TECHNICAL REPORT HL-92-13 OLMSTED LOCK OUTLET, OHIO RIVER Hydraulic Model Investigation AD-A259 299 by 1 1Richard L. Stockstill Hydraulics Laboratory DEPARTMENT OF THE ARMY Waterways Experiment Station, Corps of Engineers 3909 Halls Ferry Road, Vicksburg, Mississippi 39180-6199 DTIC ELECT... DEC 24 1992A w C 3All) November 1992 Final Report Approved For Public Release; Distribution Is Unlimited C% 2 12 23 09• HYDRAULICS 23 0 99p, Prepared for US Army Engineer DAstOict, Louisville IIRATOR Louisville, Kentucky 40201-0059

Upload: others

Post on 26-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hydraulic Model Investigation AD-A259 299 by

TECHNICAL REPORT HL-92-13

OLMSTED LOCK OUTLET, OHIO RIVER

Hydraulic Model Investigation

AD-A259 299 by1 1Richard L. Stockstill

Hydraulics Laboratory

DEPARTMENT OF THE ARMYWaterways Experiment Station, Corps of Engineers

3909 Halls Ferry Road, Vicksburg, Mississippi 39180-6199

DTICELECT...DEC 24 1992A

w C

3All)

November 1992Final Report

Approved For Public Release; Distribution Is Unlimited C%

2 12 23 09• •HYDRAULICS 23 0 99p,

Prepared for US Army Engineer DAstOict, LouisvilleIIRATOR Louisville, Kentucky 40201-0059

Page 2: Hydraulic Model Investigation AD-A259 299 by

Destroy this report when no longer needed. Do not returnit to the originator.

The findings in this report are not to be construed as an officialDepartment of the Army position unless so designated

by other authorized documents.

The contents of this report are not to be used foradvertising, publication, or promotional purposes.Citation of trade names does not constitute anofficial endorsement or approval of the use of

such commercial products.

Page 3: Hydraulic Model Investigation AD-A259 299 by

Form ApprovedREPORT DOCUMENTATION PAGE 0MB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 1 hour per response. including the time for reviewing instructions, searching existing data sources.gathering and maintaining the data needed, and completing and reviewing the collection of information Send co nments r.arding this burden estimate or any other aspect of thiscollecn of informatiOn, including suggestions for reducing this burden. to Washington Headquarters Services. Directorate for information Operations and Reports. 1215 Jefferson

Davis Highway. Suite 1204. Arlington. VA 22202-4302. and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188). Washington. DC 20503.

1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVEREDNovember 1992 Final report

4. TITLE AND SUBTITLE S. FUNDING NUMBERS

Olmsted Lock Outlet, Ohio River; Hydraulic ModelInvestigation

6. AUTHOR(S)

Richard L. Stockstill

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATIONREPORT NUMBER

USAE Waterways Experiment Station, Hydraulics Technical ReportLaboratory, 3909 Halls Ferry Road, Vicksburg, MS HL-92-1339180-6199

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING/MONITORINGAGENCY REPORT NUMBER

USAE District, Louisville, PO Box 59,Louisville, KY 40201-0059

11. SUPPLEMENTARY NOTES

Available from National Technical Information Service, 5285 Port Royal Road,

Springfield, VA 22161.

12a. DISTRIBUTION / AVAILABILITY STATEMENT 12b. DISTRIBUTION CODE

Approved for public release; distribution is unlimited.

13. ABSTRACT (Maximum 200 words)

The navigation locks at the proposed Olmsted project, Ohio River, willconsist of two 110- by 1,200-ft locks having a design lift of 21 ft. The

locks' filling and emptying system consists of culverts from the land wall, theriver wall, and the middle wall emptying into a single outlet structure located

in the river. The Olmsted Lock design is unique in that the four culverts fromthe two locks all terminate in a common outlet structure. Tests were conductedon a 1:25-scale model of the proposed Olmsted Lock outlet structure that repro-

duced 1,150 ft of the Ohio River beginning 650 ft upstream of the outlet andapproximately 400 ft of the width of the river. This model was used to evalu-ate the performance of the outlet structure for the project. Observations of

flow patterns in the vicinity of the outlet structure during emptying opera-tions indicated that no adverse flow conditions resulted from the combining ofthe four culverts into one outlet structure.

(Continued)

t14.SUBJECT TERMS 15. NUMBER OF PAGES

Discharge (water) Ohio River 37Hydraulic models Olmsted l-ocks and Dam 16. PRICE CODELock etllwrfs Outlets

17. SECURITY CLASSIFICATION 18. SECURITY CLASSIFICATION 19. SECURITY CLASSIFICATION 20. LIMITATION OF ABSTRACTOF REPORT OF THIS PAGE OF ABSTRACT

UNCLASSIFIED UNCLASSIFIED INSN 7540-01-280-5500 Standard Form 298 (Rev 2-89)

PrtscribWd by ANSI Scd t39-18298-102

Page 4: Hydraulic Model Investigation AD-A259 299 by

13. ABSTRACT (Continued).

Stability tests were conducted with the type 1 design riprap plan, whichconsisted of stones having a D50 of 20 in. placed from sta 30+46 to sta 35+66and from the lock wall riverward 250 ft. With a river unit discharge of130 cfs/ft and a tailwater elevation of 279 and with both locks discharging10,500 cfs per lock for 5 hr (prototype), a few stones were displaced in anarea about 15 to 25 ft riverward from the outlet structure. The type 2 designriprap plan (stones having a50 of 24 in.) was found to be stable for theseflow conditions and is recommended for the prototype.

Page 5: Hydraulic Model Investigation AD-A259 299 by

PREFACE

The model investigation reported herein was authorized by the Head-

quarters, US Army Corps of Engineers, on 25 September 1991 at the request of

the US Army Engineer District, Louisville. The model tests were accomplished

during the period March 1992 to May 1992 by personnel of the Hydraulics

Laboratory (HL) of the US Army Engineer Waterways Experiment Station (WES)

under the general supervision of Messrs. F. A. Herrmann, Jr., Director, HL;

R. A. Sager, Assistant Director, HL; and G. A. Pickering, Chief, Hydraulic

Structures Division (HSD), HL. Tests were conducted bv Messrs. V. E. Stewart,

Sr., and R. L. Stockstill, Locks and Conduits Branch, HSD, under the supervi-

sion of Mr. J. F. George, Chief, Locks and Conduits Branch. This report was

prepared by Mr. Stockstill and edited by Mrs. M. C. Gay, Information

Technology Laboratory, WES.

The model components were constructed and assembled by Messrs. M. A.

Simmons, J. A. Lyons, and C. H. Hopkins, Engineering and Construction Services

Division (E&CSD), WES, under the supervision of Mr. S. J. Leist, Chief of the

Model Shop, E&CSD. Pipe work for the model was provided by Messrs. K. K.

Raner, J. E. Townsend, and M. E. Anderson, E&CSD, under the supervision of

J. Taylor, Chief of the Pipe Shop, E&CSD. General construction of the model

was completed by F. James, H. R. Brown, K. R. Chiplin, V. J. Durman, W. Kelly,

A. J. Lee, and E. C. Rhodman, under the supervision of C. Drayton, Model

Construction Section, E&CSD.

At the time of publication of this report, Director of WES was

Dr. Robert W. Whalin. Commander was COL Leonard C. Hassell, EN.

NTIS 1J•*&6 I

1I I __

Page 6: Hydraulic Model Investigation AD-A259 299 by

CONTENTS

Page

PREFACE ................................................................ 1......

CONVERSION FACTORS, NON-SI to SI (METRIC)UNITS OF MEASUREMENT ..................................................... 3

PART I: INTRODUCTION .................................................... 5

The Prototype ........................................................ 5Purpose and Scope of Model Investigation ............................ 6

PART II: THE MODEL ....................................................... 7

Description .......................................................... 7Appurtenances and Instrumentation ................................... 7Scale Relations ...................................................... 10

PART III: TESTS AND RESULTS ............................................... 11

Outlet Structure ..................................................... 11Type 1 Riprap .................................................... ... 11Type 2 Riprap ...................................................... 13

PART IV: SUMMARY AND RECOMMENDATIONS .................................... 14

PHOTOS 1-3

PLATES 1-17

Page 7: Hydraulic Model Investigation AD-A259 299 by

CONVERSION FACTORS, NON-SI TO SI (METRIC)UNITS OF MEASUREMENT

Non-SI units of measurement used in this report can be converted to SI

(metric) units as follows:

Multiply By To Obtain

cubic feet 0.02831685 cubic metres

feet 0.3048 metres

miles (US statute) 1.609347 kilometres

pounds (mass) 0.4535924 kilograms

3

Page 8: Hydraulic Model Investigation AD-A259 299 by

ILLINOIS INDIANA OI

~~Lock & Dom 52enu

KENENTUCKY

Figur 1. Vicnit an5octonmp

724

Page 9: Hydraulic Model Investigation AD-A259 299 by

OLMSTED LOCK OUTLET, OHIO RIVER

Hydraulic Model Investigation

PART I: INTRODUCTION

The Prototype

1. The US Congress authorized replacement of Locks and Dams 52 and 53

with a single structure located at the Olmsted Site under the Water Resources

Development Act of 1988 (Public Law 100-676).* The project will be located

at Ohio River Mile 964.4, 16.6 miles** upstream of the mouth of the Ohio

River at Cairo, IL (Figure 1). The tailwater of the Olmsted Locks and Dam

will not be controlled by a downstream navigation project, but will be

influenced by Mississippi River stages. The proposed locks will consist of

two 110- by 1,200-ft locks located on the Illinois side of the Ohio River.

The locks will have a normal design lift of 21 ft (upper pool at el 3 00t to

tailwater at el 279). The design of the locks' filling and emptying systems

was based on the system used for the 1,200-ft lock at Cannelton Locks and

Damtt due to the similarities in water levels and structure dimensions of the

locks. The culverts from the land wall, the river wall, and the middle wall

will empty into a single outlet structure located in the river (Plates 1 and

2). The culvert from the land wall and middle wall will pass beneath the lock

floor. The invert of the outlet structure is at el 235.

* US Army Engineer District, Louisville. 1989 (Mar). "Olmsted Locks and

Dams (Replacement of Locks and Dams 52 and 53)," General Design Memorandum,Design Memorandum No. 1, Main Report, Vol 1, Louisville, KY.

** A table of factors for converting non-SI units of measurement to SI(metric) units is found on page 3.

t All elevations (el) cited herein are in feet referred to the Ohio RiverDatum.

tt J. H. Ables and M. B. Boyd. 1966 (Feb). "Filling and Emptying System,

Cannelton Main Lock, Ohio River, and Generalized Tests of Sidewall PortSystems for 110- by 1200-ft Locks; Hydraulic Model Investigation,"Technical Report 2-713, US Army Engineer Waterways Experiment Station,Vicksburg, MS.

5

Page 10: Hydraulic Model Investigation AD-A259 299 by

Purpose and Scope of Model Investigation

2. The Olmsted Lock design is unique in that the four culverts from the

two locks all terminate in a common outlet structure. There was concern that

the combining of all four culverts could result in adverse flow conditions in

and near the outlet structure. The purpose of the model study was to document

flow patterns during emptying from the land lock, the river lock, and both

locks simultaneously, and make necessary structure modifications to the outlet

structure if required. After the study was under way, it was decided that the

stability of the proposed riprap plan should also be tested.

6

Page 11: Hydraulic Model Investigation AD-A259 299 by

PART II: THE MODEL

Descrigtion

3. The 1:25-scale lock outlet model reproduced the lock emptying system

downstream of the emptying valves, approximately 1,150 ft of the Ohio River

beginning 650 ft upstream of the outlet, and approximately 400 ft of the width

of the river (Figure 2). The river topography was molded in sand and cement

mortar to sheet metal templates and was given a brushed finish. The culverts

were constructed of transparent plastic, and the outlet bucket was constructed

of plastic-coated plywood.

Appurtenances and Instrumentation

4. Water was supplied to the model through a circulating system. The

riverflow was measured with a venturi meter installed in the inflow lines.

The four emptying culverts were connected to a headbox containing a fixed

skimming weir that maintained an essentially constant head on the emptying

valves during emptying operations. Discharge through the emptying system was

measured with a flowmeter installed in one of the four lines. Flow through

the emptying culverts was controlled by slide gates in the culverts. The

movement of the slide gates was controlled by servo-driven linear actuators

that were regulated by a microcomputer. The microcomputer was programmed for

varied output to reproduce the desired valve schedule. The slide gates were

calibrated by measuring the discharge to gate opening relation for the fixed

head provided by the weir. Calibration allowed the reproduction of the lock

emptying hydrograph. The hydrographs were computed using the Conversationally

Oriented Real-Time Programming System (CORPS), Program H5322.* An overall

lock emptying coefficient of 0.745 and a 4-min valve operation for the design

lift of 21 ft were used to compute the hydrographs. The hydrographs for

normal and single-valve operations are shown in Plate 3.

* Frank M. Neilson and Martin T. Hebler. 1988 (Apr). "H5322 - Revision ofH5320 WRT Inertia, Hydraulic Friction, Value and Expression," Conversation-ally Oriented Real-Time Programming System (CORPS). Available from US ArmyEngineer Waterways Experiment Station, ATTN: CEWES-IM-MI-C, 3909 HallsFerry Road, Vicksburg, MS 39180-6199.

7

Page 12: Hydraulic Model Investigation AD-A259 299 by

4-)

Q-)

JoCJl

A,41

Add)"SO.z

Page 13: Hydraulic Model Investigation AD-A259 299 by

#tr NOo AZ

ftw

Page 14: Hydraulic Model Investigation AD-A259 299 by

5. Dye and confetti were used to study subsurface and surface current

directions. Velocities were measured with a commercial current meter that was

mounted to permit measurement of flow from any direction and at any depth.

Water-surface elevations were measured with point gages, and various flow

conditions were recorded photographically.

Scale Relations

6. The accepted equations of hydraulic similitude, based on the

Froudian relations, were used to express mathematical relations between the

dimensions and hydraulic quantities of the model and prototype. General rela-

tions for the transfer of the model data to prototype equivalents, or vice

versa, are presented in the following tabulation. Because of the nature of

the phenomena involved, certain model data can be accepted quantitatively,

while other data are reliable only in a qualitative sense. Measurements in

the model of discharges, water-surface elevations, velocities, and resistance

to displacement of riprap material can be transferred quantitatively from

model to prototype using the following scale relations.

Scale RelationsCharacteristic Dimension* Model:Prototype

Length L - L 1:25r

Area A - L2 1:625r r

Velocity V - L1/ 2 1:5r r

Discharge Q - L5/ 2 1:3,125r r

Volume V - L3 1:15,625r r

Weight W - L3 1:15,625r r

Time T - LI/2 1:5r r

* Dimension are in terms of length.

10

Page 15: Hydraulic Model Investigation AD-A259 299 by

PART III: TESTS AND RESULTS

Outlet Structure

7. Velocities near the outlet structure were measured for steady-state

flow conditions at a maximum outlet discharge of 10,500 cfs per lock, or

21,000 cfs when both locks are emptying simultaneously (Plate 3) and a lower

pool el of 279. Three steady-state flow conditions were tested: land lock

emptying, river lock emptying, and both locks emptying simultaneously. The

magnitudes and directions were measured at 1, 6.3, and 14.8 ft above the chan-

nel invert (el 260). The velocities 1 ft above the invert were plotted

directly, whereas the velocities measured 6.3 and 14.8 ft above the invert

were taken to determine the magnitude and direction of the depth-averaged

velocities. Initially, all tests were conducted with a river unit discharge

of 57 cfs/ft. The direction and magnitude of velocities measured 1 ft above

the river invert and the depth-averaged velocities resulting from the land

lock emptying are shown in Plates 4 and 5, respectively. The velocities re-

sulting from the river lock emptying are shown in Plates 6 and 7. Plates 8

and 9 show the velocity magnitudes and directions measured for steady flow

from both locks emptying simultaneously.

8. Photos 1 and 2 are flow conditions near the outlet structure at the

peak discharge during the land lock emptying and river lock emptying, respec-

tively. The outlet structure has been sketched on the photos to orient the

observer. Photo 3 shows the flow conditions at the maximum discharge

(21,000 cfs) with both locks empty simultaneously. No adverse flow conditions

were observed during lock emptying operations.

Type I Riprap

9. At this point in the testing program, there was concern regarding

the riprap plan in the vicinity of the outlet structure. The molded cement

used to represent the river invert was replaced with scaled riprap in the

vicinity of the outlet structure (Figure 3). Tests were conducted to deter-

mine the stability of the type I riprap plan, which consisted of stones having

a D5 0 of 20 in. placed from sta 30+46 (125 ft upstream of the outlet struc-

ture) to sta 35+66 (250 ft downstream of the outlet structure) and from the

11

Page 16: Hydraulic Model Investigation AD-A259 299 by

'-S.-A.-

5'o,

t -"I p

Figure 3. The type 1 design riprap plan

I ock wall r ive rwa lrd 2'0 ft The gradat ion of th1e type, 1 riprap is shown in

P1, tta 10., The rordit ioha; of these sttabil ity tests consisted of a river unit

(Ii ;clh,-irge of 57 cfs/ft, tailwater el 279, and steady maximum outlet dischirge

I rom t h, r i ve r I ock, la nd lock, and/or bo tI locks for 5 p ro t ot ype hours The

test s revealed that the type I riprap plan was stable for each of these flow

c, -o l i t: ions.

10. Concurretnt tests were being conducted in the Itydraulics Laboratory,

US Army Engineer Watrerways Experiment Station. on a physical model of the

Olmsit;ed Dam iavigat ion p.s;s gate,-- Tests witt the Olmsted navi gat ion pas.

mode l det . rminned t ie nom;ot st-veWtr f low condxiitioon for riprap along the lock

wall" when the, f1irst 10 gates adjacent to the lock were open. The enttranr(e

conf iiuration of the lock outlet model was modified to reproduce the flow

conditions found in the Olmsted navigation pass model to be t~he most severe

for riprap stability along the lock wall. Velocities in the vicinity of the

* W. G. Davis. "Olmsted Navigation Pass Gate, Ohio River; Hydraulic ModelInvestigation" (in preparation), US Army Engineer Waterways ExperimentStation, Vicksburg, MS.

12

Page 17: Hydraulic Model Investigation AD-A259 299 by

outlet structure resulting from these flow conditions (river unit discharge of

130 cfs/ft concentrated along the lock wall and tailwater el of 279) were

measured. Velocities with the land lock emptying are shown in Plates 11 and

12, and with the river lock emptying in Plates 13 and 14. Steady flow veloci-

ties resulting from both locks emptying simultaneously are provided in

Plates 15 and 16.

11. The type I design riprap plan was tested with steady flow through

the outlet for 5 hr (prototype) for the three lock emptying conditions with a

river unit discharge of 130 cfs/ft concentrated along the lock wall and tail-

water el 279. After both locks had been discharging 10,500 cfs per lock for

5 hr (prototype), a few stones were displaced in an area about 15 to 25 ft

riverward from the outlet structure. When both locks were discharging

10,500 cfs per lock, a jet was present near the surface of the riverflow.

This high-velocity jet produced uplifting forces on the bed approximately

20 ft from the structure. This was an extreme test condition; however, it was

felt that these tests needed to be conducted to determine riprap stability.

Type 2 Riprap

12. The type I design riprap plan was replaced with the type 2 design

riprap plan, which consisted of stones having a D5 0 of 24 in. and a gradation

as shown in Plate 17. The type 2 design riprap plan covered the same area as

the type 1 riprap plan (from sta 30+46 to sta 35+66 and from the lock wall

riverward 250 ft). This protection plan was also tested for 5 hr (prototype)

with a discharge of 130 cfs/ft concentrated along the lock wall, a lower pool

el of 279, and steady maximum discharges exiting both locks. Test results

indicated that the type 2 design riprap plan was stable for these extreme flow

conditions.

13

Page 18: Hydraulic Model Investigation AD-A259 299 by

PART IV: SUMMARY AND RECOMMENDATIONS

13. The navigation locks at the proposed Olmsted project will consist

of two 110- by 1,200-ft locks having a design lift of 21 ft. The locks'

filling and emptying system consists of culverts from the land wall, the river

wall, and the middle wall emptying into a single outlet structure located in

the river. The Olmsted Lock design is unique in that the four culverts from

the two locks all terminate in a common outlet structure. Observation of flow

patterns in the vicinity of the outlet structure during emptying operations

indicated that no adverse flow conditions resulted from the combining of the

four culverts into one outlet structure.

14. Stability tests were conducted with the type 1 design riprap plan,

which consisted of stones having a D50 of 20 in. placed from sta 30+46 to

sta 35+66 and from the lock wall riverward 250 ft. This plan was tested for

the three lock emptying conditions (steady flow through the land lock, the

river lock, and both locks simultaneously) with a river unit discharge of

130 cfs/ft and a lower pool el of 279. With both locks discharging 10,500 cfs

per lock for 5 hr (prototype), a few stones were displaced in an area about 15

to 25 ft riverward from the outlet structure. With this condition, the flow

from the outlet produced a jet near the surface of the riverflow. This high-

velocity jet produced uplifting forces on the bed approximately 20 ft from the

structure.

15. The type 2 design riprap plan (stones having a D50 of 24 in.) was

found to be stable for the flow conditions described in paragraph 14. These

stones were heavier than the uplifting forces created by the surface jet

issuing from the outlet structure.

16. The outlet structure could perhaps be modified such that the

lighter stone (D 50 = 20 in.) would provide adequate scour protection. How-

ever, the original design outlet structure performed satisfactorily during

lock emptying operations. Therefore, the original design lock outlet struc-

ture (Plates 1 and 2) and the type 2 design riprap plan are recommended for

the prototype.

14

Page 19: Hydraulic Model Investigation AD-A259 299 by

0 Al

A I4

~1 ?A

a.-- J AA

jQ0

Page 20: Hydraulic Model Investigation AD-A259 299 by

CL

C14

CL

D0-

15

Page 21: Hydraulic Model Investigation AD-A259 299 by

41a

41

154

ý4

cz

0

Ln

41

Page 22: Hydraulic Model Investigation AD-A259 299 by

2.7V O 1H - 2V ON 3H2.VOIHOHIO RIVER I2.V ON 1HI 2.7VON1H

EL 235

OUTLET CULVERTS/ I I I I I

---------------------- T

9-I II ~Ii- co •VERTICAL L I Iui Iq I r

, TRANSITIONf) + + I1I I 1

SI I I

140.08' RIVER LOCK CHAMBER 1 I ,0I I II

4 VERTICAL I I i+ TRANSITION I I

19', CULVERT _'-'--

14' -- -8 CULVE * j

< 0 VERTICAL iW .o TRANSITION II

+ + IIt

140.08' >LAND LOCK CHAMBER I

I I

I

-- - -14' X -18' CULVERT _ -- /'

OD VERTICAL Of)

TRANSITION

ui+ + +-> , N> o p

Iq

PLAN

76.30' -. 20'$-_

E L 2 5 6 3 1 3 1 _ __ T_

32' R IEL 235

50' R OUTLET CULVERT DETAIL

VERTICAL TRANSITION DETAIL

SCALE OWTLET SYSTEM

50 0 100 FOR LOCKS

PLATE I

Page 23: Hydraulic Model Investigation AD-A259 299 by

OHIO RIVERFLOW

145.5'

I- 1,55EL 268

EL 235120' 8' 20'8 20' 18' 20' 1

I 1 I 1 I | I6I I . I 25'

I I 1 I I I I I/_ RIVER WALL FACE

A ~ J~ -~J I- -I' I 1 fl

PLAN

FROM RIVER WALL CULVERT EL 268

FROM MIDDL WALL /R.RIER LOCK CULVE L EL 253

I/,,,IR-- 1 I M-r[,,/ EL 235

FROM MIDDLE WALL (LAND LOCK) CULVERT EFROM LAND WALL CULVERT

ELEVATION A-A

SALE INEET OUTLET BUCKET

25 0 25 50

PLATE 2

Page 24: Hydraulic Model Investigation AD-A259 299 by

CL

zz00

F:D

a-4

z0F:

Liii0 2

0

z

C'11

0 0to toti cz

wi iwn 3d38HS(

PLT

Page 25: Hydraulic Model Investigation AD-A259 299 by

o E~z~

N-jw

-w

CO -

c6 16 LOA

PI)d

00

021

z

PLATE0

Page 26: Hydraulic Model Investigation AD-A259 299 by

So

~) 0

~ w i0 I

n 1

01 n

04 a0

0

n Ui 0!

wLw

0 H-

w

0z

PLATE5

Page 27: Hydraulic Model Investigation AD-A259 299 by

iiio ELU~i ~z(0 L..

0 Iqto- 10 co O C

C! 0

z K)0 c0

O t6 06 >

LLLi00

Li~zo 0I ~0oZ

cr 0

2) 0

0 0 CLz

PLATE

Page 28: Hydraulic Model Investigation AD-A259 299 by

-JL

I o I

O IQ T C a) I

t0 CD (0 to (4 C4e~

L" L

to l

z in00

0'th 0 in ' S-

z

0

0

o b.

0

0

('I

0i I0

0z

PLATE

Page 29: Hydraulic Model Investigation AD-A259 299 by

My id

00 wO20

to d co5 r- :

zz

0 C4

N ~N

n 0 o toI zI

-0

00 w

01

z

PLT 8L

Page 30: Hydraulic Model Investigation AD-A259 299 by

I i

w rz

to

10

•o o

t')I

0 0

0ww

0

LLIE..

0

0 I

...

8

0

PLATE

Page 31: Hydraulic Model Investigation AD-A259 299 by

00

F-

IL

00

0~0

00

0Z

IN00

00

0o0

00 C10

1HO1M AeNIL~n IN3H0

PLATE 1

Page 32: Hydraulic Model Investigation AD-A259 299 by

rL ililIc 0

I(0

In LO

I t *E-

2 ifj

0 8n

I C!N

0

z

PLTE1

Page 33: Hydraulic Model Investigation AD-A259 299 by

I 0o

I 000

* z00

N'~ r-~ M; 0 ) 0a

*~ I-

T wi00

C,)

0

z

PLATE 12

Page 34: Hydraulic Model Investigation AD-A259 299 by

'wl.io _j

0 w ~ .

LO r'

Ch0D(

a6 (d

F- z0)00I0

010

z

0

U )

3: 0

PLATE1

Page 35: Hydraulic Model Investigation AD-A259 299 by

00

N-

0 coC4 L

I 0I 0

0 E

01L&z

PLAT 1L

Page 36: Hydraulic Model Investigation AD-A259 299 by

C14'C~4

60 ~ 1 0

f\ ) Go rfoi (0Oi ~

u~ N~ -w0

~ V (N

\* 0

a.

0

00

-J

0z

PLATE 15

Page 37: Hydraulic Model Investigation AD-A259 299 by

00

0 (N

06Z 6 6- 6

I 00

z 00N

OD > *I I-

wWao'1

000

Lii

0

crz

PLAT 16

Page 38: Hydraulic Model Investigation AD-A259 299 by

00

0

o~ V.

I--

00

I-r

0

0~

o 0 00o CD C4

1Hu. A 3Hfl133

PLTE1

Page 39: Hydraulic Model Investigation AD-A259 299 by

Waterways Experiment Station Cataloging-in-Publication Data

Stockstill, Richard L.Olmsted Lock outlet, Ohio River: hydraulic model investigation / by

Richard L. Stockstill ; prepared for US Army Engineer District, Louisville.37 p. : ill. ; 28 cm. - (Technical report ; HL-92-13)Includes bibliographical references.1. Culverts - Hydrodynamics - Models. 2. Locks (Hydraulic engi-

neering) - Ohio River. 3. Hydraulic models. I. United States. Army.Corps of Engineers. Louisville District. I1. U.S. Army Engineer Water-ways Experiment Station. III. Title. IV. Series: Technical report (U.S.Army Engineer Waterways Experiment Station) ; HL-92-13.TA7 W34 no.HL-92-13