i-30/i-35w interchange reconstruction

9
1 I-30/I-35W Interchange Reconstruction Downtown Ft. Worth

Upload: xander-whitaker

Post on 01-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

I-30/I-35W Interchange Reconstruction. Downtown Ft. Worth. Project. Existing elevated freeway over Lancaster Avenue Project Reconstruction Capacity and safety improvements. Initial Plan. Initial plan – west leg Widened elevated structure Community reaction Opposition Lawsuit - PowerPoint PPT Presentation

TRANSCRIPT

1

I-30/I-35W Interchange Reconstruction

Downtown Ft. Worth

2

Project• Existing elevated freeway over Lancaster Avenue

• Project– Reconstruction– Capacity and safety improvements

3

Initial Plan• Initial plan – west leg

– Widened elevated structure

• Community reaction

– Opposition

– Lawsuit

– Leadership interest to find better solution

4

CSS Approach – Stakeholder Objectives• Objectives/concerns

– Replace aging structure

– Increase interchange capacity

– Increase safety

• Merges, weaves

• Design speed

• Sight distances

– Improve aesthetics

• Freeway

• Barrier

– Historic preservation

– Permit T&P building revitalization

– Redevelopment

5

ApproachInitial alternatives

• Existing alignment

– Elevated

– At-grade

– Depressed

• New alignments

Visualization of preferred alternative (SDH&PT, FHWA, 1991)

6

Relocated I-30 West Leg

7

Improved Ramps

8

Lancaster Avenue

Before and after photos of the US Post Office façade on Lancaster Boulevard. Source, left: http://www.durangotexas.com/eyesontexas/fortworth/downtown.htm; Source, right: Texas Transportation Institute

New lofts development (next to refurbished old T&P Railroad Complex). Source: Texas Transportation