hull survey for new construction - · pdf fileabsguide for hull survey for new construction ....

40
GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION AUGUST 2007 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright © 2007 American Bureau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA

Upload: duongdieu

Post on 27-Feb-2018

227 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

GUIDE FOR

HULL SURVEY FOR NEW CONSTRUCTION

AUGUST 2007

American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862

Copyright © 2007 American Bureau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA

Page 2: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

This Page Intentionally Left Blank

Page 3: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 iii

Foreword

This Guide contains requirements obtained from IACS Unified Requirement, UR Z23 “Hull Survey for New Construction”. For the convenience of the users, the various cross-references to the relevant ABS Rules and Guides are provided in addition to those for IACS documents. These IACS documents, UR, UI (Unified Interpretation) and Recommendation, are available from www.iacs.org.uk.

The effective date of this Guide is 1 January 2008 and it is applicable for vessels contracted for construction on or after 1 January 2008.

Page 4: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

This Page Intentionally Left Blank

Page 5: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 v

GUIDE FOR

HULL SURVEY FOR NEW CONSTRUCTION

CONTENTS 1 Scope ......................................................................................1 2 Definitions...............................................................................1

2.1 Hull Structure .........................................................................1 2.2 Documents.............................................................................1 2.3 Survey Methods .....................................................................2

3 Applications............................................................................2 3.1 Vessel Types .........................................................................2 3.2 Statutory Items.......................................................................2 3.3 Equipment, Fittings and Appendages....................................2 3.4 Installation and Testing..........................................................2 3.5 Locations of Construction ......................................................3

4 Qualification and Monitoring of Personnel..........................3 5 Survey of the Hull Structure..................................................3

5.1 Items to be Surveyed.............................................................3 5.2 Evidence of Survey of Materials and Equipment...................4

6 Review of the Construction Facility .....................................4 7 Newbuilding Survey Planning...............................................4

7.1 Kick-off Meeting .....................................................................4 7.2 Administration and Statutory Requirements ..........................4 7.3 Update of Meeting Record.....................................................4 7.4 Shipbuilding Quality Standards..............................................5 7.5 Attendance by Other Parties..................................................5 7.6 Series Ship Production ..........................................................5

8 Examination and Test Plan for Newbuilding Activities ......5 9 Proof of the Consistency of Surveys ...................................5

9.1 Compliance with Newbuilding Survey Planning ....................5 9.2 Audit .......................................................................................5

10 Ship Construction File...........................................................6 10.1 Responsibility.........................................................................6 10.2 Documents to be Included .....................................................6 TABLE 1..............................................................................................7

Page 6: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

vi ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

APPENDIX 1 Shipyard Review Record..................................................... 27 1 Details of Any Management Systems..................................27 2 Construction Facilities..........................................................27

2.1 Building Berth (B) or Dock (D) .........................................27 2.2 Outfitting Quays...............................................................28 2.3 Main Fabrication and Erection Facilities ..........................28

3 Shipyard Control of Qualified Welders.................................29 4 Feature of Construction Procedure......................................29 5 Quality Control System ........................................................30 6 Measures for Safety and Health ..........................................30 7 Control System of Nondestructive Examination (NDE) .......31 8 Quality Control on Production Line ......................................32

8.1 Preventive Measures for Misuse of Materials..................32 8.2 Shot Blasting/Primer Coating ..........................................32 8.3 Marking and Cutting (Assembly Work) ............................33 8.4 Bending and Strain Free..................................................33 8.5 Control of Welding Procedure .........................................33 8.6 Treatment of Serious Non-conformities ...........................34 8.7 Hydrostatic and Watertight Tests ....................................34

Page 7: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 1

1 Scope

The scope of this Guide includes the following:

i) Examination of the parts of the vessel covered by the Rules and by applicable statutory regulations for hull construction, to obtain appropriate evidence that they have been built in compliance with the Rules and regulations, taking account of the relevant approved drawings.

ii) Appraisal of the manufacturing, construction, control and qualification procedures, including welding consumables, weld procedures, weld connections and assemblies, with indication of relevant approval tests.

iii) Witnessing inspections and tests as required in the Rules applicable for ship construction, including materials, welding and assembling, specifying the items to be examined and/or tested and how (e.g., by hydrostatic, hose or leak testing, nondestructive examination, verification of geometry) and by whom.

Appraisal of materials and equipment used for ship construction and their inspection at works is not included in this Guide. Details of requirements for hull and machinery steel forgings and castings and for normal and higher strength hull structural steel are given in Section 2-1-6, Section 2-1-5 and Sections 2-1-2 and 2-1-3, respectively, of the ABS Rules for Materials and Welding (Part 2). Acceptance of these items is verified through the survey process carried out at the manufacturer’s works and the issuing of the appropriate certificates.

2 Definitions

2.1 Hull Structure The hull structure is defined as follows:

i) Hull envelope including all internal and external structures

ii) Superstructures, deckhouses and casings

iii) Welded foundations (e.g., main engine seatings)

iv) Hatch coamings, bulwarks

v) All penetrations fitted and welded into bulkheads, decks and shell

vi) The fittings of all connections to decks, bulkheads and shell, such as air pipes and ship side valves – all ILLC 1966, as amended, items

vii) Welded attachments to shell, decks and primary members (e.g., crane pedestals, bitts and bollards), but only as regards their interaction on the hull structure

2.2 Documents Reference to documents also includes electronic transmission or storage.

Page 8: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

2 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

2.3 Survey Methods Definition of survey methods which the Surveyor is directly involved in: Patrol, Review and Witness:

2.3.1 Patrol Patrol is the act of checking on an independent and unscheduled basis that the applicable processes, activities and associated documentation of the shipbuilding functions identified in Table 1 continue to conform with classification and statutory requirements.

2.3.2 Review Review is the act of examining documents in order to determine traceability and identification and to confirm that processes continue to conform with classification and statutory requirements.

2.3.3 Witness Witness is attendance of scheduled survey items as defined within the shipbuilding functions.

3 Applications

3.1 Vessel Types This Guide covers the survey of all new construction of steel vessels intended for classification and for international voyages except for:

i) Those defined in SOLAS I/3

ii) High speed craft as defined in Part 1, Section of the ABS Guide for Building and Classing High Speed Craft

iii) Mobile Offshore Drilling Units as defined in Section 1-1-3 of the ABS Rules for Building and Classing Mobile Offshore Drilling Units

3.2 Statutory Items This Guide covers all statutory items relevant to the hull structure (i.e., Load Line and SOLAS Safety Construction).

3.3 Equipment, Fittings and Appendages This Guide does not cover the manufacture of equipment, fittings and appendages, regardless of whether they are made inside or outside of the shipyard, examples being as follows. Evidence of acceptance shall be provided by accompanying documentation from class Surveyor at manufacturer and verified at the shipyard:

i) Hatch covers

ii) Doors and ramps integral with the shell and bulkheads

iii) Rudders and rudder stock

iv) All forgings and castings integral to the hull

3.4 Installation and Testing This Guide applies to the installation into the vessel, welding and testing of:

i) The items listed in 3.3 above

ii) Equipment forming part of the watertight and weathertight integrity of the vessel.

Page 9: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 3

3.5 Locations of Construction This Guide applies to the hull structures constructed at any of the following:

i) Shipbuilder’s facilities

ii) Subcontractors at the shipbuilder’s facilities

iii) Subcontractors at their own facilities or at other remote locations

4 Qualification and Monitoring of Personnel

The Surveyors are to verify that the vessels are built using approved plans in accordance with the relevant Rules and statutory requirements. The Surveyors are to be qualified to be able to carry out the tasks and procedures are to be in place to ensure that their activities are monitored. (See Section 1-1-6 of the ABS Rules for Building and Classing Steel Vessels.)

5 Survey of the Hull Structure

5.1 Items to be Surveyed Table 1 provides a list of surveyable items for the hull structure covered by this Guide, including:

i) Description of the shipbuilding functions.

ii) Classification and statutory survey requirements

iii) Survey method required by the Rules for classification

iv) Relevant IACS and statutory requirement references

v) Documentation to be available for the Surveyor during construction.

• The shipbuilder is to provide the Surveyors access to documentation required for classification. This includes documentation retained by the shipbuilder or other third parties.

• The list of documents approved or reviewed by the Bureau for the specific new construction are as follows:

a) Plans and supporting documents

b) Examination and testing plans

c) NDE plans

d) Welding consumable details

e) Welding procedure specifications

f) Welding plan or details

g) Welder’s qualification records (See 2-4-3/7 of the ABS Rules for Materials and Welding)

h) NDE operator’s qualification records (See Section 1, subsection 5 of ABS Guide for Nondesructive Inspection of Hull Welds)

vi) Documents to be inserted into the ship construction file. Refer to Section 10 for details.

vii) A list of specific activities which are relevant to the shipbuilding functions. This list is not exhaustive and can be modified to reflect the construction facilities or specific vessel type.

Page 10: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

4 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

5.2 Evidence of Survey of Materials and Equipment Evidence is also to be made available, as required, by the shipbuilder, to the Surveyor whilst the construction process proceeds to prove that the material and equipment supplied to the vessel has been built or manufactured under survey relevant to the Rules and statutory requirements.

6 Review of the Construction Facility*

The Bureau is to review the construction facilities prior to any steelwork or construction taking place in the following circumstances:

i) Where the Bureau has none or no recent experience of the construction facilities (typically after a one year lapse) or when significant new infrastructure has been added

ii) Where there has been a significant management or personnel restructuring having an impact on the ship construction process

iii) Or where the shipbuilder contracts to construct a vessel of a different type or substantially different in design

* Note: Reference is made to Appendix 1, “Shipyard Review Record”, as an example.

7 Newbuilding Survey Planning

7.1 Kick-off Meeting Prior to commencing any newbuilding project, the Bureau is to discuss with the shipbuilder at a kick-off meeting the items listed in Table 1. The purpose of the meeting is to agree how the list of specific activities shown in Table 1 is to be addressed.

The meeting is to take into account the shipbuilder’s construction facilities and vessel type and deals with subcontractors if it is known that the builder proposes to use them. The shipyard is to be informed of likely intervals for sampling and patrol activities. A record of the meeting is to be made, based upon the contents of the Table (the Table can be used as the record with comments made into the appropriate column).

If the Bureau has nominated a Surveyor for a specific newbuilding project, then the Surveyor is to attend the kick-off meeting. The builder is to be asked to agree to undertake ad hoc investigations during construction where areas of concern arise and to keep the Bureau advised of the progress of any investigation.

Whenever an investigation is undertaken, the builder is to be requested, in principle, to agree to suspend relevant construction activities if warranted by the severity of the problem.

7.2 Administration and Statutory Requirements The records are to take note of specific published Administration requirements and interpretations of statutory requirements.

7.3 Update of Meeting Record The record of the meeting is to be updated as the construction process progresses in the light of changing circumstances (e.g., if the shipbuilder chooses to use or change subcontractors, or to incorporate any modifications necessitated by changes in production or inspection methods, Rules and regulations, structural modifications, or in the event where increased inspection requirements are deemed necessary as a result of a substantial non-conformance or otherwise).

Page 11: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 5

7.4 Shipbuilding Quality Standards Shipbuilding quality standards for the hull structure during new construction are to be reviewed and agreed during the kick-off meeting. Structural fabrication is to be carried out in accordance with ABS Guide for Shipbuilding and Repair Quality Standard for Hull Structures During Construction, or a recognized fabrication standard which has been accepted by the Bureau prior to the commencement of fabrication/construction. The work is to be carried out in accordance with the Rules and under survey of the Bureau.

7.5 Attendance by Other Parties The kick-off meeting may be attended by other parties, Owner, Administrations, etc., subject to agreement by the shipbuilder.

7.6 Series Ship Production In the event of series ship production and where the Bureau has a continual presence in the shipyard, consideration may be given to modification of the kick off meeting. The agenda would include essential variables from previous vessels, (e.g., flag requirements, modifications from previous vessels, effects of key dates, etc.) subject to mutual agreement with the builder. In any instance, the Bureau must maintain records to demonstrate compliance with Table 1. The Bureau will still need to demonstrate that changes described in 7.1 to 7.6 have been addressed.

8 Examination and Test Plan for Newbuilding Activities The shipbuilder is to provide plans of the items which are intended to be examined and tested. These plans need not be submitted for approval and examination at the time of the kick-off meeting. They are to include: i) Proposals for the examination of completed steelwork (generally referred to as the block plan)

and are to include details of joining blocks together at the pre-erection and erection stages or at other relevant stages

ii) Proposals for fit up examinations where necessary iii) Proposals for testing of the structure (leak and hydrostatic) as well as for all watertight and

weathertight closing appliances iv) Proposals for nondestructive examination v) Any other proposals specific to the vessel type or to the statutory requirements. The plans and any modifications to them are to be submitted to the Surveyors in sufficient time to allow approval before the relevant construction phase commences. The Bureau is to require sample rates of NDE, proposals for steelwork survey, tank testing requirements, etc., if the actual construction process warrants it. The Bureau is to demonstrate proof to justify the request.

9 Proof of the Consistency of Surveys

9.1 Compliance with Newbuilding Survey Planning The Bureau is to be able to provide evidence (e.g., through records, check lists, inspection and test records, etc.) that its Surveyors have complied with the requirements of the newbuilding survey planning and duly participated in the relevant activities shown in the shipbuilder’s examination and test plans.

9.2 Audit For audit purposes, the information specified in 9.1 is to be made available.

Page 12: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

6 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

10 Ship Construction File

10.1 Responsibility The shipbuilder is to deliver documents for the Ship Construction File. In the event that items have been provided by another party such as the Owner, and where separate arrangements have been made for document delivery which excludes the shipbuilder, that party has the responsibility.

10.2 Documents to be Included It is recognized that the purpose of documents held in the Ship Construction File onboard the vessel, is to facilitate inspection (survey) and repair and maintenance, and, therefore, is to include in addition to documents listed in Table 1, but not be limited to:

i) As-built structural drawings including scantling details, material details, and, as applicable, wastage allowances, location of butts and seams, cross section details and locations of all partial and full penetration welds, areas identified for close attention and rudders [Section 7-3-2 of the ABS Rules for Survey After Construction (Part 7) for Hull Surveys]

ii) Manuals required for classification and statutory requirements (e.g., loading and stability, bow doors and inner doors and side shell doors and stern doors – operations and maintenance manuals) [3-2-16/27 of the ABS Rules for Building and Classing Steel Vessels]

iii) Ship structure access manual, as applicable

iv) Copies of certificates of forgings and castings welded into the hull [Sections 2-1-6 and Section 2-1-5 of the ABS Rules for Materials and Welding (Part 2)]

v) Details of equipment forming part of the watertight and weathertight integrity of the vessel

vi) Tank testing plan including details of the test requirements [Section 3-7-1 of the ABS Rules for Building and Classing Steel Vessels]

vii) Corrosion protection specifications [3-2-18/5 of the ABS Rules for Building and Classing Steel Vessels]

viii) Details for the in-water survey, if applicable, information for divers, clearances measurements instructions, etc., tank and compartment boundaries [Appendix 7-A-1 of the ABS Rules for Survey After Construction (Part 7)]

ix) Docking plan and details of all penetrations normally examined at drydocking [3-1-2/11 and 3-2-2/7 of the ABS Rules for Building and Classing Steel Vessels and Section 7-4-1 of the ABS Rules for Survey After Construction (Part 7)]

x) Coating Technical File, for vessels subject to compliance with the IMO Coating Performance Standard (PSPC) as a class requirement under the IACS Common Structural Rules. [Section 6 of the ABS Guide for The Class Notation Coating Performance Standard (CPS)]

Page 13: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

Ship

build

ing

Qua

lity

Con

trol F

unct

ion

1 W

eldi

ng

.1 Id

entif

y co

nsum

able

s ag

ains

t ap

prov

ed li

st

.2 V

erify

te

mpo

rary

and

pe

rman

ent

stor

age

faci

litie

s

e.g.

, kep

t dry

, co

vere

d, a

nd

whe

re ap

plic

able

, he

ated

1.1

Wel

ding

C

onsu

mab

les

App

rove

d se

para

tely

at t

he

man

ufac

ture

r

Revi

ew a

ppro

val

stat

us a

nd

patro

l, ve

rify

stor

age,

ha

ndlin

g an

d tre

atm

ent i

n ac

cord

ance

with

m

anuf

actu

rer's

re

quire

men

ts

App

endi

x 2

of

the

Rule

s for

M

ater

ials

and

W

eldi

ng (P

art 2

) [U

R W

17]

C

onsu

mab

le

spec

ifica

tion

and

appr

oval

st

atus

Not

requ

ired

.3 V

erify

tra

ceab

ility

e.

g., r

ando

m

batc

h nu

mbe

r ch

ecki

ng

.1 V

erify

wel

der

qual

ifica

tion

stan

dard

, e.g

., cl

ass o

r re

cogn

ized

st

anda

rd

appr

oval

.2 V

erify

wel

der

appr

oved

for

wel

d po

sitio

n

1.2

Wel

der

Qua

lific

atio

n Q

ualif

ied

wel

ders

Re

view

of w

elde

r ce

rtific

atio

n an

d pa

trol

Pub

# 87

:

Gui

de fo

r Sh

ipbu

ildin

g an

d Re

pair

Q

ualit

y St

anda

rd fo

r H

ull S

truc

ture

s D

urin

g C

onst

ruct

ion

[Rec

omm

end-

atio

n 47

]

Sh

ipya

rds

reco

rds w

ith

indi

vidu

al's

iden

tific

atio

n

Not

requ

ired

.3 V

erify

va

lidity

of

qual

ifica

tion

certi

ficat

e

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 7

Page 14: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

All

wel

d jo

int

conf

igur

atio

ns,

posi

tions

and

m

ater

ials

to b

e co

vere

d by

wel

d pr

oced

ures

ap

prov

ed b

y th

e B

urea

u or

by

anot

her I

AC

S m

embe

r av

aila

ble

.1 V

erify

wel

d pr

oced

ures

re

cord

s hav

e be

en ap

prov

ed

and

cove

r all

wel

d pr

oces

ses

and

posi

tions

in

acc

orda

nce

with

cl

assi

ficat

ion

or re

cogn

ized

st

anda

rds.

.2 V

erify

pr

oced

ures

ar

e av

aila

ble

at re

leva

nt

wor

ksta

tions

1.3

Wel

ding

Mec

hani

cal

Prop

ertie

s (W

eldi

ng

Proc

edur

es)

The

Bur

eau

witn

esse

s all

new

w

eld

proc

edur

e qu

alifi

catio

n te

sts c

arrie

d ou

t in

the

ship

yard

w

hene

ver t

he

Bur

eau

is

surv

eyin

g in

the

ship

yard

Rev

iew

and

pa

trol

2-4-

3/5

of th

e Ru

les f

or

Mat

eria

ls a

nd

Wel

ding

(Par

t 2)

[UR

W28

]

A

ppro

ved

wel

d pr

oced

ure

spec

ifica

tion

and

wel

ding

pl

an re

leva

nt to

th

e ve

ssel

pr

ojec

t or

proc

ess

Not

requ

ired

.3 V

erify

wel

d pr

oced

ures

ar

e av

aila

ble

for t

he

Surv

eyor

’s

refe

renc

e

.1 V

erify

co

nditi

on o

f m

achi

nery

an

d eq

uipm

ent.

1.

3a

Wel

ding

Eq

uipm

ent

Cor

rect

ly

calib

rate

d an

d m

aint

aine

d

Patro

l and

re

view

Sh

ipbu

ilder

’s

mai

nten

ance

and

ca

libra

tion

reco

rds

Not

requ

ired

.2 V

erify

m

achi

nes a

re

calib

rate

d by

ap

prop

riate

st

aff

8 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 15: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.3 V

erify

ca

libra

tion

carr

ied

out i

n ac

cord

ance

w

ith

man

ufac

ture

r's

reco

mm

end-

atio

ns

1.

3a

(con

t’d.)

Wel

ding

Eq

uipm

ent

(con

t’d.)

Cor

rect

ly

calib

rate

d an

d m

aint

aine

d

Patro

l and

re

view

Sh

ipbu

ilder

’s

mai

nten

ance

and

ca

libra

tion

reco

rds

Not

requ

ired

.4 V

erify

ca

libra

tion

in

acco

rdan

ce

with

m

aint

enan

ce

sche

dule

.1 V

erify

wel

ding

ar

eas c

lean

, dr

y, w

ell l

it.

.2 C

onfir

m

rele

vant

m

easu

res

take

n fo

r any

pr

e or

pos

t he

at tr

eatm

ent,

dryi

ng o

f su

rfac

es p

rior

to w

eldi

ng

1.3b

W

eldi

ng

Envi

ronm

ent

Satis

fact

ory

envi

ronm

ent

Patro

l Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

Not

requ

ired

.3 C

onfir

m

shie

ldin

g ga

ses,

fluxe

s pr

otec

ted

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 9

Page 16: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

1.3c

W

eldi

ng

Supe

rvis

ion

Suff

icie

nt

num

ber o

f sk

illed

su

perv

isor

s

Patro

l Pu

b #

14:

Gui

de fo

r N

onde

stru

ctiv

e In

spec

tion

of

Hul

l Wel

ds

[Rec

omm

end-

atio

n 20

and

47]

.1

Ver

ify

supe

rvis

ion

is

effe

ctiv

e

.1 Id

entif

y w

orks

tatio

ns

whe

re N

DE

is

carr

ied

out,

e.g.

, pan

el li

ne

butt

wel

ds,

cast

ings

into

hu

ll st

ruct

ure

.2 V

erify

ND

E ca

rrie

d ou

t in

acco

rdan

ce

with

app

rove

d pl

ans w

here

ap

plic

able

.3 V

erify

su

itabi

lity

of

ND

E m

etho

ds

1.4

Wel

ding

- Su

rfac

e D

isco

ntin

uitie

s

Subs

tant

ially

fr

ee fr

om

sign

ifica

nt

indi

catio

ns,

satis

fact

ory

prof

ile a

nd si

ze

Vis

ual

exam

inat

ion,

su

rface

det

ectio

n te

chni

ques

, re

view

of

docu

men

ts a

nd

patro

l of o

pera

tor

Pub

# 14

: G

uide

for

Non

dest

ruct

ive

Insp

ectio

n of

H

ull W

elds

[R

ecom

men

d-at

ion

20 a

nd 4

7]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

wel

ding

and

N

DE

plan

s, N

DE

repo

rts, o

pera

tor

qual

ifica

tions

Not

requ

ired

.4 V

erify

op

erat

ors

suita

bly

qual

ified

pa

rticu

larly

w

here

sub-

cont

ract

ors

have

bee

n em

ploy

ed

10 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 17: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.5 V

erify

ND

E is

car

ried

out

acco

rdin

g to

th

e ac

cept

able

pr

oces

s

1.

4 (c

ont’d

) W

eldi

ng-

Surf

ace

Dis

cont

inui

ties

(con

t’d.)

Subs

tant

ially

fr

ee fr

om

sign

ifica

nt

indi

catio

ns,

satis

fact

ory

prof

ile a

nd si

ze

Vis

ual

exam

inat

ion,

su

rface

det

ectio

n te

chni

ques

, re

view

of

docu

men

ts a

nd

patro

l of o

pera

tor

Pub

# 14

: G

uide

for

Non

dest

ruct

ive

Insp

ectio

n of

H

ull W

elds

[R

ecom

men

d-at

ion

20 a

nd 4

7]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

wel

ding

and

N

DE

plan

s, N

DE

repo

rts, o

pera

tor

qual

ifica

tions

Not

requ

ired

.6 R

evie

w N

DE

reco

rds

.1 Id

entif

y w

orks

tatio

ns

whe

re N

DE

is

carr

ied

out,

e.g.

pan

el li

ne

butt

wel

ds,

cast

ings

into

hu

ll st

ruct

ure

.2 V

erify

ND

E ca

rrie

d ou

t in

acco

rdan

ce

with

app

rove

d pl

ans w

here

ap

plic

able

.3 V

erify

su

itabi

lity

of

ND

E m

etho

ds

1.5

Wel

ding

Embe

dded

D

isco

ntin

uitie

s

ND

E is

to b

e ca

rrie

d ou

t by

qual

ified

op

erat

ors

capa

ble

of

ensu

ring

that

w

elds

are

su

bsta

ntia

lly

free

from

si

gnifi

cant

in

dica

tions

Rad

iogr

aphy

an

d ul

traso

nic

test

ing,

revi

ew

of d

ocum

ents

an

d pa

trol o

f op

erat

or,

exam

inat

ion

of

film

s

Pub

# 14

: G

uide

for

Non

dest

ruct

ive

Insp

ectio

n of

H

ull W

elds

[R

ecom

men

d-at

ion

20 a

nd 4

7]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

wel

ding

and

N

DE

plan

s, N

DE

repo

rts,

oper

ator

qu

alifi

catio

ns

Not

requ

ired

.4 V

erify

op

erat

ors

suita

bly

qual

ified

pa

rticu

larly

w

here

sub-

cont

ract

ors

have

bee

n em

ploy

ed

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 11

Page 18: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.5 V

erify

that

re

cord

s hav

e be

en

com

plet

ed a

nd

in a

ccor

danc

e w

ith re

cogn

ized

stan

dard

s, e.

g. IQ

I and

se

nsiti

vity

re

cord

ed

.6 V

erify

that

re

ports

and

ra

diog

raph

s ha

ve b

een

eval

uate

d co

rrec

tly b

y th

e shi

pbui

lder

. Sy

stem

atic

re

view

of

radi

ogra

phs

carr

ied

out b

y th

e Su

rvey

or

.7 V

erify

eq

uipm

ent

calib

ratio

n sa

tisfa

ctory

and

in a

ccor

danc

e w

ith

man

ufac

ture

r’s

and

reco

gniz

ed

stan

dard

s re

quire

men

ts

1.5

(con

t’d.)

Wel

ding

Embe

dded

D

isco

ntin

uitie

s (c

ont’d

.)

ND

E is

to b

e ca

rrie

d ou

t by

qual

ified

op

erat

ors

capa

ble

of

ensu

ring

that

w

elds

are

su

bsta

ntia

lly

free

from

si

gnifi

cant

in

dica

tions

Rad

iogr

aphy

an

d ul

traso

nic

test

ing,

revi

ew

of d

ocum

ents

an

d pa

trol o

f op

erat

or,

exam

inat

ion

of

film

s

Pub

# 14

: G

uide

for

Non

dest

ruct

ive

Insp

ectio

n of

H

ull W

elds

[R

ecom

men

d-at

ion

20 a

nd 4

7]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

wel

ding

and

N

DE

plan

s, N

DE

repo

rts,

oper

ator

qu

alifi

catio

ns

Not

requ

ired

.8 V

erify

ND

E is

car

ried

out

acco

rdin

g to

th

e ac

cept

able

pr

oces

s

12 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 19: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

2 St

eel P

repa

ratio

n an

d Fi

t Up:

.1 V

erify

st

ocky

ard

stor

age

satis

fact

ory

.2 V

erify

m

ater

ial

trace

abili

ty,

e.g.

stam

ping

id

entif

icat

ion

agai

nst

mat

eria

l ce

rtific

atio

n,

arch

ivin

g of

re

cord

s

.3 V

erify

tra

nsfe

r m

arki

ng a

fter

treat

men

t lin

e

.4 V

erify

st

anda

rd o

f sh

otbl

astin

g an

d pr

imin

g

.5 V

erify

su

itabi

lity

of

prim

er

2.1

Surf

ace

Prep

arat

ion,

M

arki

ng a

nd

Cut

ting

Trac

eabi

lity

and

acce

ptab

ility

of

mat

eria

l, ch

eck

of st

eel p

late

s &

prof

iles

mat

eria

ls ty

pe,

scan

tling

id

entif

icat

ion,

te

stin

g m

arks

Patro

l Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

M

ater

ial

certi

ficat

es,

ship

build

er's

mar

king

/cut

ting

prod

uctio

n do

cum

ents

at t

he

wor

ksta

ge -

docu

men

ts

reta

ined

at t

he

faci

lity

Not

requ

ired

.6 V

erify

that

st

eel g

rade

s ca

n be

id

entif

ied

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 13

Page 20: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.7 V

erify

m

achi

nery

ad

just

ed to

m

aint

ain

with

in IA

CS

or

man

ufac

ture

r’s

reco

mm

end-

atio

ns

.8 V

erify

ac

cura

cy o

f m

arki

ng a

nd

cutti

ng

.2.1

(c

ont’d

) Su

rfac

e Pr

epar

atio

n,

Mar

king

and

C

uttin

g

Trac

eabi

lity

and

acce

ptab

ility

of

mat

eria

l, ch

eck

of st

eel p

late

s &

prof

iles

mat

eria

ls ty

pe,

scan

tling

id

entif

icat

ion,

te

stin

g m

arks

Patro

l Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

M

ater

ial

certi

ficat

es,

ship

build

er's

mar

king

/cut

ting

prod

uctio

n do

cum

ents

at t

he

wor

ksta

ge -

docu

men

ts

reta

ined

at t

he

faci

lity

Not

requ

ired

.9 V

erify

stor

age

of p

iece

par

ts.

.1 V

erify

that

st

raig

hten

ing

proc

esse

s are

ap

prov

ed fo

r th

e gr

ade

and

type

of s

teel

, e.

g., t

mcp

, z-

plat

e.

2.

2 St

raig

hten

ing

App

rova

l of

stra

ight

enin

g m

etho

ds/

proc

edur

es

agai

nst

defo

rmat

ion

Patro

l and

re

view

Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

R

ecog

nize

d st

anda

rds,

appr

oved

pr

oced

ures

Not

requ

ired

2. V

erify

that

pl

ates

and

se

ctio

ns

are

with

in

reco

gniz

ed

tole

ranc

es

14 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 21: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.1 V

erify

that

te

mpe

ratu

re

cont

rol i

s ex

erci

sed

by

the

oper

ator

.2 V

erify

that

su

itabl

e m

etho

ds o

f te

mpe

ratu

re

cont

rol a

re

avai

labl

e w

hen

form

ing

spec

ial s

teel

s an

d m

ater

ials

2.3

Form

ing

Mai

ntai

n m

ater

ial

prop

ertie

s. A

ccep

tanc

e of

fo

rmin

g m

etho

d ag

ains

t unp

rope

r de

form

atio

ns

Patro

l Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

Sh

ipbu

ilder

’s

proc

edur

e fo

r ho

t for

min

g

Not

requ

ired

.3 V

erify

that

fo

rmin

g pr

oces

ses a

re

acce

ptab

le

.1 V

erify

th

e pr

oces

ses

to e

nsur

e sa

tisfa

ctor

y fit

up

and

al

ignm

ent a

t all

wor

ksta

tions

.2 V

erify

th

at e

dge

prep

arat

ions

ar

e re

-inst

ated

w

here

lost

du

ring

fittin

g op

erat

ions

2.4

Con

form

ity w

ith

Alig

nmen

t/Fit

Up/

Gap

Crit

eria

Chec

k al

ignm

ent/

fit u

p/ga

p ag

ains

t re

fere

nce

stan

dard

s

Patro

l Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le

Not

requ

ired

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 15

Page 22: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

2.4

(con

t’d)

Con

form

ity w

ith

Alig

nmen

t/Fit

Up/

Gap

Crit

eria

(c

ont’d

)

Chec

k al

ignm

ent/

fit u

p/ga

p ag

ains

t re

fere

nce

stan

dard

s

Patro

l Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le

Not

requ

ired

.3 V

erify

re

med

ial

proc

edur

es

are

in p

lace

to

com

pens

ate

for w

ide

gaps

an

d al

ignm

ent

devi

atio

ns

.1 V

erify

that

the

info

rmat

ion

rele

vant

to th

e la

test

appr

oved

dr

awin

gs is

av

ailab

le at

the

wor

ksta

tions

.2 V

erify

th

e pr

oces

ses

to e

nsur

e sa

tisfa

ctor

y fit

up

and

al

ignm

ent a

t all

wor

ksta

tions

2.5

Con

form

ity fo

r C

ritic

al A

reas

w

ith A

lignm

ent/

Fit U

p or

Wel

d C

onfig

urat

ion

Chec

k al

ignm

ent/

fit u

p/ga

p ag

ains

t ap

prov

ed

draw

ings

Patro

l and

re

view

Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

appr

oved

pla

n or

st

anda

rd,

build

er's

reco

rds

App

rove

d pl

ans

of c

ritic

al a

reas

if

appl

icab

le

.3 V

erify

that

ed

ge

prep

arat

ions

ar

e re

-inst

ated

w

here

lost

du

ring

fittin

g op

erat

ions

16 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 23: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

2.5

(con

t’d)

Con

form

ity fo

r C

ritic

al A

reas

w

ith A

lignm

ent/

Fit U

p or

Wel

d C

onfig

urat

ion

(con

t’d)

Chec

k al

ignm

ent/

fit u

p/ga

p ag

ains

t ap

prov

ed

draw

ings

Patro

l and

re

view

Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

appr

oved

pla

n or

st

anda

rd,

build

er's

reco

rds

App

rove

d pl

ans

of c

ritic

al a

reas

if

appl

icab

le

.4 V

erify

re

med

ial

proc

edur

es

are

in p

lace

to

com

pens

ate

for w

ide

gaps

an

d al

ignm

ent

devi

atio

ns

.1 V

erify

that

the

info

rmat

ion

rele

vant

to th

e la

test

appr

oved

dr

awin

gs is

av

ailab

le at

the

wor

ksta

tions

.2 V

erify

that

co

rrec

t wel

d si

zes h

ave

been

ado

pted

.3 V

erify

op

erat

ion

of

the

wel

ding

pr

oces

ses a

t th

e di

ffer

ent

wor

k st

ages

is

satis

fact

ory

3 St

eelw

ork

Proc

ess,

(e.g

., su

b as

sem

bly,

bl

ock,

gra

nd a

nd

meg

a bl

ock

asse

mbl

y, p

re-

erec

tion

and

erec

tion,

clo

sing

pl

ates

)

Com

plia

nce

with

app

rove

d dr

awin

gs, v

isua

l ex

amin

atio

n of

w

eldi

ng a

nd

mat

eria

l, ch

eck

alig

nmen

t and

de

form

atio

ns

Patro

l of t

he

proc

ess a

nd

witn

ess o

f the

co

mpl

eted

item

Pub

# 87

:

Gui

de fo

r Sh

ipbu

ildin

g an

d Re

pair

Q

ualit

y St

anda

rd fo

r H

ull S

truc

ture

s D

urin

g C

onst

ruct

ion

[Rec

omm

end-

atio

n 47

]

A

ppro

ved

plan

s, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s, Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

cons

truct

ion

plan

(ste

elw

ork

subd

ivis

ion)

.4 V

erify

that

pi

ece p

arts

are

iden

tifia

ble

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 17

Page 24: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.5 V

erify

that

fit

ups a

re w

ithin

re

cogn

ized

to

lera

nces

.6 V

erify

that

co

rrect

wel

ding

re

quire

men

ts

spec

ified

in

refe

renc

e 1

of

this

tabl

e ha

ve b

een

adop

ted

.7 V

erify

pr

oces

ses f

or

clos

ing

plat

es,

etc.

, are

ac

cept

able

3 (c

ont’d

) St

eelw

ork

Proc

ess,

(e.g

., su

b as

sem

bly,

bl

ock,

gra

nd a

nd

meg

a bl

ock

asse

mbl

y, p

re-

erec

tion

and

erec

tion,

clo

sing

pl

ates

) (c

ont’d

)

Com

plia

nce

with

app

rove

d dr

awin

gs, v

isua

l ex

amin

atio

n of

w

eldi

ng a

nd

mat

eria

l, ch

eck

alig

nmen

t and

de

form

atio

ns

Patro

l of t

he

proc

ess a

nd

witn

ess o

f the

co

mpl

eted

item

Pub

# 87

:

Gui

de fo

r Sh

ipbu

ildin

g an

d Re

pair

Q

ualit

y St

anda

rd fo

r H

ull S

truc

ture

s D

urin

g C

onst

ruct

ion

[Rec

omm

end-

atio

n 47

]

A

ppro

ved

plan

s, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s, Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

cons

truct

ion

plan

(ste

elw

ork

subd

ivis

ion)

.8 C

onfir

m th

at

stee

lwor

k is

in

acc

orda

nce

with

the

appr

oved

pla

n

4 R

emed

ial W

ork

and

Alte

ratio

n W

eldi

ng, c

heck

ag

ains

t de

form

atio

n,

alig

nmen

t

Rev

iew

reco

rds

and

witn

ess

Pub

# 87

:

Gui

de fo

r Sh

ipbu

ildin

g an

d Re

pair

Q

ualit

y St

anda

rd fo

r H

ull S

truc

ture

s D

urin

g C

onst

ruct

ion

[Rec

omm

end-

atio

n 47

]

Pe

rman

ent r

ecor

d of

ship

yard

su

rvey

able

item

.1

Ver

ify th

at

reco

rds

have

bee

n m

aint

aine

d of

si

gnifi

cant

de

viat

ions

fr

om th

e ap

prov

ed

plan

s, fo

r si

tuat

ions

su

ch a

s mis

-cu

t ope

ning

s, re

-rou

ting

outfi

t ite

ms

18 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 25: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

4 (c

ont’d

) R

emed

ial W

ork

and

Alte

ratio

n (c

ont’d

)

Wel

ding

, che

ck

agai

nst

defo

rmat

ion,

al

ignm

ent

Rev

iew

reco

rds

and

witn

ess

Pub

# 87

:

Gui

de fo

r Sh

ipbu

ildin

g an

d Re

pair

Q

ualit

y St

anda

rd fo

r H

ull S

truc

ture

s D

urin

g C

onst

ruct

ion

[Rec

omm

end-

atio

n 47

]

Pe

rman

ent r

ecor

d of

ship

yard

su

rvey

able

item

.2

Ver

ify th

at a

ll de

viat

ions

br

ough

t to

the

atte

ntio

n of

the

Bur

eau

by th

e sh

ipbu

ilder

ar

e ac

cept

able

.1 C

onfir

m th

at

tank

test

ing

is

carr

ied

out i

n ac

cord

ance

w

ith th

e ap

prov

ed p

lan

.2 C

onfir

m th

e m

etho

ds u

sed

to c

arry

out

le

ak te

stin

g

.3 C

onfir

m th

at

corr

ect t

est

pres

sure

s m

aint

aine

d fo

r le

ak, h

ose

and

hydr

o an

d hy

dro-

pneu

mat

ic

test

ing

is

satis

fact

ory

5 Ti

ghtn

ess

Test

ing,

in

clud

ing

leak

an

d ho

se te

stin

g,

hydr

opne

umat

ic

test

ing

Abs

ence

of

leak

s Pa

trol o

f the

pr

oces

s and

w

itnes

s of t

he

test

Sect

ion

3-7-

1 of

th

e Ru

les f

or

Build

ing

and

Cla

ssin

g St

eel

Vess

els

[UR

S14

]

Reg

. II-

1/14

of

SOLA

S as

am

ende

d

App

rove

d ta

nk

test

ing

plan

, sh

ipbu

ilder

s in

spec

tion

reco

rds

App

rove

d ta

nk

test

ing

plan

.4 V

erify

that

ad

equa

te

reco

rds o

f the

ta

nk te

stin

g ha

ve b

een

mai

ntai

ned

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 19

Page 26: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.1 C

onfir

m th

at

tank

test

ing

is

carr

ied

out i

n ac

cord

ance

w

ith th

e ap

prov

ed p

lan

.2 C

onfir

m th

at

corr

ect t

est

pres

sure

s m

aint

aine

d fo

r tes

ting

is

satis

fact

ory

6 St

ruct

ural

Te

stin

g St

ruct

ural

ad

equa

cy o

f the

de

sign

Witn

ess t

estin

g Se

ctio

n 3-

7-1

of

the

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

R S

14]

Reg

. II-

1/14

of

SOLA

S as

am

ende

d

App

rove

d ta

nk

test

ing

plan

, sh

ipbu

ilder

s in

spec

tion

reco

rds

App

rove

d ta

nk

test

ing

plan

.3 V

erify

that

ad

equa

te

reco

rds o

f the

ta

nk te

stin

g ha

ve b

een

mai

ntai

ned

.1 V

erify

that

ap

plie

d co

atin

gs a

re

appr

oved

and

re

view

re

cord

s of

appl

icat

ion

7

Cor

rosi

on

Prot

ectio

n Sy

stem

s (e.

g.,

coat

ings

, ca

thod

ic

prot

ectio

n,

impr

esse

d cu

rren

t)

Salt

wat

er b

alla

st ta

nks w

ith

boun

darie

s fo

rmed

by

the

hull

enve

lope

, an

d al

so b

ulk

carr

ier h

old

inte

rnal

surfa

ces,

coam

ings

and

ha

tch

cove

rs

shal

l hav

e an

ef

ficie

nt

prot

ectiv

e co

atin

g. S

afet

y as

pect

s of

cath

odic

syste

ms

to b

e de

alt w

ith

sepa

rate

ly.

Rev

iew

and

re

port

on

build

er's

and

man

ufac

ture

r's

docu

men

tatio

n

3-2-

18/5

of t

he

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

R Z

8 an

d Z9

, U

I SC

122,

U

R F

1]

Reg

. II-

1/3-

2 of

SO

LAS

as

amen

ded

Man

ufac

ture

r’s

and

build

er’s

sp

ecifi

catio

n

Cor

rosi

on

prot

ectio

n sp

ecifi

catio

ns

.2 V

erify

that

ad

equa

te

reco

rds h

ave

been

m

aint

aine

d an

d co

pied

to

the

ship

file

20 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 27: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

8 In

stal

latio

n, W

eldi

ng a

nd T

estin

g of

the

Follo

win

g:

.1 C

onfir

m le

ak

test

of h

atch

co

vers

8.

1 H

atch

Cov

ers

Tigh

tnes

s and

se

curin

g W

itnes

s Se

ctio

n 3-

7-1

of

the

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

R S

14]

Reg

. 13-

14-1

5 an

d 16

of I

LLC

'6

6

App

rove

d ta

nk

test

ing

plan

, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s

Det

ails

requ

ired,

st

ruct

ural

dr

awin

gs

.2 C

onfir

m

oper

atio

n an

d se

curin

g te

st

.1 C

onfir

m le

ak

test

.2 C

onfir

m

oper

atio

n an

d se

curin

g te

st

.3 C

onfir

m

safe

ty d

evic

e op

erat

ion

8.2

Doo

rs a

nd

Ram

ps In

tegr

al

with

the

Shel

l an

d B

ulkh

eads

Tigh

tnes

s and

se

curin

g W

itnes

s Se

ctio

n 3-

7-1

of

the

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

R S

14]

Reg

. II-

1/18

of

SOLA

S as

am

ende

d; R

eg.

12 a

nd 2

1 of

IL

LC '6

6

App

rove

d ta

nk

test

ing

plan

, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s

Det

ails

requ

ired

.4 E

nsur

e cor

rect

m

aint

enan

ce

logs

/man

uals

su

pplie

d w

ith th

e sh

ip

cons

truct

ion

file

.1 C

onfir

m

alig

nmen

t and

m

ount

ing

and

fittin

g up

to

the

conn

ectio

n to

the

tille

r

.2 C

onfir

m

func

tion

test

8.3

Rud

ders

Fi

tting

W

itnes

s Se

ctio

n 3-

7-1

of

the

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

R S

14]

A

ppro

ved

plan

, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s

Det

ails

requ

ired,

st

ruct

ural

dr

awin

gs

.3 V

erify

fitti

ng

of p

intle

s and

al

l sec

urin

g bo

lts

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 21

Page 28: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

8.3

(con

t’d)

Rud

ders

(c

ont’d

) Fi

tting

W

itnes

s Se

ctio

n 3-

7-1

of

the

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

R S

14]

A

ppro

ved

plan

, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s

Det

ails

requ

ired,

st

ruct

ural

dr

awin

gs

.4 V

erify

all

fit

up re

cord

s in

clud

ing

all

clea

ranc

es

mai

ntai

ned

and

plac

ed

into

ship

co

nstru

ctio

n fil

e

.1 V

erify

cas

ting

and

forg

ings

ag

ains

t m

ater

ial

certi

ficat

e

.2 V

erify

that

co

rrect

wel

ding

an

d fit

up

requ

irem

ents

sp

ecifi

ed in

re

fere

nce

1,

2.4

and

2.5

of

this

tabl

e ha

ve b

een

adop

ted

8.4

Forg

ings

and

C

astin

gs

Com

plia

nce

with

app

rove

d dr

awin

gs, v

isua

l ex

amin

atio

n of

w

eldi

ng a

nd

mat

eria

l, ch

eck

alig

nmen

t and

de

form

atio

ns

Patro

l of t

he

proc

ess a

nd

witn

ess o

f the

co

mpl

eted

item

Sect

ions

2-1

-6

and

2-1-

5 of

th

e Ru

les f

or

Mat

eria

ls a

nd

Wel

ding

(Par

t 2)

[UR

W7

and

W8]

A

ppro

ved

plan

s, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s, Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

cons

truct

ion

plan

(ste

elw

ork

subd

ivis

ion)

Cop

ies o

f ce

rtific

ates

of

forg

ings

and

ca

stin

gs

.3 V

erify

that

m

ater

ial

certi

ficat

es

are

incl

uded

in

the

ship

co

nstru

ctio

n fil

e

22 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 29: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

8.4

(con

t’d)

App

enda

nges

w

ith a

ppro

ved

draw

ings

, vis

ual

exam

inat

ion

of

wel

ding

and

m

ater

ial,

chec

k al

ignm

ent a

nd

defo

rmat

ions

Patro

l of t

he

proc

ess a

nd

witn

ess o

f the

co

mpl

eted

item

Sect

ions

2-1

-6

and

2-1-

5 of

th

e Ru

les f

or

Mat

eria

ls a

nd

Wel

ding

(Par

t 2)

[UR

W7

and

W8]

A

ppro

ved

plan

s, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s, Sh

ipbu

ilder

’s

and

reco

gniz

ed

stan

dard

s and

R

ules

as

appl

icab

le,

cons

truct

ion

plan

(ste

elw

ork

subd

ivis

ion)

Cop

ies o

f ce

rtific

ates

of

forg

ings

and

ca

stin

gs

.4 V

erify

that

co

rrect

wel

ding

an

d fit

up

requ

irem

ents

sp

ecifi

ed in

re

fere

nce

1,

2.4

and

2.5

of

this

tabl

e ha

ve b

een

adop

ted

.1 V

erify

that

co

rrect

wel

ding

an

d fit

up

requ

irem

ents

sp

ecifi

ed in

re

fere

nce

1,

2.4

and

2.5

of

this

tabl

e ha

ve b

een

adop

ted

8.

5 Eq

uipm

ent

Form

ing

the

Wat

ertig

ht a

nd

Wea

ther

tight

In

tegr

ity o

f the

Sh

ip (e

.g.,

over

boar

d di

scha

rges

, air

pipe

s, ve

ntila

tors

)

Tigh

tnes

s and

se

curin

g W

itnes

s

Reg

. II-

1/19

of

SOLA

S as

am

ende

d; R

eg.

17-1

8-19

-20-

22-

23 o

f ILL

C '6

6

App

rove

d ta

nk

test

ing

plan

, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s

Det

ails

requ

ired

.2 V

erify

co

mpl

ianc

e w

ith L

oad

Line

C

onve

ntio

n 19

66 a

s am

ende

d (i.

e.,

all f

ittin

gs in

ac

cord

ance

w

ith th

e rec

ord

of fr

eebo

ard

assi

gnm

ent)

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 23

Page 30: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

4-6-

4/9.

3.7

of

the

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

R P

3]

.3 V

erify

air

pipe

s, ve

nts

etc.

, clo

sing

de

vice

are

ap

prov

ed ty

pe

.4 V

erify

mate

rial

certi

ficat

es

for o

verb

oard

di

scha

rges

w

here

ap

plic

able

Equi

pmen

t Fo

rmin

g th

e W

ater

tight

and

W

eath

ertig

ht

Inte

grity

of t

he

Ship

(e.g

., ov

erbo

ard

disc

harg

es, a

ir pi

pes,

vent

ilato

rs)

(con

t’d)

Tigh

tnes

s and

se

curin

g W

itnes

s

Reg

. II-

1/19

of

SOLA

S as

am

ende

d; R

eg.

17-1

8-19

-20-

22-

23 o

f ILL

C '6

6

App

rove

d ta

nk

test

ing

plan

, sh

ipbu

ilder

’s

insp

ectio

n re

cord

s

Det

ails

requ

ired

.5 V

erify

reco

rd

of fr

eebo

ard

assi

gnm

ent

and

all m

ater

ial

certi

ficat

es

incl

uded

in

the

ship

co

nstru

ctio

n fil

e

.6 V

erify

fr

eebo

ard

mar

ks in

ac

cord

ance

w

ith lo

ad li

ne

assi

gnm

ent

8.5

(con

t’d)

Free

boar

d M

arks

an

d D

raft

Mar

ks

With

in

allo

wab

le

tole

ranc

es a

nd in

ac

cord

ance

with

th

e fr

eebo

ard

assi

gnm

ent

Witn

ess

App

endi

x 1-

1-A

1 of

the

Rule

s for

Bu

ildin

g an

d C

lass

ing

Stee

l Ve

ssel

s [U

I-LL

4]

Reg

. 4- 5

- 6- 7

an

d 8

of IL

LC

'66

D

etai

ls re

quire

d

.7 V

erify

dra

ft m

arks

in

acco

rdan

ce

with

the a

gree

d to

lera

nces

sp

ecifi

ed b

y th

e bu

ilder

un

less

mor

e on

erou

s fla

g st

ate

requ

irem

ents

24 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

Page 31: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

TAB

LE 1

(con

tinue

d)

Refe

renc

e Sh

ipbu

ildin

g Fu

nctio

n Su

rvey

Re

quir

emen

ts

for

Cla

ssifi

catio

n

Surv

ey M

etho

d Re

quir

ed fo

r C

lass

ifica

tion

ABS

Rule

s/Gui

de(1

) [I

ACS

Refe

renc

e(2, 3

) ]

Stat

utor

y Re

quir

emen

ts

and

Rele

vant

Re

fere

nce

Doc

umen

tatio

n Av

aila

ble

to

Cla

ssifi

catio

n Su

rvey

or d

urin

g C

onst

ruct

ion

Doc

umen

tatio

n fo

r Shi

p C

onst

ruct

ion

File

Spec

ific

Activ

ities

Bu

reau

Pr

opos

als f

or

the

Proj

ect

.8 V

erify

pr

inci

pal

dim

ensi

ons i

n ac

cord

ance

w

ith

reco

gniz

ed

stan

dard

Pr

inci

pal

Dim

ensi

ons

With

in

allo

wab

le

tole

ranc

es

Rev

iew

and

w

itnes

s Pu

b #

87:

G

uide

for

Ship

build

ing

and

Repa

ir

Qua

lity

Stan

dard

for

Hul

l Str

uctu

res

Dur

ing

Con

stru

ctio

n [R

ecom

men

d-at

ion

47]

Det

ails

requ

ired

.9 V

erify

di

men

sion

s in

clud

ed in

sh

ip

cons

truct

ion

file

8.5

(con

t’d)

Safe

ty

Con

stru

ctio

n C

ertif

icat

ion

No

outs

tand

ing

impe

rfec

tions

or

defe

cts

Witn

ess

R

eg. 1

0 of

SO

LAS

as

amen

ded

.10

Ver

ify th

at

Adm

inist

ratio

n re

quire

men

ts

have

bee

n in

corp

orat

ed

into

the

hull

stru

ctur

e

Ship

build

er's

nam

e

K

ick-

off M

eetin

g D

ate

Pr

ojec

t

R

epre

sent

ing

Bui

lder

Proj

ect D

urat

ion

Rep

rese

ntin

g C

lass

Soc

iety

N

otes

: 1

AB

S re

fere

nced

doc

umen

ts a

re a

vaila

ble

from

the

Rul

es a

nd G

uide

s Dow

nloa

ds p

age

of w

ww

.eag

le.o

rg.

2 IA

CS

refe

renc

ed d

ocum

ents

are

ava

ilabl

e fr

om w

ww

.iacs

.org

.uk.

3 IA

CS

Rec

omm

enda

tions

are

not

man

dato

ry re

quire

men

ts.

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 25

Page 32: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

This Page Intentionally Left Blank

Page 33: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 27

A P P E N D I X 1 Shipyard Review Record

Name of Shipyard Date

1 Details of Any Management Systems

Obtained Approval Certified By Expiry Date Remarks (Scope, etc.) _____ ISO-9001 _____ ISO-9002 _____ ISO 14000 _____ ISO 18000 _____ Other:

2 Construction Facilities

(Documents such as a brochure of shipyard can be attached in lieu of completing this section.)

2.1 Building Berth (B) or Dock (D)

B / D Name Length (m)

Width (m)

Depth* (m)

Building Capacity (G/T)

Crane (Ton × No.)

* Note: In case of berth, “Depth” is not applicable.

Page 34: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

Appendix 1 Shipyard Review Record

28 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

2.2 Outfitting Quays

Name Length (m)

Width (m)

Depth (m)

Berthing Capacity (G/T)

Crane (Ton × No.)

2.3 Main Fabrication and Erection Facilities (1) Marking and cutting of steel plates (including internal members)

- Marking method ( Manual, Photo × _____, EPM × _____, NC × _____ Others _______________ ) - NC cutting machine ( Gas × _____, Plasma × _____, Laser × _____ )

Control procedure of NC ( On-line, Other ) - Cutting equipment ( Edge planer × _____, Roll-shear × _____ )

(2) Marking and cutting of section bar - Marking method ( Manual, NC ) - Marking of reference curved line ( Manual, NC ) - Cutting method ( Manual, NC ) - In case of NC ( Gas × _____, Plasma × _____ )

(3) One-side automatic welding machine ( Yes, No ) - Type of welding machine ( Flux Backing × _____, Flux and Copper Backing × _____, Other _______________ ) - Existence of special surface plate for plate welding ( Yes, No )

(4) Fillet welding machine ( Gravity, Automatic ) Percentage of automatization, except gravity: about _____ %

- Line welder ( No, Yes: submerged arc × _____ heads, CO2 × _____ heads ) - Small automatic fillet welding machine ( No, Yes: Name: _______________ × _____ ) - Welding robot ( No, Yes: Portal × _____, Rectangular × _____, Articulated × _____ )

(5) Painting equipment

- Plate shot blasting/primer coating machine ( No, Yes: Max. Width _____ m, Length _____ m ) - Section bar shot blasting/primer coating machine ( No, Yes: Max. Length _____ m ) - Special coating factory ( No, Yes: _____ m × _____ m × _____ sections )

(6) Vertical automatic welding machine ( No, Yes: EG × _____, SEG × _____, ES × _____ )

EG: Electrogas SEG: Simplified Electrogas ES: Electroslag (7) Other main fabrication facilities

Page 35: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

Appendix 1 Shipyard Review Record

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 29

3 Shipyard Control of Qualified Welders

(1) Normal steel

Certification Traceability Supervision Maintenance of Qualification

Shipyard workers Confirm system in place

Subcontracted workers Confirm system in place

4 Feature of Construction Procedure

(1) Subcontract of hull blocks (weight) - Sub members ( No, Yes: Ratio of subcontracted works _____ %, No. of subcontractors _____ ) - Blocks ( No, Yes: Ratio of subcontracted works _____ %, No. of subcontractors _____ )

(2) Method of plate block assembly

- Method fitting and welding longitudinals and transverse webs on jointed panels - Method welding longitudinals on jointed panels prior to fitting and welding transverse webs - Method fitting and welding a frame consists of longitudinals and transverse webs on jointed panels - Method jointing panels with pre-assembled longitudinals by welding prior to fitting and welding transverse webs

(3) Pre-erection outfitting carried out grand block/mega block adopted

Method of erection at building berth/dock: _____________________ - Max. weight of loading block: __________ ton - Construction method in building dock/berth/land construction etc. ( 1 ship, 1.5 ships: Semi-tandem, dual entrance ) - Block loading process ( single starting block, multi starting blocks, inserting block: No, Yes )

(4) Final dock ( No, Yes: In-house, Other place of the same company, Use other company ) (5) Other feature of construction procedure

Page 36: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

Appendix 1 Shipyard Review Record

30 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

5 Quality Control System

(Refer to Quality Manual, if available.)

Item and Description Result Remarks (1) Existence of the organization chart including the departments of

design, purchasing, manufacturing and quality assurance - Are the function, responsibility and competence of the

organization clear?

(2) Quality control organization - Existence of quality control organization - Number of employees in this organization - Existence of procedures or plans related to tests and inspections

_____ persons including

the chief

(3) Pre-inspection system of shipyard - Is pre-inspection carried out prior to shipyard inspection? - Are pre-inspectors assigned? (Check the list.) - Number of pre-inspectors (related to hull only) - Are inspection results marked on the object and/or recorded in

the checklist?

_____ persons

(4) Records of inspections and tests - Are records made and kept properly? - Does the responsible person verify the records? - Can the adoption of necessary corrective actions against

non-conformity happened be checked?

(5) Condition at the time of the surveys in the presence of class Surveyors - Is the schedule of the surveys changed often? - Are pre-inspection, shipyard inspection and repairs completed

beforehand? - Are the sufficient preparations for surveys such as scaffoldings,

lighting, cleaning made?

Note: Above-mentioned (3) and (4) include the acceptance inspection of subcontracted items.

6 Measures for Safety and Health

Item and Description Result Remarks (1) Are conditions of scaffolding, nets, safety belt, lighting and

ventilation good?

(2) Is sufficient attention paid for radiographic examination and operation of cherry picker?

Note:

Page 37: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

Appendix 1 Shipyard Review Record

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 31

7 Control System of Nondestructive Examination (NDE)

Item and Description Result Remarks (1) Number of NDE supervisors in shipyard (including persons

responsible for judging results)

_____ persons

(2) Dependence on subcontracted NDE work - Number of shipyard employees - Number of subcontractors

about _____ (%) about _____ (%)

(3) NDE subcontractor company’s name and official technical qualifications

Name _______________ (approved by) ________ Name _______________ (approved by) ________

(4) Grade and number of NDE employees with official technical qualifications in shipyard - Specialized in radiography - Specialized in ultrasonic - Specialized in surface detection

____ Grade ____ persons ____ Grade ____ persons ____ Grade ____ persons

(5) If nondestructive examinations are subcontracted, the grade and number of officially qualified persons - Specialized in radiography - Specialized in ultrasonic -Specialized in surface detection

____ Grade ____ persons ____ Grade ____ persons ____ Grade ____ persons

(6) Nondestructive examination equipment (in-house) - Number of radiographic equipment - Number of ultrasonic equipment

____________ ____________

Note: Even if all works are subcontracted, it is recommendable to attach the qualified person(s) who can verify the works.

Page 38: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

Appendix 1 Shipyard Review Record

32 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

8 Quality Control on Production Line

8.1 Preventive Measures for Misuse of Materials Item and Description Result Remarks

(1) Job title of supervisor and person in charge of collating ordered steel and received steel, and checking of mill sheet

Title of supervisor: ____________________ Title of person in charge: ____________________

(2) Are means for checking the material grade in hand prescribed for high-grade steels?

(3) Are regulations prescribed for checking the material grade for high-tensile steel and steel for low-temperature applications? Are there regulations for inscribing “high-tensile steel” on the surface of the high tensile steel and special indication for steel for low temperature applications?

(4) Are there procedures for re-using of remaining cut-off mild steel?

(5) Are there procedures for re-using of remaining cut-off high-tensile steel?

(6) In the case of (4) and (5) above, can a collation be made with the mill sheet?

(7) Section of controlling the lists of remaining cut-off steel

Name of section: ____________________

Notes: - In the case of high-tensile steel, are there means for identifying different grades?

- In the case of (3) and (4) above, are the materials approved by other classes controlled similarly?

8.2 Shot Blasting/Primer Coating Item and Description Result Remarks

(1) Existence of surface preparation standards

(2) Existence of coating thickness control standards - Existence of thickness measurement records

Note: - The standard is to include the description related traceability after shot blasting and primer coating.

- Reference is to be made to IMO Performance Standard for Protective Coatings (PSPC) and its relevant ABS Guide for Classification Notations Coating Performance Standards (CPS)

Page 39: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

Appendix 1 Shipyard Review Record

ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 33

8.3 Marking and Cutting (Assembly Work) Item and Description Result Remarks

(1) Existence of standards for accuracy and periodical inspection of tape measures, tapes, stencils, etc.

(2) Existence of standards for accuracy of cut dimensions and edge preparation

(3) Existence of standards for finish of cutting face

(4) What is the frequency and extent of maintenance and inspection carried out for ensuring accuracy of NC cutter and/or flame planer?

(5) In the case of NC, are the disks, tapes, etc., maintained in good condition?

(6) What are the measures adopted and guidance given to make the worker fully conversant with cutting work standards for maintaining accuracy?

Notes: - In the case of (2) and (3) above, check items are to include confirmation of edge preparations free from piercing hole.

- NC for section bars is also to be in accordance with the above.

8.4 Bending and Strain Free Item and Description Result Remarks

(1) Existence of standards for maximum heating temperatures during water cooling and at the time of bending and distortion removal of steel by quick heating and cooling

(2) Existence of regulations for plate thickness and bending radius for flange processing

(3) What are the measures adopted and guidance given to make the worker fully conversant with maintaining quality and accuracy during the bending process?

Note:

8.5 Control of Welding Procedure Item and Description Result Remarks

(1) Are all welding procedures applied to the vessels approved by the Bureau or other IACS members?

Note:

Page 40: HULL SURVEY FOR NEW CONSTRUCTION -  · PDF fileabsguide for hull survey for new construction . 2007 v guide for hull survey for new construction contents 1 scope

Appendix 1 Shipyard Review Record

34 ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007

8.6 Treatment of Serious Non-conformities Item and Description Result Remarks

(1) Are repair plans submitted to the Bureau when serious non-conformities happened?

(2) Were the NDE (RT/UT) plans submitted at appropriate timing?

(3) Was the extent of tests extended considering the results of the test?

Note:

8.7 Hydrostatic and Watertight Tests Item and Description Result Remarks

(1) Is the test plan submitted to the Bureau?

(2) Are vacuum tests applied to?

(3) Are local air injection tests during sub-assembly works applied to?

(4) If (2) or (3) above is applied to, are the test procedures approved by the Bureau?

Note: