HYDRO POWER PLANT BORCKA Facts Project Description The Borcka Dam and the hydro-electric power plant is located on the Coruh River, in the Lower Coruh Basin. The works included underground works (galleries and tunnels), cut off wall, drilling as well as grouting. The dam consists of an earth embankment dam with an impervious clay core on the right bank of the river and concrete structures on the left bank area, integrating the spillway and intake structure to the powerhouse. The plant has two power blocks and a transfer block. There are two vertical shaft Francis type turbines installed with the capacity of 150 MW each, having a total capacity of 300 MW. PROJECT DATA: Earth dam with impervious core Dam height 86 m Dam crest length 728 m Tunnels & galleries 6,075 m Cut off wall 11,500 m² Drilling and grouting 63,500 m Reservoir total storage capacity 419 Mio m³ Annual energy generation 1,039 GWh Installed capacity 300 MW Total volume of excavation 11,000,000 m³ Total volume of concrete 500,000 m³ Total volume of fill 8,000,000 m³ City/Country Borcka / Turkey Client Devlet Su Isleri, Ankara, Ankara Contract Value € 31,00 Mio. Construction Period 1/1999 - 1/2006 (84 months) .

Upload: others

Post on 18-Nov-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HYDRO POWER PLANT BORCKA - STRABAG

HYDRO POWER PLANT BORCKA

Facts Project Description

The Borcka Dam and the hydro-electric power plant is located on the Coruh River, in theLower Coruh Basin.

The works included underground works (galleries and tunnels), cut off wall, drilling as wellas grouting.

The dam consists of an earth embankment dam with an impervious clay core on the rightbank of the river and concrete structures on the left bank area, integrating the spillway andintake structure to the powerhouse. The plant has two power blocks and a transfer block.There are two vertical shaft Francis type turbines installed with the capacity of 150 MWeach, having a total capacity of 300 MW.

PROJECT DATA:Earth dam with impervious coreDam height 86 mDam crest length 728 mTunnels & galleries 6,075 mCut off wall 11,500 m²Drilling and grouting 63,500 mReservoir total storage capacity 419 Mio m³Annual energy generation 1,039 GWhInstalled capacity 300 MWTotal volume of excavation 11,000,000 m³Total volume of concrete 500,000 m³Total volume of fill 8,000,000 m³

City/Country

Borcka / Turkey

Client

Devlet Su Isleri, Ankara, Ankara

Contract Value

€ 31,00 Mio.

Construction Period

1/1999 - 1/2006 (84 months)

.