.3333333333 12.5150.3743333 184.04577778 189.419 193.5515

Page 39: hspk. 2012
Page 40: hspk. 2012
Page 41: hspk. 2012

DAFTAR HARGA SATUAN POKOK KEGIATAN (HSPK)

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

A BANGUNAN GEDUNG

24.01.01.02 Pembuatan Bouwplank (UILZET) m1

Upah:

23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.01.03 Kepala Tukang Kayu 0.0100 O.H 60,000.00 600.0023.06.01.03.05 Tukang Kayu 0.1000 O.H 55,000.00 5,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 0.1000 O.H 41,900.00 4,190.00

Jumlah: 10,615.00

Bahan/Material:

20.01.05.02.04.02 Kayu Meranti (Papan 2/20) 0.0070 m3 3,500,000.00 24,500.0020.01.05.02.04.04 Kayu Meranti (Usuk 5/7) 0.0120 m3 3,100,000.00 37,200.0020.01.01.46.02.01 Paku biasa 2"-5" 0.0200 Kg 12,500.00 250.00

Jumlah: 61,950.00

Nilai HSPK : 72,565.00

24.01.01.04 Pembersihan Lapangan Berat m2

Upah:

23.06.01.01.04 Mandor 0.0500 O.H 65,000.00 3,250.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 0.1000 O.H 41,900.00 4,190.00

Jumlah: 7,440.00

Nilai HSPK : 7,440.00

24.01.01.05 Uilzet Dengan WaterPass / Theodolit m2

Upah:

23.06.01.05.04 Surveyor Geodesi 0.0067 O.H 60,000.00 402.0023.06.01.02.03 Pekerja Terampil 0.0133 O.H 42,500.00 565.25

Jumlah: 967.25

Sewa Peralatan:

23.09.09.07.01 Sewa Theodolit 0.0067 Set 100,000.00 666.00Jumlah: 666.00

Nilai HSPK : 1,633.25

24.01.01.06 m2

Upah:

23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.1000 O.H 41,900.00 4,190.00

Jumlah: 4,515.00

Nilai HSPK : 4,515.00

24.01.01.08 Pembongkaran Plafond dan Rangka Tidak Dipakai Kembali m2

Upah:

23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.1000 O.H 41,900.00 4,190.00

Jumlah: 4,515.00

Nilai HSPK : 4,515.00

24.01.02 Pekerjaan tanah

24.01.02.06 Pengangkutan Tanah keluar Proyek m3

Upah:

23.06.01.04.04 Pekerja / Buruh Tak Terampil 0.2500 O.H 41,900.00 10,475.00Jumlah: 10,475.00

Sewa Peralatan:

23.09.05.04.04.01 Sewa Dump Truck 5 T (min 5 jam) 0.2500 Jam 65,000.00 16,250.00Jumlah: 16,250.00

Nilai HSPK : 26,725.00

24.01.02.09 Pembongkaran Dinding Tembok dengan pembersihan m3

Upah:

23.06.01.01.04 Mandor 0.0500 O.H 65,000.00 3,250.0023.06.01.04.04 Pekerja / buruh tak terampil 1.0000 O.H 41,900.00 41,900.00

Jumlah: 45,150.00

Nilai HSPK : 45,150.00

24.01.02.10 Pembongkaran Beton m3

Upah:

Pembongkaran Rangka dan Penutup Atap Tidak Dipakai Kembali

Page 42: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

23.06.01.01.04 Mandor 0.6600 O.H 65,000.00 42,900.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 0.6600 O.H 41,900.00 27,654.00

Jumlah: 70,554.00

Nilai HSPK : 70,554.00

24.01.02.13 Pengurugan Tanah Kembali untuk Gedung m3

Upah:

23.06.01.01.04 Mandor 0.0150 O.H 65,000.00 975.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 0.3000 O.H 41,900.00 12,570.00

Jumlah: 13,545.00

Nilai HSPK : 13,545.00

24.01.02.16 Pengurugan Pasir (PADAT) m3

Upah:

23.06.01.01.04 Mandor 0.0100 O.H 65,000.00 650.0023.06.01.02.03 Pekerja Terampil 0.3000 O.H 42,500.00 12,750.00

Jumlah: 13,400.00

Bahan:

20.01.01.04.01 Pasir Urug 1.2000 m3 115,000.00 138,000.00Jumlah: 138,000.00

Nilai HSPK : 151,400.00

24.01.02.16 Pengurugan Sirtu (PADAT) m3

Upah:

23.06.01.01.04 Mandor 0.0250 O.H 65,000.00 1,625.0023.06.01.02.03 Pekerja Terampil 0.2500 O.H 42,500.00 10,625.00

Jumlah: 12,250.00

Bahan:

20.01.01.04.01 Sirtu 1.2000 m3 75,000.00 90,000.00Jumlah: 90,000.00

Nilai HSPK : 102,250.00

24.01.02.16 Pengurugan Kerikil m3

Upah:

23.06.01.01.04 Mandor 0.0250 O.H 65,000.00 1,625.0023.06.01.02.03 Pekerja Terampil 0.2500 O.H 42,500.00 10,625.00

Jumlah: 12,250.00

Bahan:

20.01.01.04.01 Sirtu 1.2000 m3 120,600.00 144,720.00Jumlah: 144,720.00

Nilai HSPK : 156,970.00

24.01.02.07 Penggalian Tanah untuk Konstruksi m3

Upah:

23.06.01.01.04 Mandor 0.0450 O.H 65,000.00 2,925.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 0.9000 O.H 41,900.00 37,710.00

Jumlah: 40,635.00

Nilai HSPK : 40,635.00

B PEKERJAAN PONDASI

24.02.01.24 Titik

Upah:

23.02.03.01.02 Mandor 0.0720 O.H 65,000.00 4,680.00

23.02.03.01.05 Pekerja / Buruh Tak Terampil 1.4400 O.H 41,900.00 60,336.00

Jumlah: 65,016.00

Sewa Peralatan:

23.02.03.04.12.01.01 Sewa alat bantu strouss pile 1.2000 Jam 10,000.00 12,000.00

Jumlah: 12,000.00

Nilai HSPK : 77,016.00

C STRUKTUR UTAMA

24.03.01 Beton

24.03.01.04 Lantai kerja K100 slump(3-6) cm w/c=0,87 m3

Tenaga:

23.06.01.01.04 Mandor 0.0600 O.H 65,000.00 Rp 3,900.00

23.06.01.01.01 Kepala Tukang Batu 0.0200 O.H 60,000.00 Rp 1,200.00

23.06.01.03.01 Tukang batu 0.2000 O.H 55,000.00 Rp 11,000.00

23.06.01.04.04 Pekerja / Buruh Tak Terampil 1.2000 O.H 41,900.00 Rp 50,280.00

SNI DT 91-0006-2007 (6.9)

Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m

Page 43: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Jumlah: Rp 66,380.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 5.7500 Zak 48,000.00 Rp 276,000.00

20.01.01.04.05 Pasir Beton 0.5581 m3 14,500.00 Rp 8,092.45

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.5405 m3 254,000.00 Rp 137,287.00

23.04.01.02.03 Air (biaya air tawar) 215.0000 Liter 13.00 Rp 2,795.00 Jumlah: Rp 424,174.45

Nilai HSPK : Rp 490,554.45

24.03.01.22 m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00 Jumlah: Rp 327,890.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 109.0000 Kg 9,772.62 1,065,215.58

Jumlah: Rp 1,681,985.58

Nilai HSPK : Rp 2,009,875.58

24.03.01.22 m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 210.0000 Kg 9,772.62 2,052,250.20

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2000 m3 2,400,000.00 480,000.00Paku usuk 1.5000 Kg 12,000.00 18,000.00Minyak bekesting 0.4000 ltr 4,800.00 1,920.00

Jumlah: Rp 3,203,477.70

Nilai HSPK : Rp 3,602,867.70

24.03.01.22 m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 342.0000 Kg 9,772.62 3,342,236.04

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2000 m3 2,400,000.00 480,000.00Paku usuk 1.5000 Kg 12,000.00 18,000.00Minyak bekesting 0.4000 ltr 4,800.00 1,920.00

Pekerjaan pondasi beton bertulang (109kg besi ) beton strouss

Pekerjaan pondasi beton bertulang (210kg besi + bekesting) PT1

Pekerjaan pondasi beton bertulang (342kg besi + bekesting) PT2

Page 44: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Jumlah: Rp 4,493,463.54

Nilai HSPK : Rp 4,892,853.54

24.03.01.22 m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 160.0000 Kg 9,772.62 1,563,619.20

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2000 m3 2,400,000.00 480,000.00Paku usuk 1.5000 Kg 12,000.00 18,000.00Minyak bekesting 0.4000 ltr 4,800.00 1,920.00

Jumlah: Rp 2,714,846.70

Nilai HSPK : Rp 3,114,236.70

24.03.01.22Pekerjaan tandon beton bertulang (102kg besi + bekesting)

m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 102.0000 Kg 9,772.62 996,807.24

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2000 m3 2,400,000.00 480,000.00Paku usuk 1.5000 Kg 12,000.00 18,000.00Minyak bekesting 0.4000 ltr 4,800.00 1,920.00

Jumlah: Rp 2,148,034.74

Nilai HSPK : Rp 2,547,424.74

24.03.01.22 Pekerjaan tutup beton septictank (147kg besi + bekesting) m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 147.0000 Kg 9,772.62 1,436,575.14

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2000 m3 2,400,000.00 480,000.00Paku usuk 1.5000 Kg 12,000.00 18,000.00Minyak bekesting 0.4000 ltr 4,800.00 1,920.00

Jumlah: Rp 2,587,802.64

Nilai HSPK : Rp 2,987,192.64

Pekerjaan pondasi beton bertulang (160kg besi + bekesting) poer joglo uk.70x70x40

Page 45: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

24.03.01.23 m3

Tenaga:

23.06.01.01.04 Mandor 0.2830 O.H 65,000.00 18,395.00

23.06.01.01.01 Kepala Tukang Besi 0.3230 O.H 60,000.00 19,380.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.5600 O.H 55,000.00 85,800.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.6500 O.H 41,900.00 236,735.00

Jumlah: Rp 452,435.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 113.0000 Kg 9,772.62 1,104,306.06

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.2700 m3 2,400,000.00 648,000.00Paku usuk 2.0000 Kg 12,000.00 24,000.00Minyak bekesting 0.6000 ltr 4,800.00 2,880.00

Jumlah: Rp 2,442,006.06

Nilai HSPK : Rp 2,894,441.06

24.03.01.23 m3

Tenaga:

23.06.01.01.04 Mandor 0.2830 O.H 65,000.00 18,395.00

23.06.01.01.01 Kepala Tukang Besi 0.3230 O.H 60,000.00 19,380.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.5600 O.H 55,000.00 85,800.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.6500 O.H 41,900.00 236,735.00

Jumlah: Rp 452,435.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 194.0000 Kg 9,772.62 1,895,888.28

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.2700 m3 2,400,000.00 648,000.00Paku usuk 2.0000 Kg 12,000.00 24,000.00Minyak bekesting 0.6000 ltr 4,800.00 2,880.00

Jumlah: Rp 3,233,588.28

Nilai HSPK : Rp 3,686,023.28

24.03.01.23 m3

Tenaga:

23.06.01.01.04 Mandor 0.2830 O.H 65,000.00 18,395.00

23.06.01.01.01 Kepala Tukang Besi 0.3230 O.H 60,000.00 19,380.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.5600 O.H 55,000.00 85,800.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.6500 O.H 41,900.00 236,735.00

Jumlah: Rp 452,435.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 193.0000 Kg 9,772.62 1,886,115.66

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.2700 m3 2,400,000.00 648,000.00Paku usuk 2.0000 Kg 12,000.00 24,000.00Minyak bekesting 0.6000 ltr 4,800.00 2,880.00

Jumlah: Rp 3,223,815.66

Nilai HSPK : Rp 3,676,250.66

Pekerjaan sloof beton bertulang (113kg besi + bekesting) SL1 30/50

Pekerjaan sloof beton bertulang (194kg besi + bekesting) S2 20/40

Pekerjaan sloof beton bertulang (193kg besi + bekesting) S3 20/30

Page 46: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

24.03.01.24 Pekerjaan balok (151kg besi + bekesting) B1 30/60 m3

Tenaga:

23.06.01.01.04 Mandor 0.3180 O.H 65,000.00 20,670.00

23.06.01.01.01 Kepala Tukang Besi 0.3330 O.H 60,000.00 19,980.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.6500 O.H 55,000.00 90,750.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 6.3500 O.H 41,900.00 266,065.00

Jumlah: Rp 489,590.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 151.0000 Kg 9,772.62 1,475,665.62

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1400 m3 6,000,000.00 840,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 4.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,058,565.62

Nilai HSPK : Rp 4,548,155.62

24.03.01.24 Pekerjaan balok (187 kg besi + bekesting) B2 20/40 m3

Tenaga:

23.06.01.01.04 Mandor 0.3180 O.H 65,000.00 20,670.00

23.06.01.01.01 Kepala Tukang Besi 0.3330 O.H 60,000.00 19,980.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.6500 O.H 55,000.00 90,750.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 6.3500 O.H 41,900.00 266,065.00

Jumlah: Rp 489,590.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 187.0000 Kg 9,772.62 1,827,479.94

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1400 m3 6,000,000.00 840,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 4.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,410,379.94

Nilai HSPK : Rp 4,899,969.94

24.03.01.24 Pekerjaan balok (154 kg besi + bekesting) B3 20/40 m3

Tenaga:

23.06.01.01.04 Mandor 0.3180 O.H 65,000.00 20,670.00

23.06.01.01.01 Kepala Tukang Besi 0.3330 O.H 60,000.00 19,980.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.6500 O.H 55,000.00 90,750.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 6.3500 O.H 41,900.00 266,065.00

Jumlah: Rp 489,590.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 154.0000 Kg 9,772.62 1,504,983.48

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1400 m3 6,000,000.00 840,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 4.0000 Batang 0.00

Page 47: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,087,883.48

Nilai HSPK : Rp 4,577,473.48

24.03.01.24 m3

Tenaga:

23.06.01.01.04 Mandor 0.3180 O.H 65,000.00 20,670.00

23.06.01.01.01 Kepala Tukang Besi 0.3330 O.H 60,000.00 19,980.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.6500 O.H 55,000.00 90,750.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 6.3500 O.H 41,900.00 266,065.00

Jumlah: Rp 489,590.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 178.0000 Kg 9,772.62 1,739,526.36

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1400 m3 6,000,000.00 840,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 4.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,322,426.36

Nilai HSPK : Rp 4,812,016.36

24.03.01.24 m3

Tenaga:

23.06.01.01.04 Mandor 0.3180 O.H 65,000.00 20,670.00

23.06.01.01.01 Kepala Tukang Besi 0.3330 O.H 60,000.00 19,980.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.6500 O.H 55,000.00 90,750.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 6.3500 O.H 41,900.00 266,065.00

Jumlah: Rp 489,590.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 366.0000 Kg 9,772.62 3,576,778.92

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1400 m3 6,000,000.00 840,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 4.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 6,159,678.92

Nilai HSPK : Rp 6,649,268.92

24.03.01.24 m3

Tenaga:

23.06.01.01.04 Mandor 0.3180 O.H 65,000.00 20,670.00

23.06.01.01.01 Kepala Tukang Besi 0.3330 O.H 60,000.00 19,980.00

23.06.02.03.01 Tukang Besi 1.4000 O.H 55,000.00 77,000.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.6500 O.H 55,000.00 90,750.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 6.3500 O.H 41,900.00 266,065.00

Jumlah: Rp 489,590.00

Bahan:

Pekerjaan balok (178kg besi + bekesting) Balok joglo uk. 30/60

Pekerjaan balok (366kg besi + bekesting) Balok joglo uk. 20/40

Pekerjaan balok (239kg besi + bekesting) balok bordes tangga

Page 48: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 239.0000 Kg 9,772.62 2,335,656.18

Kawat Ikat Beton 3.0000 Kg 15,350.00 46,050.00

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1400 m3 6,000,000.00 840,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 4.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,918,556.18

Nilai HSPK : Rp 5,408,146.18

24.03.01.25 m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2650 O.H 60,000.00 15,900.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.4000 O.H 41,900.00 226,260.00

Jumlah: Rp 403,760.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 170.0000 Kg 9,772.62 1,661,345.40

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1200 m3 6,000,000.00 720,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 32.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,112,732.90

Nilai HSPK : Rp 4,516,492.90

24.03.01.25 m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2650 O.H 60,000.00 15,900.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.4000 O.H 41,900.00 226,260.00

Jumlah: Rp 403,760.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 215.0000 Kg 9,772.62 2,101,113.30

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1200 m3 6,000,000.00 720,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 32.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,552,500.80

Nilai HSPK : Rp 4,956,260.80

24.03.01.25 m3

Tenaga:

Pekerjaan kolom beton bertulang (170 kg besi + bekesting) (K1 30/40)

Pekerjaan kolom beton bertulang (215kg besi + bekesting) (K2 25/25)

Pekerjaan kolom beton bertulang (174 kg besi + bekesting) (K3 30/40)

Page 49: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2650 O.H 60,000.00 15,900.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.4000 O.H 41,900.00 226,260.00

Jumlah: Rp 403,760.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 174.0000 Kg 9,772.62 1,700,435.88

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.3200 m3 2,400,000.00 768,000.00Kayu kamper balok 3/5 0.1200 m3 6,000,000.00 720,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 32.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,151,823.38

Nilai HSPK : Rp 4,555,583.38

24.03.01.27 m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (50kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 189.0000 Kg 9,772.62 1,847,025.18

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2400 m3 2,400,000.00 576,000.00Kayu kamper balok 3/5 0.1600 m3 6,000,000.00 960,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 3.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 4,346,412.68

Nilai HSPK : Rp 4,745,802.68

24.03.01.27 Pekerjaan parapet atap (146kg besi + bekesting) m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (40kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 146.0000 Kg 9,772.62 1,426,802.52

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2400 m3 2,400,000.00 576,000.00Kayu kamper balok 3/5 0.1600 m3 6,000,000.00 960,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 3.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00

Pekerjaan Plat Lantai beton bertulang (189kg besi + bekesting)

Page 50: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 3,926,190.02

Nilai HSPK : Rp 4,325,580.02

24.03.01.27 Pekerjaan Plat tangga (272 kg besi + bekesting) m3

Tenaga:

23.06.01.01.04 Mandor 0.2650 O.H 65,000.00 17,225.00

23.06.01.01.01 Kepala Tukang Besi 0.2620 O.H 60,000.00 15,720.00

23.06.02.03.01 Tukang Besi 1.0500 O.H 55,000.00 57,750.00

23.06.01.03.01 Tukang batu 0.2750 O.H 55,000.00 15,125.00

23.06.01.03.05 Tukang Kayu 1.3000 O.H 55,000.00 71,500.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 5.3000 O.H 41,900.00 222,070.00

Jumlah: Rp 399,390.00

Bahan:

20.01.01.02.02 Semen portland (40kg) 8.4000 Zak 48,000.00 403,200.00

20.01.01.04.05 Pasir Beton 0.5400 m3 14,500.00 7,830.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 254,000.00 205,740.00Besi Beton (polos/ulir) 272.0000 Kg 9,772.62 2,658,152.64

Kawat Ikat Beton 2.2500 Kg 15,350.00 34,537.50

20.01.05.02.04.06 Kayu meranti bekisting 0.2400 m3 2,400,000.00 576,000.00Kayu kamper balok 3/5 0.1600 m3 6,000,000.00 960,000.00Dolken kayu gelam dia 8-10 cm, panjang 4m 3.0000 Batang 0.00Plywood tebal 9 mm 2.8000 Lembar 95,000.00 266,000.00Paku usuk 3.2000 Kg 12,000.00 38,400.00Minyak bekesting 1.6000 ltr 4,800.00 7,680.00

Jumlah: Rp 5,157,540.14

Nilai HSPK : Rp 5,556,930.14

24.03.01.29 Pekerjaan kolom praktis (11x11cm) ml

Tenaga:

23.06.01.01.04 Mandor 0.0090 O.H 65,000.00 585.00

23.06.01.01.01 Kepala Tukang Besi 0.0060 O.H 60,000.00 360.00

23.06.02.03.01 Tukang Besi 0.0200 O.H 55,000.00 1,100.00

23.06.01.03.01 Tukang batu 0.0200 O.H 55,000.00 1,100.00

23.06.01.03.05 Tukang Kayu 0.0200 O.H 55,000.00 1,100.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 0.1800 O.H 41,900.00 7,542.00

Jumlah: Rp 11,787.00

Bahan:

20.01.01.02.02 Semen portland (40kg) 0.1000 Zak 48,000.00 4,800.00

20.01.01.04.05 Pasir Beton 0.0060 m3 14,500.00 87.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.0090 m3 254,000.00 2,286.00Besi Beton (polos/ulir) 3.0000 Kg 9,772.62 29,317.86

Kawat Ikat Beton 0.4500 Kg 15,350.00 6,907.50

20.01.05.02.04.06 Kayu meranti bekisting 0.0020 m3 2,400,000.00 4,800.00Paku usuk 0.0100 Kg 12,000.00 120.00

Jumlah: Rp 48,318.36

Nilai HSPK : Rp 60,105.36

24.03.01.29 Pekerjaan balok latei (10x20cm) ml

Tenaga:

23.06.01.01.04 Mandor 0.0200 O.H 65,000.00 1,300.00

23.06.01.01.01 Kepala Tukang Besi 0.0133 O.H 60,000.00 798.00

23.06.02.03.01 Tukang Besi 0.0440 O.H 55,000.00 2,420.00

23.06.01.03.01 Tukang batu 0.0440 O.H 55,000.00 2,420.00

23.06.01.03.05 Tukang Kayu 0.0440 O.H 55,000.00 2,420.0023.06.01.04.04 Pekerja / Buruh Tak Terampil 0.3960 O.H 41,900.00 16,592.40

Jumlah: Rp 25,950.40

Bahan:

20.01.01.02.02 Semen portland (40kg) 0.1467 Zak 48,000.00 7,041.60

20.01.01.04.05 Pasir Beton 0.0120 m3 14,500.00 174.00

20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0.0200 m3 254,000.00 5,080.00Besi Beton (polos/ulir) 4.7999 Kg 9,772.62 46,907.60

Kawat Ikat Beton 0.0667 Kg 15,350.00 1,023.84

20.01.05.02.04.06 Kayu meranti bekisting 0.0040 m3 2,400,000.00 9,600.00Paku usuk 0.0267 Kg 12,000.00 320.40

Jumlah: Rp 70,147.44

Page 51: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Nilai HSPK : Rp 96,097.84

D PEKERJAAN DINDING

24.04.01 Dinding & Plesteran

24.04.01.8 Pemasangan Batu Merah 1 Pc : 4 Ps (tabal 1/2 bata) m2

Upah:

23.06.01.01.04 Mandor 0.0150 O.H 65,000.00 975.0023.06.01.01.01 Kepala Tukang Batu 0.0100 O.H 60,000.00 600.0023.06.01.03.01 Tukang Batu 0.1000 O.H 55,000.00 5,500.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.3000 O.H 41,900.00 12,570.00

Jumlah: 19,645.00

Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.2300 Zak 55,000.00 12,650.0020.01.01.04.03 Pasir Pasang 0.0430 m3 130,000.00 5,590.0020.01.01.21.03 Batu Bata Merah uk 22 x 11 x 4.5 cm 70.0000 Buah 550 38,500.00

Jumlah: 56,740.00

Nilai HSPK : 76,385.00

24.04.01.11 Pemasangan Batu Merah Kosongan m3

Upah:

23.02.03.01.02 Mandor 0.0495 O.H 65,000 3,217.50

23.02.03.01.01 Kepala Tukang Batu 0.0330 O.H 60,000 1,980.00

23.02.03.01.04 Tukang Batu 0.3300 O.H 55,000 18,150.00

23.02.03.01.05 Pekerja/Buruh Tak Terampil 0.9900 O.H 41,900 41,481.00

Jumlah: 64,828.50

Bahan:

20.01.01.18.02 Batu Bata Merah uk 22 x 11 x 4.5 cm 755.0000 Buah 550 415,250.00

Jumlah: 415,250.00

Nilai HSPK : 480,078.50

24.04.01.9 Pemasangan Batu Merah 1 Pc : 5 Ps (tebal 1/2 bata) m2

Upah:

23.06.01.01.04 Mandor 0.0150 O.H 65,000.00 975.0023.06.01.01.01 Kepala Tukang Batu 0.0100 O.H 60,000.00 600.0023.06.01.03.01 Tukang Batu 0.1000 O.H 55,000.00 5,500.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.3000 O.H 41,900.00 12,570.00

Jumlah: 19,645.00

Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1936 Zak 55,000.00 10,648.0020.01.01.04.03 Pasir Pasang 0.0450 m3 130,000.00 5,850.0020.01.01.21.03 Batu Bata Merah uk 22 x 11 x 4.5 cm 70.0000 Buah 550 38,500.00

Jumlah: 54,998.00

Nilai HSPK : 74,643.00

24.04.01.22 Pembongkaran Dinding Tembok Dengan Pembersihan m2

Upah:

23.06.01.01.04 Mandor 0.0500 O.H 65,000.00 3,250.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 1.0000 O.H 41,900.00 41,900.00

Jumlah: 45,150.00

Nilai HSPK : 45,150.00

24.04.01.16 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm m2

Upah:

23.06.01.01.04 Mandor 0.0150 O.H 65,000.00 975.0023.06.01.01.01 Kepala Tukang Batu 0.0150 O.H 60,000.00 900.0023.06.01.03.01 Tukang Batu 0.1500 O.H 55,000.00 8,250.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.3000 O.H 41,900.00 12,570.00

Jumlah: 22,695.00

Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1248 Zak 55,000.00 6,864.0020.01.01.04.03 Pasir Pasang 0.0240 m3 130,000.00 3,120.00

Jumlah: 9,984.00

Nilai HSPK : 32,679.00

24.04.01.17 Plesteran Halus 1 Pc : 5 Ps tebal 1,5 cm m2

Upah:

23.06.01.01.04 Mandor 0.0150 O.H 65,000.00 975.00

Page 52: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

23.06.01.01.01 Kepala Tukang Batu 0.0150 O.H 60,000.00 900.0023.06.01.03.01 Tukang Batu 0.1500 O.H 55,000.00 8,250.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.3000 O.H 41,900.00 12,570.00

Jumlah: 22,695.00

Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1036 Zak 55,000.00 5,698.0020.01.01.04.03 Pasir Pasang 0.0240 m3 130,000.00 3,120.00

Jumlah: 8,818.00

Nilai HSPK : 31,513.00

24.04.01.18 Pasang Benangan 1 Pc : 2 Ps m

Upah:

23.06.01.01.04 Mandor 0.0040 O.H 65,000.00 260.0023.06.01.01.01 Kepala Tukang Batu 0.0400 O.H 60,000.00 2,400.0023.06.01.03.01 Tukang Batu 0.4000 O.H 55,000.00 22,000.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0800 O.H 41,900.00 3,352.00

Jumlah: 28,012.00

Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.0100 Zak 55,000.00 550.00

20.01.01.04.03 Pasir Pasang 0.0130 m3 130,000.00 1,690.00

Jumlah: 2,240.00

Nilai HSPK : 30,252.00

24.04.01.21 Pekerjaan Acian m2Tenaga:

23.06.01.01.04 Mandor 0.0100 O.H 65,000.00 Rp 650.00 23.06.01.01.01 Kepala Tukang Batu 0.0100 O.H 60,000.00 Rp 600.00 23.06.01.03.01 Tukang Batu 0.1000 O.H 55,000.00 Rp 5,500.00 23.06.01.04.04 Pekerja/Buruh Tak Terampil 0.2000 O.H 41,900.00 Rp 8,380.00

Jumlah: Rp 15,130.00

Bahan:

20.01.01.02.02 Semen portland (50 kg) 0.0650 Zak 55,000.00 Rp 3,575.00 Jumlah: Rp 3,575.00

Nilai HSPK : Rp 18,705.00

24.04.02 FINISHING DINDING

24.04.02.01 Pemasangan Batu Klingker m2

Upah:

23.06.01.01.04 Mandor 0.0350 O.H 65,000.00 2,275.0023.06.01.01.01 Kepala Tukang Batu 0.0350 O.H 60,000.00 2,100.0023.06.01.03.01 Tukang Batu 0.3500 O.H 55,000.00 19,250.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.7000 O.H 41,900.00 29,330.00

Jumlah: 52,955.00

Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.2350 Zak 55,000.00 12,925.0020.01.01.04.03 Pasir Pasang 0.0350 m3 130,000.00 4,550.0020.01.01.05.06.02 Batu Klingker 52.5000 m2 4,300 225,750.00

Jumlah: 243,225.00

Nilai HSPK : 296,180.00

24.04.02.10 m2

Upah:

23.06.01.01.04 Mandor 0.0025 O.H 65,000.00 162.5023.06.01.01.01 Kepala Tukang Cat 0.0042 O.H 60,000.00 252.0023.06.01.03.01 Tukang Cat 0.0420 O.H 55,000.00 2,310.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0280 O.H 41,900.00 1,173.20

Jumlah: 3,897.70

Bahan:

20.01.01.06.01.02 Dempul tembok (cat dasar) 0.1200 Kg 13,660.00 1,639.20Cat tembok luar 0.1800 kg 30,000.00 5,400.00

Jumlah: 7,039.20

Nilai HSPK : 10,936.90

24.04.02.15 Pekerjaan Lapis Melamin Duco (2x Lapis Sampai Rata) m2

Upah:

23.06.01.01.04 Mandor 0.025 O.H 65,000.00 1,625.00

Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

Page 53: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

23.06.02.01.02 Kepala Tukang Cat 0.009 O.H 60,000.00 540.0023.06.02.03.02 Tukang Cat 0.09 O.H 55,000.00 4,950.0023.06.01.02.03 Pekerja Terampil 0.075 O.H 42,500.00 3,187.50

Jumlah: 10,302.50

Bahan:

20.01.01.06.03.10 Wood Filler 0.2 Kg 24,500.00 4,900.0020.01.01.06.05.16 Pewarna 0.5 Sachet 900.00 450.0020.01.01.39.01 Kertas Gosok no 150 1 Lembar 2,500.00 2,500.0020.01.01.39.01 Kertas Gosok no 280 1 Lembar 2,500.00 2,500.0020.01.01.06.05.01 Shanding 0.5 Kg 55,000.00 27,500.0020.01.01.06.05.06 Clear Doof 0.2 Kg 37,500.00 7,500.0020.01.01.06.01.05 Thinner A 0.837 Liter 21,600.00 18,079.2020.01.01.06.01.09 Coumpond 0.2 Kaleng 23,000.00 4,600.00

Jumlah: 54,720.90

Sewa Peralatan:

23.09.09.01.01 Sewa alat bantu (1 set @ 3 alat) 1 Set 1,000.00 1,000.0023.09.09.08.02 Sewa Compresor 0.625 Jam 35,000.00 21,875.00

Jumlah: 22,875.00

Nilai HSPK : 87,898.40

24.04.02.16 Pelapisan Waterproofing m2

Upah:

23.06.01.01.04 Mandor 0.0025 O.H 65,000.00 162.5023.06.02.01.02 Kepala Tukang Cat 0.0075 O.H 60,000.00 450.0023.06.02.03.02 Tukang Cat 0.0750 O.H 55,000.00 4,125.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0500 O.H 41,900.00 2,095.00

Jumlah: 6,832.50

Bahan:

20.01.01.06.02.02 Waterproofing 0.3500 Kg 37,075 12,976.2520.01.01.06.02.02 Serat fiber 1.0000 m2 9,000 9,000.00

Jumlah: 21,976.25

Nilai HSPK : 28,808.75

24.04.02.18 m2

Upah:

23.06.01.01.04 Mandor 0.0025 O.H 65,000.00 162.5023.06.02.01.02 Kepala Tukang Cat 0.0040 O.H 60,000.00 240.0023.06.02.03.02 Tukang Cat 0.1050 O.H 55,000.00 5,775.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0700 O.H 41,900.00 2,933.00

Jumlah: 9,110.50

Bahan:

Cat meni kayu 0.1500 Kg 30,400.00 4,560.00Plamir 0.3000 kg 33,700.00 10,110.00Cat Kayu 0.2000 kg 48,067.00 9,613.40Cat penutup 0.3000 kg 37,500.00 11,250.00

Jumlah: 35,533.40

Nilai HSPK : 44,643.90

E PEKERJAAN LANTAI

24.05.01 Lantai

24.05.01.01 Pemasangan Tegel Keramik 20x20 cm m2

Upah:

23.06.01.01.04 Mandor 0.0350 O.H 65,000.00 Rp 2,275.00 23.06.01.01.01 Kepala Tukang Batu 0.0350 O.H 60,000.00 Rp 2,100.00 23.06.01.03.01 Tukang Batu 0.3500 O.H 55,000.00 Rp 19,250.00 23.06.01.04.04 Pekerja/Buruh Tak Terampil 0.7000 O.H 41,900.00 Rp 29,330.00

Jumlah: 52,955.00

Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.2080 Zak 55,000.00 11,440.0020.01.01.02.05 Semen Berwarna Yiyitan 1.6200 Kg 8,000.00 12,960.0020.01.01.04.03 Pasir Pasang 0.0450 m3 130,000.00 5,850.0020.01.01.38.02.02 Tegel Keramik 20 x 20 Cm (bermotif) 1.0600 m2 33,000.00 34,980.00

Jumlah: 65,230.00

Nilai HSPK : 118,185.00

Pengecatan kayu (1plamir, 2 lapis cat dasar, 3 lapis cat penutup)

Page 54: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

24.05.01.06 m2

Upah:23.06.01.01.04 Mandor 0.0350 O.H 65,000.00 Rp 2,275.00 23.06.01.01.01 Kepala Tukang Batu 0.0350 O.H 60,000.00 Rp 2,100.00 23.06.01.03.01 Tukang Batu 0.3500 O.H 55,000.00 Rp 19,250.00 23.06.01.04.04 Pekerja/Buruh Tak Terampil 0.7000 O.H 41,900.00 Rp 29,330.00

Jumlah: Rp 52,955.00 Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1960 Zak 55,000.00 10,780.0020.01.01.02.05 Semen Berwarna Yiyitan 1.3000 Kg 8,000.00 10,400.0020.01.01.04.03 Pasir Pasang 0.0450 m3 130,000.00 5,850.0020.01.01.38.02.05 Tegel Keramik 40x40 (motif/warna gelap) 1.0608 m2 31,600.00 33,521.28

Jumlah: 60,551.28Nilai HSPK : 113,506.28

24.05.01.07 Pemasangan Tegel Keramik 20x25 cm (Dinding) m2

Upah:23.06.01.01.04 Mandor 0.0450 O.H 65,000.00 2,925.0023.06.01.01.01 Kepala Tukang Batu 0.0450 O.H 60,000.00 2,700.0023.06.01.03.01 Tukang Batu 0.4500 O.H 55,000.00 24,750.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.9000 O.H 41,900.00 37,710.00

Jumlah: 68,085.00Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1860 Zak 55,000.00 10,230.0020.01.01.02.05 Semen Berwarna Yiyitan 1.9400 Kg 8,000.00 15,520.0020.01.01.04.03 Pasir Pasang 0.0180 m3 130,000.00 2,340.0020.01.01.38.02.01 Tegel Keramik 20 x 25 Cm (dinding) 1.0500 m2 37,100.00 38,955.00

Jumlah: 67,045.00Nilai HSPK : 135,130.00

24.05.01.10 Pemasangan Tegel Plin Dinding Keramik uk. 10x40 cm m'

Upah:23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.01.01 Kepala Tukang Batu 0.0090 O.H 60,000.00 540.0023.06.01.03.01 Tukang Batu 0.0900 O.H 55,000.00 4,950.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0900 O.H 41,900.00 3,771.00

Jumlah: 9,586.00Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.0228 Zak 55,000.00 1,254.0020.01.01.02.05 Semen Berwarna Yiyitan 0.0250 Kg 8,000.00 200.0020.01.01.04.03 Pasir Pasang 0.0030 m3 130,000.00 390.0020.01.01.38.02.08 Tegel Plint Keramik warna/motif 0.2500 Buah 31,600.00 7,900.00

Jumlah: 9,744.00Nilai HSPK : 19,330.00

24.05.01.10 Pemasangan step nosing uk 5x40 m'

Upah:23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.01.01 Kepala Tukang Batu 0.0090 O.H 60,000.00 540.0023.06.01.03.01 Tukang Batu 0.0900 O.H 55,000.00 4,950.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0900 O.H 41,900.00 3,771.00

Jumlah: 9,586.00Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.0228 Zak 55,000.00 1,254.0020.01.01.02.05 Semen Berwarna Yiyitan 0.0250 Kg 8,000.00 200.0020.01.01.04.03 Pasir Pasang 0.0030 m3 130,000.00 390.0020.01.01.38.02.08 Tegel Plint Keramik warna/motif 0.5000 Buah 31,600.00 15,800.00

Jumlah: 17,644.00Nilai HSPK : 27,230.00

F PEKERJAAN ATAP

24.06.01 Rangka Atap

24.06.01.04 Pekerjaan Kuda kuda WF kg

Upah:Mandor 0.0030 O.H 65,000.00 195.00

Pemasangan Tegel Keramik 40x40 cm (Motif/Warna Gelap)

Page 55: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Kepala Tukang 0.0060 O.H 60,000.00 360.00Tukang Las 0.0600 O.H 55,000.00 3,300.00Pekerja/Buruh Tak Terampil 0.0600 O.H 41,900.00 2,514.00

Jumlah: 6,369.00Bahan:Besi profil WF 1.1500 kg 12,500.00 14,375.00

Jumlah: 14,375.00Nilai HSPK : 20,744.00

24.06.02 PENUTUP ATAP24.06.02.03 Pemasangan genteng karang pilang / wisma BARU m2

Upah:23.06.01.01.04 Mandor 0.0080 O.H 65,000.00 520.0023.06.01.01.03 Kepala Tukang Kayu 0.0080 O.H 60,000.00 480.0023.06.01.03.05 Tukang Kayu 0.0750 O.H 55,000.00 4,125.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.1500 O.H 41,900.00 6,285.00

Jumlah: 11,410.00Bahan:Genteng karang pilang / wisma 25.000 Buah 5,000.00 125,000.00

Jumlah: 125,000.00Nilai HSPK : 136,410.00

Pemasangan kembali genteng karang pilang / wisma m2

Upah:23.06.01.01.04 Mandor 0.0080 O.H 65,000.00 520.0023.06.01.01.03 Kepala Tukang Kayu 0.0080 O.H 60,000.00 480.0023.06.01.03.05 Tukang Kayu 0.0750 O.H 55,000.00 4,125.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.1500 O.H 41,900.00 6,285.00

Jumlah: 11,410.00Nilai HSPK : 11,410.00

24.06.02.10 Pemasangan wuwung genteng karang pilang mlUpah:

23.06.01.01.04 Mandor 0.0020 O.H 65,000.00 130.0023.06.01.01.03 Kepala Tukang Kayu 0.0200 O.H 60,000.00 1,200.0023.06.01.03.05 Tukang Kayu 0.2000 O.H 55,000.00 11,000.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.4000 O.H 41,900.00 16,760.00

Jumlah: 29,090.00Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1600 Zak 55,000.00 8,800.0020.01.01.04.03 Pasir Pasang 0.0323 m3 130,000.00 4,199.00

Genteng wuwung karang pilang/wisma 5.0000 m2 9,900.00 49,500.00 Jumlah: 62,499.00

Nilai HSPK : 91,589.0024.06.02.08 Pemasangan Rangka atap galvalum m2

Upah:23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.01.03 Kepala Tukang Besi 0.0100 O.H 60,000.00 600.0023.06.01.03.05 Tukang Besi 0.1000 O.H 55,000.00 5,500.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.4000 O.H 41,900.00 16,760.00

Jumlah: 23,185.00Bahan:Rangka Galvalume uk.0.8 mm 1.100 m2 237,400.00 261,140.00

Jumlah: 261,140.00Nilai HSPK : 284,325.00

Pemasangan kembali Rangka atap galvalum m2Upah:

23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.01.03 Kepala Tukang Besi 0.0100 O.H 60,000.00 600.0023.06.01.03.05 Tukang Besi 0.1000 O.H 55,000.00 5,500.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.4000 O.H 41,900.00 16,760.00

Jumlah: 23,185.00Nilai HSPK : 23,185.00

24.06.02.17 ml

Upah:23.06.01.01.04 Mandor 0.0250 O.H 65,000.00 1,625.0023.06.01.01.03 Kepala Tukang Kayu 0.0800 O.H 60,000.00 4,800.00

Pemasangan talang tritisan dari seng BJLS 30 (lebar 90 cm)

Page 56: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

23.06.01.03.05 Tukang Kayu 0.8000 O.H 55,000.00 44,000.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.5000 O.H 41,900.00 20,950.00

Jumlah: 71,375.00Bahan:Kayu meranti (papan 2/20) 0.0160 m3 3,500,000.00 56,000.00

Kayu meranti (usuk 5/7) 0.0073 m3 3,100,000.00 22,630.00

Seng talang BJLS 30 lebar 90 cm 1.0000 ml 31,000.00 31,000.00

Paku sumbat 5.0000 bh 0.00 0.00

Jumlah: 109,630.00Nilai HSPK : 181,005.00

24.06.02.23 Pemasangan talang pembuluh pipa PVC 4" type AW mlUpah:Tukang pipa 0.0675 O.H 55,000.00 3,712.50

23.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0337 O.H 41,900.00 1,412.03 Jumlah: 5,124.53

Bahan:Pipa PVC 4" type AW pj. 4 mtr 0.2500 lonjor 283,400.00 70,850.00

Klem PVC 1.0000 bh 1,650.00 1,650.00

Jumlah: 72,500.00Nilai HSPK : 77,624.53

24.06.02.26 Pemasangan talang pembuluh pipa PVC 4" mlUpah:Tukang pipa 0.0675 O.H 55,000.00 3,712.50

23.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0337 O.H 41,900.00 1,412.03 Jumlah: 5,124.53

Bahan:Pipa PVC 4" type AW pj. 4 mtr 0.2500 lonjor 283,400.00 70,850.00

Klem PVC 1.0000 bh 1,650.00 1,650.00

Jumlah: 72,500.00Nilai HSPK : 77,624.53

24.06.01.31 Pemasangan List Plank kayu kamper 3/30 cm m'

Upah:23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.01.03 Kepala Tukang Kayu 0.0200 O.H 60,000.00 1,200.0023.06.01.03.05 Tukang Kayu 0.2000 O.H 55,000.00 11,000.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.1000 O.H 41,900.00 4,190.00

Jumlah: 16,715.00Bahan:

20.01.05.02.03.03 Kayu Kamper (papan 3/30) 0.0110 m3 8,000,000.00 88,000.00Paku reng 0.0500 kg 12,500.00 625.00

Jumlah: 88,625.00Nilai HSPK : 105,340.00

24.06.03 Pemasangan Plafon

Pemasangan List plafond Gipsum m1

Upah:23.06.01.01.04 Mandor 0.0010 O.H 65,000.00 65.0023.06.01.01.03 Kepala Tukang Kayu 0.0020 O.H 60,000.00 120.0023.06.01.03.05 Tukang Kayu 0.0210 O.H 55,000.00 1,155.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.1500 O.H 41,900.00 6,285.00

Jumlah: 7,625.00Bahan:

20.01.05.02.03.08 List Plafond Gipsum t=10 1.0500 bh 12,500 13,125.00 Jumlah: 20,750.00

Nilai HSPK : 28,375.0024.06.03.17 Pemasangan Plafon Kalsiboard Rangka hollow m2

Upah:23.06.01.01.04 Mandor 0.0750 O.H 65,000.00 4,875.00

Page 57: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

23.06.01.01.03 Kepala Tukang Kayu 0.0250 O.H 60,000.00 1,500.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.1500 O.H 41,900.00 6,285.0023.06.01.03.05 Tukang Kayu 0.2500 O.H 55,000.00 13,750.00

Jumlah: 26,410.00Bahan:Kalsiboard Ling6 R 2 Uk.240 x 120 x 9 mm 0.3819 Lembar 46,000.00 17,567.40Besi Hollow 40/40 0.7500 m' 25,000.00 18,750.00Besi Hollow 20/40 2.0000 m' 13,800.00 27,600.00Skrup 4.0000 Buah 3,700.00 14,800.00

Jumlah: 78,717.40Nilai HSPK : 105,127.40

G PEKERJAAN KUSEN, PINTU DAN JENDELA

24.07.01.14 Pemasangan Kaca Mati Rayban tebal 5 mm m2Upah:

23.06.01.01.04 Mandor 0.0008 O.H 65,000.00 48.7523.06.01.01.03 Kepala Tukang Kayu 0.0150 O.H 60,000.00 900.0023.06.01.03.05 Tukang Kayu 0.1500 O.H 55,000.00 8,250.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0150 O.H 41,900.00 628.50

Jumlah: 9,827.25Bahan:

20.01.01.03.02.02 Kaca Rayban Tebal 5 mm 1.1000 m2 80,000.00 88,000.00 Jumlah: 88,000.00

Nilai HSPK : 97,827.25

24.07.01.19 Pemasangan kunci tanam besar 2x putar Buah

Upah:23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.01.01.03 Kepala Tukang Kayu 0.0100 O.H 60,000.00 600.0023.06.01.03.05 Tukang Kayu 0.5000 O.H 55,000.00 27,500.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0100 O.H 41,900.00 419.00

Jumlah: 28,844.00Bahan:Kunci tanam 1.0000 buah 95,500.00 Rp 95,500.00

Jumlah: 95,500.00Nilai HSPK : 124,344.00

24.07.01.21 Pemasangan Engsel kuningan untuk jendela stel

Upah:23.06.01.01.04 Mandor 0.0005 O.H 65,000.00 32.5023.06.01.01.03 Kepala Tukang Kayu 0.0100 O.H 60,000.00 600.0023.06.01.03.05 Tukang Kayu 0.1000 O.H 55,000.00 5,500.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0100 O.H 41,900.00 419.00

Jumlah: 6,551.50Bahan:Engsel kuningan 1.0000 stel 23,700.00 Rp 23,700.00

Jumlah: 23,700.00Nilai HSPK : 30,251.50

24.07.01.22 Pemasangan Engsel kuningan untuk pintu stel

Upah:23.06.01.01.04 Mandor 0.0008 O.H 65,000.00 52.0023.06.01.01.03 Kepala Tukang Kayu 0.0150 O.H 60,000.00 900.0023.06.01.03.05 Tukang Kayu 0.1500 O.H 55,000.00 8,250.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0150 O.H 41,900.00 628.50

Jumlah: 9,830.50Bahan:Engsel kuningan 1.0000 stel 20,400.00 Rp 20,400.00

Jumlah: 20,400.00Nilai HSPK : 30,230.50

24.07.01.24 Pemasangan grendel biasa (kecil) buah

Upah:23.06.01.03.05 Tukang Kayu 0.1200 O.H 55,000.00 6,600.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0600 O.H 41,900.00 2,514.00

Page 58: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Jumlah: 9,114.00Bahan:Grendel biasa (kecil) 1.0000 buah 32,700.00 Rp 32,700.00

Jumlah: 32,700.00Nilai HSPK : 41,814.00

24.07.01.26 Pemasangan grendel tanam buah

Upah:23.06.01.03.05 Tukang Kayu 0.1400 O.H 55,000.00 7,700.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0800 O.H 41,900.00 3,352.00

Jumlah: 11,052.00Bahan:Grendel tanam 1.0000 buah 67,100.00 Rp 67,100.00

Jumlah: 67,100.00Nilai HSPK : 78,152.00

24.07.01.32 buah

Upah:23.06.01.03.05 Tukang Kayu 0.1200 O.H 55,000.00 6,600.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.0600 O.H 41,900.00 2,514.00

Jumlah: 9,114.00Bahan:Hak angin kuningan lurus maju mundur 1.0000 Buah 15,500.00 Rp 15,500.00

Jumlah: 15,500.00Nilai HSPK : 24,614.00

24.07.01.44 Pemasangan Kusen Alumunium Profil 4" m1

Upah:23.06.01.01.04 Mandor 0.0022 O.H 65,000.00 143.0023.06.01.01.03 Kepala Tukang Kayu 0.0043 O.H 60,000.00 258.0023.06.01.03.05 Tukang Kayu 0.0430 O.H 55,000.00 2,365.0023.06.01.02.01 Pekerja Terampil 0.0430 O.H 42,500.00 1,827.50

Jumlah: 4,593.50Bahan:

20.01.01.18.04 Aluminium Putih Uk. 4 x 10, Profil 4" 1.1000 m1 62,500.00 68,750.00

20.01.01.46.01.02 Skrup/Ripet 2.0000 Buah 3,700.00 7,400.0020.01.01.46.01.02 Sealent 0.0600 tube 70,300.00 4,218.00

Jumlah: 80,368.00Nilai HSPK : 84,961.50

24.07.01.45 Pemasangan Slimar Alumunium Profil 3/8 " m1

Upah:23.06.01.01.04 Mandor 0.0022 O.H 65,000.00 143.0023.06.01.01.03 Kepala Tukang Kayu 0.0043 O.H 60,000.00 258.0023.06.01.03.05 Tukang Kayu 0.0430 O.H 55,000.00 2,365.0023.06.01.02.01 Pekerja Terampil 0.0430 O.H 42,500.00 1,827.50

Jumlah: 4,593.50Bahan:

20.01.01.18.04 Slimar Alumunium 3/8 1.1000 m1 70,000.00 77,000.00

20.01.01.46.01.02 Skrup/Ripet 2.0000 Buah 3,700.00 7,400.0020.01.01.46.01.02 Sealent 0.0600 tube 70,300.00 4,218.00

Jumlah: 88,618.00Nilai HSPK : 93,211.50

24.07.01.45 Pemasangan jalusi 2x4 cm untuk kusen m1

Upah:23.06.01.01.04 Mandor 0.0750 O.H 65,000.00 4,875.0023.06.01.01.03 Kepala Tukang besi 0.0250 O.H 60,000.00 1,500.0023.06.01.03.05 Tukang besi 0.2500 O.H 55,000.00 13,750.0023.06.01.02.01 Pekerja Terampil 0.1500 O.H 42,500.00 6,375.00

Jumlah: 26,500.00Bahan:

Pemasangan Hak Angin Lurus (Bisa Disetel Maju/Mundur)

Page 59: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

20.01.01.18.04 Profil hollow 2x4 cm 1.0000 m1 20,000.00 20,000.00

20.01.01.46.01.02 Skrup/Ripet 4.0000 Buah 3,700.00 14,800.00 Jumlah: 34,800.00

Nilai HSPK : 61,300.00

Pemasangan Sunscreen m2

Upah:23.06.01.01.04 Mandor 0.0400 O.H 65,000.00 2,600.0023.06.01.01.03 Kepala Tukang Kayu 0.0800 O.H 60,000.00 4,800.0023.06.01.03.05 Tukang Kayu 0.8000 O.H 55,000.00 44,000.0023.06.01.02.01 Pekerja Terampil 0.0800 O.H 42,500.00 3,400.00

Jumlah: 54,800.00Bahan:

Sunscreen alumunium louver 1.1000 m2 275,000.00 302,500.00 Jumlah: 302,500.00

Nilai HSPK : 357,300.00

24.07.01.46 Daun Pintu PVC Buah

Upah:23.06.01.01.04 Mandor 0.0300 O.H 65,000.00 1,950.0023.06.01.01.03 Kepala Tukang Kayu 0.2000 O.H 60,000.00 12,000.0023.06.01.03.05 Tukang Kayu 2.0000 O.H 55,000.00 110,000.0023.06.01.04.04 Pekerja/Buruh Tak Terampil 0.6000 O.H 41,900.00 25,140.00

Jumlah: 149,090.00Bahan:Daun Pintu PVC 1.0000 bh 250,000.00 Rp 250,000.00

Jumlah: 250,000.00Nilai HSPK : 399,090.00

24.07.02 Instalasi Listrik

24.07.02.01 Pemasangan Titik Stop Kontak Gedung TitikUpah:

23.06.02.01.03 Kepala Tukang Listrik 0.0500 O.H 60,000.00 3,000.0023.06.02.03.04 Tukang Listrik 0.2000 O.H 55,000.00 11,000.0023.06.01.02.01 Pekerja Terampil 0.0010 O.H 42,500.00 42.50

Jumlah: 14,042.50Bahan

20.03.06.05.01.01 Stop Kontak (broco) 1.0000 Buah 17,500.00 Rp 17,500.00 20.03.06.01.01.08 Kabel NYA 500 Volt 2 x 2,5 mm2 10.0000 m1 16,400.00 Rp 164,000.00 20.05.04.01.02.01 Pipa Pralon 5/8 1.0000 Lonjor 6,600.00 6,600.0020.05.01.05.13 T Doos Pvc 1.0000 Buah 2,200.00 Rp 2,200.00

Jumlah: 190,300.00Nilai HSPK : 204,342.50

24.07.02.02 Pemasangan Titik Lampu Gedung TitikUpah:

23.06.02.01.03 Kepala Tukang Listrik 0.0500 O.H 60,000.00 3,000.0023.06.02.03.04 Tukang Listrik 0.5000 O.H 55,000.00 27,500.0023.06.01.02.01 Pekerja Terampil 0.3000 O.H 42,500.00 12,750.00

Jumlah: 43,250.00

BahanIsolator 4.0000 Buah 32,750.00 Rp 131,000.00 Kabel NYA 500 Volt 2 x 2,5 mm2 10.0000 m1 16,400.00 Rp 164,000.00 Pipa Pralon 5/8 1.0000 Lonjor 6,600.00 Rp 6,600.00 T Doos Pvc 1.0000 Buah 2,200.00 Rp 2,200.00 Fiting Plafon 1.0000 Buah 152,800.00 Rp 152,800.00 Las Doof 1.0000 bh 5,000.00 Rp 5,000.00

Jumlah: 456,600.00Nilai HSPK : 499,850.00

24.07.02.03 Pemasangan Saklar Tunggal TitikUpah:

23.06.02.01.03 Kepala Tukang Listrik 0.0500 O.H 60,000.00 3,000.00

Page 60: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

23.06.02.03.04 Tukang Listrik 0.2000 O.H 55,000.00 11,000.0023.06.01.02.01 Pekerja Terampil 0.0010 O.H 42,500.00 42.50

Jumlah: 14,042.50BahanSaklar Tunggal Broco 1.0000 Buah Rp 27,300.00 Rp 27,300.00

Jumlah: 27,300.00Nilai HSPK : 41,342.50

24.07.02.04 Pemasangan Saklar Ganda TitikUpah:

23.06.02.01.03 Kepala Tukang Listrik 0.0500 O.H 60,000.00 3,000.0023.06.02.03.04 Tukang Listrik 0.2000 O.H 55,000.00 11,000.0023.06.01.02.01 Pekerja Terampil 0.0010 O.H 42,500.00 42.50

Jumlah: 14,042.50Bahan

20.03.06.05.02.20 Saklar Ganda Broco 1.0000 Buah Rp 35,350.00 Rp 35,350.00 Jumlah: 35,350.00

Nilai HSPK : 49,392.5024.07.02.04 Pemasangan PANEL MCB Titik

Upah:23.06.02.01.03 Kepala Tukang Listrik 0.0500 O.H 60,000.00 3,000.0023.06.02.03.04 Tukang Listrik 0.2000 O.H 55,000.00 11,000.0023.06.01.02.01 Pekerja Terampil 0.0010 O.H 42,500.00 42.50

Jumlah: 14,042.50Bahan

20.03.06.05.02.20 Panel MCB 4 fase 6A 1.0000 Buah Rp 325,000.00 Rp 325,000.00

Jumlah: 325,000.00Nilai HSPK : 339,042.50

24.07.03 Sanitair

24.07.03.10 Pemasangan Pipa Air Bersih diameter 3/4'' m

Upah:23.06.01.01.04 Mandor 0.0018 O.H 65,000.00 117.0023.06.01.01.01 Kepala Tukang Batu 0.0060 O.H 60,000.00 360.0023.06.01.03.01 Tukang Batu 0.0600 O.H 55,000.00 3,300.0023.06.01.04.04 Pekerja/Buruh Terampil 0.0360 O.H 42,500.00 1,530.00

Jumlah: 5,307.00Bahan:Pipa PVC 3/4" TYPE AW 0.3000 batang 30,850.00 9,255.00Perlengkapan 35% harga pipa 0.3500 buah 30,850.00 10,797.50

Jumlah: 20,052.50Nilai HSPK : 25,359.50

24.07.03.15 Pemasangan Pipa Air Kotor diameter 3'' mUpah:

23.06.01.01.04 Mandor 0.0018 O.H 65,000.00 117.0023.06.01.01.01 Kepala Tukang Batu 0.0060 O.H 60,000.00 360.0023.06.01.03.01 Tukang Batu 0.0600 O.H 55,000.00 3,300.0023.06.01.04.04 Pekerja/Buruh Terampil 0.0360 O.H 42,500.00 1,530.00

Jumlah: 5,307.00Bahan:Pipa PVC 3" TYPE C 0.3000 batang 62,550.00 18,765.00Perlengkapan 35% harga pipa 0.3500 buah 62,550.00 21,892.50

Jumlah: 40,657.50Nilai HSPK : 45,964.50

24.07.03.16 Pemasangan Pipa Air Kotor diameter 4'' mUpah:

23.06.01.01.04 Mandor 0.0018 O.H 65,000.00 117.0023.06.01.01.01 Kepala Tukang Batu 0.0060 O.H 60,000.00 360.0023.06.01.03.01 Tukang Batu 0.0600 O.H 55,000.00 3,300.0023.06.01.04.04 Pekerja/Buruh Terampil 0.0360 O.H 42,500.00 1,530.00

Jumlah: 5,307.00Bahan:Pipa PVC 4" TYPE C 0.3000 batang 80,500.00 24,150.00Perlengkapan 35% harga pipa 0.3500 buah 80,500.00 28,175.00

Jumlah: 52,325.00

Page 61: hspk. 2012

NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA HARGA

SATUAN

Nilai HSPK : 57,632.0024.07.03.17 Pemasangan Kran Air Ex Import Buah

Upah:23.06.02.01.04 Kepala Tukang Pipa 0.0300 O.H 60,000.00 1,800.0023.06.02.03.06 Tukang Pipa 0.1500 O.H 55,000.00 8,250.00

Jumlah: 10,050.00Bahan:

20.01.01.40.06.07 Kran Air IN 102 C/A 1.0000 Buah 27,900.00 27,900.0020.05.01.08.02 Rol TBA 1.0000 roll 9,000.00 9,000.00

Jumlah: 36,900.00Nilai HSPK : 46,950.00

24.07.03.21 Kloset jongkok porselin buahUpah:

23.06.01.01.04 Mandor 0.1600 O.H 65,000.00 10,400.0023.06.01.01.01 Kepala Tukang Batu 1.5000 O.H 60,000.00 90,000.0023.06.01.03.01 Tukang Batu 1.5000 O.H 55,000.00 82,500.0023.06.01.04.04 Pekerja/Buruh Terampil 1.0000 O.H 42,500.00 42,500.00

Jumlah: 225,400.00Bahan:Closed jongkok porselin 1.0000 bh 142,800.00 142,800.00

20.01.01.02.05 Semen PC (Portland Cement) 50 kg 0.1200 Zak 55,000.00 6,600.0020.01.01.04.03 Pasir Pasang 0.0100 m3 130,000.00 1,300.00

Jumlah: 150,700.00Nilai HSPK : 376,100.00

24.07.03.21 Wastafel besar warna buahUpah:

23.06.01.01.04 Mandor 0.1000 O.H 65,000.00 6,500.0023.06.01.01.01 Kepala Tukang Batu 0.1500 O.H 60,000.00 9,000.0023.06.01.03.01 Tukang Batu 1.4500 O.H 55,000.00 79,750.0023.06.01.04.04 Pekerja/Buruh Terampil 1.2000 O.H 42,500.00 51,000.00

Jumlah: 146,250.00Bahan:wastafel besar warna 1.0000 bh 298,700.00 298,700.00

20.01.01.02.05 perlengkapan 12% 0.1200 Zak 298,700.00 35,844.0020.01.01.02.05 Semen PC (Portland Cement) 50 kg 0.1200 Zak 55,000.00 6,600.0020.01.01.04.03 Pasir Pasang 0.0100 m3 130,000.00 1,300.00

Jumlah: 342,444.00Nilai HSPK : 488,694.00

24.07.03.21 Pemasangan urinoir buahUpah:

23.06.01.01.04 Mandor 0.1600 O.H 65,000.00 10,400.0023.06.01.01.01 Kepala Tukang Batu 0.0010 O.H 60,000.00 60.0023.06.01.03.01 Tukang Batu 1.1000 O.H 55,000.00 60,500.0023.06.01.04.04 Pekerja/Buruh Terampil 3.3000 O.H 42,500.00 140,250.00

Jumlah: 211,210.00Bahan:Urinoir 1.0000 bh 350,000.00 350,000.00

20.01.01.02.05 perlengkapan 6% 0.0600 Zak 450,000.00 27,000.00 Jumlah: 377,000.00

Nilai HSPK : 588,210.0024.07.02.04 Pemasangan Penangkal Petir Unit

Upah:23.06.01.01.04 Mandor 0.0050 O.H 65,000.00 325.0023.06.02.01.03 Kepala Tukang Listrik 0.0500 O.H 60,000.00 3,000.0023.06.02.03.04 Tukang Listrik 0.2000 O.H 55,000.00 11,000.0023.06.01.02.01 Pekerja Terampil 0.0010 O.H 42,500.00 42.50

Jumlah: 14,367.50Bahan

23.06.01.02.01 Head Penangkal Petir modern non radio aktif R 132m 1.0000 bh 450,000.00 450,000.0023.06.01.02.01 Down Conductor Ericor Cable BC 50 mm 1.0000 m1 84,981.25 84,981.2523.06.01.02.01 Dudukan Tiang Openangkal Petir 3.0000 bh 2,675,812.50 8,027,437.5023.06.01.02.01 Lighting Strike Counter 1.0000 bh 4,775,812.50 4,775,812.5023.06.01.02.01 Obstruction Lamp 1.0000 bh 1,319,625.00 1,319,625.0023.06.01.02.01 Grounding Penangkal Petir 1.0000 bh 1,414,000.00 1,414,000.00

Jumlah: 16,071,856.25Nilai HSPK : 16,086,223.75

Page 62: hspk. 2012

No Namadan Spesifikasi Satuan Harga(Rp) Keterangan

1 2 3 4 5

I MATERIAL.

Air (Biaya air tawar) ltr Rp 13.00 Aluminium 4\" M1 Rp 62,500.00 Aluminium coklat uk. 3x7,5, profil 3" M1 Rp 55,000.00 Aluminium putih uk. 3x7,5, profil 3" M1 Rp 52,500.00 Batu kali pecah15/20 m3 Rp 130,100.00 180.00 Batu pecah mesin 1/2 m3 Rp 254,000.00 Batu pecah mesin 2/3 m3 Rp 160,000.00 200.00 Batu Kali Pecah 5/7 M3 Rp 120,000.00 200.00 Batu Kerikil M3 Rp 120,600.00 Bata merah (kelas 1) Bh Rp 550.00 650.00 Besi beton polos/ulir Kg Rp 9,772.62 8,750.00 Besi Profil WF Kg Rp 12,500.00 9,000.00 Cat Genteng kg Rp 100,000.00 30.00 Cat tembok luar Kg Rp 30,000.00 35.00 Cat dasar (dempul tembok) Kg Rp 13,660.00 Cat Meni Besi Kg Rp 39,900.00 20.00 Cat Meni Kayu Kg Rp 30,400.00 20.00 Cat Kayu Kg Rp 48,067.00 45.00 Cat Penutup Kayu Kg Rp 37,500.00 20.00 Closed Jongkok Porselain bh Rp 142,800.00 Closed Duduk Porselain bh Rp 450,000.00 800,000.00 Daun pintu PVC bh Rp 250,000.00 Engsel Kuningan ARCH u Pintu Stel Rp 20,400.00 Engsel Kuningan ARCH u Jendela Stel Rp 23,700.00 20.40 Fitting Plafond Bh Rp 152,800.00 9,750.00 Glass Blok bh Rp 12,000.00 Grendel Biasa Kecil bh Rp 32,700.00 7,000.00 Grendel Tanam bh Rp 67,100.00 10,000.00 Kalsiboard EG Uk. 240 x 120 x 9mm Lembar Rp 46,000.00 60,000.00 Hakangin Lurus kuningan bisa disetel maju/mundur bh Rp 15,500.00 25,000.00 Isolator Bh Rp 32,750.00 5,000.00 Kawat Bendrat Kg Rp 15,350.00 Kayu Kamper Balok (6/15) m3 Rp 3,400,000.00 6,500,000.00 Kayu Kamper balok 8/12 m3 Rp 7,500,000.00 6,500,000.00 Kayu Kamper 3/30 cm m3 Rp 8,000,000.00 6,500,000.00 Kayu Kamper 1/5cm m1 Rp 6,000,000.00 3,000.00 Kayu kamper (slimar) m3 Rp 6,750,000.00 Kayu Kamper Usuk m3 Rp 6,500,000.00 Kayu Kamper reng (balok 3/5) m3 Rp 6,000,000.00 Kayu Meranti Balok 8/12 m3 Rp 3,400,000.00 5,500,000.00 Kayu Meranti Usuk 4/6dan5/7 m3 Rp 3,100,000.00 5,500,000.00 Kayu Meranti Usuk balok 5/7 m3 Rp 6,500,000.00 5,500,000.00 Kayu Meranti (Bekisting) m3 Rp 2,400,000.00 5,500,000.00 Kayu Meranti papan 2/20 m3 Rp 3,500,000.00 5,500,000.00 Keramik 20x20cm motif m2 Rp 33,000.00 37,100.00 Keramik dinding 20x25 m2 Rp 37,100.00 Keramik 40x 40cm (motif/warnagelap) m2 Rp 31,600.00 43,100.00 Keramik tegel plint warna/motif 7,5x20 M1 Rp 4,900.00 25,000.00 Kertas gosok No. 150 Lbr Rp 2,500.00 Kertas gosok No. 280 Lbr Rp 2,500.00 Kran air Ex Import Bh Rp 27,900.00

Kuas Bh Rp 7,500.00 Kunci Tanam besar 2x putar kuningan Bh Rp 95,500.00 Kaca Reyben t = 5 mm m2 Rp 80,000.00 65,000.00

Page 63: hspk. 2012

No Namadan Spesifikasi Satuan Harga(Rp) Keterangan

1 2 3 4 5Kabel NYA 500 volt 2x 2,5 Mm2 m Rp 16,400.00 11,500.00 Las Doof bh Rp 5,000.00 1,000.00 Lampu TL 18 Watt bh Rp 40,000.00 12,500.00 Lampu SL 14 Watt bh Rp 32,000.00 Lampu Tempel hias SL 18 Watt bh Rp 130,000.00 Lapis triplek 0,4cm lbr Rp 49,000.00 Lem kayu kg Rp 25,000.00 10,000.00 Lem PVC bh Rp 11,650.00 6,000.00 List plafond Gypsum bh Rp 12,500.00 Minyak Cat (Afdunner) Ltr Rp 7,500.00 Minyak Bekisting Ltr Rp 4,800.00 Minyak pelumas Ltr Rp 24,400.00 Metal stud M2 Rp 4,262,050.00 70,000.00 MCB MG 10A bh Rp 325,000.00 50,000.00 Paku kayu Kg Rp 14,500.00 Paku reng Kg Rp 12,500.00 Paku usuk Kg Rp 12,000.00 skrup Bh Rp 3,700.00 250.00 Paku sumbat Bh Rp - Paku triplek/eternit Kg Rp 14,000.00 Paku Asbes Kg Rp 14,500.00 Pasir Cor m3 Rp 14,500.00 180,000.00 Paku Klem (No.4) kg Rp 14,500.00 Paku Klem (No.4) doz Rp 27,100.00 Paku Biasa 2"-5" kg Rp 12,500.00 Pasir Pasang m3 Rp 130,000.00 160,000.00 Pasir Urug m3 Rp 115,000.00 140,000.00 Pipa paralon 5/8\" m Rp 6,600.00 Pewarna sct Rp 900.00 Pipa Galvanis Ø 2" BT Rp 93,200.00 Pipa PVC Ø1/2\ "Type AW batang Rp 25,450.00 Pipa PVC Ø3/4\ "Type AW batang Rp 30,850.00 Pipa PVC Ø1\ "Type AW batang Rp 38,750.00 Pipa PVC Ø11/2\ "Type AW batang Rp 71,550.00 57,000.00 Pipa PVC Ø3\ "AW panjang 6 mtr ljr Rp 194,500.00 90,000.00 Pipa PVC Ø4\ "AW panjang 4 mtr ljr Rp 283,400.00 140,000.00 Pipa PVC Ø5\ "AW panjang 4 mtr ljr Rp 446,900.00 200,000.00 Pipa PVC Ø2\"C LJR Rp 42,500.00 25,000.00 Pipa PVC Ø4\"C batang Rp 80,500.00 55,000.00 Pipa PVC Ø3\"C batang Rp 62,550.00 35,000.00 Pipa PVC Ø5\"C batangPipa PVC Ø6\"C ljrPlamur Tembok kg Rp 104,100.00 15,000.00 Plamur Kayu kg Rp 33,700.00 17,500.00 Plywood tebal 9mm lbr Rp 95,000.00 105,000.00 Saklar Tunggal Bh Rp 27,300.00 15,000.00 Saklar Ganda Bh Rp 35,350.00 25,000.00 Shanding kg Rp 55,000.00 Rangka Galvalum m2 Rp 237,400.00 220,000.00 Semen Pc 50kg Zak Rp 55,000.00 Semen Pc 40kg Zak Rp 48,000.00 48,500.00 Semen berwarna yiyitan kg Rp 8,000.00 Serat fiber m2 Rp 9,000.00 6,000.00 Sirtu m3 Rp 75,000.00 140,000.00 Slimar Alumunium3/8" m1 Rp 70,000.00 Sealent tube Rp 70,300.00 22,000.00 Stop Kontak Broco Bh Rp 17,500.00 T doos PVC Bh Rp 2,200.00 Triplek uk. 110x244 t=4mm Lbr Rp 49,000.00 Triplek uk. 110x244 t=4mm Lbr Rp 38,000.00 Teer Kg Rp 7,000.00 Thinner A ltr Rp 21,600.00 Tiang Pancang 20/20 M Rp 142,500.00

Page 64: hspk. 2012

No Namadan Spesifikasi Satuan Harga(Rp) Keterangan

1 2 3 4 5Tiang Pancang 25/25 m Rp 142,500.00 180,000.00 Tiang Pancang30/30 m Rp 142,500.00 220,000.00 Wastafel Besar Warna bh Rp 298,700.00 Waterproofing kg Rp 37,075.00 50,000.00 Besi Hollow 2/4 m1 Rp 13,800.00 Got talang R25 (1/2 lingkaran) bh Rp 25,000.00 40,000.00 Besi pipa putih (steinless)SCH 40 welded bh Rp 95,300.00 Head Penangkal Petir modern non radio aktif R 13 bh Rp 450,000.00 5,000,000.00 Down Conductor Ericor Cable BC 50 mm m1 Rp 84,981.25 Dudukan Tiang Openangkal Petir bh Rp 2,675,812.50 Lighting Strike Counter bh Rp 4,775,812.50 Obstruction Lamp bh Rp 1,319,625.00 Grounding Penangkal Petir bh Rp 1,414,000.00 tandon air plastik kapasitas 1000 liter Rp 1,500,000.00 tandon air stanles kapasitas 1000 liter bh Rp 3,250,000.00 Urinoir bh Rp 350,000.00 Sunscreen m2 Rp 275,000.00 Pompa air submersible unit Rp 2,000,000.00 Avour lantai metal bh Rp 30,000.00

II TENAGA

Mandor hr Rp 65,000.00 Surveyor Geodesi hr Rp 60,000.00 KepalaTukang Batu hr Rp 60,000.00 KepalaTukang Besi hr Rp 60,000.00 KepalaTukang Cat hr Rp 60,000.00 KepalaTukang Kayu hr Rp 60,000.00 KepalaTukang Listrik hr Rp 60,000.00 KepalaTukang Pipa hr Rp 60,000.00 Tukang Batu hr Rp 55,000.00 Tukang Besi hr Rp 55,000.00 Tukang Cat hr Rp 55,000.00 Tukang Kayu hr Rp 55,000.00 Tukang Las hr Rp 55,000.00 Tukang Listrik hr Rp 55,000.00 Tukang Pipa hr Rp 55,000.00 PekerjaTerampil hr Rp 42,500.00 Pekerja/ BuruhTakTerampil hr Rp 41,900.00

III. PERALATAN

Sewa Compresor Jam Rp 35,000.00 Sewa Concreate Mixer 0.50m3 (min 3jam) Jam Rp 50,000.00 Sewa Concreate Pump (min 3 jam ) Jam Rp 25,000.00 Sewa Concreate vibrator Jam Rp 15,000.00 Sewa Crane 30ton-min8jam (termasuk mob/demob.Opertor, BBM) Jam Rp 225,000.00 Sewa Hammer tiang pancang-min8jam (termasukmob/demob,operator, BBM) Jam Rp 185,000.00 Sewa Bucket dan crane/draglin scraper Jam Rp 80,000.00 Sewa Motor Grader125-140Pk (min5jam) Jam Rp 270,000.00 Sewa PhenumaticTire Roller (min5jam) Jam Rp 155,000.00 SewaTruck Tangki Air (min 5 jam) Jam Rp 250,000.00 Sewa Vibrator Roller (min 5 jam) Jam Rp 135,000.00 Sewa Excavator 6m Jam Rp 130,000.00 SewaTheodolit set Rp 100,000.00 Sewa Welding Set (min 5 jam) hari Rp 30,000.00 Sewa Alat Bantu (1 set@3alat ) jam Rp 1,000.00 Sewa Dump truck 6T min(5jam) jam Rp 65,000.00 Sewa Dump truck 5T min(5jam) jam Rp 65,000.00 Sewa Dump truck 3,5T min(5jam) jam Rp 65,000.00 Sewa alat bantu strouss pile jam Rp 10,000.00