I-35W Bridge

Collapse

Nancy Daubenberger

Presentation to AASHTO SCOBS

T-1

Page 2: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

I-35W Bridge

University

of

Minnesota

Downtown

Minneapolis

http://maps.google.com/

Page 3: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

History • Bridge background

– Bridge completed 1967

– 1907 feet long

• 3 span continuous truss

– Main span 456 feet

– ADT 141,000

– Sufficiency rating – 50.0

– Annually inspected

• In depth fracture critical

– 500 hours annual average by MnDOT maintenance

– Scheduled replacement 2020-2025

I-35W Bridge - Looking North July,

1967

Page 4: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rating

• Inspected annually since 1993; before that, was inspected every two

years

• Superstructure rated “structurally deficient” in 1990

• This was due to:

– Corrosion where the paint had deteriorated

– Poor weld details in the steel truss members and floor beams

– Bearings that were not moving as they were designed to move

– Existing fatigue crack repairs to the approach span beams

Page 5: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge
Page 6: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge
Page 7: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

August 1, 2007

The Collapse

Collapse occurs at 6:05 pm

Wednesday, August 1, 2007

Over 100 vehicles on the

bridge at the time

13 fatalities, 140 injuries

Page 8: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge
Page 9: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge
Page 10: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge
Page 11: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Maintenance Work at Time of Collapse • Replace concrete overlay,

repair joints and lighting, and install guardrail

• Work completed on outside

two lanes each direction

• Scheduled completion date

- September 30, 2007

• Cost - $9 million

• Contractor employees and MnDOT inspectors on bridge at collapse

Page 12: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

The Response

The First 24 Hours

Page 13: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

MnDOT’s Immediate Response

• 6:05 p.m. - Numerous concurrent calls to State Patrol Dispatch (911) and from field employees to RTMC and Maintenance Dispatch

• 6:10 p.m. - District Emergency Operations Center activated and DEOC staff report to RTMC

• Immediate traffic control for ramp and freeway closures provided by FIRST units, maintenance units, and contractors in the vicinity

Mn/DOT’s Regional Transportation

Management Center (RTMC)

Page 14: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Statewide Incident Response

• 6:20 p.m. – State Emergency Operations Center and Joint Information Center activated.

• Unified command center set up on

collapse site. Authority in command

changed as incident progressed:

– Mpls. Fire Department in charge of rescue

– Hennepin County Sheriff in charge of recovery

(MnDOT assisted with some demolition)

– MnDOT assumed command after recovery was

completed

Page 15: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Emergency Service Response • MnDOT Metro district provides maintenance staff and equipment

•MnDOT structural engineers called to site

• Effective response due to communications, planning, equipment, training, and experience with incidents on the Metro area freeway system

Page 16: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Traffic Response • 6:20 p.m. - began converting temporary traffic control measures to

more long term traffic control standards.

• 20 changeable message signs activated

• MnDOT assisted state patrol and other enforcement personnel

• Instituted 24-hour staffed traffic control

• By 7 p.m. – Over 150 employees activated

• 11:00 p.m. - Detour maps for a.m. rush posted on MnDOT Web site

• Overnight – closed I-35W with temporary barricades and converted Hwy 280 to a freeway.

Page 17: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

I-35W Detour Map

Page 18: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Public and Media Response

• 6:10 to 8 p.m. continuous MnDOT

traffic radio coverage

• Detour maps and info provided on Web

and 511 Traveler Information

• Media briefings, interviews

• Coordinated responses with other

agencies/governor’s office

http://www.511mn.org

http://www.dot.state.mn.us/i35wbridge/index.html

Page 19: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Security Response

• MnDOT safety officers

statewide called in

• Homeland Security & FBI

investigate criminal or terrorism

potential

• OSHA ensures safety

• Navy divers assist recovery

• U.S. Secret Service for

president visit

• No-fly zone activated

Page 20: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Internal Agency Response

• Employees knew what to do, when to go, who to report to

• Aug. 2 – Lt. Gov. e-mail to employees

• Aug. 2 – State employee assistance available

• Aug. 6 – Lt. Gov./Deputy thank employees

• Aug. 8 – Tips to employees on handling threats

• Critical incident stress debriefings provided

Page 21: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

The Response

Local and National

Page 22: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

• Aug. 2 - Governor Tim

Pawlenty declares a state

of emergency and

activates State

Emergency Operations

Center

Governor’s Response

Page 23: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

U.S. DOT Response

• Aug. 2 – U.S. DOT Secretary tours site and announces

$5 million grant to help pay for early expenses

Page 24: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Executive Branch Response

• Aug. 3 - First Lady Laura

Bush visits the site, victims

families

• Aug. 4 - President Bush

pledges to cut red tape that

could delay recovery

• Aug. 21 - President declares

emergency under Robert T.

Stafford Act authorizing

funds for safety and recovery

efforts

President Bush participates in a

briefing with Minneapolis Mayor R.T.

Rybak and Gov. Tim Pawlenty

Page 25: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Congressional Response

• Congress authorizes $250 million in Emergency

Relief money to repair and restore highway facilities

to pre-disaster conditions

Page 26: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

MnDOT Continued Response

• Investigation

• Inspections

• Traffic Recovery

• Bridge Demolition

• Bridge Replacement

• Media/Public

Responses

Page 27: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Continued Response

Investigation

Page 28: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

The Search for a Cause

• Message - cause

may not be known

for 12-14 months

Page 29: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

The Search for a Cause • National Transportation

Safety Board leads

investigation

• Forensic engineering firm

assisting investigation

• Consultant to review

inspection procedures

Page 30: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Construction Materials Staging

Construction equipment and

vehicles

Piles of aggregate

U10 west node

Page 31: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Dead Load of Original 1967 Bridge

Compression

diagonal Tension

diagonal

Orange and red

shading:

exceeds yield stress Stress

Yield

stress

0

Allowable

Page 32: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

After 1977 and 1998 Modifications Orange and red

shading:

exceeds yield stress

Compression

diagonal

Tension

diagonal

Stress

Yield

stress

0

Allowable

Page 33: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Loads at Time of Accident

Compression

diagonal Tension

diagonal

Orange and red

shading:

exceeds yield stress

Stress

Yield

stress

0

Allowable

Page 34: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Accident Loads on 1-Inch-Thick Gusset

Plates

Compression

diagonal

Tension

diagonal

Stress

Yield

stress

0

Allowable

Page 35: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Continued Response

Inspection

Page 36: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

• Aug. 2 - Governor directs MnDOT to inspect all bridges on the trunk highway system in priority order

• Aug. 6 – MnDOT completes inspection of five bridges with the same arch deck truss design as I-35W bridge

• Inspection continues of state bridges, structurally deficient and fracture critical bridges priority

• Aug. 10 – MnDOT requests that local agencies and private owners accelerate inspections of their bridges

• Dec. 1 - MnDOT’s goal to complete all state bridges inspections

Inspection

Page 37: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Continued Response

Traffic Recovery

Page 38: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Traffic Restoration

• Work to convert Hwy 280 to a freeway including closing at-

grade signalized intersections to cross traffic, upgrading

ramp termini signal systems and lengthening frontage road

• Add lane each direction on I-94 from Hwy 280 to I-35W by

overlaying and restriping shoulders

• Many temporary projects on other Metro alternate routes

Page 39: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge
Page 40: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Traffic Distribution After Collapse

Page 41: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Transit

• Metro Transit assigned 25 extra

buses, ridership jumps 25-50%

• Advised public to “buy bus

passes, stagger work hours,

carpool”

• Began studying additional

service enhancements

Park-and-Ride use jumps after

I-35W bridge collapse

Page 42: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Continued Response

Bridge Demolition

Page 43: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Demolition and Removal • Aug. 6 – demolition begins to aid

recovery, Carl Bolander & Sons

Co., awarded demolition contract

• Aug. 20 – recovery completed,

site turned over to Mn/DOT

• Sept. 6 - Navigation channel

opened to commercial traffic

Page 44: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Continued Response

Media/Web info

Page 45: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Media and Public Response

• Media interest worldwide

• Media briefings, interviews

• MnDOT directed to be

transparent in info provided

• AG’s office required retention

of all incident-related data

• 50+ data practices requests

• Dedicated I-35W Web site

includes all documents

Page 46: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rebuild

Legislative/Congressional Hearings

• Aug 15 – Hearings with Minnesota House and

Senate Transportation Committee

• Sept 5 – MnDOT staff testified before the U.S.

House of Representatives Committee on

Transportation and Infrastructure

Page 47: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Continued Response

Bridge Rebuild

Page 48: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rebuild

• 189’ wide

• 10 lanes of traffic, five in each direction

• Designed to handle Bus Rapid Transit (BRT) and/or a

managed lane (like I-394 MnPASS)

• Designed to be LRT ready

Page 49: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rebuild – Design Build • Aug. 4 – Design Build teams pre-qualified

• Aug. 14 – public involvement process begins

• Aug. 21 – layout submitted to Minneapolis

• Aug. 23 - RFP delivered to five design-build teams

• Aug. 23 – all but 3 environmental permits acquired

• Sept. 19 – project bid letting

• Nov. 15 - construction begins

• Sept. 2008 – bridge completed

Page 50: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rebuild - Review Process

• Minneapolis Municipal Consent hearing Sept. 20

• Technical Review Committee reviewed proposed

design

• Visual Quality Advisory Committee met with Design-

Build teams

Page 51: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rebuild-Stakeholder Involvement

• Six open houses

• Community group Meetings

• Presentations/listening sessions

• Meetings with local, state, federal officials

• E-mail alerts/ notifications

• Web site, online comment form

• Handouts at park-and-ride lots

Page 52: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rebuild-Environmental Review

• Environmental reviews accelerated due to

cooperation among agencies

• Includes a thorough analysis of the full range of

potential environmental issues for all aspects of the

project

• Met NEPA requirements

Page 53: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Bridge Rebuild

Legislative/Congressional Hearings

• Aug. 15 – Hearings with Minnesota House and

Senate Transportation Committee

• Sept. 5 – MnDOT staff testified before the U.S.

House of Representatives Committee on

Transportation & Infrastructure

Page 54: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

• Economic factors create urgency to rebuild quickly

• Daily costs to motorists of additional travel time and

distance estimated at $400,000

• Reduction in state’s average net economic output is

an additional $113,000 per day

Bridge Rebuild - Economic Impacts

Page 55: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Conclusions

What Went Right?

Lessons Learned?

Page 56: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

What Was Done Right • Employees willing to work, just showed up, returned from vacations

• Excellent employee response due to experience and training

• Good coordination with other Governor’s office/other agencies

• Good work relationship between MnDOT and contractor employees

• Other agencies/states called and emailed offering help

• Material suppliers speeded up delivery

• Permits, other documents approved quickly

• No MnDOT employees injured during response and traffic recovery

Page 57: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

What Worked Right

• In-place incident management infrastructure

• Redundancy in RTMC camera/communications

systems meant no network breakdowns

• Improved emergency radio communications

• MnDOT Web site reduced number of requests

Page 58: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Issues with Investigation

• Media, communications between national/local

agencies

• Sharing field office

• Who had jurisdiction

• Turning over portions of bridge to MnDOT

Page 59: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

Lessons Learned • Consultant onboard to facilitate table top incident review exercise

• Cell phone service was overloaded

• Confusion about DEOC and CO roles and responsibilities

• Improved system for media inquires and data practices requests

• Confusion regarding what investigation results are public information

• Use caution posting detailed contact info

• MnDOT employees can work out of the box, be flexible, work in strange locations and do what needs to get done!

Page 60: I-35W Bridge Collapse - sp.bridges.transportation.orgsp.bridges.transportation.org/Documents/2014 SCOBS... · Emergency Service Response ... arch deck truss design as I-35W bridge

QUESTIONS?