agenda
1. Design and development of the GASPOOL-Hub
2. Third party access in the German market2. Third party access in the German market
3. Target model for procurement of balancing energy
4. Implementation of network code on balancing
224 June 2014
today: cross-quality market area
• connects Poland, the Czech Republic, Denmark, the Netherlands and BelgiumNetherlands and Belgium
• covers more than 350 gas grids in Germany and more than 350 balancing group managersbalancing group managers
• this creates a trade area for more than the half of the consumed H-Gas in GermanyGas Ge a y
• GASPOOL cross-quality market area (as of 1st October 2011); conversion possible p(H-Gas ↔ L-Gas)
24 June 2014 3
where we are come from…
19.07.2006: 19 markt areas
424 June 2014
responsibilities of GASPOOL
1. to grant a non discriminatory access to the market area by offering a standardised balancing group contract
2. to operate the virtual trading point
3. to run the processes neccessary for information provision/publication and3 to u t e p ocesses eccessa y o o at o p o s o /pub cat o a dfor invoicing balancing groups
4. undertake balancing actions in order to maintain the transmission gnetwork within its operational limits
524 June 2014
Development of potential trading participants
10/2009 10/2011 04/2014
Launch of GASPOOL Market area merger Status quoLaunch of GASPOOL
• 139 registered
Market area merger
• 264 registered
Status quo
• 397 registered BGMs BGMs BGMs
Operating balancing groups for:• High-cal gas: 504• Low-cal gas: 289• High-cal biogas: 93
Since launch of GASPOOL number of potential trading participants has
High cal biogas: 93• Low-cal biogas: 34
6
p g p ptripled
24 June 2014
Development of trading volumes at the GASPOOL VTP since 2013
Trading volumes at the GASPOOL VTP since 2013Comparison: monthly max (high-cal gas) in 2009/2010 was at 79m MWh
MWh
100.000.000
120.000.000
140.000.000
60.000.000
80.000.000
100.000.000
H-Gas
0
20.000.000
40.000.000 L-Gas
24 June 2014 7
growth rates of european trading points – GASPOOL leads
Quelle: edf, 2nd Annual Gas Supply Chain Management Summit
824 June 2014
Development of the churn rate at the GASPOOL VTP
Development of the churn rate at the GASPOOL VTP
24 June 2014 9
agenda
1. Design and development of the GASPOOL-Hub
2. Third party access in the German market2. Third party access in the German market
3. Target model for procurement of balancing energy
4. Implementation of network code on balancing
1024 June 2014
legal background of third party access
Core elements of third party access based on German Energy Act of 2005
di i i t t k• non-discriminatory network access• Internet publication of terms and conditions, tariffs etc.• TSOs offer entry and exit capacities in a standardised wayy p y• shippers need only one entry and one exit contract to get access to the
transportation system• system operators are obliged to cooperate and to establish standardised• system operators are obliged to cooperate and to establish standardised
rules to realise efficient processes (Cooperation on Agreement)
1124 June 2014
scheme of the balancing system in Germany
market area
entry-exit-modelmarket area
interconnectionpoints to
TSOVTP
entry contractadjacent marketareas(cross-border
DSOexit contract
and national)
DSO
1224 June 2014
characteristics of a market area
1. virtual pooling of several transmission networks to one balancing zone(physical connection is not necessary)
2. virtual trading point allows exchange of gas volumes between balancinggroups independet of capacity bookings
3. entity responsibile: market area manager (MAM)
1324 June 2014
agenda
1. Design and development of the GASPOOL-Hub
2. Third party access in the German market2. Third party access in the German market
3. Target model for procurement of balancing energy
4. Implementation of network code on balancing
1424 June 2014
Merit Order for balancing energy
11Title Market T ti
2Transactions
• Within ownmarket area viaenergy exchange
LocationalMarket Transactions
34Within own
•
4Standardizedlong-termProducts
Non-standardizedlong-term
•
Within ownmarket area via
Within ownmarket area via bilateral platform
•products
••
market area viaenergy exchange
Within adjacentmarket area via energy exchange
Within ownmarket area via bilateral platform
Within ownmarket area via bilateral platformenergy exchange
scope:• security of supply
24 June 2014 15
• security of supply • maximization of standardized (short-term) wholesale products (Exchange)
agenda
1. Design and development of the GASPOOL-Hub
2. Third party access in the German market2. Third party access in the German market
3. Target model for procurement of balancing energy
4. Implementation of network code on balancing
1624 June 2014
Previous steps/preview in the German market
1. In a letter of 9 December 2013, based on a consultation, the market area manager was asked by the Federal Network Agency to present it with a recommendation document for implementation by 3 March 2014.
2. Consultation period from 17 January 2014 until 31 January 2014; 20 responses.
3. Recommendation document on 3 March 2014 to Federal Network Agency; also available at www.gaspool.de.
4. The notice of commencement and 1st consultation for the determination procedure which is to lead to a general decision by the Federal Network Agency was published on 3 April 2013. Consultation until 5 May 2014.
5. Second draft consultation expected in late summer 2014.
6. Then determination, if possible, at the end of 2014.
1724 June 2014
Developments on implementation
Draft Network Code on Balancing submitted for
Second consultation draft of planned BNetzA ruling
Balancing submitted for comitology process in the spring of 2013
First consultation draft of planned BNetzA ruling
Spring 2013 October 2013 January 2014 April 2014Late summer
2014December
2014
Comitology process Cons ltation of theComitology process completed in October 2013
Consultation of the recommendation document prepared by MAOs and TSOs in January 2014
Final ruling to be issued by BNetzA
24 June 2014 18
Outlook
1. Far-reaching changes: in particular, provision of information/ within-daystructuring/compensation energy/daily network accounting.
2. Change in control energy procurement and VTP nomination (lead time is reduced to 30 minutes).
3. Final system not known until determination of the general decision; probably at the end of 2014.
4. In principle, implementation by 1 October 2015 with regard to intra-daystructuring and the provision of information, but extension until 1 October 2016 applied for.pp
1924 June 2014
Thank you for your attention. Any questions?Any questions?
24 June 2014
www.gaspool.de
20
Your contact
Stefan Müller-Reinisch
GASPOOL Balancing Services GmbHReinhardtstraße 52 ▪ 10117 Berlin
Phone: +49 30 364289-500Fax: +49 30 364289-222Email: [email protected]