I-69 Team 3

Upload: preston-gilmore

Post on 16-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I-69 Team 3. Introduction History of project Proposed Route Challenges

I-69Team 3

Page 2: I-69 Team 3. Introduction History of project Proposed Route Challenges

Introduction• History of project• Proposed Route• Challenges

Page 3: I-69 Team 3. Introduction History of project Proposed Route Challenges

Introduction• Role of Team 3• Scope of 498 design

• Pavement & Drainage for 2 mile section• One bridge over water• One Underpass Design [MSE walls]

• Segment• Jacko really wants to see some fancy zooming in animations here. I’m

thinking we start in outer space.

Page 4: I-69 Team 3. Introduction History of project Proposed Route Challenges

Outline• Order of items to be discussed• Alignment• Pavement Materials• Drainage Considerations• Structure Design• Environmental Impact• Cost Analysis

Page 5: I-69 Team 3. Introduction History of project Proposed Route Challenges

Alignment• Proposed PB alignment.• Start/End points• Why this alignment is the best[?] alternative

• Right of Way requirements• Relocation requirements• Wetlands Avoidance• Other things

Page 6: I-69 Team 3. Introduction History of project Proposed Route Challenges

Pavement Design: Introduction

• Concrete vs. Asphalt• Geotechnical Considerations• Design Controls• Materials Quantity Estimates• Estimated Costs for Materials, Construction

Page 7: I-69 Team 3. Introduction History of project Proposed Route Challenges

Pavement Design: Design Controls

• Design Life• Roadway Characteristics• Design Load• ESALs, AADT

• Where does this information come from?

Page 8: I-69 Team 3. Introduction History of project Proposed Route Challenges

Pavement Design: Geotechnical Considerations

• Soil Boring Data Description• Soil Types Present• Pictures?

• Capacity of soils• How did we find this info

• Impact on design• Materials, Cost, Construction

Page 9: I-69 Team 3. Introduction History of project Proposed Route Challenges

Pavement Design: Material Selection

• HMA vs. PCC• Or WMA…• Cost Analysis

• Initial Cost• Rehab Cost

• Where did our # come from• What this means• Impact/Importance of cost

• How much money is available• Cost vs safety

Page 10: I-69 Team 3. Introduction History of project Proposed Route Challenges

Pavement Design: Material Quantities

• Dimensions of paved area• Lanes, shoulders

• Thickness of subbase, base, surface• Waste

Page 11: I-69 Team 3. Introduction History of project Proposed Route Challenges

Pavement Design: Cost

• Materials Costs• Construction Costs• Permits• Labor• Earthwork• Machinery• Quality Control

Page 12: I-69 Team 3. Introduction History of project Proposed Route Challenges

Drainage• Pavement drainage design• Median Drainage Design• Culvert Design• Design Criteria• Considerations• Estimated Quantities• Estimated cost for Materials, Construction

Page 13: I-69 Team 3. Introduction History of project Proposed Route Challenges

Structure• Over Water:• Design Load• Material to be Used

• Alternatives?• Estimated Materials Quantities• Estimated Cost of Materials, Construction

Page 14: I-69 Team 3. Introduction History of project Proposed Route Challenges

Structure• Underpass (MSE Walls)• Why MSE walls?• Design Criteria• Material Quantities• Cost Estimates

• Materials, Construction

Page 15: I-69 Team 3. Introduction History of project Proposed Route Challenges

Environmental Impacts• Materials used in construction• Hazardous? Sustainable?

• Disturbance due to construction• Hazardous Wastes• Existing Communities/Residents

• Disturbance due to operation• Indiana Bat• Indiana Snakes• Other wildlife• Floodplains• Wetlands• Noise Pollution• Air Pollution• Changes in waterway flow/path

Page 16: I-69 Team 3. Introduction History of project Proposed Route Challenges

Cost Analysis• Total cost estimates• Construction Costs• Materials Costs• Comparison of alternative Materials