hurricane sandy

13
1 Hurricane Sandy Response from Critical Infrastructure June 6, 2013

Upload: peyton

Post on 12-Feb-2016

19 views

Category:

Documents


0 download

DESCRIPTION

Hurricane Sandy. Response from Critical Infrastructure June 6, 2013. Timeline of Events. Friday 10/26 discussions begin regarding Mutual Aid Saturday 10/27 PG&E begins work plan assessment to identify ability to support mutual aid request - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Hurricane Sandy

1

Hurricane SandyResponse from Critical Infrastructure

June 6, 2013

Page 2: Hurricane Sandy

2

Timeline of Events• Friday 10/26 discussions begin regarding Mutual Aid • Saturday 10/27 PG&E begins work plan assessment to

identify ability to support mutual aid request• Sunday 10/28 PG&E confirms availability of 145 FTE’s and is

notified resources have been assigned to ConEd• All Employees notified

• Monday 10/29 travel arrangements made• Chartered 737 for employee travel• Arranged for low boys for transport of 60 pieces of equipment• Equipment begins to arrive at Davis Garage first am for mechanic

check and loading• Equipment begins to head east

• Tuesday 10/30 employees staged in Sacramento for pre-flight tailboard• Wheels up at 1800 from Mather Field

• Wednesday 10/31 arrive in Westchester 02:30 head to hotel• 1400 Tailboard with ConEd

Page 3: Hurricane Sandy

3Waves 1 and 2

Wave 1- Con Ed167 FTE’s60 pcs of equipmentCrews, Tmen, AssessorsSafety, Mechanics, ITCommand Team

Wave 2- LIPA102 FTE’s50 pcs of equipment

Page 4: Hurricane Sandy

4Logistics• Chartered 737 for personnel• Transportation Companies for low boys and drivers• Dedicated team focused on transportation• DOT/CUEA support

Challenges:Herding the cats2820 miles of what could go wrongLodgingFuelRental carsLow Bridges

Page 5: Hurricane Sandy

5Staging

• All equipment • Employees bussed • Minor material• Lodging Camp• LaundryChallenges:Homeland SecurityParking

Page 6: Hurricane Sandy

6

Communications• Initial debrief on work procedures gaps

• Daily Briefing with ConEd• 24 hour Op Periods and Written IAP• Twice Daily Briefings with home• Daily Supervisor Meetings• Daily morning tailboard with crews

Challenges:Managing MediaFluidity of work

Page 7: Hurricane Sandy

7The Work

Page 8: Hurricane Sandy

8

– 8

• Crews on a 16/8 Schedule• General work similar to home

Challenges:Limited climbing spaceDifferent systemTrafficWork delivery from host utilityDifferent safety processesSafety culture

Page 9: Hurricane Sandy

9Nor’ Easter…. Really?

Page 10: Hurricane Sandy

10

Best Practices• Leadership structure• IAP• Communication Plan with host utility• Check In/Out• Bussing employees to and from hotel• Ground transport of equipment• MCV • Utilization of POD for tools • DOT support

Page 11: Hurricane Sandy

11

Opportunities

• Travel all equipment• Don’t rely on Air transport• Send Command Team in advance• Develop IMT structure and rotation• Travel PIO and Logistics support• Better transparency of equipment travel status

Page 12: Hurricane Sandy

12

The Best Part

Page 13: Hurricane Sandy

13

Contact InfoAngie GibsonManager, Emergency Management and Public Safety707-272-3169