230
The Natural Energy Laboratory of Hawaii April 10,1989 The Honorable William Paty, Chairperson Board of Land and Natural Resources Kalanimoku Building 1151 Punchbowl Street Honolulu, Hawaii 96813 Dear Mr. Paty: rri :'... oi- Please find enclosed copies of the HGP-A Operating Figures for January, 1988 through March, 1989. We understand these reports have not been sent to you since management changes occurred at the Research Corporation of the University of Hawaii (RCUH). An HGP-A Fact Sheet which covers the years 1982 through February, 1989 is also enclosed for your information. We hope the information provided will be of interest to you. We will continue to keep you apprised of the operating figures. JPH:gym Enclosures cc: Mr. Roy N. Nakanishi Best regards, Executive Director III 220 South King Street, Suite 1280 * Honolulu, HI 96813 * (808) 548-7017 o P.O. Box 1749 * Kailua-Kona, HI 96745 * (808) 329-7341 o P.O. Box 2172 * Pahoa, HI 96778 * (808) 965-9699 .. cJ'I - rn o It71

Upload: doanh

Post on 24-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

~ ~ The Natural Energy Laboratory of Hawaii

April 10,1989

The Honorable William Paty, Chairperson Board of Land and Natural Resources Kalanimoku Building 1151 Punchbowl Street Honolulu, Hawaii 96813

Dear Mr. Paty:

~~~ rri :'... oi-

Please find enclosed copies of the HGP-A Operating Figures for January, 1988 through March, 1989. We understand these reports have not been sent to you since management changes occurred at the Research Corporation of the University of Hawaii (RCUH). An HGP-A Fact Sheet which covers the years 1982 through February, 1989 is also enclosed for your information.

We hope the information provided will be of interest to you. We will continue to keep you apprised of the operating figures.

JPH:gym Enclosures

cc: Mr. Roy N. Nakanishi

Best regards,

~HU1Zlngh Executive Director

III 220 South King Street, Suite 1280 * Honolulu, HI 96813 * (808) 548-7017 o P.O. Box 1749 * Kailua-Kona, HI 96745 * (808) 329-7341 o P.O. Box 2172 * Pahoa, HI 96778 * (808) 965-9699

.. cJ'I -

rn o

It71

Page 2: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens
Page 3: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

NATURAL ENERGY LABORATORY OF HAWAII

Puna Geothermal Facility

Net Kwh Year Generated

1982 15,252,800

1983 19,327,608

1984 20,646,000

1985 18,854,200

1986 17,534,600

1987 14,106,400

1988 16,225,300

1989 2,654,800

Average 17,991,575

Barrels of Oil Conserved To Date

Barrels of Oil Conserved per Year

HGP-A Fact Sheet

Cumulative Kwh Months Operating

9

34,580,408 12

55,226,408 12

74,080,608 12

91,615,208 12

105,721,608 12

121,946,908 12

124,501,708 2

83 months or 6 years 11 months

thru Feb., 1989

124,501,708 kwh = 249 000 bb1 500 kwh/ bb 1 '

17,991,575 kwh/yr. = 35,980 bb1/ear 500 kwh/bbl

According to HELCO, 2,000 homes are serviced by HGP-A power.

HGP-A power plant typically operates at well over 90% reliability factor.

NELH - Puna/Feb. 1989

~~~~------------- .. -.,.---

Page 4: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

HAWAII ELECTRIC LIGHT COMPANY, INC •• PO BOX 1027 • HILO, HI 96721-1027

IHEII The Natural Energy Laboratory of Hawaii 220 South King Street, Suite 1280 Honolulu, HI 96813

Attention: Mr. Jack P. Huizingh Executive Director

Gentlemen:

Cl'

March 1, 1989

Operating figures for the month of February 1989 are as follows:

RECEIVED

MAR -3 \989

NELH

Net Kwh Generated

Revenues $

Operating Hours (Hours:Min.)

1,255,300 $ 77 ,351 622:12

Also attached please find the monthly maintenance summary.

FGK:mh Attachment cc: Roy Nakanishi

Cora Chai (RCUH)

A Hawaiian Electric Industries Company

Frank G. Kennedy, Manager Production Department

-----------------------------_ .. ",,-

Page 5: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, .. o Q

HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Accomplished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

FEBRUARY 1989

1. Repaired three gas leaks during the month on the John link scrubber column.

2. Repaired one gas leak on the John link incinerator.

3. The unit developed problems this month from a plugged flash separator brine line that resulted in two outages.

The unit was taken off line on Friday, February 10, to reroute the brine flow and clean the separator. (Open venting occurred from 8:09 a.m. until 2:10 p.m. that day.) During the outage, the following work was performed:

a. Flow was rerouted from the plugged 3-inch brine line into the existing 4-inch brine line.

b. The flash separator was cleaned. c. The circulating water pump inlet screens. were cleaned. d. The 10% caustic pump motor was replaced. e. Two control valves on the John link gas line were replaced. f. A frozen gear box on the cooling tower fan was replaced. g. Distribution tray nozzles were cleaned on the cooling tower. h. A 4-inch block valve was installed on LV-1. i. Miscellaneous small piping and electrical repairs were performed

around the plant. j. The unit was put back into service at 6:48 p.m. the next day.

4. A shop overhaul was performed on the LV-1 butterfly valve.

B. Plans For Next Month

1. Perform corrective maintenance as required.

8 NMU 2127/89

---------------------------------------_ ••• p ,,-""~

Page 6: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

HAWAII ELECTRIC LIGHT COMPAeINC .. PO BOX 1027· HILO, HI 96721-1027

FUEL 1-3 H-G/Y

IHEII The Natural Energy Laboratory of Hawaii 220 South King Street, Suite 1280 Honolulu, HI 96813

Attention: Mr. Jack P. Huizingh Executive Director

Gentlemen:

February 1, 1989 RECEIVED

FEB ~6 1989

NELH

Operating figures for the month of January 1989 are as follows:

Net Kwh Generated

1,399,500

Also attached please find

FGK:NMU:mh Attachment cc: Jan War (NELH-Kona)

Cora Chai (RCUH) , . , ( "

. I ~, ';j AI' . 1 ' . ./!,~'1 Cc- ~,I\~I~Y",Gh,

A Hawaiian Electric Industries Company

Revenues $

86,391

Operating Hours (Hours:Min.)

725:39

Frank G. Kennedy, anager Production Department

,----------"""-----------------------------_ .... --.

Page 7: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

HAWAII ELECTRIC LIGHT COMPANY. INC.

A. Work Acca.plished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JANUARY 1989

1. Replaced a section of deteriorated propane tubing on the emergency generator.

2. Cleaned the circulating water pump inlet screens.

3. Repaired a gas leak on the John Zink scrubber column.

4. Replaced the main 411 City water shutoff valve.

5. Repaired a deteriorated section of air conditioning ductwork in the motor control center cab.

B. Plans for Next Month

1. Perform corrective maintenance as required.

8 NMU 2/03/89

Page 8: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.... ~-.. -:.,:;

I'J." ~,

o o GFNF'P '1 "/-"·1 H····G/G

HAWAII ELECTRIC LIGHT COMPANY, INC. INTEROFFICE CORRESPONDENCE

TO: TOM JEZIERNY, MANAGER PRODUCTION DEPARTMENT, HECO

FROM: FRANK G. KENNEDY, MANAGER PRODUCTION DEPARTMENT, HELCO

REceiVED

JAN2 0 1989 NELH

S'UBJECT: HELeO '1989 OVERHAUL SCHEDULE, REVISION &

UNIT

,... .., h ... ,

· .• • .. ··1·11··1"1 <:& 1'1 • ,., \:.-···I·:~

HII ... L :i::'')

,JUN 'j 3 .. ··~23 .. ) .~' ..

JUN ?6··-JUI ... 2;

• ..11..11 ... ?4····P,UG 4

I~UG ·;;-··-:;.:EI'"

'·' .. f·.·I·.·.. r." •• )") i... ... .:) •••• ,-l •• • \'"

r'll=lNFOkIFF: F:FO' D FI~;CJf'l HELD

BOILER INSPECTION, TURBINE MINOR, CLEAN CONDENS'EI:;:

BOILER INSPECTION, TURBINE MINOR, CLEAN CONDENSER, REPLACE EXCITE!:;:

BOIl.ER INSPECTION, TURBINE MINOR, CLEAN CClNDENSEF:

BOILER TUBE REPAIR, PICIl) CLEP,N BOILEI~;, . EVAPORATOR, & CON­DENSER (FOAM), TAKE TURBINE SHAFT SEAL CLEI::,I:;;I~NCES

BOILER INSPECTION, TURBINE MINOR, CLEAN CONDENSE!:;:

Tl.Hd:{ I I'll::: i"!(l,.li:m, I~:I:::F'L.

TURBINE SHAFT SEALS, REPAIR BOILER REFRAC­TORY, CLEAN CONDENSER, I~:EPL. SUPE!:;:HFI:1TEI:;:

TURBINE MAJOR, CLEAN CONDENSER, CLEAN & REPAIR COOLING TOWER, OVERHAUL H2S ABATEMENT INCINERATOR & SCRUB-BERS, DREDGE PONDS,

C2 .. II ..... ' 1··'1 .. ···Ii · .. I······'··I··' .. ·l·(·lf·' .,' ... :: .. '\ •...• I··J ,,!;.' I~' ::. J" 1··f or, f'Of .. 0, ..

QJ

N/I~

'j !""DFFf·'iPli··</ ~:.? !'jP,CH IN:r S'T .,.~ I,JF i. DEE S ·1 HDII..FF;:

·1 FUF;:Fi"'jPIN ~:.? ld F L :0 F F;;

HUILFF:

FR~NR-G: ~FNNFt~;-R~N~GFR----

C~ HE CO (A. NAKAMURA, R. IMAI, R. HARRIS, HELCO (N. OSS, J. PAUOL.E, C. NAKAYAMA, II 'I'T"'{I1" II I"TIT'!'T) .. ~ .. I:. f~ I'~" ~~ I-{ 1,1. . ':.' . '1\ H r' I' '( I·'! t'll ,I,! i-." "T' 'T' , HFlI'IHI<,Lh ...... {"Flfo. " ., .'. ::.1'1'1::. .I

R. ARAKAKI, V. TEVES) D. BARNES, C. NAGATA,

M~~Q ~T. JOAQUIN) HLI·· L '.1",., H .1.1 ... 1 ... l RCUH (...I. HUIZINGH) FACTORY MUTUAL. (E. BLYTHYN)

'/~/f~ tAY ~ r:. (j •• /u.n~ t,. ___________________________________________________________________________________ ~H_. ____

Page 9: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

HAWAII ELECTRIC LIGHT COMPANY, INC . . PO BOX 1027· HILO, HI 96721-1027 o

IHEII The Natural Energy Laboratory of Hawaii 220 South King Street, Suite 1280 Honolulu, HI 96813

Attention: Mr. Jack P. Huizingh Executive Director

Gentlemen:

o

January 4, 1989

FUEL 1-3 H-G/Y

JAN -9189 NEtH

Operating figures for the month of December 1989 are as follows:

Net Kwh Generated

1,391,700

Revenues $

85,911

Operating Hours (Hours:Min.)

705:24

Also attached please find the monthly maintenance summary.

FGK:NMU:mh Attachment cc: Jan War (NELH-Kona)

Cora Chai (RCUH)

A Hawaiian Electric Industries Company

--------------------------------_ .. _",-

Page 10: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

# o o HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Accomplished

ATIACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

DECEMBER 1988

1. Changed discharge hoses on both 10% caustic pumps and upgraded the hose to braided stainless steel reinforced.

2. Cleaned circulating water pump inlet screens.

3. Changed feather valves on the Joy air compressor.

4. Patched small leaks on the John link PVC gas line.

B. Plans For Next Month

1. Perform corrective maintenance as required.

8 NMU 1/05/89

-----------------------------... -~-,-

Page 11: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HAWAII ELECTRIC LIGHT COMPANY, INC.· PO BOX 1027· HILa. HI 96721-1027 o

IHEII

The Natural Energy Laboratory of Hawaii 220 South King Street, Suite 1280 Honolulu, HI 96813

Attention: Mr. Jack P. Huizingh Executive Director

Gentlemen:

December 8, 1988

t£CEtVED ute 1~"

NELH

Operating figures for the month of November 1988 are as follows:

Net Kwh Generated

1,421,500

Revenues $

87,725

Operating Hours (Hours:Min.)

700:50

Also attached please find the monthly .maintenance summary.

FGK:cr Attachment cc: Jan War (NELH-Kona)

Cora Chai (RCUH)

IJ-jnj),y (\ ~. -ro f I! t/,J (.;,'<- ~.

A Hawaiian Electric Industries Company

Fr k G. Kennedy, anager Production Department

____________________________________ RI .... "'"·""~

Page 12: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• o o HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Accomplished

ATIACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

NOVEMBER 1988

1. Replaced mechanical seals on both 10% caustic supply pumps.

2. Overhauled the "A" 10% caustic pump.

3. Repaired gas leaks on the John Zink oxidizer scrubber.

B. Plans For Next Month

1. Perform corrective maintenance as required.

8 NMU 12/2/88

------------------------------_." •... "" ... -

Page 13: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HAWAII ELECTRIC LIGHT COMPA6INC . . PO BOX 1027· HILO, HI 96721·1027

FUEL 1-3 H-G/Y

IHEII The Natural Energy Laboratory of Hawaii 220 South King Street, Suite 1280 Honolulu, HI 96813

Attention: Mr. Jack P. Huizingh Executive Director

Gentlemen:

November 1, 1988

Operating figures for the month of October 1988 are as follows:

fiECEIVED i.UV - 41988

NELH

Net Kwh Generated

Revenues $

Operating Hours (Hours:Min.)

1,258,400 77 ,550 664:30

Also attached please find the monthly maintenance summary.

FGK:NMU:mh Attachment cc: Jan War (NELH-Kona)

Cora Chai (RCUH)

A Hawaiian Electric Industries Company

/

Very truly yours,

k'~ fbtJu ~ Frank G. Kennedy, Manager ~ Production Department

----------------------_.,,-"'-

Page 14: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

A. Work Accomplished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

OCTOBER 1988

1. High condenser backpressure was experienced following September's overhaul, and maximum load was limited to 1.1 MW. The unit was taken offline for 3 days during the first week of October for condenser cleaning. Following the cleaning, normal backpressure was attained and the unit's output was raised to 2.1 MW.

2. Replaced the "B" caustic tank suction valve.

3. Replaced the "B"caustic tank sight glass.

4. Replaced the impeller on the John Zink recycle pump.

5. Callibrated all of the turbine/generator temperature measuring ci rcuits.

6. Finished installation of the new back-up H2S abatement system.

7. Repaired the telephone buzzer.

B. Plans for Next Month

1. Perform corrective maintenan~e as required.

-8 NMU 11/01/88

Page 15: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

HAWAII ELECTRIC LIGHT COMPA~NC .• PO BOX 1027 • HILa, HI 96721-1027 o \,II

IHEII

The Natural Energy Laboratory of Hawaii 220 South King Street, Suite 1280 Honolulu, HI 96813

Attention: Mr. Jack P. Huizingh Executive Director

Gentlemen:

October 4, 1988

FUEL 1-3 H-G/Y

RECEIVED !JeT - 61988

NELH

Operating figures for the month of September 1988 are as follows:

Net Kwh Generated

739,600

Revenues $

45,534

Operating Hours (Hours:Min.)

400:05

Also attached please find the monthly maintenance summary.

FGK:NMU:cr Attachment cc: Jan War (NELH-Kona)

Cora Chai (RCUH)

A Hawaiian Electric Industries Company

--------------"-._"-

Page 16: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Accomplished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

SEPTEMBER 1988

1. Completed a two-week general overhaul at the plant (see attached list of work performed during the overhaul).

2. Repaired a gas leak on the John Zink furnace manhole.

3. Installed a newly fabricated replacement section for the steel twin exhaust stack.

4. Re-installed a loose discharge hose on the 10% caustic pump discharge after the fitting failed under pressure and sprayed the operator. Minor injuries were sustained by D. Borges as a result of the incident which occurred on September 6, 1988.

5. Overhauled the "A" circulating water pump.

6. Overhauled the emergency shower and eyewash station.

B. Plans For Next Month

1. Correct low condenser vacuum condition.

2. Perform corrective maintenance as required.

~NMU 10/4/88

-------------------------,~-,."-

Page 17: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY s INC.

LIST OF WORK PERFORMED DURING ANNUAL OVERHAUL OF HGP-A SEPTEMBER 19 - 30 s 1988

1. Open venting occurred during the hours of 0732 and 1447 on Wednesday, September 21, 1988.

2. Inspected the generator bearings and gear box internals.

3. Replaced two main steam line drain valves. (This work required open venting.)

4. Replaced the LV-1 brine level control valve.

5. Repaired the ladder into the condensate tank pit.

6. Made repairs to various small sections of deteriorated conduit and piping.

7. Repaired defective light fixtures.

8. Calibrated the 50% caustic pump mixing control.

9. Repaired an oil leak on the turbine reduction gear.

10. Changed the turbine lube oil filters.

11. Replaced the ceramic packing in the John Zink scrubber column.

12. Replaced rusted pipe brackets in the Dow scrubber.

13. Overhauled the nAil 10% caustic pump.

14. Calibrated vibration and displacement sensors on the turbine.

15. Changed the charcoal generator air filter.

16. Overhauled the generator air blower.

17. Changed oil on the cooling tower fan gear boxes.

18. Inspected the turbine lube oil cooler.

19. Calibrated miscellaneous gauges and pressure switches.

8 NMU 10/4/88

Page 18: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

O w , z

o

~

3: <r :r

:1.. :.!...

...,... -'- ,;:-.:

~~

u.. L:.i

:::::: :> w;.-: « :::

.: -U

Lt..

z

L:..l

Z L:,J *-' >

:3 C

r"-

,-..

r"- <r "..:,.:

r-

Page 19: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Accomplished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

~OO~19~

1. Overhauled the John Zink scrubber recycle pump.

2. Cleared an obstructed John Zink oxidizer propane line.

3. Adjusted the turbine control valve actuator linkage.

4. Changed oil on the station air compressor.

5. Made minor repairs to the bridge crane.

6. Repaired the outside telephone horn.

7. Replaced a faulty supervisory control circuit card after the card malfunctioned and caused a unit trip on Saturday, August 20. The outage lasted 2 hours and 47 minutes.

8. Replaced a defective hydraulic turbine governor which caused a unit trip on Sunday, August 28. The outage lasted 12 hours and 46 minutes.

B. Plans For Next Month

1. Repair piping leaks on the turbine main steam line. The work will require unabated venting of the well.

2. Perform corrective maintenance as required.

NMU 9/06/88

Page 20: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.~ o o HAWAII ELECTRIC LIGHT CO" INC.

P. (). BOX 1 <~:"~'7 HILO, HAWAII 96721-1027

AUGUST 2, 19Ba

THE NATU~AL ENERGY LASORATORY OF HAWAII 220 SOUTH KING STREET, SUITE 128G HONOLULU, HI 96813

ATTENTION: Nr~ .. ~ACI< P .. HIlIZINGI-i EXECUTIV~ DIRECTOR

GENTl.EMEN:

RECEIVED f~UG - 41988

NELH

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MDNTH OF JULY i988.

TOTAl .• STEAM FL.OI4 i (~0(~ ~

._----- .... -_ .... _-----

32, 131

I='GI( : NNU : MN ATTACHMENr

TOTAL BF:r.NE FLClW 1 ~?(')0 ....

'II'

----------------

41,G99

ee: JAN WAR (NELH-KONA) CORA CHAI O;:CUIi)

OPERATING Nr..:.:,. If.ttJH I~:E:VENUES HOURS

GI~NF.:RATr:::l) ~i (HOURS':M1.N) --_._-_.- .... - ........ _ ......... _ .... - .... ,... ...... ___ ,. .. _ .... IIMl

1 I 553 1 5<~0 95, 7~~6 'n;~,: 20

YOURS,

__________________________ ~fttlll*"l~

Page 21: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JULY 1988

A. Work Accomplished

1. Tightened air compressor drive belts.

2. Replaced 50% caustic transfer pump motor with temporary unit borrowed from Puna Biomass.

3. Repaired 10% caustic pump.

4. Overhauled John Zink scrubber recycle pump.

5. Responded to a unit trip on July 25, 1988, after a downed pole caused the 34.5KV line to trip and MOS 3702 and ACB 409 would not reclose. Checked out the circuit breakers and placed the unit on line after a 7 hr. 40 min. outage.

B. Plans For The Coming Month

1. Perform corrective maintenance as required.

IHEII NMU 8/02/88

---------___________________ ,~""1I"I""' ..........

Page 22: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

,/ j../ / o o

./

HAWAII ELECTRIC LIGHT CO., INC. P. O. BOX 1027

HILO, HAWAII 96721-1027

JULY ~::i, '1';1 EtB

THE NATURAL ENERGY LABORATORY OF HAWAII 220 SOUTH KING STREET, SUITE 12B0 HONOLULU, HI 96813

ATTENTION: MR. JACK P. HUIZINGH EXECUTIVE DIRECTOR

GENTLEi"IEN:

A ECEtVED ~Ul- ~!J88

NELH

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF JUNE 19B8.

TOTAL STEAM FLOW 1000 •

TOTAL BRINE FLOW NET KWH REVENUES ~I;

OPERATING HOURS

(HOURS:MIN)

:"5'1 I·:') 'l ~?

FGK:NMU:MN ATTACHMENT CC: JAN WAR (NELH-KONA)

CORA CHAI (RCUH) "',' ,. "{' i. 'J "

I I ~. nt I, ( /':) to h. " \j C( 0 •

'I ()(H1 ~~ GENEI~f~,TED

39,752 1,502,600 9~,~, '-,;',4(-) 7 (, ~\:.~ : ~'!; :",

Ffn'~,NI'; G ,.-i(ENNE})l, MANAGEF: F"C:' ('} I)'1("'T' 'I' ('IN I)f.:'f:' "I:"'1'MI:"\"1' 1"", , , I .. " ""I "" t~ \ 1 ",I f

Page 23: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

..

A. Work Accomplished

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JUNE 1988

1. Replaced a faulty recirculation pump on the Dow scrubber.

2. Repaired a leaking section of piping on the 50% caustic tank unloading line.

3. Installed a new flame scanner on the John Zink oxidizer.

4. Replaced a defective caustic supply solenoid valve on the John Zink scrubber.

5. Installed new bearings on the 10% caustic supply pump.

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 7/05/88

~~~~----------------------~!II!II~'\III"~'~

Page 24: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

HTLU,

t;T TFNT J iJN . hE, . .JPiCi< P., Hij J:/ INCH EXFCUI·IVE DIRECTUR

o tlECEtVED

JUN-? •

NELH

PLEASE FIND HGP-A UPEEA1JNG FIGURES FOR THE MUN1H OF MAY 1988.

Fei< . j\INU : hN PiT T (·!CHr';r:NT

CURA CHAl (PCUH)

;·,![T i«("!H C E N L I:;: P! T F :0

PF\iENUFS' .:\;

ClF'E;:;:P! T I Nt; HOUkS'

( HOur;: s· : i"l I N i

--------------------~,-

Page 25: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

,

A. Work Accomplished

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

MAY 1988

RECEIVED JUN-?M

NELH

1. Replaced a leaking hose on the John link scrubber recycle pump.

2. Worked on the John link scrubber recycle pumps after experiencing numerous trips. Repaired an erratic flow switch and placed the pumps back into operation.

3. Disabled the John link scrubber high temperature interlock.

4. Removed the flame scanner from the John link thermal oxidizer.

5. Investigated the cause of three unit trips during the week ending May 29, that caused a total outage time of 16 hours, 22 minutes. No apparent cause of the trips has been found.

B. Plans For Next Month

1. Continue the investigation into the unit generator trips.

2. Perform corrective maintenance as required.

IHEII NMU 6/02/88

________ ~ ____ ~ __________ ~ __ ~~~~ _______________________________________________________________ H~~ ___

Page 26: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P., 0., E< 0 Xi (I :,:.~ ./ HILO, HAWAII 96721-1027

THE NATURAL ENERGY LABORATORY OF HAWAII 220 SOUTH KING STREET, SUITE 1280 HONOLULU, HI 96813

IYfTENTION: f'IF;;., JtICi( F'., Ht.JIZINGH EXECUTIVE DIRECTOR

GENTI ... ENEN:

HECE\VED IviAY - 9 1988

NElH

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF APRIL 1988.

TOTP,L STEI:l/'i FLOkt '10(:>(:) :::

TOTAL BRINE FLOW .\ G(1(~ ~::

~3 ~ 3/ t9~~ .Y' /2 mo. i~/? ---

)( .:;4 Ii Jrfz({ - .J' C S- .

FGI( : NNU: i"'lN I::'TTI:lCHNENT

/ -

I. <17

CC: JAN WAR (NELH-KONA) COI:;:I~ CHf':j I (r;:CUH)

:\1·····.,· !'il::. I I< !.JH I~:EVENUES

~Ii

OPEI:;:riT I NG HOUF<S

(HOUI~;S': !"'IIN)

._--------------------------------------_.,,-

Page 27: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

jI, o o HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Accomplished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

APRIL 1988

1. Removed an obstruction from within the John link furnace propane supply line.

2. Repaired a bad furnace flame sensor.

3. Ran unit isochronously on Thursday, April 14, for approximately four (4) hours, at reduced load, in conjunction with switching and isolation work on the Puna 34KV line.

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 5/02/88

Page 28: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P. O~ El()X 1(?:':'!'? HILO, HAWAII 96721-1027

AI::.rUI.. '7, 1988 .

THE NATURAL ENERGY LABORATORY OF HAWAII 220 SOUTH KING STREET, SUITE 12S0 HONOLULU, HI 96913

ATTENTION: MR. JACK P. HUIZINGH EXECUTIVE DIRECTOR

GENTLEt1EN:

RECEIVED APR 1 1 938

NELH

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF MARCH 1988.

rarAL.. STEAM FLOW 1 (')(H') I~

TOTAL BRINE FLOW NET KWH REVENUES OPEr~Al'l:Nr.~

HOur,S (HCH.H';:S: MIN)

30,044

(O:,(;I( : NMU : MN ATTAmiMENT CC: JAN WAR CNELH-KONA)

CORA CHAI <RCUH>

1000 ~ GENERATED $

Vp~LY VI ."S,

FRANK G. K~NNEDY, MANAGER PRODUCTION DEPAR 'MENT

.. : .~ ,~

---------------------------------------------------------

Page 29: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

A. Work Accomplished

o o

HA~II ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

MARCH 1988

1. Replaced and tested various control relays in the John Zink control panel.

2. Repaired defective phone ringer control.

3. Cleaned John Zink flame scanner and flame scanner relay.

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 4/04/88

Page 30: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.4-.. /' •. / _.' c o

HAWAII ELECTRIC LIGHT CO., INC. I:'. n. I~()X 1 <~~!?

HILO, HAWAII 96721-1077

MARCH 1, 19B8

THE NATURAL ENERGY LABORATORY OF HAWAII P. O. E(OX 1749 KAILUA-KONA, HI 96740-1749

ATTENTION; MR. JACK P. HUIZINGH EXECUTIVE DIRECTOR

GENTl.EMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF FEBRUARY 1988.

renAl. srEAM FLOttJ iGGG ¢

---_ ..... _--_ ... _--_ .. _ .....

I::'(;I( ; NMlI : MN ATTAC~iMENl' C(:: JAN WAR

TOTAL BRINE FLOW NET KWH i0ee • GENERATED

I~[~:VENUE::S

\Ii

OF'ERAT:r.NG Hour.;:s

(li()UIU': MUI)

696:G0

----------------------------... ""~-""",~

Page 31: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

A. Work Acca.plished

o o HA~II ELECTRIC LIGHT COMPANY. INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

FEBRUARY 1988

1. Repaired a worn coupling on the 50% caustic pump.

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 3/03/88

Page 32: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

; .- o

HAIAIr-.:r.! r:::I...E:.t::'rl~::rC 1 .. 1GHl' CO., lNC·. P.. n.· I:<OX 1 o:~)?

HII ... O, HAW(',ll 'r6"(,:;.!\'-·10~.~i'

RECEIVED

THE NATURAL ENERGY LA~ORATORY OF HAWAII P. O. Ec(;)X 1"749 KAILUA-KDNA, HI '674G-1749

ATTEN1·ION. MR. JACK P. HUIZINGH EXECUTIVE DIRECTOR

GENn .. E:MEN :

TOTAL STEAM F'LOIJJ 1 '.-)()(-) ':'

:.:.'7,4b3

........... OC ...... ~..:,.····w~·,.,.' ..... ··H ..

"T'DTAt... BIU Nt::: ri ... Ov,1 NeT ,.; (,JH 1000 • ~FNERATED

3~/1~a 1,327,800

/.\ I:;. V I::. NUl::, S 'I·

I-t8 ... 5 1988

NELH

(JPEf;:A r ;tNG HIJURS'

~ HnUI~,S': M:tN)

--

FHI~.NI~ (" I( LN' I;:.1>Y, i-I(·INl'l.~EI<

t=:"GI( : NtH.J : CR A '1'1' AC H MI::: tfT' CC : • .IAN ~JAI';;

PRODUCTION DEPARTMENT

Page 33: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Accomplished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JANUARY 1988

1. Changed Dow scrubber pH probe. 2. Recalibrated cooling tower pH probe.

3. Repaired leak on underground section of circulating water discharge piping. 4. Replaced cooling tower caustic supply solenoid valve. 5. Replaced leaking sections of after-condenser cooling water piping. 6. Fabricated new circulating water drain line and installed it on main

condenser.

7. Changed the 50% caustic transfer pump coupling.

8. Replaced defective ignition transformer on the John Zink furnace. Also replaced miscellaneous small electrical components on furnace control panel.

9. Installed new caustic piping and automatic control valves for steam bypass line abatement system.

10. Replaced caustic mixing station water valve. 11. Waterproofed condenser level controls electrical junction box.

12. Troubleshot condenser temperature circuit and tagged several defective R.T.D.s.

8. Plans For Next Month

1. Peform corrective maintenance as required.

IHEII NMU 2/02/88

Page 34: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

WED 901 PUNA GEO - 9650274

HAWAII ELECTRIC LIGHT CO. , INC. P. C. £10>< 1027

HILO, HAWAII 9672'-10~7

.. IANUARY S I i 9aa

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1111.1 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAvJAI I ~6aZ6

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

nIT AI" :f n::(.'1N fLOW 'j t·,"l() ;::

----------------

14/120

TOTAL BRINE F~OW Ntf KWH 1000 • GENiR~TEn

18,'::>6'1

~ r'

.L. ~ t .',

~\Jt>it ~

P _ a 1

ClF'ERA'r:[ Nt; HDW.;: oS'

.; HflUf.:S', MIN)

F'I-:ANI< (;. \(i:~NI·II:I·'1' I 1·1At~f!lC;fi:r~:

r-r.,1<' : NU: (;/=; ~ITTAC;~iMEN1' CC JAN WAR (NATURAL ENERGY LAB)

PROOUCTIUN DE~ARTMENT

----------------------____ IIII!!IIjIlIW*1I~

Page 35: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATIACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

DECEMBER 1981

A. Work Accomplished 1. Completed turbine inspection and general overhaul on Monday, December 14.

a. Install new brine line from flash separator to LV-I. b. Completed sandblasting of turbine components and installation of

new turbine seals. c. Replaced cooling tower distribution trays and repaired rotted areas

in cooling tower structure. d. Dredged main brine percolation pond. e. Calibrated turbine and generator vibration and temperature probes. f. Replaced Dow scrubber flow switches and pH probes. g. Installed new turbine condensate drip tank level probes. h. Replaced faulty Woodward actuator on main steam control valve. i. Repaired worn cooling tower fiberglass blades. j. Overhauled static exciter. k. Installed propane gas pressure switch on John Zink incinerator. 1. Replaced incinerator purge relay. m. Placed unit on line and took vibration readings. n. Calibrated and tested generator protective relays.

2. Installed new pH probe in cooling tower basin.

3. Vented the well through twin stacks on December 1 (2 hours), December 8 (7 hours), and December 10 (7 hours).

B. Plans For Next Month 1. Repair sections of gas ejector cooling water line.

2. Perform corrective maintenance as required.

IHEII NMU 1/05/88

Mill

Page 36: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

RECEIVEu /1J'p 1 .:J 1989

Page 37: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

t. () o i'" " i·~ ! '

i ..... ~.,

r'l: The! R~se"l/<th: c.fworation of the University of Hawaii

~1r. Willaim Paty Director Dept. of Land &

Natural Resources P.O. Box 621 Honolulu, HI. 96809

Dear Mr. Paty:

January 15, 19~

Enclosed is a copy of the HGP-A operating figures for the month of December.

Sincerely,

uf(Jt~ Wi1l2m R. Coops

Telephone: (808) 955-6344

r

§.~ C:·i -,,' r 'r, .r:" ~ ...

r r' .:.,. C .-4

, 1 ' C";

Director of Administration

WRC:l sc

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olson P. Helfrich J. Craven G. Mooers

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

~~

Page 38: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

e

Page 39: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-,

A.

C 0 HAWAII ELECTRIC LIGHT COMPANY, INC.

ATIACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

DECEMBER 1987

Completed t inspection and general overhaul on Monday, December 14. a. Install new brine line from flash separator to LV-I. b. Comp1et d sandblasting of turbine components and installation of

new tur ine seals. c. Replace cooling tower distribution trays and repaired rotted areas

in cooling tower structure. d. Dredged main brine percolation pond. e. Ca1ibra ed turbine and generator vibration and temperature probes. f. Replaced Dow scrubber flow switches and pH probes. g. Installed new turbine condensate drip tank level probes. h. Replaced faulty Woodward actuator on main steam control valve. i. Repaired worn cooling tower fiberglass blades. j. Overhauled static exciter. k. Installed propane gas pressure switch on John link incinerator. 1. Replaced incinerator purge relay. m. Placed unit on line and took vibration readings. n. Calibrat d and tested generator protective relays.

2. Installed ne pH probe in cooling tower basin.

3. Vented the w 11 through twin stacks on December 1 (2 hours), December 8 ( hours), and December 10 (7 hours).

B. Plans For Next Month

1. Repair sections of gas ejector cooling water line. 2. Perform corrective maintenance as required.

IHEII NMU 1/05/88

Page 40: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

· '. o o

HAWAII ELECTRIC LIGHT CO., INC. P., 0., BOX i 0:,:.:"/

HILO, HAWAII 96721-102"/

THE RESEARCH CORPORATION OF THE

·jil (.) Lif\! I \iFr:::·;: I TY t!\iENUE 402 VARSITY BUILDING HUNO!...Ul ... U! H(ikl(i I I (?(.H:?6

ATTENTION: MR. WILLIAM R. COOPS DIRECTOr: OF ADMINISTRATION

PLEASE FIND HGP-A UPERATING FIGURES FOR THE MONTH OF DECEMBER 198"/.

rCI< : Nt..! : CI:;: t:!TTI~CHNENT

TUTAL BPINE FLOW NET KWH 1000 # GENERATED

18,061 68:?,"/00

FE\lFNUES ·'i;

FRANK G. KENNEDY, MANAGER PRODUCTION DEPARTMENT

CC: JAN WAF <NATURAL ENERCY LAB)

OFFPt,T I NG

Page 41: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o Telephone: (808) 955-6344

f; p- ; 8 i 5 (

ry\l. (Ie lilA. Tr:q &. ,I, Lt\i~D Dt. LLl" ;.;dfI

December 9, 1987 S I irtO{HJ~'lVA;?[S

Mr. William Paty Director Dept. of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

Enclosed is a copy of the HGP-A operating figures for the month of November, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olson P. Helfrich J. Craven G. Mooers

Sincerely,

w~f Director of Administration

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

\

Page 42: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P. O. BOX 1027 HILO, HAWAII 96721-1027

DECEMBER 1, 1987

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF NOVEMBER 1987.

TOTAL STEAM FLOW 1000 4

10,943

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 ~ GENERATED

13.998 529,100

REVENUES $

32,592

OPERATING HOURS

(HOURS:MIN)

330:34

FRANK G. KENNE)Y, MANAGER PRODUCTION DEfARTMENT

CC: JAN WAR (NATURAL ENERGY LAB)

Page 43: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

NOVEMBER 1987

A. Work Accomplished

1. Vented the well through twin stacks on Thursday, November 5, to allow Arakaki Mechanical to install Thermal Power's steam connection.

2. Completed repairs on the emergency power transfer switch.

3. Repaired "B" recycle pump starter.

4. Repaired leaking brine line valve. The well was vented through twin stacks on Wednesday, November 11, to allow HELCa crews to perform the repa i r.

5. Replaced PV-1 bypass piping on Wednesday, November 18. The well was vented through twin stacks to allow HELCa crews to perform the work.

6. Began turbine inspection and general overhaul

a.

b.

c.

d.

e.

f.

g.

h.

i.

j.

k.

1.

m.

n.

IHEII o.

Vented well through twin stacks on November 24 & 25, to allow cleaning of the flash separator.

Sandblasted turbine diaphragms and rotor.

Removed cooling tower fan blades for fiberglass repairs.

Cleaned condenser tubes.

Began work to repair John Zink scrubber tower internals.

Installed new neutral grounding resistor.

Replaced main step-up transformer sudden pressure switch.

Serviced emergency propane generator.

Repaired bridge crane brakes.

Began overhaul of static exciter.

Installed repaired Woodward trip valve control.

Repaired substation fence grounding.

Welded cracks in turbine diaphragms.

Inspected generator bearings.

Replaced sections of circulating water line.

Page 44: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HGP-A Monthly Maintenance Summary Page Two December 1, 1987

B. Plans For Next Month

o

1. Complete unit overhaul and place unit back in service.

2. Perform corrective maintenance as required.

IHEII NMU 12/01/87

Page 45: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

COMFISHEHI

..!~!:ll.::LS/.:.!ENV.!.!:-+--i

_t'j~'_f!.'LfJ}~.!.--+--t

.li!~':f f.,v(::::::s~+--l

~ o

FI~H f'~'i:V~--1o;--:;~~=7.~~

Th~lfi~r AfORe

__ SE;:~;~!~~ Remarks:

..2Ff;~;~_GY~L.,l-; ---if.-----­

..1:1:,. ..-.-+-.--~------_.,_ .. __ "'''.~_M~._,>-L_~

Mr . ~J ill i am P a ty Director Dept. of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

o

Enclosed is a copy of the HGP-A operating figures for the month of October, 1987.

Sincerely, ~

.- . . ' t _ :-"',"

Telephone: (808) 955-6344

c:J -,..j

Z C' «<:.:

--

, . ~ ~." '0. -.~ - ~ ~.--

W~CoOPS Director of Administration C-.)

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olson P. Helfrich ll. Craven G. Mooers

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

r-~':~ -::' -~;- -- .. cj.::::

~? ~

f=;: c -... , ~~.-~

3...:0 ~.?o --f

.. -•• -..J

C::) r"'T-1

C-)

~ c..v

U t"V

c..n (.A.)

",0' .... .1 .... ,

"'-'-; [j

('"'-

i I

• ..,<t ... ' ....

-""+ .~

i ~ I

0

RECEIVED

NOV 171987

Dlv. of AquatIc Resources

Page 46: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

" o o HAWAII ELECTRIC LIGHT CO., INC.

P., 0., BOX 10:?1 HILO, HAWAII 96721-1027

NOVEMBER 3, 1987

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

CENTL.ENEN:

PL.EASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF OCTOBER 1987.

TOTP!I ... ST[(Ii'\ FI...Okl ·1 (:)(:)0 :~:

FG!( : NU : cr;: '~l T T ,:\c Hi·'I[ NT

TOTAL BRINE FL.OW NET KWH 1(:)00 ~ GENERATED

32,405 1,224,900

CC: JAN WAP (NATURAL. [NERGY LAB)

REVENUES' ~Ii

DPFRtlTING HOUPS

( HOUr;: s· : i"l IN)

Page 47: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

· -.

, o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHlY MAINTENANCE SUMMARY

OCTOBER 1987

A. Work Accomplished

1. Repaired gas leak on John link scrubber flange.

2. Repaired 50% caustic transfer pump coupling.

3. Removed gas furnace flame detector for repairs.

4. Repaired main step-up transformer temperature probe.

5. Installed new recycle pump motor.

6. Began repairs on emergency standby power auto transfer switch.

7. Fabricated 10% caustic pump starter panel board.

8. Installed new brackets for 10% caustic pumps.

9. Replaced corroded wiring and fittings on John link furnace.

10. Replaced John link furnace flame sensor.

11. Repaired main steam control valve actuator.

12. Repaired flash separator pressure control.

13. Installed new spark plug on John link incinerator.

B. Plans For Next Month

1. Assist Thermal Power contractor with tie-in on main steam line. (November 5)

2. Perform annual overhaul.

IHEII NMU 11/5/87

Page 48: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o Telephone: (808) 955-6344

' •• :' '. f 1,:' f , -. 'lI' _ 1.. ... 1

p 2: 59

DIV. (H7 1'111 T~R ~ •. ,J ... '; to.;" .. '!,)

lAf{O DL VLLGl"('I~~Iober 8, 1987

Mr. Will iam Paty Di rector Dept. of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

Enclosed is a copy of the HGP-A operating figures for the month of September, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. 01 son P. Helfrich J. Craven G. Mooers

s:;;~ William R. Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 49: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P. O. BOX 1027 HILO, HAWAII 96721-1027

OCTOBER 1, 1987

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R~ COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF AUGUST 1987.

TOTAL STEAM FLOW 1000 *

25,871

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 0 GENERATED

33,091 1,250,800

REVENUES $

77,105

OPERATING HOURS

(HDURS:MIN)

688:57

FRANK G. KENNEDf, MANAGER PRODUCTION DEPARTMENT

CC: JAN WAR (NATURAL ENERGY LAB)

Page 50: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

SEPTEMBER 1987

A. Work Accomplished

1. Pumped out waste oil tank.

2. Installed new 10% caustic pump.

3. Tightened drive belts on air compressor.

4. Replaced defective ignitors on John link furnace.

5. Repaired eyewash flow switch.

6. Repaired leak on circulating water line.

7. Installed new sump pumps and plastic piping on John link scrubber. (RCUH personnel)

8. Plans For Next Month

1. Repair gas leak on John link scrubber column.

2. Perform corrective maintenance as required.

IHEII Nf4U 10/5/87

__________________ 11 .WI\I~

Page 51: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

" o o ;'i 0

D!'J. Or: \I/IHF.R & LMW Di.: \, ;::.L J( i''iENT

Mr. William Paty Di rector Dept. of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear ~1r. Paty:

September 8, 1987

Enclosed is a copy of the HGP-A operating figures for the month of August, 1987.

SinCerelY~

w~ Coops

(/) --I )::. -< ,n 0 -n --'-l~'"

:£ J>

Director of Administration

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olson P. Helfrich J. Craven G. Mooers

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

8'31 Telephone: (808) 955-6344

C:-"~1

': :'~, -,. .1

- ( r-.~ .' i~~

,.

r' ..

C-

: c::,:: , : ....... -

:D -r -(J , co r.~ (. ,-,' -c-:~ "

;,., ... ~ '.

~0

'- . c..v rn ..r:-tf)

Page 52: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

· .. o o HAWAII ELECTRIC LIGHT CO., INC.

P.O. BOX '1 (1~.~1 HILO, HAWAII 96121-1021

SEPTEMBER 1, 1981

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTL.Ef·1EN:

ffiEIVED '.

SEr.·~ ,98"1

)

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF AUGUST 1981.

TOT I~IL STEI~'Ii"l FI ... OW 1000 :::

FGI< : NU : CI~: I~TTI~CHi'IENT

TOTAL BRINE FLOW NET KWH 1000 # GENERATED

31.397 1,186,800

CC: JAN WAR (NATURAL. ENERGY LAB)

REVENUES ~I;

OPERtlTING HOUI:;:S

(HOUI:~S: f"IIN)

647: '1'5

-------------------------------------_.,-

Page 53: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-- o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

AUGUST 1987

A. Work Accomplished

1. Installed two new Dow scrubber pump and motor sets.

2. Repaired water leak on above grade section of 12" circulating water line. The unit was off line from 6:07 p.m., August 2, to 1:10 p.m., August 3, due to the leak.

3. Cleaned lube oil cooler.

4. Adjusted safety relief valve on Joy air compressor.

5. Repaired and cleaned Worthington air compressor unloading solenoids.

6. Repaired gas leaks on John Zink scrubber and furnace exhaust pipe.

7. Repaired circulating water leak on gas ejector inter-condenser. The unit was off line from 7:51 p.m., August 22, to 6:43 p.m., August 24, as a result of the leak.

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 9/01/87

'_bU_

Page 54: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, o o

The Research Corporati~ OfttkJ ~ni~JDsitJloi Hawaii

DPJ. OF Wfl.TER & LAND Dl VlLOt)I~ENT

t4r. William Paty Director Dept. of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

August 7, 1987

Enclosed is a copy of the HGP-A operating figures for the month of July, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olson P. Helfrich J. Craven G. Mooers

Sincerely,

R. ops or of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Telephone: (808) 955-6344 371-

, . .< -..

Page 55: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

" o o HAWAII ELECTRIC LIGHT CO., INC.

P. 0,. BOX '\ (:}2'/ HILO, HAWAII 96721-1027

AUGUST :5, '\ <JEr?

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF JULY 1987.

TOTAL STEAM FL.OW 1000 :::

28, '\77

TOTAL. BF: I NE FLO~.I NET I(WH GENEHAlED

F~EVENUES ~I;

El4,OOB

'G3"I::' '1' 't'I:;'(11 v "(('lllf",' \,. • .... , I ,_ ~., ,

/ ~ . .-/

......,

OPEHATING HOUI:;:S

(HOUr;:S : i'1 IN)

(

r;.r ':,' .,,' . r r"';

FHANK L. KENNF,>Y, MANAGER PRODUCTION D~~ARTMENT

FGI( : NU: CI:;; ATTI~CHMENT CC: JAN WAR (NATURAL ENERGY LAB)

Page 56: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

. . . • • • o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JULY 1987

A. Work Ace." 1 i shed

1. No work performed this month.

B. Plans For Next Month

1. Repair leaking circulating water line.

2. Repair 10% caustic supply pump.

3. Repair condensate pump.

4. Repair Dow scrubber circulating pump.

IHEII NMU 8/03/87

-----------------,.,"'" ,"'-',', ,~~

Page 57: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

The Research Corporation of the University of Hi' if

Mr. William Paty Di rector Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

July 15, 1987

Enclosed is a copy of the HGP-A operating figures for the month of June, 1987.

Sincerely,

w~~

Telephone: (808) 955-6344

~~ -..;J

r- c- -,-~.

l>O c::: A.; z--0:·':: r- rn o,~ N C") r.'--n ' c:;) <.-~ rn Pi r> "U -<: C'-I -c. m fTi 3::::0 ... mS)o ::z: 0 -f en

Director of Administration

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. 01 son P. Helfrich J. Craven G. Mooers

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

170S

Page 58: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o H ('11.,.1 (I I I ELEC'fF:IC LICHT CO,!

[ i.H::\ ...... ~,.b HI L.i}! Ht'flAltl I I '-? 6'/;:: .. j .... j ('J:} 7 ..... \

'fHE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLIJLU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

CLNTLEi1EN:

!

Ul

r

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MON1'H OF JUNE 1987.

Fel< : i\IU : CR ('1 T T (:IC Hj"IL 1'1 T

TOTAL BRINE FLOW NET KWH '1000 :ii: CE::HFhPfTED

---------------- ---------

F:E 'v' E ,\1 UE S' :ii

DPEI?PIT 1 oe HUURS'

( H U U F;: S : j .... j 1 (I )

· .. ·k·· ...... :·~!II .... " .. ·11· ..... • vt.,-, ~~~""I'':'::'!

FhAOK C. KFNNFDY, MANAGER , .. , .......... ( ... \r'"'' .,. (''1'" V'. I'" " .. ·, .. ,·· .. ··· .. 1 .. ·' 'T I" t·.; I . ..! . .I I... .... t .I. .. 1"·1 .I..! :: ... H"·. t 1"1 ::. 1"1 ,

CC: JAN WAR (NATURAL LNFRGY LAB)

.~ ______________________________________________ '_.11'~

Page 59: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

A. Work Accomplished

o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATIACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JUNE 1987

1. Replaced the underground portion of the 12" steel circulating water line after the pipe developed a large leak. The unit was off line from 2:15 p.m. on June 5, until 9:57 a.m. on June 8.

2. Replaced No.2 control valve hydraulic actuator.

3. Began work to repair and modify Dow scrubber sump pumps and caustic injection system. Pumps \'1111 be relocated away from the scrubber unit to lessen motor bearing corrosion problems and caustic feed sensor will be relocated to permit smoother pH control.

4. Repaired plugged backup abatement system gas line.

B. Plans For Next Month

1. Pump down silica pond to prevent spillover into plant. (This is a temporary measure and is not expected to have long lasting results.)

2. Perform corrective maintenance as required.

IHEII NMU 7/10/87

Page 60: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-o. '

'..: -Isu@ , o 0 ..

Telephone: (808) 955-6344

~::~~/:'·i1 ". , .#'./:.' . . ~'; """ "t i

[Ii 11/ ,i'

'- U/.; /0 The Research Corporation of the University of Haw~ii'" /j/O: 2",

Mr. William Paty Di rector Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

Enclosed is a copy of the HGP-A operating figures for the month of May, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen P. Helfrich J. Craven G. Mooers

SinCerelY~

~ Coops Director of Administration

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

CJ:J -...J

e..- X c::: z f1~; .- c:; N rn

'""Q < (jo.) fT1 0

CJ1

Page 61: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-.. ,' I o o

HAWAII ELECTRIC LIGHT CO., INC. P. CJ., BO)( 1027 \

HILO, /--I(.iv,l(.,II 96721····'027'· \ ,,~\

\\..: ,JUNE '\, 'j 9B'{' .\ \

THE RESEARCH ·CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTI ... ENEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF MAY 1987.

T()TI~iL STEt,N FLOI,J i (~O(~ :~:

FG~: : NU : [:1:;: 1:1TTI~lCHNENl

TOTAL BRINE FLOW NET KWH 1000 ~ GENERATED

36,7B4 1,390,400

CC: JAN WAR (NATURAL ENERGY LAB)

t=;:EVENUES ~I;

r i

I. (.

OPEF;:I~,l INC HOUF<S:

(HOl..tr;:S: MIN)

~~~~------------ •. -

Page 62: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

A. Work Accomplished

o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

MY 1987

1. Completed installation of two air compressor inlet filter/silencer assemblies. The potassium permanganate filters will be used to remove sulfur compounds and other impurities from the air.

2. Overhauled "B" air compressor cooling water pumps.

3. Repaired defective recycle pump contactor.

4. Replaced leaking gasket on main steam pressure transmitter line.

S. Tightened packing on turbine steam control valve.

6. Took unit off line for five (5) hours on Wednesday, May 13, to 'repair a leaking water line to the generator air cooler.

7. Installed overhauled tank mixer into 10% caustic soda tank.

8. Repaired gas leaks on John Zink scrubber column.

9. Repa ired main door on turbine building.

10. Removed "8" recycle pump for repairs.

11. Installed new packing water line on "A" recycle pump.

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 6/01/87

••• 1

Page 63: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

I

• • o o Telephone: (808) 955-6344

nl t~A\( 1 Po?: '2.5 The Research Corporation of the University of Hawal

Mr. William Paty Di rector Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

May 6, 1987

Enclosed is a copy of the HGP-A operating figures for the month of April, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen P. Helfrich J. Craven G. Mooers

Sincerely, ~

Wi 11 i R. Coops Direc or of Administration

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

La

Page 64: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

•• I

It '.

Page 65: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• • o 0 Ht,f"lt, I I EI...FCrr;:IC I ... IGHT CO" 1 NC.,

P., 0., BOX 'j 0?7 HII...O, HAWAII 96721-1027

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEi"lEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF APRIL 1987.

FGI( : NU : CF: !:'-ITT!~ICHNENT

TOTAL BRINE FLOW NET KWH 1000 # GENERATED

35,657 1,347.800

CC: JAN WAP (NATURAL ENERGY LAB)

F([VENUES ',j;

OPERPITING Hour;:s'

(HUUPS: i"lIN)

Page 66: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o . ..

Page 67: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

... .i o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

APRIL 1987

A. Work Accomplished

1. Installed a new moisture separator drain line.

2. Installed new "8" recycle pump.

3. Installed new Dow scrubber sump pump No.4.

4. Repaired damaged conduit on John Zink control panel.

5. Experienced two generator trips on April 7, 1987. The cause of the brief outages was suspected to be a faulty governor control panel card. A new card is on order.

6. ,Replaced defective flow switch on Dow scrubber.

7. Attempted to repair faulty pH controller on Dow scrubber without success. Placed scrubber on outage.

8. Performed unabated venting on Thursday, April 16, and installed a new 1" drain valve on the main steam line upstream of PV-601. Also installed a new 3" ball valve on the flash separator brine line and repaired flash separator high level trip. Total outage was limited to 6 hours 33 minutes.

9. Removed newly installed "B" recycle pump for repairs. An error was made by the factory in furnishing proper internals for the pump.

10. Began work to install plant air compressor potassium permanganate filters.

11. Received generator grounding resistor. Installation will be done during the annual overhaul.

8. Plans For Next Month

1. Install air compressor inlet air filters.

2. Perform corrective maintenance as required.

IHE'II NMU 5/04/87

--~------~----~~~-------------------------------,-----

Page 68: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

"' ..... . ..

Page 69: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

- ' o Telephone: (808) 955-6344

/~rJ

Q A~: 5~ . (1:\ 10 • $\1 AP R Q Q

The Research' Corporation'()11 the University o~awaii ...

i't F

. . _i I, _I i .

Mr. William Paty Director Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

Enclosed is a copy of the HGP~A operating figures for the month of March, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen P. Helfrich J. Craven G. Mooers

Sincerely,

Willi. R~ Direc or of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 70: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

Page 71: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P. O. BOX 1027 HILO, HAWAII 96721-1027

APRIL 1, 1987

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

, ,i, • ,,!, i

ATTENT~ON':I:,ti,I{~I'! WILL)Ati ,R. COOPS " ,:, ' '," ',):',;':i l D~RECTOR';OfAI>MINISTRATION

, ';!" 'i'l' ~I!I! ' ·1,:",;: ','i; 'I ' ,,',i' ~I! ,,!l~I,,'l ," ' il i', . ,:>

GENTLEMEN: I

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF MARCH 1987.

TOTAL STEAM FLOW 1 (~00 ~

TOTAL BRINE FLOW 1(H~0 ....

."

------_ .. __ ..... _ .... __ .... -

FGK:NU:CR ATTACHNENT

::n I 5~'i2

CC: JAN WAR (NATURAL ENERGY LAB)

" '.

OPERATING NET KWH REVENUES HOURS

GENERATEI) $ (HOURS:MIN)

--------- -------- -----------

1 ,418,70(;) 87,446 712:07

Page 72: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

Page 73: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

. "~'

o o HAWAII ELECTRIC LIGHT COMPANY. INC.

A. Hark Accomplished

ATIACHMENT

HGP-A MONTHLY r·tAINTENANCE Sur·1MARY

f.V\RCH 1987

1. Ov~rhauled air compressor cooling water pump.

2. Overhauled 10% caustic pump motors.

3. Replaced outside annunciator horn. ,i: f ,;' ,~ .. ,.... , '

4. Installed new Dow scrubber flow switch.

5. Installed new starter for caustic tank mixer.

6. Overhauled cast iron caustic pump.

7. Repaired leaking caustic tank mixer packing.

8. Installed temporary high separator level trip device in place of existing unit that is not functioning.

9. Repaired caustic pump control switch.

10. Cleaned John Zink scrubber ceramic elements.

11. Cleaned John Zink loop drain by cutting out plugged section.

12. Isolated cause of three unit outages (total 9 hrs. & 51 min.) to faulty vibration sensor in generator outboard. Confirmed faulty sensor operation using handheld IRD unit and disconnected sensor.

B. Plans For Next Month ""'i. ' .. " ,-' 1. Recalibrate faulty vibration sensor and place in service.

2. Perform corrective maintenance as required.

l •

IHEII NMU 4/01/87

.. __ ... _--_._._---------------

Page 74: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

( ~

Pj9(f · ~wA1-D

o Telephone: (808) 955-6344

r ";' "" .• ' 13 ,J. 9: '.' 5 t"; i \'f\t>,\\ ~ p.co: \S

The Research Corporation of the University dt"'awaii

Mr. Will iam Paty Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

Enclosed is a copy of the HGP-A operating figures for the month of February, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen P. Helfrich J. Craven G. Mooers

Sincerely,

w~~ Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

110/

Page 75: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens
Page 76: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

."

(

o o HAWAII ELECTRIC LIGHT CO., INC.

P. O. BOX 102'7 HILO, HAWAII 96721-1027

MARCH 3, 1 987

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE ~02 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

) f)I

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF FEBRUARY 1987.

TOTAL STEAM FLOW 1000 •

26,638

FGK:NLJ:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 ~ GENERATED

34,0'72 1,287,900

CC: JAN WAR (NATURAL ENERGY LAB)

REVENUES $

"19,373

OPERATING HOURS

(HOtJRS:MIN)

635:11

~------------------------------------ ""'~

Page 77: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

,). )

o o

Page 78: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATIACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY FEBRUARY 1987

A. Werk 'erformed 1. Experienced flashover on substation bushings on February 2, at

12:53 a.m. The unit was out until 7:43 p.m. that evening due to a 34 KV fuse that blew during the flashover. Cleaned all P.T. bushings and lead acid batteries during the outage.

2. Overhauled 10% caustic pump motor. 3. Experienced another 34 KV bushing flashover on February 13, at

2:31 a.m. Replaced the bushings and placed the unit back on at 7:30 p.m.

4. Installed new "AII recycle pump. 5. Repaired "AII 10% caustic motor. 6. Began work to overhaul IIBII 10% caustic pump and motor. 7. Removed "BII alr compressor coo11ng water pump for overhaul. 8. Cleaned circulating water screens. 9. Repaired gas leak on John link scrubber.

10. Replaced visitor center's lighting switch. 11. Replaced low pressure switch on condensate line.

B. Plans For Next Month 1.

2.

IHEII

Repair leak on 10% caustic tank. Perform corrective maintenance as required.

NMU 3/04/87

-~--

Page 79: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

Mr. Will iam Paty Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

O Telephone: (808) 955-6344

. ·0 R~\:t.\"E p.1~ ~t

February 6, 1987

Enclosed is a copy of the HGP-A operating figures for the month of January, 1987.

WRC:tmn

Enclosures

cc: R. Ulveling D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen P. Helfrich J. Craven G. Mooers

s;nCerelY~

W~COOPS Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 80: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. o

THE RESEARCH CORPORATION OF THE

.j'j.j 0 UNI\/EF:SITY ,·'IVENUE ·<-102 VPIF;:SITY nUIL.DING HONOLULU, HAWAII 96826

'~l T T E (1 T ION : iTi P., (,J 1 1..1... I ,;;\ i"I F:., C U UPS DIRECTUR OF ADMINISfRATIUN

("r:"'/'l'" 1 .. ···1/ .. ···/ .Y ::.1' ... ::. jY, ::.1' :

TOfAI.. BRINE FL.OW Ncr KWH

o

TUTti!... S:TFt'li'Yj F:·L.Dkl 'j 000 :::: 'j ,> (-) () :i:: L i j\! [ r;: (I T [ :0

"')"jl ""'r.:'/. ..... 1 I \~ .. )\.)

FGI( : j\1U : CI=;: t~l TT{~'IC:HhFNT

CC: J(,I'--I 1J..I(lF;: ,; j,j(II·I.J;:«il... LNFi';:C'y L.PIJ{.i

t j "J

F:i \iLj··!Lle,;' :Ii

,J ~/

UPEI?(i i J NC Hour:,"

(HUUFS: i'ilf-!)

---------------------------------------_ .. " .. ,,,,,.-

Page 81: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• o

Page 82: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC lIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JANUARY 1987

A. Work Accomplished

1. Repaired piping leak on after-condenser cooling water line. The loss of cooling water and subsequent loss of vacuum resulted in a 24-hour outage on January 1st.

2. Unit was taken off line on January 6th, to perform maintenance on the John Zink system. Installed new transfer valves and repaired a gas leak from the scrubber tower.

3. Cleaned cooling tower distribution tray.

4. Adjusted lube oil centrifuge drive belts.

5. Cleaned insulators on MOS 3702 and step-up transformer.

6. Replaced 3702 control box fuse and DC switchgear relays.

7. Recharged lead acid batteries.

8. Installed overhauled 10% caustic pumps.

9. Replaced defective flow switches on Dow scrubber.

10. Repaired main building roll-up door control.

11. Tightened drive belts on Joy air compressor.

B. Plans For Next Month

l.

2.

3.

4.

5.

IHEII

Repair 100 feet of fencing adjacent to Visitors Center.

Shop overhaul caustic pumps.

Shop overhaul recycle pumps.

Perform corrective maintenance as required.

Repair damaged transformer PT.

NMU 2/03/87

-------------------------------------", ..............

Page 83: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o : " ...... ,

Mr. William Paty Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Paty:

0·', " : .... \.f

Enclosed is a copy of the HGP-A operating figures for the month of December, 1986.

WRC:tmn

Enclosures

cc: R. U1ve1ing D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen P. Helfrich J. Craven G. Mooers

Sincerely,

w~~ Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

/0

Telephone: (808) 955-6344

Page 84: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P.O., [lOX .j 0:':'~1

HILO, HAWAII 96121-1021

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTI ... EMEN:

'f

PLEASE FIND HGP-~ OPERATING FIGURES FCJR THE MONTH OF DECEMBER 1986.

TOTAL S'TEr!jM FI ... OW 1000 :::

3(-),448

FGI( : NU: CF: PITTACHMENT

TOTAL BRINE FLOW NET KWH 1000 ~ GENERATED

38,945 1,412,100

I:<F\/ENUES -;fi

/

DPEF~I!I T I NG HDUI=<S

(HOI.JF<S:MIN)

VER~~' ,::'1:" .~ ",Il" .:. It ,::' ~·'1\If.:· .() ~':ijAU ~ ("'::'1::, \HI , t,. , ... I'd ._ .. I, I I,(/) .1[,,1',

PRODUCTION DEPARTMENT

CC: ,..Ir~IN vJ'~I:;: (Nr~TUI?("!... [NeHGY LPIU)

______________________________________ ... ""0'-

Page 85: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

( ,'" .. o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATIACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

DECEMBER 1986

A. Work Accomplished

1. Completed overhaul of "8" air compressor cool ing water motor.

2. Repaired generator metering circuit after unit failed to synchronize.

3. Overhauled 10% caustic pump motor.

4. Repaired high temperature trip relay on John Zink furnace.

5. Replaced rupture disc on condenser.

6. Replaced leaking water valve on cooling tower.

7. Repaired main steam trip valve gasket leak.

8. Repaired leaking Dow scrubber caustic supply piping.

9. Replaced Dow scrubber sump pump Nos. 2 and 3.

10. Repaired defective cooling tower fan circuit breaker.

11. Installed new solenoid water valve on station air compressor cooling water.

12. Received two complaints of odor from steel sparger box supply piping leak.

B. Plans for Next Month

1. Per.form corrective maintenance as required.

IHEII NMU 1/02/87

---------------------------------------<'''"'''~ .... -,

Page 86: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. Sli

o o Telephone: (808) 955-6344

/ fl r:, !~ C (9 A 8' t") C o~' , L;' I 0 \ 9 t;:; U i. L, • c.. 1.1 u '.: L. ~ 1'1: ': I

The Research Corporation of'the University of Hawaii - \.I

Mr. Susumu Ono Department of Land &

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

Enclosed is a copy of the HPG·A operating figures for the month of November, 1986.

WRC:tmn

Enclosures

cc: K. Keith D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. 01 sen

Sincerely. ~

W~COOPS Director of Administration

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

Page 87: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO.,

P. O. BOX 1027 HILO, HAWAII 96721-1027

DECEMBER 1, 1986

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

)

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF NOVEMBER 1986.

TOTAL STEAM FLOW 1000 ~

----------------

27,654

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 • GENERATED

---------------- ---------35,371 1,337,000

CC: JAN WAR (NATURAL ENERGY LAB)

REVENUES $

82,302

OPERATING HOURS

(HOURS:MIN)

664:35

Page 88: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

Page 89: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY. INC.

ATIACHMENT . HGP-A MONTHLY MAINTENANCE SUMMARY

NOVEMBER 1986

A. Work Accomplished 1. Continued October cleaning and painting work on piping and

structural steel components. 2. Completed overhaul of both recycle pumps and placed units back

in service. 3. Overhauled both air compressor cooling water pumps. 4. Completed reconditioning work on four Dow scrubber pumps. 5. Rewound "A" air compressor motor and placed unit into service. 6. Dredged silica ponds. 7. Spread gravel and cinder cover over plant grounds. 8. Completed installation of new air compressor and placed unit

in service. 9. Repaired sections of deteriorated fencing (550 lineal feet

total). 10. Installed turbine trip valve power supply rheostat. 11. Repaired broken condensate level control positioner. 12. Changed control oil filters. 13. Replaced No.2 control valve actuator after faulty unit caused

three unit trips. (Total outage time of 33 hours & 32 minutes.) 14. Repaired defective float switch on Dow scrubber basin. 15. Replaced recycle pump control switches. 16. Repaired condenser high level switch. 17. Began overhaul of 10% caustic pump "B". 18. Repaired cooling water line piping leaks.

B. Plans For Next Month 1. Perform corrective maintenance as required.

IHEII NMU 12/01/86

'.

... ~

Page 90: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

'\

\, . .i L--" o o Telephone: (808) 955-6344 ~

I ' '~G \1 \ 3 AS: \ 9 q I:: ;' .. ' . I 7 .l 9: . " ~ The Research Corporation Ut~e Unigersity of Hawaii ~, " v

Mr. Susumu Ono Department of Land and

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of October, 1986.

WRC:tmn

Enclosures

cc: K. Keith D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen

Sincerely,

w~~ Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

~

Page 91: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

e •

Page 92: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

:30

o

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF ()CTOBER 1986.

TOTAL. STEAM FLOW 10(;)(~ :;:

29,302

FGI( : NU : CI~: ATT~1CH"IENT

TOTAL BRINE FLOW NET KWH 100(;) I GENERATED

37,479 1,416,700

CC: JAN WAF< (NATURAL ENERGY LAB)

I:<FVENUES $

B7 I 1 BB

DPEPt:':)TINC HDUF<S

(HOUF:S:i"lIN)

--------------------------------------- .. ' ,-

Page 93: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o Q

HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

OCTOBER 1986

A. Work Accomplished

1. Rewound shorted motor on "A" air compressor.

2. Removed compressor cooling water pump motor for overhaul.

3. Repaired and recalibrated caustic low pressure switch.

4. Exercised wellhead valves on Thursday, October 23, in preparation for maintenance outage.

5. Performed one-week overhaul. (See attached separate report.)

6. Poured foundation for new station air compressor.

B. Plans For Next Month

1.

2.

IHEII

Continue general cleanup of area in preparation for November 13th Department of Energy ceremony.

Install new station air compressor.

NMU 11/05/86

Page 94: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

Page 95: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

'., -;

o o HGP-A OVERHAUL

October 27 - 31, 1986

WORK ACCOMPLISHED

1. Installed steel collar on 20" steam bypass line after PV-1 to seal steam leak.

2. Installed 1/4" steel cover plate on 20" steam line entrance into steel muffl er box.

3. Replaced PV-l control valve and actuator with reconditioned unit.

4. Repaired main steam line target plate flange steam leak.

5. Repacked turbine throttle valve drain lines.

6. Cleaned cooling tower basin and distribution trays.

7. Inspected cooling tower fiberglass fan blades. Blades are in good condition showing very little signs of erosion.

8. Inspected steel muffler box internals. Supports for rocks have collapsed and the drain line is completely plugged.

9. Cleaned flash separator internals and downcomer to brine lines.

10. Cleaned concrete brine settling basin.

11. Excavated rock muffler brine outlet and re-covered with rocks after clearing silica deposits with jackhammer.

12. Removed both recyc 1 e pumps for shop overhaul.

13. Repaired gas leaks on John Zink incinerator and scrubber by welding rolled stainless steel patches.

14. Disassembled Dow scrubber and reworked all joints to seal gas leaks. Replaced all flange O-rings with new design O-rings. Installed additional cover bolts.

15. Repaired and replaced scrubber pumps and motors.

16. Replaced PV-601 pneumatic actuator with new unit.

17. Replaced flash separator upper and lower level sensor and transmitter.

18. Replaced moisture separator upper and lower level sensor and transmitter.

19. Replaced deteriorated propane piping to John Zink pilot.

20. Replaced deteriorated propane piping to emergency generator.

IHEII _________ ~ ________________________ ,~"",.~,..lI.._

Page 96: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, ,.. " . o o 21. Repaired broken caustic injection line to PV-l steam bypass line.

22. Repaired steam leak from instrument well on PV-l steam bypass line.

23. Installed three (3) new brine line 1" ball valves.

24. Removed moisture separator drain line and cleared pipe obstruction.

25. Exercised wellhead M.O.V. IS. Grease fittings and plastic packing fittings are plugged and valve cannot be greased or packed.

26. Rewound one wellhead M.O.V. motor after motor overloaded while exercising valve.

27. Replaced concrete covers over PV-l trench. Wooden trench shoring is giving way.

28. Replaced test lever on air receiver safety relief valve.

29. Installed a new LV-l valve and actuator on brine line to concrete sparger.

30. Installed new reverse power protective relay and placed in service.

31. Calibrated and checked metering and protective relays.

32. Megger tested plant motors from plant MCC.

33. Inspected and serviced generator exciter.

34. Replaced conduit to caustic valve solenoid at steam bypass line and replaced terminal blocks in caustic tank area terminal box.

35. Began installation of turbine trip valve power supply rheostat.

36. Removed and cleaned condenser hotwell high level trip.

37. Removed and cleaned flash separator high level trip.

38. Repacked 2" lower gate valve at moisture separator.

39. Overhauled air compressor separator moisture float traps.

40. Performed general cleaning and painting.

tHEII ~---~

Page 97: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

·, ... , .... • o

OUTAGE TIMES

Monday, October 27, 1986 Tuesday, October 28, 1986 Wednesday, October 29, 1986

VENTING THROUGH STEEL MUFFLERS

Tuesday, October 28, 1986

Wednesday, October 29, 1986

COMPLAINTS RECEIVED

o

10:25 am - 6:11 pm 7:42 am - 5:36 pm 3:59 am - 2:38 pm

8:30 am ~ 4:00 pm

9:20 am - 2:00 pm

Two (2) complaints were received and responded to on Monday and Wednesday. The plant was on line at full load on both occasions and abatement was being accomplished through the backup caustic spray system. The caustic flow to the unit was increased to obtain better abatement.

IHEII -----------------------------,-, ...........

Page 98: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o " 'l-...... ! ; ':,_ ,.,..0 t ,

-". " '-~'

DC .• ·. J' .. 1I"1 1\) p.~'. IS The Research co~poratl~ of ~e Urilversi\Pol'vHawaii

Mr. Susumu Ono Department of Land and

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of September, 1986.

WRC:tmn

Enclosures

cc: K. Keith D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen

Sincerely,

w(;;:i. ~ Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Telephone: (808) 955-6344

\1q4

Page 99: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P.O. BOX 102', HILO, HAWAII 96721-1027

OCTOBER 1, 1 <186

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF SEPTEMBER 1986.

TOTAL STEAM FLOW 1000 ===

29,248

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 ~ GENERATED

37,411 1,414,1(-)0

REVENUES $

OPERATING HOUF;:S

(HOURS:MIN)

7(-)6 : ~57

FRANK G. KENN~DY, MANAGER PRODUCTION D_PARTMENT

CC: JAN WAR (NATURAL ENERGY LAB)

---------------------------------- ~ ......... _."

Page 100: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

SEPTEMBER 1986

A. Work Accomplished

1. Completed installation of emergency shower stations.

2. Repaired gas leak on John link furnace.

3. Completed engineering on newly purchased air compressor.

4. Repaired starting problem on propane emergency generator.

5. Replaced defective photo-electric sensor on outside lighting system.

6. Repaired two existing cooling tower light fixtures and installed six new quartz lamps.

7. Repaired discharge hose leak on 10% caustic pump.

B. Plans For Next Month

1. Overhaul unit during the period October 20 - 31, 1986.

2. Perform corrective maintenance as required.

IHEII NMU 10/7/86

------------_.,,--"'..-,..

Page 101: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. o

u

o ,3b r

Telephone: (808) 955-6344

8f'(Ir'P/7 The Reseal-ct)' C6r~~rattJQ of tile University of HawJ"ii 0 t. r . _. A B: 06

ill \j. rv.: i,ln T ~ R & L\i,:u D:_', i..·L Ji ;·iun

Mr. Susumu Ono Department of Land and

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

September 11,

Enclosed is a copy of the HGP-A operating figures for the month of August, 1986.

WRC:tmn

Enclosures

cc: K. Keith D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh H. Olsen

Si ncere ly,

~~/~ William R. Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 102: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

THE r;:I:::,\' [t,r;: CH CUr;:F'UF;: (', T I Ui"i ('if HI UNlVr::r;:S'ITY Ui H(",!,..I(ii 1

.\ .\.\ (-) Uj"-·lI\/Cr;:,\'ITY (:·j\/L(.lUC 4()::.~ Vt,I';:SlTY l:{UIL.Uii·!i; HUNUL.UL.U, HAWAII 96826

,; TTL N TIC) N : i"\ j;:.. ",I J L.!... J (, (.j I·;:, L I I U I· ,:;.'

GFNTL.LhFN:

FCI< : NI.J : CF: f~', TT (·:e Hi"\[() T

:0 I r;: I::: C T U j;: (j F t, D h I i\.j I ;.;: f 1< (, r J U (I

T ( .If (,! . i.: i,' I (,I I. I!.l " 1'1 ! •. ! 1< ld 1 i iir;)J:,;;: : iH IU:, ITO

C C : j (d"i (,.,1 tli:;: {(! (:} '.11;; (:: : l::::!! ' : , Ii i

o

i<! \/[NU[S ':Ii

UFEj;:t,T J NC·; Hour: S'

.: H 0 U I;: ,J' : (\ J (I )

Page 103: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

IHEII

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATIACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

AUGUST 1986

A. Work Accomplished

1. Repaired defective unloading solenoids on both air compressors.

2. Repaired cracked nipple on "A" air compressor aftercooler pip'i ng.

3. Repaired cooling tower fan No.2 control circuit. 4. Cleaned John link scrubber column. 5. Repaired "B" air compressor low oil pressure switch. 6. Repaired faulty circulating water pump starter. 7. Changed mechanical seals on both 10% caustic pumps. 8. The unit was isolated from the system feeding the Kapoho

area as part of planned maintenance work on the 34 K~ line. The work took place on August 26, and lasted four hours.

B. Plans For Next Month

1. Repair both air compressors. 2. Complete installation of emergency showers. 3. Change 10% caustic pump seals.

4. Perform corrective maintenance as required.

NMU 9/09/86

Page 104: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. • ?-

\JJ o Q Telephone: (808) 955-6344

P f' ~! Ii [l B J.l.!l •.. 'J 8. pel' U (' 8 AS: 22 The Research CoiPOrMiOft or tNet UIIIwersity of Hawaii IJ \~ -\ \) ..,

!)jI~, (W W!H~R & LMW DL V !;;L(Wi'~EN,ugust 7, 1986

Mr. Susumu Ono Department of Land and

Na tura 1 Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of July, 1986.

WRC:tmn

Enclosures

cc: K. Keith D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh

SinCerelY~

W~COOPS Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

5S~

Page 105: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o J

H (, (.,1 (, J J I::: L. F C T I,: Ie!.. J L Hie (I" I i'l 1::, p, Ii ...Ull> .j ()2?

lillO, HAWAII 96721-1027

(,I...iCU,<·;:T .j ,j (/U/:,

THE RESEARCH CORPORATION OF THE UNIVEHSI·fY OF H t,(,j (1 I I

1110 UNIVERSITY AVENUE 402 VARSITY BUIL.DING HDNOI...UI ... U, HI~I~jl~II I ~;)6B:~!'6

r~ T TEN T ION : ,'I r;:., (,.I I L. L. I () j"1 r;:, C U 0 I' S' DIRECTOH OF ADMINISTRATION

GFNfl...[(1EN:

r U( (,L HI-< J i,li::. F 1 .. 1.1\' .. 1 ,·il: i 1< l,JI--!

FGI( : NU : CI:;: 1~·ITT(·IC:Hh[NT

1 }' , • ~ i! >

C:C: . ...t('i···! kltlF: «(I(,I· I\I;:(·,L. L!\!!:i' .. '" ! (Ii.'.'

' .. , I::. i) i:. i;; (I T i:: :0 i?FVF(!UFS

·'Ii

7

OPEI:;:(IT 1 NC Huur;:,';.'

( H U U I·;: ,'.;: : i'1 I i\/ )

----------------------------------------_ ........ ."-_ ..

Page 106: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

JULY 1986

A. Work Accomplished

1. Continued work on both station air compressors. Overhauled compression top half and calibrated un1oaders.

2. Installed new rubber hoses on recycle pumps.

3. Repaired gas leak from John Zink scrubber flange. 4. Repaired leak in 10% caustic piping.

5. Changed lube oil centrifuge pulley bearing.

6. Replaced emergency caustic scrubber packing with plastic fill. 7. Repaired air dryer control circuit. 8. Repaired annunciator horn.

9. Switched Dow scrubber motors.

10. Repaired 10 kVJ emergency generator starting sol~noid.

11. Removed cast iron 10% caustic pump and replaced with spare unit.

12. Overhauled air compressor cooling water pump. 13. Repaired defective sensor on moisture separator level control. 14. Installed new sample valves on moisture separator.

B. Plans For Next Month

1. Repair PV-601 (main steam stop) actuator. 2. Perform corrective maintenance as required.

IHEII NMU 8/01/86

• M ~

Page 107: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

! 1 ~S"

o Telephone: (808) 955-6344

", JlIl\5 A1: 58 9,E· u 86JUL 16 P3: 05 The Research Corporation of the Univer!my of HinNaii

Mr. Susumu Ono Department of Land and

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dea r Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of June, 1986.

WRC:tmn

cc: K. Keith D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh

Sincerely,

~~ Director of Administration

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

Page 108: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o 0 HAWAII ELECTRIC LIGHT CO., INC.

THE F:ES:E(~IF;:CH CDF;:F'DPtIT I DN OF THE: UNIVEPSITY OF HAWAII

1110 UNIVEPSITY AVENUE 402 VARSITY BUILDING HDNOLULU, HAWAII 96826

AT T F:: N T 1 () N : 1'1 F<., kl J 1..1... J (1 i'1 F;:.. C U U I' S' dIRECTOR DF ADMINISTRA'fJON

GENTI...Ei'"lEN:

FGI< : r-.lU : cr;: (ITTtICHi"'IFNT

'iD r ('1 i., ';{i? i i-i':: FL il\,1 i\ii:: f i< !,,JH 'j <i 1 i () :::: ',; L (.II: I';: (, 'I i, ,I ,I

\ .l 7

!.! I,' i:,I.: Ii 1 i 1'1 I,;

i:UIJh',: ': Ii (1111;0,' , Il 1 N .i

Page 109: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

A. Work Performed

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

JUNE 1986

1. Repaired gas leak from PVC piping on S02 scrubber. 2. Placed rental air compressor in service due to failure

of both station compressors. 3. Repaired steam valve PV-601 locking device. 4. Cleaned oil from instrument air dryers. 5. Began overhaul of recycle pump "A".

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 7/02/86

Page 110: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii

Mr. Susumo Ono Department of Land and

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

June 5, 1986

Enclosed is a copy of the HGP-A operating figures the month of May, 1986.

s;nCerelY'~

W~COOPS

~~.

-w C/)~ .. --I .,."~ r 1> ::::;'T --I c,"~, m?~;:,-:-i O'-r""" "= '-"

-'~

:r''''"'r-l>V':r-,. :EC; --l>§i:j2:; - ' -("')

,1"11 (.I)

Director of Administration

WRC:tmn

cc: K. Keith D. Yamamoto J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

00 c:n

'--c::: '-:"1 2: rr:

) c.o C':' f'"t~ , .

l::t ""~ CD tTl

0 ,..."

~

\~:-l1 .::1 .

tf'n ".:P

.; ....... ' -.~

Page 111: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HAWAII ELECTRIC LIGHT CO.,

P" 0" BOX 'j 027 HILO, HAWAII 96'721-1027

THE RESEARCH CORPORATION OF THE UNIVlRSI'fY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSI1Y BUILDING HONOLULU, HAWAII 96826

A'flENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEi"IEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MON1H OF MAY 1986

TOTAL BRINE FLOW NE'f KWH OF'EF;:(,T J NC

HUUF;:S TOT ()I.., STE(~,r-1 FLDI,J i 000 ::: 1000 # GENERATED

F;:F\iENUES ',I; .: HUUP S' • j"'i J (I)

FGI< : NU : C~: (~lTT (~CHI'IENT

45,088 1,704,300

.' " .'"

I '): . j,

FRANK G. KEN' ~DY, MANAGER PPODUCTJUN DEPARTMENT

--------------------------------------- -,."",,---

Page 112: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.....

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

MAY 1986

A. Work Accomplished

1. Replaced Dow scrubber pump motor after motor bearing failed.

2. Replaced defective pH sensor on Dow scrubber. 3. Cut in portable screw compressor to supply station

air. Both station compressors have been out of service since May 26, 1986, awaiting repair parts.

4. Replaced lube oil centrifuge V-belts.

B. Plans For Next Month

1. DeSign and bid out new station air compressor (1 each) with water cooled aftercooler.

2. Perform repairs as required.

IHEII NMU 6/02/86

.IIS.'*4_0

Page 113: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii c' a

Mr. Susumu Ono Department of Land and

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

May 6, 1986

Enclosed is a copy of the HGP-A operating figures for the month of April, 1986.

WRC:tmn

cc: K. D. J. P. A. A. G. J.

Keith Yamamoto Shupe Takahashi Smyklo Adduci Lesperance Huizingh

Si~~ Wi 11 i a~ ! Coops Directo~~f Administration

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

_0··

I,: .. :::~

c ::. :=-, ,., . 1- ~ r l;:D' c -!

rn :,;;: :::0 rn :z:P'O --I

j

I C(,) , ,

r·-.:; PI

r· 0 --.J

Page 114: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-' • o o HAWAII ELECTRIC LIGHT CO., INC.

P.O. BOX 1027 HILO, HAWAII 96721-1027

MAY '1, 1981.,

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

)

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF APRIL 1986.

TOTAL STEAM FLOW 1 (~(~0 :::

20,100

FGK: NU: CI=< fiTTI~'ICHi"IENT

TOTAL BRINE FLOW NET KWH 1000 0 GENERATED

35,942 1,358,600

r;:EVENUES 1;

(JPERfiTING HOURS

(HOUI=<!; : MIN)

Fr~ANI< G. KENNEl', MANAGEF: PRODUCTION DEPARTMENT

{}! r!/~ 1 • . I, Oii

. ~ I , ~.

Page 115: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

...­\ o o

HAWAII ELECTRIC LIGHT COMPANY, INC.

ATIACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

APRIL 1986

A. Work Accomplished

1. The plant experienced a generator trip when the main step-up transformer was damaged on Sunday, April 13, at 4:14 pm. A burned load tap changer was temporarily bypassed and the unit was placed back on line at 7:26 pm on Friday. The total outage was 123 hours. J

2. Changed step-up transformer oil.

3. Repaired 20" diameter below grade piping from PV-1 to steel sparger box. (This work was done during the transformer repair outage and unabated venting took place during that time.)

4. Repaired starter on caustic transfer pump.

B. Plans For Next Month

1. Perform corrective maintenance as required.

IHEII NMU 5/01/86

________________ i! .. ~~.',,_.

Page 116: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

1's":79

o o Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii

Mr. Susumu Ono Department of Land and

Natural Resources P. O. Box 621 Honolulu, HI 96809

Dear Mr. Ono:

Apri 1 4, 1986

Enclosed is a copy of the HGP-A operating figures for the month of March, 1986.

',,-

.... )! /\

Sincerely, ~ i~~

~COOPS i1 WRC:tmn

cc: K. Keith A. Konishi J. Shupe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh

Di rector of Admini stratior!;2Po -.,

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

',/

.. ~, -,'

",

f ;18: 50

-"

Page 117: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-, • , o o .;

HAWAII ELECTRIC LIGHT CO., INC. P.O. :OOX 1027

HILO, HAWAII 96721-1027

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF MARCH 1986.

TOTAL STEAM FLDW 1000 =::

32,280

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 0 GENERATED

41,289 1,560,700

r~EVENUES 1;

96, :n'1

Vtd"L Y YOURS,

DPEI=<ATING HOURS

(HOUI:;:S: MIN)

FRANK G. KENNED , MANAGER PRODUCTION DEP~RTMENT

-------- ~

Page 118: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. .'

IHEII

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

MARCH 1986

A. Work Accomplished

1. Repaired leaking piping on John link recycle line. 2. Corrected electrical problem with No. 3 Dow scrubber

pump. 3. Rewired H2S abatement system to provide for separate

annuciation from John link. 4. Overhauled IIBII recycle pump. 5. Repaired sections of deteriorated electrical conduit. 6. Performed general cleanup.

B. Plans For Next Month

1. Perform maintenance as required.

NMU 4/02/86

.. )

Page 119: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

The Research Corporation of the University of Hawaii

Mr. Susumu Ono Department of Land and

Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

March 10, 1986

\ 0 ~'2-Telephone: (808) 955-6344

[.\8:57

Enclosed is a copy of the HGP-A pperating figures for the month of February, 1986.

Sincerely,

Wi 11 i R. Coops ~4~ Dire or of Administration

WRC:tmn

cc: K. Kei th A. Konishi J. ShUpe P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

... c: c, c-: -, i .; ., -r- <-c. .b-_:; .. --I -':' .. m ~:::o

f:lS>o -f

' .... _ .. J

;::.;J

I"'V I,

P: ~ .....'"..,

C) ~I"""'" '.' ... P-I

...!:'- C c;....)

Page 120: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

'. I '" o o HAWAII ELECTRIC LIGHT CO., INC.

P. O. BOX 1027 HILO, HAWAII 96721-1027

j

MAI;:CH 4, 1986

'Y } cuJ d,.'"

i '

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DII;:ECTOR OF ADMINISTF;:AV1:0N

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF FEBRUARY 1986.

TOTAL STEAM FLOW 1000 •

::W, 2(~4

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 0 GENERATED

38,633 1,460,300

I:~EVENUES

$

88,905

OPERATING HOURS

(HOURS:MIN)

671 : 04

VF~ULY YO!':' FRAN~NNEIiY' MANAGER PRODUCTION DEPARTMENT

r-~.L :.~ '-.

t::c.:. c·;

T~

;;: ~ r- :r. ... S~-l

,,' j"\j 3:;0 mQloo ;;;;:: -f

G..,)

,",; )

J:::. ::::0

I""V

J:;, -c::::>

.J::... c.u

f' L rq

<..:: rn o

Page 121: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

IHEII

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

FEBRUARY 1986

A. Work Accomplished

1. Changed condensate pump bearings. 2. Replaced defective Dow 502 scrubber pH controller and

sensor. 3. Repaired faulty control room fire detector. 4. Replaced cooling tower fan motor overload heaters due

to intermittent fan trips. (This work required 50% derating of units for approximately 8 hours.)

B. Plans For Next Month

1. Maintenance as required.

r o'

--

L. t!..

c.::;, --' I ,-, --.

r :E r 1> C-.; -T:m 3:::0 ~90 ....

NMU 3/04/86

. .. ''''':;

" '-b

~-':'J<o ..... 1:)

!

r-..; i,

f II :P

C=> <£ ••

"'" Ji1 ...r::... 0 (".)

Page 122: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

II .

o o ;':L~ c:LIVED

R" d h F i~- k 18

',u . _ Pl' . The Research CorU&ation of the University of Hawaii

.IIV (jJ:

.<;,' ':, WATER& "UU'.~i':'L(;PMENT February 14,1986

Mr. Susumu Ono Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

s~,

Telephone: (808) 955-6344

,! ., ~. ,

. ; /,:: L:

A 8: ~ 2

l ... ,

Enclosed is a copy of the HGP-A operating figures for the month of January, 1986.

WRC:tmn

cc: K. Keith J. Shupe A. Koni shi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance J. Huizingh

SinCerelY~

Wi~ Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 123: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC. REef I Itt C

fEb 13 bbo P. O. BOX 1027

HILO, HAWAII 96721-1027

FEBRUARY 5, 1986

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

k· 'L' .... ,) "f "',: "viii' OF THE U OF H

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF JANUARY 1986.

TOTAL STEAM FLOt,,) 1000 t

32,'1()9

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 I GENERATED

42,093 1,591,1()()

REVENUES $

96,'777

OPERATING HOURS

(HOURS:MIN)

73:~: 55

Page 124: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

tHEII

o ) HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

JANUARY 1986

A. Work Accomplished 1. Repaired hole in concrete brine sparger box.

2. Overhauled "B" 10% caustic pump.

3. Installed four new Dow scrubber recycle pumps. The original pump motors furnished by Harrington Plastics were not chemical duty and deteriorated rapidly. The replacement pumps were furnished as warranty items.

4. Charged plant batteries.

5. Repaired NeG valve on John Zink incinerator.

6. Performed general maintenance on standby propane generator. 7. Installed cooling tower basin level transmitter. 8. Reconditioned Dow scrubber pump motors for use as emergency

spa res. 9. Shut down generator for eight hours on January 30, 1986, to

perform general maintenance work. Repaired leak on flash separator drain line, moisture separator level indicator, and Dow scrubber gas line. Also cleaned the John link sightglasses, reconditioned the air ejector steam stop valve, installed a new turbine exhaust hood rupture disc, and removed one lube oil pump for shop repair.

10. Began overhaul of one condensate pump.

B. Plans For Next Month 1. Repair Dow scrubber pH sensor. 2. Complete overhaul of condensate pump.

NMU 2/05/86

Page 125: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o a

The Research Corporation of the University of Hawaii

January 14, 1986

Mr. Susumu Dno Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Dno:

Enclosed is a copy of the HGP-A operating figures for the month of December, 1985.

WRC:tmn

cc: K. Keith J. Shupe A. Konishi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance

s;ncerel~

Willi m R. Coops Dir tor of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

[ "

("I '~ 7 A 0: J

Page 126: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.) "--., o o H(ll,J().i.I FLECll:~JC LIGHT CO." INC.

JAN U iJlJu I···. o. bUi i o:~,,"{'

HILO, HAWAII 96121-i021 k l. ;; l :.: _", .' :\:

OF iHE U Of H

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRAflUN

. , .j

t/

GENTLEjviEN:

)

PLlASE FIND H~P-A OPlRHIING ~lGURLS 0Uk IHL MuNIH U~ OFClMBlR 1985.

fOTAI... SfEAM FLOW .j 000 :lj:

FGK : NU: CF: '~TT(lCHf'jEN'1

IUIAL BRINE FLUW NLI KWH 1000 4 6LNERAIFO

40,141 1,540,000

F:EVENUES 'I>

DF'EF<I::) rING HOURS

(HOURS:MIN)

Page 127: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ht ,)L:' ,-', v rd

OF THE U OF H ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY DECEMBER 1985

A. Work Accomplished 1. Fabricated temporary sheet metal rupture disc and placed unit

on line after a 32-hour outage. Existing disc leaked to the point where the unit tripped on low condenser vacuum.

2. Rewound S02 scrubber motor and placed scrubber back in service. Also received 4 each warranty pump and motor sets from Harrington Plastics to replace present units.

3. "A" air compressor bearing retainer ring lock pin worked loose and caused minor damage to bearing cover. Retightened retainer and placed compressor in service.

4. Cleaned John Zink fire eye.

5. Placed turbine DC lube oil pump system in service.

6. Replaced 10% caustic pump with spare unit and overhauled pump.

7. Overhauled "B" air compressor.

B. Plans For Next Month

1. Overhaul 10% caustic pumps.

2. Repair concrete sparger box hole.

IHEII NMU 1/06/86

Page 128: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

The Research Corporation of the University of Hawaii

November 8, 1985

Mr. Susumu Ono Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

T"'phon, ~8) 95~roM /

, • ~I i~ Pin, '13 'v' '-: 1',

..", ... , .... Co" ,. , '_. -~ ", ,,: '-" •..• ' ' •. ' '1,); \ "':~)

v I jd t ;,,;r lilA WAlE ~~ '. ;""' ;; .:~ I

J ~/ /d I

Enclosed is a copy of the HGP-A operating figures for the month of October, 1985.

SinCerelY'~

Willi ~ Dire or of Administration

WRC:ss

cc: K. Keith J. Shupe A. Koni shi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

r-.~

~ .. 2-i

..

." ~?::-, ,..: .. ""Tl r, ..-,-. ;;; £::-., '''rr, 3:::';::0

!;]{;)o "-i

00 ,:-....... , ---'<0

oc....: ... ,

c::;

'" r"'/' -- i ' , c.....;, C' ~ P7

<..0 .< . . fY7 -£::.. 0 0)

Page 129: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

./ o o HI:\lkll~,JI [I ... ECTPIC LICHT CU." INC.

F' .'. o. [lOX 1 O~.~? HILO, HAWAII 96721-1027

NUV[M[l[P 1, 1985

THE RESEARCH COPPOPATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTEN1'ION: MR. WiLLIAM R. COOPS DIRECTUR OF ADMfNlSfPATION

GENTI ... Ei1EN:

1 \ (V

PLEASE FIND HGP-A OF'LRA1ING FIGURES FURfH[ MONTH OF OCTOBER 1985.

TOTt,!... STEtlM F!...Dl~ 1000 :::

FGI( : NU : CI~ t,TTt,CHi'iENT

TOTAL BPINE FLOW NET KWH 1000 # GEN[RATED

44,593 1,685,600

r;:EVENUES' ',Ii

OP[F~I:~,f J NC HUUI:;:;:·;:

(HClUF;:S' : dl (1)

'l44 : O()

Page 130: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

OCTOBER 1985

A. Work Performed

1. Repaired gas leak on top of John Zink incinerator scrubber column.

2. Provided temporary air compressor after portable unit failed. (Both "A" and "B" units also were down for repairs at the time ~ )

3. Continued work on "B" air compressor feather valves. 4. Repaired "A" air compressor unloader. 5. Overhauled recycle pump. 6. Removed #2 and #3 Dow scrubber pump and motor sets for shipment

back to Harrington Plastics. This is most likely a warranty item.

7. Began testing S02 scrubber performance with the addition of small amounts of caustic directly to John Zink scrubber. This is being done to control 502 levels in recycle effluent being discharged on the "Hill". Preliminary readings indicate no large change in total caustic consumption.

8. Awaiting response from T. Adduci prior to commenting on County's proposed silica waste handling procedure.

B. Plans For Next Week

1. Complete repairs on air compressors. 2. Overhaul 10% caustic pump. 3. Repair building gutters.

NMU 11/01/85

Page 131: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

i'u·\j !Ii;/.:' ':~'1 AiER & "f'" "J<, r,,,,, L·\ t"u" n;, - i U· !)U:I:UT i".~, 1) ...... 1j L..L I ;'TjIL,ft.1

DecemBer 9, 1985

Mr. Susumu Ono Derartment of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Telephone: (808) 955-6344

(OCo~

" ~ .,: i 1

Ii {\Q" ~}~ • "" I' i l r\ U· .... L.

, ,- r' -,,·,L1C,.':;

Enclosed is a copy of the HGP-A operating figures for the month of November, 1985.

WRC:tmn

cc: K. Keith J. Shupe A. Konishi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance

SinCerelY'~

Wi lli R. Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 132: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

..

.. o o HAWAII ELECTRIC LIGHT CO., INC •

P. O. BOX 1027 . HILO, HAWAII 96721-1027

DECEMBER 2, 1985

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF NOVEMBER 1985.

TOTAL STEAM FLOW 1000 :::

~~4, 448

FGK: NU: CI~ ATTACHMENT

TOTAL BRINE FLOW NET KWH REVENUES 1000 • GENERATED $

44,062 1,665,500 96,486

OPERATING HOURS

(HOURS:MIN)

718:59

FRANK G. KENNEDY MANAGER PRODUCTION DEPARTMENT

'I; . - .. Ifr ' r. ,.... I~ '1 ~

. :-- H ')""

" '.

, I

I

Page 133: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o \

,

Page 134: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

I •• >#

IHEII

o o .

HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACKt1ENT

HGP-A MONTHLY MAINTENANCE SUMMARY NOVEftBER 1985

A. Work Performed

1. Overhauled 10% caustic pump. 2. Cleaned cooling tower screens. 3. Repaired turbine building rain gutter. 4. Installed new air compressor unloader filters. 5. Installed new feather valves on "A" air compressor. 6. Overhauled recycle pump "A". 7. Installed new un10ader pressure switches for both air compressors. 8. Sealed gas leaks on S02 scrubber. 9. Replaced centrifuge breakover switch.

10. Rewired John Zink incinerator thermocouple. 11. Completed 30-day evaluation of Dow S02 scrubber with additional

caustic feed to John Zink column. Consumption of caustic soda is down to 58% of "pre-scrubber" values.

12. Replaced NCG moisture tank ball valve.

B. Plans For Next Month

1. Overhaul "B" air compressor. 2. Replace rupture disc on turbine exhaust line. Unit tripped on

December 1, 1985, due to failed disc.

NMU 12/02/85

---------------_______________ "''''''0(*'"' .....

Page 135: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o II ~-3 Telephone: (808) 955-6344

,';

J The Research Corporation of the University of Hawaii

o October 8~ 1985

i. . ''-' " ','. ~ ~ ,.", '-,' 'I'~,' ,:",.,' L:" .\)'

.) i iii t fI,hVAIJ'

Mr. Susumu Ono Department of Land and Natural Resources 1151 Punchbowl Street Honolulu~ HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of September~ 1985.

WRC:tmn

cc: K. Keith J. Shupe A. Konishi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance

SinCerelY~/ ~

William . ~ Direct r of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

~~. - -' t,< 0,::::­[-;-- .p

;.c: ~ '):> C-I -em 3.:::0 ~~ --I

ex:} CJl

(.~. '. ~ ,

< fTl o

/

Page 136: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

., o o

HAWAII ELECTRIC LIGHT CO .• INC. P., U., :HO>< 'IO?7

HILO. HAWAII 96/21-1027

THE RESEARCH CORPORATION OF fHE UNIVEI·;:S'ITY· UF H('lkl(~,IJ

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONULULU. HAWAII 96826

ATTEN1ION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTI...EMEN:

PI ... E I~l S F FIN D H G P .... t, UP E F: (~ l I (I C F J c.; u r;: F ,\' F 0 f~ T H [ i"1 n NTH 0 F' S' E PTE i"1 II E F< 'I? B '::; .,

'rUTAL STEAM FLOW '1 OO() :::

FGI( : NU : cr;: 1~',TTt,CHI"IENT

TOTAL BRINE FLOW NET KWH 1000 # CENERATED

20~37 J76.300

f<EVENUES' 'Ii

DPFf;:tl T I NC Hour~s

(HDur;:s: i"I IN)

I ... I ... ~, .. ~I.I ... I.,I:\ .. :.,I\. .. !" ... I".I'" " .,: (II' K l:t., \. ::.I·~ 1\ ::. ) ". ,. (II' I", t. ::. ", PRDDUCTION DEPARTMENT

Page 137: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HAWAII ELECTRIC LIGHT COMPANY. INC.

ATIACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY SEPTEMBER 1985

A. HGP-A Overhaul (Sept. 3 - 18) 1. Disassembled turbine, inspected, and sandblasted internals. 2. Inspected condenser water side and hotwell. Cleaned condenser tubes

by shooting "bullets". 3. Removed and"re-fiberglassed all cooling tower fan blades. Reset

pitch and changed gear box oil. 4. Overhauled generator air blower. 5. Cleaned John Zink incinerator and flame sensor. 6. Installed new 2" PVC "recycle dump line. 7. Inspected and cleaned flash separator internals. 8. Inspected and cleaned moisture separator internals. 9. Replaced PV-1. (Separator pressure control valve to steel muffler.)

10. Dredged silica ponds. 11. Serviced unit breakers. 12. Replaced Dow scrubber packing. 13. Installed D.C. lube oil pump (wiring is not completed). 14. Started unit and placed on line. Unit is presently exporting 2.3 MW.

B. Worked on "A" air compressor feather valves an~ "A" & "B" unloading pressure switches.

C. Repaired cooling tower fan breaker.

D. Unit experienced a three-hour outage on September 23, following two separate trips on loss of circulating water and high moisture separator level. Both conditions were corrected.

E. ·Plans For Next Month 1. Test S02 scrubber with varying amounts of caustic addition in John

Zink tower. Recycle dump effluent is S02 rich and testing will be performed to lower S02 levels inthe effluent.

NMU 10/2/85

Page 138: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-

\

"Oll

Telephoos, (808) '7 , .~', i \f E ri

The Research Corporation of the University of Hawaii .' ::~ ') I! A B: 3 0

<I> '_ 1 ; .. September 10, 1985

. " t'; .. ~!:~.h.;;d>ES SIJ~ TEDF HI\~\tAJ~

Mr. Susumu Ono Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of August, 1985.

Sincerely,

uK4 WilliamlR. Coops Director of Administration

WRC:ss

cc: K. Keith J. Shupe ,.

;.--.. =: A. Konishi ;;:;::< J. Katz o.

00 P. Takahashi r"'11 A. Smyklo ;:::~

r"l> A. Adduci 0-.

G. Lesperance ~rn 3:::0 ~QIo -f

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

co (J"I

cr:;

'" " .... "-

-0 fT! ,- (-)

P! u

CJ..) < rn c..n 0 ,an

Page 139: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, ..

o Q ( ''\

P., 0., BDX i (.)~.~,,? "-H/~~Jf'1II EL.ECTt:;: 1 C L. I GHT CO", I N[~~ .. , ' \'; 1

HIL.D, HAWAII 96721-1027 '

SEPTEMBER 3, 1985

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSI1Y BUIL.DING HONOL.UL.U, HAWAII 96826

A'fTENTIDN: MR. WIL.L.IAM R. COOPS DIRECTOR DF ADMINISTRATIDN

GENTI ... EMEN:

\ '

r,~> , . "

PLEASE FIND HGP-A OPERATING FIGURES FDR lHf MONTH OF AUGUST 1985.

TOTAl ... S'TE/~f1 FI ... Dv.1 '1 f;)(-) 0';) :~:

~33,17B

FGI( : NU : CF;: '~lT"I'(lCHi"IENl

TOTAL. BRINE FLOW NE'f KWH 1000 ~ GENERATED

42,437 1,604,100

ill

I:~EVENUES ~;

'\01,736

OPERt,TING HOUI:;:S

( 1·-/ol..lI~: S : M 1 1'1 )

7 1')"", .... ,.) ...:.,;,) .. )..:.

---------------_.-.......

Page 140: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-

A. Work Performed

o HAWAII ELECTRIC LIGHT C04PANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY AUGUST 1985

1. Completed overhaul of "A" air canpressor.

o

2. Fabricated and installed new air compressor inlet plenum and filter housing and relocated indoors.

3. Replaced carbon steel section of recycle dump line with stainless steel.

4. Overhauled "A" and "B" recycle pumps. 5. Cleaned John Zink flame sensor contacts following nuisance

incinerator trips. 6. Work performed during August 14 & 15 shutdown

a) Installed 3 each 3" brine ball valves. b) Cleaned out and replaced concrete sparger outlet spool pieces. c) Relocated emergency abatement caustic tower. d) Repaired caustic pump expansion joint.

7. Painted piping and structures in preparation for GRC tours. 8. Spread gravel over plant area to cover silica.

B. Plans For Next Month 1. Overhaul unit. (Three weeks commencing September 3)

NMU 9/03/85 ~~~------------____________ ,_<li")fiII""'~.!>~""'"

Page 141: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o Telephone: (808) 955-6344

"1 (" ~'..... .". t ,r i (,",

The Research Corporation of the University of Hawaii

o August 7, 1985

Mr. Susumu Ono Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of July, 1985.

WRC:ss

cc: K. J. A. J. P. A. A. G.

S~inCerelY~ _ -A

Willi R~r. Direc or of Administration

Keith Shupe Konishi Katz Takahashi r-Smyklo J;:., ,-'

~;::::

Adduci t~<::'

Lesperance o-".,-..c: ir1l ,,~ r--):l.. 0 .....

~m 2-"--t

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

. '" ,0 0

. '..,;:.

c:::o c.n l:> c: C';)

'N»

"U -.. c...." N

A 9: 07

........ , -,,".,)

m. G rn -'< fTl 0

Page 142: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o Q Hr=I\,Jt, I I EI...ECTI:< I C I... J GH T CO." I i'lL.

P., U., tlOX .j 0:?7 HJI...O. HAWAII 96721-1027

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF JULY 1985.

TOTAL STEAM FLOW i (-)0(-) :::

FGI( : NU : CI=< ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 # GENERATED

I:<EVENUES ~I;

VERY TRULY YOURS.

()PEF;:f~,T I NG HOUI:<S'

(HOURS: i·iIN)

744:0G

Page 143: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT HGP-A MONTHLY MAINTENANCE SUMMARY

JULY 1985

A. Work Accomplished 1. Repaired "A" and liB" air compressor unloading pressure switches. 2. Overhauled "B" air compressor top half. 3. Began work to overhaul top and bottom of "A" compressor. Wi 11

install a new piston liner due to excessive wear on existing unit. 4. Began installation of new stainless steel 2" recycle 1 ine. 5. Received Dow Chemical scrubber unit, installed and started-up.

30-day demonstration period began on July 25, 1985. Caustic usage down from about 3500 lbs/day to 1500 lbs/day.

6. Made temporary repairs to water, NeG, and caustic lines after brine sparger blew out and ejected rocks.

7. Issued purchase order to Elliot for service engineer to assist with September overhaul ($15,000).

B. Work Planned For Next Month 1. Relocate air compressor inlet and fabricate new inlet plenum and

fil ter hous i ng. 2. Complete work on "A" air compressor overhaul. 3. Conclude demonstration period for Dow scrubber. 4. Tie in research facility piping. Note: This will require unit shutdown.

NMU 8/01/85

Page 144: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

?~lf

Q Telephone: (808) 955-6344

• :' :, I .H~,

It::

The Research Corporation of the University of Hawaii

Ju ly 11, 1984 '.~.' ~j 1"\ L ~.:S

:~[ i\ rE CFllAWAn

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

: -, J"" (-' --{

rn -",," :;0

~I>o -I

Please find enclosed a copy of the HGP-A operating figures for the month of June, 1984.

WRC:ss

cc: K. Keith J. Shupe S. Kearns A. Adduci J. Katz P. Takahashi A. Smyklo

SinCerelY~

Wi~ Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

co

len

i'

! ;

o

Page 145: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, o OJ i'l ;! !,j i'l .1 j. t. L I::.. I ,< J C 1... T l.;. H I C ().., I (} C .,

. ...iI...Ii. .. 'I ::; ,i ')U"t

THE RESEARCH CORPORAfJON GflME UNIVERSIIY Uf HAWAII

i'j '\ 0 UNIVEF;:SI'j Y (l\i[iiUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRAiION

GENTI...EhEN:

TUTtll ... S'ICf-li"1 Fi...U\'.1 'j () () () :ii:

I U ! (':I! 1'.; I,.: J r,n:: I': i.c.II.'J , ... 1 L I Ii i/J I'i

.", <.) () () :jj: '::1' L i"'·.! L '":.: I~'i t I::. J)

~

;x: ":r ~ (.;:, .0

.. . ' u.. F FU·:'d·lI( G"

i'<C\!' C HLIE S ~I)

'j 'j 'I , 'I i,l6

uJ ..7') ":>0 .> PRODUCTION DEPARTMENT

:~ ::;) W L4)

,) I..oJ <..:>

-:i:~ UJ ....J :::;) :;,J~ a::: ...,

:I'll&,. , .. 0 L:

h: U 'y' ('I!..·f .I: 1:; ,\'

'"

Page 146: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

9WAII ELECTRIC LIGHT COM PANAN C.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JUNE 1984

I. Maintenance Performed

A. Repaired 10% caustic batching water meter solenoid.

t( , '

B. Repaired broken area lighting supports near wellhead.

C. Re-adjusted condensate pump low pressure switch. D. Began ordering of long lead material for annual shutdown. E. Isolated cause of erroneous vibration trip signal to

erratic proximitor on generator inboard. (Overhaul item)

II. Plans for Next Month

A. Repair recycle pump seal. B. Overhaul 10% caustic pump. C. Scrape west side brine pond.

::I:

:.... ;") 0 .-

::> -- .)

'.oJ W '-~ .J -~_.J ::;, .. f-

ll::: J u.. .. 0

NU 6/29/84

Page 147: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii

July 9, 1985

Mr. Susumu Ono Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Dno:

Enclosed is a copy of the HGP-A operating figures for the month of June, 1985.

s;;r~ Wi 11 i 7 R. Coops Direc~rF of Administration

WRC:ss

cc: K. Keith J. Shupe A. Koni shi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

r'-.~

., -., " <: '0-" '"'-,

c." -r"" 'T' . r-' ~ r' » c: ..... -c~m ::s::::o Slpo -t

c:;:-;

" ...•. ,,' '--::=~ r--

~ I

r-'" c::::> rn -0

-c- < rrt c::::> 0 CN

I

Page 148: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. , o o Hf~lWt,11 ELECfF;:IC LICHT CO." INC.

F'. U. f.<m< i O~.i7 H1LO, HAWAII 96721-1027

JUl ... Y 1! i 90'::;

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY f.<UILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATIUN

GENTLEMEN:

PLEASE FIND HGP-A OPEkAflNG ~lGURES FOR THE MON1H OF JUNE 1985.

TOTI!)L STEfiM FLOW 1 00(-) :::

TUfAL f.<RINE FLOW NET KWH 1000 C GENERATED

I:<EVENUES; ~;

VERY TRULY YOURS,

UPEH{:,TINC HOUI:;:S

(HOUF<S : i'1 IN)

;" 1'I,t~f\;::1~T~~ MANAGE" U PRODUCTION DEPARfMENT

FGI( : NU: CI=< ?lTTACHMENT

Page 149: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

. " •

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JUNE 1985

A. Work performed in June

1. Repaired "B" air compressor unloading solenoid valve. Unit experienced a 3i-hour outage on June 20, following the loss of both compressors.

2. Dismantled and crated "Citrex" abatement unit and shipped back to Connecticut. (Note: Both filter presses have been left at the HGP-A site and were not shipped due to the weight of the components.)

3. Replaced inlet and exhaust valves on "B" air compressor.

4. Repaired both air drier exhaust solenoids.

5. Repaired condensate pump sensing fitting. Unit tripped on loss of vacuum and was down for two hours following the fitting break.

B. Plans for next month

1. Install and ,test Dow S02 scrubber unit.

NMU 7/01/85

Page 150: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. ,~7 o o Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii .' J ili:\ '( lOA 8: 0 S

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of Apri1, 1985.

WRC:ss

cc: K. Keith J. Shupe A. Konishi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance

SinCerelY'~ V v/ J

WilH.{tCO ps r Director of Administrati~:'~

6:"-

r-1~"" .-;;= -< c. C::Ci '7, -r-~ CI.~," r:E: r);> C'.....; v'm 3:;0 Slp--f

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

co (.II

-­,u,)

-

co CJl ..,,~

..:.". ):>

--<

, c:.."

)::I

a . . OJ

, ... 1..,'

if ',;~-, j i·

r''',,; ~ .'

rn < fTl 0

Page 151: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o I,

HAWAII ELECTRIC LIGHT CO .• INC. P.O. BOX 102'1

HILO. HAWAII 96721-1027

MAY i. i98~)

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTL.EMEN:

\1

PLEASE FIND HGP-A OP[RATING FIGURES FOR THE MONTH OF APRIL 1985.

TOTAL STEAM FL.OW 1 (~OO :::

36.078

FGK:NU:CR ATTACHMENT

TOTAL BRINE FLOW NET KWH 1000 0 GENERATED

REVENUES $

VEV~O~:

OPEJ<ATING HOI.JF<S

(HOUI=<S:MIN)

696: 10

FRANK G. KENNEDY. MANAGER PRODUCTION DEPARTMENT

Page 152: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

:.--.. -, o HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

APRIL 1985

1. Work Accomplished

A. Performed chipping and painting of piping and structures.

B. Repaired John Zink scrubber flange leak.

C. Repaired air compressor unloading solenoid.

2. Plans For Next Month

A. Continue chipping and painting.

5/02/85 NU

Page 153: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

~ Date: May 30, 1985

Time: 0 TO Susumu Ono

FROM Wi 11 i am Coops

The attached are amended copies of

statements reflecting higher payments

for electricity.

Research Corporation of the University of Hawaii ~872, 7942. 955-6344

Page 154: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

Page 155: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o r~\i~(,~­

:-~,:~ L' E" \ \' EU HAWAII ELECTRIC LIGHT CO., INC.

F'. O. BOX 102"7 HILO, HAWAI I 96721-8~~f~t\ ~ p \ : 44

APRIL 26, i98~)

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A REVISED OPERATING FIGURES FOR THE MONTH OF JANUARY 1985.

TOTAL STEAM FLOW 1000 :0

33,180

.".. a ('10') ..... w .. ;~ > co - cr ~,:>

W oq-...J ~~.u

U CC, f.L .::-

W oiS a:: ;:::

>'Q ;::, C;~ -::>

t.r;) -J

co

FGK:NU:CR

TOTAL BRINE FLOW NET KWH 1000 :0 GENERATED

42,440 1,604,200

REVENUES $

109,758

VE~UL Y YOURS,

~.y FRANK G. KENNEDY, MANAGER PRODUCTION DEPARTMENT

r}

OPERATING HOURS

'720: ~:)3 (HR:MIN)

Page 156: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

Page 157: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P. O. BOX 1027 HILO, HAWAII 96721-1027

APRIL 26, 1985

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A REVISED OPERATING FIGURES FOR THE MONTH OF FEBRUARY 1985.

TOTAL STEAM FLOW TOTAL BRINE FLOW NET KWH REVENUES 1000 • 1000 A GENERATED $ y T

---------------- ---------------- --------- --------

27,083 34,641 1,309,400 89,576

FGK:NU:CR

1 J

~

OPERATING HOURS

---------634:31

(HR:MIN)

Page 158: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

f'. o. BOX 1 (~~!"( HILO, HAWAII 96721-102"(

APRIL 26, 1985

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: HR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A REVISED OPERATING FIGURES FOR THE MONTH OF MARCH 1985.

TOTAL STEAM FLOW i000 :::

36,059

FGK:NU:CR

TOTAL BRINE FLOW NET KWH 1000 # GENERATED

46,123 1,743,400

REVENUES $

119, 181

VE~LY YOURS,

FRANK G ~Et. MANAGER PRODUCTION DEPARTMENT

OPERATING HClURS

"(35:1"' (HR:MIN)

Page 159: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o loo

T.'.phoo., 18081, :~6344 /

, "':"~V

Apri 1 9, 1985

Mr. Susumu Dno, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Dno:

Enclosed is a copy of the HGP-A operating figures for the month of March, 1985.

WRC:ss

cc: K. Keith J. Shupe A. Konishi J. Katz P. Takahashi A. Smyklo A. Adduci G. Lesperance

/i

Si ncere 1y • ~/

u/f~YJb Will i;lR. ~ C~~· Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 160: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o H()("I(, I J ELEeTh: I C I... J: CHI Clj., , INC.,

F' .'. u. :UU >< 'j () ::?/ 1··1 I L () J 1··1 (:, lJj (:'1 I I ':;:: /) )' ::.? "j ..... j ()~? '/

THE, R[::SEtlHCH Cf)F;:F'OfU\, T 1 ON OF fHf::: UNIVERSI1Y UF HAW~11

1110 UNIVERSITY AVENU~ -4(») \i{~r;:Sl'i'y l·.IU 1 L:tJ J NI .. { HDNULULU, HAWAIi ~o8}o

I:":! T-j EN'"/ :I. ON: HI·;:., I.,J]' LL.1 '::'IH j: •. :., CUUF·' .\' DIRECTUR OF ADHINiSfRAfION

GENTI...EdEN:

F'LEASE FIND HCF'-A OF'LRA1:1.NG flCURLS FUR IH0 MUNIH O~ M0RCH, iYu5.

TOTAL STEAd FL.OW .j 000 :::

FGI( : NU : CI~: ATT'~lCHITjENT

TOIAL. BRINE FI...UW NEI KWH

46.123 i ,743,400

F;:LVCNUE,\' ':j,

VERY -RJI...Y YOURS,

j:;; U y til... T J F .\' "'i>

Page 161: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. o o HAWAII ELECTRIC LIGHT COMPANY, INC.

, 1. Work Accomplished

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

MARCH 1985

A. Cleaned John Zink incinerator scrubber ceramic packing and replaced incinerator flame sensor.

B. Began painting of piping, structures, and equipment.

C. Repaired "B" recycle pump vibration.

D. Replaced 20' section of 2" steel NCG line with PVC pipe.

E. Overhauled gland seal steam drain line steam trap.

F. Overhauled "B" 10% caustic pump.

G. Overhauled "B" recycle pump.

H. Overhauled "A" air compressor.

2. Plans For Next Month

A. Continue chipping and painting of piping, structures and equipment.

Note: On 3/15/85, the well pre~sure suddenly ;ncreased·20 psi, resulting in a 300-400 kw increase in output. The pressure has been holding steady since that time, with total net output between 2.6 - 2.7 MW!

4/01/85 NU

Page 162: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii

March 8, 1985

Mr. Susumu Dno, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Dno:

Enclosed is a copy of the HGP-A operating figures for the month of February, 1985.

WRC:ss

cc: K. Keith J. Shupe A. Koni shi J. Katz P. Takahashi A. Smyklo G. Lesperance

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

..

0;:) c"-r, ~ ~~ ....:;., ~

Page 163: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.'- o

HAWAII ELECfRIC LIGHT CO P.O., IJCJX i o:~.~/

HI i ... 0 , Hr:1l,JIL1II

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

o

/ // 'Ii.

i

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF FEBRUARY, 1985.

TOTAL STEAM FLOW 1 (W0 =::

FGK : NU: CI~ ATTACHMENT

:1: L':;' .l, -e::Z:: lJ..J . .0 Jt4. >- :??:! ··'>0

4J '"- :;:, )

<.;> ~IJJ ~ fa::: .- :z: a: ~ ":1-

J) t4. -JQ !l:

TOTAL BRINE FLOW NET KWH 1000 I GENERATED

34,641 1,309,400

REVENUES ~i

B1,173

i:<OYAL.TIES ~~

B,ll"?

Page 164: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-·0------ .

HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

FEBRUARY 1985

I. Work Accomplished

A. Completed work on cooling tower fan blade fiberglass repair.

S.Shut down_- unit for 8 hours on February 5 to clean concrete sparger outlet pipes, service LV-IS and three brine line butterfly valves.

C. : Changed John Zink air fil terse

D. Cleaned plugged non-condensible gas line to back up caustic scrubber.

E. Spread gravel over concrete sparger area to cover silica.

F. Changed section of PVC recycle line to stainless steel.

G. Repaired LV-l positioner to keep control valve from hunting.

II. Plans for Next Month

A. Work on John Zink incinerator and scrubber column.

Page 165: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• o o

The Research Corporation of the University of Hawaii

February 8, 1985

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of January, 1985.

WRC:ss

cc: K. J. A. A. J. P. A. G.

Keith Shupe Konishi Adduci Katz Takahashi Smyklo Lesperance

5;;:4= Wi 11 i";-.JR. Coops Direc26r' of Administration

r E::::;' 0:< OQ rr -r; <.~ rr-; r'):> 0-. -om z=-~s>o -i

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

co CJi -,., ;0 ......, co !""'"t-\!

; , 1

f"""\ ,~ \, "

Pi "'0 --< C:;a,;)

rr1 •• c.n 0 ....

Page 166: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• o

THE F\:ESE(~F<CH COF;:F'DF~(lOfIUrooi UF itootE UNIVLRSlofY OF HAWAII

1110 UNIVERSI1Y AVENUE 402 VAkSIloy BUILDiNG HUNOLULU. HAWAII 96820

A1TLN1ION: MR. WILLiAM K. COOPS DIRECrUR O( ADMINISTRAlolUN

GENTI ... Ei'iEN:

o

fUTr:ii... S'TE(:lh FI...CJl.j i 0 () (.) ,~,

r u 0 f tl L. ol:O; F;: J ,o'i e F /..IJ l,j i\i i::o T i< 1.101 H 1000 # GENERATeD

33,'j flO 42.440 1,604.200

)

F~E'v'FNUES' 0,1;

YOI.HU',

i':hHi'i!< t~;... 1< I::: j',iNF:: Y, jvjr-"1Nf:1CEF;: eh:UL'I...!C r J UN OEF'r:.lj:;: fi",oiEN !

FGI< : NU : CF;: r:~T'r('ICHhENT

, oj

"

W : -;

.i....I ;:) .... - .U .....

-1---. ...:

:r: '-, 'J :J

:'.1 ..:: f-

l.o... 0

F:Uyt·IL.TIE,\· "1;

Page 167: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

/ C::>HAWAII ELECTRIC LIGHT COMPANY'~. ATTACHMENT \. \\.,

HGP-A MONTHLY MAINTENANCE SUMMARY '\. I ' )

~

.) /

\. r"V , I.~.

JANUARY 1985 'I I. Work Accomplished

A. Repaired and installed cooling tower forebay low level alarm transducer. B. Repaired John Zink temperature indicator. C. Completed work on enlarging and modifying brine pond. Contractor

M. Sugimoto has constructed a 75 1 x 400 1 pond with earthen baffles and settling pond. Total cost is $12,300.

D. Ran new un PVC line to new brine pond. Line will carry recycle pump water to mix with the brine effluent. This should help to settle silica out in the baffled section of the pond.

E. Serviced PV-601 actuator (M.O.V.). F. Began work to remove and refiberglass cooling tower fan blades.

Work is expected to take 10 days. Unit will be derated to 1.2 MW during that time.

II. Plans For Next Month

aJ , ~J

'-

A. Shut down plant on March 5, 1985, for one day of open venting.

..!

)

.J

Work to be done will include repair of brine line control valve, butterfly stop valves, and unplugging of sparger outlet pipes.

-:l:

1,-, 0 ::> :.J -.-lo_

-, 0 .-.

Page 168: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

"1/

~ 1'12.-o Q Telephone: (808) 955-6344 J

r-o'- ,

The Research Corporation of the University of Hawaii (, .,-',.,. ! ii A 9: ~ --------------~------------------~--~~~~~----------------------

January 11, 1985

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of December, 1984.

WRC:ss

cc: K. Keith J. Shupe A. Koni shi A. Adduci J. Katz P. Takahashi A. Smyklo

Sincerel~, ~

a~~ WilG/m ;. Coops Director of Administration

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

) ~. I!}

~:. J ~-. .~. , - ~;~ >;: ~ , ~ ~, ~J (. ~ \"(.,~ ,J I }4 i CUr H.AWAII

.-CJ"I

):> --.... cc..» -

rn (') pm -< 11'1111 g

Page 169: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o ,···;,'I.',I;"·:I!!. ':: ' .. 1::.1 .. ' II",:.!:\". I... Le,··! " I .... I . .I.! ,:, .. j(. .. '.

fHE: FiESEHI·d:::H LUFd>,jr::;::I! J Ln·! tI, i iI< UNIVCRSI'I~ G~ HpWHLJ

l;j·J U 1"-1 J V F F: S' I T Y (i \i C i··.1 Lli:: .,.} ():' 'Ii tIF;: S J '}' YU I..! 1 1...:0 :i N (.;

H tJ NUl... UI... U I H(i I) (I I I ') 6d .~.~ '::>

I~\ T TEN T I Cl H : i'j r::.. l,J I L.I ... I H d i;; ,. C () U F' !. DIRECTOR OF ADMINISTRAfIUN

GENTI...Ei'1EN:

FLLHS:C F T i'iO HCF····() uet:::I~:(ll 1,·11.,. i jl:;iih:;·,:" r· ! .. II;:I hi': nil!! I H UF )lLC:I.j'i·{!:F: ,j ')H·<).

F CI< . i) U : L j:' (j r T (Ie:: H 1"11::. r'l i

. )

j

"~ ~

"- -:;

-...... "':> :> u -

'~ :::>

'j':II"":'} :;;:

. .l .. "' ~:" .L}

F~ !::: \l E: j\.! I ... ~ E ::.;: 1.·( I:. r"i' !< f"11 I:' .. 11

! r:: I'll·!!" ,; .'. 1< 1:: i'l 1'·1 I .. LI( I j"j :"1 , . .1 (I C; I::: 1< PPU0UCflUN DEPARI'MI:::Nf

i< IJ{ (I L.·r J F ,\' 'I,

Page 170: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

...

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

AITACIflENT

HGP-A MONTHLY MAINTENANCE SUMMARY

DECEMBER 1984

I. Work Accomplished

A. Repair John Zink furnace leak.

B. Overhaul eyewash station valves.

C. Cleaned plugged sparger box 6" outlet lines.

D. Overhauled "BII 10% caustic pump. Replaced mechanical seal, both bearings, and shaft.

E. Repaired leak on 10% caustic line.

F. Repaired broken nipple on air compressor receiver.

G. Fabricated 4" channel outriggers to keep air compressor vibration down.

H. Removed cooling tower basin level transducer for shop work.

II. Work Planned For Next Week

A. Excavate third brine pond outside of fenceline.

B. Enlarge existing brine pond and construct earthen baffles (tentative).

NU 1/02/85

Page 171: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• ~I"~ Telephone: (808) 955-&344 o o

The Research Corporation of the University of HawaGi; DEC ? 1 A B: 30

Mr. Susumu Ono, Chairman Department of Land & Natural 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

December 19, J 9.84-·, ' . i,.,M'Ni (, /\/; J ;.;, ,i,\.. hcSOURGES

ST4Tf()F HAWAII

Resources

Enclosed is a copy of the HGP-A operating figures for the month of November, 1984.

Sincerely, //

/'//~ W~'R. Coops Director of Administration

WRC:ss

cc: K. Keith J. Shupe A. Konishi A. Adduci

r0 :::;n

J. Katz P. Takahashi

,. , . . '

A. Smyklo r.-; C0 -. :A)

C;;2 j;'o ::i

CD

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

lrt 0

Page 172: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o 0 H (i l~l {l,t: 1 L I:" L C r !,;: J (:: " \..: I G I~:! ~~: "'~ lC,i • J INC.

!"<. U" l:<UX 'j t),/ ( I

!"j j'! l"l !"j i\ [,I /'j j' 'I' (;) l, ' ) ,..,) " '" " J ,.,' " " " :') ~""

DECEMBER 3, 1984

THE RESEARCH CORPORATION OF fHE UNIVERSITY OF HAWAIi

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTEN1'ION: MR. WILLIAM P. COOPS DIRECrOR O~ ADMINI~rRArJUN

GENTLEMEN:

TOTf!lL STE/~M FI...U~J i 000 :~:

FGK : NU : CF;: l~llT(lCHMENI'

.. 'r 1.. c::l:

'-u -..:.:J .',-... ~ >0

t....I "- .. ::;, )

Q " I£J l.t.J '-' ..-:-.:: a::: :':!S ...it-

.l)w.,.

--e» n:::

jUrAL B~iN~ ~Luw N(I K~H

'j 1;1 I;} 0 :i,: L L 1',1 I::, F: i':' I I::.u I,;: i::: v E i'l U E S'

',!i

i (-) i , 099

\ ',J '\

r;:Dl(,1... fILS' ~ji

i (), 'i 'j 0

Page 173: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

<..:)

lLJ .>-

loU <:..> LU ct:

CftlWAIl ELECTRIC LIGHT COMPAN~NC. ~\\ ATTACHMENT·, )

"'-.. " ""'"

HGP-A Monthly Maintenance Sunmary '"

iL ft. i I J

\

NOV EMB ER 1984

I. Work Accomplished

A. Fabricated new shaft for 10% caustic pump.

B. Investigated low turbine output. From early November, the steam pressure at the separator is down by 20 psi and output is down by 90 kw as compared to one year ago.

C. Cleaned cooling tower inlet screens.

D. Welded cracked angle iron under #1 air compressor.

E. Contacted M. Sugimoto to begin excavation of third new brine pond outside of plant fence line.

II. Plans For Next Month

A. Excavate new brine pond.

,~ :7" ,t :z: ~ .) c... ~ '>0

~ :: ;::, .> ,:'~

(..) ~.:z::

c':!5 ..u .... flc... • ..JQ 0::

NU 12/5/84

Page 174: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

Q o 8,1 NOV 13 A8

The Research Corporation of the University of Hawaii : 4 j --------------~------------------~----------------------------------

November 9, 1984

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of October, 1984.

WRC:ss

cc: K. J. S. A. J. P. A.

Sincerel~

w~. Coops Director of Administration

Keith Shupe Kearns "-

'.--

Adduci c::

Katz <- •

Takahashi _. . .. --. Smykl0 j~gd C::~ ~

402 Varsity Building. 1110 University Avenue. Honolulu. Hawaii 96826

:. -:")

( .. ~

.-, ..I=- 'i'\

-w ~~

-'-.. rV rn . .

0 .r-.s::.-

Page 175: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, " o o

HAWAII ELECTRIC LIGHl CO., INC. P. O. BOX 1027

HlLO, HAWAIl 96720

NOVEhOER -j, i ?H-4

-rHE RESEARCH CORPORAriON OFf HE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSI1-Y OUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAh R. COOPS DIRECTOR OF ADMINISTRAfION

GENTLEMEN:

I

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF OCTOBER, 1984.

TOTAL STEAM FLOW 1000 0

36, ~:)'l4

/

FGK:NU:CR ATTACHMENT

7' ~%

- 'J . ..:l '">IA., u..i .;;;n JO :> ~:::) - ..r") ;UJ u.J c.> =- -:; :z: w C) ~ ... ex:: z: .J) .... ..oJ.

~

TOTAL BRINE FLOW NET KWH 1000 ~ GENERATED

46,181 1,168,300

1:~EVENl.JES

$

1 (F/, 292

VERY TRULY YOURS,

~a{~ !;:-11:...1::-I:" '~\/I<' (': I"l::' -/1../1::- I) -'(' M (.\ N A- r E:-I~' \ HI , ,r • , ___ J\ I' ___ , , o. ___ ,

PRODUCTION DEPARTMENT

ROYALTIES' $

10,9'.::.~(1

Page 176: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, o o

HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

OCTOBER 1984

I. Work Accomplished

A. Overhauled plastic caustic supply pump. B. Recalibrated hotwell level controls. C. Overhauled 10% caustic transfer pump. D. Repacked lube oil reservoir suction valve. E. Repaired leak in waste gas line. F. Completed 4" brine line installation.

II. Plans For Next Month

A. Install new air compressor liner.

/

11/01/84 NU

Page 177: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

~

o o Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii B I_I n (\ 'r I -. .JL,,( A8:31

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

October 15, 1984

Enclosed is a copy of the HGP-A operating figures for the month of September, 1984.

WRC:ss

cc: K. Keith J. Shupe S. Kearns A. Adduci J. Katz P. Takahashi A. Smyklo

SinCerelY~

~ Coops Director of Administration

L --c' ", r - -7 r- :-' :;",~ :;::: f:J f2;>o ---I

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

co

'0::>

..

Page 178: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT CO., INC.

P. O. BOX i02"1 ~ HILO, Hl~WAII 96'7~~" vi

OCTOBEI:;: i, "1984" J THE RESEARCH CORPORATION OF THE

UNIVERSITY OF HAWAII 1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEASE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF SEPTEMBER, 1984.

TOTAL STEAM FLOW 1000 ...

or

----------------29,271

FGK:NU:CR ATTACHMENT

-,

TOTAL BRINE FLOW 1 (-)(~0 .... ...

•• _ • ___ ..... _ ....... 0 ••••••• _ ..... _ .... _ ... _ ••••• __

3"1,440

NET KWH F~EVENUES GENERATED $

.................................... .... _-_ ..... __ .-

1 , -\1 ~:) , 2(1() 87, 70~5

VFUUL Y YOURS,

FRANK G. KENNE , MANAGER PRODUCTION DEPARTMENT

ROYALTIES $

•••• _. NO. NO' .... '0_ .... _ .....

8, "('"71

Page 179: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

) L

. . o 0

Page 180: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o 0 HAWAII ELECTRIC LIGHT COMPANY, INC.

HGP-A MONTHLY MAINTENANCE SUMMARY SEPTEMBER 1984

I. Overhaul Work Performed A. Turbine

1. Inspected bearings on turbine generator set. 2. Replaced RTD's on turbine thrust bearing. 3. Repacked control valve lower stem and seal welded cover plate. 4. Serviced steam trap on gland seal drain line.

B. Generator/Gear Reducer 1. Megger readings on generator excellent. 2. Changed activated charcoal in generator air filter. 3. Replaced generator inboard vibration probe. 4. Cleaned gear box breather

C. Control Oil Systems 1. Recharged accumulator and repacked shutoff valve. 2. Replaced activated charcoal in lube oil reservoir filter.

D. Flash Separator 1. Flash separator internal lower half cleaned. 2. Installed modified Vortex breaker by adding on 3# extension. 3. Removed lower section of brine line out of separator including brine

flow venturi and replaced with 4" flanged section. E. Wellhead Valves

1. Cleaned valve stems, repacked, and exercised M.O.V. IS.

F. Moisture Separator 1. Cleaned top and bottom pressure sensors. 2. Overhauled level control valve. 3. Service 1" manual drains.

G. Condensate Drain Tank 1. Cleaned level sight glass.

H. Condenser and Air Ejector System 1. Serviced vacuum breaker. 2. Cleared inter and after condenser drain and level control piping.

I. Air Compressor System 1. Overhaul No. 2 compressor. 2. Installed new end bell covers on cooling water pump motors.

J. Cooling Tower 1. Drained cooling tower basin. 2. Cleaned basin and distribution trays and nozzles. 3. Changed gear box oil. 4. Installed new fan guards. 5. Inspected fan blades. Will re-fiberglass at later date.

Page 181: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

...

o 0 HrwAIl ELECTRIC LIGHT COMPANY, INC.

HGP-A MONTHLY MAINTENANCE SUMMARY (September) PAGE TWO

K. John link Abatement System 1. Cleaned furnace sight glass and fire-eyes. 2. Need to replace one fire-eye unit when available. 3. Cleaned aspirating air lines. 4. Overhauled combustion blower and motor. 5. Cleaned moisture accumulator tank and sight glass. 6. Cleaned out burner nozzle orifices. 7. Replaced electrical conduits with P.V.C.

L. Brine Line 1. Overhauled LV-1 and LV-1A control valves. 2. Paralleled the two existing brine lines discharging through control

valve LV-1A. 3. Installed modified cross T-connection in place of extra heavy duty

elbow below flash separator. 4. Installed new 411 brine line starting from modified cross T-connection

and discharging through control valve LV-I. M. Miscellaneous

1. Recalibrated protective relays and Kwh meters. 2. Serviced all unit breakers. 3. Tested emergency power transfer switch.

II. Maintenance Performed Outside of Overhaul Period A. Repaired leaks on turbine control valves. B. Checked thrust bearing RTD's. One lead was compressed during overhaul

reassembly. New RTD on order. C. Installed actuator on No.1 turbine trip valve and realigned limit switch. D. Installed unused positioner from circulating water reject valve to hot

well recirculating control valve.

Ill. Plans For Next Month A. Re-fiberglass cooling tower fan blades. B. Recalibrate turbine steam seal pressure gauges. C. Recalibrate condensate pump low pressure switch. D. Replace motive steam valve to inter-condenser. E. Replace filter cartridges on air dryer.

G. Jenkins 10/04/84

_.

Page 182: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.'

o o

The Research Corporation of the University of Hawaii

September 25, 1984

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Enclosed is a copy of the HGP-A operating figures for the month of August, 1984.

WRC:ss

cc: K. Keith J. Shupe S. Kearns A. Adduci J. Katz P. Takahashi A. Smyk10

Sincerely, 'L / /a?.7 " 01'1 £.;z~

Wi 11 i a R. Coops Director of Administration

......

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

11'1 o

Page 183: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

- ..

.gAil ELECTRIC LIGHT COMPANV,qC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

AUGUST 1984

I. Maintenance Performed

A. Completed dredging of Pahoa side brine pond. B. Overhauled No.1 air compressor valves. C. Changed "A" recycle pump mechanical seals. D. Overhauled "B" recycle pump.

II. Plans For Next Month

A. Overhaul No.2 air compressor. B. Clean cooling tower basin screens. C. Schedule annual maintenance for week of September 17, 1984.

Unit will be off line for approximately one week and venting will occur on September 18 and 19. Tentative work list attached.

NU 9/6/84

• ~.J

Page 184: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o HGP-A 1984 OVERHAUL WORKLIST (REQUIRES 1 - 2 DAYS OPEN VENTING)

REV. 1 - SEPT 5, 1984 PREPARED BY: HELCO PRODUCTION DEPT.

I. TURBINE

o

1. REMOVE & INSPECT JOURNAL & THRUST BEARINGS AND RECORD CLEARANCES.

2. REPLACE RTD'S FOR ACTIVE AND INACTIVE THRUST BEARINGS. 3. TEST MECHANICAL OVERSPEED TRIP. 4. RECALIBRATE SEALING STEAM GAUGES. 5. INSTALL DC LUBE OIL PUMP. 6. REPACK ~2 CONTROL VALVE LOWER PACKING. 7. FABRICATE NEW BASKET AND REPLACE EXISTING BASKET FOR 3/4-

GLAND SEAL DRAIN STRAINER. 8. SERVICE 3/4- (T.E.> YARWAY TRAP ON GLAND SEAL DRAIN LINE. 9. TAKE VIBRATION READINGS

II. GENERATOR/GEAR REDUCER 1. MEGGER GENERATOR STATOR & ROTOR. 2. CHANGE REACTIVE CHARCOAL AIR ~ILTER. 3. OVERHAUL AIR BLOWER. 4. REPLACE INBOARD VIBRATION PROBE & PROXIMITOR (AS REQUIRED). 5. CLEAN GEAR BOX BREATHER.

III. CONTROL OIL SYSTEM 1. RECHARGE ACCUMULATOR. 2. REPACK ACCUMULATOR 1-1/2- SHUTOFF VALVE. 3. REPLACE LUBE OIL RESERVOIR AIR INTAKE FILTER (ACTIVATED

CHARCOAL).

IV. FLASH SEPARATOR 1. INSPECT & CLEAN FLASH SEPARATOR. 2. REPLACE 4- SEPARATOR ROQT GATE VALVE (FLG). 3. REPLACE LOWER 2- ROOT GATE VALVE ON LEVEL COLUMN (FLG). 4. REPLACE PV-601 CHAIN BLOCK VALVE (8- GATE). 5. REMOVE LOWER BRINE PIPE SECTION & CLEAN.

V. WELHEAD VALVES 1. INSTALL 6- BLIND FLANGE AFTER MUFFLER WING VALVE. 2. EXERCISE M.O.V. 'S & MAIN ROOT VALVE. 3. REPACK VALVES. 4. INSPECT M.O.V. GEAR BOXES.

._------------_ .. _--

Page 185: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

Page 186: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o VI. MOISTURE SEPARATOR

1. INSPECT ~ CLEAN VESSEL. 2. REMOVE DRIFT ELIMINATOR ~ WATER BLAST. 3. CLEAN TOP ~ BOTTOM PRESSURE SENSORS. 4. REPLACE TOP ~ BOTTOM 3" GATE VALVES (FLG) WITH BUTTERFLY VALVES

~ SPOOL PIECES. 5. REPLACE ENTIRE SEPARATOR LEVEL CONTROL VALVE MANIFOLD (WITH

BYPASS ~ DRAIN) WITH NEW PIPING AND BALL VALVES (5 VALVES). 6. OVERHAUL LEVEL CONTROL VALVE. 7. SERVICE 1" MANUAL DRAINS ON SEPARATOR DRAIN LINE.

VII. CONDENSATE DRAIN TANK 1. DRAIN CONDENSATE TANK. 2. CLEAN SIGHT GLASS. 3. REPLACE LEVEL COLUMN GATE VALVES WITH BALL VALVES (6 EACH). 4. REPLACE EJECTOR DRAIN 3/4· GATE VALVE (TE) WITH BALL VALVE.

VIII. CONDENSER 1. RECALIBRATE CONDENSATE PUMP LOW PRESSURE SWITCH. 2. REMOVE WATER BOX COVERS ~ INSPECT WATER BOX. 3. SHOOT BULLETS. 4. SERVICE VACUUM BREAKER. 5. REMOVE AFTER CONDENSER HOTWELL PIPING, AND CHECK FOR

BLOCKAGE. (AFTERCONDENSER LEVEL IS HIGH)

IX. AIR COMPRESSOR/DRIER 1. REPLACE AIR DRIER PRE- AND AFTER- FILTER CARTRIDGES. 2. OPEN AND CLEAN AUTOMATIC CONDENSATE DRAIN FROM AIR COMPRESSOR. 3. INSTALL NEW END BELL COVERS FOR CIRCULATING PUMP MOTORS. 4. CHANGE OIL AND CLEAN BREATHERS. 5. CHECK FAN BELTS.

X. COOLING TOWER 1. CLEAN ~ DRAIN TOWER, BASIN, DISTRIBUTION TRAYS, AND FILL,

PERIODICALLY WETTING DOWN STRUCTURE. 2. INSPECT FAN BLADES ~ REFIBERGLASS IF NECESSAR~. 3. INSTALL NEW FAN GUARDS. 4. CHANGE GEAR BOX OIL. 5. CHANGE OIL FOR CIRCULATING WATER PUMPS.

XI. CAUSTIC INJECTION 1. REPLACE ALL GATE VALVES ON COOLING TOWER CAUSTIC INJECTION

MANIFOLD (5 EACH) WITH BALL VALVES. 2. SERVICE SWING CHECK. 3. TIGHTEN PACKING ON SCRUBBER CONTROL VALVE.

Page 187: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o XII. JOHN lINK

1. REPLACE HAND LEVERS & NUTS FOR 2" HILLS MCCANNA BALL VALVES (3 EACH) Al" RECYCLE PUMPS.

2. SEAL WELD LEAKING THREADS & REPLACE LEAKING BALL VALVES AT RECYCLE PUMPS.

3. CLEAN SCRUBBER CERAMIC, INCINERATOR, & HOT GAS LINE AND REPAIR REFRACTORY.

4. CLEAN FIRE-EYES AND SIGH1" GLASSES. 5. CLEAN AIR ASPIRATING LINES. 6. OVERHAUL JOHN lINK BLOWER MOTOR. 7. UPGRADE NCG TRANSFER BALL VALVE ACTUATOR & CLEAN VALVE

INTERNALS. (RAMCON) 8. CLEAN MOISTURE ACCUMULATOR TANK & SIGHT GLASS.

XIII. STEAM AND BRINE PIPING 1. REPAIR LV-1 PIPE SUPPORT. 2. CONSTRUCT PIPE SUPPORTS FOR LV-1A AND STRENGTHEN EXISTING

SUPPORTS. 3. REPLACE 1" STEAM LINE DRAIN BY AIR COMPRESSOR (2 EACH BALL

VALVES REQUIRED). 4. REPACK INTERCONDENSER STEAM SUPPLY VALVE (1" GATE). 5. INSTALL NEW 4" BRINE LINE. 6. REMOVE ORIGINAL 3" BRINE LINE.

XIV. OTHERS 1. CALIBRATE AND TEST RELAYS & METERS. 2. MEGGER ALL MOTORS FROM MCC. 3. REPLACE DETERIORATED 3/4" CONDUIT ON JOHN lINK. 4. SERVICE UNIT BREAKERS. 5. TEST EMERGENCY POWER TRANSFER SWITCH. 6. SERVICE STANDBY GENERATOR. 7. CHIP AND PAINT AS REQUIRED. 8. INSPECCT JOHN ZINK BLOWER WINDING & REVARNISH IF NECESSARY.

-----------------------------!~~~

Page 188: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

Page 189: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o MATERIAL LIST =============

QUANTITY SIZE ========

11 EA 1 •

EA

5 EA 1/2·

1 EA 3/~P

5 EA 1 •

1 EA 1/2·

3 SETS

6 EA 1 •

1 EA

1 EA

2 EA

2 EA

o

DESCRIPTION TAG =========== ===

ANSI 300¢ BALL, ALL STAINLESS, CONDo TK. COLUMN, T.E., TFE PACKING, RTFE SEAT, RECYLE HEADER CLAYTON MARKS SS880.

SAME AS ABOVE, EXCEPf S.W.E. CONDo TK. COLUMN

SAME AS ABOVE, EXCEPT T.E. CONDo TK. COLUMN, RECYCLE HEADER, RECYCLE PP DRAIN, RECYCLE PP DRAIN CONDo TK. COLUMN

SAME AS ABOVE (T.E.> EJECTOR DRAIN

SAME AS ABOVE, EXCEPT S.W.E. CONDo TK. COLUMN DRAIN, C.T. CAUSTIC C.T. CAUSTIC C.T. CAUSTIC C.T. CAUSTIC

SAME AS ABOVE (S.W.E.> C.T. CAUSTIC

HANDLE & HEX NUTS FOR HILL/MCCANNA 2· BALL VALVE

300¢ SPLIT WEDGE GATE, ALL STAINLESS, TFE PACKING, OUTSIDE SCREW, RISING STEM, BOLTED FLANGED YOKE-BONNET, TE, POWELL 2'166.

SAME AS ABOVE

3000 SOLID WEDGE GATE, FLG. ENDS, TFE PACKING,' STAINLESS STEEL TRIM, CAST STEEL BODY.

300¢ ALL STAINLESS BUTTERFLY VALVES, FISHER 8500 WITH TFE SEATS & PACKING & 1082 HAND LEVER.

JOHN ZINK

M.S. LINE DRAIN M.S. LINE DRAIN MOIST SEP LEVEL MOIST SEP LEVEL MOIST SEP LEVEL MOIST SEP LEVEL

MOIST SEP LEVEL

FLASH SEF' LEVEL

MOIST SEP LEVEL

ENDBELL COVERS FOR AIR AC PUMPS COMPRESSOR CIRCA PUMP MOTORS, BALDOUR CAT. NO. JM3545, FRAME 56J, SER. WBB0, SPEC. 34-795 3226, 1 HP, 3450 RPM, DESIGN S, CLASS A, CODE K.

- ----------·--~-·----___________ 'It\fi .... Il!iI_'f, ___ JN

Page 190: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

i EA

1 EA

i EA

4 EA 3-

3 EA 1 -

4 EA 1 -

1 EA 1/2-

2 EA 1 -

15 FT 1 -

1 EA 1 -

1 EA '")-,

100 LB

1 EA

2 EA

o o COMPRESSED AIR FILlER At PRE-FILTER CARTRIDGE REPLACEMENT FOR DEL TECH MODEL 150 AIR FILTER.

COMPRESSED. AIR FILTER AC AFTER-FILTER CARTRIDGE REPLACEMENT FOR DEL TECH MODEL 511 E AIR FILTER.

AIR FILTER CARTRIDGE REPLACE­MENT FOR ELLIOT LUBE OIL RESERVOIR.

300~ CS SLIP ON FLANGES, FLAT FACE.

TEES, SCH. 80, SWE, CS

UNIONS, SCH. 80, TE, STAINLESS STEEL

ELL, SCH. 80, TE, CS

ELL, SCH. 80, TE, CS

SCH. 80 BLACK PIPE

UNION, SCH. 80, TE, STAINLESS STEEL

PNEUMATIC BALL VALVE ACTUATOR, SPRING RETURN, 400 IN-LB, 40 PSI SUPPLY, RAMCON R260-CFS.

TYPE CJ ACTIVATED CHARCOAL FOR BARNABY CHENEY GENERATOR FILTER (ORDERED).

300~ BLIND FLANGE, CS, FLAT FACE

KINGSBURY THRUST PADS WITH IMBEDDED RTD ~ LEAD WIRE FOR ACTIVE ~ INACTIVE THRUST BEARINGS.

MOIST.

M.S. MANIFOLD

M.S. MANIFOLD

M.S. MANIFOLD

M.S. MANIFOLD

M.S. MANIFOLD

RECYCLE HEADER

EMERGENCY NCG LINE

STEEL MUFFLER

~-----------------------------.~~"',~~

Page 191: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.' : .

. . .

1 EA 8"

Q o 300~ FLANGED GATE, CAST STEEL PV-601 CB BODY, 1/16" RAISED FACE, 316 SS SEAT STEAM, ~ LANTERN RING TFE PACKING WITH LANTERN RING, STEM THREAD LUBE FITTING, STAINLESS'STEEL NUTS, CAPSCREWS, BOLTS, YOKE BUSHING, GLAND BUSHING, P.U.P. BUS~i.iNG, DISC HOLDER ~ FLEX WEDGE. UNIT TO BE FURNISHED WITH ACCESSORY DETACH­ABLE TYPE HANDWHEEL WITH CHAIN GUIDES. POWELL 3003N WITH FIG. 321 CHAINWHEEL.

Page 192: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

H j'j j),I (\1 J J I:: L. t::: t: f F;: 1 C L. I CHI C II .,' J (I C • r··., U,. b U >" i (i :~.;/

HIL.Li, HAWAII 96/20

THI::: f~ESE(lF;:CH COF~F'UF«ITIUN OF TilE UNIVERSITY OF HAWAII

1i10 UNIVERSITY AVENUE 402 VARSI1Y BUILDING HONULULU, HAWAII 96826

A'\'TENTION: MR. WILL.IAM k. cuuPS DIRECTOR OF ADMINISfRAIIUN

... ~

GENTLEMEN:

rUTAL. STEAM FLOW 1 (~(lO :lj:

37 J 3'i 0,

lurAL. bKINE ~L.UW NLI KWH 'j ,) ',.' () :ii: \:i L j") I: i< (:1 I I::.:U

47./23 1,803.900

1'< L .. I L 1\1 U I::: S -+

o w >

"':11//" 'll"'ll,'" vt~: Li lIL(,\,

RElEI\'E(J

JEP I. Uf lMW t. ~ATUHAL r<ESOURCES

STATE eF HAWAII

Pc) y (Ii.., f11:::.':..' ':1,

L! 0-LJ..J

_::;. c::::: j"I''; n 1'11\ \~;.. J< 1::: ;"1 r'! L L! Y, ;"j () N ('1 1,.; L 1'< ••• ,0_ f'1:;:U.\.!(Ii.. I' .I. Ur'! ));:::er.:·fh: i i'iFi\) T

FGI< : CF: Attachment

t..J

Page 193: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

" , ,

rYJ J' ,.

" CZ~G:,

0 0 Telephone: (808) 955-6344

t·:~ t·· ( " , •. , " .• ~. . , \ I:: '.;. t:.l)-;.\j.'ifff.p

The Research Corporation of the University of Hawaii

o August 9, 1984

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Please find enclosed a copy of the HGP-A operating figures for the month of July, 1984.

WRC:ss

cc: K. Keith J. Shupe S. Kearns A. Adduci J. Katz P. Takahashi A. Smyk 10

Sincerely, /-1

I~~ W~l ~ aJR. ~ Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

. _.,'

.~~>

~ (7.)

-

'-~ ....... ;

Page 194: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

, o

HAWAII ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY

JULY 1984

I. Maintenance Performed

A. Cut in both brine lines due to brine system plugging. Piping and material for replacement brine line delivered.

B. Began dredging Pahoa side brine pond with 0-9 on July 27, 1984.

II. Plans For Next Month

A. Complete dre.dging.

B. Overhaul 10~ caustic pump.

C. Repair recycle pump seal.

NU 8/01/84

Page 195: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

" o

.. ; : i.'

:;'11..:.1;

,:i.. i:,,':I"\,,:'; <...I",li,,;'" ',C!

:.tr'll ',I c" "

',.'i" ". ~ ! "

.. :,'!',' ,-,!! l... t,' 11-. 11 :

it 11 'f J

! .. ,l,l!·; j';. ", ".In

:.' ! 1'" 1'··!

, .. I:. '\ ~ : j-'.'

Attachment

-'

Page 196: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

\ $'..z.-V o o Telephone: (808) 955-6344

/ J:)i: Ie PI: 25

The Research Corporation of the University of Hawaii

, '.'

June 8, 1984 '"" ! ,-".: , ,~.,.,.~},-:t:,:CES

ST;\TE OF Hi~W/·dl

Mr. Susumu Dno, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Dno:

Please find enclosed a copy of the HGP-A operating figures for the month of May, 1984.

WRC:ss

Enclosure

cc: K. Keith J. Shupe S. Kearns A. Adduci J. Katz P. Takahashi A. Smyklo

Sincerely, ~

W/~~ Willi~.~OOps Director of Administration

~"

C) ... r- : -'

i i lit: r: ~;:.

r··· '-. ~J.'~

~;;M 3:~ rn~ z -1

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Cl::) ,...

c.._ c=: ".""

Z ','-: ...... -t::..

;p .>~"

en .~~ ~%,

..e.. 0 ~

Page 197: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

rHE r;:ESF(::iF<CH C(lf"·:'C.i'«·If'X'.ij,i (1' I i'!I'

1...1 ,"1 1 \j 1.1< ,\':i i'f 1 ... 1 j, Ii 1-, 1!.II'

.j 'ji 0 U i\l J V L F: S .i: . r f (:, V' I:. r,i i.i I::.

4 () ::,~ \i ~:, (;: S :t T Y J:-.I U .i. L.:O I j,! C, HONOLULU, HAWAII ~68;0

(ll','EN'fIUN: 1"1 F:.. i.'~1 :1.1 I.. i. f·:! ;.:! ":" 1) I! i I

o

" .. i,· .. I,: "., ': .... "'.'}

:0 J F: I::: c:"r \...1 t·, L! i" ; ·~.I.. 1 ! !"": 1 ! 1-;·: l-·j: t lj r"'~

T U "r (:', L. s'r I::. ('1 1", i . U lo,i

"I () (-) () ::::

r f";' ;.:J

LLJ .:n > l!.J

-::r <-)

ILJ ... ~:: ~'.::> n::: ~

FGK: NU: cr Attachment

:t: " u..

''>0

:::> : l..J

.. ~ ;:.: u.. 0

.:.

: I. I ' ;'I! :, I': i. I)! i' L. I. I \'.1 ii) 1:' ,(. 1.,.1 H

, ~ . J '. .... :

h: I:: \i Ej,!U[':;'

':/>

VIBI<' j,.,ii.{((Jl.h-:,-:-::!

.-~ .' '..--7~ , ,

"

.' 1'0: j .. , '\1 i'. I.... Ii: .. "\.' 1'.'1":: II "f' 7.. ,.,,' I'·:·"·····i ,'::',1. !.:' ,'.,' . -, '" ..•••..•....• -, ••••••• /: ..•. :::.~ ~ •• 1 ••••

""""'~"NT

j:,.: (if (',1... r J I . ,:;' I,

Page 198: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

a 0 fIlWAIl ELECTRIC LIGHT COMPANY, INC.

ATTACHMENT

HGP-A MONTHLY MAINTENANCE SUMMARY MAY 1984

I. Maintenance Performed

A. Installed Citrex reactor level control valve and controller, and absorber heat exchanger.

B. Tested Citrex Abatement System with C. Vancini of Peabody Process Sytem present. Encountered problems with reactor plugging and filter leakage. Mechanical problems will be evaluated by Peabody and E. Baughman, and recommendations will be made to HELCO.

C. Replaced John Zink blower filters. D. Serviced air conditioning for control room and motor control center. E. Replaced 10% caustic pump with rebuilt unit. F. Rewired generator vibration trip circuit to isolate faulty proximitor/

probe. G. Repaired southside barbed wire on fence. H. Switched over to newly dug brine percolation pond. 1. Purchased 4" pipe and fittings for replacement of original brine line.

II. Plans For Next Month

A. Repair caustic batching water meter. B. Repair recycle pump seal. C. Overhaul 10% caustic pump. D. Begin ordering of parts for August overhaul.

NU:cr 6/01/84

Page 199: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

I ~

-'

o ;506347 Telephoo., (808) 957 "'-: i' .. ( :.:. ~ ~

I ; "'''''.J

The Research Corporation of the University of H~\lvaUi ',: S PI: 3 I

May 8, 1984 ,1 .... .1

,", "- " .. " '.-- ~ !~. ' CES ~) lid L UF HJHV 1-'"

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Please find enclosed a copy of the HGP-A operating figures for the month of April, 1984.

WRC:ss

Enclosure

cc: K. Keith J. Shupe S. Kearns A. Adduci J. Katz P. Takahashi

s;z;{~ Willia~. Coops Actin~ Executive Director

, . .. , :.". "_. \_ .....

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

-~ ..

..

",or, ~."......

< rn o

Page 200: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o H(·I\,Jtlli FI...!::.i.:::fi·;:.IC L.J:LHf CO,., J:j\lC.

·i ·ii 0 UN.I. V F F: S,: ., T· (, '/ I::: 1,1 u I:: 402 VAF:SI1Y :OUll...DiNG HONOl.UI...U, HAWAII 96826

r:'., U ... :OU:;< 'i l)::?i H11...0, HAWAiI 06(20

ATTENTION: MR. WILLIAM R. COOPS DIF:ECrOR OF AOMINISrRA110N

GEN·fI...Fj"vjE:N:

") ,J

tJ

I ("i. J'..1 .

PI...E:ASF FIND HGP-A OPERAIING FIGUF:FS FOR THE MONTH OF APF:II..., 1984.

TUT (11... ::;:·fE(ld FL.Ut,J 100() ::::

-..... n . <:) ._.

: :::l , I U.J ~--

...... ,.:. t':" --;:)

TUTAI... BRINE FI...UW NFT KWH 1000 ~ GENFRA1ED

47,556 1,797,600

F;:E:VE:NUFS ·,1;

·i () i , ( . .1 B :~:.~

FRANK G. KENNE-Y, dANAGEF: PF:ODUCTION DEPARTMENT

F~ Of (II... TIE .:~: .'j;

'j (), 7()8

Page 201: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

\ '}/i1 .. T,lepho", ~ .. ) 9~/ o

r: , The Research Corporation of the University of Hawaii i , , •

March 6, 1984 •• , I

, ;.. I, , ~ .... ! J

" . ~ ... , ,.-~,. - !~~

. ,I,. '._' .,) I"; i '~v t:.)

Sf/IlE OF iiAV/AII

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Please find enclosed a copy of the HGP-A operating figures for the month of February, 1984.

WRC:ss

Enclosure

cc: K. Keith J. Shupe S. Kearns A. Adduci B. Chen P. Takahashi N. Oss J. Katz

sinceirelY, ~!

?L~ ~ Willia R. Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

!-... --

-I"\) .­.... j

Page 202: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• ,.-, . ',,-

o o H (I \,J () lIE I... E cr 1:< J C I... J C H 'I L 0", .t: N C •

F'... (J A l'.{CJ)( i ()2'/

HII...O, HAWAII 96720

THE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII

1110 UNIVERSITY AVENUE 402 VARSITY BUILDING HONOLULU, HAWAII 96826

ATTENTION: MR. WILLIAM R. COOPS DIRECTOR OF ADMINISTRATION

GENTLEMEN:

PLEnSE FIND HGP-A OPERATING FIGURES FOR THE MONTH OF FEBRUARY, 1984.

TOltll,., STE!~~ivj FI...Dl,J i 000 :~:

CC: ENG/R. UEMURA

TOTAL BRINE FLOW NET KWH 1000 ~ CENERAT~D

VEI~UI...Y YClUI~:S,

1:'I:~II<' ,:.: I(FN\IFI' ' "v\' ~.I:·(':r:-I;· \ f~ I , t.,. ... I... ,I f% l't I~ H .. ,

PRODUCTIUN DEPARTMENT

I:;:UY (:11...1" 1 ES ',Ii

Page 203: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

~GP-A

MOI\f-ltl /'(t::..::4 -:?/--e.CfVY1 BV'jV1C Ne:+ KWH Grec'" KS::VE. ~1 q e Royal+y ([000 Il?s,.) ([000 Ibee.") GSYlC-Vet tee! $ f

--

Jl..(n.I'2:-~ 1<151 Z4,2kD 24, '2.130

1 Jul.I- 8 1,Ic(SI 4o, ,q.zo 40,0(1..0

AU'll- 31, '.::t81 ~"1, <f?:o 42,7BO Sep. 1-4, ICj81 4, T7'40 ?,I=?O 1~4,{d/O 4'18.4D ':Ft.B4

\7[",-:.·11- 31 1'-1r:11 '2.7, ?-OO 42,'000 - - -I -

JoV\ IQS'2 37, q4-o 4<1,C1'10 11&,000 4~.40 ~.rc4

F"cb. I Cfe:)2. 34,2,0 4V130 '2-'2.7, 400 "10'1.&0 0(0. <1",

Mcw. 11B2 87,~40 40,5;70 BC::h,Cx::/O 4&, 138.0'2. 4,b1?BO

Apr. ICi82 ~/l"2.0 4?, ell0 I

1,440,000 77,710.60 I, '111.<C6

I

Mety [C(p)2 65,7'iO 4Cf,IOb I 1,1'08/100 '10,004- -1,&00 I I

JUYl. 1082- 07, ISO 47,720 I (,7"i4,000 I

'14,12.4 q 412-

I

I

~ ~~t ( . !'IB2- 38/ 3'1D 4q,lo4 I,(qo, (DO qc" W:>( 1. '1,~1

AU3' IQg1.. ~5, 3'10 4'4, (04 1,2.07,400 07, Sf"/4 0,7SQ

~'ep. 116'2 -Z>7/ I S"L. 47,72.D ( Ben CX)O \ , C17, l~ '1,(17

Oc+, 1<161 '3B, ~/10 4q lOLl- \ 501100 (GO/qoo 10/0''11 /

, ,

17e&, 1'161. ?S,SC)O 4Q,1 0 4 1,040/700 q~,?4? C:l'4~4

Jo.n, (Uj83 86 7:10 , 4CJ, (CO 1,867,100 IOI,wT7 l~lb6

t::eb. Ie/f):? 54,01'7 44,345 1,0t'0/4CO t:4- 013 /

640\

Mo.Y' [(~f')3 SB,3C10 -44. le.q. I, "1ce,/rOOo (02.,0&P 10/2.07

Apr- \t::j0~ ?:1-,S50 44,1..00 (,71:::,/40 0 Q2,317.QQ Cc '23'2..

May I Cj f'f? ?i1,oqo ~ooo (6CIO Go:? , , 10 1,63 3 10,1 B::?

Jun. \Cle):;) 1.0,2.;70 3::, S>3,'~ I -- . 1 '2hl '1-00

/ ' (oB,56S> (:;.,63(3

6ep. 1'103 ?3, '2.C72. 42,S30 1,(007,,00 ~/cc."2.'? B,0~2

Vtt, IlfB:7 2.-:;l,~ Z.q,200 I/t~, '706 '7L1/7/ 0 7,L1"71

I

Page 204: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

·. I

'\

Q ') J'lnl' '7 T_~h:..=e---.:R~e-=-s=--e=--a~r__=.c-=-h_C=--o-=-r....!.p,---o_r_a_ti..:..o_n_o=--f_t,---h=--e_U-=---n_iv--=e..:..rs-=-i'--"ty"----"o~f__=.H~a=__w:..::..a=i:..::..i ______ L_' J_\_U_~_! -'!,,'---P----loa2: 3

November 4, 1983

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

" :~,'+/.~:,'·,.'r L/qdJ

, ISTALT{olHA~/~WE

Please find enclosed a copy of the HGP-A operating figures for the month of October 1983.

Sincerely, :/

~p7~ Wi 11 i:2 R. Coops Director of Administration

WRC:ss

Enclosure

cc: K. Keith J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. Oss J. Katz

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

r-.l:'J. ~.2 :t::::i.:C

t:::::;_. .1':

_. "'.- 7'; ri'~ r-J:);; c;~

~.~ !l}&Io -I

'.:0 c.....,

>-c::;, ........ "'" ~: "- rr'1 c.r, (J

"b f'l7 "'-> -.. ~ - 0 ~

Page 205: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

.. ..

o o : I, L.i;! T T F L. F c'r I? I C i J C; Hi CU., I i'-i C .

;1 T L Ci, h ;:11/ . .1 Ii T I

I C'.,'" ,',." ," .••.... ;".,'.

I, i{"·.' ! v!:" "I. ,". I !, Li!" j'!j"j V.,i ~ , ! .1

HUi'-~UL.I...ILi.I, H(:,l,J;':i I I

ATTENTION: MR. WIL.L.IAM R. COOPS DIRECTOR OF ADMINISTRATION

I'L [: ('1;::[ r 1 (j D He I' .... ,:.:, CII'E !;.' (,"11 jlC F T CUF: I:: ;:.' I UI;:rHE (iUj',I'rll OF DCI' OItEI;:i I/U :.:;,

'r ur (:1 i j{ r;: :r N [: I' L 0 1/.1 N E 'I' I< 1 .... .1 II

1000 * GENERATED r;: E \,1 Ei"ll...l[ s

':1;

I' () i.J F: ,\' ,

FRANK G. KENNEDY, MANAGER PRDDUCTION DEPAF:TMENT

FC}"{(II,"IIFS' -:I;

Page 206: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

! '", "

o o Telephone: (808) 955-6344

)

" A (I r '\ 2 A 9: 2 ,3 The Research Corporation of the University of Hai,oiah t.. i ! ,

October

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

_.'

"-

\ " -"

i ~,

\ ji~

C --'

:;·93 in CiIO ;z:. ......

Please find enclosed a copy of the HGP-A operating figures for the month of September 1983.

WRC:ss

Enclosure

cc: K. Keith J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. Oss J. Katz

SinCerelY'~

Wi~ Coops Director of Administration

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

-, :;

-j ..t:'-

-0

<-.0 . . c::;:l

N

/

/~ ~.\

"

( '\ , . -<. rn 0

Page 207: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

r,·!ept,')ne. (808) 9~5-6344

o o

Th~Research Corporation of the University of Hawaii

October 7, 1983

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ona:

Please find enclosed a copy of the HGP-A operating figures for the month of September 1983.

WRC:ss

Enclosure

cc: K. Keith J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. ass J. Katz

Si ncere 1y, /' /

??'/~ Willia~R. Coops Director of Administration

402 Varsity BUilding, 1110 University Avenue, Honolulu, Hawaii 96826

:-.'. ;:: ", r:' P 11 ',\L,~_""'J __ '

-;r~ OCT 13 p , ...... -.- --

};;' i'. UF LI c " • ' 'I') \ L f)"-S

'.' I.; ' .• l. ilM \t:. STATE OF HA

Page 208: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-/ / .. / I o o

HAWAII ELECTRIC LIGHT COMPANY, INC. P. O. BOX 1027 HILO. HAWAII- 96720

Octobe r 5, 1983

The Research Corporation of the University of Hawaii

1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

iP

Please find HGP-A operating figures for the month of September 1983.

Total Steam Flow Total Brine Flow Net KWH Revenues 1000# 1000# Generated $ --.!.---

33,252 42,530 1,607,700 $86,623

FGK:NU:cr

Very (;u1y yours,

~--J 4d::~~,~ Frank G. Kennedy, Acting Manager Production Department

Roya Hi es $

$8,662 .

FUEL 1-3 H-G/Y - M HELCO/RCm

Page 209: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o /6 I' Telephone: (808) 955-6344

Jr3 j n L ;1 ~A ;1 :3 'R The Research Corporatioii or tile University or Hawaii

July 12, 1983

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Please find enclosed a copy of the HGP-A operating figures for the month of June 1983.

WG:st

Enclosure

cc: K. Keith J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. ass J. Katz

Sincerely,

V;f~ Wytze Gorter Executive Director

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

J

Page 210: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

P. O. BOX 1027 HILO r HAWAII- 96720

The Research Corporation of the University of Hawaii

1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

July 1, 1983

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

Please find HGP-A operating figures for the month of June 1983.

Total Steam Flow 1,000 #

26,250

Total Brine Flow Net KWH 1,000 # Generated

33,580 1,269,200

Revenues $

68,385

Manager

Royalties $

6,838

Page 211: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o Telephone: (808) 955-6344

I') JUL I The Research Corporation of the University of HawJir:

AIO: ~ 9

o

June 27, 1983

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Please find enclosed a copy of the HGP-A operating figures for the month of May 1983.

WG:st

Enclosure

cc: H. Kono J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. Oss J. Katz

Sincerely,

~FC;#~ Wytze Gorter Executive Director

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

, c' , ..

c> C) ---. r: . , .r r ~ ., -r' J>.~ C -I -~,; rn Z:::U rn f;>O :2! -I

co (,.~-")

" c::: ..-

lO">

;p c..o . . Cf\ (0

/

, ~

, ~-

\.. -;

---."

<'f-

rn 0

::::,.~ ••• I.

Page 212: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC. (®-~ *

/' P. C. BOX 1Cl27 HILCl, HAWAII- 9672Cl h'" ,1 "

r (\ I June 21, 1983 ~ ,

The Research Corporation of the University of Hawaii

1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

1

i)!

Please find HGP-A operating figures for the month of May 1983.

Total Steam Flow 1,000 #

39,090

FGK:NU:hs

Total Brine Flow Net KWH 1,000 # Generated

50,000 1,890,000

Revenues $

Royalties $

10,183

Page 213: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

41-1 D • Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii

May 10, 1983

Mr. Susumu Ono, Chairman Department of Land & Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

--- -. .,-~.:" L: ..

c· ~-.f . ;:;. . '. i" --""" r :J'> C:-..

~~~ ~ .. -iI

--,",

}.:..." -~,<

I OJ

T r-v

-L .CO

Please find enclosed a copy of the HGP-A operating figures for the month of April 1983.

Sincerely,

w1t£~~ Executive Director

WG: st

Enclosure

cc: H. Kono J. Shupe s. Kearns A. Adduci B. Chen L. Lopez N. Oss J. Katz

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

, J

".--' ---ITl 0

Page 214: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• ..

o Q HAWAII ELECTRIC LIGHT CDMPAN, , I

P. O. BOX 1027 HILO, HAWAII-9672~

The Research Corporation of the University of Hawaii

1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

May 3, 1983

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

\

J (~.

C.

Please find HGP-A operating figures for the month of April 1983.

Total Steam Flow 1,000 #

34,550

FGK:NU:hs

Total Brine Flow KWH Revenues 1,000 # Generated $

44,200 1,713,400 92,317.99

Frank G. 7 Kennedy . Acting Production Manager

Roya lties $

9,232

Page 215: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

'0 o

The Research Corporation of the University of Hawaii

April 8, 1983

Mr. Susumu Ono, Chairman Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

lC(S,&,­

Telephone: (~~8~, 955/6314

,... .. - I .I~·; .11:"1 j t -,~ L~ i", ~ ... , 1 ,. ~ ~

Please find enclosed a copy of the HGP-A operating figures for the month of March 1983.

WG: st

Sincerely,

dFt~ Wytze Gorter Executive Director

Enclosure

cc: H. Kono J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. Oss J. Katz

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

....... .;~..i {- .,j)

- J..> ...... :~ >~ -0 tC: --. ;::0 It.':·~:~

.r'c "lie , c..\) 'i.'-"""

"" _.

\1"1 ~" , "" t""> :t::> ~~---,,-- .... ~ '." -~ .... ·m 0") .... ~~ rt1 S~ ..t::.. C

-....,

Page 216: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

&e o HAWAII ELECTRIC LIGHT COMPANY, INC.

P. O. BOX 1027

The Research Corporation of the University of Hawaii

1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

HILO. HAWAII- 967:

April 4, 1983

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

Please find HGP-A operating figures for the month of March 1983.

Total Steam Flow 1,000 #

FGK: hs

38,390

-, ",

, .~

Total Brine Flow KWH Revenues 1,000 # Generated $

49,104 1,903,600 102,56~

Very truly yours,

, . '.

Roya lties $

10,257

Page 217: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o

The Research Corporation of the University of Hawaii

March 7, 1983

Mr. Susumu Ono, Chairman Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

l~(

Telephone: (808) 955-6344 /

'::::1:.':- PE· 1'\.111:.-"'1. tf~~',~: ; ',*CiUl

pI: 24 pi: 24

Please find enclosed a copy of the HGP-A operating figures for the month of February 1983.

WG:st

encl.

cc: H. Kana J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. Oss J. Katz

Sincerely,

~rji:~ Wytze Gorter Executive Director

402 Varsity Building, 1110 University Avenue. Honolulu. Hawaii 96826

~

'.-t:_.: ::C.~

-'-

-

Page 218: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

..

o • HAWAII ELECTRIC LIGHT COMPANY, INC.

P. o. BOX 1027 HILO, HAWAII- 96720

The Research Corporation of the University of Hawaii

1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

Ma rc h 2, 1 983

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

Please find HGP-A operating figures for the month of February 1983.

Total Steam Flow 1,000 #

34,675

NAO: FK: hs

.f_

Total Brine Flow KWH Revenues 1,000 # Generated $

44,348 1,570,400 84,613

Very truly yours,

i/i."an i{. fPc< N~N A. OSS, MANAGER PRODUCTION DEPARTMENT

Royalties $

8,461 ~.

Page 219: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• Telephone: (808) 955-6344

The Research Corporation of the University of Hawaii B'3 ifE B 8 P 'Z : .,

February 4, 1983

Mr. Susumu Ono, Chairman Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

~;:. ,.j I .i",. ; ",'llD i.....-, .... 1 , ~. VI .i. •. A-4,il'

Rli .'ll"urJ ~, " 'E'SOUDf'I[:((' ."'~ 111-\ I\;.tl It n'~

S TA IE 'OF /HA:irlM'

en c...0

r- -.., -.,... 1> :'2

rrl ,.,..;....;

~~ <: rn C) • co 00 l(,O r-I"o' ~

, "

«::~' c .... fl· <:.

f' .... • ! r-- ". \J < <::'-4 (.,..) ""(,m rn 3:::0 ~,.

CJ1 0 -4 .~

Please find enclosed a copy of the HGP-A operating figures for the month of January 1983.

WG:st

encl.

cc: H. J. S. A. B. L. N. J.

Kona Shupe Kearns Adduci Chen Lopez Oss Katz

Sincerely,

dfttJc:~ Wytze Gorter Executive Director

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 220: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• o o HAWAII ELECTRIC LIGHT COMPANY, INC.

~ P. O. BOX 1027 HILO, HAWAII-96720

The Research Corporation of the University of Hawaii

1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

February 1, 1983

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

Please find HGP-A operating figures for the month of January 1983.

Total Steam Flow 1,000 #

38,390

NAO:FK:hs

r)

t; j

Total Brine Flow 1,000 #

49,100

KWH Generated

1,887,100

Very truly yours,

Revenues $

101,677

Roya lties $

10,168 v/OVvV'c;)

i /}') f/·

--------------------------------".~ -_.

Page 221: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o • TelePh!e~'08) 955-6344

The Research Corporation of the University of Hawaii

,RE'C£iI~ (

~ til;llN ? ~A ,6: ,5~

January 20, 1983

Mr. Susumu Ono, Chairman Department of Land and Natural Resources 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Please find enclosed a copy of the HGP-A operating figures for the month of December 1982.

WG:st

encl.

cc: H. J. S. A. B. L. N. J.

Kono Shupe Kearns Adduci Chen Lopez Oss Katz

Sincerely,

W;f~ Wytze Gorter Executive Director

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

Page 222: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o HAWAII ELECTRIC LIGHT COMPANY, INC.

P. O. BOX 1027 HILO, HAWAJI- 9672.(J

'\ January 4, 1983 "

The Research Corporation of the University of Hawaii 1110 University Avenue 402 Varsity Building Honolulu, Hawaii 96826

Attention: Mr. William R. Coops Director of Administration

Gentlemen:

0)

Please find HGP-A operating figures for the month of December 1982.

Total Steam Flow 1,000 #

38,390

Revenues $

99,343

NAO: FK: hs

~ -::: ::;;:

.~-:"

-, ~) LA... ::r"1 "> 0

"' ::> .::J ) W ,~

~"" -,.. ~t-::c

"J ,"} L.I.. ~ 0

.:.t.:

Total Brine Flow 1,000 #

49,104

Royalties $

9,934

Very truly yours,

tb~!l ~ Norman A. Oss, Manager Production Department

KWH Generated

1,840,700

Page 223: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

- o Telephone: (808) 955-6344

HECEIVED

~ 2 NOV 2~ p \0: I 9 The Research Corporation of th'eUmvefSlty of Hawaii

82 NOV 22 Ala: 11

\~tV. Ot WATER & ! ,~. \:u~ 0;· ,;'i-L' O' PMENT

~ '. ~~f)·, I.ir~I~ND .. t riA j liilAL NtSOUHCES

L..r~., ~ 'i ~

November 17, 1982 STATE OF HAWAII

Mr. Susumu Ono, Chairman DEPARTMENT OF LAND AND NATURAL RESOURCES 1151 Punchbowl Street Honolulu, HI 96813

Dear Mr. Ono:

Pursuant to the Geothermal Mining Lease No. S-4602, we are informing you that the following amounts of geothermal fluid and electricity were produced from HGP-A from April thru October 1982. In addition, the gross revenue and the calculated royalties are included for your information:

MONTH STEAM BRINE NET KWH GROSS (Thousand Lbs) (K Lbs) GENERATED REVENUE

May 38,390 49,'100 1,788,100 $ 96,504

June 37,150 47,520 1,744,000 $ 94,124

July 38,390 49,104 1,790,100 $ 96,612

August 38,390 49,104 1,257,900 $ 67,889

September 37,152 47,520 1,800,000 $ 97,146

october 38,390 49,104 1,869,700 $100,908\

Sincerely,

*~ Wytze Gorter Executive Director

WG:st

cc: H. Kono J. Shupe S . Kearns A. Adduci B. Chen L. Lopez N. Oss

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

ROYALTY

$ 9,650

$ 9,412

$ 9,661

$ 6,789

$ 9,715

$10,091

/

Page 224: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

o o

~T~he~R~e=s~ea=r~c~h~C~o~r~p=o~ra~t~io~n~io~~f~t=h=e~U=n~i~ve=~==i~~o~f~H~a~w~a=ii~ _______ ~'~C"_:_,:_, __ ~ __ ;~~~L

May 26, 1982

, .. !

~ i " I ~~, "', .'·11

DATES

Mr. Susumu Ono Chairman DEPARTMENT OF LAND AND NATURAL RESOURCES 1151 Punchbowl Street Honolulu, Hawaii 96813

Dear f-ir. Ono:

Pursuant to the Geothermal Mining Lease No. S-4602, we are informing you that the following amounts of geothermal fluid and electricity were produced from HGP-A since June 12, 1981. In addition, the gross revenue and the calculated royalties are in­cluded for your information:

STEAM (Million Lbs)

BRINE (M1bs)

24.26 24.25

TOTAL (M1bs)

NET KWH GENERATED

GROSS REVENUE

ROYALTY

6/12-30, 1981 7/1-31, 1981 8/1-31, 1981 9/1-4, 1981

40.92 40.92 39.43 42.78 82.21 124,600 $ 498.40 $ 49.84

4.~ 5.13 _ 9.72

9/5-12/11, 1981

12/11-31, 1981 1/1-31, 1982 2/1-28, 1982 3/1-31, )1982 4/1-30,1982

.[Oi 1,IJO " t. '2. ¥-, l-6O ---L------------------------WELL SHUTDOWN--------------------~------

25.30 37.94 34.27 37.94 36.72 ._.---

1 7 7....)170

cc: H. Kono J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. Oss

42.85 49.99 41.93 45.35 43.89

68.15 87.93 76.20 83.29 80.61

------­'16, / to

116,600 227,400 866,000

1,440,000

Sincerely,

Wytze Gorter Executive Director

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

466.40 909.60

46,738.02 77,716.80

46.64 90.96

4,673.80 7,771.68

Page 225: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

Dr. Wytze Gorter Executive Director

July 2, 1982

The Research Corporation of tho University of Hawaii

1110 University A venue Honolulu, Hawaii 96826

Denr Dr. Gorter:

)

t1GP-A Production Report

·0::

'1""-"' . '

Thank you tor your letter of May 26. 1982, reporting the geothermal steam, electrical energy. and lease royalty computation as required under Geothermal Mining Lease No. 8-4602.

Very truly yours,

~'"'J1''' SUSUMU ONO

Chairman' of the Board

....... j

Page 226: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

-

..... --_ .. -...-.'

Page 227: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

,. "'" MEt~O TO

FROM

SUBJECT

;. STATE OF HAWAII

"1PARTMENT OF LAND AND NATURAL RES '''~.i' DIVISION OF WATER AND LAND DEVELOPMEN't

j

!

Mr. James Detor

Robert T. Chuck

P.O. BOX 373

HGP-A Production Report

HONOLULU, HAWAII 96809

leES

I DATE June 28. 1982

MESSAGE: ____________________________________________________________________________________ __

Attached 1s a letter from Mr. Wytze Gorter. RCUB. which was

Inadvertently routed to our office. A letter reply drafted for

Sus' signature 1s also attached for transmittal through your office.

ROBBBT T. CHUCI(

'\ DL:dh Attach.

SIGNED ___________________________________ _

Page 228: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

June 29, 1982

t~lr. Wytze Gorter Executive Director The ReMarch Corpon.tion of the

University of Hawaii 1110 University Avenue Honolulu. Hawaii 96826

Dew.- Mr. Uorter:

Hap-I.. Production ReP2rt

Thank you for your letter of May 26. 1982 t reporting the geothermal steam. electrical energy, and lease royalty COml)utation as required under Geothermal Mining Le.ase No. 8-4602.

Very truly yours,

SUSUMU ONO Chairu:um of the Board

".~

Page 229: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens
Page 230: ~HU1Zlngh - University of Hawaiievols.library.manoa.hawaii.edu/bitstream/10524/22829/1/HGP-A... · Barrels of Oil Conserved To Date ... Cleaned the circulating water pump inlet screens

• -,

! j

o Telephone: (808) 955-63,144 /

2--tt IJ /

_T_h~e~R~e_s_e_ar_C_h_'C~'-o_'r~p_o_ra_'t_io~~~'-9~f~t=h~e_U~n~i~ve~r~s~i~~o_f~H~a=w~a=i~i ________ "_"_'_' ______ ~~:~[

May 26, 1982 , ......

., .. i ~ >, ' ...... :~ ")

'., ,,- ,: : ,-'~:" \:' .i II "-' i i ~ I ..... 'oJ: I.; t • 11 \

DATES

Mr. Susumu Ono Chairman DEPARTMENT OF LAND AND NATURAL RESOURCES 1151 Punchbowl Street Honolulu, Hawaii 96813

Dear r,1r. Ono:

Pursuant to the Geothermal Mining Lease No. S-4602, we are informing you that the following amounts of geothermal fluid and electricity were produced from HGP-A since June 12, 1981. In addition, the gross revenue and the calculated royalties are in­cluded for your information:

STEAM BRINE (Million Lbs) (M1bs)

24.26 24.25

TOTAL (M1bs)

NET KWH GENERATED

GROSS REVENUE

ROYALTY

6/12-30, 1981 7/1-31, 1981 8/1-31, 1981 9/1-4, 1981

40.92 39.43

40.92 42.78

51.19} 81.14 82.21 124,600 $ 498.40 $ 49.84

4.59 5.13 9.72

9/5-12/11, 1981

12/11-31, 1981 1/1-31, 1982 2/1-28, 1982 3/1-31. ,1982 4/1-30, 1982

----------------------------WELL SHUTDOWN---------------------------

25.30 37.94 34.27 37.94 36.72

cc: H. Kono J. Shupe S. Kearns A. Adduci B. Chen L. Lopez N. Oss

42.85 49.99 41.93 45.35 43.89

68.15 87.93 76.20 83.29 80.61

116,600 227,400 866.000

1,440,000

Sincerely, /-~'~ zt

.?t~,,,, <c.~~ V:I ~.

Wytze Gorter Executive Director

402 Varsity Building, 1110 University Avenue, Honolulu, Hawaii 96826

466.40 909.60

46.738.02 77,716.80

46.64 90.96