hw pg. 282 # 24, 26, 27, 30, 38, 44
DESCRIPTION
A fountain operating 24 hours a day can be set at three different speeds, low, medium, and high. Find the number of kL/h the fountain uses at each speed. HW pg. 282 # 24, 26, 27, 30, 38, 44. - PowerPoint PPT PresentationTRANSCRIPT
Holt Algebra 2
4-5 Matrix Inverses and Solving Systems
A fountain operating 24 hours a day can be set at three different speeds, low, medium, and high. Find the number of kL/h the fountain uses at each speed.
Time on low (h)
Time on med (h)
Time on high (h)
Kiloliters Used
Monday 15 7 2 199
Tuesday 16 4 4 208
Wednesday 12 8 4 236
Holt Algebra 2
4-5 Matrix Inverses and Solving Systems
HW pg. 282
# 24, 26, 27, 30, 38, 44