Page 1: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

11-Feb-15

Hydropower Development: Bhutan’s Experience

6/8/2016 1

Dissemination Workshop on the Study for Development of Potential Regional Hydro Power Plant in South Asia

Kathmandu, Nepal 9-10 May 2016

Page 2: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Presentation Outline

1. Energy Sector Structure

2. Sector Reforms

3. Hydropower Potential

4. Development Status

5. Opportunities & Challenges

6. Looking ahead

6/8/2016 2

Page 3: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Energy Sector Structure

BPC (Trans, Dist. & System Operator)

CHP, THP, KHP & Basochhu

UNDER CONSTRUCTION

DHPC

DHI

DGPC

Ministry of

Finance

Other Shareholders

BEA

(regulatory functions)

DRE Renewable

Energy

DHMS Hdyromet

services

DOT Fossil Fuels

DHPS

Ministry of Economic Affairs

JV Projects CPSUs THEL (SPV)

PHPA-I & II

MHPA

6/8/2016 3

Page 4: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

1. Electricity Act passed by the 79th Session of the NA on 26th July 2001

2. Unbundling of Power Sector in 2002

3. BPC – Responsible for Transmission & Distribution

4. DGPC (Established in Jan 2008) – O&M of all existing hydropower plants owned by RGoB and construction of HEPs

5. BEA- Responsible for Regulation, became fully autonomous in January 2010

6. DHPS – Nodal Agency for Hydropower Sector

7. DRE & DHMS – Nodal Agency for Renewable Energy & Hydro-met Services

Power Sector Reforms

6/8/2016 4

Page 5: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Hydropower – the key sector Key to achieving economic self-reliance. Prior to harnessing of hydropower, Bhutanese economy almost entirely dependent on foreign aid. Earnings from this sector ploughed back into the social & industrial sectors.

Affordability 1. Domestic tariff kept low to stimulate economic growth. 2. Rural electrification given high priority. 3. ~75% of generation exported.

Environmentally benign 1. All major rivers in Bhutan flow through deep valleys. 2. No settlements effected. 3. Run of the river projects. 4. Very rich forests, over 72% coverage; catchment well conserved.

6/8/2016 5

Page 6: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

The steep and rugged Himalayan mountains and fast running rivers promise huge hydropower potential 30,000 MW potential 23,760 MW (76 sites of >10 MW) techno-economically viable for

development

Hydropower Potential

6/8/2016 6

Page 7: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

1. Developed Hydrop ower Potential

Hydropower Plant Capacity (MW)

Tala HEP 1020

Chukha HEP 336

Basochhu HEP 64

Kurichhu HEP Dagachhu HEP

60 126

Micro/Mini (24 Nos) ~9

Total installed

Capacity: ~1615 MW

6/8/2016 7

Page 8: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Under Construction:

Projects planned for implementation: Bunakha (180 MW), Wangchhu (570 MW), Chamkhachhu-I (770 MW) under JV Sankosh (2560 MW), Amochhu (540 MW) and KuriGongri( 2640 MW) under IG 9 Projects under PFR/DPR – IPP/PPP mode

Plant Installed Capacity (MW)

Commissioning Date

Generation (MU) Mode of Implementation

Punatsangchhu-I 1200 2018 5700 Bilateral

Punatsangchhu-II 1020 2017 4000 Bilateral

Mangdechhu 720 2017 2900 Bilateral

Kholongchhu 600 2020 2599 JV

Nikachhu 118 2019 492 PPP

Total 3,658 15,691

6/8/2016 8

Page 9: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Modalities of Implementation were agreed - 6 projects under IG mode & 4 projects under JV mode.

- 3 IG projects under construction (Puna-I, Puna-II & Mangdechhu)

- Implementation of 1 JV project has initiated (Kholongchhu)

-1 DPR yet to be carried out

JV Mode:

As per SHDP (concession terms, reversion of plant, royalty energy & JVC to be registered under Companies Act 2000 of Bhutan)

Agreed to implement 4 JV projects with 70% debt and 30% equity with each JV partner holding equal equity shareholdings.

The 70% debt will be raised by the JV Company where the GoI PSUs will take the lead role.

10,000 MW Hydropower Development by 2020 Inter-Governmental Projects Joint- Venture Projects

Project Name: Puna-I Puna-II Mangde chhu

Sankosh Amochhu Kuri- Gongri

Chamkhar chhu-I

Bunakha Wang chhu

Kholong chhu

TOTAL

Installed Capacity (MW)

1,200 1,020 720 2,560 540 2,640 770 180 570 600 10,800

90% dependable year generation

(MU)

5670.78 4357.36 2923.70 6267.00 1835.00 13855.00 3252.92 1669.27 2526.38 2592.83 45,000.00

6/8/2016 9

Page 10: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

1. Electricity sales (domestic and export) contributes to over 45% of the total internal revenues to the government, and ~20% GDP

2. >75% of electricity was exported to India in 2014

3. Access to Electricity

Urban 100%

Rural 99%

Industrial consumption 100%

6/8/2016 10

Page 11: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Opportunities

1. Renewable, Clean form of Energy

2. Reduction in GHG emission

3. Export /Market demand in India and South Asia (peaking energy)

4. ~ 30,000 MW Potential

5. Benign environment (political, social & physical/techno- economic)

6. Business development opportunities (Energy Companies, Construction Industries, Equipment, Support services, etc.)

6/8/2016 11

Page 12: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Challenges 1. Socio-Economic: Resources constraints (capital intensive, skills & technology !)

Risks (long gestation, weather, geology, seismology)

Market (pricing, competition)

Transport cost (land locked !)

2. Environment

Constitutional Environment Mandate (60 %) forest cover versus growing population/development needed

Fragile mountain eco-system and extremely vulnerable to adverse impact to climate change;

Lacks capacity to respond to adverse impacts of

climate change;

6/8/2016 12

Page 13: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Increasing threats from 25 glacier lakes (potentially dangerous with possibility of GLOF)

Loss of biodiversity; Loss of agricultural land;

3. Political and HR Capacity

New political system; Limited people trained with required expertise Planning for sustainable hydropower development

Challenges Contd…

6/8/2016 13

Page 14: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

1.Power supply shortage expected during the winter months of 2016-17 mainly due to:

- Accelerated Hydropower Development of 10,000MW

- Accelerated RE

- Growth of Industries

2.Current Power Supply - from 5 Generating Stations of DGPC and small/mini/micro hydro projects of BPC – ~1615 MW

3. Peak Demand – ~336 MW in 2015

Energy Security - Domestic Power Demand and Supply

6/8/2016 14

Page 15: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

7000

6000

5000

4000

3000

2000

1000

0

8000 19

86

198

7

198

8

198

9

199

0

199

1

199

2

199

3

199

4

199

5

199

6

199

7

199

8

199

9

200

0

200

1

200

2

200

3

200

4

200

5

200

6

200

7

200

8

200

9

2010

2011

2012

2013

En

erg

y (M

U)

->

Year -wise total Energy Generation, Export and Sales

Generated (MU) Exported (MU) Sold to BPCL (MU)

6/8/2016 15

Page 16: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

Looking Ahead

1. Update Power System Master Plan (2003-2022), preparation of Integrated Water Resource Management Plan (IWRMP ) and (Social Impact Assessment) SIAs

2. 9 projects under PFS/DPR stage

3. Continue harnessing Hydro to achieve economic self reliance

6/8/2016 16

Page 17: Hydropower Development: Bhutan’s...Hydropower Development: Bhutan’s Experience 6/8/2016 1 Dissemination Workshop on the Study for Development of Potential Regional Hydro Power

TASHI DELEK !

6/8/2016 17