Hubbs Center 4080 Issues Idenfied By School Community In 2015 1. Reliable air condioning 2. Beer plumbing heat and AC 3. New flooring throughout building 4. Fix leaky roof 5. Technology in every room 6. Healthy food choices in vending machines 7. Prayer rooms 8. Redo rooms so you do not have to walk through to get to class 9. More instruconal spaces of greater size 10. Parking ramp Grade Levels: ALC (Adults) SY 2014/15 Enrollment: XXXXX Design Enrollment: 462 1 1030 University Avenue West Project Summary: The Ronald M. Hubbs Center for Lifelong Learning (Adult Basic Educaon) is a program of the Saint Paul Public Schools’ Community Educaon Department. Educaonal services are available to adults who want to improve their basic skills, earn a GED, prepare for employ- ment or post-secondary educaon, or learn English. The Hubbs Center is also a partner in the Saint Paul Community Literacy Consorum, a collaboraon of agencies throughout Saint Paul that provide literacy services to adults in our community. The building was constructed in 1993 and contains 42,600 square feet. There have been no addions. General Notes: Exisng ulizaon shown is for School Year 2014-2015 The Conceptual Ulizaon Plans are exploratory rather than actual construcon plans and represent the design at one moment in me, which will change as the design and funding process progress. The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no priorizaon implied in a work scope tle (e.g. “Work Scope A” is not necessarily the most crical work to be done). The plans in this document are not comprehensive of the enre building’s needs as maintenance and replacement of exisng building systems such as roofs and mechanical systems are omied to maintain graphic clarity of the overall vision generated during the Facilies Master Plan Process. Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authories will occur once the funding is secured.

Upload: others

Post on 27-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hubb ter - Saint Paul Public Schools · Hubb ter 4 Issues Identified By School Community In 2015 1. Reliable air conditioning 2. Better plumbing heat and AC 3. New flooring throughout

Hubbs Center

4080

Issues Identified By School Community In 2015

1. Reliable air conditioning 2. Better plumbing heat and AC3. New flooring throughout building 4. Fix leaky roof5. Technology in every room6. Healthy food choices in vending machines7. Prayer rooms8. Redo rooms so you do not have to walk through to get to class9. More instructional spaces of greater size10. Parking ramp

Grade Levels: ALC (Adults)SY 2014/15 Enrollment: XXXXXDesign Enrollment: 462

1

1030 University Avenue West Project Summary:

The Ronald M. Hubbs Center for Lifelong Learning (Adult Basic Education) is a program of the Saint Paul Public Schools’Community Education Department. Educational services are available to adults who want to improve their basic skills, earn a GED, prepare for employ-ment or post-secondary education, or learn English. The Hubbs Center is also a partner in the Saint Paul Community Literacy Consortium, a collaboration of agencies throughout Saint Paul that provide literacy services to adults in our community.

The building was constructed in 1993 and contains 42,600 square feet. There have been no additions.

General Notes:Existing utilization shown is for School Year 2014-2015

The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress.

The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. “Work Scope A” is not necessarily the most critical work to be done).

The plans in this document are not comprehensive of the entire building’s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process.

Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured.

Page 2: Hubb ter - Saint Paul Public Schools · Hubb ter 4 Issues Identified By School Community In 2015 1. Reliable air conditioning 2. Better plumbing heat and AC 3. New flooring throughout

Hubbs Center

4080

Site ConceptLegend:S1. New two story building expansion (6,812 SF)

S2. Potential location for new 3-level parking structure with approximately 283 (28,426 SF)

AlterationsNew Landscape ConstructionNew Building Construction

Service Entry

Property Line

Secondary EntryMain Entry

2

Page 3: Hubb ter - Saint Paul Public Schools · Hubb ter 4 Issues Identified By School Community In 2015 1. Reliable air conditioning 2. Better plumbing heat and AC 3. New flooring throughout

Hubbs Center

4080

Existing Utilization

3

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Page 4: Hubb ter - Saint Paul Public Schools · Hubb ter 4 Issues Identified By School Community In 2015 1. Reliable air conditioning 2. Better plumbing heat and AC 3. New flooring throughout

Hubbs Center

4080

Conceptual Utilization Plan

Legend:C1. Create hallway for Instructional Space access (2,110 SF)

C2. Create Office Suite (2,241 SF)

C3. Create large Instructional Space (1,000 SF)

C4. Expand/enhance food commons and create single occupant restroom (268 SF)

C5. Create security check station (336 SF)

C6. New stair (1,180 SF)

C7. General Instructional Space (10,275 SF)

C8. New Indoor Playground (2,544 SF)

C9. New elevator (160 SF)

C10. New Mechanical and storage (304 SF)

C11. Reconfigure for prayer rooms (272 SF)

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

4

Service Entry

Property Line

Secondary EntryMain Entry

New / Existing

Demolition / Removal

ADDITION

EXISTING

ADDITION

EXISTING

Page 5: Hubb ter - Saint Paul Public Schools · Hubb ter 4 Issues Identified By School Community In 2015 1. Reliable air conditioning 2. Better plumbing heat and AC 3. New flooring throughout

Hubbs Center

4080

Conceptual Construction Plan

5

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

New / Existing

Demolition / Removal

Scope Package

New Construction

Heavy Remodel

Medium Remodel Light Remodel Finishes Only

A 16,400 SF

B 1,450 SF 4,410 SF

TOTAL 16,400 SF 1,450 SF 4,410 SF

Line Items Unit Lump SumNew flooringTechnology in all roomsParking structure

ADDITION

EXISTING

ADDITION

EXISTING